ML20063L426: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[U-602256, Annual Operating Rept for Period Jan- Dec 1993]]
| number = ML20063L426
| issue date = 12/31/1993
| title = Annual Operating Rept for Period Jan- Dec 1993
| author name = Phares R
| author affiliation = ILLINOIS POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000461
| license number =
| contact person =
| document report number = U-602256, NUDOCS 9403040385
| document type = ANNUAL OPERATING REPORT, TEXT-SAFETY REPORT
| page count = 4
}}
 
=Text=
{{#Wiki_filter:-.      _        _                  -, .            . . ._                . . .      _ .
  %'        W liknots Power Company Clinton Power Stat.on P.O Box 678 Clinton, il 61727 Tel 217 935-8881 ILLINSIS                                                                                                                                    .
P(wWER                                                                                                                                l U-602256                                      f L30-94(02 -25 )LP                            !
1A.120 February 25, 1994
+
Docket No. 50-461                                                                          10CFR50.36 Document Control Desk Nuclear Regulatory Commission l
Washington, D.C. 20555
 
==Subject:==
Annual Operating Repon r
i
 
==Dear Sir:==
 
In accordance with Section 6.9.1.4 of the Clinton Power Station Technical Specifications, Illinois Power is submitting the Annual Operating Report for the period of January 1,1993 through December 31,1993 for Clinton Power Station. Attachment 1                                                        ,
provides the data associated with Personnel Man-Rem by Work and Job Function                                                          .'
Attachment 11 provides performance information penaining to Safety Valve and                                                            !
Safety / Relief Valve Challenges and Primary Coolant Specific Activity Analysis.
Sincerely yours,                                                                      .
                                                                                        .        J                                                              A
                                                                  '} khhu ~d GiuD Richard F. Phares Director, Licensing -
SFB/csm Attachments cc:    NRC Region 111, Regional Administrator NRC Clinton Licensing Project Manager NRC Resident Office, V-690                                                                                                        l Director, Office of Nuclear Regulatory Research Illinois Department of Nuclear Safety                                                                                              l l
c o n :, e m                    ,
                                                                                                                                        .,      t                  '
9403040385 931231                                                                                                ,
f'r'-    i, PDR      ADOCK 05000461                ,
p-                      PDR            >
 
Attachment 1 ILLIN015 PDWER COMPANY to U-602256          <
CLINTON POWER STATION                                                                I P. O. Box 678 Page 1 of 2          1 Clinton, IL 61727 Reg. Guide 1.16 Report ReportingYear[93
                                                                    # PERSONNEL (>100 MREM)                                    TOTAL MAN-REM WORK 4 JOB FUNCilDN                      STATION              UTILITY      CONTRACT                STATION        UTILITY    CONTRACT 4........      .. .......... ...........................................................................................................+.
Routine Operations and Surveillance Maintenance and Construction                          131                    1          259                    3.819          0.022      4.843 Dperations                                                53                  2              10                  4.788          0.332      0.354 Health Physics and Lab                                    49                  0              53                  11.250          0.000      17.079 Supervisory and office Staff                              29                  1              9                    2.842        0.005      0.301 Engineering Staff                                        25                  0              19                    0.698        0.000      0.255.
  +............... ........ ... ..... . ... .........................................................................................
Routine Plant Maintenance Maintenance and Construction                              93                  1              53                    2.402        0.013      1.086 Operations                                                30                  1              1                  0.988          0.020      0.006-Health Physics and Lab                                    26                  0              8                  0.994          0.000      0.201 Supervisory and Office Staff                                5                0              2                    0.074        0.000      0.093 Engineering Staf f                                          4                0              0                  0.134          0.000      0.000
  +................................................... .............. ....... .......................... .............................
Inservice inspection Maintenance and Construction                              40                  0          266                    3.329          0.000    91.309 operations                                                  5                0              2                  0.139          0.000      2.399 Health Physics and Lab                                    14                0              23                  0.853          0.000      1.291  ;
Supervisory and Office Staff                                5                1              3                  0.929          0.097      0.870 Engineering Staf f                                        16                0              35                    2.801        0.000    31.791
  .... .............................................. ................................................... ...........................+
Special Plant Maintenance Maintenance and Construction                          151                    3          451                    40.559          0.4 73  116.649 Operations                                                53                  2              7                  13.8!          0.349      0.608 Health Physics and Lob                                    48                  0              51                    7.754        0.000      6.426 Supervisory and Office Staff                              24                  1              7                  3.390          0.028      0.848' Engineering Staff                                        27                  0              15                  3.896          0.000      0. 752
  ............ ................. ............. ............. . ................................. .............................. .....+
Waste Processing Maintenance and Construction                              10                0              7                    0.204        0.000      0.495  ,
Operations                                                  1                0              3                    0.005        0.000      0.963' t Health Physics and Lab                                    22                  0              5                  0 806          0.000      0.106 Supervisory and Office staff                                2                0              0                  0.006          0.000      0.000
    . Engineering Staff                                          0                0              0                  0.000          0.000      0.000  '
  +........... .......... ...,............... ........................... .... .....................................................+                    '
Refueling Operations Maintenance and Construction                          123                    2          404                    10.945          0.150    62.959 Operations                                                38                  0              6                    1.797        0.000    'O.965 Health Physics and Lab                                    24                  0              44                    2.407        0.000    '7.544  i Supervisory and Office Staff                              24                  0              11                  2.470          0.000      3.929 Engineering Staf f                                        17                0              10                    1.562        0 000      1.033 WORK & JOB FUNCTION TOTALS:                              1089                  15          1764                  125.736          1.488 - 355.155.
  ....................................................................................................................................+-
                                                                    # PERSONNEL (>100 MREM)                                    TOTAL MAN REM .
WORK & JOB FUNCTION                      STATION              UTILITY      CONTRACT                  STATION        UTILITY  CONTRACT GRAND TOTALS:                                              312                    6          606                  125.736          1.488  355.155 I
t 1
w
.        , ,..      ,              -          . . _ .      -_                      -          -      __ ~              . __    _-
 
i      .                                                                                ' Attachment I to U-602256 Page 2 of 2 l
i I
Report of Personnel and Man-Rem by Work and Job Fungti_o n
                                                                                                                        )
This report is a tabulation on an annual basis of the number of station, utility and other personnel (including contractors) who received exposures greater than 100 mrem /hr and their associated man-rem exposure according to work and job function.
The work. and job function totals for personnel greater than 100 mrem /yr are different than grand totals because an individual may perform work under more than one work and job        ,
function during the year, The total man-rem is based on a ratio of the official TLD results.                          ,
9 s
i
  ,  ,        -..m,,,
y- .                -
 
Attachment 2                    '
to U-602;56 Page1of1 PERFORMANCE CIIARACTERISTLCS AND TESTS
                                                                                                                      ]
                                                                                                                      )
l Safetylaive arid _ Safely!R_ cliff Valve Challsnges
 
==Reference:==
NUREG-0737, Action item II.K.3.3 CPS Technical Specification Section 6.9.1.5(b)
There were no unplanned or planned challenges to Safety Relief Valves during 1993.
                                                                                                                    -l Primar1CoJ21anLSpecific Activity Analyses Reference.      CPS Technical Specifications, Section 6.9.1.5(c)
All analyses for specific activity of primary coolant were within the limits of Technical Specification 3 4.5 fbr 1993.
s E
4 P
4 aw                                . - - - , ,                          , , , , -  ,    ,  ,-
e}}

Latest revision as of 02:33, 1 June 2023