| issue date = 06/12/1986
| issue date = 06/12/1986
| title = Requests Proposed Change to Section I of QA Manual or Ltr Followed by Revised Manual Describing Decentralization of Organization & Effect of Elimination of Corporate QA Manager Position,Per 860502 Ltr
| title = Requests Proposed Change to Section I of QA Manual or Ltr Followed by Revised Manual Describing Decentralization of Organization & Effect of Elimination of Corporate QA Manager Position,Per
| author name = Rouse L
| author name = Rouse L
| author affiliation = NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
| author affiliation = NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Line 12: Line 12:
| case reference number = REF-PROJ-M-39
| case reference number = REF-PROJ-M-39
| document report number = NUDOCS 8606190586
| document report number = NUDOCS 8606190586
| title reference date = 05-02-1986
| document type = CORRESPONDENCE-LETTERS, NRC TO ENGINEERING/CONSTRUCTION/CONSULTING FIRM, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO ENGINEERING/CONSTRUCTION/CONSULTING FIRM, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2

Latest revision as of 14:39, 6 December 2021

Requests Proposed Change to Section I of QA Manual or Ltr Followed by Revised Manual Describing Decentralization of Organization & Effect of Elimination of Corporate QA Manager Position,Per
ML20206C886
Person / Time
Issue date: 06/12/1986
From: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Massey J
NUTECH ENGINEERS, INC.
References
REF-PROJ-M-39 NUDOCS 8606190586
Download: ML20206C886 (2)


Text

,- .

DISTRIBUTION: Pleaso return concurrence.cpopy to FBrown 396 SS TProjeistiM.394 PDR NMSS r/f FCAF r/f g BKGrimes, IE JSpraul, QAB JUN 1219BI- JRoberts LCRouse FSturz LA File Project M-39 NUTECH, Inc.

ATTN: John V. Massey, Ph.D NUHOMS Project Manager 145 Martinvale Lane San Jose, CA 95119 l

l Gentlemen:

( NUTECH letter, dated May 2,1986, states that NUTECH has decentralized its

! quality assurance organization and that the position of Corporate Quality Assurance Manager has been eliminated. The elimination of the position of Corporate Quality Assurance Manager appears to be a reduction of previously accepted commitmentsl. Section 1.2.2 of the NUTECH Quality Assurance Manual describes the respoqsibilities of the Corporate Quality Assurance Manager.

Please identify, by! position title, who now has these responsibilities, discuss the " independence" f these positions from undue pressures of cost and schedule considerationsaso(pposedtoqualityconsiderations,anddescribehowthese

! responsibilities will be fulfilled under the new decentralized organization.

This information can be provided as a proposed change to Section I of the NUTECH Quality Assurance Manual or in a letter, followed in a timely manner by a revised manual.

We look forward to hearing from NUTECH on this matter.

Sincerely, original saaned by Lelanec.asuas Leland C. Rouse, Chief Advanced Fuel and Spent Fuel Licensing Branch Division of Fuel Cycle and Material Safety 1