{{#Wiki_filter:a   e Mr. J. E. Cross                               Ity 14,1999 President-Generation Group Duquesne Light Company Post Office Box 4                                                                                       ,
{{#Wiki_filter:a e
Shippingport, PA 15077
Mr. J. E. Cross Ity 14,1999 President-Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077


==SUBJECT:==
==SUBJECT:==
Line 23: Line 25:


==Dear Mr. Cross:==
==Dear Mr. Cross:==
 
By {{letter dated|date=March 16, 1999|text=letter dated March 16,1999}}, Duquesne Light Company (DLC) submitted proposed changes to the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) program described in the BVPS-2 Updated Final Safety Analysis Report (UFSAR), Chapter 17.2, which is applicable to both BVPS-1 and BVPS-2. The proposed changes would red xe commitments in the BVPS-1 and BVPS-2 QA orogram description previously approved by the Nuclear Regulatory Commission (NRC).
By letter dated March 16,1999, Duquesne Light Company (DLC) submitted proposed changes to the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) program described in the BVPS-2 Updated Final Safety Analysis Report (UFSAR), Chapter 17.2, which is applicable to both BVPS-1 and BVPS-2. The proposed                       !
The NRC staff has been reviewing your submittal, however, we have determined that additionalinformation is required from DLC in order to complete our review. Based on our need for additional information, we do not regard the proposed changes in Chapter 17,
changes would red xe commitments in the BVPS-1 and BVPS-2 QA orogram description                         )
~
previously approved by the Nuclear Regulatory Commission (NRC).                                         !
l The NRC staff has been reviewing your submittal, however, we have determined that additionalinformation is required from DLC in order to complete our review. Based on our need for additional information, we do not regard the proposed changes in Chapter 17,                 ~
Sechon17.2 of the BVPS-2 UFSAR to be acceptable pursuant to Title 10 of the Code of Federal Reaulations (10 CFR) Section 50.54(a). Therefore, you should refrain from implementing these changes until you have been formally notified otherwise.
Sechon17.2 of the BVPS-2 UFSAR to be acceptable pursuant to Title 10 of the Code of Federal Reaulations (10 CFR) Section 50.54(a). Therefore, you should refrain from implementing these changes until you have been formally notified otherwise.
The NRC requests that you provide your response to the enclosed RAI within 60 days of receipt of this letter. This was discussed with Mr. J. Maracek of your staff, and was established as a mutually agreeable timetable for your response. If circumstances result in the need to revise the target date, please call me at the earliest opportunity.
The NRC requests that you provide your response to the enclosed RAI within 60 days of receipt of this letter. This was discussed with Mr. J. Maracek of your staff, and was established as a mutually agreeable timetable for your response. If circumstances result in the need to revise the target date, please call me at the earliest opportunity.
Should you have any questions regarding this request, please contact me at (301) 415-1427.               l Sincerely, Original signed by:
Should you have any questions regarding this request, please contact me at (301) 415-1427.
Daniel S. Collins, Project Manager, Section 1 fok P
Sincerely, Original signed by:
      $oh [5b34     PDR D vis on f L en ng Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Daniel S. Collins, Project Manager, Section 1 fok $oh [5b34 D vis on f L en ng Project Management P
PDR Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
@T


==Enclosure:==
==Enclosure:==
R         st fo Additional                                               @T l
R st fo Additional cc w/ encl: See next page j
cc w/ encl: See next page                                                                       j DISTRIBUTION:
DISTRIBUTION:
Docket File             JZwolinski/SBlack         DCollins       DDorman         JPeralta       T)\
Docket File JZwolinski/SBlack DCollins DDorman JPeralta T)\\
V PUBUC                   SBajwa                   OGC             ACRS                                   '
PUBUC SBajwa OGC ACRS V
PDl-1 R/F               MO'Brien                 TQuay           MEvans, RI DCK:UMENT NAME: G:\ BEAVER \RAIA4992.WPD                 *See previous concurrence i
PDl-1 R/F MO'Brien TQuay MEvans, RI DCK:UMENT NAME: G:\\ BEAVER \\RAIA4992.WPD
OFFICE       P0ltVRM             PDI-2/LA A ,       HOMB*             PDif i/O NAME        Ddkrs!'           !MO'Brien                                 ah 1
*See previous concurrence i
DATE, _         / /M             4b/k/99             05/13/99         [/ A//99
PDi i/O OFFICE P0ltVRM PDI-2/LA A,
            +vJVId                           OFFICIAL RECORD COPY
HOMB*
f Ddkrs!'
!MO'Brien ah NAME 1
DATE, _
/ /M 4b/k/99 05/13/99
[/ A//99
+vJVId OFFICIAL RECORD COPY


n
n
  .*    'Mr. J. E. Cross .                             May 14,1999 President-Gener: tion Group 4       Duquesne Light Compiny .
'Mr. J. E. Cross.
May 14,1999 President-Gener: tion Group 4
Duquesne Light Compiny.
Post Office Box 4
Post Office Box 4
        ' Shippingport, PA 15077
' Shippingport, PA 15077


==SUBJECT:==
==SUBJECT:==
Line 53: Line 63:


==Dear Mr. Cross:==
==Dear Mr. Cross:==
By letter dated March 16,1999, Duquesne Light Company'(DLC) submitted proposed changes
By {{letter dated|date=March 16, 1999|text=letter dated March 16,1999}}, Duquesne Light Company'(DLC) submitted proposed changes
        . to the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) program described in the BVPS-2 Updated Final Safety Analysis Report
. to the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) program described in the BVPS-2 Updated Final Safety Analysis Report
        - (UFSAR), Chapter 17.2, which is applicable to both BVPS-1 and BVPS-2. The proposed changes would reduce commitments in the BVPS-1 and BVPS-2 QA program description previously approved by the Nuclear Regulatory Commission (NRC).
- (UFSAR), Chapter 17.2, which is applicable to both BVPS-1 and BVPS-2. The proposed changes would reduce commitments in the BVPS-1 and BVPS-2 QA program description previously approved by the Nuclear Regulatory Commission (NRC).
The NRC staff has been reviewing your submittal, however, we have determined that additional information is required from DLC in order to complete our review. Based on our need for additional information, we do not regard the proposed changes in Chapter 17, Section17.2 of the BVPS-2 UFSAR to be acceptable pursuant to Title 10 of the Code of Federal Reaulations (10 CFR) Section 50.54(a). Therefore, you should refrain from implementing these changes until you have been formally notified otherwise.
The NRC staff has been reviewing your submittal, however, we have determined that additional information is required from DLC in order to complete our review. Based on our need for additional information, we do not regard the proposed changes in Chapter 17, Section17.2 of the BVPS-2 UFSAR to be acceptable pursuant to Title 10 of the Code of Federal Reaulations (10 CFR) Section 50.54(a). Therefore, you should refrain from implementing these changes until you have been formally notified otherwise.
The NRC requests that you provide your response to the enclosed RAI within 60 days of receipt of this letter. This was discussed with Mr. J. Maracek of your staff, and was established
The NRC requests that you provide your response to the enclosed RAI within 60 days of receipt of this letter. This was discussed with Mr. J. Maracek of your staff, and was established
        ' as a mutually agreeable timetable for your response. If circumstances result in the need to revise the target date, please call me at the earliest opportunity.
' as a mutually agreeable timetable for your response. If circumstances result in the need to revise the target date, please call me at the earliest opportunity.
Should you have any questions regarding this request, please contact me at (301) 415-1427.
Should you have any questions regarding this request, please contact me at (301) 415-1427.
Sincerely, Original signed by:
Sincerely, Original signed by:
Line 65: Line 75:


==Enclosure:==
==Enclosure:==
. Request for Additional information cc w/enci: See next page
. Request for Additional information cc w/enci: See next page
        ' DISTRIBUTION:
' DISTRIBUTION:
Docket File .             JZwolinski/SBlack       DCollins       DDorman           JPeralta PUBLIC                     SBajwa                 OGC             ACRS PDI-1 R/F                 MO'Brien               TQuay           MEvans, RI DOCUMENT NAME: G:\ BEAVER \RAIA4992.WPD                   *See previous concurrence OFFICE       POWRM                 PDI-2/LA r ~     HOMB*             PDI-1/Q                   l NAME                  rsl        Mo'BrienAth                             "a DATE           /M99                 /f/99           05/13/99           [/ N/99 ~
Docket File.
                                                  - OFFICIAL RECORD COPY                                     l
JZwolinski/SBlack DCollins DDorman JPeralta PUBLIC SBajwa OGC ACRS PDI-1 R/F MO'Brien TQuay MEvans, RI DOCUMENT NAME: G:\\ BEAVER \\RAIA4992.WPD
*See previous concurrence OFFICE POWRM PDI-2/LA r ~
HOMB*
PDI-1/Q l
Mo'BrienAth "a
NAME rsl DATE
/M99
/f/99 05/13/99
[/ N/99 ~
- OFFICIAL RECORD COPY l


L:
L:
A Rt     .
A Rt p
E      p              A[                                 UNITED STATES jp                  {#              NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20eeH001
A[
            %g +                                         - May 14, 1999
E UNITED STATES j
                ' Mr. J. E. Cross
{
                                                                                                                        )1 President-Generation Group                                                                           l Duquesne Light Company Post Office Box 4                                                                                   ,
NUCLEAR REGULATORY COMMISSION p
Shippingport, PA 15077                                                                               I q
WASHINGTON, D.C. 20eeH001
%g +
- May 14, 1999
)
' Mr. J. E. Cross 1
President-Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077 q


==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING REVIEW OF                               1 BEAVER VALLEY POWER STATION, UNIT NOS.1 AND 2, QUALITY
REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING REVIEW OF 1
                                                                                                                        )
BEAVER VALLEY POWER STATION, UNIT NOS.1 AND 2, QUALITY
                                -ASSURANCE PROGRAM CHANGE (TAC NOS. MA4992 AND MA4993)
-ASSURANCE PROGRAM CHANGE (TAC NOS. MA4992 AND MA4993)
)


==Dear Mr. Cross:==
==Dear Mr. Cross:==
 
By {{letter dated|date=March 16, 1999|text=letter dated March 16,1999}}, Duquesne Light Company (DLC) submitted proposed changes to the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) program described in the BVPS-2 Updated Final Safety Analysis Report
By letter dated March 16,1999, Duquesne Light Company (DLC) submitted proposed changes to the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) program described in the BVPS-2 Updated Final Safety Analysis Report
'(UFSAR), Chapter 17.2, which is applicable to both BVPS-1 and BVPS-2. The proposed changes would reduce commitments in the BVPS-1 and BVPS-2 QA program description previously approved by the Nuclear Regulatory Commission (NRC).
                '(UFSAR), Chapter 17.2, which is applicable to both BVPS-1 and BVPS-2. The proposed changes would reduce commitments in the BVPS-1 and BVPS-2 QA program description previously approved by the Nuclear Regulatory Commission (NRC).
The NRC staff has been reviewing your submittal, however, we have determined that additional information is required from DLC in order to complete our review. Based on our need for additional information, we do not regard the proposed changes in Chapter 17, Section17.2 of the BVPS-2 UFSAR to be acceptable pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(a). Therefore, you should refrain from
The NRC staff has been reviewing your submittal, however, we have determined that additional information is required from DLC in order to complete our review. Based on our need for additional information, we do not regard the proposed changes in Chapter 17, Section17.2 of the BVPS-2 UFSAR to be acceptable pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(a). Therefore, you should refrain from
                                                                                                                      )
)
implementing these changes until you have been formally notified otherwise.
implementing these changes until you have been formally notified otherwise.
The NRC requests that you provide your response to the enclosed RAI within 60 days of receipt of this letter. .This was discussed with Mr. J. Maracek of your staff, and was established ,
The NRC requests that you provide your response to the enclosed RAI within 60 days of receipt of this letter..This was discussed with Mr. J. Maracek of your staff, and was established
                'as a mutually agreeable timetable for your response. If circumstances result in the need to         I revise the target date, please call me at the earliest opportunity.                                 l l
'as a mutually agreeable timetable for your response. If circumstances result in the need to I
revise the target date, please call me at the earliest opportunity.
l l
Should you have any questions regarding this request, please contact me at (301) 415-1427.
Should you have any questions regarding this request, please contact me at (301) 415-1427.
: 1.                                          Sincerely,                                         j auJ T 86~ -
Sincerely, j
Daniel S. Collins, Project Manager, Section 1 Project Directorate l Division of Licensing Project Management           )
1.
Office of Nuc! oar Reactor Regulation             1 Docket Nos. 50-334 and 50-412                                                                       ,
auJ T 86~ -
                                                                                                                      .J
Daniel S. Collins, Project Manager, Section 1 Project Directorate l Division of Licensing Project Management
)
Office of Nuc! oar Reactor Regulation 1
Docket Nos. 50-334 and 50-412
.J'


==Enclosure:==
==Enclosure:==
Request for Additional information dj cc w/ encl:" See~ next page W.
Request for Additional information dj cc w/ encl:" See~ next page W.


m                                                                                                 ,
m j..
j..   ,
t,.
t, .
Beaver Valley Power Station, Units 1 & 2 cc:
Beaver Valley Power Station, Units 1 & 2 cc:
1 Jay E. Silberg, Esquire                   Bureau of Radiation Protection Shaw, Pittman, Potts & Trowbridge'       Pennsylvania Department of 2300 N Street, NW.                         Environmental Resources Washington, DC 20037                     ATTN: Michael P. Murphy Post Office Box 2063 Director-Safety and Licensing             Harrisburg, PA 17120 Department (BV-A) .
1 Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts & Trowbridge' Pennsylvania Department of 2300 N Street, NW.
Duquesne Light Company                   Mayorof the Borough of Beaver Valley Power Station                         Shippingport PO Box 4                                 Post Office Box 3                         {
Environmental Resources Washington, DC 20037 ATTN: Michael P. Murphy Post Office Box 2063 Director-Safety and Licensing Harrisburg, PA 17120 Department (BV-A).
j Shippingport, PA 15077                   Shippingport, PA 15077                     j 1
Duquesne Light Company Mayorof the Borough of Beaver Valley Power Station Shippingport
Commissioner Roy M. Smith                 Regional Administrator, Region l           I West Virginia Department of Labor         U.S. Nuclear Regulatory Commission Building 3, Room 319                             475 Allendale Road Capitol Complex                           King of Prussia, PA 19406 Charleston, WV 25305 Resident inspector Director, Utilities Department                   U.S. Nuclear Regulatory Commission Public Utilities Commission               Post Office Box 298 180 East Broad Street                     Shippingport, PA 15077 Columbus, OH 43266-0573                                                             !
{
Director, Pennsylvania Emergency         Duquesne Light Company Management Agency                       Beaver Valley Power Station Post Office Box 3321                             PO Box 4 Harrisburg, PA 17105-3321                 Shippingport, PA 15077 ATTN: S. C. Jain, Senior Vice President     l Ohio EPA-DERR-                           Nuclear Services (BV-A)                     1 ATTN: Zack A. Clayton Post Office Box 1049                     Mr. J. A. Hultz, Manager Columbus, OH 43266-0149                   Projects & Support Services First Energy
PO Box 4 Post Office Box 3 j
            = Dr. Judith Johnsrud                     76 South Main Street National Energy Committee                 Akron, OH 44308 Sierra Club .
Shippingport, PA 15077 Shippingport, PA 15077 j
Commissioner Roy M. Smith Regional Administrator, Region l West Virginia Department of Labor U.S. Nuclear Regulatory Commission Building 3, Room 319 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WV 25305 Resident inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 298 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 Director, Pennsylvania Emergency Duquesne Light Company Management Agency Beaver Valley Power Station Post Office Box 3321 PO Box 4 Harrisburg, PA 17105-3321 Shippingport, PA 15077 ATTN: S. C. Jain, Senior Vice President Ohio EPA-DERR-Nuclear Services (BV-A)
ATTN: Zack A. Clayton Post Office Box 1049 Mr. J. A. Hultz, Manager Columbus, OH 43266-0149 Projects & Support Services First Energy
= Dr. Judith Johnsrud 76 South Main Street National Energy Committee Akron, OH 44308 Sierra Club.
433 Oriando Avenue -
433 Oriando Avenue -
State College, PA 16803 -
State College, PA 16803 -
Duquesne Light Company Beaver Valley Power Station PO Box 4
Duquesne Light Company Beaver Valley Power Station PO Box 4
            . Shippingport, PA 15077
. Shippingport, PA 15077
            / ATTN: Kevin L. Ostrowski, Division Vice President, Nuclear Operations Group and Plant Manager (BV-SOSB-7)
/ ATTN: Kevin L. Ostrowski, Division Vice President, Nuclear Operations Group and Plant Manager (BV-SOSB-7)
: m. .
: m..


;    ~
~
q le -
q le -
REQUEST FOR ADDITIONAL INFORMATION PROPOSED QUALITY ASSURANCE PROGRAM CHANGES BEAVER VALLEY POWER STATION. UNIT NOS.1 AND 2 DOCKET NOS. 50-334 AND 50-412 By letter dated March 16,1999, the Duquesne Light Company (DLC) submitted a request for approval of. changes in the Quality Assurance (QA) program described in the Beaver Valley Power Station, Unit 2, Updated Final Safety Analysis Report (UFSAR), Chapter 17.2 (applicable to both Beaver Valley Units 1 and 2, BVPS-1 and BVPS-2). Specifically, DLC has proposed to limit required Onsite Safety Committee reviews of new procedures,' and procedure revisions, to those requiring a 10 CFR 50.59 safety evaluation. All other procedural reviews would be performed by an independent qualified reviewer (IOR) and approved by the responsible discipline manager or his/her designee.
REQUEST FOR ADDITIONAL INFORMATION PROPOSED QUALITY ASSURANCE PROGRAM CHANGES BEAVER VALLEY POWER STATION. UNIT NOS.1 AND 2 DOCKET NOS. 50-334 AND 50-412 By {{letter dated|date=March 16, 1999|text=letter dated March 16,1999}}, the Duquesne Light Company (DLC) submitted a request for approval of. changes in the Quality Assurance (QA) program described in the Beaver Valley Power Station, Unit 2, Updated Final Safety Analysis Report (UFSAR), Chapter 17.2 (applicable to both Beaver Valley Units 1 and 2, BVPS-1 and BVPS-2). Specifically, DLC has proposed to limit required Onsite Safety Committee reviews of new procedures,' and procedure revisions, to those requiring a 10 CFR 50.59 safety evaluation. All other procedural reviews would be performed by an independent qualified reviewer (IOR) and approved by the responsible discipline manager or his/her designee.
While this proposed procedural review altemative is not unprecedented, the existing QA Program for BVPS-1 and BVPS-2 does not explicitly define, in UFSAR Chapter 17 2 of BVPS-2, the requisite qualifications, authority, and review responsibilities of an IQR (as described in Attachment 1 to the March 16,1999 letter). Additionally, the QA Program contains no discussion of how the population of designated lORs is to be controlled or tracked.
While this proposed procedural review altemative is not unprecedented, the existing QA Program for BVPS-1 and BVPS-2 does not explicitly define, in UFSAR Chapter 17 2 of BVPS-2, the requisite qualifications, authority, and review responsibilities of an IQR (as described in Attachment 1 to the {{letter dated|date=March 16, 1999|text=March 16,1999 letter}}). Additionally, the QA Program contains no discussion of how the population of designated lORs is to be controlled or tracked.
Please provide appropriate revisions of the QA Program which incorporate this information and support the QA Program change requested in your March 16,1999, submittal.
Please provide appropriate revisions of the QA Program which incorporate this information and support the QA Program change requested in your March 16,1999, submittal.
4 9
4 9
Enciosure}}
Enciosure}}

Latest revision as of 00:03, 7 December 2024

Refers to Proposed Changes Submitted by Dl on 990316 to BVPS QA Program Described in BVPS-2 Ufsar,Chapter 17.2.Forwards RAI Re Proposed QA Program Changes
ML20206P124
Person / Time
Site: Beaver Valley
Issue date: 05/14/1999
From: Dan Collins
NRC (Affiliation Not Assigned)
To: Cross J
DUQUESNE LIGHT CO.
References
TAC-MA4992, TAC-MA4993, NUDOCS 9905180152
Download: ML20206P124 (5)


Text

a e

Mr. J. E. Cross Ity 14,1999 President-Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAl) REGARDING REVIEW OF BEAVER VALLEY POWER STATION, UNIT NOS.1 AND 2, QUALITY ASSURANCE PROGRAM CHANGE (TAC NOS. MA4992 AND MA4993)

Dear Mr. Cross:

By [[letter::L-99-043, LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements|letter dated March 16,1999]], Duquesne Light Company (DLC) submitted proposed changes to the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) program described in the BVPS-2 Updated Final Safety Analysis Report (UFSAR), Chapter 17.2, which is applicable to both BVPS-1 and BVPS-2. The proposed changes would red xe commitments in the BVPS-1 and BVPS-2 QA orogram description previously approved by the Nuclear Regulatory Commission (NRC).

The NRC staff has been reviewing your submittal, however, we have determined that additionalinformation is required from DLC in order to complete our review. Based on our need for additional information, we do not regard the proposed changes in Chapter 17,

~

Sechon17.2 of the BVPS-2 UFSAR to be acceptable pursuant to Title 10 of the Code of Federal Reaulations (10 CFR) Section 50.54(a). Therefore, you should refrain from implementing these changes until you have been formally notified otherwise.

The NRC requests that you provide your response to the enclosed RAI within 60 days of receipt of this letter. This was discussed with Mr. J. Maracek of your staff, and was established as a mutually agreeable timetable for your response. If circumstances result in the need to revise the target date, please call me at the earliest opportunity.

Should you have any questions regarding this request, please contact me at (301) 415-1427.

Sincerely, Original signed by:

Daniel S. Collins, Project Manager, Section 1 fok $oh [5b34 D vis on f L en ng Project Management P

PDR Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

@T

Enclosure:

R st fo Additional cc w/ encl: See next page j

DISTRIBUTION:

Docket File JZwolinski/SBlack DCollins DDorman JPeralta T)\\

PUBUC SBajwa OGC ACRS V

PDl-1 R/F MO'Brien TQuay MEvans, RI DCK:UMENT NAME: G:\\ BEAVER \\RAIA4992.WPD

  • See previous concurrence i

PDi i/O OFFICE P0ltVRM PDI-2/LA A,

HOMB*

f Ddkrs!'

!MO'Brien ah NAME 1

DATE, _

/ /M 4b/k/99 05/13/99

[/ A//99

+vJVId OFFICIAL RECORD COPY

n

'Mr. J. E. Cross.

May 14,1999 President-Gener: tion Group 4

Duquesne Light Compiny.

Post Office Box 4

' Shippingport, PA 15077

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING REVIEW OF BEAVER VALLEY POWER STATION, UNIT NOS.1 AND 2, QUALITY ASSURANCE PROGRAM CHANGE (TAC NOS. MA4992 AND MA4993)

Dear Mr. Cross:

By [[letter::L-99-043, LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements|letter dated March 16,1999]], Duquesne Light Company'(DLC) submitted proposed changes

. to the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) program described in the BVPS-2 Updated Final Safety Analysis Report

- (UFSAR), Chapter 17.2, which is applicable to both BVPS-1 and BVPS-2. The proposed changes would reduce commitments in the BVPS-1 and BVPS-2 QA program description previously approved by the Nuclear Regulatory Commission (NRC).

The NRC staff has been reviewing your submittal, however, we have determined that additional information is required from DLC in order to complete our review. Based on our need for additional information, we do not regard the proposed changes in Chapter 17, Section17.2 of the BVPS-2 UFSAR to be acceptable pursuant to Title 10 of the Code of Federal Reaulations (10 CFR) Section 50.54(a). Therefore, you should refrain from implementing these changes until you have been formally notified otherwise.

The NRC requests that you provide your response to the enclosed RAI within 60 days of receipt of this letter. This was discussed with Mr. J. Maracek of your staff, and was established

' as a mutually agreeable timetable for your response. If circumstances result in the need to revise the target date, please call me at the earliest opportunity.

Should you have any questions regarding this request, please contact me at (301) 415-1427.

Sincerely, Original signed by:

Daniel S. Collins, Project Manager, Section 1 Project Directorate I -

Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

. Request for Additional information cc w/enci: See next page

' DISTRIBUTION:

Docket File.

JZwolinski/SBlack DCollins DDorman JPeralta PUBLIC SBajwa OGC ACRS PDI-1 R/F MO'Brien TQuay MEvans, RI DOCUMENT NAME: G:\\ BEAVER \\RAIA4992.WPD

  • See previous concurrence OFFICE POWRM PDI-2/LA r ~

HOMB*

PDI-1/Q l

Mo'BrienAth "a

NAME rsl DATE

/M99

/f/99 05/13/99

[/ N/99 ~

- OFFICIAL RECORD COPY l

L:

A Rt p

A[

E UNITED STATES j

{

NUCLEAR REGULATORY COMMISSION p

WASHINGTON, D.C. 20eeH001

%g +

- May 14, 1999

)

' Mr. J. E. Cross 1

President-Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077 q

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING REVIEW OF 1

BEAVER VALLEY POWER STATION, UNIT NOS.1 AND 2, QUALITY

-ASSURANCE PROGRAM CHANGE (TAC NOS. MA4992 AND MA4993)

)

Dear Mr. Cross:

By [[letter::L-99-043, LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements|letter dated March 16,1999]], Duquesne Light Company (DLC) submitted proposed changes to the Beaver Valley Power Station, Unit Nos.1 and 2 (BVPS-1 and BVPS-2) Quality Assurance (QA) program described in the BVPS-2 Updated Final Safety Analysis Report

'(UFSAR), Chapter 17.2, which is applicable to both BVPS-1 and BVPS-2. The proposed changes would reduce commitments in the BVPS-1 and BVPS-2 QA program description previously approved by the Nuclear Regulatory Commission (NRC).

The NRC staff has been reviewing your submittal, however, we have determined that additional information is required from DLC in order to complete our review. Based on our need for additional information, we do not regard the proposed changes in Chapter 17, Section17.2 of the BVPS-2 UFSAR to be acceptable pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(a). Therefore, you should refrain from

)

implementing these changes until you have been formally notified otherwise.

The NRC requests that you provide your response to the enclosed RAI within 60 days of receipt of this letter..This was discussed with Mr. J. Maracek of your staff, and was established

'as a mutually agreeable timetable for your response. If circumstances result in the need to I

revise the target date, please call me at the earliest opportunity.

l l

Should you have any questions regarding this request, please contact me at (301) 415-1427.

Sincerely, j

1.

auJ T 86~ -

Daniel S. Collins, Project Manager, Section 1 Project Directorate l Division of Licensing Project Management

)

Office of Nuc! oar Reactor Regulation 1

Docket Nos. 50-334 and 50-412

.J'

Enclosure:

Request for Additional information dj cc w/ encl:" See~ next page W.

m j..

t,.

Beaver Valley Power Station, Units 1 & 2 cc:

1 Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts & Trowbridge' Pennsylvania Department of 2300 N Street, NW.

Environmental Resources Washington, DC 20037 ATTN: Michael P. Murphy Post Office Box 2063 Director-Safety and Licensing Harrisburg, PA 17120 Department (BV-A).

Duquesne Light Company Mayorof the Borough of Beaver Valley Power Station Shippingport

{

PO Box 4 Post Office Box 3 j

Shippingport, PA 15077 Shippingport, PA 15077 j

Commissioner Roy M. Smith Regional Administrator, Region l West Virginia Department of Labor U.S. Nuclear Regulatory Commission Building 3, Room 319 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WV 25305 Resident inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 298 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 Director, Pennsylvania Emergency Duquesne Light Company Management Agency Beaver Valley Power Station Post Office Box 3321 PO Box 4 Harrisburg, PA 17105-3321 Shippingport, PA 15077 ATTN: S. C. Jain, Senior Vice President Ohio EPA-DERR-Nuclear Services (BV-A)

ATTN: Zack A. Clayton Post Office Box 1049 Mr. J. A. Hultz, Manager Columbus, OH 43266-0149 Projects & Support Services First Energy

= Dr. Judith Johnsrud 76 South Main Street National Energy Committee Akron, OH 44308 Sierra Club.

433 Oriando Avenue -

State College, PA 16803 -

Duquesne Light Company Beaver Valley Power Station PO Box 4

. Shippingport, PA 15077

/ ATTN: Kevin L. Ostrowski, Division Vice President, Nuclear Operations Group and Plant Manager (BV-SOSB-7)

m..

~

q le -

REQUEST FOR ADDITIONAL INFORMATION PROPOSED QUALITY ASSURANCE PROGRAM CHANGES BEAVER VALLEY POWER STATION. UNIT NOS.1 AND 2 DOCKET NOS. 50-334 AND 50-412 By [[letter::L-99-043, LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements|letter dated March 16,1999]], the Duquesne Light Company (DLC) submitted a request for approval of. changes in the Quality Assurance (QA) program described in the Beaver Valley Power Station, Unit 2, Updated Final Safety Analysis Report (UFSAR), Chapter 17.2 (applicable to both Beaver Valley Units 1 and 2, BVPS-1 and BVPS-2). Specifically, DLC has proposed to limit required Onsite Safety Committee reviews of new procedures,' and procedure revisions, to those requiring a 10 CFR 50.59 safety evaluation. All other procedural reviews would be performed by an independent qualified reviewer (IOR) and approved by the responsible discipline manager or his/her designee.

While this proposed procedural review altemative is not unprecedented, the existing QA Program for BVPS-1 and BVPS-2 does not explicitly define, in UFSAR Chapter 17 2 of BVPS-2, the requisite qualifications, authority, and review responsibilities of an IQR (as described in Attachment 1 to the [[letter::L-99-043, LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements|March 16,1999 letter]]). Additionally, the QA Program contains no discussion of how the population of designated lORs is to be controlled or tracked.

Please provide appropriate revisions of the QA Program which incorporate this information and support the QA Program change requested in your March 16,1999, submittal.

4 9

Enciosure