ML20212B329: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:1 4hb cott J. Rubin
{
}
Attorney
* Consultant DOCKETED 3 Lost Creek Drive
* Selinsgrove, PA 17870 * (570)743 2233
* Fax: (570)743-8145YsJrubin@ptd. net
?) SU' 17 P2 :48 1
Septemberll,1999 OFi+
RUu Secretary ADJJ '
AFF U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 l
Attention: Rulemakings and Adiudications Staff I
Re: In the Matter of FirstEnergy Nuclear Operating Company, Pennsylvania Power Company, and Duquesne Light Company (Beaver Valley Power Station, Units 1 & 2)
Docket Nos. 50-334 & 50-412 - L7'
 
==Dear Sir or Madam:==
Enclosed for filing please find the Petition to Waive Time Limits in 10 CFR Q 2.1305 and Supplemental Comments of Local 29, International Brotherhood of Electrical Workers, in the above-referenced proceeding.
Copies have been served upon the applicants and the General Counsel, by electronic mail and
{
first class mail, as required by 10 CFR Q 2.1313 and as shown on the attached certificate of service.
In addition, I have enclosed an extra copy of the petition that I would appreciate having time-stamped and returned in the enclosed envelope.
Please let me know if you have any questions or require additional information about this filing.
Thank you for your cooperation.
Sincerely, f
Scott), u in Enclosure cc: Parties of record 9909200055 990916 PDR ADOCK 05000334 0
PDR
)Sa.3) u}}

Latest revision as of 20:41, 5 December 2024

Forwards for Filing,Petition to Waive Time Limits in 10CFR2.1305 & Supplemental Comments of Local 29,Intl Brotherhood of Electrical Workers Re Beaver Valley Power Station,Units 1 & 2
ML20212B329
Person / Time
Site: Beaver Valley
Issue date: 09/16/1999
From: Rubin S
AFFILIATION NOT ASSIGNED, INTERNATIONAL BROTHERHOOD OF ELECTRICAL WORKERS
To:
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20212B334 List:
References
CON-#399-20828 LT, NUDOCS 9909200055
Download: ML20212B329 (1)


Text

1 4hb cott J. Rubin

{

}

Attorney

  • Consultant DOCKETED 3 Lost Creek Drive
  • Selinsgrove, PA 17870 * (570)743 2233
  • Fax: (570)743-8145YsJrubin@ptd. net

?) SU' 17 P2 :48 1

Septemberll,1999 OFi+

RUu Secretary ADJJ '

AFF U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 l

Attention: Rulemakings and Adiudications Staff I

Re: In the Matter of FirstEnergy Nuclear Operating Company, Pennsylvania Power Company, and Duquesne Light Company (Beaver Valley Power Station, Units 1 & 2)

Docket Nos. 50-334 & 50-412 - L7'

Dear Sir or Madam:

Enclosed for filing please find the Petition to Waive Time Limits in 10 CFR Q 2.1305 and Supplemental Comments of Local 29, International Brotherhood of Electrical Workers, in the above-referenced proceeding.

Copies have been served upon the applicants and the General Counsel, by electronic mail and

{

first class mail, as required by 10 CFR Q 2.1313 and as shown on the attached certificate of service.

In addition, I have enclosed an extra copy of the petition that I would appreciate having time-stamped and returned in the enclosed envelope.

Please let me know if you have any questions or require additional information about this filing.

Thank you for your cooperation.

Sincerely, f

Scott), u in Enclosure cc: Parties of record 9909200055 990916 PDR ADOCK 05000334 0

PDR

)Sa.3) u