IA-86-272, Forwards Region IV Evaluation Rept for Isap Iii.D Re Preoperational Testing Results Rept Transmitted by Util 860404 Ltr.W/O Encl: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[IA-86-272, Further Response to Appeals of FOIA Request for Records Re Evaluation of issue-specific Action Plan Re Plant.Documents I.2.b & I.10 Addressed in Responses to FOIA 86-A-203 & 86-A-204 & Contained in Other Documents Available in PDR]]
| number = ML20212N292
| issue date = 05/16/1986
| title = Forwards Region IV Evaluation Rept for Isap Iii.D Re Preoperational Testing Results Rept Transmitted by Util 860404 Ltr.W/O Encl
| author name = Johnson E
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name = Noonan V
| addressee affiliation = NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
| docket = 05000445, 05000446
| license number =
| contact person =
| case reference number = FOIA-86-272, FOIA-86-454, FOIA-86-A-194, FOIA-86-A-195
| document report number = NUDOCS 8703120434
| package number = ML20212N239
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 1
}}
 
=Text=
{{#Wiki_filter:._
p** "%,
UNITED STATES fy          *
                ,            NUCLEAR REGULATORY COMMISSION k                                        REGION IV
                                  $11 RYAN PLAZA drive. SulTE 1000 ARLINGTON, TEXAS M011 14AY 161986 MEMORANDUM FOR:    V. Noonan, Director, Comanche Peak Group                      ,
FROM:              E. H. Johnson.. Director, Division of Reactor Safety and Projects, Region IV
 
==SUBJECT:==
EVALUATION REPORT Attached is the Region IV Evaluation Report for the ISAP III.d., "Preoperational Testing" Results Report submitted on April 4, 1986, by TUGCo.
With regard to Region IV's evaluation of the Results Reports for ISAPs I.a.4.,
      " Agreement Between Drawings and Field Terminations" and VII.b.2, " Valve Disassembly." Region IV is awaiting TUGCo's revision to the Results Report for ISAP I.a.4. and TUGCo's reply to the staff's request for additional information concerning the Results Report for ISAP VII.b.2.
                    ,                                rA AL E. H. Johnson, Director Division of Reactor Safety and Projgets Attachment cc:
R. Martin T. Westerman I. Barnes W. Smith L. Ellershaw C. Hale P. Wagner C. Trammell A
: g. Cook
        . Chandler, ELD R. Heishman IE l
l 1
0703120434 870310                                          h'g          FDI A   Tf'3 U ,
f0 M 9b'N 3
\          c$DEO    -194 PDR}}

Latest revision as of 05:25, 20 February 2021