ML20154C788: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20154C788 | | number = ML20154C788 | ||
| issue date = 02/24/1986 | | issue date = 02/24/1986 | ||
| title = Responds to | | title = Responds to Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-160/85-03 & 50-276/85-02.Violation 2,Subpart a Deleted.Response to Subparts b-d Required within 30 Days | ||
| author name = Walker R | | author name = Walker R | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8603050320 | | document report number = NUDOCS 8603050320 | ||
| title reference date = 12-09-1985 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO EDUCATIONAL INSTITUTION, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO EDUCATIONAL INSTITUTION, OUTGOING CORRESPONDENCE | ||
| page count = 1 | | page count = 1 | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:o/Nebeb/ | {{#Wiki_filter:o/Nebeb/ | ||
Georgia Institute of Technology | |||
ATTN: | |||
Dr. Ratib A. Karam, Director | |||
of Nuclear Research Center | |||
900 Atlantic Drive, N.W. | |||
Atlanta, GA 30332 | |||
Gentlemen: | |||
SUBJECT: | |||
INSPECTION REPORT NOS. 50-160/85-03 AND 50-276/85-02 | |||
Our letter dated January 9,1986, in response to your letter of December 9,1985, | |||
stated that your response to the Notice of Violation enclosed with the above | |||
report was under review and that you would be notified of the results of this | |||
review at a later date. | |||
In response to Violation 1, concerning sampling for liquid effluent releases, we | |||
have reviewed the steps you have taken to correct this violation and will examine | |||
e | |||
the implementation of your corrective actions during future in:pections. | |||
With regard to Violation 2, | |||
subpart a, we agree with your position and have | |||
deleted the subpart from our records. | |||
Violation 2, subparts b, c and d were not addressed in your December 9,1985, | |||
response. | |||
Therefore, in accordance with the requirements of 10 CFR 2.201, | |||
please submit to this office within 30 days of the date of this letter, a written | |||
statement which includes admission or denial of subparts b, c and d of the | |||
alleged violation, the reason for the violation, if admitted, the corrective | |||
steps which have been taken and the results achieved, corrective steps which | |||
will be taken to avoid further violations, and the date when full compliance | |||
will be achieved. | |||
The responses directed by this letter and the enclosure are not subject to the | |||
clearance procedures of the Office of Management and Budget issued under the | |||
Paperwork Reduction Act of 1980, PL 96-511. | |||
We appreciate your cooperation in this matter. | |||
Sincerely, | |||
BAS!"B1MK1bv | |||
Roger D. Walker, Director | |||
Division of Reactor Projects | |||
cc: vDr. T. E. Stelson, Vice President | |||
for Research | |||
bec:. License Fee Management Branch | |||
Document Control Desk | |||
State of Georgia | |||
-.. | |||
. | . | ||
kn' | |||
C | |||
DC | |||
i s. | |||
tohr | |||
f | |||
o r. | |||
Lei | |||
V | |||
nc | |||
ia | |||
2/g/86 | |||
2/\\( /86 | |||
2//7 | |||
2{C(/86 | |||
/4 /86 | |||
2/29/86 | |||
pj | |||
/86 | |||
8603050320 860224 | |||
g | |||
PDR | |||
ADOCK 05000160 | |||
0 | |||
G | |||
PDR | |||
t | |||
1 20/ | |||
_ _ _ | |||
_ | |||
_ | |||
___ | |||
_ _ . _ _ | |||
}} | }} | ||
Latest revision as of 11:51, 24 May 2025
| ML20154C788 | |
| Person / Time | |
|---|---|
| Site: | Neely Research Reactor, 05000276 |
| Issue date: | 02/24/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Karam R Neely Research Reactor, ATLANTA, GA |
| References | |
| NUDOCS 8603050320 | |
| Download: ML20154C788 (1) | |
See also: IR 05000160/1985003
Text
o/Nebeb/
Georgia Institute of Technology
ATTN:
Dr. Ratib A. Karam, Director
of Nuclear Research Center
900 Atlantic Drive, N.W.
Atlanta, GA 30332
Gentlemen:
SUBJECT:
INSPECTION REPORT NOS. 50-160/85-03 AND 50-276/85-02
Our letter dated January 9,1986, in response to your letter of December 9,1985,
stated that your response to the Notice of Violation enclosed with the above
report was under review and that you would be notified of the results of this
review at a later date.
In response to Violation 1, concerning sampling for liquid effluent releases, we
have reviewed the steps you have taken to correct this violation and will examine
e
the implementation of your corrective actions during future in:pections.
With regard to Violation 2,
subpart a, we agree with your position and have
deleted the subpart from our records.
Violation 2, subparts b, c and d were not addressed in your December 9,1985,
response.
Therefore, in accordance with the requirements of 10 CFR 2.201,
please submit to this office within 30 days of the date of this letter, a written
statement which includes admission or denial of subparts b, c and d of the
alleged violation, the reason for the violation, if admitted, the corrective
steps which have been taken and the results achieved, corrective steps which
will be taken to avoid further violations, and the date when full compliance
will be achieved.
The responses directed by this letter and the enclosure are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
We appreciate your cooperation in this matter.
Sincerely,
BAS!"B1MK1bv
Roger D. Walker, Director
Division of Reactor Projects
cc: vDr. T. E. Stelson, Vice President
for Research
bec:. License Fee Management Branch
Document Control Desk
State of Georgia
-..
.
kn'
C
i s.
tohr
f
o r.
Lei
V
nc
ia
2/g/86
2/\\( /86
2//7
2{C(/86
/4 /86
2/29/86
pj
/86
8603050320 860224
g
ADOCK 05000160
0
G
t
1 20/
_ _ _
_
_
___
_ _ . _ _