PNO-II-86-045: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
#REDIRECT [[PNO-II-86-045, B:on 860628-0701,augmented Insp Team Sent to Plant.Corrective Action Documented in 860630 Confirmatory Action Ltr Being Monitored by NRC Resident Inspectors.Plant at 6% Power]]
#REDIRECT [[PNO-II-86-045, on 860627,four PORVs Opened,Dropping Primary Sys Pressure from 2,235 Psi to 702 Psi & Temp from 550 F to 450 F in 6 Minutes.Cause Under Investigation.Valves Closed & Safety Injection Initiated]]

Latest revision as of 19:17, 5 May 2021