ML20214W810: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[BECO-87-099, Number of Personnel & Man-REM by Work & Job Function,1986]]
| number = ML20214W810
| issue date = 12/31/1986
| title = Number of Personnel & Man-REM by Work & Job Function,1986
| author name = Bird R
| author affiliation = BOSTON EDISON CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000293
| license number =
| contact person =
| document report number = BECO-87-099, BECO-87-99, NUDOCS 8706160192
| document type = ENVIRONMENTAL MONITORING REPORTS(&RADIOLOGICAL)-PERIODIC, TEXT-ENVIRONMENTAL REPORTS
| page count = 5
}}
 
=Text=
{{#Wiki_filter:_        . . __      __  _ _ _ . . . - __              . _ _ _ . . .    .- _ __ _ _ _ _ _. _ _ - __                            .  .- -      _ . _ .        _ _
NUMBER OF PERSONNEL AND MAN-REM BY HORK AND JOB FUtlCTION 1986                                                          j
    -PLAtlT: PILGRIM                          (BUR) l NUMBER OF PERS0flNEL (>100 m-rem)                                                            TOTAL MAN-REMS STATION                    UTILITY                      CONTRACT      TOTAL  STATIO!!      UTILITY      CONTRACT    TOTAL-EMPLOYEES                    L OTHERS      PERSONS EMPLOYEES      EMPLOYEES      & OTHERS  MAN-REMS HORK L JOB FUNCTION                    EMPLOYEES REACTOR OPERATIONS & SURV.
0                          1                        9                  0.623        0.175        18.790 MAINTENANCE PERSONNEL 16                        12                          1                  21.501        4.733          0.716 OPERATING PERSONNEL 6                          1                        9                  11.335        0.484        26.484 HEALTH PHYSICS PERS0tlNEL 4                          0                        5                  1.849        0.026          2.204 SUPERVISORY PERSONNEL 2                          3                        3                  0.644        0.628          0.819 ENGINEERING PERSONNEL
      ~
28                        17                        27            72    35.952        6.046        49.013    91.011 TOTAL liOUTINE MAINTENANCE                                                                                                                                  '
54                          1                      405                  29.824        0.221      274.834 MAINTENANCE PERSONNEL 30                        11                        10                  6.860        3.414          5.258 l        OPERATING PERSONNEL 24                          4                      100                  7.574          1.190        46.407-ilEALTil PHYSICS PERSONNEL 23                          5                      10                  6.474        1.406          3.868 SUPERVISORY PERSONNEL 13                          7                      31                  3.512        4.285        17.814 ENGINEERING PERSONNEL
      ~
144                          28                        556          728    54.244        10.516      348.181    412.941 TOTAL l
iN-SERVICE ItiSPECTION 0                          0                      72                  0.314        0.005        33.331 MAINTENANCE PERSONilEL 0                          2                        9                    0.041        0.366          9.095 OPERATING PERSONNEL 0                        ~0                        17                    0.000        0.041          6.290 HEALTH PHYSICS PER50tlNEL 0                          0                        0                    0.041        0.010          0.196 SUPERVISORY PERSONNEL i                          1                        6                  0.391        0.232          @.172 ENGINEERING PERSONNEL b                          3                      104          108      0.787        0.654        52.084      53.525 TOTAL SPECIAL MAINTENANCE 22                          0                      44                    7.447        0.000        92.139 MAINTENANCE PERSONNEL l-                        0                        0                  0.603        0.299        0.000 l h OPERATING PER50tlNEL                                  3                          0                        6                  0.917        0.036          1.499 m HEALTH PHYSICS PERSONNEL                                                                                                        1.465        0.108          1.262 3                          0                        2 m SUPERVISORY PERSONNEL 3                          0                        1                  1.082        0.335          0.237 e ENGINEERING PERSONNEL 0                      53            85    11.514        0.778        95.137    107.429 TOTAL                                32 8706160192 861231 PDR      ADOCM 05000293 R                                    PDR  ^          ~
\                                                    -_,                                                                                                              .
 
Y NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION (CONT.)
1986                                                          b, PLANT: PILGRIM                                        (BWR)
TOTAL MAN-REMS NUMBER OF PERSONNEL (>100 m-rem)
TOTAL    STATION      UTILITY      CONTRACT    TOTAL STATION    UTILITY    CONTRACT
                                                                                      & OTHERS      PERSONS  EMPLOYEES    EMPLOYEES    & OTHERS  MAN-REMS WORK L JOB FUNCTION                          EMPLOYEES  EMPLOYEES HASTE PROCESSING                                                                                                                    25.101 2          0        74                      1.221      0.021 MAINTENANCE PERSONNEL                                                                                                        0.906 9          0          4                    2.930      0.031 OPERATING PERSONNEL                                                                                                          8.023 9          0        34                      3.615      0.149 HEALTH PHYSICS PERSONNEL                                                                                    0.103        0.448 0          0          2                    0.158 SUPERVISOR PERSONNEL                                                                                        0.015        0.798 0          0          4                    0.052 ENGINEERING PERSONNEL 0        118          138        7.976      0.319        35.276      43.571 TOTAL              20 REFUELING                                                                                                                          9.548 0          0          0                    0.082      0.000 MAINTENANCE PERSONNEL                                                                                                    1.138 0          0          0                    0.021      0.026 OPERATING PERSONNEL                                                                                                        2.034 0          0          0                    0.046      0.031 HEALTH PHYSICS PERSONNEL                                                                                    0.000        0.288 0          0          0                    0.000 SUPERVISORY PERSONNEL                                                                                                    0.242 0          0          0                    0.000      0.000 ENGINEERING PERSONNEL 0          0            0        0.149      0.057        13.250      13.456 TOTAL                0 TOTAL BY JOB FUNCTION                                                                                                0.422      453.743    493.676 78          2        604          684      39.511 MAINTENANCE PERSONNEL                                                                                                  17.113      57.938 56          25        24          105      31.956      8.869 OPERATING PERSONNEL                                                                                        1.931      90.737    116.155-42          5        166          213      23.487 HEALTH PHYSICS PERSONNEL                                                                                                8.266      19.906 30          5          19          54        9.987      1.653 SUPERVISORY PERSONNEL                                                                                      5.495      23.082      34.258 19          11        45            75        5.681 ENGINEERING PERSONNEL 48        858        1,131      110.622      18.370      592.941    721.933 GRAND TOTAL        225
            *THE TOTAL NUMBER OF PERSONNEL IS HIGHER THAN THE
* TRUE TOTAL DUE TO SOME INDIVIDUALS BEING REPORTED UNDER MORE THAN ONE CATEGORY.
 
    ~^
  .                                                  ((
L~J 80STGVN Executive Offices 800 Boylston Street Boston, Massachusetts 02199 June 9, 1987 Ralph G. Bird                                                                  BECo 87-099 Senior Vice President - Nuclear License DPR-35 Docket 50-293 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.            20555
 
==Subject:==
Reg. Guide 1.16 Annual Report
 
==Dear Sir:==
 
,      In accordance with the reporting requirements of Pilgrim Nuclear Power Station i
Technical Specification 6.9.A.3, attached is the Regulatory Guide 1.16 annual report of personnel and man-rem exposure by job function.
Ylb R. G.hN&.
Bird        --
GGH/ pac cc:    U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station                                                                          l l
l l
l Ygby
 
Attachment to 1986 U. S. NRC Reaulatory Guide 1.16 Renort
{            The collective dose measured by TLD for the Pilgrim Nuclear Power Station for t          calendar year 1986 totalled 874.359 Person-Rem. The collective dose measured by TLD for station, utility and contractor personnel who were assigned to
;            radiation work permits during 1986 totalled 721.933 Person-Rem.
U. S. NRC Regulatory Guide 1.16 suggests that at least 80 percent of the total whole body dose received from external sources be assigned to specific
,          major work functions. The collective dose accrued for individuals assigned to      :
specific major work functions versus the total collective dose measured by Pilgrim Station for 1986 was determined to be 82.6 percent.
f
'l i                                                                                                -
i i                                                                                                ;
,i                                                                                              ,
h 1
I I
I l
l                                                                                      -
i i
i i
i r
 
REGULATORY GUIDE 1.16 JOB FUNCTION CATEGORIES 3
i            The following information is offered in an effort to clarify Reg. Guide,l.16 job function categories:                                                      ,
Reactor Operations and Surveillances i
All extended RWPs, operator tours, inspections, surveillances, valve manipulations, etc.
Routine Maintenance
!          All I&C surveillances and most maintenance functions.
I
;          In Service Inspections
!            Erosion / corrosion inspections, weld inspections, component support
!          Inspections, pressure tests and trevitesting.
Special Maintenance
;          TMI modifications, fire' protection, NRC mandated items or'other non-routine maintenance work.-
Waste Processinq
]
!          Dlatomaceous earth and resin transfers, most work associated with the Radwaste j            Truck Lock. All shipments and preparations of radioactive waste.              i Refueling                                                                      .
i Work performed on the 117' elevation from the shleid block removal to the' i          re-installation of the shleid blocks after the refueling itself if it is a part of the refueling process (Feedwater Sparger Replacement is Special
:          Maintenance).
i i
i I
:}}

Latest revision as of 09:34, 27 July 2021