ML20235F610: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[TXX-6773, Forwards Wg Counsil 870923 Cover Ltr & Impell Calculations & Position Papers,Including Rev 0 to IM-P-011, Unbraced Lengths Used to Evaluate Lateral Torsional Buckling of Trapeze Support Post Members, as Requested by Cygna]]
| number = ML20235F610
| issue date = 09/23/1987
| title = Forwards Wg Counsil 870923 Cover Ltr & Impell Calculations & Position Papers,Including Rev 0 to IM-P-011, Unbraced Lengths Used to Evaluate Lateral Torsional Buckling of Trapeze Support Post Members, as Requested by Cygna
| author name = Counsil W, Keeley G
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000445, 05000446
| license number =
| contact person =
| document report number = TXX-6773, NUDOCS 8709290233
| package number = ML20235F613
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 3
}}
 
=Text=
{{#Wiki_filter:.
(-
e l                                                                            ==
Log # TXX-6773 1                                                                            -                        2              File #~10068
                                                                            .-T                    C'
                                                                                                    ,_                      10010 clo 1UELECTRIC g                                    ,
wmism c. counsit Executive Vice President September 23, 1987 i'
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.'C. 20555
 
==SUBJECT:==
'COMANCllE PEAVs STEAM ELECTRIC STATION.(CPSES)
I-                                        DOCKET N05. 50-445 AND 50-446 DOCUMENTS REQUESTED BY CYGNA
                ' Gentlemen:
Attached are 15 copies of the {{letter dated|date=September 23, 1987|text=letter dated September 23, 1987}},;from W. G.
!                  Counsil to N. II. Williams (with enclosures), transmitting information requested by CYGNA.
The Atomic Safety and Licensing Board will be notified of the transmittal by a separate letter from our attorney.
L Very truly yours,
                                                                                                                    ,        1d W. G. Counsil By:  .s_- r b,      #  '
G. S. Keeley      &                      i Manager, Nuclear Lics ing JDS/mgt Attachmen; c-        Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) b 8709290233 870923                                                                                          /
PDR A
ADOCK 05000445 PDR I jp l
400 North Olive Street LB 8I Dallas. Texas 75201                                            l
 
4 M
lllllllll' ':lllllllll                Log # TXX-6772
:-                :                  File # 2260
:-                                            10068 clo it/ ELECTRIC
["j' [l"j,                                                                                                              September 23, 1987 CYGNA Energy Services AlTN: Ms. N. H. Williams, Project Manager Comanche Peak Project 2121 N. California Blvd.
Suite 390 Walnut Creek, CA 94596 i
 
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
TRANSMITTAL OF DOCUMENTS REQUESTED BY CYGNA
 
==Dear Ms. Williams:==
 
Enclosed please find three copies of the following documents:
Impell Document                                                                Related Generic Issue Calculation B-04 Rev. O                                                                    Issue 4 B Calculation M-12 Rev. 3                                                                    Issue 7 Calculation M-27 Rev. 2                                                                    Issue 19 Calculation M-39 Rev. 2                                                                    Issue 21 D Calculation M-59 Rev. 2                                                                    Issue 16 G Calculation M-65 Rev. 2                                                                    Issue 9 Position Paper IM-P-011,                                                                  Issue 14 B "Unbraced Lengths Used to Evaluate Buckling of Trapeze Support Post Members" Position Paper IM-P-012,                                                                    Issue 26 B
                                                                            " Stress Evaluation of Angles" Position Paper IM-P-013,                                                                  Issue 18
                                                                            " Justification for Use of Rigid Clamp Stiffnesses" 400 North Ohve Street LB 81 Dntlas. Tens 75201
____ _ _ _ _ _____                                                                  - - - . - - - - - - - - - - - - - - - - - - -          - -- ------ -                      -              ~
 
D t
Calculation M-15 Rev. 3                                  Issue 26 B Calculation M-28 Rev. 3                                        *
                                                                                  *This document was requested by CYGNA during an audit at the Impell office in Walnut Creek. (8/4/87 - 8/6/87)
Very truly yours, W. G. Counsil GY
                                                                                                                                                        ^
l
'                                                                                                                                          By:            z .
G. S. Keeley &      -/-
Manager, Nuclear Lfgsnsing JDS/mgt Enclosures
_ _ _ _ _ _ _ _ _ _ - - - - _ _ _ . _ _ - . _ _ - - - _ _ .                                            - - -  - - ~ ~ ~ ~ ' - ' ~ ~ ~    '~}}

Latest revision as of 21:04, 8 July 2023