ML20155E260: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:NRC FORM 255 | ||
, CONTR ACT NUMOER | |||
" > 78' NRC-04-88-109 OlVISION OF CONTR ACTS MOOlFIC ATION NUMBE R U.S. NUCLE AR REGULATORY CGMMtSSION W ASHINGTON, D.C. 20555 N/A i | |||
(QNEW O MOOlFIC ATION OTHE R (Soeco!vi NOTIFICATION OF CONTRACT EXECUTION CONTR ACT BASED ON: | |||
TO: | |||
Guy A. Arinttn-nirnetn" AUTHORI2 ATION NUMBER I Tottel Division of Engineering RES-88-109 Office of fluClear Regulatory Research OATE 7/27/88 e- | |||
/_ | |||
CONTR ACT CHANGES PER THIS ACTION | |||
/ | |||
TerEba' CYe@ren /. | |||
' g LL | |||
,c / 1 rJ J | |||
FRoM: | |||
(Contreet Specostosti I (Datel l | |||
Contract Negotiation Branch Nn-1 DIVISION OF CONTR ACTS, ADM 1 | |||
CONTR ACTOR (Name & L ocation) | |||
EXECUTION DATE Kalsi Engineering, Inc. | |||
745 Park Two Drive TYPE OF CONTR ACT Sugar Land, TX 77478 Fixed Price (SBIR) | |||
PROJECT TITt E PERIOD OF PERFORM ANCE 5 months Prediction of Check Valve PerfomanCe and Degradation in fluclear Power Plant Systems PRINCIP A L INVESTIG ATOR NRC AUTHORIZEO REPRESENTATIVE Wm Farmer, X-23858 APPPO NO-Bs e gR FIN NUMBER 31X0200.608 0 | |||
D2510 AMOUNT NEW NRC CUNDS S 50,000.00 FUNDING TOTAL FY 63 FUNDING S 50,000.00 TOTAL NRC OBLIGATIONS S 50,000.00 GOVE ANMENT PROPERTY A T T ACH M E NTISI: | |||
8810120208 881003 CONTR ACT DOCUME NT ( | |||
) | |||
PDR CONTR NRC-04-08-109 PNV n | |||
NRC FORM 255 I t (> 76) r ig 6}} | |||
Latest revision as of 21:44, 10 December 2024
| ML20155E260 | |
| Person / Time | |
|---|---|
| Issue date: | 10/03/1988 |
| From: | Mclearen T NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| To: | Arlotto G, Farmer W NRC, NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
| Shared Package | |
| ML20155E266 | List: |
| References | |
| CON-FIN-D-2510, CON-NRC-04-88-109, CON-NRC-4-88-109 NUDOCS 8810120208 | |
| Download: ML20155E260 (1) | |
Text
, CONTR ACT NUMOER
" > 78' NRC-04-88-109 OlVISION OF CONTR ACTS MOOlFIC ATION NUMBE R U.S. NUCLE AR REGULATORY CGMMtSSION W ASHINGTON, D.C. 20555 N/A i
(QNEW O MOOlFIC ATION OTHE R (Soeco!vi NOTIFICATION OF CONTRACT EXECUTION CONTR ACT BASED ON:
TO:
Guy A. Arinttn-nirnetn" AUTHORI2 ATION NUMBER I Tottel Division of Engineering RES-88-109 Office of fluClear Regulatory Research OATE 7/27/88 e-
/_
CONTR ACT CHANGES PER THIS ACTION
/
TerEba' CYe@ren /.
' g LL
,c / 1 rJ J
FRoM:
(Contreet Specostosti I (Datel l
Contract Negotiation Branch Nn-1 DIVISION OF CONTR ACTS, ADM 1
CONTR ACTOR (Name & L ocation)
EXECUTION DATE Kalsi Engineering, Inc.
745 Park Two Drive TYPE OF CONTR ACT Sugar Land, TX 77478 Fixed Price (SBIR)
PROJECT TITt E PERIOD OF PERFORM ANCE 5 months Prediction of Check Valve PerfomanCe and Degradation in fluclear Power Plant Systems PRINCIP A L INVESTIG ATOR NRC AUTHORIZEO REPRESENTATIVE Wm Farmer, X-23858 APPPO NO-Bs e gR FIN NUMBER 31X0200.608 0
D2510 AMOUNT NEW NRC CUNDS S 50,000.00 FUNDING TOTAL FY 63 FUNDING S 50,000.00 TOTAL NRC OBLIGATIONS S 50,000.00 GOVE ANMENT PROPERTY A T T ACH M E NTISI:
8810120208 881003 CONTR ACT DOCUME NT (
)
PDR CONTR NRC-04-08-109 PNV n
NRC FORM 255 I t (> 76) r ig 6