ML20212B329: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:. .                                                                                                                  1 4
{{#Wiki_filter:1 4hb cott J. Rubin
{
}
}
hb      cott J. Rubin Attorney
Attorney
* Consultant
* Consultant DOCKETED 3 Lost Creek Drive
{
DOCKETED 3 Lost Creek Drive
* Selinsgrove, PA 17870 * (570)743 2233
* Selinsgrove, PA 17870 * (570)743 2233
* Fax: (570)743-8145YsJrubin@ptd. net 1
* Fax: (570)743-8145YsJrubin@ptd. net
                                                                                        ?) SU' 17 P2 :48               1 Septemberll,1999                                                   !
?) SU' 17 P2 :48 1
OFi+
Septemberll,1999 OFi+
RUu Secretary                                                                       ADJJ '               AFF U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                                                                                         l Attention: Rulemakings and Adiudications Staff I
RUu Secretary ADJJ '
AFF U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 l
Attention: Rulemakings and Adiudications Staff I
Re: In the Matter of FirstEnergy Nuclear Operating Company, Pennsylvania Power Company, and Duquesne Light Company (Beaver Valley Power Station, Units 1 & 2)
Re: In the Matter of FirstEnergy Nuclear Operating Company, Pennsylvania Power Company, and Duquesne Light Company (Beaver Valley Power Station, Units 1 & 2)
Docket Nos. 50-334 & 50-412 - L7'
Docket Nos. 50-334 & 50-412 - L7'


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Enclosed for filing please find the Petition to Waive Time Limits in 10 CFR Q 2.1305 and Supplemental Comments of Local 29, International Brotherhood of Electrical Workers, in the above-referenced proceeding.
Enclosed for filing please find the Petition to Waive Time Limits in 10 CFR Q 2.1305 and Supplemental Comments of Local 29, International Brotherhood of Electrical Workers, in the above-referenced proceeding.
Copies have been served upon the applicants and the General Counsel, by electronic mail and first class mail, as required by 10 CFR Q 2.1313 and as shown on the attached certificate of service.             {
Copies have been served upon the applicants and the General Counsel, by electronic mail and
{
first class mail, as required by 10 CFR Q 2.1313 and as shown on the attached certificate of service.
In addition, I have enclosed an extra copy of the petition that I would appreciate having time-stamped and returned in the enclosed envelope.
In addition, I have enclosed an extra copy of the petition that I would appreciate having time-stamped and returned in the enclosed envelope.
Please let me know if you have any questions or require additional information about this filing.
Please let me know if you have any questions or require additional information about this filing.
Thank you for your cooperation.
Thank you for your cooperation.
Sincerely, f               ,
Sincerely, f
Scott), u in Enclosure                                                                                                           i 1
Scott), u in Enclosure cc: Parties of record 9909200055 990916 PDR ADOCK 05000334 0
cc: Parties of record                                                                                             I i
PDR
l 9909200055 990916 PDR       ADOCK 05000334 0                         PDR
)Sa.3) u}}
                                                                                                                  )Sa.3) u}}

Latest revision as of 20:41, 5 December 2024

Forwards for Filing,Petition to Waive Time Limits in 10CFR2.1305 & Supplemental Comments of Local 29,Intl Brotherhood of Electrical Workers Re Beaver Valley Power Station,Units 1 & 2
ML20212B329
Person / Time
Site: Beaver Valley
Issue date: 09/16/1999
From: Rubin S
AFFILIATION NOT ASSIGNED, INTERNATIONAL BROTHERHOOD OF ELECTRICAL WORKERS
To:
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20212B334 List:
References
CON-#399-20828 LT, NUDOCS 9909200055
Download: ML20212B329 (1)


Text

1 4hb cott J. Rubin

{

}

Attorney

  • Consultant DOCKETED 3 Lost Creek Drive
  • Selinsgrove, PA 17870 * (570)743 2233
  • Fax: (570)743-8145YsJrubin@ptd. net

?) SU' 17 P2 :48 1

Septemberll,1999 OFi+

RUu Secretary ADJJ '

AFF U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 l

Attention: Rulemakings and Adiudications Staff I

Re: In the Matter of FirstEnergy Nuclear Operating Company, Pennsylvania Power Company, and Duquesne Light Company (Beaver Valley Power Station, Units 1 & 2)

Docket Nos. 50-334 & 50-412 - L7'

Dear Sir or Madam:

Enclosed for filing please find the Petition to Waive Time Limits in 10 CFR Q 2.1305 and Supplemental Comments of Local 29, International Brotherhood of Electrical Workers, in the above-referenced proceeding.

Copies have been served upon the applicants and the General Counsel, by electronic mail and

{

first class mail, as required by 10 CFR Q 2.1313 and as shown on the attached certificate of service.

In addition, I have enclosed an extra copy of the petition that I would appreciate having time-stamped and returned in the enclosed envelope.

Please let me know if you have any questions or require additional information about this filing.

Thank you for your cooperation.

Sincerely, f

Scott), u in Enclosure cc: Parties of record 9909200055 990916 PDR ADOCK 05000334 0

PDR

)Sa.3) u