ML20207P766: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IA-88-464, Requests That Generic Issue (GI) 119.1, Pipe Rupture Requirements & Decoupling of Seismic Loads Be Subsumed in Remaining Portion of GI B-6, Loads,Load Combinations & Stress Limits]]
{{Adams
| number = ML20207P766
| issue date = 01/08/1987
| title = Requests That Generic Issue (GI) 119.1, Pipe Rupture Requirements & Decoupling of Seismic Loads Be Subsumed in Remaining Portion of GI B-6, Loads,Load Combinations & Stress Limits
| author name = Bosnak R
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee name = Kniel K
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket =
| license number =
| contact person =
| case reference number = FOIA-88-464, REF-GTECI-119, REF-GTECI-B-06, REF-GTECI-NI, REF-GTECI-PI, TASK-119, TASK-B-06, TASK-B-6, TASK-OR
| document report number = NUDOCS 8701200186
| package number = ML20205C260
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 1
}}
 
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _          _ _ _ _ _ _ _                _ _ _ _
AwfM mia 9 B&P i' Ovn 4Qt'E7Md'zD2,Mf8M8pM'.27dM
          . .e M8                                  1987
                                                                                                                                                                  .d C /,3 4 MEMORANDUM FOR:          Karl K'nici, Chief Safety Program Evaluation Branch Division of Safety Review and Oversight FROM:                    Robert J. Bosnak, Chief                                                                                                              -
Engineering Issues Branch Division of Safety Review and Oversight
 
==SUBJECT:==
REQUEST FOR SUBSUMPTIO!! 0F GEtlERIC ISSUE B-d (GI B-6) IfiTO GEtiERIC ISSUE 119.1 (GI 119.1)
NRR is the designated fiRC lead office for the resolution of the only uncompleted portion (decoupling of SSE and LOCA loads) of GI B-6, "Loads, load Combinations and Stress Limits". However, decoupling of SSE ano LOCA loads is also a part of GI 119.1, "Pipe Rupture Requirerents and Decoupling of Seismic and LOCA Loads; for which P.ES is the designated fiRC lead of fice.
Since GI 119.1 is larger.in scope than GI B-G we request that Gl 119.1 subsume the remaining portion of GI B-6 to eliminate the unnecessarily redundant GlHCS tracking requirerents. RES and fiRR have been and will continue to work together in the resolution of these issues.
Robert J. Bosnak, Chief Engineering issues Branch Division of Safety Review and Oversight l
cc:  T. Speis B. Sheron YS M                                          <
F. Cherny G. Arlotto J. Richardson J. O'Brien J. Page DISTRIDUTION 15peis BSheren DSR0 Chron ElB Rdg. File                                                                                                                                                            >
A ~e'ntral files JPage RBosnak OFFICIAL RECORD COPY i                ElB:DSRO        ElB:DSR    f,        ElB RBor;nak R0
[
JPage            FChernr                                                                                                                              ,                ,
j                01/ 7 /87        01/ 7 /87              01/"j7 /07                                                                                                                i-
                                                                                                                                                                    - pl le            e, d
                                                                                                                                                                      ) \) ~
                                                                                                                                                          ~I
                  ,/"                  % 1                                                                                                                                  '
B701200106 870108 b' CF , SU3J,,
                                                                                                                                                  ..}}

Latest revision as of 16:51, 5 December 2021

Requests That Generic Issue (GI) 119.1, Pipe Rupture Requirements & Decoupling of Seismic Loads Be Subsumed in Remaining Portion of GI B-6, Loads,Load Combinations & Stress Limits
ML20207P766
Person / Time
Issue date: 01/08/1987
From: Bosnak R
Office of Nuclear Reactor Regulation
To: Kniel K
Office of Nuclear Reactor Regulation
Shared Package
ML20205C260 List:
References
FOIA-88-464, REF-GTECI-119, REF-GTECI-B-06, REF-GTECI-NI, REF-GTECI-PI, TASK-119, TASK-B-06, TASK-B-6, TASK-OR NUDOCS 8701200186
Download: ML20207P766 (1)


Text

_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

AwfM mia 9 B&P i' Ovn 4Qt'E7Md'zD2,Mf8M8pM'.27dM

. .e M8 1987

.d C /,3 4 MEMORANDUM FOR: Karl K'nici, Chief Safety Program Evaluation Branch Division of Safety Review and Oversight FROM: Robert J. Bosnak, Chief -

Engineering Issues Branch Division of Safety Review and Oversight

SUBJECT:

REQUEST FOR SUBSUMPTIO!! 0F GEtlERIC ISSUE B-d (GI B-6) IfiTO GEtiERIC ISSUE 119.1 (GI 119.1)

NRR is the designated fiRC lead office for the resolution of the only uncompleted portion (decoupling of SSE and LOCA loads) of GI B-6, "Loads, load Combinations and Stress Limits". However, decoupling of SSE ano LOCA loads is also a part of GI 119.1, "Pipe Rupture Requirerents and Decoupling of Seismic and LOCA Loads; for which P.ES is the designated fiRC lead of fice.

Since GI 119.1 is larger.in scope than GI B-G we request that Gl 119.1 subsume the remaining portion of GI B-6 to eliminate the unnecessarily redundant GlHCS tracking requirerents. RES and fiRR have been and will continue to work together in the resolution of these issues.

Robert J. Bosnak, Chief Engineering issues Branch Division of Safety Review and Oversight l

cc: T. Speis B. Sheron YS M <

F. Cherny G. Arlotto J. Richardson J. O'Brien J. Page DISTRIDUTION 15peis BSheren DSR0 Chron ElB Rdg. File >

A ~e'ntral files JPage RBosnak OFFICIAL RECORD COPY i ElB:DSRO ElB:DSR f, ElB RBor;nak R0

[

JPage FChernr , ,

j 01/ 7 /87 01/ 7 /87 01/"j7 /07 i-

- pl le e, d

) \) ~

~I

,/"  % 1 '

B701200106 870108 b' CF , SU3J,,

..