=Text= | =Text= | ||
{{#Wiki_filter:RR3 | {{#Wiki_filter:RR3 | ||
) | |||
GEHitachi Nuclear Energy x;ny MattJ. | |||
Feyrer Site | |||
: Manager, Vallecitos Nuclear Center 6705Vallecitos Rd M210053 | |||
: Sunol, CA94586 USA April 19,2021 T9259186018 U.S.Nuclear Regulatory Commission Matt.feyrer@ge.com Attn: | |||
Document Control Desk Washington, D.C.20555-001 | |||
==Subject:== | ==Subject:== | ||
GEHRequest to Extend Request | GEHRequest to Extend Request forAdditional Information (RAI) | ||
===Response=== | |||
DueDateto July 28,2021 | |||
==References:== | ==References:== | ||
1) | 1)NRCLicense DPR-1, Docket 50-18 2)Letter GEHVallecitos Nuclear Center (VNC) | ||
Request forAlternate Decommissioning Schedules for DPR-1, DR-10, andTR-1Licenses, 7/10/2015 3)Letter, J.D.Parrot (NRC) to M.F. Feyrer,GEHitachi Request forAlternate Decommissioning Schedule for VBWR atVNC | |||
Theinitial | - Request forAdditional Information, (EPID L-2017-LLA-0052), | ||
inletter | 7/15/2020 4)Letter, M.F.Feyrer Requestingto Extend RequestforAdditional information Due DatetoApril 28,2021,8/14/2020 5)MSTEAMSmeeting between GEHand NRC presenting supplemental information regarding thestatus ofVBWRsamplingand | ||
50.12(a). | : analysis, 3/18/2021 6)Letter, M.F.Feyrer Supplemental Information for Request forAdditional information | ||
===Response=== | |||
Sincerely, | dueApril 28,2021,3/22/2021 GEHitachi Nuclear | ||
g p4- | : Energy, LLC(GEH) isrequesting toextend theresponse duedatefortheNRC's request foradditional information (RAI) related tothealternate decommissioning schedule fortheVBWR. | ||
Theinitial request foranalternate decommissioning schedule wasmade7/10/2015 (Ref 2)andproposed aVBWRdecommissioning dateofApril 2041tofacilitate asingle holistic decommissioning oftheentire VNCsite. | |||
inletter (Ref 3)dated 7/15/2020, theNRCrequested GEHprovide additional information related tothe structural integrity oftheVBWRtoenable anindependent assessment todetermine if the requested exemption to10CFR50.82(a)(3) wouldpresent anunduerisk topublic health andsafetyunder @ | |||
50.12(a). | |||
Uponreviewing thenineRAlsinthat | |||
: letter, GEHrequested (Ref 4)andwasauthorized until 4/28/2021 torespond toallow timeforextensive concrete structure coresampling, | |||
: analysis, and evaluation. | |||
GEHupdated theNRConthestatus ofthat effort andprovided adetailed planon3/18/2021 (Ref 4&5). | |||
Sampling wascompleted on4/8/2021 Aresponse duedateof7/28/2021 isbeing requested inthis communication toallow timetoanalyze andevaluate thesampleresults andtocompose afinal response totheRAls. | |||
Ifyouhaveanyquestions regarding this | |||
: matter, please contact meat(925) 918-6018. | |||
Sincerely, | |||
, / | |||
g p4- | |||
~- | |||
/M V | |||
(/ | (/ | ||
MattFeyrer, Site Manager Vallecitos Nuclear Center cc:NRCRegion IVAdministrator S.Anderson, NRCRIV J.D.Parrott, NMSS/DUWP/RDB MJF21-006}} | |||
Latest revision as of 09:41, 29 November 2024
| ML21110A095 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center |
| Issue date: | 04/19/2021 |
| From: | Feyrer M GE Hitachi Nuclear Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| M210053 | |
| Download: ML21110A095 (1) | |
Text
RR3
)
GEHitachi Nuclear Energy x;ny MattJ.
Feyrer Site
- Manager, Vallecitos Nuclear Center 6705Vallecitos Rd M210053
- Sunol, CA94586 USA April 19,2021 T9259186018 U.S.Nuclear Regulatory Commission Matt.feyrer@ge.com Attn:
Document Control Desk Washington, D.C.20555-001
Subject:
GEHRequest to Extend Request forAdditional Information (RAI)
Response
DueDateto July 28,2021
References:
1)NRCLicense DPR-1, Docket 50-18 2)Letter GEHVallecitos Nuclear Center (VNC)
Request forAlternate Decommissioning Schedules for DPR-1, DR-10, andTR-1Licenses, 7/10/2015 3)Letter, J.D.Parrot (NRC) to M.F. Feyrer,GEHitachi Request forAlternate Decommissioning Schedule for VBWR atVNC
- Request forAdditional Information, (EPID L-2017-LLA-0052),
7/15/2020 4)Letter, M.F.Feyrer Requestingto Extend RequestforAdditional information Due DatetoApril 28,2021,8/14/2020 5)MSTEAMSmeeting between GEHand NRC presenting supplemental information regarding thestatus ofVBWRsamplingand
- analysis, 3/18/2021 6)Letter, M.F.Feyrer Supplemental Information for Request forAdditional information
Response
dueApril 28,2021,3/22/2021 GEHitachi Nuclear
- Energy, LLC(GEH) isrequesting toextend theresponse duedatefortheNRC's request foradditional information (RAI) related tothealternate decommissioning schedule fortheVBWR.
Theinitial request foranalternate decommissioning schedule wasmade7/10/2015 (Ref 2)andproposed aVBWRdecommissioning dateofApril 2041tofacilitate asingle holistic decommissioning oftheentire VNCsite.
inletter (Ref 3)dated 7/15/2020, theNRCrequested GEHprovide additional information related tothe structural integrity oftheVBWRtoenable anindependent assessment todetermine if the requested exemption to10CFR50.82(a)(3) wouldpresent anunduerisk topublic health andsafetyunder @
50.12(a).
Uponreviewing thenineRAlsinthat
- letter, GEHrequested (Ref 4)andwasauthorized until 4/28/2021 torespond toallow timeforextensive concrete structure coresampling,
- analysis, and evaluation.
GEHupdated theNRConthestatus ofthat effort andprovided adetailed planon3/18/2021 (Ref 4&5).
Sampling wascompleted on4/8/2021 Aresponse duedateof7/28/2021 isbeing requested inthis communication toallow timetoanalyze andevaluate thesampleresults andtocompose afinal response totheRAls.
Ifyouhaveanyquestions regarding this
- matter, please contact meat(925) 918-6018.
Sincerely,
, /
g p4-
~-
/M V
(/
MattFeyrer, Site Manager Vallecitos Nuclear Center cc:NRCRegion IVAdministrator S.Anderson, NRCRIV J.D.Parrott, NMSS/DUWP/RDB MJF21-006