BVY-96-129, Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.       ..          _.          . - - .    . . .    .        _ _ . _ -.        . - - . .  ._    _          _ . _ . .        __ _      _
{{#Wiki_filter:.
VERMONT YANKEE NUCLEAR POWER CORPORATION
VERMONT YANKEE i
      *    '              Ferry Road, Brattleboro, VT 05301-7002
NUCLEAR POWER CORPORATION Ferry Road, Brattleboro, VT 05301-7002
(                                                                                                           HEPL.Y TO ENGINEERING OFFICE
(
,      ,                                                                                                  580 MAIN STREET BOLTON, MA 01740
HEPL.Y TO ENGINEERING OFFICE 580 MAIN STREET
(                  ,
(
l                                                                                                            (508)779-6711 i
BOLTON, MA 01740 l
October 21,1996 BVY 96 - 129 United States Nuclear Regulatory Commission                                                                                               1 ATTN: Document Control Desk Washington, DC 20555
(508)779-6711 i
October 21,1996 BVY 96 - 129 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==References:==
==References:==
(a) License No. DPR-28 (Docket No. 50-271)                                                                                   l 1
(a) License No. DPR-28 (Docket No. 50-271) l


==Subject:==
==Subject:==
Vermont Yankee Cycle 19 Core Operating Limits Report                                                                       l l
Vermont Yankee Cycle 19 Core Operating Limits Report l
In accordance with Section 6,7.A.4 of the Vermont Yankee Technical Specifications, enclosed is the Core Operating Limits Report (COLR) for Vermont Yankee Cycle 19, dated October 1996. This report presents the cycle-specific operating limits for the operation of Cycle 19 of the Vermont Yankee Nuclear Power Station.
l In accordance with Section 6,7.A.4 of the Vermont Yankee Technical Specifications, enclosed is the Core Operating Limits Report (COLR) for Vermont Yankee Cycle 19, dated October 1996. This report presents the cycle-specific operating limits for the operation of Cycle 19 of the Vermont Yankee Nuclear Power Station.
Also enclosed for your convenience is a copy of the Core Performance Analysis Report (CPAR) for Vermont Yankee Cycle 19, YAEC 1935, dated October 1996. This repost presents design information, calculational results, and operating limits pertinent to the operation of Cycle 19 of the Vermont Yankee Nuclear Power Station.
Also enclosed for your convenience is a copy of the Core Performance Analysis Report (CPAR) for Vermont Yankee Cycle 19, YAEC 1935, dated October 1996. This repost presents design information, calculational results, and operating limits pertinent to the operation of Cycle 19 of the Vermont Yankee Nuclear Power Station.
Should you have any questions regarding the enclosed material, please contact this office.
Should you have any questions regarding the enclosed material, please contact this office.
Sincerely,                                                                       _m .
Sincerely,
_m.
VERMONT YANKEE NUCLEAR POWER CORPORATION fftbd ames J. Duffy Licensing Engineer
VERMONT YANKEE NUCLEAR POWER CORPORATION fftbd ames J. Duffy Licensing Engineer
                                                                                                                                          /
/
Enclosure
Enclosure
                                                                                                                                        /
/
c: USNRC RegionI Administrator USNRC ResidentInspector- VYNPS                                                                                             /
c: USNRC RegionI Administrator
USNRC Project Manager- VYNPS 9610200090 961021                                                                                        /
/
                                                                                                                                  ,! ',(l l '
USNRC ResidentInspector-VYNPS USNRC Project Manager-VYNPS
PDR     ADOCK 05000271 P                         PDR l
!,(l l 9610200090 961021
l I}}
/
PDR ADOCK 05000271 P
PDR l
I}}

Latest revision as of 11:34, 12 December 2024

Forwards COLR for Vermont Yankee Cycle 19 Which Presents cycle-specific Operating Limits for Operation of Cycle IAW Section 6.7.A.4
ML20129E539
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/21/1996
From: Duffy J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20129E542 List:
References
BVY-96-129, NUDOCS 9610280090
Download: ML20129E539 (1)


Text

.

VERMONT YANKEE i

NUCLEAR POWER CORPORATION Ferry Road, Brattleboro, VT 05301-7002

(

HEPL.Y TO ENGINEERING OFFICE 580 MAIN STREET

(

BOLTON, MA 01740 l

(508)779-6711 i

October 21,1996 BVY 96 - 129 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

References:

(a) License No. DPR-28 (Docket No. 50-271) l

Subject:

Vermont Yankee Cycle 19 Core Operating Limits Report l

l In accordance with Section 6,7.A.4 of the Vermont Yankee Technical Specifications, enclosed is the Core Operating Limits Report (COLR) for Vermont Yankee Cycle 19, dated October 1996. This report presents the cycle-specific operating limits for the operation of Cycle 19 of the Vermont Yankee Nuclear Power Station.

Also enclosed for your convenience is a copy of the Core Performance Analysis Report (CPAR) for Vermont Yankee Cycle 19, YAEC 1935, dated October 1996. This repost presents design information, calculational results, and operating limits pertinent to the operation of Cycle 19 of the Vermont Yankee Nuclear Power Station.

Should you have any questions regarding the enclosed material, please contact this office.

Sincerely,

_m.

VERMONT YANKEE NUCLEAR POWER CORPORATION fftbd ames J. Duffy Licensing Engineer

/

Enclosure

/

c: USNRC RegionI Administrator

/

USNRC ResidentInspector-VYNPS USNRC Project Manager-VYNPS

!,(l l 9610200090 961021

/

PDR ADOCK 05000271 P

PDR l

I