ML20199G225: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20199G225
| number = ML20199G225
| issue date = 01/07/1999
| issue date = 01/07/1999
| title = Expresses Appreciation for 981103 Ltr Addressing Concerns Re US-Russian Plutonium Production Reactor Core Conversion Project
| title = Expresses Appreciation for Addressing Concerns Re US-Russian Plutonium Production Reactor Core Conversion Project
| author name = Jackson S, The Chairman
| author name = Jackson S, The Chairman
| author affiliation = NRC COMMISSION (OCM)
| author affiliation = NRC COMMISSION (OCM)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9901220221
| document report number = NUDOCS 9901220221
| title reference date = 11-03-1998
| package number = ML20199G230
| package number = ML20199G230
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:. - _ .         .            _            - - _ - _..                  _ - - . - - --      -.      -_.. _  _- -
{{#Wiki_filter:. - _.
D R-o y    j6          b   #                                          UNITED STATES p*                                       NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055fM001
D R-o b
        \..... CHAIRMAN January 7,1999 The Honorable John D. Holum Acting Under Secretary of State for Arms Control and International Security Affairs and Director, U.S.
6 UNITED STATES y
j p*
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055fM001
\\.....
January 7,1999 CHAIRMAN The Honorable John D. Holum Acting Under Secretary of State for Arms Control and International Security Affairs and Director, U.S.
Arms Control and Disarmament Agency United States Department of State Washington, D.C. 20520
Arms Control and Disarmament Agency United States Department of State Washington, D.C. 20520


==Dear Mr. Holum:==
==Dear Mr. Holum:==
Thank you for your letter of November 3 addressing concerns that I recently relayed to you about the U.S.-Russian plutonium production reactor core conversion project (CCP). I appreciate the additionalinformation you conveyed.
Thank you for your letter of November 3 addressing concerns that I recently relayed to you about the U.S.-Russian plutonium production reactor core conversion project (CCP). I appreciate the additionalinformation you conveyed.
As you know, the Nuclear Regulatory Commission (NRC) is working to define a program of l               technical assistance and advice for GAN in support of GAN's regulatory oversight of CCP l               activities. As part of this effort, over the past month NRC staff has continued to have l               discussions about safety matters with GAN representatives. I believe that we now have a better l               understanding of GAN's safety concerns related to core conversion.
As you know, the Nuclear Regulatory Commission (NRC) is working to define a program of l
technical assistance and advice for GAN in support of GAN's regulatory oversight of CCP l
activities. As part of this effort, over the past month NRC staff has continued to have l
discussions about safety matters with GAN representatives. I believe that we now have a better l
understanding of GAN's safety concerns related to core conversion.
The objectives, implementation schedules and technical parameters of the core conversion
The objectives, implementation schedules and technical parameters of the core conversion
            - project will result in a converted core design that is unique. There does not appear to be a similarly configured reactor operating anywhere in the world. As a result, we now understand that one of GAN's principal safety concerns revolves around the lack of actual operational experience data that can be used to demonstrate how the converted cores will actually perform.
- project will result in a converted core design that is unique. There does not appear to be a similarly configured reactor operating anywhere in the world. As a result, we now understand that one of GAN's principal safety concerns revolves around the lack of actual operational experience data that can be used to demonstrate how the converted cores will actually perform.
This appears to be why GAN is calling for an increased focus on the validation and verification of the computer codes used for design calculations for such safety significant areas as emergency core cooling system performance, boron absorber performance, control rod performance, core neutronics, transient and accident analyses, etc., as safety judgments will be made largely based on these computer code calculations instead of actual operational experience data.
This appears to be why GAN is calling for an increased focus on the validation and verification of the computer codes used for design calculations for such safety significant areas as emergency core cooling system performance, boron absorber performance, control rod performance, core neutronics, transient and accident analyses, etc., as safety judgments will be made largely based on these computer code calculations instead of actual operational experience data.
l              Since the U.S. is heavily engaged in financing the core conversion project, I felt a responsibility I               to inform you of concerns that had been conveyed to me by Russian officials at the highest j               levels. While the information to date is based on preliminary reports, I continue to encourage GAN to proceed with their safety analyses, and have pressed them on the need to document i              their findings. An official evaluation regarding safety concerns needs to be completed by GAN                         ;
Since the U.S. is heavily engaged in financing the core conversion project, I felt a responsibility l
and shared with all relevant parties.                                                                                 i l
I to inform you of concerns that had been conveyed to me by Russian officials at the highest j
!                                                                                                                      1            l d     !        i l
levels. While the information to date is based on preliminary reports, I continue to encourage GAN to proceed with their safety analyses, and have pressed them on the need to document their findings. An official evaluation regarding safety concerns needs to be completed by GAN i
9901220221 990107                           I                                                                 l PDR     COMMS NRCC                           l                                                                 i CORRESPONDENCE PDR                                                                                             ;
and shared with all relevant parties.
i.
i 1
d i
l 9901220221 990107 I
PDR COMMS NRCC l
i CORRESPONDENCE PDR i.
m


W 2-I trust that you will join me in supporting the timely resolution of GAN's safety concerns through the existing CCP framework, and in underscoring that we remain committed to ensuring that l     safety is given the highest priority during core conversion efforts.
W 2-I trust that you will join me in supporting the timely resolution of GAN's safety concerns through the existing CCP framework, and in underscoring that we remain committed to ensuring that l
safety is given the highest priority during core conversion efforts.
Sincerely,
Sincerely,
                                                                        &L Shirley Ann Jackson cc:     OVP- Leon Fuerth                                                                             l NSC- Gary Samore                                                                             l OSD- Edward Warner DOE- Rose Gottemoeller I
&L Shirley Ann Jackson cc:
l I
OVP-Leon Fuerth NSC-Gary Samore OSD-Edward Warner DOE-Rose Gottemoeller er l}}
1 l
er l}}

Latest revision as of 07:36, 10 December 2024

Expresses Appreciation for Addressing Concerns Re US-Russian Plutonium Production Reactor Core Conversion Project
ML20199G225
Person / Time
Issue date: 01/07/1999
From: Shirley Ann Jackson, The Chairman
NRC COMMISSION (OCM)
To: Holum J
STATE, DEPT. OF
Shared Package
ML20199G230 List:
References
NUDOCS 9901220221
Download: ML20199G225 (2)


Text

. - _.

D R-o b

6 UNITED STATES y

j p*

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055fM001

\\.....

January 7,1999 CHAIRMAN The Honorable John D. Holum Acting Under Secretary of State for Arms Control and International Security Affairs and Director, U.S.

Arms Control and Disarmament Agency United States Department of State Washington, D.C. 20520

Dear Mr. Holum:

Thank you for your letter of November 3 addressing concerns that I recently relayed to you about the U.S.-Russian plutonium production reactor core conversion project (CCP). I appreciate the additionalinformation you conveyed.

As you know, the Nuclear Regulatory Commission (NRC) is working to define a program of l

technical assistance and advice for GAN in support of GAN's regulatory oversight of CCP l

activities. As part of this effort, over the past month NRC staff has continued to have l

discussions about safety matters with GAN representatives. I believe that we now have a better l

understanding of GAN's safety concerns related to core conversion.

The objectives, implementation schedules and technical parameters of the core conversion

- project will result in a converted core design that is unique. There does not appear to be a similarly configured reactor operating anywhere in the world. As a result, we now understand that one of GAN's principal safety concerns revolves around the lack of actual operational experience data that can be used to demonstrate how the converted cores will actually perform.

This appears to be why GAN is calling for an increased focus on the validation and verification of the computer codes used for design calculations for such safety significant areas as emergency core cooling system performance, boron absorber performance, control rod performance, core neutronics, transient and accident analyses, etc., as safety judgments will be made largely based on these computer code calculations instead of actual operational experience data.

Since the U.S. is heavily engaged in financing the core conversion project, I felt a responsibility l

I to inform you of concerns that had been conveyed to me by Russian officials at the highest j

levels. While the information to date is based on preliminary reports, I continue to encourage GAN to proceed with their safety analyses, and have pressed them on the need to document their findings. An official evaluation regarding safety concerns needs to be completed by GAN i

and shared with all relevant parties.

i 1

d i

l 9901220221 990107 I

PDR COMMS NRCC l

i CORRESPONDENCE PDR i.

m

W 2-I trust that you will join me in supporting the timely resolution of GAN's safety concerns through the existing CCP framework, and in underscoring that we remain committed to ensuring that l

safety is given the highest priority during core conversion efforts.

Sincerely,

&L Shirley Ann Jackson cc:

OVP-Leon Fuerth NSC-Gary Samore OSD-Edward Warner DOE-Rose Gottemoeller er l