Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:- - - - _ _ _ _ _ - _ _ - _ - _ - _ _ _ _ - _ _ _ _ _ _ - _ - - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:-
g gf   , O>mmonwealth I Alium Comp.m)
g gf
, O>mmonwealth I Alium Comp.m)
Ihm Gener.iting Stathm 141 Shiloh iksulcun!
Ihm Gener.iting Stathm 141 Shiloh iksulcun!
            /.km,1L M in 27%'
/.km,1L M in 27%'
i           1t i H 17 " M 2(W, ZRA97064 November 18,1997-U. S. Nuclear Regulatory Commission Washington, D.C, 20555 Attention:                                                         Do::umeni Control Desk                                                                                           -
i 1t i H 17 " M 2(W, ZRA97064 November 18,1997-U. S. Nuclear Regulatory Commission Washington, D.C, 20555 Attention:
Do::umeni Control Desk


==Subject:==
==Subject:==
Line 27: Line 29:


==Reference:==
==Reference:==
(a)                               R. L. Bolger (Comed) letter to V. Stello (USNRC), dated A pril 29, 1977, transmittmg report entitled "Informanon Relevant to Fire Protselion Systems cod Programs "
(a)
(b)                               J,11. Mueller (Comed) letter to USNRC, dated Jarmcry 31,1997, transmitting Amendment 4 to the Zion Statiim Fire Protectior, Report.
R. L. Bolger (Comed) letter to V. Stello (USNRC), dated A pril 29, 1977, transmittmg report entitled "Informanon Relevant to Fire Protselion Systems cod Programs "
(b)
J,11. Mueller (Comed) letter to USNRC, dated Jarmcry 31,1997, transmitting Amendment 4 to the Zion Statiim Fire Protectior, Report.
Through Reference (a) Commonwealth Edison (Comed) submitted the fire lion Station Fire Protection Report. Following submittal of reference (a) various aspects of the program have been updated and addressed through correspondence to and from the NRC.
Through Reference (a) Commonwealth Edison (Comed) submitted the fire lion Station Fire Protection Report. Following submittal of reference (a) various aspects of the program have been updated and addressed through correspondence to and from the NRC.
The most recent of these updates was transmitted via Reference (b) as Amendment 4 to the Fire Protection Report. The purpose of this letter is to provide the Amendment 5 update to the Fire Protection Report (FPR).
The most recent of these updates was transmitted via Reference (b) as Amendment 4 to the Fire Protection Report. The purpose of this letter is to provide the Amendment 5 update to the Fire Protection Report (FPR).
M50001                                                                                                                       s
M50001 s
                                                                                                                              ~
~
9711250292 971118                                                                                               25 DR                         ADOCK O llllll3!!!ll!!!!iljl!ll,11llli a,m _ m ,m,
9711250292 971118 DR ADOCK O 25 llllll3!!!ll!!!!iljl!ll,11llli a,m _ m,m,


,f 4 ZRA97064 November 18,1997 Page 2 of 2 Attachment A is an Amendment 5 Change Summary that describes the individual changes made to the FPR. In general these include:
,f 4 ZRA97064 November 18,1997 Page 2 of 2 Attachment A is an Amendment 5 Change Summary that describes the individual changes made to the FPR. In general these include:
: a.     Changes to the Safe Shutdown Report, Volume 1, and the Fir- Ilazards Analysis, Volume 2, to reDect plant changes.
a.
: b.     The Fire llazards Analysis, Volume 2, has been revised to correct a de6ciency identined by an internal QA Audit of Dre protection. The audit found that she FPR did not identify Dre suppression systems that are required to be controlled by the Sre protection Administrative Technical Requirements
Changes to the Safe Shutdown Report, Volume 1, and the Fir-Ilazards Analysis, Volume 2, to reDect plant changes.
: c.     NRC SERs in Volume 3 are being updated to include missing pages.
b.
: d.     Corrections and clari6 cations have been made to various sections.
The Fire llazards Analysis, Volume 2, has been revised to correct a de6ciency identined by an internal QA Audit of Dre protection. The audit found that she FPR did not identify Dre suppression systems that are required to be controlled by the Sre protection Administrative Technical Requirements c.
NRC SERs in Volume 3 are being updated to include missing pages.
d.
Corrections and clari6 cations have been made to various sections.
Attachment B contains the replacement pages, revised index, and an instruction sheet for inserting Amendment 5 into the FPR.
Attachment B contains the replacement pages, revised index, and an instruction sheet for inserting Amendment 5 into the FPR.
Should you have any questions concerning this response, please contact Robert Godley, Zion Station Regulatory Assurance Manager, at (847)746-2084, ext.-2900.
Should you have any questions concerning this response, please contact Robert Godley, Zion Station Regulatory Assurance Manager, at (847)746-2084, ext.-2900.
Line 45: Line 52:


==Enclosures:==
==Enclosures:==
Fire Protection Report Amendment 5 xc:     Regional Administrator, USNRC - Region III Senior Project Manager, USNRC - NRR Project Directorate 111-2 NRC Senior Resident inspector Zion Generating Station Office of Nuclear Facility Safety u m munnunnn -cn ame
Fire Protection Report Amendment 5 xc:
Regional Administrator, USNRC - Region III Senior Project Manager, USNRC - NRR Project Directorate 111-2 NRC Senior Resident inspector Zion Generating Station Office of Nuclear Facility Safety u m munnunnn -cn ame


y . ?, E REGULATORY COMMITMENTS 1
y. ?, E REGULATORY COMMITMENTS 1
The following identines those actions committed to by Comed in this document. Any other actions discussed is this submittal represent intended or planned actions by Comed. They are described to the NRC for the NRC's information and are not regulatory commitments.
The following identines those actions committed to by Comed in this document. Any other actions discussed is this submittal represent intended or planned actions by Comed. They are described to the NRC for the NRC's information and are not regulatory commitments.
Regulatory Commitments                                                     Tracking Number None included in this correspondence                                         None i
Regulatory Commitments Tracking Number None included in this correspondence None i
L
L


4 N
4 N
t e
t e
.      O.
O.
i 1
i 1
4
4
Line 60: Line 68:
4 C
4 C
a
a
                                                                                                                                        ^
^
i 4
i 4
l                                                                     ATTACHMENT A '
l ATTACHMENT A '
a ll O                               Fire Protection Report Amendment 5 Change Summary l
a ll O
t
Fire Protection Report Amendment 5 Change l
Summary t
[ '.
[ '.
l
l
Line 73: Line 82:
a 4
a 4
1 o
1 o
                                                . . . . , . . . _ . ,    . , - . . . - , _ - . . _ _ . . - . .  . ...--,.,.c.-.   . ... . . . ,,
...--,.,.c.-.


O                                       O                                             O 4
O O
O 4
aITANDiENT A ZION 1&2 FIRE PROTECTIOH REPORT AMENDMENT 5, JULY 1997 CHANGE  
aITANDiENT A ZION 1&2 FIRE PROTECTIOH REPORT AMENDMENT 5, JULY 1997 CHANGE  


==SUMMARY==
==SUMMARY==
1 of 12 Section/
1 of 12 Section/
Table /   Page           Change" Description                     Basis for change Figure   Number VOLUME 1 1.2       1-1     Editorial.                           Reference to App. A was incorrect.
Table /
1.3       1-2     Clarification. Date of BTP           The revision date was not APCSB 9.5-1 revision applicable     previously identified. This is to Zion has been.added.             provided to avoid confusion as to which version of the BTP applies to-Zion.
Page Change" Description Basis for change Figure Number VOLUME 1 1.2 1-1 Editorial.
Table 1-3 1-22,   Historical developments list         Added correspondence since 1995 and 1-22a   revised to add correspondence       clarified the description of the.
Reference to App. A was incorrect.
and add clarifications.             08-31-93 correspondence.
1.3 1-2 Clarification. Date of BTP The revision date was not APCSB 9.5-1 revision applicable previously identified. This is to Zion has been.added.
Table 2-2 2-13   Revised due to changes in           For combustible load changes refer thru   combustible loading and to           to the discussion for changes to 2-22,   correct inconsistencies in           Volume 2, Sections 2 and 3 in this and 2- description of fire protection       Attachment. The other changes are
provided to avoid confusion as to which version of the BTP applies to-Zion.
;              2.7 and features.                           for internal consistency of the
Table 1-3 1-22, Historical developments list Added correspondence since 1995 and 1-22a revised to add correspondence clarified the description of the.
              -28                                         FPR.
and add clarifications.
3.3.3     3-5     Corrected definition of hot         The change is editorial and is shutdown.                           consistent with the Technical Specifications.
08-31-93 correspondence.
3.4.4,   3-16,   Adued references to safe             One change is editorial, one 3.4.9     3-25   shutdown flowpath figures in         corrects a missing figure reference     ;
Table 2-2 2-13 Revised due to changes in For combustible load changes refer thru combustible loading and to to the discussion for changes to 2-22, correct inconsistencies in Volume 2, Sections 2 and 3 in this and 2-description of fire protection Attachment. The other changes are 2.7 and features.
this section.                       and     other refers to a new flowpuch figure for the boron sample system.                         ,
for internal consistency of the
-28 FPR.
3.3.3 3-5 Corrected definition of hot The change is editorial and is shutdown.
consistent with the Technical Specifications.
3.4.4, 3-16, Adued references to safe One change is editorial, one 3.4.9 3-25 shutdown flowpath figures in corrects a missing figure reference this section.
and other refers to a new flowpuch figure for the boron sample system.
r
r


O                                       O                                             O ATTACHMENT A ZION 1&2 FIRE PRO'?EC"rION REPORT AMENDMENT 5, JULY 1997 CHANGE SCMMARY                         2 of 12       _ .
O O
Section/
O ATTACHMENT A ZION 1&2 FIRE PRO'?EC"rION REPORT AMENDMENT 5, JULY 1997 CHANGE SCMMARY 2 of 12 Section/
Table /   Page           Change Description-                   -Basis for. Change Figure     Number Table 3-1 3-28   Editorial.                           Corrected instrument number.
Table /
Table 3-   3-34, The turbine-driven AFW pump         Yhe valves were removed from the_         .
Page Change Description-
2.1 3-35   cooling pressure contrcl valves     plant by an Exempt Change.' Removal       !
-Basis for. Change Figure Number Table 3-1 3-28 Editorial.
1/2PCV-FW541 have been deleted       of these valves, in conjunction           t from the list of safe shutdown       with other changes in this               ;
Corrected instrument number.
equipment.                           modification, improves the               ,
Table 3-3-34, The turbine-driven AFW pump Yhe valves were removed from the_
reliability of the AFW pump' turbine     '
2.1 3-35 cooling pressure contrcl valves plant by an Exempt Change.' Removal 1/2PCV-FW541 have been deleted of these valves, in conjunction t
bearing oil cooling system.
from the list of safe shutdown with other changes in this equipment.
Figures 3- N/A   The figures were replaced with       The update was done to reflect the 5.through         the current P& ids, although the     current P&lDs. The new figure 3-26             safe shutdown flowpaths are           showing the primary sampling valves unchanged. Figure 3-24 is new.       is consistent with the existing         .
modification, improves the reliability of the AFW pump' turbine bearing oil cooling system.
This figure shows the primary                                                 '
Figures 3-N/A The figures were replaced with The update was done to reflect the 5.through the current P& ids, although the current P&lDs. The new figure 3-26 safe shutdown flowpaths are showing the primary sampling valves unchanged. Figure 3-24 is new.
safe shutdown analysis in this sampling isolation valves that       volume of the FPR.                       i are used for obtaining a boron sample in tile event of a loss                                                 !
is consistent with the existing This figure shows the primary safe shutdown analysis in this sampling isolation valves that volume of the FPR.
of source range neutron flux                                                   i monitoring.                      .
i are used for obtaining a boron sample in tile event of a loss of source range neutron flux i
4.6.3     4-8   Editorial.                           Punctuation.
monitoring.
6.6.1     6-11   Revised to clarify location of       Ravised to be consistent with condensate normal and emergency     physical locations.                       !
4.6.3 4-8 Editorial.
makeup and overflow isolation                                                 i valves.
Punctuation.
6.6.1 6-11 Revised to clarify location of Ravised to be consistent with L
condensate normal and emergency physical locations.
makeup and overflow isolation i
valves.
h j
h j
t-
t-


ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT                                     I AMENDMENT 5, JULY 1997 CHANGE  
ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT I
AMENDMENT 5, JULY 1997 CHANGE  


==SUMMARY==
==SUMMARY==
                              '3 of 12 Section/
'3 of 12 Section/
Table /   Page'         Change Description                         Basis for Phanne Figure   Number                                     _
Table /
7 7.4.5     7-44   Revised to delete listing of           Th s partial coverage sprinkler     ~
Page' Change Description Basis for Phanne
Figure 2-       partial coverage sprinkler             system was part of the original 18 and           system in Fire Zone 14.3A-0             design, but was later. deleted from 7.4-4           (dry active. waste storage             the design. The radwaste equipment:
(
area).                                 in the room is not used. Presently, '
Figure Number 7
the fire hazards in the room would not warrant the installation of a sprinkler system.
7.4.5 7-44 Revised to delete listing of Th s partial coverage sprinkler
VOLUME 2                       .
~
1.0       1-1,   Clarification. Date of BTP             The revision date was not 1-3   APCSB 9.5-1 revision applicable         previously identified. This is to Zion has been added.                 provided to avoid confusion as to which version of the BTP applies to
Figure 2-partial coverage sprinkler system was part of the original 18 and system in Fire Zone 14.3A-0 design, but was later. deleted from 7.4-4 (dry active. waste storage the design. The radwaste equipment:
                                                  -        Zion.-
area).
1.2.1     1-3   The text has been revised to           The identification of foam was made-include foam as a type of         ,
in the room is not used. Presently, the fire hazards in the room would not warrant the installation of a sprinkler system.
to be consistent with other FPR' suppression and to provide             sections. The revision for Table reference to Table 2.2, which           2.2, is a corrective action has been revised to identify           resulting from the 1997 Triennial the type of suppression system         fire protection audit. The audit provided for each fire zone and         determined that the FPR should be-which systems are r2 quired to         clarified to identify the           i be controlled by the                   suppression systems that are Administrative Technical               required to be controlled by1the-   ,
VOLUME 2 1.0 1-1, Clarification. Date of BTP The revision date was not 1-3 APCSB 9.5-1 revision applicable previously identified. This is to Zion has been added.
Requirements.                           Administrative Technical             !
provided to avoid confusion as to which version of the BTP applies to Zion.-
Requirements.
1.2.1 1-3 The text has been revised to The identification of foam was made-include foam as a type of to be consistent with other FPR' suppression and to provide sections. The revision for Table reference to Table 2.2, which 2.2, is a corrective action has been revised to identify resulting from the 1997 Triennial the type of suppression system fire protection audit. The audit provided for each fire zone and determined that the FPR should be-which systems are r2 quired to clarified to identify the i
be controlled by the suppression systems that are Administrative Technical required to be controlled by1the-Requirements.
Administrative Technical Requirements.


i ATTACHMENT A ZION 1&2 FIRE PROTEC~ ION REPORT AMENDMENT 5, JULY 1997 CHANGE  
i ATTACHMENT A ZION 1&2 FIRE PROTEC~ ION REPORT AMENDMENT 5, JULY 1997 CHANGE  
Line 132: Line 154:
==SUMMARY==
==SUMMARY==
4 of 12 Section/
4 of 12 Section/
Table /   Page             Change Description                     Basis for Mange Figure'   Number 2.0       2-2   Clarification of reference to           Reference to the 1987 safe shutdown Volume 1 of the Fire Protection         report submittal was-incorrect Report.                                 since the report has been updated since that time.
Table /
Table 2.1 2-14   The calculated fixed                   The fixed. combustible loading thru   combustible loading was revised         changes are due to installation of
Page Change Description Basis for Mange Figure' Number 2.0 2-2 Clarification of reference to Reference to the 1987 safe shutdown Volume 1 of the Fire Protection report submittal was-incorrect Report.
                                    .2-17, for various fire zones. In             modifications, correction of and 2- addition, the note at the               errors, and use of refined method         ;
since the report has been updated since that time.
19     bottom of page 2-21 was revised         for calculating combustible thru   to clarify the historical               contribution from cables in cable 2-21. chronology regarding NRC review         tray. The note on page 2-21 is per of exemption requests.                 the NRC SER dated 08-31-93.
Table 2.1 2-14 The calculated fixed The fixed. combustible loading thru combustible loading was revised changes are due to installation of
Table 2.2 2-22   Table revised to identify fire         The revision is a corrective action thru   suppression systems required-           resulting from the 1997 Triennial 2-29   to be controlled by the                 fire protection audit. The audit         ,
.2-17, for various fire zones. In modifications, correction of and 2-addition, the note at the errors, and use of refined method 19 bottom of page 2-21 was revised for calculating combustible thru to clarify the historical contribution from cables in cable 2-21.
Administrative Technical               determined that the FPR should be Requirements. Also, table               clarified to identify the corrected to indicate that fire         suppression systems that are detection is present in Fire           required to be controlled by the..
chronology regarding NRC review tray. The note on page 2-21 is per of exemption requests.
Zones 5.6A-1, 5.6A-2, and 7.0-         Administrative Technical                 !
the NRC SER dated 08-31-93.
: 0.                                     Requirements. Fire detection information corrected to be i
Table 2.2 2-22 Table revised to identify fire The revision is a corrective action thru suppression systems required-resulting from the 1997 Triennial 2-29 to be controlled by the fire protection audit. The audit Administrative Technical determined that the FPR should be Requirements. Also, table clarified to identify the corrected to indicate that fire suppression systems that are detection is present in Fire required to be controlled by the..
consistent with other sections'of the Fire Protection Report.           g-t
Zones 5.6A-1, 5.6A-2, and 7.0-Administrative Technical 0.
* I' 4-
Requirements. Fire detection information corrected to be i
consistent with other sections'of the Fire Protection Report.
g-t I'
4-


    .m                                                                                       p-(V l                                                                                   (
.m p-(V l
                                                                                              .L ATTACHMENT A ZION 162 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997                                         -
(.L ATTACHMENT A ZION 162 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 j-CHANGE  
j-                                             CHANGE  


==SUMMARY==
==SUMMARY==
5 of 12 Section/-                                                               .
5 of 12 Section/-
Table /. Page           Change Description.                     Basis for N nge Figure   Number 3.0.1.1, 3-3,     Corrected to show zone location       Revised and corrected based on           '
Table /.
3.0.1.3, 3-4,     of source range flux monitors         Gamma-Metrics modification to             l 3.0.2.1, 3-9,     inside containment. Also, the         source range flux instrumentation.
Page Change Description.
3.0.2.3   3-l'     design basis fire discussion         Also, correction of errors in was revised and corrected to         discussion of design basis fire.
Basis for N nge Figure Number 3.0.1.1, 3-3, Corrected to show zone location Revised and corrected based on 3.0.1.3, 3-4, of source range flux monitors Gamma-Metrics modification to l
evaluate the combu :ibles that                                                 i exist in this zone.
3.0.2.1, 3-9, inside containment. Also, the source range flux instrumentation.
3.0.1.2, 3-6,     Revised to list the primary           Revised to be consistent with the 3.0.2.2   3-19     sampling isolation valve             safe shutdown analysis (FPR Volume (1/2SS9358A) as a safe shutdown       1).
3.0.2.3 3-l' design basis fire discussion Also, correction of errors in was revised and corrected to discussion of design basis fire.
evaluate the combu :ibles that i
exist in this zone.
3.0.1.2, 3-6, Revised to list the primary Revised to be consistent with the 3.0.2.2 3-19 sampling isolation valve safe shutdown analysis (FPR Volume (1/2SS9358A) as a safe shutdown 1).
component.
component.
3.0.1.2, 3-7,     combustible material                 Revised per Gamma-Metrics nuclear         !
3.0.1.2, 3-7, combustible material Revised per Gamma-Metrics nuclear 3.0.1.3, 3-10, information revised.
3.0.1.3, 3-10,   information revised.                 instrumentation modification-and a 3.0.1.4, 3-13,                                   .
instrumentation modification-and a 3.0.1.4, 3-13, modification which deleted the RCFC 3.0.2.2, 3-20, HEPA filters in this zone. Also, 3.0.2.3, 3-22, for zone 1.4-2, combustibles were 3.0.2.4 3-23, added based on a modification of 3-26 the reactor vessel head lead shielding design.
modification which deleted the RCFC 3.0.2.2, 3-20,                                         HEPA filters in this zone. Also, 3.0.2.3, 3-22,                                         for zone 1.4-2, combustibles were 3.0.2.4   3-23,                                        , added based on a modification of 3-26                                     -    the reactor vessel head lead             ;
3.0.3.1 3-31 Revised equipment numbers for Revised based on Gamma-Metrics source range flux monitors.
shielding design.
nuclear instrumentation modification.
3.0.3.1   3-31     Revised equipment numbers for         Revised based on Gamma-Metrics source range flux monitors.           nuclear instrumentation modification.                       -
9 5
9 5
                                                                                  .                -  ~.
~.


    %                                          (                                         O' V
(
ATTACID4ENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SIHOfARY-                       6 of 12 Section/
O' V
Table / Page             Change Description                     Basis for channe Figure   Number 3.0     See       Following pages revised:             The calculated fixed combustible Change   3-32,36,41,54,58,70,76,             loading increased in several fire Descr-   82,90,124,129,133,151,154,161,       zones due to installation of iption   200,203,207,210,213,344,357,         equipment (mostly cable) as of 12-and 369. The changes include         31-36. The calculated fixed revision of fixed combustible       combustible loading decreased in loadings.                           some zones due to use of. refined method for calculating combustible contribution from cab]as in cable tray.                              .
ATTACID4ENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SIHOfARY-6 of 12 Section/
3.0.4,   3-55,     Revised to reflect that outer       The changes were made to be 3.0.8   3-67     and inner cable spreading room       consistent with other sections of have automatic halon                 the FPR.
Table /
suppression with backup CO2 suppression.                     '
Page Change Description Basis for channe Figure Number 3.0 See Following pages revised:
3.0.26   3-132,   Revised to indicate that             The changes are consistent with FPR 3.0.27   3-134     detection is present in Fire         Vol. 1, Section 5.
The calculated fixed combustible Change 3-32,36,41,54,58,70,76, loading increased in several fire Descr-82,90,124,129,133,151,154,161, zones due to installation of iption 200,203,207,210,213,344,357, equipment (mostly cable) as of 12-and 369. The changes include 31-36. The calculated fixed revision of fixed combustible combustible loading decreased in loadings.
Zones 5.6A-1 and 5.6A-2 (DC                                             .
some zones due to use of. refined method for calculating combustible contribution from cab]as in cable tray.
distribution panel rooms).
3.0.4, 3-55, Revised to reflect that outer The changes were made to be 3.0.8 3-67 and inner cable spreading room consistent with other sections of have automatic halon the FPR.
3.0.28   3-136     A statement was added that fire     Corrected to be consistent with detectioa is provided in the         Volume 1 of the Fire Protection Div. 17/27 DC battery room           Report.                             ;
suppression with backup CO2 suppression.
3.0.26 3-132, Revised to indicate that The changes are consistent with FPR 3.0.27 3-134 detection is present in Fire Vol.
1, Section 5.
Zones 5.6A-1 and 5.6A-2 (DC distribution panel rooms).
3.0.28 3-136 A statement was added that fire Corrected to be consistent with detectioa is provided in the Volume 1 of the Fire Protection Div. 17/27 DC battery room Report.
(Zone 7.0-0).
(Zone 7.0-0).
t
t


O                                             O                                         O A'ITACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE  
O O
O A'ITACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE  


==SUMMARY==
==SUMMARY==
7 of 12-Section/
7 of 12-Section/
Table / Page             Change Description                       Basis for change Figure- Ytumber 3.0.33   3-150,     Revised to indicate that the         These changes were made to be 3-151     EDG room vent fan is safe             consistent with other sections of shutdown equipment. Also, the         the FPR.
Table /
Page Change Description Basis for change Figure-Ytumber 3.0.33 3-150, Revised to indicate that the These changes were made to be 3-151 EDG room vent fan is safe consistent with other sections of shutdown equipment. Also, the the FPR.
section was revised to add description of the DG intake water deluge system.
3.0.34 3-153, Revised to indicate that the These changes were made to be 3-154 EDG room vent fan is safe consistent with other sections of shutdown equipment. Also, the the FPR.
section was revised to add description of the DG intake water deluge system.
section was revised to add description of the DG intake water deluge system.
3.0.34  3-153,     Revised to indicate that the         These changes were made to be 3-154      EDG room vent fan is safe             consistent with other sections of shutdown equipment. Also, the         the FPR.
3.0.35 3-157, Revised to indicate that the These changes were made.to'be 3-158 EDG room vent fan is safe consistent with other sections of shutdown equipment. Also, the the FPR.
section was revised to add description of the DG intake water deluge system.
section was revised to add description of the DG intake water deluge system.
3.0.35  3-157,    Revised to indicate that the          These changes were made.to'be 3-158      EDG room vent fan is safe        -
3.0.36 3-160, Revised to indicate that the These changes were made to be-3-161 EDG room vent fan is safe consistent with other sections of.
consistent with other sections of shutdown equipment. Also, the        the FPR.
shutdown equipment. Also, the the FPR.
section was revised to add description of the DG intake water deluge system.              .
3.0.36   3-160,     Revised to indicate that the         These changes were made to be-3-161     EDG room vent fan is safe             consistent with other sections of.
shutdown equipment. Also, the         the FPR.                           ,
section was revised to add description of the DG intake water deluge system.
section was revised to add description of the DG intake water deluge system.
I a
I a


O                                                 O                                                   O ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SUI 9fARY                             8 of 12 Section/
O O
Table /       Page                 Change Description                       Basis for: changer Figure       Number-3.0.37       3-163,   Revised to indicate that the               These changes were made to be 3-164     EDG room vent fan is safe                   consistent with other sections of shutdown equipment. Also, the               the FPR.
O ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SUI 9fARY 8 of 12 Section/
Table /
Page Change Description Basis for: changer Figure Number-3.0.37 3-163, Revised to indicate that the These changes were made to be 3-164 EDG room vent fan is safe consistent with other sections of shutdown equipment. Also, the the FPR.
section was revised to add description of the DG intake water deluge system.
section was revised to add description of the DG intake water deluge system.
3.0.44       3-227     Editorial correction of name of             Editorial to be cc wistent with     ,
3 3.0.44 3-227 Editorial correction of name of Editorial to be cc wistent with Fire Zone 14.4A-0 (Tool Crib).
Fire Zone 14.4A-0 (Tool Crib).             other sections of FPR.
other sections of FPR.
3.0.44.27     3-298,   Revised to state that a culb is             This is consistent with the design 3.0.44.28     3-301     provided in the doorway of the             and an SER commitment,to provide reciprocating charging pump                 this.
3.0.44.27 3-298, Revised to state that a culb is This is consistent with the design 3.0.44.28 3-301 provided in the doorway of the and an SER commitment,to provide reciprocating charging pump this.
,                        rooms to prevent oil spread due to a spill.
rooms to prevent oil spread due to a spill.
3.0.44.31     3-305,   Revised to list the primary                 Revised to be consistent with the 3.0.44.32     3 307     sampling isolation valves                   safe shutdown analysis (FPR Volume   !
3.0.44.31 3-305, Revised to list the primary Revised to be consistent with the 3.0.44.32 3 307 sampling isolation valves safe shutdown analysis (FPR Volume (1/2SS9356A and B) as safe
(1/2SS9356A and B) as safe                 1) .
: 1).
shutdown components.
shutdown components.
3.0.44.34     3-311,   For Fire Zone 14.2A-0 the text             The existing safe shutdown analysis 3-312     was corrected to indicate that             and the Appendix R exemptions in combustibles and safe shutdown             FPR Volume 1 (Sec. 7) discuss'the cables are present, and to                 presence of safe shutdown cables.
3.0.44.34 3-311, For Fire Zone 14.2A-0 the text The existing safe shutdown analysis 3-312 was corrected to indicate that and the Appendix R exemptions in f
revise the design basis fire               However, the fire hazards analysis evaluation.                                 text in Volume 2 was inconsistent.
combustibles and safe shutdown FPR Volume 1 (Sec. 7) discuss'the cables are present, and to presence of safe shutdown cables.
revise the design basis fire However, the fire hazards analysis evaluation.
text in Volume 2 was inconsistent.


ATTACHMEITT A ZION 1&2 FIRE PROTECTION REPORT AMENDMEITF 5, JULY 1997-CHANGE SIDetARY                           9 of 12-Section/-                                                                                                 ,
ATTACHMEITT A ZION 1&2 FIRE PROTECTION REPORT AMENDMEITF 5, JULY 1997-CHANGE SIDetARY 9 of 12-Section/-
Table /'- Page         Change Description                     . Basis for Change' Figure   Number 3.0.44.35 3-314- Text revised to list boron           Revised to be consistent with the sample panels as being present       safe shutdown analysis.
Table /'-
Page Change Description
. Basis for Change' Figure Number 3.0.44.35 3-314-Text revised to list boron Revised to be consistent with the sample panels as being present safe shutdown analysis.
in the zone.
in the zone.
3.0.44.42 3-329, For Fire Zone 14.3A-0 the text       The existing safe shutdown analysis
3.0.44.42 3-329, For Fire Zone 14.3A-0 the text The existing safe shutdown analysis 3-330 was corrected to irdicate that and the Appendix R exemptions'in safe shutdown cables are FPR Volume 1 (Sec. 7) discuss the present, to revise the presence of safe shutdown cables..
;          3-330 was corrected to irdicate that       and the Appendix R exemptions'in safe shutdown cables are             FPR Volume 1 (Sec. 7) discuss the present, to revise the               presence of safe shutdown cables..
combustible loading, and to However, the fire hazards analysis revise the design basis fire text in Volume 2 was inconsistent'.
combustible loading, and to         However, the fire hazards analysis revise the design basis fire         text in Volume 2 was inconsistent'.
evaluation. Also, the text was Also, regarding.the sprinkler revised to state that partial system, this system'is not present automatic sprinkler coverage is in the tesign, and'the' fire hazardsu not provided in this zone.
evaluation. Also, the text was       Also, regarding.the sprinkler revised to state that partial       system, this system'is not present automatic sprinkler coverage is     in the tesign, and'the' fire hazardsu not provided in this zone.           in the zone would not wa' ant the installation of'a system. .ae FPR text was incorrect. This change                     i does not alter the basis for the Appendix R exemption for El. 592' of the Aux. Bldg. (NRC-SER. dated 06/07/88).                                           ,
in the zone would not wa' ant the installation of'a system..ae FPR text was incorrect. This change i
3.0.44.48 3-346, Barrier description corrected       Revised to reflect modification.
does not alter the basis for the Appendix R exemption for El. 592' of the Aux. Bldg. (NRC-SER. dated 06/07/88).
3.0.44.49 3-349 to discuss non-rated removable                                                           '
3.0.44.48 3-346, Barrier description corrected Revised to reflect modification.
seal provided for radiation                                                               ,
3.0.44.49 3-349 to discuss non-rated removable seal provided for radiation monitoring and ALARA considerations.
monitoring and ALARA                                                                     .
i h
considerations.                                                                           !
i n
i i
w
n
                                                                    ,        w             - - _ - - _ - -


  .j Q                                         ~
.j Q
~
v w/
v w/
ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT                                   '
ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SUNNARY 10 of 12 Section/
AMENDMENT 5, JULY 1997 CHANGE SUNNARY                         10 of 12 Section/
Table /
Table /   Page         Change Description ~                     Basis for Change Figure   Number 3.0.44.53 3-358, Barrier description corrected         Revised to reflect modification.       <
Page Change Description ~
3.0.44.54 3-361 to discuss non-rated removable seal provided for radiation                                                 ,
Basis for Change Figure Number 3.0.44.53 3-358, Barrier description corrected Revised to reflect modification.
monitoring and ALARA-considerations, 3.0.44.56 3-368, Editorial correction of name of       Editorial to be consistent with       ,
3.0.44.54 3-361 to discuss non-rated removable seal provided for radiation monitoring and ALARA-considerations, 3.0.44.56 3-368, Editorial correction of name of Editorial to be consistent with 3-369 Fire Zone 14.4A-0 (Tool Crib),
3-369 Fire Zone 14.4A-0 (Tool Crib),       other sections of FPR. Design basis which is on other side of west       fire discussion is consistent with     i wall of 14.4Br0. Also, the           the safe shutdown analysis.
other sections of FPR. Design basis which is on other side of west fire discussion is consistent with i
wall of 14.4Br0. Also, the the safe shutdown analysis.
design basis fire discussion was clarified.
design basis fire discussion was clarified.
l 3.0.44.59 3-377 Revised to indicate that Aux.         This change was made to be Bldg. Ventilation fans are safe       consistent with the safe shutdown'     ,
l 3.0.44.59 3-377 Revised to indicate that Aux.
shutdown equipment.             . analysis in Volume l'of the FPR.
This change was made to be Bldg. Ventilation fans are safe consistent with the safe shutdown' shutdown equipment.
3.0.51   3-399, Editorial change to clarify           Editorial.
analysis in Volume l'of the FPR.
3-400 name of outdoor fuel oil tank.
3.0.51 3-399, Editorial change to clarify Editorial.
3.0.52   3-402, This change adds discussion of       This modification was made to 3.0.53   3-403 the modification to delete           protect against inadvertent' water automatic actuation of the main       deluge and potential transformer transformer deluge system on         damage. The operators would heat detection. The detectors         manually actuate the system based alarm only.                           on a control room alarm _from the heat detectors. The deluge system     ;
3-400 name of outdoor fuel oil tank.
will still automatically' actuate on detection of a transformer-fault.
3.0.52 3-402, This change adds discussion of This modification was made to 3.0.53 3-403 the modification to delete protect against inadvertent' water automatic actuation of the main deluge and potential transformer transformer deluge system on damage. The operators would heat detection. The detectors manually actuate the system based alarm only.
on a control room alarm _from the heat detectors. The deluge system will still automatically' actuate on detection of a transformer-fault.
v
v


Line 241: Line 279:
==SUMMARY==
==SUMMARY==
11 of 12 Section/
11 of 12 Section/
Table /- Page             Change Description                         Bas's.'for.
Table /-
i        Change Figure   Number i
Page Change Description Bas's.'for. Change i
4 .- 1   4.1   Clarification. Date of BTP APCSB 9.5-1 revision applicable The revision date was_not previously identified..This is-to Zion has been added.             provided to avoid confusion as-to which version of the BTP: applies to Zion.
Figure Number i
4.5     4.5-2,   ' Revised to modify hose stream     The NRC and NFPA ilave revised 'the -
4.- 1 4.1 Clarification. Date of BTP The revision date was_not APCSB 9.5-1 revision applicable previously identified..This is-to Zion has been added.
4.5-4,   demand assumption for use in FP     recommended hose stream demand' and     water supply hydraulic analysis     assumption to 500 gpm..Therefore, 4.5-5     from 1000 gpm,to 500 gpm.           this change is consistent with-the current NRC BTP CMEB 9.5-1 and NFPA 13.
provided to avoid confusion as-to which version of the BTP: applies to Zion.
4.6     4.6-21   The paragraph on criticality         The basis for this change is FOL analysis of the new fuel             Amendment 164/152 which allowed.an storage vault was revised to,       increased U-235 enrichment for new-     '
4.5 4.5-2,
delete the statement that non-       fuel stored in the new fuel storage fogging type nozzles preclude       vault. The revised criticality.
' Revised to modify hose stream The NRC and NFPA ilave revised 'the -
conditions of optimum             . analysis showed that optimum moderation.                          moderation occurs for a fully flooded non-borated water condition     '
4.5-4, demand assumption for use in FP recommended hose stream demand' and water supply hydraulic analysis assumption to 500 gpm..Therefore, 4.5-5 from 1000 gpm,to 500 gpm.
rather than for a fire-fighting water fogging condition.               '
this change is consistent with-the current NRC BTP CMEB 9.5-1 and NFPA 13.
4.6 4.6-21 The paragraph on criticality The basis for this change is FOL analysis of the new fuel Amendment 164/152 which allowed.an storage vault was revised to, increased U-235 enrichment for new-delete the statement that non-fuel stored in the new fuel storage fogging type nozzles preclude vault. The revised criticality.
conditions of optimum moderation.
analysis showed that optimum moderation occurs for a fully flooded non-borated water condition rather than for a fire-fighting water fogging condition.


                        . em; .                                           3                                             ..
. em;.
                        .k.                                                                                         %)
3
ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SUMP'ARY                         12 of'12 Section/     .
.k.
%)
ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SUMP'ARY 12 of'12 Section/
Table /
Table /
Page         Change Description                     Basis for manne Figure         Number VOLUME 3 NRC             N/A   Provide.s missing.page (7-1)         This is editorial type change to safety                 from 03-10-78 SER.                   clean up documentation.
Page Change Description Basis for manne Figure Number VOLUME 3 NRC N/A Provide.s missing.page (7-1)
Evsluation             Providea new copy of 08-27-93 Reports               SEh to replace existing copy that has missing page.                                                       ,
This is editorial type change to safety from 03-10-78 SER.
clean up documentation.
Evsluation Providea new copy of 08-27-93 Reports SEh to replace existing copy that has missing page.
t i
t i
4 e
4 e
                                                                                                    .y,.             ,    , -}}
L
.y,.
-}}

Latest revision as of 07:28, 10 December 2024

Provides Amend 5 to Zion Fire Protection Rept for Zion Generating Station,Units 1 & 2
ML20199G795
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/18/1997
From: Brons J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199G800 List:
References
ZRA-97064, NUDOCS 9711250292
Download: ML20199G795 (16)


Text

-

g gf

, O>mmonwealth I Alium Comp.m)

Ihm Gener.iting Stathm 141 Shiloh iksulcun!

/.km,1L M in 27%'

i 1t i H 17 " M 2(W, ZRA97064 November 18,1997-U. S. Nuclear Regulatory Commission Washington, D.C, 20555 Attention:

Do::umeni Control Desk

Subject:

AMENDMENT 5 TO ZION FIRE PROTEC flON REPORT Zion Generating Station, Units 1 & 2; NRC Docket Numbers 50-295 and 50004

Reference:

(a)

R. L. Bolger (Comed) letter to V. Stello (USNRC), dated A pril 29, 1977, transmittmg report entitled "Informanon Relevant to Fire Protselion Systems cod Programs "

(b)

J,11. Mueller (Comed) letter to USNRC, dated Jarmcry 31,1997, transmitting Amendment 4 to the Zion Statiim Fire Protectior, Report.

Through Reference (a) Commonwealth Edison (Comed) submitted the fire lion Station Fire Protection Report. Following submittal of reference (a) various aspects of the program have been updated and addressed through correspondence to and from the NRC.

The most recent of these updates was transmitted via Reference (b) as Amendment 4 to the Fire Protection Report. The purpose of this letter is to provide the Amendment 5 update to the Fire Protection Report (FPR).

M50001 s

~

9711250292 971118 DR ADOCK O 25 llllll3!!!ll!!!!iljl!ll,11llli a,m _ m,m,

,f 4 ZRA97064 November 18,1997 Page 2 of 2 Attachment A is an Amendment 5 Change Summary that describes the individual changes made to the FPR. In general these include:

a.

Changes to the Safe Shutdown Report, Volume 1, and the Fir-Ilazards Analysis, Volume 2, to reDect plant changes.

b.

The Fire llazards Analysis, Volume 2, has been revised to correct a de6ciency identined by an internal QA Audit of Dre protection. The audit found that she FPR did not identify Dre suppression systems that are required to be controlled by the Sre protection Administrative Technical Requirements c.

NRC SERs in Volume 3 are being updated to include missing pages.

d.

Corrections and clari6 cations have been made to various sections.

Attachment B contains the replacement pages, revised index, and an instruction sheet for inserting Amendment 5 into the FPR.

Should you have any questions concerning this response, please contact Robert Godley, Zion Station Regulatory Assurance Manager, at (847)746-2084, ext.-2900.

Sincerely, 7'3JJ John C. Brons Si~te Vice President Zion G nerating Station

Enclosures:

Fire Protection Report Amendment 5 xc:

Regional Administrator, USNRC - Region III Senior Project Manager, USNRC - NRR Project Directorate 111-2 NRC Senior Resident inspector Zion Generating Station Office of Nuclear Facility Safety u m munnunnn -cn ame

y. ?, E REGULATORY COMMITMENTS 1

The following identines those actions committed to by Comed in this document. Any other actions discussed is this submittal represent intended or planned actions by Comed. They are described to the NRC for the NRC's information and are not regulatory commitments.

Regulatory Commitments Tracking Number None included in this correspondence None i

L

4 N

t e

O.

i 1

4

(

4 C

a

^

i 4

l ATTACHMENT A '

a ll O

Fire Protection Report Amendment 5 Change l

Summary t

[ '.

l

?

t l

A t

i I

a 4

1 o

...--,.,.c.-.

O O

O 4

aITANDiENT A ZION 1&2 FIRE PROTECTIOH REPORT AMENDMENT 5, JULY 1997 CHANGE

SUMMARY

1 of 12 Section/

Table /

Page Change" Description Basis for change Figure Number VOLUME 1 1.2 1-1 Editorial.

Reference to App. A was incorrect.

1.3 1-2 Clarification. Date of BTP The revision date was not APCSB 9.5-1 revision applicable previously identified. This is to Zion has been.added.

provided to avoid confusion as to which version of the BTP applies to-Zion.

Table 1-3 1-22, Historical developments list Added correspondence since 1995 and 1-22a revised to add correspondence clarified the description of the.

and add clarifications.

08-31-93 correspondence.

Table 2-2 2-13 Revised due to changes in For combustible load changes refer thru combustible loading and to to the discussion for changes to 2-22, correct inconsistencies in Volume 2, Sections 2 and 3 in this and 2-description of fire protection Attachment. The other changes are 2.7 and features.

for internal consistency of the

-28 FPR.

3.3.3 3-5 Corrected definition of hot The change is editorial and is shutdown.

consistent with the Technical Specifications.

3.4.4, 3-16, Adued references to safe One change is editorial, one 3.4.9 3-25 shutdown flowpath figures in corrects a missing figure reference this section.

and other refers to a new flowpuch figure for the boron sample system.

r

O O

O ATTACHMENT A ZION 1&2 FIRE PRO'?EC"rION REPORT AMENDMENT 5, JULY 1997 CHANGE SCMMARY 2 of 12 Section/

Table /

Page Change Description-

-Basis for. Change Figure Number Table 3-1 3-28 Editorial.

Corrected instrument number.

Table 3-3-34, The turbine-driven AFW pump Yhe valves were removed from the_

2.1 3-35 cooling pressure contrcl valves plant by an Exempt Change.' Removal 1/2PCV-FW541 have been deleted of these valves, in conjunction t

from the list of safe shutdown with other changes in this equipment.

modification, improves the reliability of the AFW pump' turbine bearing oil cooling system.

Figures 3-N/A The figures were replaced with The update was done to reflect the 5.through the current P& ids, although the current P&lDs. The new figure 3-26 safe shutdown flowpaths are showing the primary sampling valves unchanged. Figure 3-24 is new.

is consistent with the existing This figure shows the primary safe shutdown analysis in this sampling isolation valves that volume of the FPR.

i are used for obtaining a boron sample in tile event of a loss of source range neutron flux i

monitoring.

4.6.3 4-8 Editorial.

Punctuation.

6.6.1 6-11 Revised to clarify location of Ravised to be consistent with L

condensate normal and emergency physical locations.

makeup and overflow isolation i

valves.

h j

t-

ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT I

AMENDMENT 5, JULY 1997 CHANGE

SUMMARY

'3 of 12 Section/

Table /

Page' Change Description Basis for Phanne

(

Figure Number 7

7.4.5 7-44 Revised to delete listing of Th s partial coverage sprinkler

~

Figure 2-partial coverage sprinkler system was part of the original 18 and system in Fire Zone 14.3A-0 design, but was later. deleted from 7.4-4 (dry active. waste storage the design. The radwaste equipment:

area).

in the room is not used. Presently, the fire hazards in the room would not warrant the installation of a sprinkler system.

VOLUME 2 1.0 1-1, Clarification. Date of BTP The revision date was not 1-3 APCSB 9.5-1 revision applicable previously identified. This is to Zion has been added.

provided to avoid confusion as to which version of the BTP applies to Zion.-

1.2.1 1-3 The text has been revised to The identification of foam was made-include foam as a type of to be consistent with other FPR' suppression and to provide sections. The revision for Table reference to Table 2.2, which 2.2, is a corrective action has been revised to identify resulting from the 1997 Triennial the type of suppression system fire protection audit. The audit provided for each fire zone and determined that the FPR should be-which systems are r2 quired to clarified to identify the i

be controlled by the suppression systems that are Administrative Technical required to be controlled by1the-Requirements.

Administrative Technical Requirements.

i ATTACHMENT A ZION 1&2 FIRE PROTEC~ ION REPORT AMENDMENT 5, JULY 1997 CHANGE

SUMMARY

4 of 12 Section/

Table /

Page Change Description Basis for Mange Figure' Number 2.0 2-2 Clarification of reference to Reference to the 1987 safe shutdown Volume 1 of the Fire Protection report submittal was-incorrect Report.

since the report has been updated since that time.

Table 2.1 2-14 The calculated fixed The fixed. combustible loading thru combustible loading was revised changes are due to installation of

.2-17, for various fire zones. In modifications, correction of and 2-addition, the note at the errors, and use of refined method 19 bottom of page 2-21 was revised for calculating combustible thru to clarify the historical contribution from cables in cable 2-21.

chronology regarding NRC review tray. The note on page 2-21 is per of exemption requests.

the NRC SER dated 08-31-93.

Table 2.2 2-22 Table revised to identify fire The revision is a corrective action thru suppression systems required-resulting from the 1997 Triennial 2-29 to be controlled by the fire protection audit. The audit Administrative Technical determined that the FPR should be Requirements. Also, table clarified to identify the corrected to indicate that fire suppression systems that are detection is present in Fire required to be controlled by the..

Zones 5.6A-1, 5.6A-2, and 7.0-Administrative Technical 0.

Requirements. Fire detection information corrected to be i

consistent with other sections'of the Fire Protection Report.

g-t I'

4-

.m p-(V l

(.L ATTACHMENT A ZION 162 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 j-CHANGE

SUMMARY

5 of 12 Section/-

Table /.

Page Change Description.

Basis for N nge Figure Number 3.0.1.1, 3-3, Corrected to show zone location Revised and corrected based on 3.0.1.3, 3-4, of source range flux monitors Gamma-Metrics modification to l

3.0.2.1, 3-9, inside containment. Also, the source range flux instrumentation.

3.0.2.3 3-l' design basis fire discussion Also, correction of errors in was revised and corrected to discussion of design basis fire.

evaluate the combu :ibles that i

exist in this zone.

3.0.1.2, 3-6, Revised to list the primary Revised to be consistent with the 3.0.2.2 3-19 sampling isolation valve safe shutdown analysis (FPR Volume (1/2SS9358A) as a safe shutdown 1).

component.

3.0.1.2, 3-7, combustible material Revised per Gamma-Metrics nuclear 3.0.1.3, 3-10, information revised.

instrumentation modification-and a 3.0.1.4, 3-13, modification which deleted the RCFC 3.0.2.2, 3-20, HEPA filters in this zone. Also, 3.0.2.3, 3-22, for zone 1.4-2, combustibles were 3.0.2.4 3-23, added based on a modification of 3-26 the reactor vessel head lead shielding design.

3.0.3.1 3-31 Revised equipment numbers for Revised based on Gamma-Metrics source range flux monitors.

nuclear instrumentation modification.

9 5

~.

(

O' V

ATTACID4ENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SIHOfARY-6 of 12 Section/

Table /

Page Change Description Basis for channe Figure Number 3.0 See Following pages revised:

The calculated fixed combustible Change 3-32,36,41,54,58,70,76, loading increased in several fire Descr-82,90,124,129,133,151,154,161, zones due to installation of iption 200,203,207,210,213,344,357, equipment (mostly cable) as of 12-and 369. The changes include 31-36. The calculated fixed revision of fixed combustible combustible loading decreased in loadings.

some zones due to use of. refined method for calculating combustible contribution from cab]as in cable tray.

3.0.4, 3-55, Revised to reflect that outer The changes were made to be 3.0.8 3-67 and inner cable spreading room consistent with other sections of have automatic halon the FPR.

suppression with backup CO2 suppression.

3.0.26 3-132, Revised to indicate that The changes are consistent with FPR 3.0.27 3-134 detection is present in Fire Vol.

1, Section 5.

Zones 5.6A-1 and 5.6A-2 (DC distribution panel rooms).

3.0.28 3-136 A statement was added that fire Corrected to be consistent with detectioa is provided in the Volume 1 of the Fire Protection Div. 17/27 DC battery room Report.

(Zone 7.0-0).

t

O O

O A'ITACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE

SUMMARY

7 of 12-Section/

Table /

Page Change Description Basis for change Figure-Ytumber 3.0.33 3-150, Revised to indicate that the These changes were made to be 3-151 EDG room vent fan is safe consistent with other sections of shutdown equipment. Also, the the FPR.

section was revised to add description of the DG intake water deluge system.

3.0.34 3-153, Revised to indicate that the These changes were made to be 3-154 EDG room vent fan is safe consistent with other sections of shutdown equipment. Also, the the FPR.

section was revised to add description of the DG intake water deluge system.

3.0.35 3-157, Revised to indicate that the These changes were made.to'be 3-158 EDG room vent fan is safe consistent with other sections of shutdown equipment. Also, the the FPR.

section was revised to add description of the DG intake water deluge system.

3.0.36 3-160, Revised to indicate that the These changes were made to be-3-161 EDG room vent fan is safe consistent with other sections of.

shutdown equipment. Also, the the FPR.

section was revised to add description of the DG intake water deluge system.

I a

O O

O ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SUI 9fARY 8 of 12 Section/

Table /

Page Change Description Basis for: changer Figure Number-3.0.37 3-163, Revised to indicate that the These changes were made to be 3-164 EDG room vent fan is safe consistent with other sections of shutdown equipment. Also, the the FPR.

section was revised to add description of the DG intake water deluge system.

3 3.0.44 3-227 Editorial correction of name of Editorial to be cc wistent with Fire Zone 14.4A-0 (Tool Crib).

other sections of FPR.

3.0.44.27 3-298, Revised to state that a culb is This is consistent with the design 3.0.44.28 3-301 provided in the doorway of the and an SER commitment,to provide reciprocating charging pump this.

rooms to prevent oil spread due to a spill.

3.0.44.31 3-305, Revised to list the primary Revised to be consistent with the 3.0.44.32 3 307 sampling isolation valves safe shutdown analysis (FPR Volume (1/2SS9356A and B) as safe

1).

shutdown components.

3.0.44.34 3-311, For Fire Zone 14.2A-0 the text The existing safe shutdown analysis 3-312 was corrected to indicate that and the Appendix R exemptions in f

combustibles and safe shutdown FPR Volume 1 (Sec. 7) discuss'the cables are present, and to presence of safe shutdown cables.

revise the design basis fire However, the fire hazards analysis evaluation.

text in Volume 2 was inconsistent.

ATTACHMEITT A ZION 1&2 FIRE PROTECTION REPORT AMENDMEITF 5, JULY 1997-CHANGE SIDetARY 9 of 12-Section/-

Table /'-

Page Change Description

. Basis for Change' Figure Number 3.0.44.35 3-314-Text revised to list boron Revised to be consistent with the sample panels as being present safe shutdown analysis.

in the zone.

3.0.44.42 3-329, For Fire Zone 14.3A-0 the text The existing safe shutdown analysis 3-330 was corrected to irdicate that and the Appendix R exemptions'in safe shutdown cables are FPR Volume 1 (Sec. 7) discuss the present, to revise the presence of safe shutdown cables..

combustible loading, and to However, the fire hazards analysis revise the design basis fire text in Volume 2 was inconsistent'.

evaluation. Also, the text was Also, regarding.the sprinkler revised to state that partial system, this system'is not present automatic sprinkler coverage is in the tesign, and'the' fire hazardsu not provided in this zone.

in the zone would not wa' ant the installation of'a system..ae FPR text was incorrect. This change i

does not alter the basis for the Appendix R exemption for El. 592' of the Aux. Bldg. (NRC-SER. dated 06/07/88).

3.0.44.48 3-346, Barrier description corrected Revised to reflect modification.

3.0.44.49 3-349 to discuss non-rated removable seal provided for radiation monitoring and ALARA considerations.

i h

i n

w

.j Q

~

v w/

ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SUNNARY 10 of 12 Section/

Table /

Page Change Description ~

Basis for Change Figure Number 3.0.44.53 3-358, Barrier description corrected Revised to reflect modification.

3.0.44.54 3-361 to discuss non-rated removable seal provided for radiation monitoring and ALARA-considerations, 3.0.44.56 3-368, Editorial correction of name of Editorial to be consistent with 3-369 Fire Zone 14.4A-0 (Tool Crib),

other sections of FPR. Design basis which is on other side of west fire discussion is consistent with i

wall of 14.4Br0. Also, the the safe shutdown analysis.

design basis fire discussion was clarified.

l 3.0.44.59 3-377 Revised to indicate that Aux.

This change was made to be Bldg. Ventilation fans are safe consistent with the safe shutdown' shutdown equipment.

analysis in Volume l'of the FPR.

3.0.51 3-399, Editorial change to clarify Editorial.

3-400 name of outdoor fuel oil tank.

3.0.52 3-402, This change adds discussion of This modification was made to 3.0.53 3-403 the modification to delete protect against inadvertent' water automatic actuation of the main deluge and potential transformer transformer deluge system on damage. The operators would heat detection. The detectors manually actuate the system based alarm only.

on a control room alarm _from the heat detectors. The deluge system will still automatically' actuate on detection of a transformer-fault.

v

i ATTACHMENT A ZION'1&2 FIRE PROTECTION REPORT-AMENDMENT 5, JULY 1997 CHANGE

SUMMARY

11 of 12 Section/

Table /-

Page Change Description Bas's.'for. Change i

Figure Number i

4.- 1 4.1 Clarification. Date of BTP The revision date was_not APCSB 9.5-1 revision applicable previously identified..This is-to Zion has been added.

provided to avoid confusion as-to which version of the BTP: applies to Zion.

4.5 4.5-2,

' Revised to modify hose stream The NRC and NFPA ilave revised 'the -

4.5-4, demand assumption for use in FP recommended hose stream demand' and water supply hydraulic analysis assumption to 500 gpm..Therefore, 4.5-5 from 1000 gpm,to 500 gpm.

this change is consistent with-the current NRC BTP CMEB 9.5-1 and NFPA 13.

4.6 4.6-21 The paragraph on criticality The basis for this change is FOL analysis of the new fuel Amendment 164/152 which allowed.an storage vault was revised to, increased U-235 enrichment for new-delete the statement that non-fuel stored in the new fuel storage fogging type nozzles preclude vault. The revised criticality.

conditions of optimum moderation.

analysis showed that optimum moderation occurs for a fully flooded non-borated water condition rather than for a fire-fighting water fogging condition.

. em;.

3

.k.

%)

ATTACHMENT A ZION 1&2 FIRE PROTECTION REPORT AMENDMENT 5, JULY 1997 CHANGE SUMP'ARY 12 of'12 Section/

Table /

Page Change Description Basis for manne Figure Number VOLUME 3 NRC N/A Provide.s missing.page (7-1)

This is editorial type change to safety from 03-10-78 SER.

clean up documentation.

Evsluation Providea new copy of 08-27-93 Reports SEh to replace existing copy that has missing page.

t i

4 e