Template:System actuation summary: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page with "==System Actuation Reporting Summary== {| class="wikitable" ! !! Valid !! Invalid |- | '''Moved''' | ENS + LER | LER (as 60 day ENS) |- | '''Not moved''' | ENS + LER | None |...")
 
No edit summary
 
Line 27: Line 27:
Allowance for invalid signals which actuated a system
Allowance for invalid signals which actuated a system
* [[10 CFR 50.73(a)(1), Submit an LER]]
* [[10 CFR 50.73(a)(1), Submit an LER]]
===System actuation list===
System Actuation Reporting contains a list of applicable systems
* [[10 CFR 50.72(b)(3)(iv)(A), System Actuation|ENS-50.72(b)(3)(iv)(A)]] -> [[10 CFR 50.72#b3ivB|(b)(3)(iv)(B)]]
* [[10 CFR 50.73(a)(2)(iv)(A), System Actuation|LER-50.73(a)(2)(iv)(A)]] -> [[10 CFR 50.73#a2ivA|(a)(2)(iv)(A)]]
Both list include:
:(1) [[Reactor protection system]] (RPS) including: Reactor scram and reactor trip.
:(2) [[General containment isolation signal]]s affecting containment isolation valves in more than one system or multiple main steam isolation valves (MSIVs).
:(3) [[Emergency core cooling system]]s (ECCS) for pressurized water reactors (PWRs) including: High-head, intermediate-head, and low-head injection systems and the low pressure injection function of residual (decay) heat removal systems.
:(4) [[ECCS]] for boiling water reactors (BWRs) including: [[High-pressure core spray|High-pressure]] and low-pressure core spray systems; [[high-pressure coolant injection system]]; low pressure injection function of the [[residual heat removal system]].
:(5) BWR [[reactor core isolation cooling system]]; [[isolation condenser system]]; and [[feedwater coolant injection system]].
:(6) PWR [[auxiliary feedwater system|feedwater system]] or [[emergency feedwater system]].
:(7) [[Containment heat removal system|Containment heat removal]] and depressurization systems, including [[containment spray system|containment spray]] and [[fan cooler system]]s.
:(8) [[Emergency ac electrical power system]]s, including: [[Emergency diesel generator]]s (EDGs); hydroelectric facilities used in lieu of EDGs at the Oconee Station; and BWR dedicated Division 3 EDGs.
Only 50.73: (9) [[Emergency service water system]]s that do not normally run and that serve as ultimate heat sinks.

Latest revision as of 18:50, 19 April 2023

System Actuation Reporting Summary

Valid Invalid
Moved ENS + LER LER (as 60 day ENS)
Not moved ENS + LER None

4-hour (ENS)

While Critical or RPS (ie Scram)

8-hour (ENS)

60-day (LER)

60-day (ENS)

Allowance for invalid signals which actuated a system

System actuation list

System Actuation Reporting contains a list of applicable systems

Both list include:

(1) Reactor protection system (RPS) including: Reactor scram and reactor trip.
(2) General containment isolation signals affecting containment isolation valves in more than one system or multiple main steam isolation valves (MSIVs).
(3) Emergency core cooling systems (ECCS) for pressurized water reactors (PWRs) including: High-head, intermediate-head, and low-head injection systems and the low pressure injection function of residual (decay) heat removal systems.
(4) ECCS for boiling water reactors (BWRs) including: High-pressure and low-pressure core spray systems; high-pressure coolant injection system; low pressure injection function of the residual heat removal system.
(5) BWR reactor core isolation cooling system; isolation condenser system; and feedwater coolant injection system.
(6) PWR feedwater system or emergency feedwater system.
(7) Containment heat removal and depressurization systems, including containment spray and fan cooler systems.
(8) Emergency ac electrical power systems, including: Emergency diesel generators (EDGs); hydroelectric facilities used in lieu of EDGs at the Oconee Station; and BWR dedicated Division 3 EDGs.

Only 50.73: (9) Emergency service water systems that do not normally run and that serve as ultimate heat sinks.