ML20149K255: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2]]
| number = ML20149K255
| issue date = 01/31/1996
| title = Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2
| author name = Reible B, Woodlan D
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000445, 05000446
| license number =
| contact person =
| document report number = TXX-96019, NUDOCS 9602220087
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 9
}}
 
=Text=
{{#Wiki_filter:. _ _          ..
e a
                                                            ==                          Log # TXX 96019
_- -,,--                    File # 10010.2
                                                            -,,                          Ref. # 10CFR50.36 r          =
7UELECTRIC                    February 15. 1996 C. I.ance Terry Gmup h e Presulent U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
 
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50 445 AND 50-446 MONTHLY OPERATING REPORT FOR JANUARY 1996 Gentlemen:
Attached is the Monthly Operating Report for January 1996, prepared and                                    ,
submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2. Operating License Nos. NPF 87 and NPF 89, respectively. Should you have any questions, please contact Jacob H. Kulangara at (214) 812 8818.
Sincerely, 1
                                                                                                                      )
C. L. Terry                                  l By:
D. R. Woodlan                    !
Docket Licensing Manager CLW/grp                                                                                                      )
Attachment                                                                                                  ,
cc:        Mr. L. J. Callan, Region IV Mr. W. D. Johnson, Region IV Mr. T. J. Polich, NRR Resident Inspectors j
l g2220oe7960131 R          ADOCK 05000445 PDR 220021                          Energy Plaza 1601 Bryan Street Dallas, Texas 75201-3411
                                                                                                              .r624
                                                                                                                  'O
 
Attachment to TXX %019 Page ,1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO.:          50 445 UNIT:                CPSES 1 DATE:                2/ 9/96 COMPiUED BY:          Bob Reible TELEPHONE:            817 897 0449 OPERATING STATUS
: 1. REPORTING PERIOD:      JANUARY 1996              GROSS HOURS IN REPORTING PEROD:                    744 1150  *
,  2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):        3411    MAX. DEPEND. CAPACITY (HWe Net):
1 DESIGN ELECTRICAL RATING (MWe Net):            1150
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):    NONE                                                  ,
: 4. REASON FOR RESTRICTION (IF ANY)-
THIS MONTH        YR TO DATE        CUMULATIVE 5,    NUMBER OF HOURS REACTOR WAS CRITICAL                      443                443                39,195
: 6.      REACTOR RESERVE SHUTDOWN HOURS                            69                69                2.673
: 7. HOURS GENERATOR ON LINE                                  438                438                38,627
: 8. UNIT RESERVE SHUTDOWN HOURS                              0                  0                  0
: 9. GROSS THERMAL ENERGY GENERATED (MWH)                      1,426,730          1,426,730          124.851,983
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                  481,186            481,186            41,547.389
: 11. NET ELECTRICAL ENERGY GENERATED (HWH)                    450,558            450,558            39,617,751
: 12. REACTOR SERVICE FACTOR                                    59.6              59.6              81.7
: 13. REACTOR AVAILABILITY FACTOR                              68.8              68.8              87.3
: 14. UNIT SERVICE FACTOR                                      58.9              58.9              80.6
: 15. UNIT AVAILABILITY FACTOR                                  58.9              58.9              80.6            l
: 16. UNIT CAPACITY FACTOR (USING MDC)                          52.7              52.7              71.9
: 17. UNIT CAPACITY FACTOR (USING DESIGN MWe)                  52.7              52.7              71.9
: 18. UNIT FORCED OUTAGE RATE                                  41.1              41.1              5.1            l
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
l
: 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:                2/4/96                      j 1
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):        ACHIEVED COMMERCIAL OPERATION          900813                                        I
* ESTIMATED
 
Attachment to TXX %019 Pige 2. 'of 8                                                                                                                                      ,
AVERAGE DAILY UNIT POWER LEVEL
                                                                                          ' DOCKET NO.:                                          50 445 UNIT:                                                CPSES  1 DATE:                                                2/ 9/96 COMPLETED BY:                                        Bob Reible TELEPHONE:                                          817 897 0449 HONTH:    JANUARY 1996 AVERAGE DAILY POWER LEVEL                                              AVERAGE DAILY POWER LEVEL                                        l i
DAY                (MWe Net)                                            DAY                            (MWe Net) 1                      1112                                                17                                                      350          s 2                      1111                                                18                                                        0 l
3                      1111                                                19                                                        0 4                      1111                                                20                                                        90 a
4            5                      1110                                              21                                                        717
)
!            6                      1110                                              22                                                        348 1
7                      1109                                              23                                                          0 8                    1110                                                24                                                          0 t
9                    1110                                                25                                                          0
^
10                    1110                                                26                                                          0 i            11                    1111                                                27                                                          0 12                    1108                                                28                                                          0 13                    1008                                                29                                                          0 14                    1110                                                30                                                          0 15                    1109                                                31                                                          0 16                    1108 L
t
 
1 l
  . Attachment to TXX %019 Page 3 pf 8
 
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:      50 445 UNIT:            CPSES    1 DATE:            2/ 9/96 COMPLETED BY:    Bob Reible TELEPHONE:        817 897 0449                j MONTH:  JANUARY 19%
DAY            TIME              REMARK / MODE 01/01          0000              Unit started the month in MODE 1 at 1001 power.
01/17          0808              Automatic Reactor scram and Safety Injection System actuation due to an instrument spike while re energizing failed inverter IV1PC2. Unit in MODE 3. ABN procedure revised to reflect additional steps while re energizing inverters,                                            t 01/20          0421              Entered MODE 2.
0502              Reactor Critical.
0955              Entered MODE 1.
1002              Unit synchronized to the grid; began power ascension.
01/22          0147              Unit at 100% power.
0806              Hanually tripped the reactor due to a loss of feedwater flow that resulted from a loss of power to bus IEC1 due to IV1EC1 Inverter failure. Inverter testing and repairs were conducted to increase equipment reliability. Unit entered MODE 3.
01/24          0444              Unit entered MODE 4.
1447              Unit entered MODE 5.
01/31          2400            Unit ended the month in MODE 5.
 
f i
Attachment to TXX-%019                                                                                                                            .
Page 4 of 8 l                                                                                                                                        UNIT SHUTDOWNS AIO POWER REDUCTIONS                                                  '.
DOCKET NO.:        50-445                .        ,
UNIT:              CPSES    1 i
DATE:              2/ 9/%
COMPLETED BY:      Bob Reible TELEPHONE:          817-897-0449 l
REPORT MONTH.              JANUARY 1996 ETH00 0F TYPE                                                  SHUTTING DOWN                                                          '
F: FORCED              DURATION                      THE REACTOR OR NO        DATE      S: SCHEDULED            (HOURS)          REASON        REDUCING POWER      CORRECTIVE ACTIONS /COMENTS 1        % 0117          F                  73.9              A                3            Rx trip and SI actuation due to instrument spike while re-energizing failed inverter IVIPC2. See previous page. LER 445/%-001-00 2        % 0122          F                  231.9              A                  1            Manual RX trip after loss of power to bus 1EC1 due to IV1EC1 Inverter failure. See previous page. LER 445/%-002-00.
: 1)    REASON                                                                                                      2)  METHOD A:    EQUIPMENT FAILURE (EXPLAIN)              E:    OPERATOR TRAINING AND LICENSE EXAMINATION                    1: MANUAL B:    MAINT OR TEST                            F:    ADMINISTRATIVE                                                2: MANUAL SCRAM C:    REFUELING                                G:    OPERATIONAL ERROR (EXPLAIN)                                  3: AUTOMATIC SCRAM D:    REGULATORY RESTRICTION                  H:    OTHER (EXPLAIN)                                              4: OTHER (EXPLAIN)
 
Attachment to TXX 96019
  . Page 5 of 8
                          .            C0HANCHE PEAK STEAM ELECTRIC STATION. UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO.:          50 446 UNIT:                CPSES 2 DATE:                2/ 9/96 COMPLETED BY:        Bob Reible TELEPHONE:            817 897 0449 OPERATING STATUS
: 1.      REPORTING PERIOD:      JANUARY 19%              GROSS HOURS IN REPORTING PER00:                      744 1150 *
: 2.      CURRENTLY %lTHORIZED POWER LEVEL (HWt):      3411    MAX. DEPEND. CAPACITY 01We-Net):
DESIGN ELECTRICAL RATING (HWe Net):          1150
: 3.      POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):    NONE
: 4.      REASON FOR RESTRICTION (IF ANY):
THIS HONTH          YR TO DATE      CUMULATIVE
: 5.      NUMBER OF HOURS REACTOR WAS CRITICAL                    744                  744              18.288
: 6.      REACTOR RESERVE SHUTDOWN HOURS                          0                    0                2,229
: 7.      HOURS GENERATOR ON LINE                                  744                  744              18.066
: 8.      UNIT RESERVE SHUTDOWN HOURS                              0                    0                0
: 9. GROSS THERHAL ENERGY GENERATED (HWH)                      2.529,072            2.529.072        58.091.983
: 10. GROSS ELECTRICAL ENERGY GENERATED (HWH)                      864.708              864.708          19.569.329
: 11. NET ELECTRICAL ENERGY GENERATED (HWH)                        832.973              832.973          18.691.331
: 12. REACTOR SERVICE FACTOR                                      100.0                100.0            83.6        i
: 13. REACTOR AVAILABILITY FACTOR                                  100.0                100.0            93.8
: 14. UNIT SERVICE FACTOR                                          100.0                100.0            82.6
: 15. UNIT AVAILABILITY FACTOR                                    100.0                100.0            82.6        I
: 16. UNIT CAPACITf FACTOR (USING HDC)                            97.4                97.4              74.3
: 17. UNIT CAPACITY FACTOR (USING DESIGN HWe)                      97.4                97.4              74.3
: 18. UNIT FORCED OUTAGE RATE                                      0.0                  0.0              7.0
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
Refueling Outage scheduled to begin February 22. 1996 with an estimated duration of 42 Days.                  I
: 20. If SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):            ACHIEVED COMMERCIAL OPERATION            930803
* ESTIMATED
 
Attachment to TXX 96019
. Rage 6.'of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:      50 446 UNIT:            CPSES~ 2 DATE:            2/ 9/96 COMPLETED BY:    Bob Reible TELEPHONE:        817 897-0449 MONTH:    JANUARY 1996 AVERAGE DAILY POWER LEVEL                          AVERAGE DAILY POWER LEVEL DAY                (MWe Net)                            DAY            (MWe Net)          l l
1                      1124                              17                1123 2                      1124                              18                1123 3                      1122                              19                1123 4                      1126                              20                1123 1
5                      1124                              21                1123          j 6                      1124                              22                1123 1
7                      1125                              23                1123          ,
8                      1125                              24                1122          ,
9                      1124                              25                1124 10                    1123                              26                1123 11                    1125                              27                1116 12                    1124                              28                1008 13                    1125                              29                1123 14                    1124                              30                1123 15                    1124                              31                1122 16                    1124
 
l
  ~
Attachment to TXX 96019
.            Pa'ge  7. of 8                                                                              ,
 
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:      50 446 2
UNIT:            CPSES DATE:            2/ 9/96 COMPLETED BY:    Bob Reible TELEPHONE:        817 897 0449 MONTH:    JANUARY 19%
:          DAY            TIME                REMARK / MODE                                              :
i
,          01/01          0000                Unit started the month at 100* Power.
,          01/31          2400                Unit ended the month at 1001 Power.                        ,
4 f
i J
1                                                                                                        5 r
l l
l i
 
Attachment to TXX-%019                                                                                                                                                                                              .
Page 8 of 8                                                                                                                                                                                                          .          2 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:                                                                                50-446 UNIT:                                                                                      CPSES                        2 DATE:                                                                                      2/ 9/%
COMPLETED BY:                                                                              Bob Reible TELEPHONE:                                                                                817-897-0449 REPORT MONTH:          JANUARY 1996 METHOD OF TYPE                                          SHUTTING DOWN F: FORCED        DURATION                    THE REACTOR OR NO        DATE        S: SCHEDULED    (HOURS)      REASON        REDUCING POWER          CORRECTIVE ACTIONS / COP 9ENTS NONE
: 1)    REASON                                                                                                                                              2)                                        METHOD A:    EQUIPMENT FAILURE (EXPLAIN)        E:    OPERATOR TRAINING AND LICENSE EXAMINATION                                                                                                1: MANUAL B:    MAINT OR TEST                      F:    ADMINISTRATIVE                                                                                                                          2: MANUAL SCRAM C:    REFUELING                          G:    OPERATIONAL ERROR (EXPLAIN)                                                                                                              3: AUTOMATIC SCRAM D:    REGULATORY RESTRICTION            H:    OTHER (EXPLAIN)                                                                                                                          4: OTHER (EXPLAIN) t
                                                                                                    ,-    - - - _ _ - _ - _ _ _ _ _ _ _ - - _ - - _ _ - _ _ . - - _ _ - _ _ _ _ _ _ - - _ . - - _ - - - _ _ - . . -              .}}

Latest revision as of 00:57, 12 July 2023