ML20212C581: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[PLA-2713, Monthly Operating Repts for Aug 1986]]
| number = ML20212C581
| issue date = 08/31/1986
| title = Monthly Operating Repts for Aug 1986
| author name = Hirt J, Keiser H
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = Beebe M
| addressee affiliation = NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
| docket = 05000387, 05000388
| license number =
| contact person =
| document report number = PLA-2713, NUDOCS 8612310105
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 9
}}
 
=Text=
{{#Wiki_filter:'
      ,  ,                                            AVERAGE DAILY UNIT POWER LEVEL ss; 4                                                            DOCKET NO.
50-387 LF      '
                                  ~%                                                                              One Q                                                                          09-06-86 D
J.A. Hirt SJC $                                                                  COMPLETED BY TELEPHONE      (717)542-3917 g            August, 1986 DAY        AVERAGE DAILY POWER LEVEL                      DAY        AVERAGE DAILY POWER LEVEL (MWe Net)                                                (MWe-Net) l            1024                                                              784 37 2          1020                                          ,,                  999 3            1014                                          g,                  1021            ,
4            1026                                                              1024 20 1022                                                              1030 21 6                                                        22 1028 7      _
1026 23                                _
1021                                                            1030 g
9            1018                                        ,                  1035 10            1017                                                            1030                    "
26 lI 1026                                                            1026 37 1032                                                            1038 12                                                          ,3 l
13                                                          29                  1040 14            1029                                                              1039 3
I5            1023                                                              1034 3,
16              701 INSTRUCTIONS On this format.!ist the average dady unit power levelin MWe Net for each day in the reporung month. Compute to the nearest whole megawatt.
(9/77) 8612310105 860831 PDR      ADOCK 05000387 PDR y\\
R
                                                                                                                          \
 
W' y              e Of.W m            ...
7 s
tA.--          7. J                        OPERATING DATA REPORT o                                  \                                          DOCKET NO. 50-387 09-04-86 DATE 07NIC si[s                                                                            COMPLETED BY                J.A.Hirt TELEPHONE (717) S42-3917 OPERATING STATUS Unit 1 Susemehanna steam Electric station                      N0('5
: 1. Unit Name:
: 2. Reporting Penod:          Auoust, 1986
: 3. Licensed Thermal Power IMWt):          3293
: 4. Nameplate Rating (Gross MWe):          1152                                                                                            l S. Design Electrical Rating (Net MWe):    1065
: 6. Maximum Dependable Capacity (Gross MWe):          1068 1032                                                                                l
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Reasons:
No changes
: 9. Power Level To Which Restricted. If Any INet MWe):              No restrictions
: 10. Reasons For Restrictions. If Any:            NA This Month                    Yr..to.Date                  Cumulatise
: 11. Hours In Reporting Period                                  744                    5,831                          28,344
: 12. Number Of Hours Reactor Was Critical                      744                      3,675.9                        19,667'.1
: 13. Reactor Reserve Shutdown Hours                              0                        102.1                          812.7
: 14. Hours Generator On.Line                                    744                      3,535.8                        19,154.6
: 15. Unit Reserve Shutdown Hours                                  0                            0                            0
: 16. Gross Thermal Energy Generated IMWH)                  2,403,752              11,077,921                            58,665,246 17 Gross Electrical Energy Generated lMWH)                  776,550                  3,598,742                        19,097,734
: 18. Net Electrical Energy Generated IMWH)                  749,537                    3,435,133                      18,279,871
: 19. Unit Service Factor                                        100.0                            60.6                        67.6
: 20. Unit Availability Factor                                    100.0          ,_                60.6                        67.6
: 21. Unit Capacity Factor iUsing MDC Neti                        m6        _                      G ~7        1              mR
: 22. Unit Capacity Factor IUsing DER Net)                        M6        -                      99 1                        60 6
: 23. Unit Forced Outage Rate                                          0                            16.2                        12.2
: 24. Shutdowns Scheduled Over Next 6 Months tType. Date, and Duration of Eaein Mn nh n t-a nwn c- nchodninM
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:              MA
: 26. Units In Test Status t Prior to Commercial Operation):                              Forecast                      Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION p, . - i
 
gANN4 4          ,  e                                                                                                                    l a
l
                  ')f%,) ' t','
9          ....
[                                                                                                                         :
UNIT SifU(DOWNS AND POWER REDUCTIONS                  DOCKET NO. 50-387 PPat g                                                                                    UNIT NAME SSES-Unit One          .
O (f's            f                                                                                              DATE 09/ 04a/ 06        )
NIC 5Y                                          REPORT MONTH Angumt. 1986                    COMPLETED BY        .T A - Hirt TELEPHONE (717)S42-3917 e
                                                            "h                                -
                                        =_
Ee
                                                  ,. s==          Licensee      E-r g
No .          Darc i,
i      35 E
                                                    $    7sX rs5            Event        5Y c 1, 8.''3 Cause & Corrective Action to
* 5
                                        $E              j5g          Report er    $0            L              prevent Recurrence c5 9        860816          S          0      B        5              NA    SB          SIIV    On August 16 a power reduction to 55% rated power was scheduled to perform a control rod sequence                  ,
                  -                                                                                    exchange. Reactor power was brought down to 70% about one hour earlier than scheduled due the malfunctioning of a main stop valve to the turbine. After the limit switches on the stop valve were replaced the valve operated satisfactorily. The sequence exchange was completed at 1745 hourt on August 16 and full power oper-ation was restored on August 18 at approximately 1000 hours.
I                        2                                                  3                              4 F: Forced                Reason:                                            Method:
S: Scheduled                                                                                                Exhibit G-Instructions A Equipment Failure (Explain)                      l Manual                      for Preparation of Data B-Maintenance of Test                              2 Manual Scram.                Entry Sheels for Licensee
!                              C Refueling                                        3. Automatic Scram.            Event Repor (LER) File (NUREG-D-Regulatory Restriction                            4 Continuation                0161)
E-Operator Training & License Examination              from previous month F-Administrative                                                                5 G-Operational Error (Explain)                      5-Reduction (9/77)                      Il-Oth r(Explain)                                  9-Other                        Exhibit I Same Source l
 
Y I
UNIT 1 3
SUSQUEHANNA STEAM ELECTRIC' STATION 4
Docket Number 50-387    Date 09-04-86 i
Completed by J. A. Hirt              Telephone (717)542-3917
.,                        Challenges to Main Steam Safety-Relief Valves
.,                        None i
Changes to the Offsite Dose Calculation Manual
  ,                        None j'                        Major Changes to Radioactive Waste Treatment Systems i
None
  'l t
l l
1 L.  . . . , - . . - . .        . , - . , , , - - . - . - - . - . ~              - -
 
n      Op                AYERAGE DAILY UNIT POWER LEVEL
                                                                            &)
2                                                \ *r g                                        ,,yy.        E                                                      DOCKET NO.                        50-388 a                  _\
gy                      '
                                                                                    ~ M'                                                                                                Two WIT -
ff                                  E          so                                                                      DAtt                9- 4-as DIC 54                                                                COMPLETED BY J. A. Hirt TELEPHONE (717)542-3917 l
WONTH                          August, 1986 DAY                              AVERAGE DAILY POWER LEVEL                            DAY  AVERAGE DAILY POWER LEVEL (MWe Net)                                            iMWe-Net) g                                739                                                      0 g
2                                  no                                          18        0 723                                                      0 3                                                                              g,                                  _
4                                  722                                                      0 20 5
712                                                      0 21 6                                  700                                                      0 22 7                                700                                                      0 23                                _
3                                  674                                                      0 24 9
8 D
0                                                                                                  '
10                                                                                  10 0
11 0
12                                                                                                0 28 0
f                                          13                                                                                                0 29 0                                                    0 14                                                                                    30 0
15 0
31 0
16 INSTRUCTIONS On this format. list the average dady unit power fevet in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt. '
(9/77)
 
      ..          k'              fs g
            =          c            r, j s
t L _.                                  ' OPERATING DATA REPORT
                                                                          \                            DOCKET NO. 50-388 k    NIC gi DATE COMPLETED BY 09/04/86 J.A. Hitt TELEPHONE (717)542-3917 OPERATING STATUS Unit 2 Susquehanna Steam Electric Station                    Notes
: 1. Unit Name:
: 2. Reporting Penod:            An e t 19A6                                  Commenced first refueling              l
: 3. Licensed Thermal Power IMWt,                r93                          outage on August 9.
: 4. Nameplate Rating (Gross MWel:              1152                                                                  i
: 5. Design Electrical Rating (Net MWel:        1065                                                                  l
: 6. Maximum Denendable Capacity (Gross MWe):          1068                                                            l
: 7. Maximum Dependable Capacity (Net MWe):            1032                                                            l
: 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Lart Report. Give Reasons:
No changes
: 9. Power Level To Which Restricted,if Any (Net MWe):          No restrictions
: 10. Reasons For Restrictions. If Any:              NA This Month                  Yr..to.Date      Cumulatise i1. Hours In Reporting Period                              744                    5,831          13,583
: 12. Number Of Hours Reactor Was Critical                    196.3                  4 mn.,          11,631.S'
: 13. Reactor f.eserve Shutdown Hours                            0                      ,,,_n            71i.9
: 14. Hours Generator On.Line                                195                    4.396.6          11,391.7
: 15. Unit Reserve Shutdown Hours                                o                        o                0
: 16. Gross Thermal Energy Ger.erated (MWH)              455'953                13,285,935            35,316,733 17 Gross Eledrcal Energy Generated (MWH)                144,090                  4,349,718        11,562,518
: 18. Net Electncal Energy Generated IMWH)                132,133                  4,172,744        11,127,054
: 19. Unit Service Factor                                    26.2                          75.4            83.9 l0. Unit Availability Factor
                                              .                    26.2                          75.4            83.9
: 21. Unit Capacity Factor lUsing MDC Nett                  17*2            _
69.3            79.4 16.7                          67.2
: 22. Unit Capacity Factor (Using DER Net)                                  _                              76.9
: 23. Unit Forced Outags Rate                                    0                      16.8              39_n
: 24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Eaea r No shutdowns scheduled
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:                October 24,1986
: 26. Units in Test Status aPrior to Commercial Operation):                            Forecast          Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION l
l go.-*)
 
              <i,N                                                                                                                                      l sp'
                ,  y. *, '                                                                                                                            ..
y m        w).#z    L y
DOCKET NO.        50-388 UNIT SHU4 DOWNS AND POWER REDUCll0NS PPal                                                                                          UNIT NAME        SSES-Unit 2          .
            @ ,I          .O                                                                                              DATE      09/04/86          l 43c 5                                                          August, 1986                  COMPLETED BY          J.A. Hirt REPORT MONTl1 TELEPHONE          (7171542-3917 e
                                                                "i
:                                        =_      ..      3.:                                _c 5$              3  5h                                                Cauw & Correchve g ;e No '          gyage        ~g,                k                                =          ,
g        ya        g                  Event
[3        gU3                    Action to oe        e      g5g        Report a    vi V g                  Prevent Recurrence 6
8        860809          S      549 0        C        2        NA        ZZ        ZZZZZ    Unit 2 manually shutdown to start
* its first refuel outage. Expected restart date is October 24,1986.
s 1                        2                                                  3                              4 F: Forced                Reason:                                            Method:
S: Scheduled                                                                                                Exhibit G - Instructions A-Equipment Failure (Explain)                      1-Manual                        for Preparation of Data B-Maintenance of Test                              2-Manual Scram.                Entry Sheets for Licensee C. Refueling                                      3-Automatic Scram.              Event Report (LER) File (NUREG.
D-Regulatory Restriction                          4 Continuation                0161)
E-Operator Training & License Examination            from previous month F Administrative                                                              5 Goperational Error ( E xplain)                    5-Reduction Exhibit I - Same Source (9/77)                      llother (Explain)                                  9-Other
 
T ': '
W.
                *u UNIT 2 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-388                      Date 09/04/86 Completed by J.A. Firt                              Telephone (717) 542-3917
                              ' Challenges to Main Steam Cafety Relief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systems None 4
l 1
1 l
 
p.
p.
PP&L Pennsylvania Power & Light Company Two North Ninth Street
* Allentown, PA 18101
* 215 / 770 5151 Harold W. Keiser Vice President-Nuclear Operations 215/770-7502 SEP 121986 Director, Data Automation &                                                                          .
Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTELY OPERATING REPORTS                                                  Docket Nos. 50-387/NPF-14 PLA-2713                      FILE R41-2A                                                  50-388/NPF-22
 
==Dear Mr. Beebe:==
 
The August 1986 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, I
              \    %
H. W. Keiser Vice President-Nuclear Operations Attachment cc:  Dr. Thomas E. Murley Regional Administrator-Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk (12 copies)
Mr. L. R. Plisco - NRC
([
Ms. M. J. Campagnone - NRC                                                                    f
                                                                                                                'I}}

Latest revision as of 01:04, 28 July 2021