ML17067A413: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000461/LER-2016-010]]
| number = ML17067A413
| issue date = 03/06/2017
| title = LER 16-010-01 for Clinton Power Station, Unit 1 Failure to Complete Technical Specification Required Actions within the Completion Time Resulted in a Condition Prohibited by Technical Specifications
| author name = Stoner T R
| author affiliation = Exelon Generation Co, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000461
| license number = NPF-062
| contact person =
| case reference number = U-604334
| document report number = LER 16-010-01
| document type = Letter, Licensee Event Report (LER)
| page count = 4
| revision = 0
}}

Latest revision as of 13:30, 12 July 2018