NRC-2020-0234, Comment (14) of Sara Bannon on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
(3 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:10/13/21, 3:50 PM                                     blob:https://www.fdms.gov/34c3fc1c-9dbc-4e4d-ac21-e796cf0d7bea SUNI Review Complete Template=ADM-013      As of: 10/13/21 3:49 PM E-RIDS=ADM-03 Received: October 12, 2021 PUBLIC SUBMISSION                                                ADD: Tam Tran, Sandra Figueroa, Mary Status: Pending_Post Tracking No. kuo-xuxm-ilt5 Neely Comment (14)          Comments Due: October 12, 2021 Publication Date:    Submission Type: Web 8/25/2021 CITATION 86 FR Docket: NRC-2020-0234                                             47525 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Comment On: NRC-2020-0234-0144 Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.
{{#Wiki_filter:10/13/21, 3:50 PM blob:https://www.fdms.gov/34c3fc1c-9dbc-4e4d-ac21-e796cf0d7bea blob:https://www.fdms.gov/34c3fc1c-9dbc-4e4d-ac21-e796cf0d7bea 1/1 PUBLIC SUBMISSION As of: 10/13/21 3:49 PM Received: October 12, 2021 Status: Pending_Post Tracking No. kuo-xuxm-ilt5 Comments Due: October 12, 2021 Submission Type: Web Docket: NRC-2020-0234 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Comment On: NRC-2020-0234-0144 Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.
1 and 2 Document: NRC-2020-0234-DRAFT-0156 Comment on FR Doc # 2021-18255 Submitter Information Name: Sara Bannon Address:
1 and 2 Document: NRC-2020-0234-DRAFT-0156 Comment on FR Doc # 2021-18255 Submitter Information Name: Sara Bannon Address:
Arlington, VA, 22204 Email: saradispenza@gmail.com Phone: 7033096384 General Comment I cant believe its even a question as to whether or an environmental study be done. This is imperative that we understand the impact of this plant on the environment so action can be taken if needed.
Arlington, VA, 22204 Email:saradispenza@gmail.com Phone:7033096384 General Comment I cant believe its even a question as to whether or an environmental study be done. This is imperative that we understand the impact of this plant on the environment so action can be taken if needed.
blob:https://www.fdms.gov/34c3fc1c-9dbc-4e4d-ac21-e796cf0d7bea                                                                1/1}}
SUNI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Tam Tran, Sandra Figueroa, Mary Neely Comment (14)
Publication Date:
8/25/2021 CITATION 86 FR 47525}}

Latest revision as of 04:14, 7 February 2025

Comment (14) of Sara Bannon on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2
ML21286A751
Person / Time
Site: North Anna  
Issue date: 10/12/2021
From: Bannon S
- No Known Affiliation
To:
Office of Administration
References
86FR47525 00014, NRC-2020-0234
Download: ML21286A751 (1)


Text

10/13/21, 3:50 PM blob:https://www.fdms.gov/34c3fc1c-9dbc-4e4d-ac21-e796cf0d7bea blob:https://www.fdms.gov/34c3fc1c-9dbc-4e4d-ac21-e796cf0d7bea 1/1 PUBLIC SUBMISSION As of: 10/13/21 3:49 PM Received: October 12, 2021 Status: Pending_Post Tracking No. kuo-xuxm-ilt5 Comments Due: October 12, 2021 Submission Type: Web Docket: NRC-2020-0234 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Comment On: NRC-2020-0234-0144 Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.

1 and 2 Document: NRC-2020-0234-DRAFT-0156 Comment on FR Doc # 2021-18255 Submitter Information Name: Sara Bannon Address:

Arlington, VA, 22204 Email:saradispenza@gmail.com Phone:7033096384 General Comment I cant believe its even a question as to whether or an environmental study be done. This is imperative that we understand the impact of this plant on the environment so action can be taken if needed.

SUNI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Tam Tran, Sandra Figueroa, Mary Neely Comment (14)

Publication Date:

8/25/2021 CITATION 86 FR 47525