{{#Wiki_filter:2/2017
* RFO
* ISTC-3700 Test 7/2018
* 2012 OM Code adoption 2/2019
*RFO
*ISTC-3700 Test (SPI required) 8/2019
*End of ISTC-3700 Grace per OMN-20 (if applicable) 2/2021
*RFO
*ISTC-3700 Test (SPI required) 2 year window for ISTC-3700 Incorrect 2 year window Spring refueling outage (RFO), during which ISTC-3700 testing is performed (2/2017).
IST Program updates to 2012 OM Code after this test (7/2018).
Next ISTC-3700 test is due 2 years after last ISTC-3700 test (2/2019).
10 CFR 50.55a(b)(3)(xi) conditions the existing requirements of ISTC-3700 (states when implementing paragraph ISTC-3700) so the supplemental verification occurs on the same schedule, but may be performed at a different time within the 2 year window for ISTC-3700 testing (i.e. need not be concurrent).
This provides flexibility to conduct local observation and pressure/flow measurement for both the open and close directions.
The wording for supplemental verification has been present as an ASME-recommended practice in the OM Code for years (as far back as OMa-1988).
A plant could conduct supplemental verification earlier than IST Program 2012 update, or submit a proposed alternative if additional time is needed to safely perform supplemental verification.}}

Latest revision as of 11:18, 29 November 2024

NRC Visual Representation of Supplemental Valve Position Testing Frequency (50.55a/ISTC-3700)
ML21032A238
Person / Time
Issue date: 02/01/2021
From: Douglas Bollock
NRC/NRR/DRO/IRIB
To:
Douglas Bollock, NRR/DRO/IRIB, 415-6609
References
Download: ML21032A238 (1)


Text

2/2017

  • ISTC-3700 Test 7/2018
  • 2012 OM Code adoption 2/2019
  • RFO
  • ISTC-3700 Test (SPI required) 8/2019
  • End of ISTC-3700 Grace per OMN-20 (if applicable) 2/2021
  • RFO
  • ISTC-3700 Test (SPI required) 2 year window for ISTC-3700 Incorrect 2 year window Spring refueling outage (RFO), during which ISTC-3700 testing is performed (2/2017).

IST Program updates to 2012 OM Code after this test (7/2018).

Next ISTC-3700 test is due 2 years after last ISTC-3700 test (2/2019).

10 CFR 50.55a(b)(3)(xi) conditions the existing requirements of ISTC-3700 (states when implementing paragraph ISTC-3700) so the supplemental verification occurs on the same schedule, but may be performed at a different time within the 2 year window for ISTC-3700 testing (i.e. need not be concurrent).

This provides flexibility to conduct local observation and pressure/flow measurement for both the open and close directions.

The wording for supplemental verification has been present as an ASME-recommended practice in the OM Code for years (as far back as OMa-1988).

A plant could conduct supplemental verification earlier than IST Program 2012 update, or submit a proposed alternative if additional time is needed to safely perform supplemental verification.