ML20217P526: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 20: | Line 20: | ||
l t | l t | ||
Northeast Utilities System Q | Northeast Utilities System Q | ||
O l' | O Memo l' | ||
l NO-99-0169 l' | |||
NO-99-0169 l' | October 20,1999 i | ||
- TO: | |||
T. P. White % | Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Controlled Copyholders T. P. White % | ||
FROM: | |||
==SUBJECT:== | ==SUBJECT:== | ||
Distribution of Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Revision 0, Change 1 f | Distribution of Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Revision 0, Change 1 f | ||
Enclosed is Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Revision 0, Change 1. This is an entirely new document, applicable to Unit 1 only. | Enclosed is Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Revision 0, Change 1. This is an entirely new document, applicable to Unit 1 only. | ||
For licensing purposes, Revision 0 of this Unit 1 Quality Assurance topical report was defined as Revision 21 of the original Northeast Utilities Quality Assurance Program (NUQAP) Topical C | For licensing purposes, Revision 0 of this Unit 1 Quality Assurance topical report was defined as Revision 21 of the original Northeast Utilities Quality Assurance Program (NUQAP) Topical C | ||
Report. Revision 0 was not issued for use. Change 1 is the initial version being issued to the Unit for use. Changes from Revision 0 are in bold anditalics with a revision bar in the right margin, except in Section 1.0 and in Appendix G. Section 1.0 was entirely re-written, so change bars would not have been meaningful. Appendix G is entirely new, so all change notations were omitted. | |||
i Please note the effective date of the change is October 25,1999. | |||
If you have any questions, contact David Bryant at X0633 or Tom White, Manager-Unit 1 Nuclear Oversight, at X4463. | If you have any questions, contact David Bryant at X0633 or Tom White, Manager-Unit 1 Nuclear Oversight, at X4463. | ||
t l | t l | ||
/ | |||
==Enclosure:== | ==Enclosure:== | ||
Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Revision 0, change 1 (initialissue of entire document, in binder). | Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Revision 0, change 1 (initialissue of entire document, in binder). | ||
.m ob 29t'035 | |||
( @W G ToAIoEEUhg P}} | |||
Latest revision as of 07:42, 3 December 2024
| ML20217P526 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/20/1999 |
| From: | White T NORTHEAST NUCLEAR ENERGY CO. |
| To: | NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20217P532 | List: |
| References | |
| NO-99-0169, NUDOCS 9910290322 | |
| Download: ML20217P526 (1) | |
Text
I.
l t
Northeast Utilities System Q
O Memo l'
l NO-99-0169 l'
October 20,1999 i
- TO:
Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Controlled Copyholders T. P. White %
FROM:
SUBJECT:
Distribution of Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Revision 0, Change 1 f
Enclosed is Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Revision 0, Change 1. This is an entirely new document, applicable to Unit 1 only.
For licensing purposes, Revision 0 of this Unit 1 Quality Assurance topical report was defined as Revision 21 of the original Northeast Utilities Quality Assurance Program (NUQAP) Topical C
Report. Revision 0 was not issued for use. Change 1 is the initial version being issued to the Unit for use. Changes from Revision 0 are in bold anditalics with a revision bar in the right margin, except in Section 1.0 and in Appendix G. Section 1.0 was entirely re-written, so change bars would not have been meaningful. Appendix G is entirely new, so all change notations were omitted.
i Please note the effective date of the change is October 25,1999.
If you have any questions, contact David Bryant at X0633 or Tom White, Manager-Unit 1 Nuclear Oversight, at X4463.
t l
/
Enclosure:
Millstone Unit 1 Northeast Utilities Quality Assurance Program Topical Report Revision 0, change 1 (initialissue of entire document, in binder).
.m ob 29t'035
( @W G ToAIoEEUhg P