ML20236P264: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[BECO-87-183, Requests Extension of Deadline to Respond to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Plan for Completing Remaining Test & Providing Final Results Listed]]
| number = ML20236P264
| issue date = 11/13/1987
| title = Requests Extension of Deadline to Respond to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Plan for Completing Remaining Test & Providing Final Results Listed
| author name = Bird R
| author affiliation = BOSTON EDISON CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000293
| license number =
| contact person =
| document report number = BECO-87-183, IEB-85-003, IEB-85-3, NUDOCS 8711170218
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
}}
 
=Text=
{{#Wiki_filter:,.                                                  __      _-    _ . - _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ . - _
j l}$;i.je '                                                                                                                      IEB 85-03 G
BOSTONED50N
                                                                                                                                                          ^
Executive Offices -                                                                        .!
800 Boylston Street Boston, Massachusetts 02199                                                                        '
November 13, 1987 Ralph G. Bird
                                                                                                                                                            ]
Senior Vice President - Nuclear BECo 87-183              f l
U. S.. Nuclear Regulatory Commission
                . Document Control Desk Hashington, DC 20555 License DPR-35 Docket 50-293 IE BULLETIN 85-03:                                RE00EST FOR EXTENSION
 
==Dear Sir:==
 
This letter is to provide notification we will be unable to complete valve testing required' by IE Bulletin (IEB) 85-03 by the November 15, 1987 deadline and to request an extension to the deadline. He have ' completed part of the -
required testing and have included below our plan for completing.the remaining testing and providing the final results.
In a letter to the NRC dated December 31, 1986 (BEC0 86-193) we provided the required 180 day' response to IEB 85-03 and described our approach to performing the valve testing.                      At .that time, we expected to have completed I
refueling, returned to power, and completed the testing prior to November 15, 1987. Our outage extended longer than originally anticipated; consequently.
the lack of plant steam and normal                                                                  operating conditions precluded the completion of testing in accordance with our original schedule. Our plan is to complete all testing on the identified valves under normal plant operating conditions within 90 days after full power is reached (i.e., plant steam is available and' full system pressure is attained) and provide the test results 120 days after completion of testing.
h are requesting an extension to the bulletin deadline based on this plan, b[
                                                                                                                                      . G. Bird JFS/amm/1267                                                                                                                                -
l cc: See next page                                                                                                                          )
I 8711170218 871113                                                                                                                    l PDR o
ADOCK 05000293 PDR gIj    J a      1 WL__ _ __ _ _ __
 
.                            BOSTON EDISON COMPANY U. S. Nuclear Regulatory Commission Page 2-cc:    Mr. R. H. Nessman, Project Manager Division of Reactor Projects I/II Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20814                  I U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station i
i
                                                                            \
        - -- - -_____ _ __ _}}

Latest revision as of 20:09, 25 July 2021