ML20196J951: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[ST-HL-AE-2664, Application for Amend to License NPF-76,changing Tech Specs 6.2.1 & 6.2,deleting Onsite & Offsite Organization Charts from Administrative Control Requirements.Fee Paid]]
| number = ML20196J951
| issue date = 06/22/1988
| title = Application for Amend to License NPF-76,changing Tech Specs 6.2.1 & 6.2,deleting Onsite & Offsite Organization Charts from Administrative Control Requirements.Fee Paid
| author name = Vaughn G
| author affiliation = HOUSTON LIGHTING & POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000498, 05000499
| license number =
| contact person =
| document report number = ST-HL-AE-2664, NUDOCS 8807060486
| package number = ML20196J955
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 5
| project =
| stage = Request
}}
 
=Text=
{{#Wiki_filter:,
The Light company                                  P.O. Box 1700 Houston, Texas 77001 (713) 228-9211 Ilouston Lighting & Power                        _    .      -  -        _.-- - - _ _ .
June 22, 1988 ST-HL-AE-2664 File No.t    G20.02.02 10CFR50.90 U. S. Nuclear Regulatory Commission Attention: Document Control Dest Washington, DC 20555 South Texas Project Electric Generating Station Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Proposed Revision to Technical Specifications Removal of Organization Charts from Technical Specification Administrative Control Recuirements Reference      Combined Technical Specifications for Units 1 and 2, M. A. McBurnett, HL&P; Letter to Document Control Desk, NRC; May 27, 1988. ST-HL-AE-2675.
Purso, 't to 10CFR50.90 and 2.101. Houston Lighting & Power Company (HL&P) hereby proposes to amend its Operating License NPF-76 by incorporating the attached proposed change into the Technical Specifications, NUREG-1395, of South Texas Project Electric Generating Station (STPEGS) Unit 1. In addition, HL&P requests that the changes be incorporated into the Combined Technical Specifications for Units 1 and 2 (Draft) submitted by Reference 1.
Specifically, the proposed change to Technical Specifications 6.2.1 and 6.2.2 deletes onsite and offsite organization charts and provides appropriate changes to the administrative control requirements. These changes have been made in accordance with the ruidelines of NRC Generic Letter 88-06, "Removal of Organization Charts from Technical Specification Administrative Control Requirements." The proposed change to delete these organization charts will provide greater flexibility for implementation of changes in both the onsite and offsite organizational structure, consistent with Commission policy.
HL&P has reviewed the attached proposed change pursuant to 10CFR50.59 and 10CFR50.92 and determined that it does not constitute an unreviewed safety                    1 question or a significant hazards consideration. The basis for this                            ,
I determination is provided below.
8807060486 080622498                                                                      f JvA DR    ADOCK 050                                                                                [f l
A Subsidiary of Ilouston Industries incorporated NL.88.126.01
 
Ilo,uston 1.ighting & Power Company ST-HL-AE-2664 File No.: G20.02.02 Page 2 The Commission has provided standards in 10CFR50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazards
            - consideration if operation of the facility in accordance with the proposed amendment would nots (1) involve a significant increase in the probability or consequences of an accident previously evaluated; (2) create the possibility of a new or different kind of accident from any previously evaluated; or (3) involve a significant reduction in a margin of safety. HL&P has reviewed the proposed change and cetermined that:
: 1. The proposed amendment does not involve a significant increase in the probability or consequences of a accident previously evaluated because deletion of the organization charts does not affect plant operation. General requirements have been added that capture the essential aspects of the organizational structure that are defined by the organization charts to be removed.
: 2. The proposed amendment does not create the possibility of a new or different kind of accident than previously evaluated because the proposed change is administrative in nature, and no physical alteraticas of plant configuration or changes to setpoints or operating parameters are proposed.
: 3. The proposed amendment does not involve a significant reduction in the margin of safety because of the admirdstrative nature of the hange and the addition of general requirements that capture the essential aspects of the organizational structure that are defined by existing onsite and offsite organization charts.
Based on the above discussion, HL&P has determined that the proposed amendment does not involve a significant hazards consideration. Additionally, based on the information contained in this submittal and the NRC Final Environmental Assessment f or STPEGS Units 1 and 2, HL&P has concluded that pursuant to 10CFR51, there are no significant radiological or nonradiologial impacts associated with the proposed action and the pr oposed licerse amendment will not have a significant effect on the quality of the human environment.
The STPEGS Unit ^ Nuclear Safety Review Board has reviewed and approved this proposed change.
NL.88.126.01
 
                                                                                        .-=
Ilo,uston Lighting & Power Company ST-HL-AE-2664 File No.: G20.02.02 Page 3 s
In accordance with 10CFR50.91(b). HL&P is providing the State of Texas with a copy of this proposed amendment.
Pursuant to the requirements of 10CFR170.12(c), enclosed with this amendment request is the application fee of $150.00.
If you should have any questions on this matter, please contact Mr. M.A. McBurnett at (512) 972-8530.
I                                                              G. E. Vaughn Vice President Nuclear Plant Operations GEV/PLW/nl l
i             
 
==Attachment:==
: 1) Proposed Revision to Technical Specification pages xviii, 6-1, 6-3 and 6-4
: 2) Check No. 00116409 I
l l
l I
NL.88.126.01
 
l        .
Ilouston Lighting & Power Company ST-HL-AE-2664 File No.:G20.02.02 Page 4 CCI Regional Administrator, Region IV      Rufus S. Scott Nuclear Regulatory Commission          Associated General Counsel 611 Ryan Plaza Drive, Suite 1000        Houston Lighting & Power Company Arlington, TX 76011                    P. O. Box 1700 Houston, TX 77001 George Dick U. S. Nuclear Regulatory Commission    INPO Washington, DC 20555                    Records Center 1100 Circle 75 Parkway Jack E. Bess                            Atlanta, Ga. 30339-3064 Resident Inspector / Operations c/o U. S. Nuclear Regulatory Commission Dr. Joseph H. Hendrie P. O. Box 910                          50 Be11 port Lane Bay City, TX 77414                      Bellport, NY 11713 Don L. Garrison                        D. K. Lacker Resident Inspector / Construction      Bureau of Radiation Control c/o U. S. Nuclear Regulatory Commission Texas Department of Health P. O. Box 910                          1100 West 49th Street Bay City, TX 77414                      Austin, Texas 78756-3189 J. R. Newman, Esquire Newman & Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Hiner (2 copies)
Chief Operating Officer City of Austin Electric Utility 721 Barton Springs Road Austin, TX 78704 R. J. Costello/H. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 06/16/88 NL.DIST
 
w          . , -
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter                                                      )
                                                                                          )
Houston Lighting & Power                                            )                                  Docket No. 50-498 Company, et al.,                                                  )
                                                                                          )
South Texas Project                                                )
Unit 1                                                              )
AFFIDAVIT G. E. Vaughn being duly sworn, hereby deposes and says that he is Vice President, Nuclear Plant Operations, of. Houston Lighting & Power Company; that he is duly authorized to sign and file with the Nuclear Regulatory Commission t                  the attached proposed amendment to the Technica1' Specification index, Section 6-2, Figure 6.2-1, and Figure 6.2-21 is familiar with the content :-he reof ;
that the matters set forth therein are true and correct to the best of his knowledge and belief.
G. E. Vaughn/ ~
                                                                                                                                  ~
Vice President Nuclear Plant Operations Subscribed and sworn to before me, a otary Public in and for Matagorda County, Texas this              -Qf pr/ M of                            sa                            1988.
[            f MN WMM L%
Notary Public in and for the
                          .            hearv PutAc. S:4 s of fm,      ,
State of Texas i
l,    *
                                  , Wr Commrsse Emrn 1991 ;
I I                      _
l{
- . . . . .                                                _ _ _ -        ._. _ _ _ _    _    __ _ _ _ _ _ _ _ _ _ _ _                    _}}

Latest revision as of 12:09, 10 April 2022