ML21110A095: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:RR3 x;ny
{{#Wiki_filter:RR3
          )                                                                                         GEHitachi       Nuclear Energy MattJ. Feyrer Site Manager, Vallecitos Nuclear Center 6705Vallecitos Rd M210053                                                                                               Sunol, CA94586 USA April     19,2021                                                                                     T 9259186018 U.S.     Nuclear                                                                                     Matt.feyrer@ge.com Regulatory      Commission Attn:     Document Control Desk Washington,     D.C.20555-001
)
GEHitachi Nuclear Energy x;ny MattJ.
Feyrer Site
: Manager, Vallecitos Nuclear Center 6705Vallecitos Rd M210053
: Sunol, CA94586 USA April 19,2021 T9259186018 U.S.Nuclear Regulatory Commission Matt.feyrer@ge.com Attn:
Document Control Desk Washington, D.C.20555-001


==Subject:==
==Subject:==
GEHRequest to Extend Request                       for Additional  Information   (RAI)   Response       DueDate    to July   28,2021
GEHRequest to Extend Request forAdditional Information (RAI)
 
===Response===
DueDateto July 28,2021


==References:==
==References:==
1)NRCLicenseDPR-1, Docket 50-18 2)Letter       GEHVallecitos Nuclear Center       (VNC)   Request   for Alternate    Decommissioning Schedules   for DPR-1, DR-10, and    TR-1Licenses,     7/10/2015 3)Letter,     J.D. Parrot (NRC) to M.F. Feyrer,     GEHitachi   Request     for Alternate Decommissioning     Schedule for VBWR atVNC Request -
1)NRCLicense DPR-1, Docket 50-18 2)Letter GEHVallecitos Nuclear Center (VNC)
for Additional    Information, (EPID   L-2017-LLA-0052),   7/15/2020 4)Letter,     M.F. Feyrer Requestingto Extend       Requestfor    Additional    information     Due Date  toApril 28,2021, 8/14/2020 5)MSTEAMS          meeting  between   GEHand       NRC presenting     supplemental       information regarding thestatus   ofVBWRsamplingand analysis, 3/18/2021 6)Letter,     M.F. Feyrer Supplemental     Information for Request for      Additional    information Response   dueApril 28,2021,   3/22/2021 GEHitachi       Nuclear     Energy,   LLC(GEH)   isrequesting toextend     theresponse duedate          for theNRC's request     foradditional     information (RAI) related tothealternate     decommissioning       schedule for    theVBWR.
Request forAlternate Decommissioning Schedules for DPR-1, DR-10, andTR-1Licenses, 7/10/2015 3)Letter, J.D.Parrot (NRC) to M.F. Feyrer,GEHitachi Request forAlternate Decommissioning Schedule for VBWR atVNC
Theinitial     request for    analternate  decommissioning   schedule   wasmade7/10/2015 (Ref           2)andproposed a VBWRdecommissioning                date ofApril 2041tofacilitate   a single holistic decommissioning         oftheentire VNCsite.
- Request forAdditional Information, (EPID L-2017-LLA-0052),
inletter     (Ref3)dated       7/15/2020, theNRCrequested     GEHprovide     additional   information     related tothe structural     integrity ofthe    VBWRtoenable      anindependent     assessment   todetermine       ifthe requested exemption       to10CFR50.82(a)(3)         would present  anundue    risk topublic health   andsafetyunder @
7/15/2020 4)Letter, M.F.Feyrer Requestingto Extend RequestforAdditional information Due DatetoApril 28,2021,8/14/2020 5)MSTEAMSmeeting between GEHand NRC presenting supplemental information regarding thestatus ofVBWRsamplingand
50.12(a). Upon  reviewing      the n ine R Alsi n that letter,GEH    requested  (Ref     and
: analysis, 3/18/2021 6)Letter, M.F.Feyrer Supplemental Information for Request forAdditional information
: 4) wasauthorized until 4/28/2021     torespond       toallowtime  for extensive  concrete   structure   coresampling,   analysis,     and evaluation. GEHupdated         theNRConthe      status ofthat   effort andprovided   a detailed    plan  on3/18/2021 (Ref     4 & 5).Sampling       wascompleted   on4/8/2021   A response    duedate  of7/28/2021       isbeing   requested inthis     communication       toallow time  toanalyze andevaluate     the sample  results  andtocompose         afinal response     tothe  RAls.
 
If      youhaveanyquestions        regarding thismatter, please   contact meat(925)     918-6018.
===Response===
Sincerely,     , /
dueApril 28,2021,3/22/2021 GEHitachi Nuclear
g p4-         --  ~-
: Energy, LLC(GEH) isrequesting toextend theresponse duedatefortheNRC's request foradditional information (RAI) related tothealternate decommissioning schedule fortheVBWR.
              /M V
Theinitial request foranalternate decommissioning schedule wasmade7/10/2015 (Ref 2)andproposed aVBWRdecommissioning dateofApril 2041tofacilitate asingle holistic decommissioning oftheentire VNCsite.
inletter (Ref 3)dated 7/15/2020, theNRCrequested GEHprovide additional information related tothe structural integrity oftheVBWRtoenable anindependent assessment todetermine if the requested exemption to10CFR50.82(a)(3) wouldpresent anunduerisk topublic health andsafetyunder @
50.12(a).
Uponreviewing thenineRAlsinthat
: letter, GEHrequested (Ref 4)andwasauthorized until 4/28/2021 torespond toallow timeforextensive concrete structure coresampling,
: analysis, and evaluation.
GEHupdated theNRConthestatus ofthat effort andprovided adetailed planon3/18/2021 (Ref 4&5).
Sampling wascompleted on4/8/2021 Aresponse duedateof7/28/2021 isbeing requested inthis communication toallow timetoanalyze andevaluate thesampleresults andtocompose afinal response totheRAls.
Ifyouhaveanyquestions regarding this
: matter, please contact meat(925) 918-6018.
Sincerely,
, /
g p4-
~-
/M V
(/
(/
Matt      Feyrer,Site Manager Vallecitos     Nuclear     Center cc:NRCRegion           IVAdministrator S.Anderson,   NRCRIV J.D. Parrott,NMSS/DUWP/RDB MJF21-006}}
MattFeyrer, Site Manager Vallecitos Nuclear Center cc:NRCRegion IVAdministrator S.Anderson, NRCRIV J.D.Parrott, NMSS/DUWP/RDB MJF21-006}}

Latest revision as of 09:41, 29 November 2024

GE Hitachi Nuclear Energy - Requesting to Extend Request for Additional Information Response Due Date to July 28, 2021
ML21110A095
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 04/19/2021
From: Feyrer M
GE Hitachi Nuclear Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
M210053
Download: ML21110A095 (1)


Text

RR3

)

GEHitachi Nuclear Energy x;ny MattJ.

Feyrer Site

Manager, Vallecitos Nuclear Center 6705Vallecitos Rd M210053
Sunol, CA94586 USA April 19,2021 T9259186018 U.S.Nuclear Regulatory Commission Matt.feyrer@ge.com Attn:

Document Control Desk Washington, D.C.20555-001

Subject:

GEHRequest to Extend Request forAdditional Information (RAI)

Response

DueDateto July 28,2021

References:

1)NRCLicense DPR-1, Docket 50-18 2)Letter GEHVallecitos Nuclear Center (VNC)

Request forAlternate Decommissioning Schedules for DPR-1, DR-10, andTR-1Licenses, 7/10/2015 3)Letter, J.D.Parrot (NRC) to M.F. Feyrer,GEHitachi Request forAlternate Decommissioning Schedule for VBWR atVNC

- Request forAdditional Information, (EPID L-2017-LLA-0052),

7/15/2020 4)Letter, M.F.Feyrer Requestingto Extend RequestforAdditional information Due DatetoApril 28,2021,8/14/2020 5)MSTEAMSmeeting between GEHand NRC presenting supplemental information regarding thestatus ofVBWRsamplingand

analysis, 3/18/2021 6)Letter, M.F.Feyrer Supplemental Information for Request forAdditional information

Response

dueApril 28,2021,3/22/2021 GEHitachi Nuclear

Energy, LLC(GEH) isrequesting toextend theresponse duedatefortheNRC's request foradditional information (RAI) related tothealternate decommissioning schedule fortheVBWR.

Theinitial request foranalternate decommissioning schedule wasmade7/10/2015 (Ref 2)andproposed aVBWRdecommissioning dateofApril 2041tofacilitate asingle holistic decommissioning oftheentire VNCsite.

inletter (Ref 3)dated 7/15/2020, theNRCrequested GEHprovide additional information related tothe structural integrity oftheVBWRtoenable anindependent assessment todetermine if the requested exemption to10CFR50.82(a)(3) wouldpresent anunduerisk topublic health andsafetyunder @

50.12(a).

Uponreviewing thenineRAlsinthat

letter, GEHrequested (Ref 4)andwasauthorized until 4/28/2021 torespond toallow timeforextensive concrete structure coresampling,
analysis, and evaluation.

GEHupdated theNRConthestatus ofthat effort andprovided adetailed planon3/18/2021 (Ref 4&5).

Sampling wascompleted on4/8/2021 Aresponse duedateof7/28/2021 isbeing requested inthis communication toallow timetoanalyze andevaluate thesampleresults andtocompose afinal response totheRAls.

Ifyouhaveanyquestions regarding this

matter, please contact meat(925) 918-6018.

Sincerely,

, /

g p4-

~-

/M V

(/

MattFeyrer, Site Manager Vallecitos Nuclear Center cc:NRCRegion IVAdministrator S.Anderson, NRCRIV J.D.Parrott, NMSS/DUWP/RDB MJF21-006