{{#Wiki_filter:NRC INSPECTION MANUAL                   NMSS/DFM INSPECTION MANUAL CHAPTER 2600 APPENDIX B NRC CORE INSPECTION REQUIREMENTS Effective Date: 01/01/2021
{{#Wiki_filter:NRC INSPECTION MANUAL NMSS/DFM INSPECTION MANUAL CHAPTER 2600 APPENDIX B NRC CORE INSPECTION REQUIREMENTS Effective Date: 01/01/2021  


IMC 2600 Appendix B NRC Core Inspection Requirements Tables 1 and 2 PURPOSE:
Issue Date: 12/14/20 1
2600 App B IMC 2600 Appendix B NRC Core Inspection Requirements Tables 1 and 2 PURPOSE:
This appendix identifies the NRC Core and Resident inspection requirements for each type of Fuel Facility by Inspection Procedure.
This appendix identifies the NRC Core and Resident inspection requirements for each type of Fuel Facility by Inspection Procedure.
Table 1 Category III Fuel       Uranium Conversion                                                                 Laser Enrichment Category I Fuel Facility                                                                       Gas Centrifuge Facility Fabrication Facility              Facility                                                                          Facility Procedure                      Estimated                Estimated                  Estimated                Estimated                    Estimated                  Estimated Function/                                                                                                                                   Approved or         Inspection     Resources    Inspection  Resources     Inspection    Resources    Inspection Resources                    Resources    Inspection  Resources Program                                                                                                                                      CAP Procedure      Frequency        per IP   Frequency       per IP     Frequency       per IP     Frequency   per IP                       per IP    Frequency       per IP Areas                                                                                                                                    Frequency Suite                          (hrs)                     (hrs)                      (hrs)                    (hrs)                        (hrs)                      (hrs)
Table 1 Category I Fuel Facility Category III Fuel Fabrication Facility Uranium Conversion Facility Gas Centrifuge Facility Laser Enrichment Facility Function/
SAFETY OPERATIONS 88020         Annual                    Annual (2                  Annual (2                    Annual (2                  Annual 105                      120                        90                        90                          90          -              -
Program Areas Procedure or Procedure Suite Inspection Frequency Estimated Resources per IP (hrs)
(OPR)       (2 per year)                 per year)                 per year)                   per year)               (2 per year)
Inspection Frequency Estimated Resources per IP (hrs)
Plant      88135+
Inspection Frequency Estimated Resources per IP (hrs)
Operations    (Resident Annual            752          -              -            -            -            -          -              -            -          -              -
Inspection Frequency Estimated Resources per IP (hrs)
Inspection Program)
Approved CAP Frequency Estimated Resources per IP (hrs)
Criticality                   Annual                    Annual (2                                               Annual (2                   Annual 88015                            120                        60            -            -                        60                          60          -              -
Inspection Frequency Estimated Resources per IP (hrs)
Safety                    (2 per year)                 per year)                                              per year)                (2 per year)
SAFETY OPERATIONS Plant Operations 88020 (OPR)
Fire         88055 Biennial         30       Biennial         60       Biennial         60         Biennial     60         Triennial       60           -              -
Annual (2 per year) 105 Annual (2 per year) 120 Annual (2 per year) 90 Annual (2 per year) 90 Annual (2 per year) 90 88135+
Protection      (FPB)
(Resident Inspection Program)
            +Resident inspection activities are conducted over the course of the year at the frequency and in the manner described in the relevant inspection procedure. The hours listed are for planning purposes and may vary by +10%. If variance is more than 10%, the difference must be explained and the hours reviewed Issue Date: 12/14/20                                                              1                                                                  2600 App B
Annual 752 Criticality Safety 88015 Annual (2 per year) 120 Annual (2 per year) 60 Annual (2 per year) 60 Annual (2 per year) 60 Fire Protection 88055 (FPB)
Biennial 30 Biennial 60 Biennial 60 Biennial 60 Triennial 60  
+Resident inspection activities are conducted over the course of the year at the frequency and in the manner described in the relevant inspection procedure. The hours listed are for planning purposes and may vary by +10%. If variance is more than 10%, the difference must be explained and the hours reviewed  


Category III Fuel   Uranium Conversion         Gas Centrifuge       Laser Enrichment Category I Fuel Facility Fabrication Facility        Facility                Facility                Facility Estimated                Estimated              Estimated              Estimated              Estimated Function/
Issue Date: 12/14/20 2
Procedure or   Inspection  Resources  Inspection  Resources Inspection  Resources  Inspection  Resources  Inspection  Resources Program Procedure Suite Frequency       per IP   Frequency     per IP Frequency       per IP Frequency       per IP Frequency       per IP Areas (hrs)                  (hrs)                  (hrs)                  (hrs)                  (hrs)
2600 App B Category I Fuel Facility Category III Fuel Fabrication Facility Uranium Conversion Facility Gas Centrifuge Facility Laser Enrichment Facility Function/
SAFEGUARDS Procedures as in Annual         120     Biennial       60         -            -    Biennial         60       -              -
Program Areas Procedure or Procedure Suite Inspection Frequency Estimated Resources per IP (hrs)
IMC 2683 MC&A MC&A Triennial       30     Triennial       30         -            -    Triennial       30       -              -
Inspection Frequency Estimated Resources per IP (hrs)
Observation Physical     HEU Security Protection  Measures (PS1) 81700.01       Biennial         18         -            -          -            -        -            -        -              -
Inspection Frequency Estimated Resources per IP (hrs)
81700.02       Annual         27         -            -          -            -        -            -        -              -
Inspection Frequency Estimated Resources per IP (hrs)
81700.04       Biennial         40         -            -          -            -        -            -        -              -
Inspection Frequency Estimated Resources per IP (hrs)
81700.05       Triennial       70         -            -          -            -        -            -        -              -
SAFEGUARDS MC&A Procedures as in IMC 2683 Annual 120 Biennial 60 Biennial 60 MC&A Observation Triennial 30 Triennial 30 Triennial 30 Physical Protection HEU Security Measures (PS1) 81700.01 Biennial 18 81700.02 Annual 27 81700.04 Biennial 40 81700.05 Triennial 70 81700.06 Triennial 20 81700.07 Biennial 25 81700.08 Triennial 24 81700.10 Triennial 6
81700.06       Triennial       20         -            -          -            -        -            -        -              -
81700.11 Annual 8
81700.07       Biennial         25         -            -          -            -        -            -        -              -
LEU Security Measures (PS2) 81431 Triennial 14 Triennial 22 Triennial 14 81810 Triennial 2
81700.08       Triennial       24         -            -        -            -        -            -        -              -
Triennial 2
81700.10       Triennial         6         -            -          -            -        -            -        -              -
Triennial 2
81700.11       Annual           8         -            -          -            -        -            -        -              -
Transportation Security (PS3) 81335 Triennial 4
LEU Security Measures (PS2) 81431           -            -      Triennial       14     Triennial       22     Triennial       14       -              -
81340 Triennial 4
81810           -            -      Triennial       2     Triennial         2     Triennial         2       -              -
Triennial 8
Transportation Security (PS3) 81335       Triennial         4         -            -          -            -        -            -        -              -
Triennial 8
81340       Triennial         4     Triennial       8         -            -    Triennial         8       -              -
Other 96001 Triennial 360 Classified Material and INFOSEC 81820 (INFOSEC)
Other 96001       Triennial       360         -            -          -            -        -            -        -              -
Annual 2
Classified 81820 (INFOSEC)     Annual           2         -            -          -            -      Annual       48-160     Annual       104-120 Material    81815 (Access       -            -          -            -          -            -      Annual         8-16     Annual         16 and      Authorization)
Annual 48-160 Annual 104-120 81815 (Access Authorization)
INFOSEC Issue Date: 12/14/20                                                  2                                                        2600 App B
Annual 8-16 Annual 16  


Category III Fuel         Uranium Conversion                                                           Laser Enrichment Category I Fuel Facility                                                                     Gas Centrifuge Facility Fabrication Facility              Facility                                                                  Facility Procedure                  Estimated                  Estimated                    Estimated            Estimated                Estimated                  Estimated Function/                                                                                                                               Approved or       Inspection   Resources    Inspection Resources Inspection Resources Inspection              Resources                Resources   Inspection Resources Program                                                                                                                                  CAP Procedure    Frequency      per IP     Frequency         per IP     Frequency         per IP Frequency     per IP                   per IP    Frequency         per IP Areas                                                                                                                                Frequency Suite                      (hrs)                       (hrs)                        (hrs)                (hrs)                    (hrs)                      (hrs)
Issue Date: 12/14/20 3
RADIOLOGICAL CONTROLS Radiation         88030 Biennial       60       Biennial           60       Biennial           60   Biennial       60         Triennial     60           -              -
2600 App B Category I Fuel Facility Category III Fuel Fabrication Facility Uranium Conversion Facility Gas Centrifuge Facility Laser Enrichment Facility Function/
Protection         (RP) 88045 Environmental      (Effluent Triennial     30-60       Triennial       30-60       Triennial       30-60   Triennial   30-60       5 Years     30-60         -              -
Program Areas Procedure or Procedure Suite Inspection Frequency Estimated Resources per IP (hrs)
Protection        Control and Env.)
Inspection Frequency Estimated Resources per IP (hrs)
Transportation   86740 (T)     Triennial     30-60       Triennial       30-60       Triennial       30-60   Triennial   30-60       5 Years     30-60         -              -
Inspection Frequency Estimated Resources per IP (hrs)
FACILITY SUPPORT 88050                                                     32                          32                  32 Biennial       30       Biennial                     Biennial                 Biennial                 Biennial       30           -              -
Inspection Frequency Estimated Resources per IP (hrs)
(EP)                                                    30                          30                  30 Emergency          88051 Preparedness      (Exercise Biennial       48       Biennial           48       Biennial           48   Biennial       48         Biennial     48           -              -
Approved CAP Frequency Estimated Resources per IP (hrs)
Observati on)
Inspection Frequency Estimated Resources per IP (hrs)
Annual                    Annual                      Annual                  Annual Plant unless                   unless                      unless                  unless Modifications      88070                    30-90*                       30-90*                       30-90*               30-90*                                   -              -
RADIOLOGICAL CONTROLS Radiation Protection 88030 (RP)
88072 is                  88072 is                    88072 is                88072 is (Annual) performed                  performed                    performed                performed Plant Modifications      88072       Triennial       90*       Triennial         90*       Triennial         90*   Triennial     90*       Triennial     90**         -              -
Biennial 60 Biennial 60 Biennial 60 Biennial 60 Triennial 60 Environmental Protection 88045 (Effluent Control and Env.)
(Triennial)
Triennial 30-60 Triennial 30-60 Triennial 30-60 Triennial 30-60 5 Years 30-60 Transportation 86740 (T)
Corrective Action         88161           -            -            -              -            -              -        -          -        Triennial     90           -              -
Triennial 30-60 Triennial 30-60 Triennial 30-60 Triennial 30-60 5 Years 30-60 FACILITY SUPPORT Emergency Preparedness 88050 (EP)
Program
Biennial 30 Biennial 32 30 Biennial 32 30 Biennial 32 30 Biennial 30 88051 (Exercise Observati on)
              *Note: The actual planned inspection hours will depend on information developed from routine inspections, changes to the ISA Summary, discussions with Project Inspectors, Project Managers, and staff, etc.
Biennial 48 Biennial 48 Biennial 48 Biennial 48 Biennial 48 Plant Modifications (Annual) 88070 Annual unless 88072 is performed 30-90*
Issue Date: 12/14/20                                                              3                                                              2600 App B
Annual unless 88072 is performed 30-90*
Annual unless 88072 is performed 30-90*
Annual unless 88072 is performed 30-90*
Plant Modifications (Triennial) 88072 Triennial 90*
Triennial 90*
Triennial 90*
Triennial 90*
Triennial 90**
Corrective Action Program 88161 Triennial 90  
* Note: The actual planned inspection hours will depend on information developed from routine inspections, changes to the ISA Summary, discussions with Project Inspectors, Project Managers, and staff, etc.


Table 2 As Needed Inspection Procedures IP Number Title 40100   Independent Safety Culture Assessment Follow-up 71152   Problem Identification and Resolution 71153   Follow-up of Events and Notices of Enforcement Discretion Radioactive Waste Management - Inspection of Waste Generator Requirements of 10 CFR 84850 Part 20 and 10 CFR Part 61 88003   Reactive Inspection for Events at Fuel Cycle Facilities 88005   Management Organization and Controls 88010   Training 88071   Configuration Management Programmatic Review 88075   Event Follow Up 88161   Corrective Action Program (CAP) Implementation at Fuel Cycle Facilities 92701   Follow up Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory 92702 Action Letters, and Orders 92709   Contingency Plans for Licensee Strikes or Lockouts 92711   Implementation of Licensee Contingency Plans During a Strike/ Lockout 92712   Resumption of Normal Operations After a Strike 93001   OSHA Interface Activities 93100   Safety-Conscious Work Environment Issue of Concern Follow up 93800   Augmented Inspection Team 93812   Special Inspection 95003.02 Guidance for Conducting an Independent NRC Safety Culture Assessment END Issue Date: 12/14/20                                      4                                                      2600 App B
Issue Date: 12/14/20 4
2600 App B Table 2 As Needed Inspection Procedures IP Number Title 40100 Independent Safety Culture Assessment Follow-up 71152 Problem Identification and Resolution 71153 Follow-up of Events and Notices of Enforcement Discretion 84850 Radioactive Waste Management - Inspection of Waste Generator Requirements of 10 CFR Part 20 and 10 CFR Part 61 88003 Reactive Inspection for Events at Fuel Cycle Facilities 88005 Management Organization and Controls 88010 Training 88071 Configuration Management Programmatic Review 88075 Event Follow Up 88161 Corrective Action Program (CAP) Implementation at Fuel Cycle Facilities 92701 Follow up 92702 Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders 92709 Contingency Plans for Licensee Strikes or Lockouts 92711 Implementation of Licensee Contingency Plans During a Strike/ Lockout 92712 Resumption of Normal Operations After a Strike 93001 OSHA Interface Activities 93100 Safety-Conscious Work Environment Issue of Concern Follow up 93800 Augmented Inspection Team 93812 Special Inspection 95003.02 Guidance for Conducting an Independent NRC Safety Culture Assessment END


Revision History Table for IMC 2600 Appendix B Commitment       Accession                     Description of Change               Description of Training Comment Resolution Tracking            Number                                                          Required and            and Closed Feedback Number            Issue Date                                                        Completion Date        Form Accession Change Notice                                                                                Numbers (Pre-Decisional, Non-Public)
Issue Date: 12/14/20 Att 1-1 2600 App B Revision History Table for IMC 2600 Appendix B Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Numbers (Pre-Decisional, Non-Public)
N/A           04/26/07       Revised to incorporate the new inspection             N/A                    ML070610109 CN-07-014      procedures developed to address changes to 10 CFR Part 70 and to reflect enhancements made to the fuel facility inspection program.
N/A 04/26/07 CN-07-014 Revised to incorporate the new inspection procedures developed to address changes to 10 CFR Part 70 and to reflect enhancements made to the fuel facility inspection program.
N/A           ML072070159    Remove OFFICIAL USE ONLY - SENSITIVE                  N/A                     ML072070181 08/15/07       INTERNAL INFORMATION designation from entire CN-07-025      manual chapter to make publicly available.
N/A ML070610109 N/A ML072070159 08/15/07 CN-07-025 Remove OFFICIAL USE ONLY - SENSITIVE INTERNAL INFORMATION designation from entire manual chapter to make publicly available.
(1) Revised to correct estimated resources per year for Plant Operations [Cat. III and Uranium Conversion], MC&A [Cat I], and Radiation Protection [Cat. I]; (2) Revised to delete Procedure 84900, Low Level Waste. The procedure was combined into Procedure 88035, Waste Management.
(1) Revised to correct estimated resources per year for Plant Operations [Cat. III and Uranium Conversion], MC&A [Cat I], and Radiation Protection [Cat. I]; (2) Revised to delete Procedure 84900, Low Level Waste. The procedure was combined into Procedure 88035, Waste Management.
N/A           ML080660565    Revised to incorporate Gas Centrifuge Facility        N/A                    N/A 03/21/08       inspections into the fuel facility inspection program CN 08-011      A N/A           ML093170399    Revised to incorporate Gas Centrifuge Facility        N/A                     N/A 01/27/10       inspections into the fuel facility inspection program.
N/A ML072070181 N/A ML080660565 03/21/08 CN 08-011 Revised to incorporate Gas Centrifuge Facility inspections into the fuel facility inspection program A
CN 10-003 N/A           ML112720197   Revised to incorporate revised hours of IP 88015       N/A                    ML112720208 11/07/11      and 88017.
N/A N/A N/A ML093170399 01/27/10 CN 10-003 Revised to incorporate Gas Centrifuge Facility inspections into the fuel facility inspection program.
CN 11-028 N/A           ML13311A662    Significant revision to:                              N/A 02/07/14
N/A N/A N/A ML112720197 11/07/11 CN 11-028 Revised to incorporate revised hours of IP 88015 and 88017.
* Deleted Cat III Fuel Assembly Facility Type as CN 14-005          FCSS & DFFI no longer has this type of facility in its jurisdiction.
N/A ML112720208 N/A ML13311A662 02/07/14 CN 14-005 Significant revision to:
Issue Date: 12/14/20                                           Att 1-1                                            2600 App B
* Deleted Cat III Fuel Assembly Facility Type as FCSS & DFFI no longer has this type of facility in its jurisdiction.
N/A
 
Issue Date: 12/14/20 Att 1-2 2600 App B
* Revised to include adjustment to Gaseous Diffusion Plant resident inspection hours as described in ML12284A329.
* Revised to include adjustment to Gaseous Diffusion Plant resident inspection hours as described in ML12284A329.
* Revise to make total core hours for Gaseous Diffusion Plant consistent with the core hours described in ML12284A329.
* Revise to make total core hours for Gaseous Diffusion Plant consistent with the core hours described in ML12284A329.
Line 92: Line 108:
* Added new Corrective Action Programs for Fuel Cycle Facilities inspection procedure.
* Added new Corrective Action Programs for Fuel Cycle Facilities inspection procedure.
* The Environmental Protection, 88045, inspection hours were increased to correspond to the new material included in the inspection procedure revision.
* The Environmental Protection, 88045, inspection hours were increased to correspond to the new material included in the inspection procedure revision.
* The Waste Management (88035) inspection hours were increased to correspond with the Issue Date: 12/14/20                                  Att 1-2          2600 App B
* The Waste Management (88035) inspection hours were increased to correspond with the  


new material included in the inspection procedure revision. The inspection frequency has been reduced to biannual, from annual inspections, due to the amount of waste management activities at the site.
Issue Date: 12/14/20 Att 1-3 2600 App B new material included in the inspection procedure revision. The inspection frequency has been reduced to biannual, from annual inspections, due to the amount of waste management activities at the site.
* The Transportation inspection procedure (IP 86740) was not revised. The change in hours reflect the current recommendation in hours from the Resource Estimate section of the inspection procedure. The frequency of the IP was changed to biennial, from annual, to keep the total number of inspection hours consistent with the current level of risk for this activity. This change addresses an audit finding which stated that the App B hours should be consistent with the recommended hours of the inspection procedure.
* The Transportation inspection procedure (IP 86740) was not revised. The change in hours reflect the current recommendation in hours from the Resource Estimate section of the inspection procedure. The frequency of the IP was changed to biennial, from annual, to keep the total number of inspection hours consistent with the current level of risk for this activity. This change addresses an audit finding which stated that the App B hours should be consistent with the recommended hours of the inspection procedure.
The column headings were revised to simplify the chart and to decrease the number of footnotes applicable.
The column headings were revised to simplify the chart and to decrease the number of footnotes applicable.
N/A           ML14119A212 Table revised to add columns for Laser Enrichment     N/A  ML14119A214 06/27/14    Facility and rows for Classified Material and CN 14-014  Information Security.
N/A ML14119A212 06/27/14 CN 14-014 Table revised to add columns for Laser Enrichment Facility and rows for Classified Material and Information Security.
N/A           ML15070A286 Revision includes:                                    None ML15070A287 09/24/15
N/A ML14119A214 N/A ML15070A286 09/24/15 CN 15-018 Revision includes:
* Removed reference to GDP from Table 1.
Removed reference to GDP from Table 1.
CN 15-018
Inspection procedures 88015, 88016, and 88017 were merged into one procedure. The chart was updated and hours adjusted accordingly.
* Inspection procedures 88015, 88016, and 88017 were merged into one procedure. The chart was updated and hours adjusted accordingly.
Table 2, As Needed Inspection Procedures, was added to appendix. NRR communicated that listing inspection procedures in the IMC was essential for administratively including IPs in RPS.
* Table 2, As Needed Inspection Procedures, was added to appendix. NRR communicated that listing inspection procedures in the IMC was essential for administratively including IPs in RPS.
As needed Inspection Procedures 88005, None ML15070A287
* As needed Inspection Procedures 88005, Issue Date: 12/14/20                                        Att 1-3                      2600 App B


88010, 88161, and 92702 were removed from Table 1 and included in Table 2.
Issue Date: 12/14/20 Att 1-4 2600 App B 88010, 88161, and 92702 were removed from Table 1 and included in Table 2.
* The table which included the resident inspection hours for GDP and Category 1 facilities was deleted and information consolidated in Table 1.
The table which included the resident inspection hours for GDP and Category 1 facilities was deleted and information consolidated in Table 1.
* Resident inspection responsibilities for Gaseous Diffusion Plant were removed. The inspection procedures removed from the IMC are 88100, 88102, 88103, and 88105.
Resident inspection responsibilities for Gaseous Diffusion Plant were removed. The inspection procedures removed from the IMC are 88100, 88102, 88103, and 88105.
* 88135 inspection hours for NFS was reduced from 1504 to 752 hours/year. This corresponds with the NRC staffing change at the facility; from two resident inspectors to one.
88135 inspection hours for NFS was reduced from 1504 to 752 hours/year. This corresponds with the NRC staffing change at the facility; from two resident inspectors to one.
N/A           ML17299B292 Editorial changes to reflect the latest revision to IMC N/A          N/A 12/20/17    2681 and its associated procedures.
N/A ML17299B292 12/20/17 CN 17-030 Editorial changes to reflect the latest revision to IMC 2681 and its associated procedures.
CN 17-030 N/A           ML18099A226
N/A N/A N/A ML18099A226 06/12/18 CN 18-015 Revision includes changes to estimated resource hours for Category I Fuel Facilities in the areas of Plant Operations and Fire Protection to reflect a transfer of hours from IPs 88020 and 88055 to IP 88135 (Resident Inspector Program).
* Revision includes changes to estimated            N/A           N/A 06/12/18         resource hours for Category I Fuel Facilities in CN 18-015        the areas of Plant Operations and Fire Protection to reflect a transfer of hours from IPs 88020 and 88055 to IP 88135 (Resident Inspector Program).
Revised to include changes to 88070 and 88072 regarding annual implementation versus triennial.
* Revised to include changes to 88070 and 88072 regarding annual implementation versus triennial.
Added 3 inspection procedures to Table 2: 40100, 71153, and 84850 N/A N/A N/A ML20211L835 12/14/20 CN 20-071 Revision to implement the recommendations from the Smarter Inspection Program (ML20077L247 and ML20073G659). Deleted waste management and maintenance and surveillance IPs and incorporated risk significant elements into other IPs to reduce overlaps in the inspection guidance.
Added 3 inspection procedures to Table 2: 40100, 71153, and 84850 N/A           ML20211L835 Revision to implement the recommendations from          Complete by  N/A 12/14/20   the Smarter Inspection Program (ML20077L247             December 2020 CN 20-071  and ML20073G659). Deleted waste management and maintenance and surveillance IPs and incorporated risk significant elements into other IPs to reduce overlaps in the inspection guidance.
Complete by December 2020 N/A}}
Issue Date: 12/14/20                                      Att 1-4                                2600 App B}}

Latest revision as of 21:52, 5 December 2024

IMC 2600 Appendix B NRC Core Inspection Requirements
ML20211L834
Person / Time
Issue date: 12/14/2020
From: Alayna Pearson
NRC/NMSS/DFM/IOB
To:
Pearson A
Shared Package
ML20211L831, ML20349A009 List:
References
CN 20-071
Download: ML20211L834 (9)


Text

NRC INSPECTION MANUAL NMSS/DFM INSPECTION MANUAL CHAPTER 2600 APPENDIX B NRC CORE INSPECTION REQUIREMENTS Effective Date: 01/01/2021

Issue Date: 12/14/20 1

2600 App B IMC 2600 Appendix B NRC Core Inspection Requirements Tables 1 and 2 PURPOSE:

This appendix identifies the NRC Core and Resident inspection requirements for each type of Fuel Facility by Inspection Procedure.

Table 1 Category I Fuel Facility Category III Fuel Fabrication Facility Uranium Conversion Facility Gas Centrifuge Facility Laser Enrichment Facility Function/

Program Areas Procedure or Procedure Suite Inspection Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

Approved CAP Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

SAFETY OPERATIONS Plant Operations 88020 (OPR)

Annual (2 per year) 105 Annual (2 per year) 120 Annual (2 per year) 90 Annual (2 per year) 90 Annual (2 per year) 90 88135+

(Resident Inspection Program)

Annual 752 Criticality Safety 88015 Annual (2 per year) 120 Annual (2 per year) 60 Annual (2 per year) 60 Annual (2 per year) 60 Fire Protection 88055 (FPB)

Biennial 30 Biennial 60 Biennial 60 Biennial 60 Triennial 60

+Resident inspection activities are conducted over the course of the year at the frequency and in the manner described in the relevant inspection procedure. The hours listed are for planning purposes and may vary by +10%. If variance is more than 10%, the difference must be explained and the hours reviewed

Issue Date: 12/14/20 2

2600 App B Category I Fuel Facility Category III Fuel Fabrication Facility Uranium Conversion Facility Gas Centrifuge Facility Laser Enrichment Facility Function/

Program Areas Procedure or Procedure Suite Inspection Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

SAFEGUARDS MC&A Procedures as in IMC 2683 Annual 120 Biennial 60 Biennial 60 MC&A Observation Triennial 30 Triennial 30 Triennial 30 Physical Protection HEU Security Measures (PS1) 81700.01 Biennial 18 81700.02 Annual 27 81700.04 Biennial 40 81700.05 Triennial 70 81700.06 Triennial 20 81700.07 Biennial 25 81700.08 Triennial 24 81700.10 Triennial 6

81700.11 Annual 8

LEU Security Measures (PS2) 81431 Triennial 14 Triennial 22 Triennial 14 81810 Triennial 2

Triennial 2

Triennial 2

Transportation Security (PS3) 81335 Triennial 4

81340 Triennial 4

Triennial 8

Triennial 8

Other 96001 Triennial 360 Classified Material and INFOSEC 81820 (INFOSEC)

Annual 2

Annual 48-160 Annual 104-120 81815 (Access Authorization)

Annual 8-16 Annual 16

Issue Date: 12/14/20 3

2600 App B Category I Fuel Facility Category III Fuel Fabrication Facility Uranium Conversion Facility Gas Centrifuge Facility Laser Enrichment Facility Function/

Program Areas Procedure or Procedure Suite Inspection Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

Approved CAP Frequency Estimated Resources per IP (hrs)

Inspection Frequency Estimated Resources per IP (hrs)

RADIOLOGICAL CONTROLS Radiation Protection 88030 (RP)

Biennial 60 Biennial 60 Biennial 60 Biennial 60 Triennial 60 Environmental Protection 88045 (Effluent Control and Env.)

Triennial 30-60 Triennial 30-60 Triennial 30-60 Triennial 30-60 5 Years 30-60 Transportation 86740 (T)

Triennial 30-60 Triennial 30-60 Triennial 30-60 Triennial 30-60 5 Years 30-60 FACILITY SUPPORT Emergency Preparedness 88050 (EP)

Biennial 30 Biennial 32 30 Biennial 32 30 Biennial 32 30 Biennial 30 88051 (Exercise Observati on)

Biennial 48 Biennial 48 Biennial 48 Biennial 48 Biennial 48 Plant Modifications (Annual) 88070 Annual unless 88072 is performed 30-90*

Annual unless 88072 is performed 30-90*

Annual unless 88072 is performed 30-90*

Annual unless 88072 is performed 30-90*

Plant Modifications (Triennial) 88072 Triennial 90*

Triennial 90*

Triennial 90*

Triennial 90*

Triennial 90**

Corrective Action Program 88161 Triennial 90

  • Note: The actual planned inspection hours will depend on information developed from routine inspections, changes to the ISA Summary, discussions with Project Inspectors, Project Managers, and staff, etc.

Issue Date: 12/14/20 4

2600 App B Table 2 As Needed Inspection Procedures IP Number Title 40100 Independent Safety Culture Assessment Follow-up 71152 Problem Identification and Resolution 71153 Follow-up of Events and Notices of Enforcement Discretion 84850 Radioactive Waste Management - Inspection of Waste Generator Requirements of 10 CFR Part 20 and 10 CFR Part 61 88003 Reactive Inspection for Events at Fuel Cycle Facilities 88005 Management Organization and Controls 88010 Training 88071 Configuration Management Programmatic Review 88075 Event Follow Up 88161 Corrective Action Program (CAP) Implementation at Fuel Cycle Facilities 92701 Follow up 92702 Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders 92709 Contingency Plans for Licensee Strikes or Lockouts 92711 Implementation of Licensee Contingency Plans During a Strike/ Lockout 92712 Resumption of Normal Operations After a Strike 93001 OSHA Interface Activities 93100 Safety-Conscious Work Environment Issue of Concern Follow up 93800 Augmented Inspection Team 93812 Special Inspection 95003.02 Guidance for Conducting an Independent NRC Safety Culture Assessment END

Issue Date: 12/14/20 Att 1-1 2600 App B Revision History Table for IMC 2600 Appendix B Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Form Accession Numbers (Pre-Decisional, Non-Public)

N/A 04/26/07 CN-07-014 Revised to incorporate the new inspection procedures developed to address changes to 10 CFR Part 70 and to reflect enhancements made to the fuel facility inspection program.

N/A ML070610109 N/A ML072070159 08/15/07 CN-07-025 Remove OFFICIAL USE ONLY - SENSITIVE INTERNAL INFORMATION designation from entire manual chapter to make publicly available.

(1) Revised to correct estimated resources per year for Plant Operations [Cat. III and Uranium Conversion], MC&A [Cat I], and Radiation Protection [Cat. I]; (2) Revised to delete Procedure 84900, Low Level Waste. The procedure was combined into Procedure 88035, Waste Management.

N/A ML072070181 N/A ML080660565 03/21/08 CN 08-011 Revised to incorporate Gas Centrifuge Facility inspections into the fuel facility inspection program A

N/A N/A N/A ML093170399 01/27/10 CN 10-003 Revised to incorporate Gas Centrifuge Facility inspections into the fuel facility inspection program.

N/A N/A N/A ML112720197 11/07/11 CN 11-028 Revised to incorporate revised hours of IP 88015 and 88017.

N/A ML112720208 N/A ML13311A662 02/07/14 CN 14-005 Significant revision to:

  • Deleted Cat III Fuel Assembly Facility Type as FCSS & DFFI no longer has this type of facility in its jurisdiction.

N/A

Issue Date: 12/14/20 Att 1-2 2600 App B

  • Revised to include adjustment to Gaseous Diffusion Plant resident inspection hours as described in ML12284A329.
  • Revise to make total core hours for Gaseous Diffusion Plant consistent with the core hours described in ML12284A329.
  • Removed Operator Training hours and made it as needed.
  • Changed MC&A hours to reflect the sum of estimated hours in the IPs.
  • Removed Management Organization and Controls hours and frequency as inspections requirements were transferred to other IPs.

Made this IP as needed.

  • Updated IP 88054 and 88055 inspection hours.

All inspection hours will be charged to the triennial procedure every three years. The triennial inspection hours have been increased to reflect that 88055 will not be charged during this 3rd year.

  • Reduced the Radiation Protection (88030) inspection hours to be performed at the Category 1 fuel facilities. This reduction allows for the same resource allocation as the Category 3 and Conversion facilities. The evaluation for this change included the safety significance of the facilities and the radiation protection evaluations included in 88135.
  • Added new Corrective Action Programs for Fuel Cycle Facilities inspection procedure.
  • The Environmental Protection, 88045, inspection hours were increased to correspond to the new material included in the inspection procedure revision.
  • The Waste Management (88035) inspection hours were increased to correspond with the

Issue Date: 12/14/20 Att 1-3 2600 App B new material included in the inspection procedure revision. The inspection frequency has been reduced to biannual, from annual inspections, due to the amount of waste management activities at the site.

  • The Transportation inspection procedure (IP 86740) was not revised. The change in hours reflect the current recommendation in hours from the Resource Estimate section of the inspection procedure. The frequency of the IP was changed to biennial, from annual, to keep the total number of inspection hours consistent with the current level of risk for this activity. This change addresses an audit finding which stated that the App B hours should be consistent with the recommended hours of the inspection procedure.

The column headings were revised to simplify the chart and to decrease the number of footnotes applicable.

N/A ML14119A212 06/27/14 CN 14-014 Table revised to add columns for Laser Enrichment Facility and rows for Classified Material and Information Security.

N/A ML14119A214 N/A ML15070A286 09/24/15 CN 15-018 Revision includes:

Removed reference to GDP from Table 1.

Inspection procedures 88015, 88016, and 88017 were merged into one procedure. The chart was updated and hours adjusted accordingly.

Table 2, As Needed Inspection Procedures, was added to appendix. NRR communicated that listing inspection procedures in the IMC was essential for administratively including IPs in RPS.

As needed Inspection Procedures 88005, None ML15070A287

Issue Date: 12/14/20 Att 1-4 2600 App B 88010, 88161, and 92702 were removed from Table 1 and included in Table 2.

The table which included the resident inspection hours for GDP and Category 1 facilities was deleted and information consolidated in Table 1.

Resident inspection responsibilities for Gaseous Diffusion Plant were removed. The inspection procedures removed from the IMC are 88100, 88102, 88103, and 88105.

88135 inspection hours for NFS was reduced from 1504 to 752 hour0.0087 days <br />0.209 hours <br />0.00124 weeks <br />2.86136e-4 months <br />s/year. This corresponds with the NRC staffing change at the facility; from two resident inspectors to one.

N/A ML17299B292 12/20/17 CN 17-030 Editorial changes to reflect the latest revision to IMC 2681 and its associated procedures.

N/A N/A N/A ML18099A226 06/12/18 CN 18-015 Revision includes changes to estimated resource hours for Category I Fuel Facilities in the areas of Plant Operations and Fire Protection to reflect a transfer of hours from IPs 88020 and 88055 to IP 88135 (Resident Inspector Program).

Revised to include changes to 88070 and 88072 regarding annual implementation versus triennial.

Added 3 inspection procedures to Table 2: 40100, 71153, and 84850 N/A N/A N/A ML20211L835 12/14/20 CN 20-071 Revision to implement the recommendations from the Smarter Inspection Program (ML20077L247 and ML20073G659). Deleted waste management and maintenance and surveillance IPs and incorporated risk significant elements into other IPs to reduce overlaps in the inspection guidance.

Complete by December 2020 N/A