| number = ML20071P858
| number = ML20071P858
| issue date = 05/20/1983
| issue date = 05/20/1983
| title = Responds to NRC 830422 Ltr Re Violations Noted in IE Insp Rept 50-482/83-07.Corrective Actions:Procedures/Activities Identified Will Be Revised to Include Definitive Test Control Criteria
| title = Responds to NRC Re Violations Noted in IE Insp Rept 50-482/83-07.Corrective Actions:Procedures/Activities Identified Will Be Revised to Include Definitive Test Control Criteria
| author name = Koester G
| author name = Koester G
| author affiliation = KANSAS GAS & ELECTRIC CO.
| author affiliation = KANSAS GAS & ELECTRIC CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = KMLNRC-83-057, KMLNRC-83-57, NUDOCS 8306080188
| document report number = KMLNRC-83-057, KMLNRC-83-57, NUDOCS 8306080188
| title reference date = 04-22-1983
| package number = ML20071P853
| package number = ML20071P853
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:.-
KANSAS GAS AND ELECTRIC COMPANY vm etecmc cowey                                             l GLENN L MOESTER vics pegsiogmt NuCLEA#
KANSAS GAS AND ELECTRIC COMPANY vm etecmc cowey GLENN L MOESTER vics pegsiogmt NuCLEA#
May 20, 1983 Mr. W.C. Seidle, Chief                           p                   ,--
May 20, 1983 Mr. W.C. Seidle, Chief p
Reactor Pro]ects Branch 2                                   1 m 4.I, g==. l 'i y l
Reactor Pro]ects Branch 2 l
U.S. Nuclear Regulatory Commission l                 ]j fN Re91 = IV                                                                   'd 611 Ryan Plaza Drive, Suite 1000               ,
1 m 4.I, g==. l 'i y U.S. Nuclear Regulatory Commission l
MAY 2 31983      !i l' Arlington, Texas   76011                         y KMLNRC 83-057 Re:   Docket No. STN 50-482 Subj: Response to Inspection Report STN 50-482/07
]j fN Re9 = IV MAY 2 31983
'd 1
611 Ryan Plaza Drive, Suite 1000
!i l' Arlington, Texas 76011 y
KMLNRC 83-057 Re:
Docket No. STN 50-482 Subj: Response to Inspection Report STN 50-482/07


==Dear Mr. Seidle:==
==Dear Mr. Seidle:==
This letter is written in response to your letter of April 22, 1983, which transmitted Inspection Report STN 50-482/83-07. As requested, the violation identified in the Inspection Report is being addressed in three parts:
This letter is written in response to your letter of April 22, 1983, which transmitted Inspection Report STN 50-482/83-07. As requested, the violation identified in the Inspection Report is being addressed in three parts:
a) The corrective steps which will be taken and the results achieved; b) Corrective step.s which will be taken to avoid further violations; and c) We date unen full compliance will Le achieved.
a) The corrective steps which will be taken and the results achieved; b) Corrective step.s which will be taken to avoid further violations; and c) We date unen full compliance will Le achieved.
Violation: Failure to Implement Quality Assurance Program Requirements Finding:
Violation: Failure to Implement Quality Assurance Program Requirements Finding:
10CFR Part 50, Appendix B, Criterion II, states, in part: "The Applicant shall establish at the earliest practical time ...a quality assurance progran ...         . This program shall be documented by written policies, procedures, or instructions and shall be carried out throughout plant life in accordance with these policies, procedures, or instructions ... .          Management of other organizations partief pating in the quality assurance progrrm shall regularly review the status and adequacy of that part of the quality program which they are executing."
10CFR Part 50, Appendix B, Criterion II, states, in part: "The Applicant shall establish at the earliest practical time...a quality assurance progran...
This program shall be documented by written policies, procedures, or instructions and shall be carried out throughout plant life in accordance with these policies, procedures, or instructions Management of other organizations partief pating in the quality assurance progrrm shall regularly review the status and adequacy of that part of the quality program which they are executing."
The Wolf Creek Quality Assurance Program For Design and Construction 630608018e 830606 -
The Wolf Creek Quality Assurance Program For Design and Construction 630608018e 830606 -
gDRADOCK 05000482 PDR em mmxwven
gDRADOCK 05000482 PDR em mmxwven


Nm c . -
Nm c
Mr. W.C. Seidle KMLNRC 83-057                                           May 20, 1983 I
Mr. W.C. Seidle KMLNRC 83-057 May 20, 1983 Finding (continued) :
Finding (continued) :
Manual, paragraph 17.1.11, requires Daniel International Corporation (DIC) to establish a test program to control its testing cctivities. This program will cover all required tests including, where appropriate, prototype qualification tests, hydrostatic tests of pressure boundaries, in process tests of manufact'ared items, and proof tests prior to installation.
Manual, paragraph 17.1.11, requires Daniel International Corporation (DIC) to establish a test program to control its testing cctivities. This program will cover all required tests                     ,
I including, where appropriate, prototype qualification tests, hydrostatic tests of pressure boundaries, in process tests of manufact'ared items, and proof tests prior to installation.
Contrary to the above, DIC does not have a formal program in place to control the performance of testing.
Contrary to the above, DIC does not have a formal program in place to control the performance of testing.
Respanse:
Respanse:
Line 45: Line 49:
QCP-I-01, R/14*
QCP-I-01, R/14*
QCP-VII-211, R/3*
QCP-VII-211, R/3*
QCP-X-304, R/5*                                                           -
QCP-X-304, R/5*
WP-VII-211, R/9*
WP-VII-211, R/9*
WP-X-304, R/8*
WP-X-304, R/8*
                                                                                                ]
]
WP-XI-302, R/4*                                                             '
WP-XI-302, R/4*
AP-VI-13, P/3 l
AP-VI-13, P/3
* Approved and implemented                                             I b) Corrective steps which will be taken to avoid further violations:
* Approved and implemented b) Corrective steps which will be taken to avoid further violations:
(1) Daniel Construction Procedure AP-I-02, " Preparation, Review and Approval of Construction Procedures", will be revised to include more specific and defir;itiva dirt etion for preparation and processing construction procedures 'centaining test activities.
(1) Daniel Construction Procedure AP-I-02, " Preparation, Review and Approval of Construction Procedures", will be revised to include more specific and defir;itiva dirt etion for preparation and processing construction procedures 'centaining test activities.
1 (2) Corrective Action Report 1-G-0024 will be revir,ed to require each Daniel Discipline Manager to perform a review of con-struction work procedures within the scope of the given discipline to assure adequacy of the current testing program.
(2) Corrective Action Report 1-G-0024 will be revir,ed to require each Daniel Discipline Manager to perform a review of con-struction work procedures within the scope of the given discipline to assure adequacy of the current testing program.
__        ,          __ _ _-._    _    ~ - _ .    ._ _          __- - -
~ -


            .. e Mr. W.C. Seidle KMLNRC 83-057                                                 May 20, 1983 Response (continued) :
.. e Mr. W.C. Seidle KMLNRC 83-057 May 20, 1983 Response (continued) :
2his review will consist of verification that ap-plicable criteria of the associated ANSI Standard (i.e. , ANSI N45.2.4, N45.2.5, N45. 2.0) as well as specification requirements have been included in the applicable work procedures. Daniel Quality i
2his review will consist of verification that ap-plicable criteria of the associated ANSI Standard (i.e., ANSI N45.2.4, N45.2.5, N45. 2.0) as well as specification requirements have been included in the applicable work procedures. Daniel Quality Engineering will perform a similar review of quality i
Engineering will perform a similar review of quality control procedures (QCP's) to verify adequacy of current procedural requirements. This review will be coordinated with the work procedures review.
control procedures (QCP's) to verify adequacy of current procedural requirements. This review will be coordinated with the work procedures review.
(3) Should these reviews result in the determination that specific procedures are inadequate, procedural revisions will be initiated and implemented.
(3) Should these reviews result in the determination that specific procedures are inadequate, procedural revisions will be initiated and implemented.
(4) A review of procedures previously governing test activities will be conducted to evaluate the adequacy of test control criteria. Procedural inadequacies which render test results indeterminate or unaccept-able will be documente 1 on Nonconformance Reports in ac~ordance with AP-VI-02.
(4) A review of procedures previously governing test activities will be conducted to evaluate the adequacy of test control criteria. Procedural inadequacies which render test results indeterminate or unaccept-able will be documente 1 on Nonconformance Reports in ac~ordance with AP-VI-02.
Line 65: Line 69:
c) The date when full compliance will be achieved:
c) The date when full compliance will be achieved:
Full compliance will be achieved by July 15, 1983.
Full compliance will be achieved by July 15, 1983.
Supporting documentation for the responses previled above is available for review at the Wolf Creek job site. If you have any further questions concerning this response, please contact me or Mr. Otto Maynard of my staff.
Supporting documentation for the responses previled above is available for review at the Wolf Creek job site.
If you have any further questions concerning this response, please contact me or Mr. Otto Maynard of my staff.
Ve y truly yours,
Ve y truly yours,
                                                                  ?)ffU     u  U       l Glenn L. Koester                         ,
?)ffU U
Vice President - Nuclear                 l GLK:bb                                                                               j cc: HRoberds/WSchum                                                                 )
l u
Glenn L. Koester Vice President - Nuclear GLK:bb j
cc: HRoberds/WSchum
)
i
i
                                            -_                .    -                  -            ~.}}
~.}}

Latest revision as of 06:00, 15 December 2024

Responds to NRC Re Violations Noted in IE Insp Rept 50-482/83-07.Corrective Actions:Procedures/Activities Identified Will Be Revised to Include Definitive Test Control Criteria
ML20071P858
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/20/1983
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20071P853 List:
References
KMLNRC-83-057, KMLNRC-83-57, NUDOCS 8306080188
Download: ML20071P858 (3)


Text

.-

KANSAS GAS AND ELECTRIC COMPANY vm etecmc cowey GLENN L MOESTER vics pegsiogmt NuCLEA#

May 20, 1983 Mr. W.C. Seidle, Chief p

Reactor Pro]ects Branch 2 l

1 m 4.I, g==. l 'i y U.S. Nuclear Regulatory Commission l

]j fN Re9 = IV MAY 2 31983

'd 1

611 Ryan Plaza Drive, Suite 1000

!i l' Arlington, Texas 76011 y

KMLNRC 83-057 Re:

Docket No. STN 50-482 Subj: Response to Inspection Report STN 50-482/07

Dear Mr. Seidle:

This letter is written in response to your letter of April 22, 1983, which transmitted Inspection Report STN 50-482/83-07. As requested, the violation identified in the Inspection Report is being addressed in three parts:

a) The corrective steps which will be taken and the results achieved; b) Corrective step.s which will be taken to avoid further violations; and c) We date unen full compliance will Le achieved.

Violation: Failure to Implement Quality Assurance Program Requirements Finding:

10CFR Part 50, Appendix B, Criterion II, states, in part: "The Applicant shall establish at the earliest practical time...a quality assurance progran...

This program shall be documented by written policies, procedures, or instructions and shall be carried out throughout plant life in accordance with these policies, procedures, or instructions Management of other organizations partief pating in the quality assurance progrrm shall regularly review the status and adequacy of that part of the quality program which they are executing."

The Wolf Creek Quality Assurance Program For Design and Construction 630608018e 830606 -

gDRADOCK 05000482 PDR em mmxwven

Nm c

Mr. W.C. Seidle KMLNRC 83-057 May 20, 1983 Finding (continued) :

Manual, paragraph 17.1.11, requires Daniel International Corporation (DIC) to establish a test program to control its testing cctivities. This program will cover all required tests including, where appropriate, prototype qualification tests, hydrostatic tests of pressure boundaries, in process tests of manufact'ared items, and proof tests prior to installation.

Contrary to the above, DIC does not have a formal program in place to control the performance of testing.

Respanse:

a) Corrutive citeps which have been takan and results achieved:

Specific Daniel procedures / activities identified through KG&E Surveillance and Audit have been or are in the process of being revised to include definitive test control criteria as required by Corrective Action Report (CAR) 1-G-0024.

These procedures are:

QCP-I-01, R/14*

QCP-VII-211, R/3*

QCP-X-304, R/5*

WP-VII-211, R/9*

WP-X-304, R/8*

]

WP-XI-302, R/4*

AP-VI-13, P/3

  • Approved and implemented b) Corrective steps which will be taken to avoid further violations:

(1) Daniel Construction Procedure AP-I-02, " Preparation, Review and Approval of Construction Procedures", will be revised to include more specific and defir;itiva dirt etion for preparation and processing construction procedures 'centaining test activities.

(2) Corrective Action Report 1-G-0024 will be revir,ed to require each Daniel Discipline Manager to perform a review of con-struction work procedures within the scope of the given discipline to assure adequacy of the current testing program.

~ -

.. e Mr. W.C. Seidle KMLNRC 83-057 May 20, 1983 Response (continued) :

2his review will consist of verification that ap-plicable criteria of the associated ANSI Standard (i.e., ANSI N45.2.4, N45.2.5, N45. 2.0) as well as specification requirements have been included in the applicable work procedures. Daniel Quality Engineering will perform a similar review of quality i

control procedures (QCP's) to verify adequacy of current procedural requirements. This review will be coordinated with the work procedures review.

(3) Should these reviews result in the determination that specific procedures are inadequate, procedural revisions will be initiated and implemented.

(4) A review of procedures previously governing test activities will be conducted to evaluate the adequacy of test control criteria. Procedural inadequacies which render test results indeterminate or unaccept-able will be documente 1 on Nonconformance Reports in ac~ordance with AP-VI-02.

(5) Upon completion of the Constructor's corrective actions, Kansas Gas and Electric Contpany's (KG&E)

Quality Assurance (QA) organization will verify completeness of the corrective actions. KG&E's QA organization will also determine the effective-ness of the corrective actions on subsequent scheduled audits /surveillances.

c) The date when full compliance will be achieved:

Full compliance will be achieved by July 15, 1983.

Supporting documentation for the responses previled above is available for review at the Wolf Creek job site.

If you have any further questions concerning this response, please contact me or Mr. Otto Maynard of my staff.

Ve y truly yours,

?)ffU U

l u

Glenn L. Koester Vice President - Nuclear GLK:bb j

cc: HRoberds/WSchum

)

i

~.