ML20249B033: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.n                                  , ,      10 CFR 2.790 INFORMAT7                               b#
{{#Wiki_filter:10 CFR 2.790 INFORMAT7 b#
                                                          ,                                ,                      Yhd$ ff PRELIMINARY NOTIFICATION - NOT F0f PUBLIC DISCLOSURE January 28, 1976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE                             --PNO-76-17 Thie_ preliminary notification constitutes EARLY notice of events of POSEjBLE sr.fety or pu'lic       o    interest significance.               The information preignted is as initially roccived without verification or evaluation n
.n Yhd$ f f
and,js     basically all that is knoun by OIE staff as of 10:15 a.n. on date of this notification. IT S:10ULD BE SPECIFICALLY NOTED THAT THIS NOT111 CATION MAY CONTAIN INFORMATION THAT LATER !!AY BE DETER:1INED TO BE JUACCURATE OR II: CONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURREUCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.
PRELIMINARY NOTIFICATION - NOT F0f PUBLIC DISCLOSURE January 28, 1976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE
--PNO-76-17 Thie_ preliminary notification constitutes EARLY notice of events of POSEjBLE sr.fety or pu'lic interest significance.
The information o
preignted is as initially roccived without verification or evaluation and,js basically all that is knoun by OIE staff as of 10:15 a.n. on n
date of this notification.
IT S:10ULD BE SPECIFICALLY NOTED THAT THIS NOT111 CATION MAY CONTAIN INFORMATION THAT LATER !!AY BE DETER:1INED TO BE JUACCURATE OR II: CONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURREUCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.
FACILITY: Three Mile Island-1 (DN 50-289)
FACILITY: Three Mile Island-1 (DN 50-289)
Three Mile Island-2 (DN 50-320)
Three Mile Island-2 (DN 50-320)


==SUBJECT:==
==SUBJECT:==
UNAUTHORIZED ENTRY ONTO THE THREE MILE ISLAND SITE At 6:50 p.m., January 27, 1976 an individual in an automobile made an unauthor-ized, uncontrolled entry through an open gate onto the Three Mile Island site.
UNAUTHORIZED ENTRY ONTO THE THREE MILE ISLAND SITE At 6:50 p.m.,
January 27, 1976 an individual in an automobile made an unauthor-ized, uncontrolled entry through an open gate onto the Three Mile Island site.
He remained on the Island in the construction area for fifty minutes and then exited in his automobile through the open gate in an unauthorized, uncontrolled manner.
He remained on the Island in the construction area for fifty minutes and then exited in his automobile through the open gate in an unauthorized, uncontrolled manner.
When the North gate to the Island was opened to permit an employee in his auto-mobile to enter, the unauthorized automobile drove through the gate. Fifty minutes later the gate was again opened to permit exit of an authorized auto-mobile. The unauthorized automobile then drove through the gate, nearly strik-ing the guard. A description and license number were obtained.
When the North gate to the Island was opened to permit an employee in his auto-mobile to enter, the unauthorized automobile drove through the gate.
Entry through the North gate permits access to the fenced, owner controlled                                     /
Fifty minutes later the gate was again opened to permit exit of an authorized auto-mobile. The unauthorized automobile then drove through the gate, nearly strik-ing the guard. A description and license number were obtained.
Entry through the North gate permits access to the fenced, owner controlled
/
area. The Unit-2 construction site is in this controlled area. A second, inner /
area. The Unit-2 construction site is in this controlled area. A second, inner /
fence The  securedsurrounds      the not area was    secured opened. area,     which contains Unit-1, the operating facility.g During the time the man was on the Island                   ,q searches were conducted in the vicinity of Unit-1. No search was made at the 1
fence surrounds the secured area, which contains Unit-1, the operating facility.g The secured area was not opened.
    !              south end of the Island which is the construction area for Unit-2.
During the time the man was on the Island
Searches showed that no entry had been made through the security fence for Unit-1.
,q searches were conducted in the vicinity of Unit-1. No search was made at the south end of the Island which is the construction area for Unit-2.
    ;              In addition, no alarm was received from the fence intrusion alarm system, and no abnormalities were found.
1 Searches showed that no entry had been made through the security fence for Unit-1.
The individual was identified by the State Police. He is an employee of United Engineers and Constructors and is employed as an electrician on
In addition, no alarm was received from the fence intrusion alarm system, and no abnormalities were found.
    ,              Unit-2. Members of his family hrought him to the Island where he was inter-viewed by security personnel. The individual exhibited abnormal behavior patterns.
The individual was identified by the State Police. He is an employee of United Engineers and Constructors and is employed as an electrician on Unit-2. Members of his family hrought him to the Island where he was inter-viewed by security personnel. The individual exhibited abnormal behavior patterns.
l 4               Region I is inquiring, on site, into the circumstances and licensce's j               responses relating to this occurrence.
l 4
Region I is inquiring, on site, into the circumstances and licensce's j
responses relating to this occurrence.
i 4
i 4
I
{
{                                                                                                   ,
I c
c         _                    _                                    -                                        -                --
Continue 10 CFR 2.790 INFORMATION L '. g' 9906190303 760128 POR I&E O
Continue
FNO-76-017 PDR
                                              ;            10 CFR 2.790 INFORMATION L '. g'       .
]
9906190303 760128 POR I&E O
FNO-76-017               PDR                                                             -                              ]


f,                         O                                   O
f, O
              ,                            *l'0 CFR 2.790 INFORMATION
O
          ,        Page 2                                                               January 28, 1976 Continued                                                               PNO-76-17
*l'0 CFR 2.790 INFORMATION Page 2 January 28, 1976 Continued PNO-76-17
                = ,
=
  "q Media interest is expected because of the interest related to security at reactor facilities. The     State of Pennsylvania has been informed. A press
;"q Media interest is expected because of the interest related to security at reactor facilities.
(,               release is not planned.
The State of Pennsylvania has been informed. A press
l           Region I, NRC, Philadelphia, PA received notification of this occurrence by 1           telephone from the Station Superintendent at 10:25 p.m., January 27, 1976, q               This information is up-to-date as of 8:15 a.m.,     January 28, 1976.
(,
release is not planned.
l Region I, NRC, Philadelphia, PA received notification of this occurrence by 1
telephone from the Station Superintendent at 10:25 p.m., January 27, 1976, q
This information is up-to-date as of 8:15 a.m., January 28, 1976.
t
t


==Contact:==
==Contact:==
FADreher, IE x27261         GWRoy, IE x27352     HDThornburg, IE x27541 4               Distribution:
FADreher, IE x27261 GWRoy, IE x27352 HDThornburg, IE x27541 4
Chairman Anders                   Commissioner Mason       S. J. Chilk, SECY Commissioner Gilinsky             Commissioner Rowden       G. F. Murphy, JCAE j           Commissioner Kennedy             C. C. Kammerer, CA i
Distribution:
L. V. Gossick,                   J. G. Davis, OIE         J. A. Harris, PA         -
Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE j
      ,              B. C. Rusche, NRR               J. La F.leur, ISP         T. J. McTiernan, AIA y               K. R. Chapman, NMSS             H. K. Shapar, ELD Transmitted:   P Bldg l0 A ; H St l[       ; MNBB /) A ;     Luge /r/4 /
Commissioner Kennedy C. C. Kammerer, CA i
L. V. Gossick, J. G. Davis, OIE J. A. Harris, PA B. C. Rusche, NRR J. La F.leur, ISP T. J. McTiernan, AIA y
K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted:
P Bldg l0 A ;
H St l[
; MNBB /) A ;
Luge /r/4 /
1 4
1 4
{
{
4 0
4 0
i                                                       '
i
                                                                =
=
fi1                                          10 CFR 2.790 INFORMATION         '
1 fi 10 CFR 2.790 INFORMATION 1
                                                                                                      =q 1
N m
Nm}}
=q}}

Latest revision as of 14:10, 30 November 2024

PNO-76-017:on 760127,individual in Car Made Unauthorized, Uncontrolled Entry Through Open Gate Onto Three Mile Island Site.Description & License Number Obtained.Individual Identified & Interviewed by Security Personnel
ML20249B033
Person / Time
Site: Crane  Constellation icon.png
Issue date: 01/28/1976
From: Dreher F, Roy G, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-017, PNO-76-17, NUDOCS 9806190303
Download: ML20249B033 (2)


Text

{{#Wiki_filter:10 CFR 2.790 INFORMAT7 b# .n Yhd$ f f PRELIMINARY NOTIFICATION - NOT F0f PUBLIC DISCLOSURE January 28, 1976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PNO-76-17 Thie_ preliminary notification constitutes EARLY notice of events of POSEjBLE sr.fety or pu'lic interest significance. The information o preignted is as initially roccived without verification or evaluation and,js basically all that is knoun by OIE staff as of 10:15 a.n. on n date of this notification. IT S:10ULD BE SPECIFICALLY NOTED THAT THIS NOT111 CATION MAY CONTAIN INFORMATION THAT LATER !!AY BE DETER:1INED TO BE JUACCURATE OR II: CONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURREUCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED. FACILITY: Three Mile Island-1 (DN 50-289) Three Mile Island-2 (DN 50-320)

SUBJECT:

UNAUTHORIZED ENTRY ONTO THE THREE MILE ISLAND SITE At 6:50 p.m., January 27, 1976 an individual in an automobile made an unauthor-ized, uncontrolled entry through an open gate onto the Three Mile Island site. He remained on the Island in the construction area for fifty minutes and then exited in his automobile through the open gate in an unauthorized, uncontrolled manner. When the North gate to the Island was opened to permit an employee in his auto-mobile to enter, the unauthorized automobile drove through the gate. Fifty minutes later the gate was again opened to permit exit of an authorized auto-mobile. The unauthorized automobile then drove through the gate, nearly strik-ing the guard. A description and license number were obtained. Entry through the North gate permits access to the fenced, owner controlled / area. The Unit-2 construction site is in this controlled area. A second, inner / fence surrounds the secured area, which contains Unit-1, the operating facility.g The secured area was not opened. During the time the man was on the Island ,q searches were conducted in the vicinity of Unit-1. No search was made at the south end of the Island which is the construction area for Unit-2. 1 Searches showed that no entry had been made through the security fence for Unit-1. In addition, no alarm was received from the fence intrusion alarm system, and no abnormalities were found. The individual was identified by the State Police. He is an employee of United Engineers and Constructors and is employed as an electrician on Unit-2. Members of his family hrought him to the Island where he was inter-viewed by security personnel. The individual exhibited abnormal behavior patterns. l 4 Region I is inquiring, on site, into the circumstances and licensce's j responses relating to this occurrence. i 4 { I c Continue 10 CFR 2.790 INFORMATION L '. g' 9906190303 760128 POR I&E O FNO-76-017 PDR ]

f, O O

  • l'0 CFR 2.790 INFORMATION Page 2 January 28, 1976 Continued PNO-76-17

=

"q Media interest is expected because of the interest related to security at reactor facilities.

The State of Pennsylvania has been informed. A press (, release is not planned. l Region I, NRC, Philadelphia, PA received notification of this occurrence by 1 telephone from the Station Superintendent at 10:25 p.m., January 27, 1976, q This information is up-to-date as of 8:15 a.m., January 28, 1976. t

Contact:

FADreher, IE x27261 GWRoy, IE x27352 HDThornburg, IE x27541 4 Distribution: Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE j Commissioner Kennedy C. C. Kammerer, CA i L. V. Gossick, J. G. Davis, OIE J. A. Harris, PA B. C. Rusche, NRR J. La F.leur, ISP T. J. McTiernan, AIA y K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted: P Bldg l0 A ; H St l[

MNBB /) A ;

Luge /r/4 / 1 4 { 4 0 i = 1 fi 10 CFR 2.790 INFORMATION 1 N m =q}}