ML20212F362: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[BECO-87-043, Forwards Radioactive Effluent & Waste Disposal Rept Including Radiological Impact on Humans,Jul-Dec 1986. Final Calculations Re Final Dose Assessment Will Be Submitted by 870401]]
| number = ML20212F362
| issue date = 03/02/1987
| title = Forwards Radioactive Effluent & Waste Disposal Rept Including Radiological Impact on Humans,Jul-Dec 1986. Final Calculations Re Final Dose Assessment Will Be Submitted by 870401
| author name = Bird R
| author affiliation = BOSTON EDISON CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000293
| license number =
| contact person =
| document report number = BECO-87-043, BECO-87-43, NUDOCS 8703050073
| package number = ML20212F368
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
}}
 
=Text=
{{#Wiki_filter:-          ___
h            PNPS Technical Specification Section 6.9.C.1 SOSFONEDtSON        (Reg. Guide 1.21)
Executive offices 800 Boylston street Boston, Massachusetts 02199 Ralph G. Bird                                                                                Harch 2, 1987 Senior Vice President- Nuclear BECo 87-043 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC              20555
      -                                                                                              License DPR-35    ,
Docket 50-293 Semi-Annual Radioactive Effluent and Waste Disposal Report for the Period July 1 through December 31, 1986
 
==Dear Sir:==
 
In accordance with the Pilgrim Nuclear Power Station Technical Specification Section 6.9.C.1, the Boston Edison Company hereby submits the Radioactive Effluent and Haste Disposal Report for the period of July 1 through December 31, 1986.
This report does not contain the final dose assessment results due to a lack of effluent release data. This data is presently unavailable in a final format due to a delay in receiving analyses results from a contractor laboratory. We expect these final calculations to be complete and submitted to you by April 1, 1987.
Please do not hesitate to contact me directly should youhave any questions regarding this matter.
Very truly yours, MTL/ns
 
==Attachment:==
Pilgrim Nuclear Power Station Radioactive Effluent and Waste Disposal Report, including Radiological Impact on Humans:
December 31, 1986 (2 copies) cc:    U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Senior NRC Resident Inspector
:I EV8 Pilgrim Nuclear Power Station                                                                  ,
  , N[OpD                          [
R
_ _                - _ _ _ _ - _ _ _ _ _ _}}

Latest revision as of 23:32, 27 July 2021