ST-HL-AE-1593, Forwards Rev 13 to QA Program Description, for Design & Const Phase of Facility.Rev Reflects Organizational Change & Incorporates Changes to Organizational Charts: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:The Light                                                                                           '
{{#Wiki_filter:The Light comPuy ii""''"" i.ixi>>i"x & "" << it o. iim' ivo" i i""._''".,"_. i cm'..""i < 7 i:n 22 -"2i i x
x comPuy ii""''"" i.ixi>>i"x & "" << it o. iim' ivo" i i""._''".,"_. i cm' . .""i < 7 i:n 22 -"2i i January 22, 1986 ST-HL-AE-1593 File No.: G9.11/Q39.
January 22, 1986 ST-HL-AE-1593 File No.: G9.11/Q39.
Mr. Robert D. Martin                                                 I   Q @ p;lp'Q//[f 3 I
Mr. Robert D. Martin I
Regional Administrator, Region IV
Q @ p;lp'Q//[f 3 I
                                                                                      '~
Regional Administrator, Region IV d
d M;
'~
q  ,
q M;
Nuclear Regulatory Commission                                         i                   } g 611 Ryan Plaza, Dr., Suite 1000 l     ,JAN 2 7 688 Arlington, TX 76012
Nuclear Regulatory Commission i
[                    !
611 Ryan Plaza, Dr., Suite 1000 l
South Texas Project                                     -
,JAN 2 7 688 g
Units I & II Docket Nos. STN 50-498, STN 50-499 Quality Assurance Program for the Design and Construction Phase of the South Texas Project
}
[
Arlington, TX 76012 South Texas Project Units I & II Docket Nos. STN 50-498, STN 50-499 Quality Assurance Program for the Design and Construction Phase of the South Texas Project


==Dear Mr. Martin:==
==Dear Mr. Martin:==
Enclosed is Revision 13 of the Quality Assurance Program Description (QAPD) for the design and construction phase of the South Texas Project (STP). This revision is being submitted in accordance with the requirements of 10CFR50.55(f)(3).
Enclosed is Revision 13 of the Quality Assurance Program Description (QAPD) for the design and construction phase of the South Texas Project (STP). This revision is being submitted in accordance with the requirements of 10CFR50.55(f)(3).
Included in this submittal are complete replacements for Part A, Houston Lighting and Power Company (HL&P) QAPD, Part B, Bechtel Energy Corporation QAPD and Part C, Ebasco QAPD.
Included in this submittal are complete replacements for Part A, Houston Lighting and Power Company (HL&P) QAPD, Part B, Bechtel Energy Corporation QAPD and Part C, Ebasco QAPD.
Line 36: Line 37:
Part B revisions incorporate changes to organizational charts and reflect the current QA Program. Details are provided in Attachment B.
Part B revisions incorporate changes to organizational charts and reflect the current QA Program. Details are provided in Attachment B.
Part C of Revision 13 contains no changes from the previous revision.
Part C of Revision 13 contains no changes from the previous revision.
These changes to Parts A and B do not reduce commitments made in pre-vious revisions to the QAPD. The revised QAPD continues to satisfy criteria to 10CFR50, Appendix C. The changes described in Revision 13 to the QAPD are being implemented immediately.
These changes to Parts A and B do not reduce commitments made in pre-vious revisions to the QAPD.
O 0602030171ADOCKOgy49                                    I g}                   PDR                       PDR i
The revised QAPD continues to satisfy criteria to 10CFR50, Appendix C.
                                                                                    .V MG-86-QS-70                                                                       ,
The changes described in Revision 13 to the QAPD are being implemented immediately.
L                                                                                                  J
0602030171ADOCKOgy49 O
I g}
PDR PDR i
.V MG-86-QS-70 L
J


IIouston Lighting & Power Company ST-HL-AE-1593 File No.: G9.11/Q39.
IIouston Lighting & Power Company ST-HL-AE-1593 File No.: G9.11/Q39.
Line 45: Line 50:
If you have any questions, please contact Mr. Michael E. Powell at 713/993-1328.
If you have any questions, please contact Mr. Michael E. Powell at 713/993-1328.
Sincerely,
Sincerely,
                                                          ' Y.
' Y.
J. H. Goldberg Group Vice President, Nuclear cY sc     vsa JHG/TJJ/CLH/ SAM:mg MG-86-QS-70
J. H. Goldberg Group Vice President, Nuclear cY sc vsa JHG/TJJ/CLH/ SAM:mg MG-86-QS-70
                                                                                      /
/


Houston Lighting & Power Company ST-HL-AE-1593 File No.: G9.ll/Q39.
Houston Lighting & Power Company ST-HL-AE-1593 File No.: G9.ll/Q39.
Page 3 cc:
Page 3 cc:
Hugh L. Thompson, Jr., Director     Brian E. Berwick, Esquire Division of PWR Licensing - A       Assistant Attorney General for Office of Nuclear Reactor Regulation   the State of Texas U.S. Nuclear Regulatory Commission   P.O. Box 12548, Capitol Station Washington, DC 20555                 Austin, TX 78711 N. Prasad Kadambi, Project Manager   Lanny A. Sinkin U.S. Nuclear Regulatory Commission   Christic Institute                                   '
Hugh L. Thompson, Jr., Director Brian E. Berwick, Esquire Division of PWR Licensing - A Assistant Attorney General for Office of Nuclear Reactor Regulation the State of Texas U.S. Nuclear Regulatory Commission P.O. Box 12548, Capitol Station Washington, DC 20555 Austin, TX 78711 N. Prasad Kadambi, Project Manager Lanny A. Sinkin U.S. Nuclear Regulatory Commission Christic Institute 7920 Norfolk Avenue 1324 North Capitol Street Bethesda, MD 20814 Washington, DC 20002 Claude E. Johnson Oreste R. Pirfo, Esquire Senior Resident Inspector /STP Hearing Attorney c/o U.S. Nuclear Regulatory Office of the Executive Legal Director Commission U.S. Nuclear Regulatory Commission P.O. Box 910 Washington, DC 20555 Bay City, TX 77414 Charles Bechhoefer, Esquire M.D. Schwarz, Jr., Esquire Chairman, Atomic Safety &
7920 Norfolk Avenue                 1324 North Capitol Street Bethesda, MD 20814                   Washington, DC 20002 Claude E. Johnson                   Oreste R. Pirfo, Esquire Senior Resident Inspector /STP       Hearing Attorney c/o U.S. Nuclear Regulatory         Office of the Executive Legal Director Commission                         U.S. Nuclear Regulatory Commission P.O. Box 910                         Washington, DC 20555 Bay City, TX 77414 Charles Bechhoefer, Esquire M.D. Schwarz, Jr., Esquire           Chairman, Atomic Safety &
Baker & Botts Licensing Board One Shell Plaza U.S. Nuclear Regulatory Commission Houston, TX 77002 Washington, DC 20555 J.R. Newman, Esquire Dr. James C. Lamb, III Newman & Holtzinger, P.C.
Baker & Botts                           Licensing Board One Shell Plaza                     U.S. Nuclear Regulatory Commission Houston, TX 77002                   Washington, DC 20555 J.R. Newman, Esquire                 Dr. James C. Lamb, III Newman & Holtzinger, P.C.           313 Woodhaven Road 1615 L Street, N.W.                 Chapel Hill, NC 27514 Washingtnn, DC 20036 Judge Frederick J. Shon Director, Office of Inspection       Atomic Safety and Licensing Board and Enforcement                   U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission   Washington, DC 20555 Washington, DC 20555 Mr. Ray Goldstein, Esquire T.V. Shockley/R.L. Range             1001 Vaughn Building Central Power & Light Company       807 Brazos P.O. Box 2121                       Austin, TX 78701 Corpus Christi, TX 78403 Citizens for Equitable Utilities, Inc.
313 Woodhaven Road 1615 L Street, N.W.
H.L. Peterson/G. Pokorny             c/o Ms. Peggy Buchorn City of Austin                       Route 1, Box 1684 P.O. Box 1088                       Brazoria, TX 77422 Austin, TX 78767 Docketing & Service Section J.B. Poston/A. vonRosenberg         Office of the Secretary City Public Service Board           U.S. Nuclear Regulatory Commission P.O. Box 1771                       Washington, DC 20555 San Antonio, TX 78296                 (3 Copies)
Chapel Hill, NC 27514 Washingtnn, DC 20036 Judge Frederick J. Shon Director, Office of Inspection Atomic Safety and Licensing Board and Enforcement U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Mr. Ray Goldstein, Esquire T.V. Shockley/R.L. Range 1001 Vaughn Building Central Power & Light Company 807 Brazos P.O. Box 2121 Austin, TX 78701 Corpus Christi, TX 78403 Citizens for Equitable Utilities, Inc.
Advisory Committee on Reactor Safeguards U.S. Nuclear Regulatory Commission 1717 H Street Washington, DC 20555 Revised 12/2/85
H.L. Peterson/G. Pokorny c/o Ms. Peggy Buchorn City of Austin Route 1, Box 1684 P.O. Box 1088 Brazoria, TX 77422 Austin, TX 78767 Docketing & Service Section J.B. Poston/A. vonRosenberg Office of the Secretary City Public Service Board U.S. Nuclear Regulatory Commission P.O. Box 1771 Washington, DC 20555 San Antonio, TX 78296 (3 Copies)
-                                                                            ____-_______-__J
Advisory Committee on Reactor Safeguards U.S. Nuclear Regulatory Commission 1717 H Street Washington, DC 20555 Revised 12/2/85 J


ST-HL-AE-1593 Attachment A Quality Assurance Program Description for the Design and Construction of the South Texas Project Revision 13 Principal Changes Part A, Houston Lighting & Power Company (HL&P QAPD)
ST-HL-AE-1593 Attachment A Quality Assurance Program Description for the Design and Construction of the South Texas Project Revision 13 Principal Changes Part A, Houston Lighting & Power Company (HL&P QAPD) 1.
: 1. Section 1, Paragraph 1.6.3 Replaced "in their respective discipline group" with the statement "in their respective sections."
Section 1, Paragraph 1.6.3 Replaced "in their respective discipline group" with the statement "in their respective sections."
l Due to reorganization, personnel are no longer divided by discipline but rather by sections based on their function within the QA Program.
l Due to reorganization, personnel are no longer divided by discipline but rather by sections based on their function within the QA Program.
The above change does NOT reduce HL&P's QA programmatic commitments.
The above change does NOT reduce HL&P's QA programmatic commitments.
MG-86-QS-70 J
MG-86-QS-70 J


ST-HL-AE-1593 Attachment B Quality Assurance Program Description for the Design and Construction of the South Texas Project Revision 13 Principal Changes Part B, Bechtel Energy Corporation (BEC QAPD)
ST-HL-AE-1593 Attachment B Quality Assurance Program Description for the Design and Construction of the South Texas Project Revision 13 Principal Changes Part B, Bechtel Energy Corporation (BEC QAPD) 1.
: 1. Section 1, paragraphs 1.4.2 (page 9), 1.4.3.8 (page 10); Section 2, paragraphs 2.2 (page 17) and 2.4 (page 19):
Section 1, paragraphs 1.4.2 (page 9), 1.4.3.8 (page 10); Section 2, paragraphs 2.2 (page 17) and 2.4 (page 19):
Revised text to reflect BPC withdrawal of QA Policy Manual.
Revised text to reflect BPC withdrawal of QA Policy Manual.
: 2. Section 1, paragraph 1.5.2 (page 14):
2.
Section 1, paragraph 1.5.2 (page 14):
Revised text to reflect Deputy PEMs.
Revised text to reflect Deputy PEMs.
Revised organization charts:
Revised organization charts:

Latest revision as of 16:45, 11 December 2024

Forwards Rev 13 to QA Program Description, for Design & Const Phase of Facility.Rev Reflects Organizational Change & Incorporates Changes to Organizational Charts
ML20140E055
Person / Time
Site: South Texas  
Issue date: 01/22/1986
From: Goldberg J
HOUSTON LIGHTING & POWER CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20140E058 List:
References
ST-HL-AE-1593, NUDOCS 8602030171
Download: ML20140E055 (5)


Text

The Light comPuy ii"""" i.ixi>>i"x & "" << it o. iim' ivo" i i""._".,"_. i cm'..""i < 7 i:n 22 -"2i i x

January 22, 1986 ST-HL-AE-1593 File No.: G9.11/Q39.

Mr. Robert D. Martin I

Q @ p;lp'Q//[f 3 I

Regional Administrator, Region IV d

'~

q M;

Nuclear Regulatory Commission i

611 Ryan Plaza, Dr., Suite 1000 l

,JAN 2 7 688 g

}

[

Arlington, TX 76012 South Texas Project Units I & II Docket Nos. STN 50-498, STN 50-499 Quality Assurance Program for the Design and Construction Phase of the South Texas Project

Dear Mr. Martin:

Enclosed is Revision 13 of the Quality Assurance Program Description (QAPD) for the design and construction phase of the South Texas Project (STP). This revision is being submitted in accordance with the requirements of 10CFR50.55(f)(3).

Included in this submittal are complete replacements for Part A, Houston Lighting and Power Company (HL&P) QAPD, Part B, Bechtel Energy Corporation QAPD and Part C, Ebasco QAPD.

Revision to Part A reflects an organizational change. This change is described in Attachment A.

Part B revisions incorporate changes to organizational charts and reflect the current QA Program. Details are provided in Attachment B.

Part C of Revision 13 contains no changes from the previous revision.

These changes to Parts A and B do not reduce commitments made in pre-vious revisions to the QAPD.

The revised QAPD continues to satisfy criteria to 10CFR50, Appendix C.

The changes described in Revision 13 to the QAPD are being implemented immediately.

0602030171ADOCKOgy49 O

I g}

PDR PDR i

.V MG-86-QS-70 L

J

IIouston Lighting & Power Company ST-HL-AE-1593 File No.: G9.11/Q39.

Page 2 Copies of Revision 13 to the QAPD are also being_ submitted to the NRC Resident Inspector at the South Texas Project site and to the NRC Document Control Desk as required by 10CFR50.55(f)(3)(1).

If you have any questions, please contact Mr. Michael E. Powell at 713/993-1328.

Sincerely,

' Y.

J. H. Goldberg Group Vice President, Nuclear cY sc vsa JHG/TJJ/CLH/ SAM:mg MG-86-QS-70

/

Houston Lighting & Power Company ST-HL-AE-1593 File No.: G9.ll/Q39.

Page 3 cc:

Hugh L. Thompson, Jr., Director Brian E. Berwick, Esquire Division of PWR Licensing - A Assistant Attorney General for Office of Nuclear Reactor Regulation the State of Texas U.S. Nuclear Regulatory Commission P.O. Box 12548, Capitol Station Washington, DC 20555 Austin, TX 78711 N. Prasad Kadambi, Project Manager Lanny A. Sinkin U.S. Nuclear Regulatory Commission Christic Institute 7920 Norfolk Avenue 1324 North Capitol Street Bethesda, MD 20814 Washington, DC 20002 Claude E. Johnson Oreste R. Pirfo, Esquire Senior Resident Inspector /STP Hearing Attorney c/o U.S. Nuclear Regulatory Office of the Executive Legal Director Commission U.S. Nuclear Regulatory Commission P.O. Box 910 Washington, DC 20555 Bay City, TX 77414 Charles Bechhoefer, Esquire M.D. Schwarz, Jr., Esquire Chairman, Atomic Safety &

Baker & Botts Licensing Board One Shell Plaza U.S. Nuclear Regulatory Commission Houston, TX 77002 Washington, DC 20555 J.R. Newman, Esquire Dr. James C. Lamb, III Newman & Holtzinger, P.C.

313 Woodhaven Road 1615 L Street, N.W.

Chapel Hill, NC 27514 Washingtnn, DC 20036 Judge Frederick J. Shon Director, Office of Inspection Atomic Safety and Licensing Board and Enforcement U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Mr. Ray Goldstein, Esquire T.V. Shockley/R.L. Range 1001 Vaughn Building Central Power & Light Company 807 Brazos P.O. Box 2121 Austin, TX 78701 Corpus Christi, TX 78403 Citizens for Equitable Utilities, Inc.

H.L. Peterson/G. Pokorny c/o Ms. Peggy Buchorn City of Austin Route 1, Box 1684 P.O. Box 1088 Brazoria, TX 77422 Austin, TX 78767 Docketing & Service Section J.B. Poston/A. vonRosenberg Office of the Secretary City Public Service Board U.S. Nuclear Regulatory Commission P.O. Box 1771 Washington, DC 20555 San Antonio, TX 78296 (3 Copies)

Advisory Committee on Reactor Safeguards U.S. Nuclear Regulatory Commission 1717 H Street Washington, DC 20555 Revised 12/2/85 J

ST-HL-AE-1593 Attachment A Quality Assurance Program Description for the Design and Construction of the South Texas Project Revision 13 Principal Changes Part A, Houston Lighting & Power Company (HL&P QAPD) 1.

Section 1, Paragraph 1.6.3 Replaced "in their respective discipline group" with the statement "in their respective sections."

l Due to reorganization, personnel are no longer divided by discipline but rather by sections based on their function within the QA Program.

The above change does NOT reduce HL&P's QA programmatic commitments.

MG-86-QS-70 J

ST-HL-AE-1593 Attachment B Quality Assurance Program Description for the Design and Construction of the South Texas Project Revision 13 Principal Changes Part B, Bechtel Energy Corporation (BEC QAPD) 1.

Section 1, paragraphs 1.4.2 (page 9), 1.4.3.8 (page 10); Section 2, paragraphs 2.2 (page 17) and 2.4 (page 19):

Revised text to reflect BPC withdrawal of QA Policy Manual.

2.

Section 1, paragraph 1.5.2 (page 14):

Revised text to reflect Deputy PEMs.

Revised organization charts:

Figure 3, Figure 4, Figure 6, and Figure 7 to current published charts.

The above changes do NOT reduce BEC's QA programmatic connitments.

1 MG-86-QS-70