ML20207M174: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:r.
{{#Wiki_filter:r.
                                                                                            #7'##/
DEC20ISOO
1 DEC20ISOO                            No. M t 142'#
#7'##/
U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Name of Licensee:               Duquesne Light Company Name of Facility:               Beaver Valley Power Station, Unit 2 Docket Number:                   50-412 Time and Date of Meeting:       10:30 AM, January 5, 1987 Location of Meeting:             NRC Region I, King of Prussia, Pennsylvania Executive Conference Room Purpose of Meeting:             Update status of Cold License Training Program and discuss future Operator Licensing issues.
1 No. M t 142'#
NRC Attendees:                   W. Kane, Director, DRP S. Collins, Deputy Director, DRP L. Tripp, Chief, Projects Section 3A R. Keller, Chief, Projects Section 1C N. Dudley, Lead Reactor Engineer P. Tam, NRR J. Buzy, DHFT, NRR Licensee Attendees:               T. Burns, Director, Operation Training J. Sieber, Vice President - Nuclear Operations NOTE: Attendance by NRC perscnnel at +51s meeting should be made known by January 2, 1987, via telephone call to Mr. N. Dudley, Region I at FTS 8-488-1240.
U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Name of Licensee:
Duquesne Light Company Name of Facility:
Beaver Valley Power Station, Unit 2 Docket Number:
50-412 Time and Date of Meeting:
10:30 AM, January 5, 1987 Location of Meeting:
NRC Region I, King of Prussia, Pennsylvania Executive Conference Room Purpose of Meeting:
Update status of Cold License Training Program and discuss future Operator Licensing issues.
NRC Attendees:
W. Kane, Director, DRP S. Collins, Deputy Director, DRP L. Tripp, Chief, Projects Section 3A R. Keller, Chief, Projects Section 1C N. Dudley, Lead Reactor Engineer P. Tam, NRR J. Buzy, DHFT, NRR Licensee Attendees:
T. Burns, Director, Operation Training J. Sieber, Vice President - Nuclear Operations NOTE: Attendance by NRC perscnnel at +51s meeting should be made known by January 2, 1987, via telephone call to Mr. N. Dudley, Region I at FTS 8-488-1240.
Orih;inal Signed Bya, Prepared by Robert M. Keller, Chief Reactor Projects Section 1C Distribution:
Orih;inal Signed Bya, Prepared by Robert M. Keller, Chief Reactor Projects Section 1C Distribution:
Victor Stello, Jr. , Executive Director for Operations James Sniezek, Acting, Deputy Executive Director for Regional Operations and Generic Requirements James M. Taylor, Director, Office of Inspection and Enforcement James G. Partlow, Director, Division of Inspection Programs, IE Jane Axelrad, Director, Enforcement Staff, IE J. Lieberman, Director and Chief Counsel, Regional Operations and Enforcement Division, OELD Hugh L. Thompson, Division Director, NRR Peter S. Tam, Project Manager, NRR Lester S. Rubenstein, Branch Chief, NRR Public Document Room (PDR)
Victor Stello, Jr., Executive Director for Operations James Sniezek, Acting, Deputy Executive Director for Regional Operations and Generic Requirements James M. Taylor, Director, Office of Inspection and Enforcement James G. Partlow, Director, Division of Inspection Programs, IE Jane Axelrad, Director, Enforcement Staff, IE J. Lieberman, Director and Chief Counsel, Regional Operations and Enforcement Division, OELD Hugh L. Thompson, Division Director, NRR Peter S. Tam, Project Manager, NRR Lester S. Rubenstein, Branch Chief, NRR Public Document Room (PDR)
Local Public Document Room (LPDR) 0FFICIAL RECORD COPY         OL BV2 MTG - 0001.0.0 870113o109 e61229-                                           12/18/86 TB/f PDR     ADOCK 05000412                                                             IO OV                 PDR                                                           !
Local Public Document Room (LPDR) 0FFICIAL RECORD COPY OL BV2 MTG - 0001.0.0 870113o109 e61229-12/18/86 TB/f PDR ADOCK 05000412 I O OV PDR


Duquasna Light Company                               2-bec:
Duquasna Light Company 2-bec:
                ' Regional Administrator Deputy Regional Administrator Division Directors                                                                                                   '
' Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Public Affairs Officer Region I Receptionist DRMA File DRP File
Branch Chiefs Public Affairs Officer Region I Receptionist DRMA File DRP File
'DRP Bulletin Board a
                'DRP Bulletin Board                                                                                                     .
a e
a a
f L
e f
RI:DRP RI:
L RI:DRP               RI: P                 RD Dudley/kim           K   r                 Co       ns 12/ 11/86           12 1/86                     /   86 Aff 0FFICIAL RECORD COPY                         OL BV2 MTG - 0002.0.0 12/18/86
P RD Dudley/kim K
                                                          . _ _ - _ _      _ _ , - . . - . . .            __    _ , _  _ _ . . ,}}
r Co ns 12/ 11/86 12 1/86
/
86 Aff 0FFICIAL RECORD COPY OL BV2 MTG - 0002.0.0 12/18/86
_ _..,}}

Latest revision as of 20:29, 6 December 2024

Notification of Licensee Meeting 87-001 on 870105 W/Util in King of Prussia,Pa to Update Status of Cold License Training Program & to Discuss Future Operator Licensing Issues
ML20207M174
Person / Time
Site: Beaver Valley
Issue date: 12/29/1986
From: Keller R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8701130109
Download: ML20207M174 (2)


Text

r.

DEC20ISOO

  1. 7'##/

1 No. M t 142'#

U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Name of Licensee:

Duquesne Light Company Name of Facility:

Beaver Valley Power Station, Unit 2 Docket Number:

50-412 Time and Date of Meeting:

10:30 AM, January 5, 1987 Location of Meeting:

NRC Region I, King of Prussia, Pennsylvania Executive Conference Room Purpose of Meeting:

Update status of Cold License Training Program and discuss future Operator Licensing issues.

NRC Attendees:

W. Kane, Director, DRP S. Collins, Deputy Director, DRP L. Tripp, Chief, Projects Section 3A R. Keller, Chief, Projects Section 1C N. Dudley, Lead Reactor Engineer P. Tam, NRR J. Buzy, DHFT, NRR Licensee Attendees:

T. Burns, Director, Operation Training J. Sieber, Vice President - Nuclear Operations NOTE: Attendance by NRC perscnnel at +51s meeting should be made known by January 2, 1987, via telephone call to Mr. N. Dudley, Region I at FTS 8-488-1240.

Orih;inal Signed Bya, Prepared by Robert M. Keller, Chief Reactor Projects Section 1C Distribution:

Victor Stello, Jr., Executive Director for Operations James Sniezek, Acting, Deputy Executive Director for Regional Operations and Generic Requirements James M. Taylor, Director, Office of Inspection and Enforcement James G. Partlow, Director, Division of Inspection Programs, IE Jane Axelrad, Director, Enforcement Staff, IE J. Lieberman, Director and Chief Counsel, Regional Operations and Enforcement Division, OELD Hugh L. Thompson, Division Director, NRR Peter S. Tam, Project Manager, NRR Lester S. Rubenstein, Branch Chief, NRR Public Document Room (PDR)

Local Public Document Room (LPDR) 0FFICIAL RECORD COPY OL BV2 MTG - 0001.0.0 870113o109 e61229-12/18/86 TB/f PDR ADOCK 05000412 I O OV PDR

Duquasna Light Company 2-bec:

' Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Public Affairs Officer Region I Receptionist DRMA File DRP File

'DRP Bulletin Board a

a e

f L

RI:DRP RI:

P RD Dudley/kim K

r Co ns 12/ 11/86 12 1/86

/

86 Aff 0FFICIAL RECORD COPY OL BV2 MTG - 0002.0.0 12/18/86

_ _..,