ML20199K895: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20199K895
| number = ML20199K895
| issue date = 12/31/1998
| issue date = 12/31/1998
| title = Monthly Operating Repts for Dec 1998 for Browns Ferry Nuclear Plant.With 990115 Ltr
| title = Monthly Operating Repts for Dec 1998 for Browns Ferry Nuclear Plant.With
| author name = Abney T, Wallace J
| author name = Abney T, Wallace J
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9901270060
| document report number = NUDOCS 9901270060
| title reference date = 01-15-1999
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 13
| page count = 13
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:l l . s                                                                                                     -
{{#Wiki_filter:l s
l -e.
l
      ,5                                                                                                      l l
,5
i RIA                                                                                                 \
-e.
i RIA
\\
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 15, 1999 i
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 15, 1999 i
i l
i U.S. Nuclear Regulatory Commission i
l l
ATTN:
U.S. Nuclear Regulatory Commission                                                                   i ATTN:       Document Control Desk Washington, D.C. 20555                                                                               j Gentlemen:
Document Control Desk Washington, D.C.
I In the Matter of                                         )                   Docket Nos. 50-259   !
20555 j
Tennessee Valley Authority                               )                               50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - DECEMBER 1999 MONTHLY OPERATING REPORT                                                                                     l The enclosure provides the December 1998 Monthly operating Report as required by BFN Technical Specifications Section 5.6.4.
Gentlemen:
If you have any questions concerning this matter, please call me at (256) 729-2636.                                                                               l Shcerely,                                                                                         /
In the Matter of
(                                                                                         /
)
ne                       -
Docket Nos.
Manager of             censing and Ind stry Affairs                                                                         -h Enclosure cc:     Seepagb 9901270060 981231 34 PDR     ADOCK 05000259 R                             PM         b
50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - DECEMBER 1999 MONTHLY OPERATING REPORT l
The enclosure provides the December 1998 Monthly operating Report as required by BFN Technical Specifications Section 5.6.4.
If you have any questions concerning this matter, please call me at (256) 729-2636.
: Shcerely,
/
(
/
ne Manager of censing and Ind stry Affairs
-h Enclosure Seepagb cc:
9901270060 981231 3
PDR ADOCK 05000259 4
R PM b


o-   o p.S. Nuclear Regulatory Commission Page 2                                                             ,
o-o p.S. Nuclear Regulatory Commission Page 2 January 15, 1999 i
January 15, 1999 i
1 Enclosure j
1 Enclosure                                                           j cc (Enclosure) :
cc (Enclosure) :
Mr. Harold O. Christensen, Branch Chief                       i U.S. Nuclear Regulatory Commission                             j Region II 61 Forsyth Street, S.W.
Mr. Harold O. Christensen, Branch Chief i
Suite 23T85 Atlanta, Georgia 30303 Mr. Cecil O. Thrmas, Director'                               l Project Directorate 11-4 Division of Reactor Projects _.I-II Office of Nuclear Reactor                                   :
U.S. Nuclear Regulatory Commission j
Regulation, Mail 13 H3                                       l Washington, D.C. 20555                                       ;
Region II 61 Forsyth Street, S.W.
INPO Records Center                                         I Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. James Lang, Manager Advanced Reactor Department                                   .
Suite 23T85 Atlanta, Georgia 30303 Mr. Cecil O. Thrmas, Director' l
Electric Power.Research Institute                             l 3340 Hillview Avenue Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission
Project Directorate 11-4 Division of Reactor Projects _.I-II Office of Nuclear Reactor Regulation, Mail 13 H3 l
              -Region II 61 Forsyth Street, S.W.
Washington, D.C. 20555 INPO Records Center I
Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. James Lang, Manager Advanced Reactor Department Electric Power.Research Institute 3340 Hillview Avenue Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission
-Region II 61 Forsyth Street, S.W.
Suite 23T85 Atlanta, Georgia 30303 Ms. Barbara Lewis McGraw-Hill Companies 1200 G Street, N.W.
Suite 23T85 Atlanta, Georgia 30303 Ms. Barbara Lewis McGraw-Hill Companies 1200 G Street, N.W.
Suite 1100 Washington, D.C. 20005-3802 I
Suite 1100 Washington, D.C.
l
20005-3802


a -                   a -  -- - -        - -~, -- - ..n - - . . . . .- , , -_ ,
a -
l l                  . , . .  .                ENCLOSURE l.
a
-~, --
..n l
ENCLOSURE l.
l ',
l ',
L TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN) y
L TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN) y MONTHLY OPERATING REPORT l
,                                  MONTHLY OPERATING REPORT l
DECEMBER 1998 l
DECEMBER 1998 l
UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 l-UNIT 2 i
UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 l-UNIT 2 i
Line 55: Line 75:
f
f


a .
a c,
c,           OPERATIONAL SUl@iARY DECEMBER 1998                               !
OPERATIONAL SUl@iARY DECEMBER 1998 BROWNS FERRY NUCLEAR PLANT UNIT 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns.
BROWNS FERRY NUCLEAR PLANT UNIT 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit 1 has been on administrative hold since June 1, 1985. As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of zero MWe. Accordingly, TVA does not consider reporting cumulative hours for the period beginning June 1, 1985, when-calculating the operating status variables.
Unit 1 has been on administrative hold since June 1, 1985.
BROWNS FERRY NUCLEAR PLANT UNIT 2 For the month of December, Unit 2 generated 813,190 megawatt hours gross electrical power and operated at a net capacity factor of 100.2 percent. As of December 31, 1998, Unit 2 has operated continuously for 90 days.
As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of zero MWe.
BROWNS FERRY NUCLEAR PLANT UNIT 3 For the month of December, Unit 3 generated 868,130 megawatt hours gross electrical power with a net capacity factor of 102.1 percent. As of December 31, 1998, Unit 3 has operated continuously for 77 days.
Accordingly, TVA does not consider reporting cumulative hours for the period beginning June 1, 1985, when-calculating the operating status variables.
BROWNS FERRY NUCLEAR PLANT UNIT 2 For the month of December, Unit 2 generated 813,190 megawatt hours gross electrical power and operated at a net capacity factor of 100.2 percent.
As of December 31, 1998, Unit 2 has operated continuously for 90 days.
BROWNS FERRY NUCLEAR PLANT UNIT 3 For the month of December, Unit 3 generated 868,130 megawatt hours gross electrical power with a net capacity factor of 102.1 percent.
As of December 31, 1998, Unit 3 has operated continuously for 77 days.
E-1
E-1


          ..<    .. e .
.. e.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50-259     UNIT NO. ONE     DATE:     Jan. 6, 1999 COMPLETED BY:         J. E. Wallace       TELEPHONE       256-729-7874 MONTH'     DECEMBER 1998 AVERAGE DAILY POWER LEVEL               AVERAGE DAILY POWER LEVEL DAY               (MWe-Net)             DAY                 (MWe-Net)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
: 1.                     0                 17.                   0
50-259 UNIT NO.
: 2.                     0                 18.                   0
ONE DATE:
: 3.                     0                 19.                   0
Jan.
: 4.                     0               20.                     0
6, 1999 COMPLETED BY:
: 5.                     0               21.                     0
J. E. Wallace TELEPHONE 256-729-7874 MONTH' DECEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
: 6.                     0               22.                     0
DAY (MWe-Net) 1.
: 7.                     0               23.                     0
0 17.
: 8.                     0               24.                     O c                         9.                     0               25.                     O i;
0 2.
: 10.                     0               26.                     0
0 18.
: 11.                     0               27.                     0 12                       0               28.                     0
0 3.
: 13. -                     0               29.                     0
0 19.
: 14.                       0               30.                     0
0 4.
: 15.                       0               31.                     0
0 20.
: 16.                       0 E-2
0 5.
0 21.
0 6.
0 22.
0 7.
0 23.
0 8.
0 24.
O c
9.
0 25.
O i;
10.
0 26.
0 11.
0 27.
0 12 0
28.
0
: 13. -
0 29.
0 14.
0 30.
0 15.
0 31.
0 16.
0 E-2


l 1
l 1
AVERAGE DAILY UNIT POWER LEVEL                           !
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
DOCKET NO.       50-260     UNIT NO.     TWO     DATE: Jan. 6, 1999         !
50-260 UNIT NO.
i l
TWO DATE:
COMPLETED BY:         J. E. Wallace           TELEPHONE   256-729-7874       :
Jan.
l-MONTH         DECEMBER 1998 j
6, 1999 i
l AVERAGE DAILY POWER LEVEL                 AVERAGE DAILY POWER LEVEL DAY                 (MWe-Net)                 DAY             (MWe-Net)       ;
l COMPLETED BY:
: 1.                 1079                     17.                 1070         I I
J. E. Wallace TELEPHONE 256-729-7874 MONTH DECEMBER 1998 l-j l
: 2.                 1075                     18.                 1089           !
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
l
DAY (MWe-Net) 1.
                  '3.                 1077                     19.                 1080
1079 17.
: 4.                 1083                   20.                   993
1070 I
: 5.                 1084                   21.                 1092 6 '. .             1088                   22.                 1086
I 2.
                                                                                                    )
1075 18.
: 7.                 1087                   2.3 .               1083
1089 l
: 8.                 1071                   24.                 1078
'3.
: 9.                 1077                   25.                 1089
1077 19.
: 10.                   1076                   26,                 1083
1080 4.
: 11.                   1033                   27.                 l'090 12                     854                   28.                 1085
1083 20.
: 13.                   1001                     29.                 1085           .
993 5.
I
1084 21.
: 14.                   1063                     30.                 1093
1092 6 '..
                ' 15 .                 1068                     31.                 1093
1088 22.
: 16.                   1082                                                       !
1086
1 E-3
)
7.
1087 2.3.
1083 8.
1071 24.
1078 9.
1077 25.
1089 10.
1076 26, 1083 11.
1033 27.
l'090 12 854 28.
1085 13.
1001 29.
1085 I
14.
1063 30.
1093
' 15.
1068 31.
1093 16.
1082 1
E-3


1 l .
1l i
i                                              AVERAGE DAILY UNIT POWER LEVEL l               .                                                                                          ;
AVERAGE DAILY UNIT POWER LEVEL l
1 DOCKET NO.               50-296         UNIT NO. THREE   DATE:   Jan.     6, 1999 l
1 DOCKET NO.
COMPLETED BY:                     J. E. Wallace         TELEPHONE     256-729-7874 MONTH         DECEMBER 1998 i
50-296 UNIT NO.
l                                                                                                         >
THREE DATE:
l                                                                                                         !
Jan.
                          . AVERAGE DAILY POWER LEVEL                           AVERAGE DAILY POWER LEVEL i
6, 1999 l
DAY                             (MWe-Net)             DAY                 (MWe-Net)
COMPLETED BY:
: 1.                               1149               17.                     1143
J. E. Wallace TELEPHONE 256-729-7874 MONTH DECEMBER 1998 i
: 2.                               1144               18.                     1151
l l
: 3.                               1146               19.                     1151
. AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL i
: 4.                               1147               20.                     1135
DAY (MWe-Net)
: 5.                               1145               21.                     1123
DAY (MWe-Net) 1.
: 6.                               1147               22.                     1160     .
1149 17.
: 7.                                1149               23.                     1151     ,
1143 2.
: 8.                               1139               24.                     1139     l
1144 18.
: 9.                               1143               25.                     1150     ,
1151 3.
: 10.                               1140               26.                     1137
1146 19.
: 11.                               1142               27.                     1144 12                                 1140~               28.                     1135
1151 4.
: 13.                               1084               29.                     1143     :
1147 20.
1
1135 5.
: 14.                               1143               30.                     1152 15,                               1159               31.                     1146
1145 21.
                .16.                               1114 I
1123 6.
1147 22.
1160 7.
1149 23.
1151 8.
1139 24.
1139 l
9.
1143 25.
1150 10.
1140 26.
1137 11.
1142 27.
1144 12 1140~
28.
1135 13.
1084 29.
1143 1
14.
1143 30.
1152 15, 1159 31.
1146
.16.
1114 I
E-4
E-4


  .      .                                                                                                        l OPERATING DATA REPORT
l OPERATING DATA REPORT
              ''        ~
~
Docket No.             50-259 l                                                                   Date:                 Jan.6.1999 l                                                                   Completed By:         J. E. Wallace           l l                                                                  Telephone:             (256)-729-7874 t
Docket No.
: 1.       Unit Name:                                       BFN Unit 1
50-259 l
: 2.       Reporting Period:                                 December 1998
Date:
!      3.       Licensed Thermal Power (MWt):                     3293 l
Jan.6.1999 l
: 4.       Nameplate Rating (Gross MWe):                     1152
Completed By:
: 5.       Design Electrical Rating (Net MWe):               1065
J. E. Wallace l
: 6.       Maximum Dependable Capacity (Gross MWe):         2 t       7.       Maximum Dependable Capacity (Net MWe):           2                                               ;
Telephone:
: 8.       If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
(256)-729-7874 t
: 9.       Power Level To Which Restricted, If any (net MWe): 0
1.
: 10.       Reasons for Restrictions, If any: Administrative Hold This Month       Yr-To-Date Cumulative *
Unit Name:
: 11.       Hours in Reporting Period                                   0           0               95743 ;
BFN Unit 1 2.
: 12.       Number of Hours Reactor was Critical                       0           0               59521
Reporting Period:
: 13.       Reactor Reserve Shutdown Hours                             0           0                 6997
December 1998 3.
: 14.       Hours Generator On-Line                                     0           0               58267
Licensed Thermal Power (MWt):
: 15.       Unit Reserve Shutdown Hours                                 0           0                   0 *
3293 l
: 16.       Gross Thermal Energy Generated (MWh)                       0           0           168066787
4.
!      17.       Gross Electric Energy Generated (MWh)                       0           0             55398130
Nameplate Rating (Gross MWe):
: 18.       Net Electrical Energy Generated (MWh)                       0           0             53796427
1152 5.
: 19.       Unit Service Factor                                         0           0                 60.9
Design Electrical Rating (Net MWe):
: 20.       Unit Availability Factor                                   0           0                 60.9
1065 6.
: 21.       Unit Capacity Factor (Using MDC Net)                       0           0                 52.8
Maximum Dependable Capacity (Gross MWe):
: 22.       Unit Capacity Factor (Using DER Net)                       0           0                 52.8
2 t
: 23.       Unit Forced Outage Rate                                     0           0                 25.6
7.
: 24.       Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
Maximum Dependable Capacity (Net MWe):
:'      25.       If Shutdown at End of Report Period, Estimate Date ofStartup: To Be Determined
2 8.
* Excludes hours under Administrative Hold                                                       l (June 1,1985 to present) l E-5                                                   l
If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A 9.
Power Level To Which Restricted, If any (net MWe): 0 10.
Reasons for Restrictions, If any: Administrative Hold This Month Yr-To-Date Cumulative
* 11.
Hours in Reporting Period 0
0 95743 12.
Number of Hours Reactor was Critical 0
0 59521 13.
Reactor Reserve Shutdown Hours 0
0 6997 14.
Hours Generator On-Line 0
0 58267 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWh) 0 0
168066787 17.
Gross Electric Energy Generated (MWh) 0 0
55398130 18.
Net Electrical Energy Generated (MWh) 0 0
53796427 19.
Unit Service Factor 0
0 60.9 20.
Unit Availability Factor 0
0 60.9 21.
Unit Capacity Factor (Using MDC Net) 0 0
52.8 22.
Unit Capacity Factor (Using DER Net) 0 0
52.8 23.
Unit Forced Outage Rate 0
0 25.6 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A 25.
If Shutdown at End of Report Period, Estimate Date ofStartup: To Be Determined
* Excludes hours under Administrative Hold (June 1,1985 to present)
E-5 l


            -.                  -      -                  -                    ~                       .  . _ - - .
~
I i
I i
OPERATING DATA REPORT
OPERATING DATA REPORT I.
                    .'. I.
Docket No.
Docket No.                 50-260 Date:                     Jan.6.1999 Completed By:             J. E. Wallace Telephone:                 (256)-729-7874 l         1.     Unit Name:                                       BFN Unit 2
50-260 Date:
: 2.     Reponing Period:                                 December 1998 l         3.     Licensed Thermal Power (MWt):                     3293 4;       Nameplate Rating (Gross MWe):                     1152
Jan.6.1999 Completed By:
: 5.     Design Electrical Rating (Net MWe):               1065
J. E. Wallace Telephone:
: 6.     Maximum Dependable Capacity (Gross MWe):         1098.4
(256)-729-7874 l
: 7.     Maximum Dependable Capacity (Net MWe):           1065 h
1.
: 8.     If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Repon, Give Reasons: N/A
Unit Name:
: 9.     Power Level To Which Restricted, If any (net MWe): N/A
BFN Unit 2 2.
: 10.     R.easons for Restrictions, If any: N/A This Month     Yr-To-Date Cumulatiyg*
Reponing Period:
: 11.     Hours in Reporting Period                                         744.0         8760.0       15713!
December 1998 l
: 12.     Number of Hours Reactor was Critical                             744.0         8735.0       115542
3.
: 13.     Reactor Reserve Shutdown Hours                                       0.0           0.0       14200
Licensed Thermal Power (MWt):
: 14.     Hours Generator On-Line                                           744.0         8730.0       113143
3293 4;
: 15.     Unit Reserve Shutdown Hours                                         0.0           0.0           0.0   1
Nameplate Rating (Gross MWe):
: 16.     Gross Thermal Energy Generated (MWh)                         2414383.0     28540860     338576344 "7
1152 5.
Gross Electric Energy Generated (MWh)                         813190.0       9520480     112522958     j i d. Net Electrical Energy Generated (MWh)                         794079.0       9301037     109507128
Design Electrical Rating (Net MWe):
: 19.     Unit Service Factor                                               100.0           99.7         72.0
1065 6.
: 20.     Unit Availability Factor                                         100.0           99.7         72.0
Maximum Dependable Capacity (Gross MWe):
: 21.     Unit Capacity Factor (Using MDC Net)                             100.2           99.7         65.4   -
1098.4 7.
: 22.     Unit Capacity Factor (Using DER Net)                             100.2           99.7         65.4
Maximum Dependable Capacity (Net MWe):
: 23.     Unit Forced Outage Rate                                             0.0             0.3         13.2
1065 h
: 24.     Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Unit 2, Cycle 10 refueling outage is scheduled to begin on April 11,1999, for a duration                                                   ,
8.
of 25 days.                                                                                             :
If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Repon, Give Reasons: N/A 9.
!      25.     If Shutdown at End of Report Period, Estimate Date                                                       ,
Power Level To Which Restricted, If any (net MWe): N/A 10.
of Startup: N/A
R.easons for Restrictions, If any: N/A This Month Yr-To-Date Cumulatiyg*
11.
Hours in Reporting Period 744.0 8760.0 15713!
12.
Number of Hours Reactor was Critical 744.0 8735.0 115542 13.
Reactor Reserve Shutdown Hours 0.0 0.0 14200 14.
Hours Generator On-Line 744.0 8730.0 113143 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 1
16.
Gross Thermal Energy Generated (MWh) 2414383.0 28540860 338576344 Gross Electric Energy Generated (MWh) 813190.0 9520480 112522958 j
"7 i d.
Net Electrical Energy Generated (MWh) 794079.0 9301037 109507128 19.
Unit Service Factor 100.0 99.7 72.0 20.
Unit Availability Factor 100.0 99.7 72.0 21.
Unit Capacity Factor (Using MDC Net) 100.2 99.7 65.4 22.
Unit Capacity Factor (Using DER Net) 100.2 99.7 65.4 23.
Unit Forced Outage Rate 0.0 0.3 13.2 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Unit 2, Cycle 10 refueling outage is scheduled to begin on April 11,1999, for a duration of 25 days.
25.
If Shutdown at End of Report Period, Estimate Date of Startup: N/A
* Excludes hours under Administrative Hold (June 1,1985 to May 24,1991)
* Excludes hours under Administrative Hold (June 1,1985 to May 24,1991)
E-6                                                           1
E-6 1


                        -        .    . - .    ..    -,        .-      -- ~ . -           . .-            .        . - _ -
-- ~. -
t:.        .
/
    ,        .                                                                                                                      j i
t:.
                            =
j i
l                 ..        =,
=
OPERATING DATA REPORT Docket No.                     50-296                       !
l
Date:                         Jan.6.1999                     j Completed By:                 J. E. Wallace Telephone:                     (256)-729-7874
=,
: 1.       Unit Name:                                       BFN Unit 3                                                 'l
OPERATING DATA REPORT Docket No.
: 2.       Reporting Period:                                 December 1998
50-296 Date:
: 3.       Licensed Thermal Power (MWt):                     3458
Jan.6.1999 j
: 4.       Nameplate Rating (Gross MWe):                     1190
Completed By:
: 5.       Design Electrical Rating (Net MWe):               1120 L       - 6.       Maximum Dependable Capacity (Gross MWe):         1155
J. E. Wallace Telephone:
: 7.       Maximum Dependable Capacity (Net MWe):           1118
(256)-729-7874 1.
: 8.       If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report,                               ;
Unit Name:
l                    Give Reasons: N/A                                                                                               I
BFN Unit 3
        ~9         Power Level To Which Restricted, If any (net MWe): N/A
'l 2.
: 10.       Reasons for Restrictions, If any: N/A This Month       Vr-To-Date           Cumulative *
Reporting Period:
: 11.       Hours in Reporting Period                                       744.0           8760.0           100357
December 1998 3.
: 12.       Number of Hours Reactor was Critical                             744.0           7907.0           70981
Licensed Thermal Power (MWt):
: 13.       Reactor Reserve Shutdown Hours                                     0.0               0.0           7195
3458 4.
: 14.       Hours Generator On-Line                                         744.0           7863.6           69585
Nameplate Rating (Gross MWe):
: 15.       Unit Reserve Shutdown Hours                                         0.0               0.0                 0.0
1190 5.
: 16.       Gross Thermal Energy Generated (MWh)                       2571430.0     24477754.0           211912667
Design Electrical Rating (Net MWe):
: 17.       Gross Electric Energy Generated (MWh)                       868130.0           8091860         70855270
1120 L
: 18.       Net Electrical Energy Generated (MWh)                       849371.0           7885977         68091474
- 6.
: 19.       Unit Service Factor                                               100.0             89.8               69.3 20.'     . Unit Availability Factor                                         100.0             89.8               69.3     ,
Maximum Dependable Capacity (Gross MWe):
21.-       Unit Capacity Factor (Using MDC Net)                             102.1             83.5               63.6     l
1155 7.
: 22.       Unit Capacity Factor (Using DER Net)                             102.1             83.5               63.6
Maximum Dependable Capacity (Net MWe):
: 23.     - Unit Forced Outage Rate                                             0.0             0.1             15.1     i
1118 8.
        ' 24.       Shutdowns Scheduled Over Next 6 Months (Type, Date, and                                                         l Duration ofEach): N/A
If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, l
: 25.       If Shutdown at End ofRepon Period, Estimate Date of Startup:
Give Reasons: N/A I
~9 Power Level To Which Restricted, If any (net MWe): N/A 10.
Reasons for Restrictions, If any: N/A This Month Vr-To-Date Cumulative
* 11.
Hours in Reporting Period 744.0 8760.0 100357 12.
Number of Hours Reactor was Critical 744.0 7907.0 70981 13.
Reactor Reserve Shutdown Hours 0.0 0.0 7195 14.
Hours Generator On-Line 744.0 7863.6 69585 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWh) 2571430.0 24477754.0 211912667 17.
Gross Electric Energy Generated (MWh) 868130.0 8091860 70855270 18.
Net Electrical Energy Generated (MWh) 849371.0 7885977 68091474 19.
Unit Service Factor 100.0 89.8 69.3 20.'
. Unit Availability Factor 100.0 89.8 69.3 21.-
Unit Capacity Factor (Using MDC Net) 102.1 83.5 63.6 22.
Unit Capacity Factor (Using DER Net) 102.1 83.5 63.6 23.
- Unit Forced Outage Rate 0.0 0.1 15.1 i
' 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration ofEach): N/A 25.
If Shutdown at End ofRepon Period, Estimate Date of Startup:
N/A
N/A
* Excludes hours under Administrative Hold
* Excludes hours under Administrative Hold
(-                       (June 1,1985 to November 19,1995)
(-
(June 1,1985 to November 19,1995)
E-7 I.
E-7 I.
l
l


UNIT SIIUTDOWNS AND POWER REDUCTIONS                                                       +
UNIT SIIUTDOWNS AND POWER REDUCTIONS
REPORT MONTH: DECEMBER 1998 DOCKET NO:               50-259 UNIT NAME:               BFN-1         ,,
+
DATE:                   January 6,1999 COMPLETED BY: J. E. Wallace TELEPHONE:               (256) 729-7874 No.      ' Date:
REPORT MONTH: DECEMBER 1998 DOCKET NO:
50-259 UNIT NAME:
BFN-1 DATE:
January 6,1999 COMPLETED BY: J. E. Wallace TELEPHONE:
(256) 729-7874
' Date:
Type' Duration Reason
Type' Duration Reason
* Method of? Licensee ;                     Systent - Component; .Cause and Corrective Action to Prevent t:1
* Method of?
                          '(Hours)                                                   Shutting 1               Event Report     CodeY     CodeV         Recurrencet Down .                   No.-
Licensee ;
Reactor' 1     06/01/85   S         744                 F                                                   4             N/A             N/A       N/A       Administrative hold to resolve various TVA and NRC concerns.
Systent -
2
Component;.Cause and Corrective Action to Prevent t:1 No.
' F: Forced        Reason:                                                                                   ' Method
'(Hours)
* Instructions for Preparation of S: Scheduled     A-Equipment Failure (Explain)                                                               1-Manual                           Data Entry sheets for Licensec B-Maintenance or Test                                                                       2-Manual Scram                       Event Report (LER)
Shutting 1 Event Report CodeY CodeV Recurrencet Down.
C-Refueling                                                                                 3-Automatic Scram                   (NUREG - 1022)
No.-
D-Regulatoiy Restriction                                                                   4-Contimaation of Existing E-Operator Training and License                                                               Outage Examination                                                                             5-Reduction F-Administrative                                                                           9-Other G-Operational Error (Explain)
Reactor' 1
06/01/85 S
744 F
4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.
Reason:
' Method
* Instructions for Preparation of
' F: Forced 2
S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensec B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatoiy Restriction 4-Contimaation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
H-Other (Explain)
E-8
E-8


UNIT SHUTDOWNS AND POWER REDUCTIONS                                                           .
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTil: DECEMBER 1998 DOCKET NO:
REPORT MONTil: DECEMBER 1998 DOCKET NO:                 50-260 UNIT NAME:                 BFN-2           .
50-260 UNIT NAME:
DATE:                     January 6,1999 ' '
BFN-2 DATE:
COMPLETED BY: J. E. Wallace TELEPHONE:                 (256) 729-7874 No.'     ;; Date8 Type'; Durationi : Reason 2
January 6,1999 ' '
                                ^        '
COMPLETED BY: J. E. Wallace TELEPHONE:
Method $1: .Licenseej     ~
(256) 729-7874 No.'
Systent Cosaponent; ;Cause and Corrective Action to Prevent?
;; Date8 Type'; Durationi : Reason Method $1:.Licenseej Systent Cosaponent; ;Cause and Corrective Action to Prevent?
(Hours)       ~
2
                                                                                                                      ,  Shutting 0   Event Reports Code *5     Code *'^       :Recurrencel
^
                                                                                                                        .Dowat       No.
(Hours)
Reactdr's N/A 8
Shutting 0 Event Reports Code *5 Code *'^
F: Forced         ' Reason:
:Recurrencel
~
~
.Dowat No.
Reactdr's N/A F: Forced
' Reason:
* Method
* Method
* Instructions for Preparation of S: Scheduled       A-Equipment Failure (Explain)                                                                     1-Manual                             Data Entry sheets for Licensee B-Maintenance or Test                                                                             2-Manual Scram                       Event Report (LER)
* Instructions for Preparation of 8
C-Refueling                                                                                       3-Automatic Scram                   (NUREG - 1022)
S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
D-Regulatory Restriction                                                                           4-Continuation of Existing E-Operator Training and License                                                                     Outage Examination                                                                                 5-Reduction F-Administrative                                                                                   9-Other G-Operational Error (Explain)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
H-Other (Explain)
E-9
E-9


UNIT SHUTDOWNS AND POWER REDUCFIONS                                                                                                                                                                           .-
UNIT SHUTDOWNS AND POWER REDUCFIONS REPORT MONTH: DECEMBER 1998 DOCKET NO:
REPORT MONTH: DECEMBER 1998 DOCKET NO:                                                                                                             50-296 UNIT NAME:                                                                                                             BFN-3           .,
50-296 UNIT NAME:
DATE:                                                                                                                 January 6,1999 COMPLETED BY: J. E. Wallace TELEPHONE:                                                                                                             (256) 729-7874 No.                                 1Date ?                                     . Type'                         Duration l Reason *:- Method 'of -Licenseej                 Systen   Counponent" Cause and Corrective Action to Preventl
BFN-3 DATE:
                                                                                                                                            .(Hours)4               Shatting[ Event' Report - Codey (Code *"                                             LRacurrence s
January 6,1999 COMPLETED BY: J. E. Wallace TELEPHONE:
                                                                                                                                                                    -Down4           No.                                         W
(256) 729-7874 No.
                                                                                                                                                                    ~ Reactor'J N/A 2                                                        8
1Date ?
                              ' F: Forced                                                                                 Reason:                                                   Method
. Type' Duration l Reason *:-
* Instructions for Preparation of S: Scheduled                                                                           A-Equipment Failure (Explain)                             1-Manual                                           Data Entry sheets for Licensee E-Maintenance or Test                                     2-Manual Scram                                     Event Report (LER)
Method 'of
C-Refueling                                               3-Automatic Scram                                 (NUREG - 1922)
-Licenseej Systen Counponent" Cause and Corrective Action to Preventl
D-Regulatory Restriction                                 4-Continuation of Existing E-Operator Training and License                             Outage Examination                                       5-Reduction F-Administrative                                         9-Other G-Operational Error (Explain)
.(Hours)4 Shatting[
Event' Report - Codey (Code *"
LRacurrence s
-Down4 No.
W
~ Reactor'J N/A
' F: Forced Reason:
Method
* Instructions for Preparation of 2
8 S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee E-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1922)
D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
H-Other (Explain)
E-10 t
E-10 t
  - - - - - - - - - - - . . - - - _ _ _ _ - . . _ - _ . . _ . - _ _ . _ - - - - _ - - _ _ - - _ - - _ - _ . _ . . . _ - -                                                              -              -  -        -,    .- - -  _ . - - - _ - -          _ - - . _ . _ - - - _ _ . . _ _ _ - - - _ _ _ - - _ _ . . . - _ _ _ _ _ _ . _ - _ . - - _ -}}
-}}

Latest revision as of 04:08, 8 December 2024

Monthly Operating Repts for Dec 1998 for Browns Ferry Nuclear Plant.With
ML20199K895
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/31/1998
From: Abney T, Jay Wallace
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9901270060
Download: ML20199K895 (13)


Text

l s

l

,5

-e.

i RIA

\\

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 15, 1999 i

i U.S. Nuclear Regulatory Commission i

ATTN:

Document Control Desk Washington, D.C.

20555 j

Gentlemen:

In the Matter of

)

Docket Nos.

50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - DECEMBER 1999 MONTHLY OPERATING REPORT l

The enclosure provides the December 1998 Monthly operating Report as required by BFN Technical Specifications Section 5.6.4.

If you have any questions concerning this matter, please call me at (256) 729-2636.

Shcerely,

/

(

/

ne Manager of censing and Ind stry Affairs

-h Enclosure Seepagb cc:

9901270060 981231 3

PDR ADOCK 05000259 4

R PM b

o-o p.S. Nuclear Regulatory Commission Page 2 January 15, 1999 i

1 Enclosure j

cc (Enclosure) :

Mr. Harold O. Christensen, Branch Chief i

U.S. Nuclear Regulatory Commission j

Region II 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 Mr. Cecil O. Thrmas, Director' l

Project Directorate 11-4 Division of Reactor Projects _.I-II Office of Nuclear Reactor Regulation, Mail 13 H3 l

Washington, D.C. 20555 INPO Records Center I

Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. James Lang, Manager Advanced Reactor Department Electric Power.Research Institute 3340 Hillview Avenue Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission

-Region II 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 Ms. Barbara Lewis McGraw-Hill Companies 1200 G Street, N.W.

Suite 1100 Washington, D.C.

20005-3802

a -

a

-~, --

..n l

ENCLOSURE l.

l ',

L TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN) y MONTHLY OPERATING REPORT l

DECEMBER 1998 l

UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 l-UNIT 2 i

DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 i

UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68 i

f

a c,

OPERATIONAL SUl@iARY DECEMBER 1998 BROWNS FERRY NUCLEAR PLANT UNIT 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 1 has been on administrative hold since June 1, 1985.

As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of zero MWe.

Accordingly, TVA does not consider reporting cumulative hours for the period beginning June 1, 1985, when-calculating the operating status variables.

BROWNS FERRY NUCLEAR PLANT UNIT 2 For the month of December, Unit 2 generated 813,190 megawatt hours gross electrical power and operated at a net capacity factor of 100.2 percent.

As of December 31, 1998, Unit 2 has operated continuously for 90 days.

BROWNS FERRY NUCLEAR PLANT UNIT 3 For the month of December, Unit 3 generated 868,130 megawatt hours gross electrical power with a net capacity factor of 102.1 percent.

As of December 31, 1998, Unit 3 has operated continuously for 77 days.

E-1

.. e.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-259 UNIT NO.

ONE DATE:

Jan.

6, 1999 COMPLETED BY:

J. E. Wallace TELEPHONE 256-729-7874 MONTH' DECEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)

DAY (MWe-Net) 1.

0 17.

0 2.

0 18.

0 3.

0 19.

0 4.

0 20.

0 5.

0 21.

0 6.

0 22.

0 7.

0 23.

0 8.

0 24.

O c

9.

0 25.

O i;

10.

0 26.

0 11.

0 27.

0 12 0

28.

0

13. -

0 29.

0 14.

0 30.

0 15.

0 31.

0 16.

0 E-2

l 1

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-260 UNIT NO.

TWO DATE:

Jan.

6, 1999 i

l COMPLETED BY:

J. E. Wallace TELEPHONE 256-729-7874 MONTH DECEMBER 1998 l-j l

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)

DAY (MWe-Net) 1.

1079 17.

1070 I

I 2.

1075 18.

1089 l

'3.

1077 19.

1080 4.

1083 20.

993 5.

1084 21.

1092 6 '..

1088 22.

1086

)

7.

1087 2.3.

1083 8.

1071 24.

1078 9.

1077 25.

1089 10.

1076 26, 1083 11.

1033 27.

l'090 12 854 28.

1085 13.

1001 29.

1085 I

14.

1063 30.

1093

' 15.

1068 31.

1093 16.

1082 1

E-3

1l i

AVERAGE DAILY UNIT POWER LEVEL l

1 DOCKET NO.

50-296 UNIT NO.

THREE DATE:

Jan.

6, 1999 l

COMPLETED BY:

J. E. Wallace TELEPHONE 256-729-7874 MONTH DECEMBER 1998 i

l l

. AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL i

DAY (MWe-Net)

DAY (MWe-Net) 1.

1149 17.

1143 2.

1144 18.

1151 3.

1146 19.

1151 4.

1147 20.

1135 5.

1145 21.

1123 6.

1147 22.

1160 7.

1149 23.

1151 8.

1139 24.

1139 l

9.

1143 25.

1150 10.

1140 26.

1137 11.

1142 27.

1144 12 1140~

28.

1135 13.

1084 29.

1143 1

14.

1143 30.

1152 15, 1159 31.

1146

.16.

1114 I

E-4

l OPERATING DATA REPORT

~

Docket No.

50-259 l

Date:

Jan.6.1999 l

Completed By:

J. E. Wallace l

Telephone:

(256)-729-7874 t

1.

Unit Name:

BFN Unit 1 2.

Reporting Period:

December 1998 3.

Licensed Thermal Power (MWt):

3293 l

4.

Nameplate Rating (Gross MWe):

1152 5.

Design Electrical Rating (Net MWe):

1065 6.

Maximum Dependable Capacity (Gross MWe):

2 t

7.

Maximum Dependable Capacity (Net MWe):

2 8.

If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A 9.

Power Level To Which Restricted, If any (net MWe): 0 10.

Reasons for Restrictions, If any: Administrative Hold This Month Yr-To-Date Cumulative

  • 11.

Hours in Reporting Period 0

0 95743 12.

Number of Hours Reactor was Critical 0

0 59521 13.

Reactor Reserve Shutdown Hours 0

0 6997 14.

Hours Generator On-Line 0

0 58267 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWh) 0 0

168066787 17.

Gross Electric Energy Generated (MWh) 0 0

55398130 18.

Net Electrical Energy Generated (MWh) 0 0

53796427 19.

Unit Service Factor 0

0 60.9 20.

Unit Availability Factor 0

0 60.9 21.

Unit Capacity Factor (Using MDC Net) 0 0

52.8 22.

Unit Capacity Factor (Using DER Net) 0 0

52.8 23.

Unit Forced Outage Rate 0

0 25.6 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A 25.

If Shutdown at End of Report Period, Estimate Date ofStartup: To Be Determined

  • Excludes hours under Administrative Hold (June 1,1985 to present)

E-5 l

~

I i

OPERATING DATA REPORT I.

Docket No.

50-260 Date:

Jan.6.1999 Completed By:

J. E. Wallace Telephone:

(256)-729-7874 l

1.

Unit Name:

BFN Unit 2 2.

Reponing Period:

December 1998 l

3.

Licensed Thermal Power (MWt):

3293 4;

Nameplate Rating (Gross MWe):

1152 5.

Design Electrical Rating (Net MWe):

1065 6.

Maximum Dependable Capacity (Gross MWe):

1098.4 7.

Maximum Dependable Capacity (Net MWe):

1065 h

8.

If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Repon, Give Reasons: N/A 9.

Power Level To Which Restricted, If any (net MWe): N/A 10.

R.easons for Restrictions, If any: N/A This Month Yr-To-Date Cumulatiyg*

11.

Hours in Reporting Period 744.0 8760.0 15713!

12.

Number of Hours Reactor was Critical 744.0 8735.0 115542 13.

Reactor Reserve Shutdown Hours 0.0 0.0 14200 14.

Hours Generator On-Line 744.0 8730.0 113143 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 1

16.

Gross Thermal Energy Generated (MWh) 2414383.0 28540860 338576344 Gross Electric Energy Generated (MWh) 813190.0 9520480 112522958 j

"7 i d.

Net Electrical Energy Generated (MWh) 794079.0 9301037 109507128 19.

Unit Service Factor 100.0 99.7 72.0 20.

Unit Availability Factor 100.0 99.7 72.0 21.

Unit Capacity Factor (Using MDC Net) 100.2 99.7 65.4 22.

Unit Capacity Factor (Using DER Net) 100.2 99.7 65.4 23.

Unit Forced Outage Rate 0.0 0.3 13.2 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Unit 2, Cycle 10 refueling outage is scheduled to begin on April 11,1999, for a duration of 25 days.

25.

If Shutdown at End of Report Period, Estimate Date of Startup: N/A

  • Excludes hours under Administrative Hold (June 1,1985 to May 24,1991)

E-6 1

-- ~. -

/

t:.

j i

=

l

=,

OPERATING DATA REPORT Docket No.

50-296 Date:

Jan.6.1999 j

Completed By:

J. E. Wallace Telephone:

(256)-729-7874 1.

Unit Name:

BFN Unit 3

'l 2.

Reporting Period:

December 1998 3.

Licensed Thermal Power (MWt):

3458 4.

Nameplate Rating (Gross MWe):

1190 5.

Design Electrical Rating (Net MWe):

1120 L

- 6.

Maximum Dependable Capacity (Gross MWe):

1155 7.

Maximum Dependable Capacity (Net MWe):

1118 8.

If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, l

Give Reasons: N/A I

~9 Power Level To Which Restricted, If any (net MWe): N/A 10.

Reasons for Restrictions, If any: N/A This Month Vr-To-Date Cumulative

  • 11.

Hours in Reporting Period 744.0 8760.0 100357 12.

Number of Hours Reactor was Critical 744.0 7907.0 70981 13.

Reactor Reserve Shutdown Hours 0.0 0.0 7195 14.

Hours Generator On-Line 744.0 7863.6 69585 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWh) 2571430.0 24477754.0 211912667 17.

Gross Electric Energy Generated (MWh) 868130.0 8091860 70855270 18.

Net Electrical Energy Generated (MWh) 849371.0 7885977 68091474 19.

Unit Service Factor 100.0 89.8 69.3 20.'

. Unit Availability Factor 100.0 89.8 69.3 21.-

Unit Capacity Factor (Using MDC Net) 102.1 83.5 63.6 22.

Unit Capacity Factor (Using DER Net) 102.1 83.5 63.6 23.

- Unit Forced Outage Rate 0.0 0.1 15.1 i

' 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration ofEach): N/A 25.

If Shutdown at End ofRepon Period, Estimate Date of Startup:

N/A

  • Excludes hours under Administrative Hold

(-

(June 1,1985 to November 19,1995)

E-7 I.

l

UNIT SIIUTDOWNS AND POWER REDUCTIONS

+

REPORT MONTH: DECEMBER 1998 DOCKET NO:

50-259 UNIT NAME:

BFN-1 DATE:

January 6,1999 COMPLETED BY: J. E. Wallace TELEPHONE:

(256) 729-7874

' Date:

Type' Duration Reason

  • Method of?

Licensee ;

Systent -

Component;.Cause and Corrective Action to Prevent t:1 No.

'(Hours)

Shutting 1 Event Report CodeY CodeV Recurrencet Down.

No.-

Reactor' 1

06/01/85 S

744 F

4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.

Reason:

' Method

  • Instructions for Preparation of

' F: Forced 2

S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensec B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatoiy Restriction 4-Contimaation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

E-8

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTil: DECEMBER 1998 DOCKET NO:

50-260 UNIT NAME:

BFN-2 DATE:

January 6,1999 ' '

COMPLETED BY: J. E. Wallace TELEPHONE:

(256) 729-7874 No.'

Date8 Type'; Durationi
Reason Method $1
.Licenseej Systent Cosaponent; ;Cause and Corrective Action to Prevent?

2

^

(Hours)

Shutting 0 Event Reports Code *5 Code *'^

Recurrencel

~

~

.Dowat No.

Reactdr's N/A F: Forced

' Reason:

  • Method
  • Instructions for Preparation of 8

S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

E-9

UNIT SHUTDOWNS AND POWER REDUCFIONS REPORT MONTH: DECEMBER 1998 DOCKET NO:

50-296 UNIT NAME:

BFN-3 DATE:

January 6,1999 COMPLETED BY: J. E. Wallace TELEPHONE:

(256) 729-7874 No.

1Date ?

. Type' Duration l Reason *:-

Method 'of

-Licenseej Systen Counponent" Cause and Corrective Action to Preventl

.(Hours)4 Shatting[

Event' Report - Codey (Code *"

LRacurrence s

-Down4 No.

W

~ Reactor'J N/A

' F: Forced Reason:

Method

  • Instructions for Preparation of 2

8 S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee E-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1922)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

E-10 t

-