ML21168A152: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 20: | Line 20: | ||
==SUMMARY== | ==SUMMARY== | ||
LICENSEE: | |||
LICENSEE: | NextEra Energy, Seabrook, LLC FACILITY: | ||
Seabrook Station, Unit No. 1 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF PUBLIC MEETING On June 9, 2021, at 5:30 p.m., the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar to discuss the NRCs assessment of the safety performance at Seabrook Station for 2020. During the first part of the webinar, the NRC staff presented the agencys safety performance assessment at Seabrook for the period of January 1 through December 31, 2020, the NRCs role in ensuring safe plant operations, and the NRC actions in response to the national health emergency. The second part of the webinar provided members of the public with an opportunity to submit questions verbally or in writing on topics discussed during the first part of the webinar. Members of the public, State and local officials, elected officials or their staff, and members of the media participated in the meeting. ADAMS Accession Number ML21168A149 is a list of NRC personnel who participated in the webinar. The following NRC staff provided presentations during the webinar: Paul Krohn (Deputy Director, Division of Operating Reactor Safety (DORS)), Brice Bickett (Projects Branch 3 Chief, DORS), Chris Newport (Senior Resident Inspector, DORS), Brett Klukan (Regional Counsel), and Justin Poole (Project Manager, Nuclear Reactor Regulation). | OF PUBLIC MEETING On June 9, 2021, at 5:30 p.m., the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar to discuss the NRCs assessment of the safety performance at Seabrook Station for 2020. During the first part of the webinar, the NRC staff presented the agencys safety performance assessment at Seabrook for the period of January 1 through December 31, 2020, the NRCs role in ensuring safe plant operations, and the NRC actions in response to the national health emergency. The second part of the webinar provided members of the public with an opportunity to submit questions verbally or in writing on topics discussed during the first part of the webinar. Members of the public, State and local officials, elected officials or their staff, and members of the media participated in the meeting. ADAMS Accession Number ML21168A149 is a list of NRC personnel who participated in the webinar. The following NRC staff provided presentations during the webinar: Paul Krohn (Deputy Director, Division of Operating Reactor Safety (DORS)), Brice Bickett (Projects Branch 3 Chief, DORS), Chris Newport (Senior Resident Inspector, DORS), Brett Klukan (Regional Counsel), and Justin Poole (Project Manager, Nuclear Reactor Regulation). | ||
| Line 31: | Line 31: | ||
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Seabrook Station can be found on the NRC's web site at: | Additional information relative to the NRC's Annual Assessment Process and the safety performance of Seabrook Station can be found on the NRC's web site at: | ||
https://www.nrc.gov/reactors/operating/oversight.html. | https://www.nrc.gov/reactors/operating/oversight.html. | ||
Digitally signed by | Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety Brice A. | ||
Bickett Digitally signed by Brice A. Bickett Date: 2021.06.22 14:08:59 -04'00' | |||
ML21168A152 Non-Sensitive | ML21168A152 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS NAME CKline BBickett DATE 6/21 /21 6/22/21}} | ||
Latest revision as of 08:27, 29 November 2024
| ML21168A152 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/22/2021 |
| From: | Brice Bickett Division of Operating Reactors |
| To: | |
| Shared Package | |
| ML21168A146 | List: |
| References | |
| Download: ML21168A152 (2) | |
Text
Meeting Summary UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 June 22, 2021 MEETING
SUMMARY
LICENSEE:
NextEra Energy, Seabrook, LLC FACILITY:
Seabrook Station, Unit No. 1
SUBJECT:
SUMMARY
OF PUBLIC MEETING On June 9, 2021, at 5:30 p.m., the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar to discuss the NRCs assessment of the safety performance at Seabrook Station for 2020. During the first part of the webinar, the NRC staff presented the agencys safety performance assessment at Seabrook for the period of January 1 through December 31, 2020, the NRCs role in ensuring safe plant operations, and the NRC actions in response to the national health emergency. The second part of the webinar provided members of the public with an opportunity to submit questions verbally or in writing on topics discussed during the first part of the webinar. Members of the public, State and local officials, elected officials or their staff, and members of the media participated in the meeting. ADAMS Accession Number ML21168A149 is a list of NRC personnel who participated in the webinar. The following NRC staff provided presentations during the webinar: Paul Krohn (Deputy Director, Division of Operating Reactor Safety (DORS)), Brice Bickett (Projects Branch 3 Chief, DORS), Chris Newport (Senior Resident Inspector, DORS), Brett Klukan (Regional Counsel), and Justin Poole (Project Manager, Nuclear Reactor Regulation).
Copies of the slides used by the NRC staff during the webinar can be accessed through ADAMS, Package Accession Number ML21168A146. A notice of the NRC meeting was issued on May 12, 2021, and was posted on the NRCs external (public) Web page (ADAMS Accession Number ML21132A016). ADAMS is accessible from the NRC Web page at:
http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Seabrook Station can be found on the NRC's web site at:
https://www.nrc.gov/reactors/operating/oversight.html.
Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety Brice A.
Bickett Digitally signed by Brice A. Bickett Date: 2021.06.22 14:08:59 -04'00'
ML21168A152 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS NAME CKline BBickett DATE 6/21 /21 6/22/21