December 16,1998
Mr. John F. Franz, Jr.
Vice President, Nuclear
,
L
! Alliant Tower -
:
200 First Street SE
j
L
P. O; Box 351
!
' Cedar Rapids, lA 52406-0351
'
;
SUBJECT:
NRC DUANE ARNOLD ENERGY CENTER SECURITY INSPECTION
i
l'
REPORT 50-331/98018(DRS)
l
' Dear Mr. Franz:
!
r
4
L
On December 8,1998, the NRC completed a security inspection of your Duane Amold
j
Energy Center reactor facility. The onsite inspection effort was conducted between
,
November 16-20,-1998. The enclosed report presents the results of that inspection.
!
~ - No violations of NRC requirements were identified during this inspection. Your security .
' equipment testing and maintenance program was a performance strength. The dedication
l
of the maintenance technicians ensured that problems were corrected efficiently and
l
effectively. JThe cooperation between the security department and various other
L
maintenance departments resulted in' low equipment outage times and contributed to
;
L. .
improvements in delay barriers. The security force had an aggressive and effective
;
equipment testing program. We also observed that your security organization implemented
. their duties and responsibilities in an effective manner.
'
'
L
;
.Two' issues were . identified that will require further analysis by us. One issue relates to
;
,
'
.several occasions when the required number of armed response force members were not
{
g
immediately available, and the reporting requirements for such incidents. The other issue
:
l
' pertains to the unescorted access authorization for a contractor employee. Resolution of
,
these issues will be addressed by separate correspondence,
o
I
e
'
\\
L
\\
L
.!:
040138
:
9902050013L981216
!"
!
,!
PDR
ADOCK 05000331
u
''
.G
PDR
-
.
.-
 
.
.
.
_
_
_ _ _ . _
-
-
.
.. __.-
_ _ . _
.
s
'
.
i
.
J. Franz
-2-
]
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
the enclosure will be placed in the NRC Public Document Room (PDR).
Sincerely,
/s/ J. R. Creed
James R. Creed, Chief,
Plant Support Branch 1
Docket No.: 50-331
License No.: DPR-49
Enclosure:
Inspection Report 50-331/98018(DRS)
cc w/ encl:
E. Protsch, Executive Vice President
1
Energy Delivery Alliant;
]
President, IES Utilities, Inc.
G. Van Middlesworth, Plant Manager
K. Peveler, Manager, Regulatory Performance
j
Chairperson, Iowa Utilities Board
1
l
1
i
l
i
 
.
._
-
.-.
.
*
i
~ J. Franz -
-2-
i
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
'the enclosure will be placed in the NRC Public Document Room (PDR).
Sincerely,
l
James R. Creed, Chief,
i
Plant Support Branch 1
i
,
Docket No.: 50-331
l
License No.: DPR-49
Enclosure:
Inspection Report 50-331/98018(DRS)
cc w/ encl:
E. Protsch, Executive Vice President
Energy Delivery Alliant;
President, IES Utilities, Inc.
G. Van Middlesworth, Plant Manager
l
K. Peveler, Manager, Regulatory Performance
Chairperson, Iowa Utilities Board
Distribution:
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlli w/enci
C. Pederson, Rlli w/enct
B. Clayton, Rlli w/enct
SRI Duane Arnold w/enct
DRP w/ encl
TSS w/enci
DRS (2) w/enci
Rlll PRR w/enct
PUBLIC IE-01 w/ enc!
Docket File w/enci
-GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
DOCUMENT NAME: G:DRS\\DUA98018.WPD
To r.
. c.p, , a. .,c
oi. in.c
in m. i=: e cm unwi en.cnm.nu.ncew. r cm m n on.nu.new.=
w No copy
OFFICE
Rlli
Rill
Rlli
l
NAME
Pirtle:jp
Lanksbury
Creed
DATE
02/ /99
02/ /99
02/ /99
}}
}}

Latest revision as of 02:38, 8 December 2024

Forwards Insp Rept 50-331/98-18 on 981116-20 Onsite & 1208 NRC Region 3 Ofc.No Violations Noted.Two Issues Were Identified That Will Require Further Analysis by NRC Listed
ML20202G149
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 12/16/1998
From: Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Franz J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20202G154 List:
References
50-331-98-18, NUDOCS 9902050013
Download: ML20202G149 (3)


See also: IR 05000331/1998018

Text

,

.

.

~

. . . - . . .

...-. - -.~...-

.

- . - ~ . . . . .

. . . . .

,

.

.

, ,

l.

. _ ,

./^

t.

.+

'

.

t

December 16,1998

Mr. John F. Franz, Jr.

Vice President, Nuclear

,

L

! Alliant Tower -

200 First Street SE

j

L

P. O; Box 351

!

' Cedar Rapids, lA 52406-0351

'

SUBJECT:

NRC DUANE ARNOLD ENERGY CENTER SECURITY INSPECTION

i

l'

REPORT 50-331/98018(DRS)

l

' Dear Mr. Franz:

!

r

4

L

On December 8,1998, the NRC completed a security inspection of your Duane Amold

j

Energy Center reactor facility. The onsite inspection effort was conducted between

,

November 16-20,-1998. The enclosed report presents the results of that inspection.

!

~ - No violations of NRC requirements were identified during this inspection. Your security .

' equipment testing and maintenance program was a performance strength. The dedication

l

of the maintenance technicians ensured that problems were corrected efficiently and

l

effectively. JThe cooperation between the security department and various other

L

maintenance departments resulted in' low equipment outage times and contributed to

L. .

improvements in delay barriers. The security force had an aggressive and effective

equipment testing program. We also observed that your security organization implemented

. their duties and responsibilities in an effective manner.

'

'

L

.Two' issues were . identified that will require further analysis by us. One issue relates to

,

'

.several occasions when the required number of armed response force members were not

{

g

immediately available, and the reporting requirements for such incidents. The other issue

l

' pertains to the unescorted access authorization for a contractor employee. Resolution of

,

these issues will be addressed by separate correspondence,

o

I

e

'

\\

L

\\

L

.!:

040138

9902050013L981216

!"

!

,!

PDR

ADOCK 05000331

u

.G

PDR

-

.

.-

.

.

.

_

_

_ _ _ . _

-

-

.

.. __.-

_ _ . _

.

s

'

.

i

.

J. Franz

-2-

]

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

the enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

/s/ J. R. Creed

James R. Creed, Chief,

Plant Support Branch 1

Docket No.: 50-331

License No.: DPR-49

Enclosure:

Inspection Report 50-331/98018(DRS)

cc w/ encl:

E. Protsch, Executive Vice President

1

Energy Delivery Alliant;

]

President, IES Utilities, Inc.

G. Van Middlesworth, Plant Manager

K. Peveler, Manager, Regulatory Performance

j

Chairperson, Iowa Utilities Board

1

l

1

i

l

i

.

._

-

.-.

.

i

~ J. Franz -

-2-

i

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

'the enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

l

James R. Creed, Chief,

i

Plant Support Branch 1

i

,

Docket No.: 50-331

l

License No.: DPR-49

Enclosure:

Inspection Report 50-331/98018(DRS)

cc w/ encl:

E. Protsch, Executive Vice President

Energy Delivery Alliant;

President, IES Utilities, Inc.

G. Van Middlesworth, Plant Manager

l

K. Peveler, Manager, Regulatory Performance

Chairperson, Iowa Utilities Board

Distribution:

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rlli w/enci

C. Pederson, Rlli w/enct

B. Clayton, Rlli w/enct

SRI Duane Arnold w/enct

DRP w/ encl

TSS w/enci

DRS (2) w/enci

Rlll PRR w/enct

PUBLIC IE-01 w/ enc!

Docket File w/enci

-GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

DOCUMENT NAME: G:DRS\\DUA98018.WPD

To r.

. c.p, , a. .,c

oi. in.c

in m. i=: e cm unwi en.cnm.nu.ncew. r cm m n on.nu.new.=

w No copy

OFFICE

Rlli

Rill

Rlli

l

NAME

Pirtle:jp

Lanksbury

Creed

DATE

02/ /99

02/ /99

02/ /99