ML21167A104: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:PRA Acceptability - Future Oversight of Risk-Informed Initiatives Edgardo Torres Reliability & Risk Analyst PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation 1
 
PRA Acceptability RG 1.200 Rev 3 PRA Acceptability
                                    @ LAR RG 1.200                                      RG 1.200 Position C.1                                  Position C.2 Plant Technical      Level of Representation      ASME              Peer Scope Elements        Detail      & PRA          Standard          Review Configuration control
 
PRA Configuration and Control PRA found acceptable Issuance of SE Plant Modifications Operating Experience Assessing the gap and Data PRA maintenance and upgrades 3
 
Future Challenges
* Configuration Control Oversight
    - Familiarization with Licensees programs
    - Familiarization with Licensees technical elements analysis
* Industry Collaboration:
    - Information Gathering & Guidance Exercise at facilities
    - Feedback 4}}

Latest revision as of 21:51, 18 January 2022

6 - PRA Acceptability - Future Oversight of Risk-Informed Initiatives
ML21167A104
Person / Time
Issue date: 06/16/2021
From: Edgardo Torres
NRC/NRR/DRA
To:
Vasavada S
Shared Package
ML21167A163 List:
References
Download: ML21167A104 (4)


Text

PRA Acceptability - Future Oversight of Risk-Informed Initiatives Edgardo Torres Reliability & Risk Analyst PRA Oversight Branch Division of Risk Assessment Office of Nuclear Reactor Regulation 1

PRA Acceptability RG 1.200 Rev 3 PRA Acceptability

@ LAR RG 1.200 RG 1.200 Position C.1 Position C.2 Plant Technical Level of Representation ASME Peer Scope Elements Detail & PRA Standard Review Configuration control

PRA Configuration and Control PRA found acceptable Issuance of SE Plant Modifications Operating Experience Assessing the gap and Data PRA maintenance and upgrades 3

Future Challenges

  • Configuration Control Oversight

- Familiarization with Licensees programs

- Familiarization with Licensees technical elements analysis

  • Industry Collaboration:

- Information Gathering & Guidance Exercise at facilities

- Feedback 4