ML20136B247: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IA-96-529, Discusses 950911 Telcon W/J Davis Re Chevron Allegation RIII-95-A-0098]]
{{Adams
| number = ML20136B247
| issue date = 09/11/1995
| title = Discusses 950911 Telcon W/J Davis Re Chevron Allegation RIII-95-A-0098
| author name = Snell W
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name = Glinski R, House J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| docket =
| license number =
| contact person =
| case reference number = FOIA-96-529
| document report number = NUDOCS 9703100219
| package number = ML20136A921
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 5
}}
 
=Text=
{{#Wiki_filter:. _._ __ .                _ _ _ . _ _ _ . _ - - __ . . - _ _ _ _ _ . _ _ _ . _ .                _ __ _ _ _ _ _      _
From:        William G. Snell              (WGS:            Ib To:          RLG. JEH E % AASKisLUbOSS.# RF
                                                                                                  ~
Date:        Monday. September 11. 1995                              12:1~ pm
 
==Subject:==
Chevron Allegation No. RIII-95-A-0098
 
==Reference:==
Phone call with Joe Davis. Foster Wheeler, 11:30-11:45 AM, 9/11/95.
1 After discussing your 9/7/95 site visit on above allegation. I called Joe Davis to get a few more details.                                  He provided the following:
As the Site Health & Safety Coordinator. and as allowed by                                              !
procedure. he met with the electricians during the week prior to August 6. and went over their work assignment, and authorized                                            i their access without the need for the 6 hour training course.
They did sign in on the RWP'and sign-in sheet during that week.
He said there should have been a sign-in sheet for August 5 and 6 because he put one out for them to use. He will look for these sheets and fax them to me.                Ile said the electricians were authorized to work,with booties only based on the work going on at the site at that time and based on the work they were to do.
Their work was to only install the main electrical panel for the main feed coming into the building. When done, they were supposed to tour the buiIding looking for what other needs they may have for additional work to be done such as stringing lighting While working. an individual from B. Koh & Associates came in started walking around and taking pictures. B. Koh has the contract for the remediation work exterior to the building.                                      This person had no authorization to be in the building.                                      The electricians approached the individual and asked him what he was doing. He got defensive and said he was taking pictures of the                                        i exterior areas around the building and was doing Engelhard a I                  favor by also taking pictures inside.                                The electricians requested the individual to leave. According to Davis. this individual was not wearing any anti-C's or hard hat, and had not signed in on any RWPs or signin sheets.                In fact, there was some speculation l
that he was really in trying to get some photos of a
                    " competitors" equipment.          The individual did leave, but they                                  1 l                  could not verify he frisked out, but routine surveys have not identified and contamination problem outside the RP area.
Followup Call by Joe Davis, 12:10 PM. 9/11/95 Joe said he was told by his staff that he dropped tne ball and never posted the sign-in sheets for the weekend of August 5-6.
l He said the electricians therefore signed in on the Friday August
:                  4 sheet. He will fax them to me. lie also stated that only 2
+
electricians were working that weekend.
Bill CC:        DEF 9703100219 970305 PDR  FOIA                                                                                                    i BABCOCK 96-529     PDR                                                                                        j 1
 
    ^                ^      ~  ~    _ _ _  ._        -      -      ' - ~ ~~^ ~ ~' ~'^      ^^'
jf _ y                                '
Number of pages including cowr sheet Y
                                                                  ~56C 1 Av . 5 m TO: & .' l l    5A)sI \                  FROM:          Foster 1%eeler Environmental Corycieilon 1000 HarvardAwpnoe Clewland, Ohio 44109 i
Phone FaxPhone(168 ) S I 5- l z 59                Phone        (216) 398-4064 Fax Phone    (216) 398-2127 l CC:
REMARKS:      0 Ument    fForyourmview    D ReplyASAP        Q Please Comment' l
l l
l G
S
 
gr.
l FOSTER WHEELER EfMROIIMENTAL CORPORATION              Sheet 1 BUILDING C DECONTAMINATION & Dl8MARTLEMENT j                                                    RWP/ SAFETY ENTRY AND EXIT LOG DATL    R - O'/- ff~
      "P:          W O/                                                      NOTE Sqp-m RWP shes h                      -
w .ucl.houl-mu,
      ^
                                                      -_js l
l                      '
v
                                          .1 %.
r mmmm                          _
M PlullT            SIGIIATURE      colsP    IN      OUT              ouT    m lei                  our          a        ogy 4
CODE Ch 5kebu khs$_m1,                      llW1  % c' ' 1c          9%    \pf,6 17 f6 FCD  I      406      tyjg l D, 17Pm i
adlutdi';us d&s'b,4 PJf'                wr    on    Mc          11IC  12un  12sf Inc          tros-issf l
ewr i>nh o ezo sess yst 1.23g typ iu;u ira l    LAset Y si                O-          lMr of% IIm nio ido M(so Sm' /CD l715                                                1 T%E Ga!!0            0.            hs I/(J1 OdoC 6% ca 'g' udf I
ESws 4M~                                                                ''
i46 OMI /v/s iur iam /3sf /W Ip.c /tro l      NmqNds                        N NZ 6M' //3f' IJr0 1 Tis'
      $lff> fc/ ^ Y W      L3% IAt19 $              / 7tS''
6(LL G vn 0,, 012t~~Pw Cto? T3$ ~ 04X10]c 16 %5MC f(OT\1 *r%
i    herlwie i mat HA.T 06to f40 09 bc Im joys ii)o tw if/.c CN>> Gem          &d                  t'WE    d4/3 0132          19 72 /75/ 13sE      WT //1/fintf l $,Yed Y$                                  flI!M O7/i~    $''k 10i' /7tv>
                                                                .                    171s  I. 's c
      $yblr,esN$n hn 07's 1?f t o ! C' M'a                                            inc    00
        )N$ K'tL ,;2 5 d $ fKi                      0so5 tos*s !!3 o        INo I01O 4'36 Sco                  lis VS' l      f)) L L L d 6LDVAGI F tv lY30                          %
      &Xlavan k%Lw. Nf3 C:it                                  TlYk    ]..
i    Byjtkveu &$ _ ^IE s'tG                                  @'/$      V haUawA W:8                                                                                    ].,
f%      'G %
Dwedsw.+ ?$?      .
I B8 2 00          b3n      /0;<tG 12:3 0 1700 16:00        -
                                                                                                        ?
l Bh1Gb os )[Ul}[ f G c.2L a/ Toe. %cs, 4sj nevs. Pos1kJ Cy-,*k club h 4:g 5fl, ilfi Page 1 T G re.$we., & L o c(c<.te:czant use) sane M -\Ly vid n hqA % 'Kyn *L *;f d r* ag
                            --                                        .                                    -            _      J
 
l l.
l  FOSTER WHEELER ENWtONMENTAL CORPORATION              Sheatl CUILDING C DECONTAMINATION & DISMANTLEMENT i                                                                                                                                  i q
RWP/ SAFETY ENTRY AND EXIT LOG i
. mra-    3 / - f5                                                                                                          1
;  e        ~9C-o/                                                                                                                :
!  mTu:          .L    02>    _L Apu
                                                .A . m o NOTE % RWP ed % %                      {
'                                                                                              . adam,an .ennWrismys        a vv        v                                                                                            ,
i i      mAmerswr          ownATvRs          coup      m        out                  u        our      a j                                                                                                                out m      our  !
ooot L d~w          Yelb.. : ,                N to    N/[ Ib3a 1.tav i                                                                                                    ttso 13ac Ino        $3D i  T~Vnla              .&                      0800    h/< UEI                            l200    h*o      12 s Iffo M-lC
! LGu                %Adlal                    vez oEl f ih Lv.dT bd                                  m7        oh7s                                                                    i i
faut Cice M g -
owa 6NO                      i sou        133 0    Ic/65 if]5 1550        /7/3 h/l    GW]        h      l          ^ . QfE      c f$f                          '
lI f"    lb O t'  Wh{ &
!  wn tw              rL=F*d              ,    082t    ovo                  laico        b;n
                    $l
    $U:YL                                      OkL 0135                      16C0        tuo ISt/s        sW k]d Kla            /?      5                Ch3      %                  I bdo                                                l
! cm . ~              dhA                      un ew                                                                              )
l  w                dM                      .
: m. /ar nac pc                                      n        we l,  %A4 soar /L(d              i    -        ? 95 9%                                                                          ,
l ausw hyd%r                                    sx(Mt inon pzo o x4                                          ~
M%
! 7t W %        t il/AkhhD                      @W      /*h              7d              lom l  % dim 7&                                    oers    &
Ud&pg)fg6                                    ogsr forg imo uno iow                                        isao l  S. $$ b                IN                  lO'$      lO* io~! l(& tyc3 77 6 i  wo- GL                                      y4 4 6% ag 7% 7E l Tot b.)hk;                                    I> t 7W h.aw&M
                    ~
6% &%                        72 7%                            -
o
:                                                        Pgei
 
                  - ~ ~ -      -
                                                .  . _ . . .          .~.~..,......-                  - - - - - - - - -                --              - - -          - - - -
BUILDING C DECONTAMINATION & DISMANTLEMENT
                                                                                                                                                                                  \ '
s JRWP/ SAFETY ENTRY AND EXIT LOG -
DATE:                      ~O            ~
riwp-                        4'f - O /            -                        r NOTE: Sign-in RWP shc=t indicates understanding DESCRIPTTON:                  A 11 v -        1^ I'          d-          M                and complir.nce ytch RWP / Saicry Rcquirements.
y 1                                                              v              -
NAME PRINT                        SIGNA 9URF                        IN          QUT  IN          OUT                IN        OUT IN                      OUT k . S O tif            _ M D, / k., e ob
                                                                                    /#@7 /OsT' 12 oo                    /7. 'io 154p                  ElC    ym' T (Y)a3rr A                    MA                            one 2000 /D IT M                                1730 lC06 a9W j7 (O h l. :1 T c A f 6W ADR' "-
8 700 M60 1015 12co itso __t '%0 @ wio
    'R MirJr>                    '
ns580 %                      otob 700o        maf        rm                  ins          \ coo            asIc    nm It. eenaw                              ffJ/d4E                      ostr ossu so:cw won Iz so n:70 ir to                                                    war                -
H f.drs                            } n A ll W-                      n e > <" 10:0c IC D d b:M                      h 59q I3: 30 ti to i lis                  -
n C. waned . emb                                            e    o49Wh            \ b'M2    it'.M              ' 1,%    13 # wao                    (Gco e n-M ( MM3WC&~dre                                                    06tS c>641
                                                                                                  '                "        '~
Maxfsnwt5                                JAMbun                      dro 0837 one i&W                                i wz. j wp                .
:  W i W 64AvJE -i t i f h -                                            o W6 ows avz- /W0
  . h A1_e                                WCJ                          owo ogvs                                  '
N8_* C                        09If "? J62L L1 n6
?
          \/Mr)S'n!                                  _                                                                  I2l%    MCV bW                      /7t[
,  G_hvki,x rs_Avivn2H.1s& .li: o r ivc y              -        -
4
[
2 i
i
)
l TOTAL P.04                  i
 
from: William G. Snell      WGS):                            --
To:            RLG, JEH Date: Monday, September 11,        RII[ M Xh /EUU s.atv5 1995 6tT*I2:17 pm        s                      i
 
==Subject:==
Chevren Allegation No. RIII-95-A-0098
 
==Reference:==
Phone call with Joe Davis, Foster Wheeler, 11:30-11:45 AM, 9/11/95.                                                                          l I
After discussing your 9/7/95 site visit on above allegation, I called Joe l
4 Davis to get a few more details. He provided the following:
As the Site Health & Safety Coordinator, and as alWed by procedure, he met a
with the electricians during the week prior to August 6, and went over their 3
work assignment, and authorized their access without the need for the 6 hour j          training course. They did sign in on the RWP and sign-in sheet during that j          week. He said there should have been a sign-in sheet for August 5 and 6 because he put one out for them to use. He will look for these sheets and fax them to me. He said the electricians were authorized to work with booties only based on the work going on at the site at that time and based on the work they were to do. Their work was to only install the main electrical panel for i          the main feed coming into the building. When done, they were supposed to tour    1 i          the building looking fer what other needs they may have for additional work to    l j          be done such as stringing lighting.
While working, an individual from B. Kch & Associates came in started walking    l
;          around and taking pictures. B. Koh has tne contract for the remediation work      i 4
exterior to the building. This person had no authorization to be in the i          building. The electricians approached the individual and asked him what he was doing. He got defensive and said he was taking pictures of the exterior      ,
!          areas around the building and was doing Engelhard a favor by also taking 1
pictures inside. The electricians requested the individual to leave.              !
4 According to Davis, this individual was not wearing any anti-C's or hard hat,
;          and had not signed in on any RWPs or signin sheets. In fact, there was some i          s' peculation that he was really in trying to get some photos of a " competitors" equipment. The individual did leave, but they could not verify he frisked out, but routine surveys have not identified and contamination problem outside
]           the RP area.
Followup Call by Joe Davis, 12:10 PM, 9/11/95 I
;          Joe said he was told by his staff that he dropped the ball and never posted i          the sign-in sheets for the weekend of August 5-6. He said the electricians I          therefore signed in on the Friday August 4 sheet. He will fax them to me. He
)          also stated that only 2 electricians were working that weekend.
c
!          Bill CC:            DEF 4
4,
 
J
,        On 8/23/95 at 8:20 am, Mike Weber (DRSS) received a call from a concerned individual (CI) who was present at the above listed company last weekend. The CI-stated that during the weekend, when the facility was shut down and only a few workers'were present, he observed some electricians installing lighting.
The electricians were working by themselves (without any coverage from the Health Physics (HP) staff), and were not wearing any type of protective
        ' clothing, radiation monitors, etc. An engineer observed the electricians and requested that they leave the work location and report to HP.
[ Note from M. Weber - the above information is what I heard over the phone.
During the rest of the phone call, we were constantly interrupted by an operator informing the CI that additional money was needed to continue the call,  I repeatedly asked the CI if he'd like to call collect, but he never responded, he just kept talking - this was occurring at the same time that the operator was asking for additional money. Therefore, it was very difficult to              i hear the CI, so the next paragraph is the best that I can piece together.]               ,
1 The engineer remained at the work location and took pictures of the work area.
Shortly thereafter, someone from Foster-Wheller, the contractor responsible for the site decontamination work, ordered the engineer off site, claiming                  i that the engineer shouldn't have told the electricians to go to HP, and that              i the engineer shouldn't have been taking photographs. The CI expressed concern that the electricians were working without HP support. He also aidn't think that it was right that the engineer was ordered off site.                                  l The CI then abruptly terminated the call before Mike could obtain the CI's name, address, or telephone number.
i-                                          _
j}}

Latest revision as of 01:34, 14 December 2021

Discusses 950911 Telcon W/J Davis Re Chevron Allegation RIII-95-A-0098
ML20136B247
Person / Time
Issue date: 09/11/1995
From: Snell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Glinski R, House J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20136A921 List:
References
FOIA-96-529 NUDOCS 9703100219
Download: ML20136B247 (5)


Text

. _._ __ . _ _ _ . _ _ _ . _ - - __ . . - _ _ _ _ _ . _ _ _ . _ . _ __ _ _ _ _ _ _

From: William G. Snell (WGS: Ib To: RLG. JEH E % AASKisLUbOSS.# RF

~

Date: Monday. September 11. 1995 12:1~ pm

Subject:

Chevron Allegation No. RIII-95-A-0098

Reference:

Phone call with Joe Davis. Foster Wheeler, 11:30-11:45 AM, 9/11/95.

1 After discussing your 9/7/95 site visit on above allegation. I called Joe Davis to get a few more details. He provided the following:

As the Site Health & Safety Coordinator. and as allowed by  !

procedure. he met with the electricians during the week prior to August 6. and went over their work assignment, and authorized i their access without the need for the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> training course.

They did sign in on the RWP'and sign-in sheet during that week.

He said there should have been a sign-in sheet for August 5 and 6 because he put one out for them to use. He will look for these sheets and fax them to me. Ile said the electricians were authorized to work,with booties only based on the work going on at the site at that time and based on the work they were to do.

Their work was to only install the main electrical panel for the main feed coming into the building. When done, they were supposed to tour the buiIding looking for what other needs they may have for additional work to be done such as stringing lighting While working. an individual from B. Koh & Associates came in started walking around and taking pictures. B. Koh has the contract for the remediation work exterior to the building. This person had no authorization to be in the building. The electricians approached the individual and asked him what he was doing. He got defensive and said he was taking pictures of the i exterior areas around the building and was doing Engelhard a I favor by also taking pictures inside. The electricians requested the individual to leave. According to Davis. this individual was not wearing any anti-C's or hard hat, and had not signed in on any RWPs or signin sheets. In fact, there was some speculation l

that he was really in trying to get some photos of a

" competitors" equipment. The individual did leave, but they 1 l could not verify he frisked out, but routine surveys have not identified and contamination problem outside the RP area.

Followup Call by Joe Davis, 12:10 PM. 9/11/95 Joe said he was told by his staff that he dropped tne ball and never posted the sign-in sheets for the weekend of August 5-6.

l He said the electricians therefore signed in on the Friday August

4 sheet. He will fax them to me. lie also stated that only 2

+

electricians were working that weekend.

Bill CC: DEF 9703100219 970305 PDR FOIA i BABCOCK 96-529 PDR j 1

^ ^ ~ ~ _ _ _ ._ - - ' - ~ ~~^ ~ ~' ~'^ ^^'

jf _ y '

Number of pages including cowr sheet Y

~56C 1 Av . 5 m TO: & .' l l 5A)sI \ FROM: Foster 1%eeler Environmental Corycieilon 1000 HarvardAwpnoe Clewland, Ohio 44109 i

Phone FaxPhone(168 ) S I 5- l z 59 Phone (216) 398-4064 Fax Phone (216) 398-2127 l CC:

REMARKS: 0 Ument fForyourmview D ReplyASAP Q Please Comment' l

l l

l G

S

gr.

l FOSTER WHEELER EfMROIIMENTAL CORPORATION Sheet 1 BUILDING C DECONTAMINATION & Dl8MARTLEMENT j RWP/ SAFETY ENTRY AND EXIT LOG DATL R - O'/- ff~

"P: W O/ NOTE Sqp-m RWP shes h -

w .ucl.houl-mu,

^

-_js l

l '

v

.1 %.

r mmmm _

M PlullT SIGIIATURE colsP IN OUT ouT m lei our a ogy 4

CODE Ch 5kebu khs$_m1, llW1  % c' ' 1c 9% \pf,6 17 f6 FCD I 406 tyjg l D, 17Pm i

adlutdi';us d&s'b,4 PJf' wr on Mc 11IC 12un 12sf Inc tros-issf l

ewr i>nh o ezo sess yst 1.23g typ iu;u ira l LAset Y si O- lMr of% IIm nio ido M(so Sm' /CD l715 1 T%E Ga!!0 0. hs I/(J1 OdoC 6% ca 'g' udf I

ESws 4M~

i46 OMI /v/s iur iam /3sf /W Ip.c /tro l NmqNds N NZ 6M' //3f' IJr0 1 Tis'

$lff> fc/ ^ Y W L3% IAt19 $ / 7tS

6(LL G vn 0,, 012t~~Pw Cto? T3$ ~ 04X10]c 16 %5MC f(OT\1 *r%

i herlwie i mat HA.T 06to f40 09 bc Im joys ii)o tw if/.c CN>> Gem &d t'WE d4/3 0132 19 72 /75/ 13sE WT //1/fintf l $,Yed Y$ flI!M O7/i~ $k 10i' /7tv>

. 171s I. 's c

$yblr,esN$n hn 07's 1?f t o ! C' M'a inc 00

)N$ K'tL ,;2 5 d $ fKi 0so5 tos*s !!3 o INo I01O 4'36 Sco lis VS' l f)) L L L d 6LDVAGI F tv lY30  %

&Xlavan k%Lw. Nf3 C:it TlYk ]..

i Byjtkveu &$ _ ^IE s'tG @'/$ V haUawA W:8 ].,

f% 'G %

Dwedsw.+ ?$? .

I B8 2 00 b3n /0;<tG 12:3 0 1700 16:00 -

?

l Bh1Gb os )[Ul}[ f G c.2L a/ Toe. %cs, 4sj nevs. Pos1kJ Cy-,*k club h 4:g 5fl, ilfi Page 1 T G re.$we., & L o c(c<.te:czant use) sane M -\Ly vid n hqA % 'Kyn *L *;f d r* ag

-- . - _ J

l l.

l FOSTER WHEELER ENWtONMENTAL CORPORATION Sheatl CUILDING C DECONTAMINATION & DISMANTLEMENT i i q

RWP/ SAFETY ENTRY AND EXIT LOG i

. mra- 3 / - f5 1

e ~9C-o/

! mTu: .L 02> _L Apu

.A . m o NOTE % RWP ed % % {

' . adam,an .ennWrismys a vv v ,

i i mAmerswr ownATvRs coup m out u our a j out m our  !

ooot L d~w Yelb.. : , N to N/[ Ib3a 1.tav i ttso 13ac Ino $3D i T~Vnla .& 0800 h/< UEI l200 h*o 12 s Iffo M-lC

! LGu %Adlal vez oEl f ih Lv.dT bd m7 oh7s i i

faut Cice M g -

owa 6NO i sou 133 0 Ic/65 if]5 1550 /7/3 h/l GW] h l ^ . QfE c f$f '

lI f" lb O t' Wh{ &

! wn tw rL=F*d , 082t ovo laico b;n

$l

$U:YL OkL 0135 16C0 tuo ISt/s sW k]d Kla /? 5 Ch3  % I bdo l

! cm . ~ dhA un ew )

l w dM .

m. /ar nac pc n we l, %A4 soar /L(d i -  ? 95 9% ,

l ausw hyd%r sx(Mt inon pzo o x4 ~

M%

! 7t W % t il/AkhhD @W /*h 7d lom l  % dim 7& oers &

Ud&pg)fg6 ogsr forg imo uno iow isao l S. $$ b IN lO'$ lO* io~! l(& tyc3 77 6 i wo- GL y4 4 6% ag 7% 7E l Tot b.)hk; I> t 7W h.aw&M

~

6% &% 72 7% -

o

Pgei

- ~ ~ - -

. . _ . . . .~.~..,......- - - - - - - - - - -- - - - - - - -

BUILDING C DECONTAMINATION & DISMANTLEMENT

\ '

s JRWP/ SAFETY ENTRY AND EXIT LOG -

DATE: ~O ~

riwp- 4'f - O / - r NOTE: Sign-in RWP shc=t indicates understanding DESCRIPTTON: A 11 v - 1^ I' d- M and complir.nce ytch RWP / Saicry Rcquirements.

y 1 v -

NAME PRINT SIGNA 9URF IN QUT IN OUT IN OUT IN OUT k . S O tif _ M D, / k., e ob

/#@7 /OsT' 12 oo /7. 'io 154p ElC ym' T (Y)a3rr A MA one 2000 /D IT M 1730 lC06 a9W j7 (O h l. :1 T c A f 6W ADR' "-

8 700 M60 1015 12co itso __t '%0 @ wio

'R MirJr> '

ns580 % otob 700o maf rm ins \ coo asIc nm It. eenaw ffJ/d4E ostr ossu so:cw won Iz so n:70 ir to war -

H f.drs } n A ll W- n e > <" 10:0c IC D d b:M h 59q I3: 30 ti to i lis -

n C. waned . emb e o49Wh \ b'M2 it'.M ' 1,% 13 # wao (Gco e n-M ( MM3WC&~dre 06tS c>641

' " '~

Maxfsnwt5 JAMbun dro 0837 one i&W i wz. j wp .

W i W 64AvJE -i t i f h - o W6 ows avz- /W0

. h A1_e WCJ owo ogvs '

N8_* C 09If "? J62L L1 n6

?

\/Mr)S'n! _ I2l% MCV bW /7t[

, G_hvki,x rs_Avivn2H.1s& .li: o r ivc y - -

4

[

2 i

i

)

l TOTAL P.04 i

from: William G. Snell WGS): --

To: RLG, JEH Date: Monday, September 11, RII[ M Xh /EUU s.atv5 1995 6tT*I2:17 pm s i

Subject:

Chevren Allegation No. RIII-95-A-0098

Reference:

Phone call with Joe Davis, Foster Wheeler, 11:30-11:45 AM, 9/11/95. l I

After discussing your 9/7/95 site visit on above allegation, I called Joe l

4 Davis to get a few more details. He provided the following:

As the Site Health & Safety Coordinator, and as alWed by procedure, he met a

with the electricians during the week prior to August 6, and went over their 3

work assignment, and authorized their access without the need for the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> j training course. They did sign in on the RWP and sign-in sheet during that j week. He said there should have been a sign-in sheet for August 5 and 6 because he put one out for them to use. He will look for these sheets and fax them to me. He said the electricians were authorized to work with booties only based on the work going on at the site at that time and based on the work they were to do. Their work was to only install the main electrical panel for i the main feed coming into the building. When done, they were supposed to tour 1 i the building looking fer what other needs they may have for additional work to l j be done such as stringing lighting.

While working, an individual from B. Kch & Associates came in started walking l

around and taking pictures. B. Koh has tne contract for the remediation work i 4

exterior to the building. This person had no authorization to be in the i building. The electricians approached the individual and asked him what he was doing. He got defensive and said he was taking pictures of the exterior ,

! areas around the building and was doing Engelhard a favor by also taking 1

pictures inside. The electricians requested the individual to leave.  !

4 According to Davis, this individual was not wearing any anti-C's or hard hat,

and had not signed in on any RWPs or signin sheets. In fact, there was some i s' peculation that he was really in trying to get some photos of a " competitors" equipment. The individual did leave, but they could not verify he frisked out, but routine surveys have not identified and contamination problem outside

] the RP area.

Followup Call by Joe Davis, 12:10 PM, 9/11/95 I

Joe said he was told by his staff that he dropped the ball and never posted i the sign-in sheets for the weekend of August 5-6. He said the electricians I therefore signed in on the Friday August 4 sheet. He will fax them to me. He

) also stated that only 2 electricians were working that weekend.

c

! Bill CC: DEF 4

4,

J

, On 8/23/95 at 8:20 am, Mike Weber (DRSS) received a call from a concerned individual (CI) who was present at the above listed company last weekend. The CI-stated that during the weekend, when the facility was shut down and only a few workers'were present, he observed some electricians installing lighting.

The electricians were working by themselves (without any coverage from the Health Physics (HP) staff), and were not wearing any type of protective

' clothing, radiation monitors, etc. An engineer observed the electricians and requested that they leave the work location and report to HP.

[ Note from M. Weber - the above information is what I heard over the phone.

During the rest of the phone call, we were constantly interrupted by an operator informing the CI that additional money was needed to continue the call, I repeatedly asked the CI if he'd like to call collect, but he never responded, he just kept talking - this was occurring at the same time that the operator was asking for additional money. Therefore, it was very difficult to i hear the CI, so the next paragraph is the best that I can piece together.] ,

1 The engineer remained at the work location and took pictures of the work area.

Shortly thereafter, someone from Foster-Wheller, the contractor responsible for the site decontamination work, ordered the engineer off site, claiming i that the engineer shouldn't have told the electricians to go to HP, and that i the engineer shouldn't have been taking photographs. The CI expressed concern that the electricians were working without HP support. He also aidn't think that it was right that the engineer was ordered off site. l The CI then abruptly terminated the call before Mike could obtain the CI's name, address, or telephone number.

i- _

j