ML20246C886: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 20: | Line 20: | ||
: a. - | : a. - | ||
prF | prF | ||
- BALTIM O RE p- | |||
- GAS AND F | |||
ELECTRIC | |||
l | .. crd.. ' | ||
s L | |||
CHARLES CENTER. P. O. BOX 1475 BALTlWORE, MARYLAND 21203 | |||
\\< | |||
l GroRoc C CRctL. | |||
I'' | I'' | ||
Vicg PersiDENT L W,1 | Vicg PersiDENT L W,1 NucLEAn Engmov ' | ||
c (301)260 4456 I | |||
p U. S. Nuclear Regulatory Commission Washington, DC 20555 I | August 18, 1989 m | ||
pf l | |||
p U. S. Nuclear Regulatory Commission Washington, DC 20555 I | |||
ATTENTION: | |||
Document Control Desk | |||
==SUBJECT:== | ==SUBJECT:== | ||
Calvert Cliffs Nuclear Power - Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Uodated Final Safety Analysis Reoort Gentlemen: | Calvert Cliffs Nuclear Power - Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Uodated Final Safety Analysis Reoort Gentlemen: | ||
q Enclosed for your information and use is one signed original and ten additional copies | q Enclosed for your information and use is one signed original and ten additional copies | ||
. of Revision 9 to our Updated Final Safety Analysis Report (UFSAR). These copies are provided in accordance with 10 CFR 50.71(e) and 50.4(b)(6). | |||
Attachment I to this letter identifies facility changes made under the ' provisions of 10 CFR 50.59 and reflected . in this revision, but not previously reported to' the I- | Attachment I to this letter identifies facility changes made under the ' provisions of 10 CFR 50.59 and reflected. in this revision, but not previously reported to' the I- | ||
. Commission. The List of Effective Pages for the UFSAR is included with the enclosed | |||
,e revision. | |||
In a conference call with Dr. P. K. Espen and Mr. G. A. Napuda on March 16,1988, we agreed to include a summary of our basis for concluding QA Program changes do not | In a conference call with Dr. P. K. Espen and Mr. G. A. Napuda on March 16,1988, we agreed to include a summary of our basis for concluding QA Program changes do not | ||
. reduce BG&E's' commitments. Attachment 2 contains a summary for each QA Program | |||
. change made since the last UFSAR revision. | |||
u f | u f | ||
8908250170 890818 PDR | 8908250170 890818 ADOCK0500g7 PDR K | ||
i. | |||
l- | |||
h,. | h,. | ||
I6 | I6 | ||
- Document Control Desk P | |||
August 18, 1989 Page 2 I | |||
1 L | |||
Please replace the appropriate pages of your copies of the UFSAR with the.. enclosed I | |||
pages and then ~ complete and return the Transmittal of. Document form included as 1 to the letter'. | |||
I Very truly yours, I | |||
l l | l l | ||
STATE OF MARYLAND | STATE OF MARYLAND 7 | ||
TO WIT : | |||
Olliyb I , | Olliyb I, l7 !stMT J | ||
e | e I hereb certify that on the | ||
I hereb certify that on the | / [ ' day of O// /*'/ /L | ||
,19 f7, before me, the scriber | |||
/' / /" ' d | |||
that he' id Vice President of the Baltimore Gas and Electric Company, a . corporation of the State of Maryland; that he provides ' the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge, information,. and belief;, and that he was authorized to provide the response on behalf of said Corporation. | .i sup& /47o a Notary Public of the State of Maryland in~ and for | ||
WITNESS my Hand and Notarial Seal: | / | ||
Notary Public | , personally appeared George C. Creel, being duly sworn, and states that he' id Vice President of the Baltimore Gas and Electric Company, a. corporation of the State of Maryland; that he provides ' the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge, information,. and belief;, and that he was authorized to provide the response on behalf of said Corporation. | ||
WITNESS my Hand and Notarial Seal: | |||
h7A L. | |||
J. E. Silberg, Esquire R. A.Capra, NRC | 74 7 | ||
S. A.McNeil,NRC W. T. Russell, NRC P. K. Eapen, NRC (w/o Attachment 3 and Enclosures) | Notary Public Q | ||
J My Commission Expires: | |||
J A b /r M | |||
!/ | |||
(Date j | |||
GCC/ WPM / dim Enclosures 7 | |||
cc: | |||
D. A. Brune, Esquire (w/o Attachment 3 and Enclosures) | |||
J. E. Silberg, Esquire R. A.Capra, NRC S. A.McNeil,NRC W. T. Russell, NRC P. K. Eapen, NRC (w/o Attachment 3 and Enclosures) | |||
V. L. Pritchett/D. F. Limroth, NRC T. Magette, DNR (w/o Attachment 3 and Enclosures) s}} | V. L. Pritchett/D. F. Limroth, NRC T. Magette, DNR (w/o Attachment 3 and Enclosures) s}} | ||
Latest revision as of 00:09, 2 December 2024
| ML20246C886 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 08/18/1989 |
| From: | Creel G BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20246C891 | List: |
| References | |
| NUDOCS 8908250170 | |
| Download: ML20246C886 (2) | |
Text
_
- a. -
prF
- BALTIM O RE p-
- GAS AND F
ELECTRIC
.. crd.. '
s L
CHARLES CENTER. P. O. BOX 1475 BALTlWORE, MARYLAND 21203
\\<
l GroRoc C CRctL.
I
Vicg PersiDENT L W,1 NucLEAn Engmov '
c (301)260 4456 I
August 18, 1989 m
pf l
p U. S. Nuclear Regulatory Commission Washington, DC 20555 I
ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power - Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Uodated Final Safety Analysis Reoort Gentlemen:
q Enclosed for your information and use is one signed original and ten additional copies
. of Revision 9 to our Updated Final Safety Analysis Report (UFSAR). These copies are provided in accordance with 10 CFR 50.71(e) and 50.4(b)(6).
Attachment I to this letter identifies facility changes made under the ' provisions of 10 CFR 50.59 and reflected. in this revision, but not previously reported to' the I-
. Commission. The List of Effective Pages for the UFSAR is included with the enclosed
,e revision.
In a conference call with Dr. P. K. Espen and Mr. G. A. Napuda on March 16,1988, we agreed to include a summary of our basis for concluding QA Program changes do not
. reduce BG&E's' commitments. Attachment 2 contains a summary for each QA Program
. change made since the last UFSAR revision.
u f
8908250170 890818 ADOCK0500g7 PDR K
i.
l-
h,.
I6
- Document Control Desk P
August 18, 1989 Page 2 I
1 L
Please replace the appropriate pages of your copies of the UFSAR with the.. enclosed I
pages and then ~ complete and return the Transmittal of. Document form included as 1 to the letter'.
I Very truly yours, I
l l
STATE OF MARYLAND 7
TO WIT :
Olliyb I, l7 !stMT J
e I hereb certify that on the
/ [ ' day of O// /*'/ /L
,19 f7, before me, the scriber
/' / /" ' d
.i sup& /47o a Notary Public of the State of Maryland in~ and for
/
, personally appeared George C. Creel, being duly sworn, and states that he' id Vice President of the Baltimore Gas and Electric Company, a. corporation of the State of Maryland; that he provides ' the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge, information,. and belief;, and that he was authorized to provide the response on behalf of said Corporation.
WITNESS my Hand and Notarial Seal:
h7A L.
74 7
Notary Public Q
J My Commission Expires:
J A b /r M
!/
(Date j
GCC/ WPM / dim Enclosures 7
cc:
D. A. Brune, Esquire (w/o Attachment 3 and Enclosures)
J. E. Silberg, Esquire R. A.Capra, NRC S. A.McNeil,NRC W. T. Russell, NRC P. K. Eapen, NRC (w/o Attachment 3 and Enclosures)
V. L. Pritchett/D. F. Limroth, NRC T. Magette, DNR (w/o Attachment 3 and Enclosures) s