ML20234B158: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- ----_-_--- _ _ _ _ _ _ | {{#Wiki_filter:- ----_-_--- _ _ _ _ _ _ | ||
IN RESPONSE, PLEASE | IN RESPONSE, PLEASE REFER TO: | ||
M870909 | |||
#e# " 04'o Uth FED STATES | |||
~g | |||
['' | ['' | ||
g NUCLEAR REGULATORY COMMISSION | |||
: E | : E W AS HIN GTON, 0.C. 20555 5 | ||
I September 16, 1987 OFFICE OF THE SECRETARY MEMORANDUM FOR: | |||
Executive Director for Opera lons i e FROM: | Victor Stello, Jr. | ||
Executive Director for Opera lons i | |||
e FROM: | |||
Samuel J. Chilk, Secretary | |||
==SUBJECT:== | ==SUBJECT:== | ||
STAFF REQUIREMENTS - BRIEF C ON PERFORMANCE OF SANDIA CONTAINMENT TESTS, 2:00 P.M., | STAFF REQUIREMENTS - BRIEF C | ||
ON PERFORMANCE OF SANDIA CONTAINMENT TESTS, 2:00 P.M., | |||
WEDNESDAY, SEPTEMBER 9, 1987, COMMISSIONERS' CONFERENCE' ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE) | WEDNESDAY, SEPTEMBER 9, 1987, COMMISSIONERS' CONFERENCE' ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE) | ||
The Commission | The Commission | ||
* was briefed by representatives of the staff and the Sandia National Laboratory on preliminary data from over-pressurization tests of a 1:6 scale model of a dry reactor containment building. | * was briefed by representatives of the staff and the Sandia National Laboratory on preliminary data from over-pressurization tests of a 1:6 scale model of a dry reactor containment building. | ||
The Chairman noted that this was a quick look repcrt on the results of this test and that the Commission would be interested in receiving the full results of the test after careful evaluation of the data. | The Chairman noted that this was a quick look repcrt on the results of this test and that the Commission would be interested in receiving the full results of the test after careful evaluation of the data. | ||
Commissioner Bernthal requested the staff to consider carefully the possibility for the use of the Sandia facility as part of the ongoing containment performance program, to test the containment responses to dynamic loads (e.g. , hydrogen detonation). | Commissioner Bernthal requested the staff to consider carefully the possibility for the use of the Sandia facility as part of the ongoing containment performance program, to test the containment responses to dynamic loads (e.g., hydrogen detonation). | ||
cc: | cc: | ||
Chairman Zech Commissioner Roberts Commissioner Bernthal Commissioner Carr Commissioner Rogers OGC GA R - Advance DCS - 016 Phillips | |||
* Commissioner Roberts was not present. | * Commissioner Roberts was not present. | ||
8709180285 070916 PDR | 8709180285 070916 PDR 10CFR PT9.7 PDR}} | ||
Latest revision as of 07:04, 3 December 2024
| ML20234B158 | |
| Person / Time | |
|---|---|
| Issue date: | 09/16/1987 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| REF-10CFR9.7 M870909, NUDOCS 8709180285 | |
| Download: ML20234B158 (1) | |
Text
- ----_-_--- _ _ _ _ _ _
IN RESPONSE, PLEASE REFER TO:
M870909
- e# " 04'o Uth FED STATES
~g
[
g NUCLEAR REGULATORY COMMISSION
- E W AS HIN GTON, 0.C. 20555 5
I September 16, 1987 OFFICE OF THE SECRETARY MEMORANDUM FOR:
Victor Stello, Jr.
Executive Director for Opera lons i
e FROM:
Samuel J. Chilk, Secretary
SUBJECT:
STAFF REQUIREMENTS - BRIEF C
ON PERFORMANCE OF SANDIA CONTAINMENT TESTS, 2:00 P.M.,
WEDNESDAY, SEPTEMBER 9, 1987, COMMISSIONERS' CONFERENCE' ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE)
The Commission
- was briefed by representatives of the staff and the Sandia National Laboratory on preliminary data from over-pressurization tests of a 1:6 scale model of a dry reactor containment building.
The Chairman noted that this was a quick look repcrt on the results of this test and that the Commission would be interested in receiving the full results of the test after careful evaluation of the data.
Commissioner Bernthal requested the staff to consider carefully the possibility for the use of the Sandia facility as part of the ongoing containment performance program, to test the containment responses to dynamic loads (e.g., hydrogen detonation).
cc:
Chairman Zech Commissioner Roberts Commissioner Bernthal Commissioner Carr Commissioner Rogers OGC GA R - Advance DCS - 016 Phillips
- Commissioner Roberts was not present.