ML20091N984: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:}}
        ..          . ~ . .: .              ..  .
                                                      . . . + . .  . .. .. ~ . ~ -          -            ..  ..
                                                                                                                      ~        ..    .
NUREG-0020 Vol. 8, No. 4 April 1984 L CENSED OPERAT NG REACTORS STATUS
 
==SUMMARY==
REPORT DATA AS OF 03-31-84                                                                                                                                                      ,
1 l
l l
l l
l UNITED STATES NUCLEAR REGULATORY COMMISSION pn nac o, a
          .? \          7 E .. %nfJ . ''1 B406120532 840531 PDR NUREG 0020 R                PDR lgt{..l^ ' ]
j
                                      ' ~ ' '                                                                                                                            '
- .{ ' t}_ 'J_ . l'.~l '7 ':[ - ,l-:'
                                                  '.~
                                          * {l] -}  ? .iv'l ' f.'l- ib; ;f.~.. .f{,l .[.fY.?f.l 9. '' $.)-l,0 .l:fl:,Nl,).'.
_    ,                                                  .f$i'  :):.lf.."ll , ff'l;}
t
 
yw                                                                                                  - -
c                                        -
: v. .                                                                                    ,
W  , .
1H                                                      ~
h[ ~ -                                                                                      ;u.
y                                ,
g.,
Qr
$.,+        -
r W-    --
                                  -Q *    ...,                      ,            . ,
t.
3                                        i, Available from NRC/GPO Sales Program A .. . ,                                                                        3 W  -
                                                                                                                                +
Sagerintendent of Documents
                                                                                                                  ~
Government Printing Of fice
^
              , . .                                                                                                                                                          Washington, D. C. 20402 s x                      -                                              ;
s';r"                                                                        . A year's subscription consists of 12 issues for e                                                                ,
                                                                                                                                                                                - this publication.
                                                                        ~
,- t ,
                      .                            ._                                                                                        @).                      Single copies of this publication E L-                          -
are available from National Technical g-    .;.          ,
Information Service, Springfield, VA 22161
      - s >                                                                .
1                                                                                                              ,                                          Microfiche of single copies are
      . :                  s              <
                                                                                                                                -                                  . available from NRC/GPO Sales Program
              ?.                                                                      .; .                                                                                  Washington, D. C. 20555 hl.
T                          , ,
                                                *^
                                                        .g
                                                                            .Q {
                      /                                                                        *
                                                    ' -                                                                          ' ,' d .
e
      '' l' . '                                                l                      l. N ' ,                                                                                                                              e
              ,'.                  ,                      ,;..                                        ?'
                                        ^
t            2;    -
s
    }fff
* _;; 3
            ".i                                                                                                                      ,
ll .                                                            ;&,
J                                        .
c, , . :                                                n'
                                                                ' ~                                                                      '            '
gf                                                                ,
4
                                                                                                                                                  ~'
s- w :                                                        -
}}+'
Y-t tr .i'
                          "'"    ., f. '
                                                                                  'lr                  .~._ w ..                          _,x.;w-        __
 
                            'y : :.~i. y.; v. r . Tym,.-u = ts - :.. . ? .. > y..?. .
                                                                                    . ;.;r ?. .v- ~ -
w-r. -.: : .,: . . .~.+ . . . . . : .. c. . ... .
f . " ; v.; . ;. . ;., .
NUREG-0020 Vol. 8, No. 4 April 1984 LICENSED OPERATING REACTORS STATUS
 
==SUMMARY==
REPORT DATA AS OF 03-31-84 Manuscript Completed: May 1984 Date Published: May 1984 0FFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 P
                    /
 
_ c  ,
u
: AUTHORIZATION AND CLEARANCE *
                              -The U.S. NucleacIRegulatory Commission's Office of Management and
: Program Analysis publishes this monthly status report "as part of
                              ?the reporting requirements in Section 50.36 of 10 CFR Part 50 under
          -                    GAO Clearance Number B-180225, with an expiration date of September 30, 1981," as stated in the October 3,            1978 letter from John M. Lovelady,
: Assistant Director, General Government Division, U.S. General Account-ing Office, to J.M. Felton, Director, Division of Rules and Records, U.S. Nuclear. Regulatory Commission.
(.
* Extended to April 30,1985 by OMB Directive 31500011.
                                            ~
            ~
L l
l l-i
 
                                                                            - - ..; y . - - . - - -.          . - - - ~ . - . . . -  .~.~ -- - - -.~ - - . .-- --- - - . .
      ~
                            %                                                                                                                                                  C t
t t
STATEMENT OF PURPOSE i
The U.S. Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary. Report provides data en the operation of nuclear units as timely and accurately as possible. .This information is
                                                                        . senested ' by the O ffice of R esou rce ; M anagem ent. from the                                  .>
_Needguarters Staff of NRC's Office of Inspection and Enforcement, from
                                                  ;                      NRC's Reglenal Offices, and from utilities. Since all of the data                                    ;
concerning operation of the units is provided by the utility operators less than two weeks af ter the end of the month, necessary corrections
                                                                        -to published,information are shown en the ERRATA page.                                                [
t
  '                                                                      This report is divided inte.three sections: the first contains monthly                                i highlights and statistics for commercial operating units, and ereata                                  '
  - ~                                                                    from previously reported data; the second is a compilation of detailed                                ,
information en each unit, provided by NRC Regional Offices. IE Head-guarters and the Utilities; and the third section is an a; pendix for                                '
miscellaneous information such as spent fuel storage capaoility, reacter years of experience and non power reactors in the United States, n                                'The percentap computations -Items 20 through 24 in Section 2, the i
verder capacity facters en page 1-7, and actual vs. notential energy                                  !
production on Page 1-2 are computed using actual data for the period                                i
_of consideration. The percentages listed in power generation on Page                                  l t-2.are computed as an arithmetic average. The factors for the life span of each uni t (the " Cumulative" . coluw'n) are reported by the
                                                                          . utility and are not entirelv re computed by NRC. Utility power production data is checked for consistency with previously submitted                                j L
                                                                        -statistics.
i
                                                                        . It is noped this status report s.reves informative and helpful to all
                                                                        . agencies and individuals interested in analyzing trends in the nuclear                              ;
                                                                        , industry which alght have safety implications, or in maintaining an                                  '
ansareness of the U.S.. energy situation as a whole.                                                >
                                            ~
: a.                                                                                                    l
[
                                                          -                                                                                                                    i z.::._                . -
f s ,
[
                                                                            '#. .'                                                                                              I Q - -                              -
mj r .,      ,c            ._ ;            -
f
 
TABLE      OF  CDHTENVS PAGE GLOSSARY                                                                  li INDEX TO LICENSED UNITS                                                  vii SECTION 1 - CURRENT DATA SUMMARIES MONTHLY HIGHLIGHTS OF COMMERCIAL NUCLEAR POWER UNITS                    t-2 Licensed Power Reactors                                                1-2 Power Generation                                                        1-2 Actual vs. Potential Energy Production                                  1-2 Outaco Data                                                            1-2 Reasons for Shutdown                                                    1-3 Derated Units                                                          1-3 Shutdowns Greater Than 72 Hours Each                                    1-3 UNIT AVAILABILITY, CAPACITY, AND FORCED OUTAGE RATE PLOT                1-4 AVERAGE DAILY PONER LEVEL FOR ALL COMMERCIAL OPERATING UNITS              1-5 AVERAGE CAPACITY FACTORS BY VENDOR Vendor Plot                                                            1-6 Statistics                                                              8-7 MEMORANDA - SPECIAL INFORMATION                                          3-8 ERRATA - CORRECTIONS TO PREVIOUSLY REPORTED DATA                        1-9 I
l    SECTION 2 - OPERATING POWER REACTORS 1
ARKANSAS 1 THROUGH ZION 2                                        2002 thrcmgh 2 382 For each reactor:
Operating Status l
Average Daily Power Level (MWe) Plot l            Unit Shutdowns / Reductions Summary Facility Data Inspection Status Licensee Reports SECTION 3 - APPENDIX STATUS OF SPENT FUEL STORAGE CAPABILITY                                  3-2 REACTOR-YEARS OF OPERATION                                              3-4 NON-POWER REACTORS IN THE U.S.                                            3-5 PAGE i
  - -  .            m  .      .        .
                                            .,  ..  . . . . .. . . . . . . .        u.      .. . .. .. u , ;. .
 
0L0$$ARY AVERAGE DAILY POWER LEVEL        The net electrical energy generated during the L                    (MWe)                day (measured from 0001 to 2400 hours inclusive) p                                          in megawatts hours, divided by 24 hours.
LICENSED THERMAL POWER          The maximum thermal power of the reactor authorized
!                    (MWt)                by the NRC, expressed in megawatts.
F-DATE OF COMMERCIAL OPERATION    Date unit was declared by utility owner to be
,                                        available for the regular production of electricity; I                                        usually related to satisfactory completion of l                                        qualification tests as specified in the purchase contract and to accounting policies and practices of utility.
DESIGM ELECTRICAL RATING        The nominal net electrical output of the unit CDER) (NET MWe)            specified by the utility and used for the purpose of plant design.
FORCED OUTAGE                  An outage required to be initiated no later than the weekend following discovery of an offnormal condition.
FORCED OUTAGE HOURS            The. clock hours during the report period that a unit is unavailable due to forced outages.
GROSS ELECTRICAL EMERGY        Electrical output of the unit during the 'eport r
GENERATED (MWH)                period as measured at the output terminals of the turbine generator, in megawatts hours.
GROSS NOUR$                    The clock hours from the beginning of a specified situation until its end. For outage durations, the clock hours during which the unit is not in power production.
GROSS THERMAL ENERGY GENERATED  The thermal energy produced by the unit during the (MWH)                report period as measured or computed by the licensee in megawatt hours.
NSURS GENERATOR ON-LINE        Also, " Unit Service Hours."  The total clock hours in the report period during which the unit operated with breakers closed to the station bus. These hours added to the total outage hours experienced by the unit during the report period, shall equal the hours in the report period.
N00R$ IN REPORTING PERIOD      For units in power ascension at the end of the period, the gross hours from the beginning of the period or the first electrical production, whichever comes last, to the end of the period.
                                        -For units in commercial operation at the end of the period, the gross hours from the beginning of the period or of commercial operation, whichever comes last, to the end of the period or decommissioning, whichever comes first.
PAGE il w      m m-    m .    ._
 
        -~ , _
                                                                                                        ~'
GL055ACY (centinusd)
NOUPS REACTOR CRITICAL      The total clock hours in the report period during which the reactor sustained a controlled chain reaction.
MAXIMUM DEPENDABLE CAPACITY  Dependable main-unit gross capacity, winter or summer, (GROSS) (MDC Gross) (Gross MWe) whichever is smaller. The dependable capacity varies because the unit efficiency varies during the year due to cooling water temperature variations. It is the gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions (usually summer).
MAXIMUM DEPENDABLE CAPACITY  Maximum Dependable Capacity (Gross) less the normal (MET) (MDC Met) (Met MWe)    station service loads.
MAMEPLATE RATING            The nameplate power designati;n of the generator in (Gross MWe)              megavoit amperes (MVA) times the nameplate power factor of the generator. NOTE: The nameplate rating of the ger.erator may not be indicative of the maximum or dependable capacity. since some other item of equipment of a lesser rating (e.g., turbine) may limit unit output.
MET ELECTRICAL EMERGY GENERATED Gross electrical output of the unit measured at the output terminals of the turbine generator during the reporting period, minus the normal  station service If this quantity is electrical energy utilization.
less than zero, a negative number should be recordet DUTA6E                      A situation in which no electrical production takes place.
DUTAGE DATE                  As reported on Appenie< D of Reg. Guide 1.16, the date of the start of the outage. If continued from a previous minth, report the same outage date but change " Method of Shutting Down Reactor" to "4 (continuations)" and add a note: " Continued from previous month."
OUTAGE DURATION              The Total clock hours of the outage measured from        ._
the beginning of the report period or the outage, whichever comes last, to the end of the report period n                              or the outage, whichever comes first.
OUTAGE MUMBER                A number-unique to the outage assigned by the licensee.
The same number is reported each month in which the outage is in progress. One format is "76-05" for the fifth outage to occur in 1976.
PERIOD MOURS                See " Hours in Reporting Period."
POWER REDUCTION              A reduction in the Average Daily Power Level of more than 20% from the previous day. All power reductions e                                are defined as outage of zero hours durations for the purpose of computing unit service and availability factors, and forced outage rate.
PAGE lii
 
g.
GL05SARY (continued)
REACTOR AVAILABLE HOURS                        The Total clock hours in the report period during which the reactor was critical or was capable of
                                                                - being made critical.        (Reactor Reserve Shutdown Hours.+ Hours Reactor Critical.)
            ~ -REACTOR.AWAILABILITY FACTOR                      - Reactor Available Hours w 100 Period Hours-REACTOR RESERVE SMUTDOWN                        The cessation of criticality in the reactor for administrative or other similar reasons when operation could have been continued.
                                                      ~
REACTOR RESERVE SNUTDOWN NOURS                ' The total clock hours in the report period that the reactor-is in reserve shutdown mode.
NOTE: No credit is given for NRC imposed shutdowns.
              -REACTOR SERVICE FACTOR                            Hours Reactor Critical w 100 Period Hours REPORT PERIOD                                    Usually, the preceding calender month. Can also be the preceding calendar year, (Year-to-Date), or the life span of a unit (cumulative),
iCESTRICTED POWER LEVEL                          Maximum not electrical generation to which the unit is restricted during the report period due to the state of equipment, external conditions, administrative reasons, or a direction by MRC.
ISCNEDULED 0UTAGE                                  Planned removal of a unit from service for refueling,
        ~
inspection, training, or maintenance. Those outages which do not fit the definition of " Forced Outage" perforce are " Scheduled Outages."
STARTUP AND POWER ASCENSION                    Period following initial criticality during which the TEST PHASE                                unit is tested at successively higher levels, culmin-ating with operation at full power for a sustained period and completion.of warranty runs. Following
* this phase, the utility generally considers the unit to be available for commercial operation.
                                                ' ~ '
WNITl '                                        ~ The set of equipment uniquely associated with the reactor, including turbine generators, and ancillary
: 2.          w                                              equipment, considered as a single electrical energy production facility.
fdNIT-AVAILABLE NOURS                              The total clock hours in the report period durinq
                    <. ,                        ,            which the unit operated on-line or was capable of such operation.        (Unit Reserve Shutdown Hours + Hours Generater On-Line.)
PAGE iv "C          WA ._. TN nu m- - -
 
GL05SARY (centinusd)
UNIT AVAILABILITY FACTOR                        Unit Availrble Hours x 100 Period Hours UNIT CAPACITY FACTORS
          - Using Licensed Thermal Power Gross Thermal Enerov Generated x 100 Period Hours x LIc. Thermal Power
          - Using Nameplate Rating                        Gross Electrical Enerov Generated x 100 Period Hours x Hameplate Rating
          - Using DER                                    Net Electrical Enerov Generated x 100 Period Hours x DER
          - Using MDC Gross                              Gross Electrical Enerov Generated x 100 Period Hours x MDC Gross h          - Using MDC Net                                Het Electrical Enerov Generated x 100 Period Hours x MDC Net NOTE: if MDC GROSS and/or MDC NET have not been determined, the DER is l
l substituted for this quantity for Unit Capacity Factor calculations.
UNIT FORCED OUTAGE RATE                                        Forced Outaae Hours Unit Service Hours + Forced Outage Hours l
UNIT RESERVE SHUTDOWN                            The removal of the unit from on-line operation for economic or other similar reasons when operation could have been continued.
UNIT RESERVE SHUTDOWN HOURS                      The total clock hours in the report period during which the unit was in reserve shutdown mode.
UNIT SERVICE FACTOR                              Unit Service Hours x 100 Period Hours UNIT SERVICE HOURS                              See " Hours Generator On-Line."
NOTE:
At the end of each statement in the Enforcement Summary for any given facility may be found numbers in parentheses. These numbers are related to the inspection, e.g.,8111 (the lith inspection of the plant in 1981); and the severity level, e.g.,4 (severity level IV). Violations are ranked by severity levels from I through V with level I being the most serious. The severity level is used in the determination of any resulting enforcement action. Gray Book lists severity level by Arabic numbers corresponding to the Roman numerals. Details on the various severity levels and enforcement actions can be found in Appendix C to 10 CFR Part 2 published in the Federal Register of March 9,1982 pages 9987 through 9995, and as corrected April 14,1982.
PAGE v
  ~ -
      +'pf.;.            . , .; . . j . ,3.  ; ,( . .,
y..-    .q.  .
: 7.      j      g, -
                                                                                                                    .. ,7
: f. ....
                                                                                                                                              , 7 . . ,
 
INDEX TO OPERATING POWER REACTORS PAGE                                  PAGE ARKAHSAS 1            2-002          HORTH ANNA 1          2-190 ARKANSAS 2            2-006          HORTH AHHA 2          2-196 BEAVER VALLEY 1      2-012          OCONZE 1              2-200 BIG ROCK POINT 1      2-016          OCONEE 2              2-204 2-208          l BROWHS FERRY 1        2-020          OCOHEE 3 BROWHS FERRY 2        2-026          OYSTER CREEK 1        2-212 BROWNS FERRY 3        2-032          PALISADES              2-2f8 BRUNSWICK 1          2-038          PEACH BOTTOM 2        2-222 BRUNSWICK 2          2-044          PEACH BOTTOM 3        2-228 CALVERT CLIFFS 1      2-050          PILGRIM 1              2-234 CALVERT CLIFFS 2      2-054          POINT BEACH 1          2-238 COOK 1                2-058          POINT BEACH 2          2-244 COOK 2                2-062          PRAIRIE ISLAND 1      2-250 COOPER STATION        2-666          PRAIRIE ISLAND 2      2-254 CRYSTAL RIVER 3      2-070          QUAD CITIES 1        2-258 DAVIS-BESSE 1        2-074          QUAD CITIES 2        2-262 2-080          RANCHO SECO 1        2-266 DRESDEN 2                                                  2-272 DRESDEN 3            2-086          ROBINSON 2 2-090          SALEM 1              2-278 DUAHE ARHOLD 2-094          SALEM 2              2-282 FARLEY 1                                                    2-286 FARLEY 2              2-100          SAN OHOFRE 1 2-104          SAN ONOFRE 2          2-290 FITZPATRICK                                                2-296 FORT CALHOUH 1        2-108          SAN OHOFRE 3 FORT ST VRAIN        2-112          SEQUOYAH 1            2-302 2-116          SEQUOYAH 2            2-308 GINHA                                                      2-314 HADDAM HECK          2-120          ST LUCIE 1 2-124          ST LUCIE 2            2-318 HATCH 1                                                    2-322 HATCH 2              2-130          SUMMER 1 2-136          SURRY 1              2-328 INDIAN POINT 2                                              2-334 INDIAN POINT 3        2-140          SURRY 2 2- 144          SUSQUEHANHA 1        2-340 KEWAUNEE                                                    2-344 LA CROSSE            2-f48          THREE MILE ISLAND 1 2-152          TROJAN                2-348 LASALLE 1                                                  2-354 MAINE YANKEE          2-158          TURKEY POINT 3 2-162          TURKEY POIHT 4        2-360 MCGUIRE 1                                                  2-366 MCGUIRE 2            2-168          VERM0HT YANKEE 1 2-174          YANKEE-ROWE 1        2-370 MILLSTONE 1 MILLSTCHE 2          2-178          ZIDH 1                2-374 MONTICELLO            2-182          ZIDH 2                2-378 HINE MILE POINT 1    2-186 PAGE vii
 
- , +        -    ,.      , ,, .
                                    - -  - 4  -
C4 N        LaJ M                        """
                        ;E:
E    4  E L&J      4 o                    >==
                                              "" E U              m
:s        E W              o        :s to j
 
    .. ........___          _ _ _ ---____      _______=== _ __--.......--_...--                            ____ _ _ _ __
                                                                                                                                                        =......... - .. -=.__                  -_=. ===.__--.....---. -
M0NTHLY                HIGHLIGHTS unuuuuuuuuuuuun                  78 IN COMMERCIAL DPERATIDH u LICENSED            u (a) 1---IN POWER ASCENSION. . .
                                                                            . . . . . . . . . .                                    61,028 CAPACITY MWe (Net) --Based upon maximum dependable n                                                                      . . . . . . . . .                                        1,070                                          capacity; design elec. rating POWER            u u REACTORS            u (b) 79 LICENSED TO OPERATE , . . . . . . . . . . .
62,098 TOTAL used if MDC not determined uuuuuuuuuuuuuum (c) 4 LICENSED FOR FUEL LOADING AND LOW POWER TESTING MDC NET                                                                                                      DER (a) SAN 0$N)FRE 3 . . 1087 (b) Excludes these plants                                                                                                                                    DATE              DER
: 1. DRESDEN 1...... 200                                          (c) GRAND GULF 1                      06/1 & 82        1290 Ilcensed for operation              2. HUMBOLDT BAY.... 65 which are shut down                  3. TMI 2.......... 906 LA SALLE 2 . . . . 12/1&83 indefinitely                                                                                                  WASH. NUC. 2 . . .            12/20/83 . . 1078 1103 SUSQUEHANNA 2 .              0W23/EM      .. 1052
___---_ ____ _-_- =______------==___ =_=---.--------=____ _                                                          -_.--....---------------.-----------....--
REPORT MONIH                                  PREVIOUS MONTH              YEAR-TO-DATE unuuuuuuuuuuuun 1 GROSS ELECTRICAL (MWHE)                          . . . . . . . . . .                28,071,040                                  28,561,699                  86,759,498 m        PDWER m GENERATION u u
: 2. NET ELECTRICAL (MWHE). . . . . . . . . . .                              26A15A02                                    27,259,288                  82.A64,433 unuuuuuuuuuuuun
: 3. AVG. UNIT SERVICE FACTOR (%). . . . . . . .                                          61.4                                  69.6                      67.1
: 4. AVG. UNIT AVAILABILITY FACTOR (%) . . . . .                                          61.4                                  69.6                      67.1
: 5. AVG. UNIT CAPACITY FACTOR (MDC) (%) . . . .                                          59.6                                65.8                      G5.0
: 6. AVG. UNIT CAPACITY FACTOR (DER) (%) . . . .                                          SB.2                                64.1                      63.3
: 7. FORCED OUTAGE RATE (%).            . . . . . . . . . .                                  8.0                                11.2                      10.3
____= =_. _      _-        .=-- =                                      = _ .
                                                                                                                                                                                % OF POTENTIAL PRODUCTION unununuunununum 1 ENERGY ACTUALLY PRODUCED DURING THIS REPORT PERIOD.                                                              . .    .26,815,802 NET                            59.1 u ACTUAL VS. u u POTENTIAL u              2. ENERGY MOT PRODUCED DUE T0. SCHEDULED OUTAGES (HET).                                                  . .      13,018,511 MWHe                        28.7 m      ENERGY        u u PRODUCTION u              3. ENERGY NOT PRODUCED DUE TO FORCED OUTAGES (NET)                                          . . . . .              3,812,682 MWHe ununpuuuuuuuuun                                                                                                                                                                        8.4
: 4. ENERGY NOT PRODUCED FOR OTHER REASONS (NET)                            . . . . . . .                            1,757,838 MWHe                          3.9 POTENTI AL ENERGY PRODUCTION IN THIS PERIOD BY UNITS IN COMMERCI AL OPERATION 45,404,832 MWHe                                                                                        100.0% TOTAL (Using Maximum Cependable Capacity Net)
: 5. ENERGY NOT PRODUCED DUE TO NRC-REQUIRED OUTAGES . . . . .                                                          597,038 MWHe
: 6. ENERGY MOT PRODUCED DUE TO HRC RESTRICTED POWER LEVELS.                                                      .      .......        MWHe                      1 UNIT (S) WITH NRC
_.. __            _.                                                                                                                                                          RESTRICTION uuuuuuuuuuuuuum                                                                                                                                      PERCENT OF          NWHE LOST u                                                                                              NUMBER                                HOURS          CLOCK TIME          PRODUCTION OUTAGE          u 1 FORCED OUTAGES DURING REPORT PERIOD . .                                        36                        4,270.7                  7.4          3,612,632 m        DATA          u unununununununu 2. SCHEDULED OUTAGES DURING REPORT PERIOD.. .. . ---35                                                            17,907.2 30.9 13,018,511 TOTAL          71                      22,177.9                38.2            16,831,192 MWHE LOST PRODUCTION : Down time X maximum dependable capacity not Report Period MAR 1944 PAGE 1-2
: u.  . - - - - ,
MONTHLY HIGHLIGHTS HUMBER HOURS LOST 26          3,059.9 unuuuuuuuuuuuum              A - Equipment Failure . . . . . . . . ......                                                                9          2,214.2 m REASONS                u    8 - Maintenance or Test . . . . . . . ......                                                              25          14,711.9 u        FOR            u    C - Refueling . . . . . . . . . . . . ......                                                                              766.9 D - Regulatory Restriction. . . . . . . .....                                                              2 m SHUTDOWNS u                                                                                                                                              0.0 unuuuuuuuuuuuum              E - Operator Training 8 License Examination .                                        . .                    0 1            286.7 F - Administrative. . . . . . . . . . . .....                                                              0                  0.0 0 - Operational Error . . . . . . . . . .....                                                              8          1,138.3 H - Other . . . . . . . . . . . . . . . .....
TOTAL                71        22,177.9
                                                                                                                                                                                                                      -- _ _ _ _-_=--------- -_ ____
POWER LIMIT (MWe Het)                                              TYPE wunnununamunnum                                                    MDC (MWe Het)                                                                      Self-imposed u    BROWHS FERRY 2                                      M65                650 u      DERATED 330                280                                                HRC Restriction u        UNITS          u    FORT ST VRAIN UNIT                                      REASON            UNIT                            REASON REASON              UNIT                          REASON muuuuuuuuuuuuun UNIT                                                              BEAVER VALLEY 1                        B              BIG ROCK POINT 1                                    A      BROWNS FERRY 3                            C B                                                                                                                                                                        C N SHUTDOWNS u ARKANSAS 1                                                          BRUNSWICK 2                            C              CALVERT CLIFFS 1                                    A      COOK 2 u      GREATER          u BRUNSWICK 1                                B C              FARLEY 1                                            C      FITZPATRICK                              B u THAN 72 HR$ u DAVIS-BESSE 1                                        A          DRESDEN 3                                                                                                  C      HATCH 1                                  A C          FORT ST VRAIN                            C              GINHA u        EACH            u FORT CALHOUM 1                                                                                  C              LASALLE 1                                          B,F    MCGUIRE 1                                C Muunnunuuununum HATCH 2                                              H          K EWAUNEE                                                                                                                                                    C C              OCONEE 3                                            C      OYSTER CREEK 1 l
MONTICELLO                                C          NINE MILE POINT 1                                                                                                  QUAD CITIES 1                            C l
C          PILGRIM 1                                C              POINT BEACH 1                                      C PALISADES                                                                                      C              SALEM 1                                            A      SALEM 2                                  A t
RANCHO SECO 1                            A          ROBINSON 2                                                                                                  C      d. _UCIE 1                              C l
B          $4N ONOFRE 2                            H              SEQUOYAH 1 SAN ONOFRE 1                                                                                  H              SURRY 2                                            A      SUSQUEHANNA 1                            A SUMMER 1                                  B          SURRY 1 D          TURKEY POINT 4                          C              ZION 2                                              C THREE MILE ISLAND 1 l                                                                                                                                                                                                                                                              --_-_ _-_
                                                                                                                                                                                      -    --_=.                  _=--_=-__=_ __ _= -
PAGE 1-3 Report Period MAR 1984
        ^ ^
                          ''.                                        9-                      , . > - ;;            .>'                                                        -
                                                                                                                                                                                                , ;. . . . . . ,            ;i . . .
                                                        ...[                  .m 3' . q. .' v.. . [ .".; . . _
s.z.,.                      '
7        _
_-.., . ..                        .. . . . . -                  r..:            , ..:,
                                                                                                                                                                                                                        . . }g . ,',. a c ; y . ,
vs        ., >                                                              . .                      .,
                                                                                                                              ,y ., g g , -                                                                                                                        y - %_ . !
          +            > .                    . ~
(
1                      .._                                .    ~~ ,                                                                                          '
                    ';                                                                                                                                                      (_l."..., . '
    ~
: .L:,-                                ,            .. ."
                                                                                                                                                                                            ,.                                        . ,.                ,        .3
 
Unit Availability, Capacity, Forced Outage Avg. Ilnit Pnentag      .F s1>-31-84 Per at l                                IN    -
Awetlebtitty r            N  -
N l
Cepeetty L r          no      7e V\
                              ~
                                      -\k ,f#\.r^w jO/\// /\[\ Av r~/O r          een      5  -
                                                          %/
a  -
Y Fereed Se an m  -
33  \_.g-        '' \ . - A -gg.j^ v\-                            N g. .
E N M .'SEP E N M SEP E M M SEP DEC M M SEP E M M SEP EN Dec 1979- br 1984 s
Report Period MAR 1984                                                                              PAGE 1-4
  ;. 4  _~n; ---        t
 
p%-m+ _    ; -
                                  . AVERAGE DAILY PDWER LEVEL FOR ALL COMMERCIALLY OPERATING UNITS R
E-SLM or 700 - 61,028 (100%)
                                                                                                                                    -8 This chart depi:ts the average daily power level for                              S-                                    -
the units in commercial operation during the month.
The straight line on the graph labelled " SUM OF MDC"                        [3 g_-
is plotted at the value shown by summing the separate                        z maximum dependable capacities c3 the commercially                            C
          -operating units (in Het MWe). The plot shown below                          US E" the'line is calculated by summing the separate average                                                                  -S daily power levels of the same units for each day of
          .the month.                                                                  t* g.
z The scale on the left vertical axis runs in t 000 MWe increments from 0 to 55.000 MWe (Het). The right                          '' g ,
vertical axis shows the percentage in 10% increments,                        c3 up to 100% of the " SUM OF MDC".                                            hJ
                                                                                                                                    -E O C
E  E_                                        O It should be recognized that the 100% line would be                          W    ,                                        20 Z
obtainable only if all of the commercially operating units operated at 100% capacity, 24 hours per day, for                      hl g.      ,
                                                                                                                                        $2 hJ the entire month..In other words, since any power                                                                          L)
          . generator must occasionally shut down to refuel and/or                      gl                                            Ej perform needed maintenance, and also since 100%                              g N"                                      _ g n_
capacity production is not always required by power                          M
          -demands, the 100% line is a theoretical goal and not o practical one.                                                            E ,
R- -
                                                                                          .3 C
F*      .
l3 2:
I
_g l
2-m-
l l
i I                                                                                            o      -.      .      ,      ,  ,  ,  o 0        5  10    15    2D 25 3D
'                                                                                                                  DAYS l
                  -                                                                                          MARCH 1984 PAGE t-5
          -Report' Period MAR 1984 L __ __    .
 
Vendor Average Capacity Factors A. OF 39-31-94 Pereens IN Generel' Deserie        98  -
                                  =                                                        -- ' N s                                      x Embeseh a                            /
                    ,, w              -
y/-              -      -        -
                                                                                                        %          N
                                        % '~
                                                      ,//                              ,'              -- - % N as  -
p      ,
Combuetten ,                                  N Engtaneeta5      m'/
Voeg @
                                  .m    -
                            *~
3    -
10 g                                f f
DEC                          JAN                              FEB NAR MAR 1984
      . MOTE *- This di splay of average capacity factors provides a general performance comparison of plants supplied by the four nuclear steam supply system vendors. One must be careful when drawing conclusions regarding the reasons for the performance levels indicated, since plant performance may be affected by unspecified factors such ass (1) various plant designs and models are included for each vendor; (2) turbine / generators and (3) different architect / engineers are also involved.
    ' Report.Perled FIAR 1984 PAGE t-6 c ,~~, -
 
Ud  .MQ4,y kd {J .                                                (( fut %C i
                                                                              ?
                                                                                                          };,s          ,[yy          _f + ., q    f ., p      ,3 ,;  ,    4 , ? ..,        .
                                                                                                                                                                                                    . ,}            j ,. ,, ; ; ;    , ,t j, AVERAGE                    CAPACITY                    FACT 0RS                  BY    VEND 0RS
____                ._=_ _                    = _ - - - _ _ _          ----...--------------------------                        _-_-_===----------------------------------------------------
i muuuuuuuuuuuuun CFMDC                                                                          CFMDC                                      CFMDC                                    CFMPC u 3ENERAL                              u      94.6 BROWNS FERRY 1                              63.1 BROWNS FERRY 2                            0.0 BROWNS FERRY 3                    72.2 BRUNSWICK 1 m ELECTRIC                              u      32.3 BRUNSWICK 2                                  86.5 COOPER STATION                          95.5 DRESDEN 2                            0.0 DRESDEN 3 unuuuuuuuuuuuun 98.5 DUANE ARNOLD                                                                30.8 FITZPATRICK                            53.5 HATCH I                              0.0 HATCH 2 20.6 LASALLE 1                                    97.9 MILLSTONE 1                              0.0 MONTICELLO                        41.9 NINE MILE POINT 1 C.0 OYSTER CREEK 1                              93.5 PEACH BOTTOM 2                      102.1 PEACH BOTTOM 3                        0.0 PILGRIM 1 13.9 QUAD CITIES 1                                97.0 QUAD CITIES 2                          26.1 SUSQUEHANNA 1                    100.8 VERMONT YANKEE 1
__                ___.__                  __=...----..---------- ..-------------------------------- ---- -----------------------------------------------
muuuuuuuuuuuuun CFMDC                                                                          CFMDC                                      CFMDC                                    CFMDC u BABCOCK 8                            m      45.9 ARKANSAS 1                                    94.1 CRYSTAL RIVER 3                        73.2 DAVIS-BESSE 1                      96.0 OCONEE 1 m          WILCOX                      u      98.9 OCONEE 2                                      19.0 DCONEE 3                              51.3 RANCHO SECO 1                        0.0 THREE MILE ISLAND 1 unuununuuununum
______.                  ____-_ __-__              __=____-------------____                    __=- -__ ==-------------------------------------- ----------------
unuuuuuuuuuuuum CFMDC                                                                          CFMDC                                      CFMDC                                    CFMDC u COMBUSTION u 92.4 ARKANSAS 2                                                                  85.3 CALVERT CLIFFS 1                      101.8 CALVERT CLIFFS 2                      4.2 FORT CALHOUN 1 m FNGINEERING u 84.3 MAINE YANKEE                                                                96.8 MILLSTONE 2                              0.0 PALISADES                        81.2 SAN ONOFRE 2 unuuuuuuuuuuuun                                  0.0 ST LUCIE 1                                103.8 ST LUCIE 2
\            _
___ ____ ____ _----------.....--------------------------------- __ =___---- -------------- --------------------------
l unuuuuuuuuuuuun CFMDC                                                                          CFMDC                                      CFMDC                                    CFM"C 0.0 FARLEY 1 u WESTINGHOUSEu 62.9 BEAVER VALLEY 1                                                              95.1 COOK 1                                30.0 COOK 2 unnuunununuuunu 97.8 FARLEY 2                                                                      4.7 GINNA                                99.9 HADDAM NECK                        97.2 INDIAN POIFT 2 91.7 INDIAN POINT 3                                44.4 KEWAUNEE                                O.0 MCGUIRE 1                        91.0 MCGUIRE 2 101.3 NORTH ANNA 1                                88.8 HORTH ANNA 2                              0.0 POINT BEACH 1                    98.6 POINT BEACH 2 103.6 PRAIRIE ISLAND 1                            100.4 PRAIRIE ISLAND 2                          0.0 ROBINSON 2                          0.0 SALEM 1 77.7 SALEM 2                                        0.0 SAN ONOFRE 1                            0.0 SEQUDYAH l                        99.6 SEQUOYAH 2 71.5 SUMMER 1                                    63.7 SURRY 1                                46.9 $URRY 2                            93.4 TROJAN 94.8 TURKEY POINT 3                                14.3 TURKEY POINT 4                        98.1 YANKEE-ROWE 1                      93.0 ZION 1 71.7 ZIDH 2
____    __.        _==-.-------. - - =___-------....---___ .------------------.--------__-_------------------.
Units excluded aret muuuuuuuuuuuuun                                  BIG ROCK POINT                                  Capacity factor in this page, denotud as CFMDC, is a function of the not maximum u OTHER INFO u                                  DRESDEN 1                                          dependable capacity. See the corresponding definition in the glossary. The nummunumruunuum                                  FORT ST VRAIN                                      vendor averages are computed by the formula:
HUMBOLDT BAY LACROSSE                                                                                          Net Electrical Energy Produced by Vendor                          x 100%
THREE MILE ISLAND 2                                                              Potential Electrical Production by Vendor in this Month GE BWRs            West PWRs                  Comb PWRs                  B8W PWRs                ALL PWRs NET ELECTRICAL                                                                                                      3,037,707                19,428,190 PRODUCTION.......... 7.318,276                          12,261,171                  4.129,312 19.226                26,671                        7,929                    6,760                  41,360 MDC NET................
CFMDC..................                            51.2                  61.8                        70.0                      60.4                      63.1 Report Period MAR 1984                                                                                                                                                                                              PAGE 1-7 m                                                                                                          ,
 
                                                            -  - -  -      .      -      -          . - =      .- -- . -  -. .  .-
MEM0RANDA THE FOLLOWING UNITS USE WEIGNIED AVERAGES TO CALCULATE CAPACITY FACTORS:
ITEM 22                      ITEM 22 8 23
                                        . BIG ROCK POINT 1              GINHA                                                          i
'~                                '' . CALVERT CLIFFS 1 82    '
HADDAM NECK (CONNECTICUT YANKEE)
FARLEY 1                      MAINE YANKEE FITZPATRICK                  MILLSTONE 2 FORT CALHOUN 1                OCONEE 1, 2, 83 INDIAN POINT 2n              YANKEE-ROWE 1
                                        .KEWAUNEE                                                                                      i 1
SYSTER CREEK t                                                                                i POINT SEACM i82-                                                                              l
                                      - THREE MILE ISLAND 1
                                      - TURKEY POINT 3 8 4 mCOMPUTED SINCE 7/1/74, THE DATE OF COMPLETION OF A 100 DAY - 100% POWER OPERATION TEST.
t TWE FOLLOWING UNITS USE THE DATE OF FIRST ELECTRICAL GENERATION INSTEAD OF COMMERCIAL OPERATION, FOR TNEIR CUMULATIVE DATA:
ITER $ 20 THROUGH 24          ITEN 24 ONLY
                                      ' COOK-1 82-                    BIG ROCK POINT 1 DEAVER VALLEY 1 SAN ONOFRE 1 44 l
Ampue rtded MAR 1984 -                                                                                          PAGE 1-8 NT-        _ -__y  -
 
9 1
E G
A P
0    7    3 3    2    3 5,    7,    6, 2    2    5
                    -    -    6 4
d    d    d e    e    e t    t      t A  T    a    a    a T  R    r    r    r A  O    e    e    e D  P    n    n    n E    e    e    e D  R  G    G    G E
T  T  l    l    l R  N    a    a    a O  E    c    c    c P  R  i    i    i E  R    r    r    r R  U    t    t    t C    c    c    c Y        e    e    e A L    E  l    l    l S  H              E T U    T  E    E O        t    t    t A  I  N V  I    e    e    e R E          N    N    N R  D R P    E N
E O    I T  A T
S  N N  O O  C    1 I            1      2 T  A    e C  T    r    e    e E  A R  D    f    i      n R        o    c    o O  E    n    u    t C  H    O    L      s T                l n      . l N    a    t    i I    S    S    M D
E T
C E
L F    2    2    3 E
R      .    .    .
E    o    o    o R  N    N    N A      .    .    .
S  8    8    8 E
G      .    .    .
0 8    l    l      l A    o    o    o H
C V    V    V E
S E                                      S H
T W
:                                      R X                                      A I                                      M M                                      d e
t s
u R
t s
o p
i
    <m
    .4                                                  R s
T l l,  l  lllt      !IL
 
F I
SECTION 2 l
I OPERATING POWER REACTORS
 
1 Docket:    59-313          0PERATING            STATUS                  nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm a            ARKAMSAS t                  u
: 2. Reporting Period: 83/98/84    Outage + On-line Mrs:      744.9          mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmuunen
: 3. Utility Contacts    K. t. FORT 04 (Set) 964-3155                          AVERACE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thereat Pewer (MWt):                      2568 RRKRNSRS 1
: 5. Nameplate Rating (Gross MWe):              1893 Y S.9 : 993 IS"'                                                8
: 6. Design Electrical Rating (Net MWe):                858 EIESIGN E2EC. RRTING - 850
: 7. Maximum Dependable Capacity (Gross MWe):            883                        g,    m,          m.        a gg m j
: 8. Maxieue Dependable Capacity (Not fede):            836
: 9. If Changes Occur Above Since Last Report Give Reasons:
WCNE
: 18. Powee Level To Which Restricted, If Any (Net MWe):
S t. Reasons for Restrictions, If Any                                  gg ,,,
womE MCNTH        YEAR    CtIMUL ATIVE                                                              g
: 12. Report Period Mrs              744.9      2.184.8      89.379.0                        ---    -    ---------------      - UM3 g
: 13. Mours Reacter critical        332.7      v.822.7      54.258.0 5.044.9                                                          .go
: 14. Ex Reserve Shtdwn Mrs              .8          .8 f
: 15. Mrs Cenerater On-Line          332.7      1.s22.7      53.972.9
: 16. Unit Reserve Shtdan Mrs            .9          .8        811.1    ,,,_                                                  ,,,
17'. Gross Thern Ener (MWM)      989.919    4.449.652 126.369.949
: 18. Gross Elec Ener (MWM)        298.29s    1.493.s45  41.631.410                                                            ,
: 19. Net EIoc Ener (MWM)          285.269    1.439.711  39.689.998 1
: 28. Unit Service Facter            51.4        33.5          (1.1                                                                            l
                                                                                                                              ~0
: 21. Unit Avail Facter              51.4        83.5          66.2
: 22. Unit Cap Facter (MDC Net)      45.9        78.4          58.3 0                    ,                  ,    ,    O
: 23. 5 nit Cap Facter (CER Met)      45.1        77.1          57.4              -
: 24. Unit Forced Outage Rate            .9          .9          16.1                            DRYS
: 25. Forced Outage Meurs                .8          .8    18.178.1
: 26. Shutdesans Sched Over Next 6 Months (Type.Date, Duration):                            MARCH 1984 mane
: 27. If Currently Shutdown Estimated Startup Dates          e5/ts/s4                                                                PAGE 2-882
 
p _ _.- _ .-                                                                          - - -      -
                                                                                                          -7 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984~                UNIT      SHUTD0WHS / REDUCTI'ON$                            N          ARKANSAS 1              N NMMMMMMNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Eta __  Date    Isis HiHEi neason Method LER Number System comoonent                  cause a corrective Action to Prevent Recurrence S4-Ol''83/16/84'-    S 361.3 .  .B. 3'                CC    HTEXCH        PLANNED SHUTDOWN FOR MID-CYCLE STEAM GENERATOR INSPECTIrM.
A NORMAL POWER REDUCTIDH WAS IN PROGRESS WHEN A TRIP FR.M 17% POWER OCCURRED DUE TO A LOSS OF BOTH MAIN FEEDWATER PUMPS.
J
?
          -Emuummuuuuu      ARKANSAS 1 SHUTDOWN ON MARCH 16TH FOR STEAM GENERATOR INSPECTIDH
          - O
 
==SUMMARY==
u      AND MAINTENANCE.
          .tummmMNummu -
        - Twee        Reason                          Method          System a Component F-Forced.'A-Equip Failure' F-Admin          1-Manual        Exhibit F 8 H
        . S-Sched    S-Maint or Test G-Oper Error 2-Manual Scram Instructions for
                      ~C-Refueling      ' H-Other      3-Auto Scram    Preparation of D-Regulatory Restriction        4-Continued    Data Ertry Sheet
                      ..E-Operator Training            5-Reduced Load Licensee Event Report a License Examination        9-Other        (LER) File (HUREG-0161)
PAGE 2-003
 
rwunummunuwauwwwumunwunuunnuwsumunum O              ARKANSAS 1              N.
cmuunummuummununuwwumunummunuuuuuuMM                  FACILITY            DATA                                                      Report Period MAR 1984 E&gILITY DESCRIPTION                                              UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                        UTILITY STATE.................... ARKANSAS                                LICENSEE................. ARKANSAS POWER 8 LIGHT COUNTY...................P0PE                                    CORPORATE ADDRESS........ NINTH 8 LOUISIANA STREETS LITTLE ROCK, ARKANSAS 72203 DIST AND DIRECTIDH FROM NEAREST POPULATION CTR.. 6 MI WNW.0F                          CONTRACTOR RUSSELLVILLE, AR                        ARCHIT ECT/ ENGIPEER. . . . . . .B ECHT EL TYPE OF REACTOR............PWR                                      HUC STEAM SYS SUPPLIER... BABCOCK & WILCOX DATE INITIAL CRITICALITY... AUGUST 6,    1974                        CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER'.'.. AUGUST 17, 1974                        TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 19, 1974                REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                            IE REGIDH RESPONSIBLE......IV CONDENSER COOLING WATER....DARDAMELLE RESERVOIR                IE RESIDENT INSPECTOR......B. JOHNSON ELECTRIC RELIABILITY                                            LICENSING PROJ MANAGER.....G. VISSING CDUNCIL................. 50UTHWEST POWEK P0OL                      DOCKET NUMBER........... 50-313 LICENSE 8 DATE ISSUANCE....DPR-St. MAY 21, 1974 PUBLIC DOCUMENT ROOM....... ARKANSAS TECH UNIVERSITY RUSSELLVILLE, ARKANSAS 72801 IN$PECTION                $TATU3 INSPECTION
 
==SUMMARY==
 
            ' INSPECTION CONDUCTED JANUARY 1-31, 1984 (84-01):      ROU;INE, ANNOUNCED INSPECTION OF MAINTENANCE, SURVEILLANCE, OPERATIONAL SAFETY VERIFICATION, FOLLOWUP DN PREVIOUSLY IDENTIFIED ITEMS, AND LICENSEE EVENT REPORT FOLLOWUP WITHIN THE AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
            . INSPECTION CONDUCTED JANUARY 25, 1984 (84-03): SPECIAL ANNOUNCED INSPECTION TO DETERMINE THE STATUS OF ACTIONS TAKEN AS THE RESULTS OF A DISCREPAMCY-BETWEEN THE PUBLIC INFORMATION BROCHURE AND THE JANUARY 1984 TELEPHONE DIRECTORY FOR THE 10-MILE EMERGENCY PLANNING ZONE. WITHIN THE AREAS INSPECTED, NO VIOLATIONS OR DEVI ATIONS WERE IDENTIFIED.
INSPECTION CONDUCTED JANUARY 24-26, 1984 (84-04):      ANNOUNCED, REACTIVE INSPECTION OF THE SECURITY ORGANIZATION PERSONNEL AND
          ' INSTRUCTION METHODS AS A RESULT OF AN ALLEGED COMPROMISE OF SAFEGUARDS.INFORMATION. WITHIN THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION CONDUCTED JANUARY 26, 1984 (84-05): ROUTINE. ANNOUNCED INSPECTION TO DETERMINE THE STATUS OF THE REX-84 EXERCISE
          .SCENERIO DEVELOPMENT. WITNIN THE AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION CONDUCTED FEBRUARY 21-24, 1984 (84-06): ROUTINE, UNANNOUNCED INSPECTION OF THE ARKANSAS NUCLEAR ONE MAINTENANCE
      '    ' PROGRAM. WITHIM THE AREA INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
l PAGE 2-004 i
W*      "        '
 
y-    _.
MNNNNMNNNNNNNNNNNNMMNNNNNNNNNNNNNNNN Report Period MAR 1984                  IN5PECTION          STATU$ - (CONTINUED)            N                    ARKANSAS 1          N WMNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN ENFORC' MENT SurftARY NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NOME FACILITY ITEMS (PLANS AND PROCEDURES)*
MONE MANAGERIAL ITEMS:
NOME PLANT STATUS:
MAINTENANCE DUTAGE LAST IE SITE INSPECTION DATE: FEBRUARY 21-24, 1983 INSPECTION REPORT NO        50-313/84-06 REPORTS      FR0M        LICENSEE
      ==================================================================================================================================
NUMBER    'DATE OF      DATE OF        SUBJECT EVENT        REPORT'
        -    _      _      --                    _                    -_                        _ _ _ _ . = - - -                      _ _-
NOME
      ==========================================================================================-==================================i===-
PAGE 2-005
.wa
______I
 
1 Decket    50-368            0PERATING                    STATUS                                unumMuuuuuuuuuuuMNuuNuMuununummuuuuN N                  ARKANSAS 2                          M
: 2. Reporting Period      03/01/84    Outage + On-line Hrs: JJdLJL                                  NNNNNMMNNNNMMMNNMMMMMMNNMMMMMNNMMMMM
      ' 3. Utility
 
==Contact:==
LINDY BRAMLETT (501) 964-3145                                                  AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                  2815 RRKRNSRS 2
: 5. Nameplate Rating (Gross MWe):
943
: 6. Design Electrical Rating (Met MWe):                              912                    tem 3
: 7. Maximum Dependable Capacity (Gross MWe):                        897                                                              [          gg                        ,
: 8. Maximum Dependable Capacity (Het MWe):                          858
: 9. If Changes Occur Above Since Last Report Give Reasons:
140NE
: 10. Power Level To Which Restricted, If Any (Net MWe):
: 11. Reasons for Restrictions, If Anyt tom 3-88C 08#8 DE """=n  tamm orTIwu. castT! cess NONE N--
MONTH        YEAR                CUMULATIVE                    ~~~~~~~~''~~~~~~~~~~~~~~~~~~~~~~~~~~~
: 12. Report Period Mrs                744_,0  2. 184.0                35.208.0                                                                              ~100 hf
      '13. Hours Reactor Critical            687.6    1.511.2                23,183.9
                                                                                                                                                                      -80
: 14. Rx Reserve'Shtdwn Mrs                .0                .t          1,430.1 ll
: 15. Hrs Generator.On-Line            683.2    1,372.0                22.322.3 16.' Unit Reserve Shtdun Hrs              .0                .0              75.0                                                                            - 80 503-17.l Gross Therm Ener (MWH)      1.834.894  3.013,830                55.563,370
: 18. Gross Elec Ener-(MWH).          617.280    998,740                18.015.691
                                                                                                                                                                      - e3
: 19. Met Elec Ener (MWH)            589.589    947.045                17.153.385
: 20. Unit Service Factor                91.8                62.8              63.4
                                                                                                                                                                      - ao
: 21. Unit Avall Factor                  91.8                62.8              63.6
                                                                                  . 56.6
                    ~
: 22. Unit Cap Factor (MDC Het)          92.4                50.5
: 23. Unit Cap Factor.(DER Met)          86.9                47.5              53.4                0                                                              0 g-      .
                                                                                                                                      .g      g        g-24.. Unit Forced Outage Rate            8.2                4.2              19 1                                          DAYS
: 25. Forced Outage Hours                60.8                60.8    _
5,439.3
      . 26. Shutdowns Sched Over Next 6 Months (Type,Date. Duration):                                                          MARCH 1984 NONE L27. If Currently Shutdown Estimated Startup Dates                        N/A                                                                                        PAGE 2-006 i-i
  #~  ~"
 
NNNMMMMMNNNNMMMMMMMMMMNNNNNNNNNMPMMM Rooort Period MAR 1984                UNIT      SHUTD0WHS / REDUCTIONS                        N            ARKANSAS 2                                              N MNNNNNNMMMMMMMMMMNNMMMMNNMMMMMMMNNNM Ho.      Date    lEin Hours Egison Method LER Number hy;igs Comnonent            Cause & Corrective Action to Prevent Recurrence 01  03/10/84    F  60.5    A'    3                                  SHUTDOWN TO REPAIR AH RCS RTD.
      "84-02  03/12/84    F    0.3'    A    9                                  TUR3INE/ GENERATOR LOAD LIMITING INDICATION FAILURE.
+
muumMuuuuMM      ARKANSAS 2 OPERATED WITH 2 OUTAGES FOR EQUIPMENT FAILURE DURING N
 
==SUMMARY==
N      MARCH.
MmMmMMNNNwM
      'Twne      Reason                          Method          System 8 Comoonent
      'F-Forced A-Equip Failure F-Admin          1-Manual        EFhibit F & H 5-Sched -B-Maint or Test G-Oper Error    2-Manual Scram  Instructions for C-Refueling-        H-Other    3-Auto Scram    Preparation of D-ReevIatory Restriction        4-Continued    Data Entry Sheet E-Operator Training            S-Reduced Load Licensee Event Report
                    'A License Examination        9-Other        (LER) File (HUREG-0161)
PAGE 2-007
 
NNNNMMNNNNNNNMMMMMMMWNNNNNNNMMMNNNNN N              ARKANSAS 2'              W unununuunuunMuuwmuunununumMMNNNMMNNM                FACILITf            DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                            UTILITY 8 CONTRACTOR INFORMATION LOCATION ~                                                  UTILITY STATE.................... ARKANSAS                              LICENSEE................. ARKANSAS POWER & LIGHT
                  -COUNTY................... POPE                                  CORPORATE ADDRESS........ NINTH 8 LOUISIANA STREETS LITTLE ROCK. ARKANSAS 72203 DIST AND DIRECTIDM FROM NEAREST POPULATION CTR.. 6 MI WNW OF                      CONTRACTOR RUSSELLVILLE, AR                    ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                    HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE IMITIAL' CRITICALITY... DECEMBER 5,  1978                    CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... DECEMBER 26, 1978                    TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 26, 1980                REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER                    IE REGION RESPONSIBLE......IV CONDENSER COOLING WATER. . ..DARDANELLE RESERVOIR            IE RESIDENT INSPECTOR......L. CALLAN ELECTRIC RELIABILITY                                        LICENSING PROJ MANAGER.....R. LEE DOCKET NUMBER........... 50-368 COUNCIL................. 50UTHWEST POWER POOL
                                                                                                                                                    ~
                                                                            ~ LICENSE 8 DATE ISSUANCE. . . .NPF-6, SEPTEMBER      1, 1978 PUBLIC DOCUMENT ROOM....... ARKANSAS TECH UNIVERSITY RUSSELLVILLE, ARKANSAS 72801 IN5PECTION  ~
                                                                                      $TATUS INSPECTION
 
==SUMMARY==
 
INSPECTION CONDUCTED JANUARY l'- 31, 1984 (84-01):    ROUTINE, ANNDUNCED INSPECTION OF MAINTENANCE, SURVEILLANCE, OPERATIONAL SAFETY-
              ' VERIFICATION, FOLLOWUP DN PREVIOUSLY IDENTIFIED ITEMS, LICENSEE EVENT REPORT FOLLOWUP, AND PLANT FOLLOWUP, AND PLANT STARTUP FROM REFUELING. WITHIN THE AREAS INSPECTED, ONE VIOLATION WAS IDENTIFIED (FAILURE TO FOLLOW PROCECURAL REQUIREMENTS FOR COMPLETING JOB ORDER FORMS.).
INSPECTION CONDUCTED JANUARY 25, 1984-(84-03)    SPECIAL ANNOUNCED INSPECTION TO DETERMINE THE STATUS OF ACTIONS TAKEN AS THE RESULTS OF A DISCREPANCY BETWEEN THE PUBLIC INFORMATION BROCHURE AND THE JANUARY 1984 TELEPHONE DIRECTORY FOR THE 10-MILE EMERGENCY PLANNING ZONE. . WITHIM THE AREAS. INSPECTED, MS VIOL ATIONS OR DEVI ATIONS WERE IDENTIFIED.
INSPECTION CONDUCTED JANUARY 24-26, 1984 (84-04): ANNOUI.CED, REACTIVE INSPECTION OF THE SECURITY ORGANIZATION PERSONNEL AND
              . INSTRUCTION METHODS AS A RESULT OF AN ALLEGED COMPROMISE OF SAFEGUARDS INFORMATION. WITHIN THE AREAS INSPECTED, MO VIOLATIONS OR 1 DEVIATIONS WERE IDENTIFIED.
INSPECTION CONDUCTED JANUARY 26, 1984'(84-05)* ROUTINE, AMNGUNCED INSPECTION TO DETERMINE THE STATUS OF THE REX-84 EXERCISE SCENERIO DEVF.LOPMENT. WITHIN THE AREAS INSPECTED, NU VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION CONDUCTED FEBRUARY 21-24,'1984 (89-06)    ROUTINE, UNANNOUNCED INSPECTION OF THE ARKANSAS NUCLEAR ONE MAINTENANCE r~
PROGRAM. WITHIN THE AREA INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
PAGE 2-008 f.'
    -  L-                                                                                                                                            __    ___
 
Report Period MAR 1984                                                      NNNNMMMMMMMMNNNNNMMMMMMMMMMMMMMMMMMM IN5PECTION      5iATUS  -
(CONTINUED) M          ARKANSAS 2                                          m NNNMMMMMMMMMNNMMNNNMMMMMMMMMMMMMMNNN ENFORCEMENT
 
==SUMMARY==
 
NOME OTHER ITEMS SYS1 EMS AND COMPONENT PROBLEM $s NONE FACILITY ITEMS (PLANS AND PROCEDURES)*
NOME MANAGERIAL ITEMS NOME PLANT STATUS -
POWER OPERATION LAST IE SITE INSPECTION DATE: FEBRUARY'21-24, 1984 INSPECTION REPORT N08- 50-368/84-06 PAGE 2-009 s
                                        *=
 
                                                    .                .      .                    . ..            = _ _
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                                        REPQRTS                FR3M  LICENSEE                      N          ARKANSAS 2              N MNNNNNNNMMMMMNNNNNNNNNNNNMMNNNMMMNNN
            ' ==================================================================================================================================
NUM8ER              DATE OF    "DATE OF        SU8 JECT EVENT        REPORT                                                                          _ __=_    -__= =    ----- _    __=-
_-                .._    _ _ _ =      --------..........-_____- ...--- .......-_- _      _  -__-_    _ _ _ __==
83-8501              11/9/83      3/7/84        ERRATIC PERFORMANCE OF DIESEL GENERATOR NO.      2 99X-0
_84'-001                1/28/84      2/21/84        REACTOR TRIP DURING LUN-POWER PHYSICS TESTING DUE TO PROCEDURE DEFICIENCY.
84-002              1/29/84      2/21/84        WRONC TYPE II ADDRESSABLE CONSTANTS LOADED INTO CORE PROTECTION CALCULATOR DURING PHYSICS i                                                              TESTING 84-003              1/30/84      3/5/84        ACTUATION OF THE MAIN STEAM ISOLATION SYSTEM DURING LOW-POWER OPERATION.
84-804              1/31/84      3/5/84        REACTCR TRIP DN LOW STEAM GENERATOR LEVEL DURING LOW POWER OPERATION.
84-095              2/10/84-    3/11/84        IMPROPER FUNCTIDH OF THE CHANNEL A EXCORE DETECTOR SUBCHANNELS
                    ,84-006.              2/21/84      3/20/84        CORE PROTECTION CALCULATOR CHANNEL D BYPASSED PRIOR TO COMPLETING ADDRESSABLE CONSTANT UPDATE ON CHANNEL C.
            ' ============================================================ =====================================================================
r 9
L.
PAGE 2-010
 
b THIS PAGE INTENTIONALLY LEFT BLANK e
I PAGE 2-011 b
5 kl_
        ..- _ _ _ = _ -
: 1. Docket 8        50-334          0PERATING                STATU5                                  NNNNNNNMMMMMMMMMMNNNNNNNNNNMMNNNNNNN N            BEAVER VALLEY 1                    M
              .2.          Reporting Periodt 03/01/84      . Outage + On-line Hrs:            744.0                  NNNNNNNNNNNNNMMMMMNNNNMMNNNNNANNNNNN
: 3. Utility
 
==Contact:==
J. L. HOLTZ (412) 643-1369                                              AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                      ,,
2660
              .5.          Nameplate Rating (Gro.ss MWe):              in26 X 0.9 : 923                                      BERVER VRLLEY 1 6.. Design Electrical Rating (Het MWe):
8"5                  1soo
: 7. Maximum Dependable Capacity (Gross MWe):                            860                                      DESIGN ELEC. RATING -      835
                                                                                                                      ......lWIX.      DEPDD. OPP. -        810 (100%)
: 8. Maximum' Dependable Capacity (Het MWe):                            810__
: 9. If Changes Occur Above $1nce Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted, If Any'(Not MWe):
: 11. Reasons for Restrictions, If Anyt 1000-                                                                          i NONE
* MONTH        YCAR            CUMl'L ATIVE                      imo ens ut exonsso taesst arrassu ome:T1 oms
: 12. Report Period Hrs                        744.0    2.184.0          _ 69,408.0
                                                                                                                  ..                                                      -100 32.869.0                                    ...............--w  IV V
            ^13. Hours Reactor Critical 571.7 _M1LJ.
: 14. Rx Reserve Shtdun Mrs                      .0            .o          4 ,4 pt 2 . 7  W F.                                                              -so
: 15. Hrs Generator On-Line                  ' 46M      1.837.5          _$1.616.4
: 16. Unit Reserve Shtdun Mrs                    .e            .0      ._            .0
: 17. Gross Therm Ener (MWH)              1.263.131  b},Kj g 72.216.462
: 18. Gross Elec Ener (PedH)                409.000 M 01 3 22.929.440
                                                                                                                                                                          -40
:19. Het Elec Ener (fteH)                  378.81t. _f.420.411 E 309.213
: 20. Unit Service Factor                        65.?        P,4 .1                    47.7
: 21. Unit Avall' Factor                        65.2        s4.1                      47.7                                                                  -so
: 22. Unit Cap Factor -(MDC Net)                62.9        80.3        _
41.4 23.~ Unit Cap Factor (DER Net)                '61.(        77.9                      40.1        0            ,.                ,,    .,      .,.        o 0          5      to      15      30      25  .,30 24.: Unit Forced. Outage Rate                    .0          4.6                    29.8                                      DMS
: 25. Forced Outage Hours                          .0        872            17.765.0
: 26. Shutdowns Sched Over Hext 6 Months (Type,Datu, Duration):                                                            MARCH 1984 NOME
          '27. If Currently Shutdown Estimated Startup Dates                            N/A                                                                                    PAGE 2-012 t
,          ~
 
7%g-. ,.
NNNNNNNNNMMNNNNNNNNNNNNNNNNNNNNNNNNN Report _ Period MAR 1984                  UNIT      SHUTD0WH$ / REDUCTIONS                        N        BEAVER VALLEY 1                          N NNNNNNNMMNNNNNNNNNNMMMMNNMMNNNNNNNNN No.      Data    lijj Nours Reason Method LEP Numgan_ Syntes Epmoonent            Cause & Corrective Action to Prevent Recurrence 5-      03/10/84      S 258.6    8      3  54-15          CB    PIP EXX  THE STATION WAS TAKEN OFF-LINE AT 0000 HOURS ON THE 10TH TO REPAIR VARIOUS LEAKS ON THE LC REACTOR COOLANT LOOP AND PERFORM OTHER PLANT MAINTENANCE. AN ATTEMPT WAS MADE TO REPAIR THE LEAKS WHILE KEEPING THE REACTOR CRITICAL.
IT SOON BECAME APPARENT, HOWEVER, THAT THE REACTOR COOLANT SYSTEM WOULD HAVE TO BE COOLED DOWN IN ORDER TO EFFECT THE HECESSARY REPAIRS.
  ..sc.-
NNNNNNNNNNN      . BEAVER VALLEY 1 OPERATED WITH 1 OUTAGE FOR MAINTENANCE DURING N
 
==SUMMARY==
N        MARCH.
NNNNwMmMNNN Twna        Raaman                          Method          Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin              1-Manual        Exhibit F 4 H S-Sched      BHMairt or Test G-Oper Error 2-Manual Scram Instructions for
                      - C-Refueling        N-Other      3-Auto Scram    Preparation of D-Regulatory Restriction        4-Continued      Data Entry Sheet E-Operator Training              5-Reduced Load Licensee Event Report 4 License Examination        9-Other          (LER) File (HUREG-Of61) l-                                                                                                                            PAGE 2-013
_    m
 
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN N    .
BEAVER VALLEY 1            M NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN                        FACILITY              DATA                                                        Report Period MAR 1984 FACILITY DESCRIPTION                                                        UTILITY 8 CONTRACTOR INFORMATION LOCATION'                                                                  UTILITY STATE....................PEMMSYLVANIA                                      LICENSEE.................DUQUESHE LIGHT COUNTY................... BEAVER                                            CURPORATE ADDRESS........ONE OXFORD CENTRE, 301 GRANT STREET PITTSBURGH, PENHSYLVANIA 15279 DIST ANO DIRECTION FROM NEAREST POPULATION CTR.. 5 MI E OF                                      CONTRACTOR E. LIVERPOOL, ON                                ARCHITECT /ENGIlEER....... STONE 8 WtbSTER
    -TYPE OF REACTOR............PWR                                                HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY...MAY 18, 1976                                      CONSTRUCTOR.............. STONE 8 WEBSTER DATE ELEC ENER 1ST GENER... JUNE 14, 1976                                    TURBINE SUPPLIER. . . . . . . . .WESTINGNOUSE DATE COMMERCIAL OPERATE... 0CTOBER 1,    1976                            BEGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TPWER                                  IE REGION RESPONSIBLE......I CONDENSER COOLING WATER....ONIO RIVER                                      IE RESIDENT INSPECTOR......W. TROSKOSKI ELECTRIC RELIABILITY                                                      LICENSING PROJ MANAGER.....P. TAM COUNCIL.................. EAST CENTRAL AREA                                DOCKET NUMBER........... 50-334 RELIABILITY COGRDINATION AGREEMENT                                  LICENSE 8 DATE ISSUANCE....DPR-66, JULY 2,                    1976 PUBLIC DOCUMENT R00M.......B.F. JONES MEMORIAL LIBRARY 633 FRANKLIN AVENUE ALIQUIPPA, PA 15001 IN5?ECTION                            STATUS INSPECTION
 
==SUMMARY==
 
NO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
CONTRARY TO TECHNICAL SPECIFICATION 4.0.5 AND DST 1.1.10, COLD SHUTDOWN VALVE EXERCISE TEST, ESTABLISHED TO CONDUCT ASME SECTION XI VALVE TESTING, DID NOT INCLUDE 4 FULL STROKE EXERCISE OF TV-CC-107 A, B, C WHEN PERFORMED DURING THE THIRD REFUELING OUTAGE (JUNE THRU SEPTEMBER 1983). CONTWARY TO ANSI N18.7, ADMINISTRATIVE CONTROLS FOR NUCLEAR POWER PLANTS, AS ENDORSED BY APPENDIX A, QUALITY ASSURANCE, OF THE BVPS UPDATED FINAL SAFETY ANALYSIS REPORT, MAINTENANCE SURVEILLANCE PROCEDURES (MSP 36.41 THRU 36.56)
USED FOR PERFORMING TECHNICAL SPECIFICATION 3.3.2.1 CHANNEL FUNCTIONAL TESTING AND CALIBRATIDH OF ESF ACTUATION INSTRUMENTATION-LOSS OF POWER, DID NOT INCLUDE LIMITING CONDITIONS Ok PREREQUISITES HECESSARY TO SIMULATE ABNORMAL CONDITIONS SPECIFIED BY THE ACTION STATEMENT RELATED TO THE SPECIFIC RELAY BEING TESTED.
(8329 4)
    .TWO VIOLATIONS CLASSIFIED IN AGGREGATE AS A LEVEL III PROBLEM: (1) CONTRARY TO T.S. TABLE 1.1 DEFINITION OF MODE 6 AS A CONDITION WHERE THE AVERAGE REACTOR COOLANT TEMPERATURE 15 LESS THAN 140 F. THE COOLANT TEMP REACHED 180 F DUE TO AN INDPERABLE RHR SYSTEM; AND (2) CONTRARY TO A SERIES OF ADMIN CONTROL 9, TWO OF THR?E RIVER WATER PUMPS WERE IN THE PULL-TO-LOCK POSITION WITH THE KEACTOR PAGE 2-014
 
E
  <J4                                                                                                                                wmumuwunwunwwwwnumunwunnummunuwumwww Report Period MAR'1984                      'INSPECTICN                            5TATU$ - (CONTINUED)                    M        BEAVER VALLEY 1                                N MMMMMNNNNNMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT
 
==SUMMARY==
 
IN MODE 3.
(Et01 31 CONTRARY TO OPERAYING PROCEDURES. RIVER WATER PUMP 1C WA; ELECTRICALLY ALIGNED TO THE 1AE EMERGENCY BUS WITHOUT CYCLING THE LBREAKER CHARGING SPRINGS. CONSEQUENTLY, THE EMERGENCY PUhr WAS INOPERABLE FOR ABOUT 50 HOURS BEFORE DISCOVERY.
(8481 4)
OTHER ITEMS
            -SYSTEMS AND COMPONENTS:
NO INPUT PROVIDED.
            -FACILITY ITEMS (PLANS AND PROCEDURES):
NO INPUT PROVIDED.
MANAGERIAL ITEMS NO INPUT PROVIDED.
PLANT STATUS:
NOIpPUTPROVIDED.
            'LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED.
INSPECTION REPORT N08 MO INPUT PROVIDED.
2EPQRT$                FR0M    LICENSEE
              ============================================ ========== ==========================================================================
                'MUMBER            DATE OF  DATE OF    SUBJECT EVENT-    REPORT
______      _______        _      ____    ____._______.____. .____ ___--                    ________    _______ =__---        ___ - __--- _
NO INPUT PROVIDED.
            ..===========================================2.m====================================================================================
PAGE 2-015
 
  , ;!                %y        . *                .*            s . P.s ; g        s..        : : i.      "a                          - -                    -
                                                                                                                                              ' ) j '_. ',i ,,
  - . lj p \ ' ' }.',  s
                            , y .. . ' ' --' - "I ' , ,- % : . ' g i .g6 : %#1 g y f ' '- "9[*4 [.{4..3i.!
s .                                    ...
                                                                                                                                                                          '0;    ';          . Y',( A (./ -
                                                                                                                                                                                                .                  c, Y '_ ', '.l, f, E '' . . ,, , , .: . '
: 1. Docket          50-155                0PERATIN0                      5TATUS                                                    WNMMMMMMMNNNNNNNMMMMMNNMMMMMNNNNNNNN N                BIG ROCK POINT 1                                M
: 2. Reporting Period                03/01/84        Outage + Cn-line Hrst              ''ii.d NNNMMMMNNNMMMMNNMMNNMMMNNNKNNNNNNNNM
: 3. Utility Contacts SUE AMSTUTZ (616) 3 47-6537                                        .
AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Lic.ns.d Thermat rower (nWt):                                            roe --
BIG ROCK POINT 1
: 5. Nameplate Rating (Gross MWe)8                                  70.6 X 0.85 : 61 I"
: 6. Design Electrical Rating (Het MWe):                                          7?
                                                                                                                                                                -DESIGN ELEC. RATING =                72
: 7. Maximum Dependable Capacity (Gross t''fe):                                  69              -
                                                                                                                                                    ......MnX.          DEPDO. CAP -                  64 (100%)
: 8. Maximum Dependable Capacity (Het MWela                                      64
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME                                                                                  _,,,
: 10. Power Level To Which Restricted, If Any (Nat NWe):
: 11. Reasons'for Restrictions, If Anyt                                                                                    1000-NOME MONTH          YE7.R      CUMULATIVE
                                                                                                                                  ''#                                                                                              M
: 12. Report Period Hrs                                744.0      2 ,1J M 184.171.0                                                                                                                          M
: 13. Hours Reactor Critical                            656.1      ?.335.2        129.545.6                        m
: 14. Rx Reserve Shtdun Hrs                                  .0            .0                    .C                  k
: 15. Hrs Generator On-Line                            617.9        1.194 1 _hU
: 16. Unit Reserve Shtdwn Hrs                                .0            .3  ,,,
                                                                                                              .e                        g.
: 17. Gross Therm Ener (MWH)                        111.579        339.155 23.825,047
: 18. Gross Elec Ener (PGdH)                          35.959        110.637        7,526.246
: 19. Net Elec Ener (MWH)                            33,818        1e4.330        7.1_114J.42
: 20. Unit Service Factor                                83.1            82.2                69.0
: 21. Unit Avail Factor                                  83.1            82.2 ,,. _6,L,,g, 57.6N                                                                                                            100 74M
: 22. Unit Cap Factor (MDC Net)                          71.0 0                                              ~'
i
: 23. Unit Cap Factor (DER Net)                          63.1            66.3                53.7                                  g              5    'ga-        I's '    2O                    ' 3'o 16.9          17.8                17.0                                                                  DAYS
: 24. Unit Forced Outage Rate
: 25. Forced Outage Hours                              126.1          389.3          10.2894
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                                                                            MRRCH 1984 NOME
: 27. If Currently Shutdown Estimated Startup Date:                                  ;f/A      -
N Item calculated with a Weighted Average                                                                PAGE 2-016 g-                                            .cj, . . .j; o
                                      - f. . , .y-; 1 .p ~ . .,-      ' ,, * ; 7 , . g ; , . ,.. .                                                                                                              . ,
l 3. , ,, , ,q . ,S                                                            ;. j x,
y;        gy :. 7, ,.. . .
    . 7,.y.                                                                                                            s
                                                                                                                                                -l
 
NNNNNNNNNNNNNNNNNNNNNNMMMMMMMMMNNMMM Report Period MAR 1984                UMIT          SHUTD0WMS / REDUCTIOMS                    M        BIG ROCK POINT 1            M MMNNNMWMNNNMMMMNNMMMMMNNNNMMMMMMMNNN Mo.      Date    lEng Hours Reason        _LER Mum 6ac. System gomoonent          cause a Corrective Action to Prevent Recurrence 84-01 02/19/84      F  108.1    A    4                  CB    VALVEX' STEAM LEAK IN THE PACKING OF A PRIMARY SYSTEM VALVE CAUSED THE INITIAL SHUTDOWN. SUBSEQUENT FAILURE OF THREE OUT OF FOUR REACTOR DEPRESSURIZATION VALVES REQUIRED ADDITIONAL REPAIRS AND TESTING PRIOR TO POWER ESCALATION.
84-82 03/18/84      F    18.8    A      1                  CB    VALVEX  STEAM LEAK IN THE PACKING OF A PRIMARY SYSTEM INSTRUMENT ISOLATION VALVE.
                                                                    ~
-i-NNNNNNMMNNN'      BIG ROCK POINT 1 OPERATED WITH 2 OUTAGES FOR EQUIPMENT FAILURE.
M
 
==SUMMARY==
N' NNMMNNNNNNN Twee '    Reason                          Method          Svstem 8 Comoonent
    -F-Forced A-Equip Failure F- Adei n        1-Manual        Exhibit F & H S-Sched    B-Maint or Test .G-Oper Error 2-Manual Scram Instructions for C-Refueling        H-Other      3-Auto Scram    Preparation oV D-Regulatory Restriction        4-Continued      Data Entry Sheet E-Operator Training            5-Reduced Load Licensee Event Report
                    & License Examination      9-Other        -(LER) File (NUREG-0161)
PAGE 2-017
 
unummunuurmuumuwummuunwummuunuunnuww N            BIG ROCK POINT 1              m ununN#NMMNNMMMMMMMMMNNMMNNMMMMMNNNum                    FACI 6 ITY        DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                              UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                        UTILITY STATE.................... MICHIGAN-                              LICENSEE................. CONSUMERS POWER
                                                                  ~
COUNTY...................CHARLEVOIX                              CORPORATE ADDRESS....... 212 WEST MICHIGAN AVENUE JACKSON, MICHIGAN 49201 DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 4 MI NE OF                          CONTRACTOR CHARLEVOIX, MICH                  ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BWR                                    HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... SEPTEMBER 27, 1962                    CONSTRUCTOR..............BECHTEL
      'DATE ELEC ENER 1ST GENER... DECEMBER 8,      1962                  TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 29, 1963                    MLGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                            IE REGION RES$'ONSIBLE......III CONDENSER COOLING WATER.... LAKE MICHIGAN                      IE RESIDENT INSPECTOR......G. WRIGHT ELECTRIC RELIABILITY'                                          LICENSING PROJ MANAGER.....R. EMCH COUNCIL.................. EAST CENTRAL AREA                      DOCKET NUMBER........... 50-155 RELIABILITY COORDINATION-
)                                        AGREEMENT                    LICENSE 8 DATE ISSUANCE....DPR-6, AUGUST 30, :962 PUBLIC DOCUMENT ROOM.......CHARLEVOIX PUBLIC LIBRARY 107 CLINTON STREET CHARLEVOIX, MICHIGAN 49720 INSPECTIOM              STATUS INSPECTION
 
==SUMMARY==
 
NO-INSPECTION SUMMARIES RECEIVED FOR THIS TIMd PERIOD.
ENFORCEMENT
 
==SUMMARY==
 
NONE OTHER ITEMS SYSTLMS AND COMPONENT PROBLEMS NOME
    ' FACILITY ITEMS (PLANS AND PROCEDURES)2
    ' NOME PAGE 2-018
 
l'''4
                  ~
?
MNNNNNNNNNNNNNNNNNNNNNMMNNMMNNNNNNNN Esport Period MAR 1984                      IN5PFCTICH                      STATUS - (CONTIhuED)                        N        BIG ROCK POINT 1                                                  W MMNNMMMMMMNNNMMNNNMMMMMMMNNNNNNNNNNN STMER ITEMS MANAGERIAL ITEMS:
MOME
              ' PLANT STATUS -
              .THE PLANT IS OPERATING ROUTIMELY.
LAST IE SITE INSPECTION DATES. MARCH 17 - APRIL 29, 1984 INSPECTION REPORT NO*' 84-02 REPORTS                  FR0M LICEHSEE
                =====================================================t============================================================================
NUMBER-  -DATE OF          DATE OF        SUBJECT EVENT            REPORT                                                                                                    ____----------------
                                                                  -  __  -====___ ____.--- -__-_          -____====-_______:-- ------ _____.
84-81/    O2/22/84        03/22/84' RDS ISOLATION VALVE FAILURE.
                ==================================================================================================================================
            ~
        ..t.
8 PAGE 2-019 s
 
  .1. Decket              58-259        0PERATING                    STATU5                                ununununuwwMummwwwwuumununununummuun M            BROWNS FERRY 1                    M
: 2. Reporting Period                03/01/84  Outage + Gn-line Hrs: 1.iid                                  MMMMMMMMMMMMMMMMMMNhMNNMMMMMMMMMMMMM 3._ Utility Contacts TED THOM (205) 729-0834                                                                AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt)*                                        3293 BROWNS PERRY i
: 5. Nameplate Rating (Gross MWe):                              8280 X 0.9 : 115L 1500
  '6. Design Electrical Rating (Not Ptie):                              1065 DESIGN ELEO. ItRTING - 1085
: 7. Maximum Dependable Capacity (Gross MWe): __                          1998                                ......MRX.      DEPDC.    (WP. - 1085 (100%)
: 8. Maximum Dependable Capacity (Met MWe)8                                1965
: 9. If Changes Occur Above Since Last Report, Gisw Reasons:
NONE                                                                                                    peo sfus at EXCEEEED 1850t GPfilWE. Cape!TIONS
: 10. Power Level To Which Restricted, If Any (hak iMe):                                ___
Ab'            -        ^      300 11.' Reasons for Restrictions, If Any                                                            goon.
NONE                                                                          _
MONTH          YoAR        CUMULATIVE                                                                            -80            M
..12., Report Period Mrs                          744.s  _.2.384 1              84.746J                                                                                          E
-13. Hours Reactor Critical          k 733.7  _1 2992.2              51.7as.6
: 14. Rx Reserve Shtdun Mrs                        10.2          42L} __ 6.009.9                                                                                  ,,,
: 15. Mrs Generator On-Line                        715.3      1.E55.6          50.573.2        g 116. Unit Reserve Shtdun Hrs                          .8 .,              .(                u      goo
: 17. Gross Therm Ener (PtfH)                  2.279.594  5.268. dA 143.826,21Z,                                                                                  -40 18.: Gross Else Ener (miH)                    767.870  1.773.6fd 47.419.300
: 19. Met Elec Ener (ftfH)                      749.475  1. 7 2 7 . 0_t_6_  16 052.341
: 20. Unit Service Factor                          96.1            85.3              59 2                                                                        -20
.21. Unit. Avail Factor                            96.I            aLa              59 2
: 22. Unit Cap Factor (MDC Met)                    94.6              74.2            51.J 0
: 23. Unit Cap'. Factor.(DER Met).                  94.6            74.g              51 1                    g      's~      l'O      th      A      2h      A
: 24. Unit Forced Outage Rate                        3.9              13.g            23.5                                            DAYS
'25.. Forced Outage Hours                          28.7          296.6        1S.521.3 26-. Shutdowns Sched Over Next 6 Months (Type,Date, Duration)
        ' HONE 27.'If Currently Shutdown Estimated Startup Dates                              N/A                                                                                              PAGE 2-020
 
NMMMNNMMNNNNNNNNNNNNNNNNNNNNNNNNNNNN M
Report Period MAR 1984-                UNIT        SHUTD0hMS / REDUCTIONS N        BROWAS FERRY 1 NNNNNNNNNMMMMMNNMMMNNNNMMMMNNNNNNNMM No.      Date                    s Method LER Numbs /~ Svstem Coroonent
                  ]s)) NoUrs Rea'on                                                  Cause 2 Corrective Action to Prevent Recurrence 274    03/01/84    .F  28.7    N    3                                      REACTOR SCRAM DUE TO POSSIBLE BUMPING OF PANEL 25-6A.
275. 03/10/84      5    0.8    5    5                                    DERATED FOR RTI 23 (FEEDWATER CONTROL) AND TURBINE CV TESTS AND SI'S.
276    03/17/84      5    0.0    5    5                                      DERATED FOR TURBINE CONTROL VALVE TESTS AND SI'S, CONTROL ROD PATTERN ADJUSTMENT.
tummMMuuMMM        BROWMS FERRY 1 OPERATED WITH f CUTAGE AND 2 REDUCTIONS DURING O SUMARY M          MARCH.
Enummunummu Twee      Rem men                          Met h->d          }ystem 8 Comoonent F-Forced A-Equip" Failure F-Admin          1-Manual          EFhibit F & H S-Sched    B-Maint or Test G-Oper Error    2-Manual Scram lettructions for C-Refueling        M-Other      3-Auto Scrae      Preparation of D-Regulatory Restriction        4-Continued        Data Entry Sheet E-Operator Training              5-Raduced Load Licer.see Event Report
                & License Examination        9-Othar            (LER) File (NUREG-0161)
PAGE 2-021
 
NNNNNMMNNNNNMMMNNNNMMMMNNMMNNNMMNNNN N              BROWNS FERRY 1                                            N MumMammumNummmumMuunununNNNNNNNNNNNN                                                                          FACILITY          DATA                                                          Report Period MAR 1984 FACILITY DESCRIPTION                                                                                                    UTILYTY 8 CONTRACTOR INFORMATION LOCATION                                                                                                            UTILITY S T AT E . . . . . . . . . . . . . . . . . . . . AL AB AMA                                                            LICENSEE. . . . . . . . . . . . . . . . . TENNESS EE VAL L EY AUTHORITY COUNTY...................LINESTONE                                                                                    CORPORATE ADDRESS....... 500A CHESTHUT STREET TOWER II CHATTANDOGA, TENNESSEE 37401 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 10 MI HW OF                                                                              CONTRACTOR DECATUR, ALA                                                        ARCHITECT / ENGINEER....... TENNESSEE VALLEY AUTHORITY TYPE OF REACTOR............BWR                                                                                        HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... AUGUST 17, 1973                                                                            CONSTRUCTOR.............. TENNESSEE VALLEY AUTHORITY DATE ELEC ENER IST GENER.. 0CTOBER 15, 1973                                                                            TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... AUGUST 1,                                                    1974                    REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                                                                IE REGION RESPONSIBLE......II CONDENSER COOLING WATER.... TENNESSEE RIVER                                                                          IE RESIDENT INSPECTOR......J. PAULK
    -ELECTRIC RELIABILITY                                                                                                  LICENSING PROJ MANAGER.....R. CLARK COUNCIL.................. SOUTHEASTERN ELECTRIC                                                                      DOCKET NUMBER........... 50-259 RELIABILITY COUNCIL LICENSE B DATE ISSUANCE....DPR-33, DECEMBER 20, 1973 PUBLIC DOCUMENT ROOM....... ATHENS PUBLIC LIBRARY SOUTH AND FORREST ATHENS, ALABAMA 35611 IN$PECTICN            STATUS INSPECTION
 
==SUMMARY==
 
    + INSPECTION DECEMBER 26, 1983 - JANUARY 25, 1984 (83-603? THIS ROUTINE INSPECTION INVOLVED 40 RESIDENT INSPECTOR-HOURS ON SITE IN THE AREAS OF OPERATIONAL SAFETY, SURVEILLANCE, MANAGEMENT CONTROLS, MAINTENANCF, PHYSICAL PROTECTION, TMI ITEM, REACTOR TRIPS, DRYWELL TO TORUS PRESSURE CONTROL, REPORTABLE OCCURRENCES, AND LUBRICATION OIL CONTROL. FIVE VIOLATIONS WERE IDENTIFIED. TWO
  ' VIOLATIONS WERE IDENTIFIED IN OPERATIONAn. SAFETf AND THREE VIOLATIONS WERE IDENTIFIED IN THE DRYWELL TO TORUS PRESSURE CONTROL SECTION. -(OME OF THESE VIOLATIONS HAD TWO EXAMPLES.)
INSPECTION JANUARY 10-13 (84-03): THIS ROUTINE, UNAH50UNCED INSPECTION INVOLVED 10 INSPECTOR-HOURS OH SITE IN THE AREAS OF TRANSPORTATION, - 10 CFR PART 61 IMPLEMENTATICH, POSTING ANC LABELING, PROCEDURE COMPLIANCE. TLD/ POCKET CHAMBER MISMATCH EVALUATION, WHOLE BODY COUNT REPORTS AND ADMINISTRATICH OF MULTIBADGIPG TLDS. OF THE SEVEN AREAS INSPECTED HO VIOLATIONS OR DEVIATIONS WERE
  ' IDENTIFIED IN TWO AREAS; FOUR APPARENT VIOLATIONS WERE FOUND IN FIVE AREAS.
INSPECTION JANUARY 30 - FEBRUARY 1 (84-05): THIS SPECI Ais ANNCUNCED INSPECTION INVOLVED 6 INSPECTOR-HOURS ON SITE REGARDING
  . SP.
FOLLOWUP 0F ole BULLETIN 81-03 FLOW BLOCKAGE OF COOLING WATER TO S4FETY COMPONENTS BY CORBINCULA SP. (ASIATIC CLAM) AND MYTILLUS (MUSSEL). INSPECTION INCLUDED THE FOLLOWING, VIZ                                                            REVIEW OF LICENSEE'S RESPONSES TO THE SUBJECT BULLETIN AND SUPPLEMENTAL
  .'4UESTIONS ISSUED BY THE NRC'ON APRIL 10, 1981 AND JANdARY 21, 1984, RESPECTIVELY; REVIEW OF LER'S REGARDING THE SUBJECT BULLETIN; REVIEW OF LICENSEE PROCEDURE *> DETAILING FLOW VERIFICATION TESTS OF COOLING WATER SYSTEMS POTENTIALLY AFFECTED BY BI0 FOULING AND
  -SUBSEQUENT FLOW BLOCKAGE; REVIEW OF FLOW VERIFICATION TESTS AND DATA COMPILED DURING 1981 THROUGH JANUARY 1984. OF THE FOUR AREAS 1 INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
PAGE 2-022
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMNNNMMMMM BROWNS FERRY 1                                          M Report Period MAR 1984            'IN5PECTION              $TATU$ - (CONTINUED)              M MMMMMMMMMMMMMMMMMMMMMMMMMNNMMMMMMMMM INSPECTIDM
 
==SUMMARY==
 
ENFORCEMENT CONFERENCE FEBRUARY 24 (84-06): AN ENFORCEMENT CONFERENCE WAS HELD IN THE REGIDH II 0FFICE.      MR. JAMES P. O'REILLY OPENED THE MEETING BY PRESENTING NRC CONCERNS REL ATED TO BYPASSING THE ROD SEQUENCE CONTROL SYSTEM WHILE SHUTTING DOWN (SEE INSPECTION REPORT N05. 50-259/84-02, 50-250/84-02. AND 53-296/84-02 FOR DETAILS) AND THE ISOLATION OF THE DRYWELL TO SUPPRESSION POOL DIFFERENTIAL PRESSURE INSTRUMENT (SEE INSPECTIDH REPORT NOS. 50-259/83-60, 50-260/83-60, AND 50-296/83-60 FOR DETAILS). NRC EXPRESSED CONCERN IN THE AREAS OF PROPER DEFINITION OF THE ROOT CAUSES OF PROBLEMS, INADEQUATE PROCEDURES, LACK OF OPERATIONAL DISCIPLINE, LACK OF ASSURANCE OF NOTIFICATIDH TO PLANT PERSONNEL OF NRC ISSUED BULLETINS, NOTICES, CIRCULARS, ETC., AND OPERATOR
    ' TRAINING. TVA ALSO REQUESTED GUIDANCE ON OPERATOR REQUALIFICATION TRAINING AND THE BROWHS FERRY IMPROVEMENT PROGRAM.
INSPECTION JANUARY 26'- FEBRUARY 25 (84-17): THIS ROUTINE INSPECTION INVOLVED 42 RESIDENT INSPECTOR-HOURS IN THE AREAS OF OPERATIONAL SAFETY, LICENSEE FOLLOW-UP DH PREVIOUS INSPECTION I1 EMS, CONTAINMENT ATMOSPHERE DILUTION, REPORTABLE OCCURRENCES, SURVEILLANCE, MAINTENANCE, PHYSICAL PROTECTIOh. TRIP REVIFW, AND ROSEMOUNT TRANSMITTERS. OF THE NINE AREAS INSPECTED, THERE WERE THREE VIOLATIONS AND ONE DEVIATION. THER3 WAS ONE DEVIATION IN THE AREA 0F " LICENSEE FOLLOW-UP" FOR FAILURE TO SUEMIT A FOLLOW-UP REPORT AS COMMITTED TOI THERE WAS ONE VIOLATICM IN THE OPERATIONAL SAFETY AREA FOR USE OF INCORRECT KF FACTOR FOR DETERMINING MCPRs AND TWO VIOLATIONS IN THE AREA DN CONTAINMENT ATMOSPHERE DILUTION FOR LIMITING CONDITIONS FOR OPERATIDH VIOL ATION AND FAILURE TO FOLLOW PROCEDURE.
ENFORCEMENT
 
==SUMMARY==
 
NOME OTHER ITEMS SYSTEMS AND COMPONENT PRGSLEMS:
INTERGRANULAR STRESS CORROSION CRACKING (IGSCC) PROBLEMS IN RHR, CORE SPRAY AND OTHER PIPING HAS HECESSITATED WELD OVERLAY REPAIRS.
FACILITY ITEMS (PLANS AND PROCEDURES):
NOME.
MANAGERIAL ITEMS:
NOME.
PLANT STATUS:
ROUTIME POWER OPERATIONS.
LAST IE SITE INSPECTION DATE: JANUARY 26 - FEBkUARY 25, 1984 +
INSPECTION REPORT NO 259/84-07 +
PAGE 2-023
 
Report Period MAR 1984                                                                                                                                          NMMNNNNNNNNNMMNNNNNNNNNNNNNNNNNNNNNN REPQRTS                    FR0M              LICENSEE                              N                BROWNS FERRY 1                                          M MNNNNNNNNNNNNNNNNNNNNNNNNMMMMNNNNNNN
  ===========================================v=================================================================================                                                                                                              ====
NUMBER                        DATE OF    DATE OF                SUBJECT EVENT      REPORT
                                                          =- - - - - - - - - - - - - - - - - - - - - - - - - - - -      --- -- - - - - - - - - - -      ------ = -== = ------==              -- ===- =- ------
83-071/                      12/12/83    01/10/84 03-L                                                            A BROKEN VACUUM FUMP BELT ON REACTOR AND TURBINE BUILDING VENT MONITOR. THE CAUSE WAS NORMAL WEAR DUE TO CONTINUOUS OPERATION.
83-072/                        12/27/83    01/24/84              WIND SPEED RECORDER WAS DBEERVED TO BE INOPERABLE READING ZERO.
03-L-                                                          SENSOR.
ICE F''MATION ON THE WIND SPEED
:83-073/                        12/31/83  01/16/84 St-T                                                          .A REACTOR COOLANT SAMPLE AT 0320 HOURS INDICATED A CHLORIDE CONCENTRATION OF 525 PPB.
CONDUCTIVITY AND OFFGAS RADIATION LEVEL ALSO INCREASED WHILE PH DECREASED.
83-074/                      .12/22/83-  01/20/84
    '03-L                                                              PLANT PERSONNEL DISCOVERED A DEGRADED FLOW CONDITION ON RADIATION MONITC2 1-RM-90-250.                                                              THE LOW FLOW CONDITION WAS CAUSED BY NORMAL WEAR AND DEGRADATION OF THE SAMPLE PUMP.
84-001/
01/05/84    01/23/84              RESIDUAL HEAT REMOVAL (RPR) PUMP 1D STARTED WITHOUT RECEIVING EITHER AN AUTOMATIC SIGNAL OR A MANUAL START STGNAL.
  '84-002/                        01/03/84    01/24/84              DURING UNIT STARTUP, ROUTINE SURVEILLANCE TESTING SHOWED THAT THE SETPOINT FOR PRESSURE SWITCHES PS-64-57A THROUGH D WERE POI WITHIN LIMITS OF TECHNICAL SPECIFICATION 3.2.8.
84-003/
01/17/84 ' ~02/06/84              1 0F 3 TRAINS HAD FLOW BELOW DESIGN, DISCHARGE DAMPERS OH 'A' AND 'C' TRAINS WERE MISADJUSTED IN HONCONSERVATIVE DIRECTION.
84-004/                      01/06/84    01/27/84              THE ROD NOTCH OVERRIDE (RONOR) SWITH WAS USED TO INSERT RODS TO "00".
    '84-005/                        01/22/84    02/13/84
    --                                                                THE SETPOINTS FOR PRESSURE SWITCHES PS-64-56B AND C WERE NOT WITHIN THE LIMITS OF TECHNICAL SPECIFICATION 3.2.A. THE SETPOINTS HAD DRIFTED.
84-007/
01/27/84    02/17/84              DECREASING PRESSURE ON THE CONTROL ATMOSPHERIC DILUTION TANKS. UPON INVESTIGATIDH IT WAS DETERMINED THAT THE TWO ISOLATION VALVES FOR MAINTAINING TANK PRESSURE WERE IN THE CLOSED POSITION.
84-008/                        01/29/84    02/23/84              1 DR MORE PRESS. DIFFERENTIAL TRANSMITTERS FAILED IN DOWMSCALE. CAUSE IS UNKNOWN.
84-009/
01/30/84    02/17/84- THE FACTCR KF USED IN CALCULATIONS OF CRITICAL POWER RATIO (CPR) BY THE PROCESS COMPUTER WAS FOUND TO BE IN ERROR BY APPROXIMATELY 2.5% AT RECIRCULATION FLOWS.
44-011/                        02/09/84    02/29/84              REACTOR SCRAMMED, DC C0"L FAILURE IS A RANDOM FAILURE.
84-013/''02/13/84                          03/02/84              AIR AND VACUUM RELEASE VALVES FOUND TO BE UNDERRATED FOR THEIR SERVICE APPLICATION.
84-014/                        02/22/84 :03/13/84                REACTOP SCRAMMED WHEN TURBINE HIGH-PRES $URE 1ST STAGE PRESSURE EXCEEDED 142 PSIG DUE TO PRCCEDURAL ERROR.
PAGE 2-024
 
f NNMMMNNNNNNMMNNNNNNNNNNNNNNNNNNNNNNN BROWHS FERRY I                                    N Report Period MAR 1984    R E P.0 R.T S    FR0M      LICEN$EE        -
(CONTI6UED)    N NNNNNNMMNNNNNNNNNNNNNNNNNNNNNNNNNNNN 84-815/    02/21/84  03/89/84    THE EMERGENCY EQUIPMENT CGOLING WATER VACUUM PRIMING VALVE WAS NOT QUALIFIED FOR ITS
        ' - -                            APPLICATI0H. THE LONG TERM SOLUTIDH WILL BE TO REPLACE THE VALVE WITH A QUALIFIED ONE.
        ===============================================================================================================================
k PAGE 2-025
 
          't. Docket    se-26e        OPERATING                STATUS                        MMMNNNNXMMMMMMMNNNNNNNMMMMMMMMMMMMMM-N            BROWNS FERRY 2                N
: 2. Reporting Period: 83/et/84        Outage + On-line Hrs        744.0              MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 3. Utility Contacts TED THOM (285) 729-e834 AVERAGE DAILY POWER LEVEL (MWe) PLOT
: t. Lic.ns.d_Th.real row.c (MWt):                        32,3
: 5. Nameplate Rating (Gross fede):              123e X e.9 = 1152 MWE EMY 2
: 6. Design Electrical Rating (Met MWo):                    1065                1500
: 7. Maximum Dependable Capacity (Gross fede):              #998                                DESIGN ELEC. RATING - 1085
                                                                                                ......MRX.      DEPDC. CRP. - 1085 (100%)
: 4. Maximum Dependable Capacity (Met MWe):                1065
: 9. If Changes Occur Above $1nce.Last Report, Give Reasons:
NONE
: 10. Power Level To Which Restricted, If Any (Het MWe):              650
                                                                                                                                                      .ggg
: 11. Reasons for Restrl-tlons,-If Any                                    --
IN EXTEND FUEL CYCLE MONTH          YEAR      CUMULATIVE
: 12. Report Period Mrs                744.e                    79.657.6                                                                      -e0 W 2M 4_ . 0                                                                                          g
      '13. Hours Reactor Critical.            744.8      f.893.8        51.8572 14.LRx Reserve Shtdun Mrs                  .e      *
                                                            &1          14.190.5 f                    __
f
: 15. Mrs Generator On-Line            744.0      1.F49.2        5e.342.2
: 16. Unit Reserve Shtdun Mrs              .0            9 d        ,,,,
: 17. Gross There Ener (PedH)    1.574.676    5.934.521 145.179.573
:14. Gross Elec Ener (PldH)          511.89e    t.651.171    48.248 Aja
: 19. Met Elec Ener (PedH)          499.613 M6.183          46.864.791 20.' Unit Service Factor -              fee.e          84.7          63.2                                                                      -30
: 21. Unit-Avail Factor                  tes.e          84.7          63.2 L22. Unit Cap Factor (MDC Net)            63.1          65.1          55.2
    '23. Unit Cap Factor (DER Net)            63.t          69.1          55.g          o        ..        .      ,  .,.        .
                                                                                                                                          ,              0 0      5        to      15    20    25    30
: 24. Unit Forced Outage Rate                .8        11 2          24.4                                    DFlYS
:25. Forced Outage Hours                      .e      211J        t6.288.8 26.' Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                          MARCH 1984 JULY 1984 - REFUELING.
: 27. If Currently Shutdown Estimated Startup Dates            - N/A PAGE 2-026
 
NNNMMNNNMMMMNNNNNNNMMMMNNNNNMMMNNMMM
            - Report Period MAR 1984                UNIT      SHUTD0WHS / REDUCTION 5                      N        BROWHS FERRY 2                                    N MMMMMMMMMMMMMMMMMMMMMMMMAMMMMMMMMMNN No. Date    Tvie Hours Reason Method LEP Number Sv9 tem Component          Cause 4 Corrective Action to Prevent Recurrence NONE i:
C
( 'r' ENNNNNNNNNN      BROWHS FERRY 2 OPERATED ROUTIMELY DURING MARCH.
            - 0
 
==SUMMARY==
M:
            ' CNNMMMMMMNN
            .Tvee      Reason                          MethoC          Svstem 8 Comoonent F-Forced ,A-Equip Failure F-Admin          1-Manual-      Exhibit F & H 5-Sched LB-Maint or Test iG-Oper Error 2-Manvil Scram. Inseructions for
                      ,C-Refuellag -      H-Other      3-Auto Scram    Probaration of D-Regulatory Restriction        4-Continued      Cata Entry Sheet
:        '. ,    JE-Operator Training,            5-Reduced Load  Licensee Event Report
:9 -                      8 License Examination      l9-Other          (LER) File (NUREG-0161)
PAGE 2-027 s
      )
 
JQ t umummuu m ww wm mu u u u u u u u m mu n u'a u m u u m u n u O-                BROWNS FERRY 2                          M taununummma n u n u n u n n u n un n m u n nu u M N NN N M            FACILITY                    DATA                                                Report Period MAR 1984 FACILITY BESCRIPTION                                                                      UTILITY 8 CONTRACTOR INFORMATION LOCATION,                                                                          UTILITY STATE.................... ALABAMA                                                    LICENSEE................. TENNESSEE VALLEY AUTHORITY COUNTY..e................ LIMESTONE                                                  CORPORATE ADDRESS....... 500A CHESTNUT STREET TOWER II CHATTANOOGA, TENNESSEE 37401                        !
DIST AND DIRECTION FROM,                                                                                                                                                      '
NEAREST POPULATION CTR.. 10 MI NW OF                                              CONTRACTOR s                                                    DECATUR, ALA                                  ARCHITECT / ENGINEER....... TENNESSEE VALLEY AUTHORITY TYPE.0F REACTOR............BWR                                                          HUC STEAM SYS SUPPLTER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... JULY 20, 1974                                              CONSTRUCTOR.............. TENNESSEE VALLEY AUTHORITY DATE ELEC ENER 1ST GENER... AUGUST 28,'1974                                            TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 1, 1975                                          REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                                IE REGION RESPONSIBLE. . . . . .II
                  ' CONDENSER COOLING WATER.... TENNESSEE RIVER                                          IE RESIDENT INSPECTOR......J. PAULK                                                        i ELECTRIC RELIABILIT'Y                                                                LICENSING PROJ MANAGER.....R. CLARK
                      ' COUNCIL................. 50UTHEASTERN ELECTRIC                                      DOCKET NUMBER........... 50-260 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....DPR-52, AUGUST 2, 1974 PUBLIC DOCUMENT ROOM....... ATHENS PUBLIC LIBRARY SOUTH AND FORREST ATHENS, ALABAMA 35611 4-      INSPECTION
 
==SUMMARY==
 
                    + INSPECTION DECEMBER 26, 1983 - JANUARY 25, 1984 (83-60): THIS ROUTINE INSPECTIDH INVOLVED 40 RESIDENT INSPECTOR-HOURS ON SITE                                                  l IN THE AREAS OF OPERATIONAL SAFETY, SURVEILLANCE, MANAGEMENT CONTROLS, MAINTENANCE, PHYSICAL PROTECTION, TMI ITEM, REACTOR TRIPS, DRYMELL'TO TORUS PRESSURE CONTROL, REPORTABLE OCCURKENCES, AND LUBRICATION DIL CONTROL. FIVE VIOLATIONS WERE IDENTIFIED. TWO 1 VIOLATIONS WERd IDENTIFIED IN OPERATIONAL SAFETY AND THREE VIOLATIONS WERE IDENTIFIED IN THE DRYWELL TO TORUS PRESSURE CONTROL SECTION. (OME OF THESE VIOLATIONS NAD TWO EXAMPLES.)
* INSPECTION JANUARY 10-13 (84-03): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED to INSPECTOR-HOURS ON SITE IN THE AREAS OF
                . TRANSPORTATION,.10.CFR PART 61 IMPLEMENTATION, POSTING AND LABELING, PROCEDURE COMPLIANCE TLD/ POCKET CHAMBER MISMATCH EVALUATION, WHOLE BODY COUNT REPORTS AND ADMINISTRATION OF MULTIBADGING TLDS. OF THE SEVEN AREAS INSPECTED NO VIOLATIONS OR DEVIATIONS WERE
.i..
IDENTIFIED IN TWO AREAS; FOUR APPARENT VIOLATIONS WERE FOUND IN FIVE AREAS.                                                                                                        ,
4 INSPECTION JANUARY 30 - FEBRUARY 1 (84-05)e THIS SPECIAL, ANNOUNCED INSPECTIDH INVOLVED 6 INSPECTOR-HOURS ON SITE REGARDING FOLLOWUP OF OIE BULLETIN 81-03 FLOW BLOCKAGE OF COOLING WATER TO SAFETY COMPONENTS BY CORBINCULA SP. (ASIATIC CLAM) AND MYTILLUS SP. -(MUSSEL). INSPECTION INCLUDED THE FOLLOWING, VIZ                              REVIEW OF LICENSEE'S RESPONSES TO THE SUBJECT BULLETIN AND SUPPLEMENTAL SUESTIONS ISSUED BY THE NRC ON APRIL 10, 1981-AND JANUARY 21, 1984. RESPECTIVELY; REVIEW OF LER'S REGARDING THE SUBJECT BULLETIN; d'
REVIEW OF LICENSEE PROCEDURES DETAILING FLOW VERIFICATION TESTS OF COOLING WATER SYSTEMS POTENTIALLY AFFECTED BY BI0 FOULING AND                                                  I SUBSEtuENT-FLOW BLOCKAGE; REVIEW OF FLOW VERIFICATION TESTS AND DATA COMPILED DURING 1981 THROUGH JANUARY 1984.                                        OF THE FOUR AREAS
                ' INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
PAGE 2-028  !
~ '
 
p ununuuunununumwwwwunnunuwunuwwwnuwww Report Period MAR 1984              IN5PECTION                5TATUS - (CONTINUED)              w          BROWNS FERRY 2                                      M MMMMNNWMMMMMMMMMMMMMMMMMMMNNMMMMNNMM INSPECTION
 
==SUMMARY==
 
ENFORCEMENT CONFERENCE FEBRUARY 24 (84-06): AN ENFORCEMENT CONFERENCE WAS HELD IN THE REGION II 0FFICE.      MR. JAMES P. O'REILLY OPENED THE MEETING BY PRESENTING HRC CONCERNS REL ATED TO BYPASSING THE ROD SEQUENCE CONTROL SYSTEM WHILE SHUTTING DOWN (SEE INSPECTION REPORT NOS. 50-259/84-02, 50-260/84-02, AND 50-296/84-02 FOR DETAILS) AND THE ISOLATION OF THE DRYWELL TO SUPPRESSIDH POOL DIFFERENTIAL PRESSURE INSTRUMENT (SEE INSPECTION REPORT HOS. 50-259/83-60, 50-260/83-60, AND 50-296/83-60 FOR DETAILS). NRC EXPRESSED CONCERN IN THE AREAS OF PROPER DEFINITION OF THE ROOT CAUSES OF PROBLEMS, INADEQUATE PROCEDURES, LACK OF OPERATIONAL DISCIPLINE, LACK OF Ab$URANCE OF NOTIFICATION TO PLANT PERSONNEL OF NRC ISSUED BULLETINS, NOTICES, CIRCULARS, ETC., AND OPERATOR
    .. TRAINING. TVA ALSO REQUESTED GUIDANCE ON OPERATOR REQUALIFICATION TRAINING AND THE BROWHS FERRY IMPROVEMENT PROGRAM.
INSPECTION. JANUARY 26 - FEBRUARY 25 (84-07): THIS ROUTINE INSPECTIDH INVOLVED 43 RESIDENT INSPECTOR-HOURS IN THE AREAS OF 0PERATIONAL SAFETY, LICENSEE FOLLOW-UP DN PREVIOUS INSPECTION ITEMS, CONTAINMENT ATMOSPHERE DILUTION, REPORTABLE OCCURRENCES, SURVEILLANCE, MAINTENANCE, PHYSICAL PROTECTION, TRIP REVIEW, AND ROSEMOUNT TRANSMITTERS. OF THE HINE AREAS INSPECTED, THERE WERE THREE VIOLATIONS AND ONE DEVIATION. THERE WAS ONE DEVIATION IN THE AREA 0F " LICENSEE FOLLOW-UP" FOR FAILURE TO SUBMIT A FOLLOW-UP
    . REPORT AS COMMITTED TOs THERE WAS ONE VIOLATION IN THE OPERATIONAL SAFETY AREA FOR USE OF INCORRECT KF FACTOR FOR DETERMINING MCPR; AND TWO VIOLATIONS IN THE AREA DH CONTAINMENT ATMOSPHERE DILUTION FOR LIMITING CONDITIONS FOR OPERATION VIOLATION AND FAILURE TO FOLLOW PROCEDURE.
ENFORCEMENT
 
==SUMMARY==
 
NOME OTHER ITEMS
    . SYSTEMS AND CDMPONENT PROBLEMS:
NONE.
FACILITY ITEMS (PLANS AND PROCEDURES):
NOME, MANAGERIAL ITEMS:
NOME.
PLANT STATUS:
NORMAL OPERATION.
LAST IE SITE INSPECTION DATE: JANUARY 25 - FEBRUARY 25, 1984 +
INSPECTION REPORT NO: 50-260/84-07 +
PAGE 2-029
 
L i
i MMMMMNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                    REP 0RTS              FR0M  LICEN$EE                    N          BROWNS FERRY 2            N NNNNMMMMNNNNNNNNNNNNNNNNNNNNNNNNMNNN
          ,;    ^ ==================================================================================================================================
i  )*
                    - NUM8ER  DATE OF        DATE OF  SUBJECT EVENT          REPORT 83-878/  12/07/83      81/06/84  THE RHR CROSSTIE CONNECTION FOR UNIT 2 WAS ISOLATED, DUE TO MAINTENANCE ACTIVITIES ON THE RHR 83-L                            SYSTEM OH UNITS 1 AND 3, RHR CROSSTIE CONNECTIONS FOR UNIT 2 WERE MADE INOPERABLE.
83-079/  12/12/83 ' 91/11/84      4.2.5-1, ". HSTRUMENTATIDF THAT INITIATE OR CONTROL THE CSCS, REACTOR LOW WATER LEVEL", WAS NOT 03-L'                            PERFORMED WITHIN THE MAXIMUM FREQUENCY INTERVAL SPECIFIED IN THE TECHNICAL SPECIFICATION.
83-080/  12/14/83      81/12/84  RPS-HIGH WATER LEVEL IN SCRAM DISCHARGE TANK, WAS FOUND TO OPERATE IN 76 SECONDS. THE ROSEMOUNT 83-L                              1153 TRANSMITTER WAS REPLACED.
83-082/  12/23/83    ' 81/19/84. RECIRCULATION PUMP 2A TRIFPED DUE TO ACTUATION OF RELAY 2A-K21A NEUTRAL OVERVOLTAGE. THE 03-L                              INSULATION OF THE C PHASE CONDUCTOR IN CABLE 2PP1005 HAD BEEN PREVIOUSLY COUGED.
83-883/  12/29/83 . 81/27/84      THE HYDROGEN ANALYZER 'B' HYDROGEN SAMPLE INLET PUMP WAS DISCOVERED TO BE INDPERABLE. METAL 03-L-                            BELLOWS CORP. MOTOR, FAILED DUE TO A. SEIZED BEARING.
                    '83-984/  12/29/83      91/27/84  EMERGENCY EQUIPMENT COOLING WATER PUMP BECAME RESTRICTED BY DEBRIS AND ALL FLOW WAS LOST TO THE        '
                    '03-L                              NCRTH EECW HEADER. THE LOSS OF THE EECW PUMP STRAINER WAS CAUSED BY DEBRIS.
84-901/  01/88/84      81/27/84  RCIC FAILED TO REACH RATED FLOW IN THE REQUIRED 30 SECONDS. THE OFFSET VOLTAGE SIGNAL WAS NOT
                      --                                WITHIN SPECIFIED CALIBRATION LIMITS, SETPOINT DRIFT.
84-002/  01/21/84      02/08/84  OPERATOR DID HOT INSURE 'B' CHANNEL PRIMARY CONTAINMENT ISOLATION, SYSTEM WAS RESET BEFORE TESTING 'C' CHANNEL.
                    .84-004/'
02/22/84-      03/15/84  REACTOR SCRAMMED DUE TO A HIGH FLUX SPIKE.
                  ==================================================================================================================================
ys-v 4
L
                                      /
;                                                                                                                                                    PAGE 2-030 i
I
 
M N
O 1
N W
O 4
A W
Z 4
                      .J 53
                      >=
b W
1
                      >=
                        .a
                        .A 4
Z O
M
                        >=
Z LaJ
                        >=
Z M
ILS O                                              s A
eth M
Z
                      >=
    -'s A
\                                                                    ..
                                            ^ ,- _ >_        __ ,
h% GOk.h a,.    'j'k' tz "' fp _            _
: 1. Deckets- 50-296'                OPERATING            STATU5                      ununnuwwwwwwuununummuuMMMuunununuuun M            BROWHS FERRY 3            m
: 2. Reporting Period 03/01/84  Outage + On-line Hrs: 744.0                  MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMNNNNMM 3.: Utility-contact: TED THOM (205) 729-0834                                        AVERAGE DAILY POWER LEVEL (MWe) PLOT
      - 4'..      Licensed Thermal Power (MWt):                  3293 y .3 5.~      Nameplate Rating (Gross MWe):          1280 X 0.9 = 1152 8800
: 6. Design Electrical Rating (Het MWe):
1065
                                                                                                    -DESIGN ELEO. RRTING - 1085
: 7. Maximum Dependable Capacity (Gross MWe):              1098
                                                                                              .... rtRX. DEPEle. Crr. - 1085 (100%)
: 8. Maximum Dependable Capacity (Het MWe):                  1065
: 9. If Changes Occur.Above Since Last Report, Give Reasons:
NONE NO NET POWER OUTPUT THIS MONTH
: 10. Power Level To Which Restricted, If Any (Het MWe):                                                                          _3ag
: 11. Reasons for Restrictions, If Anyt                                        1000-NOME N0HTH      YEAR-    CUMULATIVE                                                          -so W
: 12. Report Period Hrs                    744.0    2.184.0    62.112.0                                                              E 13.. Hours Reactor Critical                  .0        .0    43.088.6
: 14. Rx Reserve Shtdwn Hrs                    .0        .0      3*.878.1 f                                                                    ,
15.'Mrs Generator On-Line.                    .6        .0    42.194.5
    .16. Unit Reserve.Shtdwn Mrs                  .0        .0            .0      gag.
: 17. Gross Thern Ener (PWH)                      0          0 126.285.520                                                          .g
: 18. Gross Elec Ener (MWH) -                    0          0 41.597.620
: 19. Het Elec Ener (PWH).                        0          0  40.376.156
: 20. Unit Service Factor                        .0        .6          67.9                                                        -20
: 21. Unit Avail Factor.                        .0        .0          67.9
    .22. Unit Cap Factor (MDC Net)                  .0        .0          61.0
    '23.- Unit Cap Factor (DER Net)                                      61.0        0  -
                                                    .6        .0                        g          5    l'O '  l'5 ' Io    is  60
: 24. Unit Forced Outage Rate                    .6        .0          10.8                                DAYS
:25. Forced Outage Hours                        .0        .0      5.091.4
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration),                                          MARCH 1984 NONE
: 27. If Currently Shutdown Estimated Startup Date:              08/01/84                                                              PAGE 2-032
 
                                .                                                                          NNNNNMMMMNNNNNNMMMMMNNNNNNNNNMMNNNNN
      -Report Perled MAR 1984
* UNIT-    SHU.TD0WNS / REDUCTIONS                      N        BROWNS FERRY 3                              N NMMMMNNMMMNNMMMMMMMMMMMMMMWNNMMMMMMM No.      Date    IEin Rours Reason Method LER Number System Component            Cause a Corrective Action to Prevent Recurrence
      'I  140'  .89/07/85 :S 744.8          C    4                                  E0C-5 REFUEL OUTAGE CONTINUES.
l t
L
    ~
MINNNNNMWNN        BRDWNS FERRY-3 REMAINS SHUTDOWN IN A CONTINUING REFUELING / MAINTENANCE 0'
 
==SUMMARY==
M        OUTAGE.
      .CIMMMMNNNNN Tvoo-      , Reason'                        Method          Svstem 8 Comoonent
      . F-Forced > A-Equip Failure ~ F-Admin .          1-Manual        Exhibit F 8 H
      . S-Sched..B-Maint or Test G-Oper Error 2-Manual Scram Instructions for
                    -C-Refueling        -.H-Other    3-Auto Scram    Preparation of D-Regulatory Restriction        4-Continued      Data Entry Sheet E-Operator Training              5-Reduced Load Licensee Event Report
                          & License Examination        9-Other          (LER) File (NUREG-0161)
PAGE 2-033 L
: wai,
 
n.
tummununununummuwwnununununununuwwww
  'O            BROWHS FERRY 3                      w connununummunummmuununummununummunum                          FACILITY          DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                                      UTILITY 8 CONTRACTOR INFORMATION LOCATIDH                                                                UTILITY STATE.................... ALABAMA                                      LICENSEE................. TENNESSEE VALLEY AUTHORITY COUNTY................... LIMESTONE                                    CORPORATE ADDRESS....... 500A CHESTNUT STREET TOWER II CHATTANDOGA, TENNESSEE 37401 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 10 MI NW OF                                CONTRACTOR DECATUR, ALA                        ARCHITECT / ENGINEER....... TENNESSEE VALLEY AUTHORITY
      - TYPE OF REACTOR. . . . . . . . . . . .BWR                                  HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... AUGUST 8,            1976                    CONSTRUCTOR.............. TENNESSEE VALLEY AUTHORITY DATE ELEC ENER 1ST GENER... SEPTEMBER 12, 1976                            TURBINE SUPPLIER......... GENERAL ELECTRIC PATE COMMERCIAL OPERATE...'.MARCN            1, 1977                REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0NCE THRU                                    IE REGION RESPONSIBLE. . . . . .II CONDENSER COOLING WATER.... TENNESSEE RIVER                            IE RESIDENT INSPECTOR......J. PAULK ELECTRIC RELIABILITY                                                    LICENSING PROJ MANAGER.....R. CLARK COUNCIL................. 50UTHEASTERN ELECTRIC                          DOCKET NUMBER........... 50-296 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-68, AUGUST 18, 1976 PUBLIC DOCUMENT ROOM....... ATHENS PUBLIC LIBRARY SOUTH AND FORREST ATHENS, ALABAMA 35611
                                                              . INSPECTION            STATUS INSPECTION
 
==SUMMARY==
 
        + 11SPECTION DECEMBER 26, 1983 - JANUARY 25, 1984 (83-60): THIS ROUTINE INSPECTION INVOLVED 40 RESIDENT INSPECTOR-HOURS ON SITE IM .THE AREAS OF CPERATIONAL- SAFETY, SURVEILL ANCE, MANAGEMENT CONTROLS, MAINTENANCE, PHYSICAL PROTECTION, TMI ITEM, REACTOR TRIPS, DRYWELL TO TORUS PRESSURE CONTROL, REPORTABLE OCCURRENCES, AND LUBRICATION OIL CONTROL. FIVE VIOLATIONS WERE IDENTI?IED. TWO VIOLATIONS WERE IDENTIFIED IN OPERATION #'_ SAFETY AND THREE VIOLATIONS WERE IDENTIFIED IN THE DRYWELL TO TORUS PRESSURE CONTROL SECTION.' (ONE OF THESE VIOLATIONS flAD TWO EXAMPLES.)
INSPECTION JANUARY 10-13 (84-03): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 11 INSPECTOR-HOURS ON SITE IN THE AREAS OF TRANSPORTATION, to CFR PART 61 IMPLEMENTATION, POSTING AND LABELING, PROCEDURE COMPLIANCE, TLD/ POCKET CHAMBER MISMATCH EVALUATION, WHOLE BODY COUNT REPORTS AND ADMINISTRATION OF MULTIBADGING TLDS. OF THE SEVEN AREAS INSPECTED NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN TWO AREAS; FOUR APPARENT VIOLATIONS WERE FOUND IN FIVE AREAS.
,      . INSPECTION JANUARY 30 -~ FEBRUARY 1 (84-05):            THIS SPECIAL, ANNOUNCED INSPECTION INVOLVED 7 INSPECTOR-HOURS ON SITE REGARDING r      FOLLCWUP OF OIE BULLETIN 81-03 FLOW BLOCKAGE OF COOLING WATER TO SAFETY COMPONENTS BY CORBINCULA SP. (ASIATIC CLAN) AND MYTILLUS
      ' SP. (MUSSEL). INSPECTION INCLUDED THE FOLLOWING, VIZ: REVIEW OF LICENSEE'S RESPONSES TO THE SUBJECT BULLETIN AND SUPPLEMENTAL QUESTIONS. ISSUED BY THE NRC ON APRIL 10, 1981 AND JANUARY 21, 1984, RESPECTIVELY; REVIEW OF LER'S REGARDING THE SUBJECT BULLETIN; REVIEW OF LICENSEE PROCEDURES DETAILING FLOW VERIFICATION TESTS OF COOLING WATER SYSTEMS POTEN1IALLY AFFECTED BY BI0 FOULING AND SUBSEQUENT FLOW BLOCKAGE; REVIEW 0F FLOW VERIFICATION TESTS AND DATA COMPILED DURING 1981 THROUGH JANUARY 1984. OF THE FOUR AREAS INSPECTED..MO-VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
PAGE 2-034
 
g-                                                    -                            -                                      __
I MMMMMMMNNNNNNNMMNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984            IN5PECTION                5TATUS - (CONTINUED)              N        BROWNS FERRY 3            N NNNNNNNNNNNNNNNNNNNNNNNNNNNNMMNNNNNN INSPECTION
 
==SUMMARY==
 
ENFORCEMENT CONFERENCE FEBRUARY 24 (84-06): AN ENFORCEMENT CONFERENCE WAS HELD IN THE REGIDH II 0FFICE. MR.          JAMES P. O'REILLY OPENEb THE MEETING BY PRESENTING HRC CONCERNS RELATED TO BYPASSING THE ROD SEQUENCE CONTROL SYSTEM WHILE SHUTTING DOWN (SEE INSPECTION REPORT HOS. 50-259/84-02, 50-260/84-02, AND 50-296/84-02 FOR DETAILS) AND THE ISOLATION OF THE DRYWELL TO SUPPRESSION POOL DIFFERENTIAL PRESSURE IESTRUMENT (SEE INSPECTION REPORT NOS.      50-259/83-60, 50-260/83-60, AND 50-296/83-60 FOR DETAILS). NRC EXPRESSED CONCERN IN THE AREAS OF PROPER DEFINITIUM OF THE ROOT CAUSES OF PROBLEMS, INADEQUATE PROCEDURES, LACK OF OPERATIONAL DISCIPLINE, LACK OF ASSURANCE OF NOTIFICATION TO PLANT PERSONNEL OF NRC ISSUED BULLETINS, NOTICES, CIRCULARS, ETC.. AND OPERATOR
      -TRAINING. TVA ALSO REQUESTED GUIDANCE ON OPERATOR REQUALIFICATION TRAINING AND THE BROWNS FERRY IMPROVEMENT PROGRAM.
INSPECTION' JANUARY 26'- FEBRUARY 25 (84-07): THIS ROUTINE INSPECTION INVOLVED 43 RESIDENT INSPECTOR-HOURS IN THE AREAS OF OPERATIONAL SAFETY, LICENSEE FOLLOW-UP DN PREVIOUS INSPECTION ITEMS, CONTAINMENT ATMOSPHERE DILUTIDH, REPORTABLE OCCURRENCES, SURVEILLANCE, MAINTENANCE, PHYSICAL PROTECTION, TRIP REVIEW, AND ROSEMOUNT TRANSMITTERS. OF THE HINE AREAS INSPECTED, THERE WERE THREE VIOLATIONS AND ONE DEVIATION. THERE WAS ONE DEVIATION IN THE AREA 0F " LICENSEE FOLLOW-UP" FOR FAILURE TO SUBMIT A FOLLOW-UP REPORT AS COMMITTED T0; THERE WAS ONE VIOLATION IN THE OPERATIONAL SAFETY AREA FOR USE OF INCORRECT KF FACTOR FOR DETERMINING MCPR; AND TWO VIOLATIONS IN THE AREA ON CONTAINMENT ATMOSPHERE DILUTION FOR LIMITING CONDITIONS FOR OPERATION VIOLATION AND FAILURE TO FOLLOW PROCEDURE.
ENFORCEMENT SUFMARY NOME OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NONE.
FACILITY ITEMS (PLANS AND PROCEDURES):
NOME.
MANAGERIAL ITEMS:
NOME.
PLANT STATUS:
SHUTDOWN FOR REFUELING AND MAINTENANCE.
LAST.IE SITE INSPECTION DATE: J4HUARY 25 - FEBRUARY 25, 1984 +
INSPECTION REPORT NO: 50-296/84-07 +
PAGE 2-035
 
m,                      --                  --- -
1 s
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR.1984                        REP 0RTS        FR0M      LICENSEE                    N          BROWNS FERRY 3                                M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
            ==================================================================================================================================
NUMBER  DATE OF    DATE OF        SUBJECT EVENT        REPORT
_---- -_ --==___ .--_ _----------____ __-------------- -- ------------------------------
              ?S4-001/      01/03/84  01/23/84      THE OPERATOR OBSERVED THE DIESEL GENERATOR OVERHEATING. EMERGENCY EQUIPMENT COOLING WATER
                  --                                  (EECW) SYSTEM, WAS BEING BLOCKED BY CLAM SHELLS. THE APPARENT CAUSE WAS OVERCHLORINATION.
84-002/  01/2S/84- .02/16/84'      THE REACTOR OPERATOR RECEIVED SECONDARY CONTAINMENT ISOLATION ALARMS FOR REACTOR ZONE VENTILATION AND REFUELING FLOOR VENTILATION AND GROUP 6 ISOLATION VALVE CLOSURE.
003/      01/29/84  02/22/84      AN ATTEMPT WAS MADE TO TRANSFER 4-KV START BUS IB FROM ITS ALTERNATE FEED TO ITS NORMAL FEED.
THE NORMAL FEEDER BREAKER FAILED TO CLOSE.
84-004/  02/28/84  03/14/84      THE RESIDUAL HEAT REMOVAL (RHR) OUTBOARD LOOP II ISOLATI0H VALVE STEM WAS FOUND TO BE BROKEN.
            < --                                      THE VALVE STEM IS MADE OF 410 STAIHLESS STEEL #ND WILL BE REPLACED WITH 17-4 PH STAINLESS STEEL.
            ==================================================================================================================================
f I
b
    %5 PAGE 2-036 s
M . q
 
N M
O I
N W
O 4
L M
Z e4
      .e E3
      >=
    -A W
      .a
      > a
      .J 4
Z O
M
      >=
Z W
      >=
Z M
W G
4 L
tri M
Z
      >=
                            'I s
4 :p i  =
?,                -
: 1.                          .t
@fhd                  ,    )
 
1 Becket:    50-325          0PERATING            STATUS                  NNNNNNNNNNNNNNNNNNNNNMMNNNNNNNNNNNNN N              BRUNSWICK I                                    N
: 2. Reporting Period: 03/01/84      Outage + On-line Hrs: 744.0              NNNNNNNNNNNNNNunNNNNNNNNNNNNNNNNNNNN
: 3. Utility
 
==Contact:==
FRANCES HARRISON (919) 457-9521                        AVERAGE DAILY POWER LEVEL (MWe) PLOT 2436
: 4. Licensed Thermal Power (MWt):                                                        BRUNSWICK 1
: 5. Nameplate Rating (Gross MWe):            963 x 0.9 : 867
: 6. Design Electrical Rating (Net MWe):                821 DESIGN EIEO. RRTING =                        821
: 7. Maximum Dependable Capacity (Gross MWe):          815                      .... ,qRX. DEPEND, CRP. - 790 (100%1
: 8. Maximum Dependable Capacity (Het MWe):            790
: 9. If Changes Occur Abose Since Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted, If Any (Het MWe):
: 11. Reason's for Restrictions, If Any:                              ggmo .
MONE MONTH      YEAR    CUMULATIVE              recom u m -en m era m nte                                            g
: 12. Report Period Mrs              744.0    2.184.0    61.705.0                                                                                  E
                                                                            . ...............-- - ~
                                                                                                                                              -100 585.2    1.948.0    38.346.0 TIV
: 13. Hours Reactor Critical                                                                                                                    ,
M
: 14. Rx Reserve Shtdwn Hrs              .0        .0      1.647.1 f                                                                          - so M
: 15. Hrs Generator On-Line          567.8    1.903.8    35.992.5  g
: 16. Unit Reserve Shtdun Hrs            .0        .0          .0    gas _
                                                                                                                                              -so
: 17. Gross Thern Ener (MWH)    1.319.848  4.492.362  72.919.648
: 18. Gross Elec Ener (MWH)        437.255  1.503.436  24.050.484
                                                                                                                                              - 43
: 19. Met Elec Ener (MWH)          424.522  1.462.944  23.076.775
: 20. Unit Service Factor              76.3        87.2        58.3
                                                                                                                                              ~*
: 21. Unit Avail Factor                76.3        87.2        58.3                                                .
: 22. Unit Cap Factor _(MDC Met)      72.2        84.8        47.3 U    -
: 23. Unit Cap Factor (DER Het)        69.5        81.6        45.6        o        5      1'o    t's    fo ~                          is 30 5.2        20.2                              UOTS
: 24. Unit Ferced Outage Rate            .2
: 25. Forced Dutage Hours                1.0      105.0      9.024.2 MflRCH 1984
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):
NOME
: 27. If Currently Shutdown Estimated Startup Date:        04/05/84                                                                                  PAGE 2-038
 
NNNNNNNNNNNNNNNNNNNNNNNNNMMNNNNNNNNN Report Period MAR 1984                            UMIT      SHUTD0WN5 / REDUCTIONS                      N          BRUNSWICK 1                                            M NNNNMMNNNNNNNNNNNNNNNNNNNNMMMNNNNNNN No.            Date    1EER Nouis Reason Method LER Number System Component              Cause 4 Corrective Action to Prevent Recurrence
        .44-017 03/03/84              SE.175.2      B      1                  CB    PUMPXX    OUTAGE-1B RX RECIRC PUMP SEAL REPLACEMENT. TWO STAGE MECHANICAL SEAL ON THE IB REACTOR RECIRC PUMP WAS REPLACED WITH A NEW ASSEMBLY.
84-819 93/11/84              S    8.0      3      5-                                REDUCED POWER 60% FOR ROD IMPROVEMENT.
84-021 83/24/84              5    0.0      B      5                  ZZ    ZZZZZZ- REDUCED POWER FOR ROUTINE VALVE TESTING AND SPE WORK.
84-825 93/31/83              F    1. 0 -    H      3                  ZZ    VALVEX    RX SCRAM-LOSS OF IHSTRUMENT AIR TO RADWASTE WHICH RESULTED IN CFD EFFLUENT VALVES TO GO SHUT AND THE BYPASS FAILURE TO OPEN.
muuammuuman                BRUNSWICK 1.0PERATED WITH 2 OUTAGES AND 2 REDUCTIONS DURING MARCH.
m
 
==SUMMARY==
m summmMmMmMM Twee              . Reason                            Method          Svstem 8 Comoonent
        .F-Forced .A-Equip' Failure F-Admin                    't-Manual.      Exhibit F 4 H S-Sched            B-Maint or Test 1G-Oper Error 2-Manual Scram Instructions for tC-Refueling          H-Other      3-Auto Scram    Preparation of D-Regulatory Restriction.    '
4-Continued    Data Entry Sheet E-Operator Training                5-Reduced Load Licensee Event Report
                                & License Examination          9-Other        (LER) File (HUREG-0161)
PAGE 2-039
 
MMMMMMMMMMMMMMMMMMMMMMNNMMMMMMMNNNMM N              BRUNSWICK 1                      N nunununumusunnunununummunummuununman                        FACILITY . DATA                                                                Report Period MAR 1984 FACILITY DESCRIPTION                                                    UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                              UTILITY
          . STATE....................H0RTH CAROLINA-                            LICENSEE................. CAROLINA POWER 8 LIGHT COUNTY................... BRUNSWICK                                  CORPORATE ADDRESS........P. O. BOX 1551 RALEIGH, NORTH CAROLINA 27602 DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 3 MI N OF                                CONTRACTOR SOUTHPORT, NC                      ARCHITECT / ENGINEER....... UNITED ENG. 8 CONSTRUCTORS TYPE OF REACTOR. . . . . . . . . . . .BWR                                HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY.. 0CTOBER 8, 1976                                CONSTRUCTOR.............. BROWN 8 ROOT DATE ELEC ENER 1ST GENER... DECEMBER 4,            1976                  TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH 18, 1977                        -REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0NCE THRU                                  IE REGION RESPONSIBLE......II CONDENSER COOLING WATER.... CAPE FEAR RIVER                            IE RESIDENT INSPECTOR......D. MYERS ELECTRIC RELIABILITY                                                  LICENSING PROJ MANAGER.....S. MACKAY COUNCIL..................SDUTHEASTERN ELECTRIC                        DOCKET NUMBER........... 50-325 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....DPR-71, NOVEMBER 12, 1976 PUBLIC DOCUMENT ROOM.......SOUTHPORT-BRUNSWICK COUNTY LIBRARY 108 W. MOORE STREET SOUTHPORT, NORTH CAROLINA 28461 INSPECTION              STATUS INSPECTION
 
==SUMMARY==
 
        + INSPECTION FEBRUARY 6-10 (84-01): THIS ROUTIME, UNANNOUNCED INSPECTION INVOLVED 45 INSPECTOR-HOURS ON SITE IN THE AREAS OF LICENSEE ACTIDMS~0N PREVIOUS ENFORCEMENT-MATTERS; QA PROGRAM REVIEW; TRAINING; REQUALIFICATION TRAINING; QA PROGRAM ADMINISTRATIDH; DESIGN PROGRAM; PROCUREMENT; RECEIPT, STORAGE, AND HANDLING; AUDITS; 0FFSITE SUPPORT STAFF; AND LICENSEE ACTIONS ON PREVIOUSLY. IDENTIFIED INSPECTION FINDINGS. OF.THE 11 AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
      ' INSPECTION FEBRUARY 6-10 (84-02): THIS SPECIAL, ANNOUNCED INSPECTIDH INVOLVED 16 INSPECTOR-HOURS ON SITE IN THE AREAS OF DESIGN,
      . INSTALLATION AND OPERABILITY OF THE POST ACCIDENT SAMPLING SYSTEM; INSPECTION OF INSPECTOR FOLLOWUP ITEMS; POSTING, LABELING AND CONTROL; DUTAGE PLANNING; ALARA; REPORTS TO INDIVIDUALS; RADWASTE GENERATION; AND IMPFJVED INPLANT IODINE MONITORING. OF THE EIGHT AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 21-24 (84-03): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 13 INSPECTOR-HOURS ON SITE IN THE AREAS OF STARTUP TESTING FOLLOWING REFUELING,.STARTUP FOLLOWING A REACTOR SCRAM AND A PLANT TOUR.                  OF THE 3 AREAS INSPECTED, NO VIOLATIONS OR DEVIATIDMS WERE IDENTIFIED.
INSPECTION JANUARY 15'- FEBRUARY 15 (84-04): THIS ROUTINE SAFETY INSPECTION INVOLVED 101 INSPECTOR-HOURS ON SITE IN THE AREAS OF SURVEILLANCE, MAINTEHANCE, OPERATIONAL SAFETY VERIFICATION, ESF SYSTEM WALKDOWN, IN-OFFICE LICENSEE EVENT REPORTS REVIEW, INDEPENDENT INSPECTION, PLANT TRANSIENTS, FIRE PROTECTION, IEB 84-01              OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.'
PAGE 2-040 1                                                                                                                __. _ _ _ _ _ _ _ _ _ _ _
 
f, Tit                  . .                                      .
wwwunuwwwwununuwwwwumunuwwwwwwwwwwww 7      EReport Period MAR ~ 1984            IN$PECTION            $TATU$ - (CONTINUED)            w          BRUNSWICK 1                                      w wwwwwwwwMWwMuwMuwwwwwMuwwwwwwwwMwMwM INSPECTION
 
==SUMMARY==
 
              . INSPECTION MARCH 19-23 (84-06): THIS INSPECTION INVOLVED 18 INSPECTOR-HOURS ON SITE BY ONE NRC INSPECTOR. THE INSPECTION WAS BEGUN DURING AN OFFSHIFT PERIOD; 8 HOURS WERE ACCOMPLISHED DURING OFFSHIFT PERIODS. INCLUDED REVIEW OF SECURITY 10RGANIZATIDH-PERSONNEL AND RESPONSE; TESTING AND MAINTENANCE; PHYSICAL BARRIERS-PROTECTED AND VITAL AREAS; SECURITY SYSTEM POWER SUPPLY; ASSESSMENT AIDS; ACCESS CONTROL-PERSONNEL, PACKAGES, AND VEHICLES; DETECTION AIDS-PROTECTED AND VITAL AREAS; ALARM
              , STATIONS AND COMMUNICATIONS. ..THE LICENSEE WAS FOUND TO BE IN COMPLIANCE WITH NRC REQUIREMENTS WITHIN THE 14 AREAS EXAMINED DURING THE INSPECTION.
ENFORCEMENT
 
==SUMMARY==
 
NOME OTHER ITENS
              ' SYSTEMS AND COMPONENT PROBLEMS:-
              'NONE.
: FACILITY ITEMS (PLANS AND PROCEDURES):
NONE.'
MANAGERIAL ITEMS:
            ; NOME.
PLANT STATUS:-
ROUTINE OPERATION.
            -LAST IE SITE INSPECTION DATE: . MARCH 19-23, 1984 +
INSPECTION REPORT NC '- 50-325/84-06 +
f          . : ~'
,                                                                                                                                                  PAGE 2-041        l b-
 
{+
MMMMMNNNNNNNNNNNNNNMMMNNNNNNNNNNNNNN Report Period MAR 1984                REPORT 5        FR0M      LICEN5EE                    N                BRUNSWICK 1                        M NNNNNNNNNMMNNNMMNNNNNNNNNWWNMMNNNNMW
    -==================================================================================================================================
NUMBER    DATE OF    ~ DATE OF  SUBJECT EVENT      REPORT                                                                                                          -_ ==---
                                  .==-==    ___ - _ _ _    _____    ____      - = _  _=____  _-------------- ___          ___ ____
79-056/  08/08/79    01/31/84  MAIM STEAM LINE HI RAD MONITOR 'B' OUT OF TOLERANCE, DUE TO INSTRUMENT DRIFT.
93-L 83-030/    12/21/83  01/17/84  MEASURED SPECIFIC GRAVITY OF THE PILOT CELL FOR DIVISION I BATTERY 1A-1 WAS 1.178.
93-L 83-050/. 12/12/83- 01/11/84    RHR SYSTEM FLOW INDICATION SIGNAL CONVERTER COULD NOT BE CALIBRATED DUE TO A FLUCTUATING 03-L                            INSTRUMENT GUTPUT SIGNAL, A COLD SOLDER JOINT CAUSED THE EVENT.
83-060/    12/17/83  01/16/84  REMOTE SHUTDOWN PANEL REACTOR VESSEL PRESSURE INDICATOR. SHOWED A PRESSURE OF 860 PSI WHILE 03-L.                            REDUNDANT CONTROL ROOM INSTRUMENTATION SHOWED AN EXPECTED PRESSURE OF 990 PSI.
83-062/ . 12/06/83    01/05/84. EXHAUST VENTILATION RADIATION HIGH INSTRUMENT ACTUATED AT A SETPOINT OF 13 MR/HR VERSUS THE 03-L.                            SPECIFIED ACTUATION SETPOINT OF LESS THAN OR EQUAL TO 11 MR/HR.
83-064/    12/28/83  01/17/84  THE SQUARE ROOT INTEGRATOR WAS FUNCTIONING OUT OF CALIBRATION TOLERANCES. THIS EVENT WAS CAUSED 03-L-                            BY INSTRUMENT DRIFT OF THE FYQ-K603 SQUARE ROOT TRANSMITTER (SIT) CARD.
84-001/  01/19/84    03/09/84  LOOP PUMPS A AND C RAN FOR 5 SECONDS AND TRIPPED ON LOW SUCTION PRESSURE LOCKOUT DUE TO AIR IN LOOP SUCTION HEADER.
t 84-002/ . 02/03/84    03/02/84  UNIT 01 REACTOR SCRAM OCCURRED DUE TO HIGH REACTOR VESSEL PRESSURE.
84-003/  02/19/84    03/14/84  SPEED CONTROL OF THE HPCI TURBINE WAS VERY ERRATIC. THE HPCI TURBINE ELECTRONIC SPEED CONTROLLER WAS FOUND TO BE NOT FUNCTIONING PROPERLY.
      ===================================================================================================== ============================
v I
c-PAGE 2-042
 
7 .-
m 4
O O
M W
O 4
L M
Z 4
J M
      >=
4 W
e b
n ea 4
Z O
M l'=
Z W
      >=
Z
      >e W
O 4
L
* en M
Z O
                  ~.        .I L
              'Q m      e aw
 
  ~1. Docket    50-324          0PERATIHG            STATUS                      MNNNNMMNNMMNNMMNNNNNNNNNNNNNNNNNNNNM N            BRUNSWICK 2                                N
: 2. Reporting Period    03/81/84  Outage + On-line Hrs:      744.0            MNNNNNNNNNNMMMMNNMMMNNNNNNNNNNNNNNMM
: 3. Utility Contacts FRANCES HARRISON (919) 457-9521                            AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                      2436
: 5. Nameplate Rating (Gross MWe):
BRUNSHICK 2 963 X 0.9 = 867
: 6. Design Electrical Rating (Met MWe):                  82,            tem 3 DESIGN EXEC. RATING - 821
: 7. 19aximum Dependable Capacity (Gross MWe):            815
                                                                                    .... MAX. DEPDC. CN". = 790 (100%3
: 8. Itaximum Dependable Capacity (Het MWe):              790
  .9. If Changes Occur Above Since Last Report, Give Reasons:
NOME
: 18. Power Level To Which Restricted, If Any (Het MWe):
11 Reasons for Restrictions, If Any:                                    gg ,3, NONE
      ~
MONTH      YEAR      CUMULATIVE
: 12. Report Period Mrs              744.0    2.184.0      73.729.0
                                                                                                            "~~~~~~~~                  "
: 13. Hours Reactor Critical-        265.9    1.604.3      46.331.6
: 14. Rx Reserve Shtdwn Mrs              .0        .0              .0 hf                                                                  - so
: 15. Hrs Generator On-Line          265.9    1.566.9      43.352.5
: 16. Unit Reserve Shtdwn Hrs            .0        .0              .0 500-                                                            ~
: 17. Gross Therm Ener (MWH)        610.832  3.355.120    81.931.834
: 18. Gross Elec Ener (MWH)        200.061  1.110.430    27.220.128
                                                                                                                                            - 40
: 19. Met Elec Ener (MWH)            190.052  1.071.207    26.098.825
: 20. Unit Service Factor              35.7      71.7            58.8
'21    Unit Avail Factor              35.7      71.7            58.8                                                                      - 80
: 22. Unit Cap Factor (MDC Net)        32.3      62.1            44.8
: 23. Unit Cap Factor (DER Het)        31.1      59.7            43.1        0  -
                                                                                                                                          ,  0
: 24. Unit Forced Outage Rate              .0      2.2            17.5                              C8YS
: 25. Forced Outage Hours                  .0      35.5        9.638.9
: 26. Shutdowns Sched Over Hext 6 Months (Type Date, Duration):                                MARCH 1984 NONE
: 27. If Currently Shutdown Estimated Startup Date:          10/16/84                                                                            PAGE 2-044
 
g                                                                                _.                            _    _                    _
WNMMNNMMNNNMMMNNNNNNNMMMMMMNNNNMMMMM
    . Report Period MAR 1984                          UMIT      SHUTD0WM$ / REDUCTION 5                            N          BRUNSWICK 2                              N MMMMMMNNMMMMMMMNNMMMNNMMMMMMNNNNNNNM No.      Bate            liig Hiuri Reason Method _LER Number System Comoonent                  Cause a Corrective Action to Prevent Recurrence 84-029 03/13/84                5 478.1    .C    1                    RC      FUELXX  REFUELING /MAINTEHANCE OUTAGE COMMENCED.
I muummunusuu                BRUNSWICK 1 ENTERED A REFUELING OUTAGE DURING MARCH.
u
 
==SUMMARY==
u emummenenen Twas      Reanen                                    Method            System 8 Component F-Forced A-Equip Failure .F-Admin                      1-Manual          Exhibit F & H S-Sched    B-Maint er Test G-oper Error              2-Manual Scram Instructions for C-Refueling                  N-Other      3-Auto Scram      Preparation of D-Regulatory Rettriction                    4-Continued      Data Entry Sheet E-Operator Training                        5-Reduced Load Licensee Event Report
                            & Licensa Examination-        9-Other          (LER) File (HUREG-0161)
PAGE 2-045 C      ._    _ _ _ _ _ -
 
r-nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmunum a            BRUNSWICK 2                                    a Report Period MAR 1984 mammmmmmmmmmmmmmmmmmmmmmmmmmmmmmanum                                      FACILITY        DATA FACILITY DESCRIPTION                                                              UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                        UTILITY STATE.................... NORTH CAROLINA                                        LICENSEE................. CAROLINA POWER 8 LIGHT COUNTY.= . . . . . . . . . . . .'. . . . . . B R UN SWICK                        CORPORATE ADDRESS....... 411 FAYETIEVILLE STREET RALEIGH, NORTH CAROLINA 27602 DIST AND DIRECTION FROM
            ~MEAREST POPULATIDM CTR..SOUTMPORT,              3 MI N OF NC                CONTRACTOR ARCHITECT / ENGINEER....... UNITED ENG. 8 CONSTRUCTORS l
TYPE OF REACTOR............BWR                                                      HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC BATE INITIAL CRITICALITY... MARCH 20, 1975                                          CONSTRUCTOR.............. BROWN & ROOT DATE ELEC ENER IST GENER... APRIL 29, 1975                                          TURBINE SUPPLIER......... GENERAL ELECTRIC
:DATE CDMMERCIAL OPERATE....MOVEMBER 3,                          1975          REGULATORY INFORMATION t
CONDENSER COOLING METHOD.. 0MCE THRU                                            IE REGION RESPONSIBLE......II CONDENSER COOLING WATER.... CAPE FEAR RIVER                                      IE RESIDENT INSPECTOR......D. MYERS ELECTRIC RELIABILITY                                                            LICENSING PROJ MANAGER.....S. MACKAY C00MCIL................. 50UTNEASTERN ELECTRIC                                  DOCKET NUMBER........... 50-324 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....DPR-62, DECEMBER 27, 1974 I                                                                                        PUBLIC DOCUMENT ROOM.......SOUTHPORT-BRUNSWICK COUNTY LIBRARY 108 W. MOORE STREET SOUTHPORT, NORTH CAROLINA 28461 IN5PECTION            STATUS INSPECTION
 
==SUMMARY==
 
          + INSPECTION FEBRUARY 6-10 (84-81): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 45 INSPECTOR-MOURS ON SITE IN THE AREAS OF LICENSEE ACTIONS ON PREVIOUS ENFORCEMENT MATTERS; OA PROGRAM REVIEW; TRAINING; REQUALIFICATION TRAINING; QA PROGRAM ADMINISTRATION; DESIGN PROGRAM; PROCUREMENT; RECEIPT, STORAGE, AND HANDLING AUDITS; 0FFSITE SUPPORT STAFF; AND LICENSEE ACTIONS ON PREVIOUSLY IDENTIFIED INSPECTION FINDINGS. OF THE 11 AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTIDN FEBRUARY 6-10 (84-02): THIS SPECIAL, ANNOUNCED INSPECTION INVOLVED 16 INSPECTOR-HOURS ON SITE IN THE AREAS OF DESIGN, INSTALLATIDM AND OPERABILITY OF THE POST ACCIDENT SAMPLING SYSTEM; INSPECTION OF INSPECTOR FOLLOWUP ITEMS; POSTING, LABELING AND CON!t0L; OUTAGE PLAMMING; ALARA REPORTS TO INDIVIDUALS; RADWASTE GENERATI0H; AND IMPROVED INPLANT IODINE MONITORING. OF THE EIGHT AREAS INSPECTED, M0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FESRUARY 21-24 (84-03): THIS EDUTIME, UNANNOUNCED INSPECTION INVOLVED 13 INSPECTOR-HOURS ON SITE IN THE AREAS OF STARTUP TESTING FOLLOWING REFUELING, STARTUP FOLLOWING A REACTOR SCRAM AND A PLANT TOUR.                              OF THE 3 AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
        -INSPECTION JANUARY 15 - FEBRUARY 15 (84-04): THIS ROUTINE SAFETY INSPECTION INVOLVED 102 INSPECTOR-HOURS ON SITE IN THE AREAS OF SURVEILLANCE, MAINTENANCE, OPERATIONAL SAFETY VERIFICATION, ESF SYSTEM WALKDOWN, IN-OFFICE LICENSEE EVENT REPORTS REVIEW, INDEPENDENT INSPECTION, PLANT TRANSIENTS, FIRE PROTECTION, IEB 84-01                          OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
PAGE 2-046
 
                                                                                                                                              *s MMMNNNNNNNNMMMMMNNMMNNNNNNNNNNNNNMMM
  ;*:  Report Period MAR 1984              IN$PECTION            $TATU$ - (CONTINUED)              N          BRUNSWICK 2            N NNMMMMMWNNMMMMMMMNNNNNNNNNNNMMMNNNMM INSPECTION
 
==SUMMARY==
 
INSPECTION MARCN 19-25 (84-06): THE INSPECTION INVOLVED 18 INSPECTOR-HOURS ON SITE BY ONE HRC INSPECTOR. THE INSPECTION WAS
          -BEGUN DURING AN OFFSHIFT PERIOD; 8 HOURS WERE ACCOMPLISHED DURING OFFSHIFT PERIODS. INCLUDED REVIEW JF SECURITY GRGANIZATION-PERSONNEL AND RESPONSE; TESTING AND MAINTENANCE; PHYSICAL BARRIERS-PROTECTED AND VITAL AREAS; SECURITY SYSTEM PCWER SUPPLY; ASSESSMENT AIDS; ACCESS C0t4 TROL-PERSONNEL, PACKAGES, AND VEHICLES; DETECTION AIDS-PROTECTED AND VITAL AREAS; ALARM STATIONS AND C0FMUNICATIONS. THE LICENSEE WAS FOUND TO BE IN COMPLIANCE WITH HRC REQUIREMENTS WITHIN THE 14 AREAS EXAMINED DURING THE INSPECTION.
EIIFORCEMENT SufMARY NONE STilER ITERS SYSTEMS AND C0fFONENT PROBLEMS:
NONE.
FACILITY ITEMS (PLANS AND PROCEDURES):
NONE.-
MANAGERIAL ITEMS:
NONE
          ' PLANT STATUS:
SNUTettel FOR REFUELING..
LAST IE SITE INSPECTION DATE: MARCN-19-23,.1984 +
INSPECTION REr0RT NO: 58-324/44-06 +
PAGE 2-047
 
m                        -                    -                    .- .        -            _
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period RAR 1984                    REPORT $        FR0M        LICEN$EE                      N          BRUNSWICK 2                                N NNNNNNNNNNNNN MMNNNNNNNNNNM MMNNNNNNNM
    ==================================================================================================================================
NUMBER    DATE OF    D4TE OF-      SUBJECT EVENT      REPORT
_      ___ _ __-__-__                _=____ -- ______
83-092/    12/19/83  81/16/84      CONTROL ROD DRIVE SYSTEM ACCUMULATOR LEAK DETECTION INSTRUMENTATIDH CALIBRATION AND FUNCTIONAL 03-L                                TEST REVEALED THE ACCUMULATOR LEAK DETECTION INSTRUMENTS DID NOT RESPOND.
83-896/    12/26/83  02/03/84      FIRE NOSE STATIONS 2-A0G-57 THROUGH 62 INOPERABLE DUE TO VALVE BODY CRACK-RUPTURING OF A0G FIRE 03-L                                PROT STANDPIPE SYSTEM VALVE.
83-113/    12/11/88  02/22/84 . PRIMARY CONTAINMENT ATMOSPNERIC CONTROL INERTING INLET ISOLATION VALVE, HAD DUAL OPEN-CLOSE 03-L                                POSITION INDICATION. THE CAUSE WAS DETERMINED TO BE A DEFECTIVE LIMIT SWITCH.
84-002/
01/29/84    03/02/A4      D/G OUTPUT BREAKER 125 VDC HORMAL CONTROL POWER BREAKER DEENERGIZED.
84-003/  --          --
NORMAL WEAR SUPPLY FEEDER TO EMERGENCY BUS E-4 AUTO OPENED DUE TO A BUS UNDERVOLTAGE.
    ==================================================================================================================================
s I
k PAGE 2-048
 
m t
c I
f6 W
O 4
L M
Z 4
J 53 L
W J
    .J J
4 Z
O M
N Z
W Z
M W
O 4
L en M
Z pa r
h      dsk
 
L W.
1 Docket      50-317        0PERATING            STATU5                          MMMMMMMMMMMMMMMMMMMNNNMMNNMMMMMMMMMM N            CALVERT CLIFFS 1                                M
    '2. Reporting Period: 03/01/84    Outage + On-line Hrs:    744.0                  MMMMMMunnuMmMMMNwMuuMuwwwmuwwMuwwwMu
: 3. Utility
 
==Contact:==
EVELYN BEWLEY (301) 787-5365                                    AVERAGE DAILY POWER LEVEL (MWe) PLOT
      +. Lic.ns.d Thermal Power (MWt):                    2700
: 5. Nameplate Rating (Gross NWe):
CRLVERT CLIFFS 1 1020 X 0.9 = 918
: 6. Design Electrical Rating (Net MWe):                                      I8"'
845 DESIGN ELEC. RRTING =        845
: 7. Maximum Dependable capacity (Gross MWe):          860
                                                                                            .... tvet. DEPDC. CMP. -          825 (100X3
: 8. Maximum Dependable Capacity (Het MWe):            825
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted, If Any (Net MWe):
: 11. Reasons for Restrictions, If Any:                                        gagg, NONE                                                                              pec ens et rwareren uent OPT!fWE. 00BSIT!cNS MONTH        YEAR    CUMULATIVE                                I              ''      '
                                                                                                                                                    \ /"      W
: 12. Report Period Hrs              744.0    2.184.0    78.013.0
                                                                                        .-------gF--------------------------yF- -100 E
: 13. Hours Reactor Critical          618.4    2.013.9    61.980.8
: 14. Rx Reserve Shtdwn Mrs              .6          .0      1.887.9 f                                                                        - so
: 15. Hrs Generator On-Line          607.5    1.997.1    60.743.0
: 16. Unit Reserve Shtdwn Hrs            .6          .0            .0 sus-                                                                  -so
: 17. Gross Therm Ener (MWH)      1.620.646  5.29  193 149.432.488
: 18. Gross Elec Ener (MWH)        547.785  1.810.454    49.037.939
                                                                                                                                                          - SD
: 19. Met Elec Ener (MWH)          523.596  1.734.680    46.969.646
: 28. Unit Service Factor              81.7        91.4          77.9
                                                                                                                                                          - 33
: 21. Unit Avail Factor                81.7        91.4          77.9
: 22. Unit Cap Factor (MDC Net)        85.3        96.3          73.9u
: 23. Unit Cap Factor (DER Net)                                  71.3              0
                                                                                                  )
83.3        94.0                              0        5      t'o    1 15    2'O              2's        30
: 24. Unit Forced Outage Rate          18.3        8.6          7.5                                        08YS
: 25. Forced Outage Hours            136.5      186.9      4.849.7
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                          MARCH 1984 NOME
  '27. If Currently Shutdown Estimated Startup Date          N/A        N Item calculated with a Weighted Average                                            PAGE 2-050
 
wMuumuNummuunnunNumanwMunnumMuwwnunu Report Period MAR 1984                UMIT      SHUTD0WN5 / REDUCTIONS                      N          CALVERT CLIFFS 1        N NNNNNMMMMMMMMMMMMMMMNNNNNNNNNNNNNNNN me. Bate    E E Reason Method W Number tivstem comoonent                  cause 8 Corrective Action to Prevent Recurrence 84-03 82/28/84    F 134.5      A    4                  CB    PUMPXX    DUE TO LOSS OF TWO CHARGING PUMPS AND REPAIR LEAKING PRESSURIZER SAFETY VALVE.
unemmesamme      CALVERT CLIFFS 1 RETURNED ONLINE MARCH 6TH FROM A CONTINUING J SUPHARY u      REPAIR DUTAGE.
maammesumes Twan      Emanen                          Method          System 8 Comoonent F-Forced A-Equip Failure F- A dmi n        1-Manual      Exhibit F 8 H S-Sched  B-Maint or Test G-Oper Error  2-Manual Scram Instructions for C-Refueling      N-Other      3-Auto Scram    Preparation of D-Regulaten Restriction        4-Continued    Data Entry Sheet E-Operator Training            5-Reduced Load Licensee Event Report
              & License Examination      9-Other        (LER) File (NUREG-0161)
PAGE 2-051
 
s maammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm a          CALVERT CLIFFS 1                      m
_maammmmmmmmmmmmmmmmmmmmmmmmmmmmmmuum                            FACILITY        DATA                                          Report Period MAR 1984 UACILITY DESCRIPTION                                                    UTILTTY a CONTRACTOR INFORMATION LOCATION                                                              UTILITY STATE.................... MARYLAND                                      LICENSEE................. BALTIMORE GAS & ELEC COUNTY...................CALVERT                                        CORPORATE ADDRESS........P.O. BOX 1975 BALTIMORE, MARYLAND 21203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 48 MI S OF                                  CONTRACTOR ANNAPOLIS, MD                    ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACT OR. . . . . . . . . . . . PWR                                HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY.. 0CTOBER 7, 1974                                CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... JANUARY 3, 1975                              TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE. . . .MAY 8, 1975                            REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                    IE REGION RESPONSIBLE......I CONDENSER COOLING WATER.... CHESAPEAKE BAY                              IE RESIDENT INSPECTOR......R. ARCHITZEL ELECTRIC RELIABILITY                                                    LICENSING PROJ MANAGER.....D. JAFFE CDUNCIL..................MID-ATLANTIC                                  DOCKET NUMBER........... 50-317 AREA COUNCIL LICENSE 8 DATE ISSUANCE....DPR-53, JULY 31, 1974 PUBLIC DOCUMENT ROOM.......CALVERT COUNTY LIBRARY FOURTH STREET PRINCE FREDERICK, MARYLAND 20678 IN5PECTION            STATUS INSPECTION
 
==SUMMARY==
 
NO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
10 CFR 58, APPENDIX 5, CRITERION XVI REQUIRES THAT, IN THE CASE OF SIGNIFICANT CONDITIONS ADVERSE TO QUALITY, MEASURES SHALL BE ESTABLISHED TO ASSURE THAT CORRECTIVE ACTION IS TAKEN TO PRECLUDE REPETITION. CONTRARY TO THE ABOVE, DURING THE PERIOD OF AUGUST 8,
1982 TO NOVEMBER 28, 1923, SUFFICIENT MEASURES WERE NOT ESTABLISHED TO ASSURE THAT CORRECTIVE ACTION WOULD BE TAKEN TO PREVENT RECURRENCE OF EXCESSIVE PRESSURIZER PRESSURE TRANSMITTER (TRANSMITTERS I-PT-102A, B, C, AND D) CALIBRATION DRIFT.
(8331 4)
TECNNICAL SPECIFICATION 6.8.1.A REQUIRES THAT WRITTEN PROCEDURES SHALL BE ESTABLISHED, IMPLEMENTED, AND MAINTAINED COVERING THE APPLICABLE PROCEDURES RECOMMENDED IN APPENDIX A 0F THE REGULATORY GUIDE 1.33. REVISION 2. FEBRUARY 1978. SECTION C OF APPENDIX A TO REGULATORY GUIDE 1.33, REVISION 2, FEBRUARY 1978 RECOMMENDS PROCEDURES FOR STARTUP, OPERATION, AND SHUTDOWN OF SAFETY RELATED PRESSURIZED WATER REACTOR SYSTEMS. CONTRARY TO THE ABOVE PLANT PROCEDURES FOR OPERATION OF THE SAFETY RELATED AUXILIARY FEEDWATER (AFW) SYSTEM WERE NOT ADEGUATELY ESTABLISHED IN THAT INITIATION OF AN ALTERNATE MEANS OF AFW PUMP ROOM COOLING WAS NOT REQUIRED FOLLOWING THE LOSS OF NORMAL ROOM AIR CONDITIONING FOR OTHER THAM LOSS OF AC POWER CONDITIONS.
PAGE 2-052
 
i Nuuuuuuuuuuuuwwwwwwunnunuwwunuwwnunu
    . Report Period MAR 1984              IN5PECTION                $TATU$ - (CONTINUED)                  M              CALVERT CLIFFS 1                            N NNNNWMNNMMMMMMMMMMMNNMWNMNNNNNNNNMMN ENFORCEMENT
 
==SUMMARY==
 
(8331 53 STMER ITEMS SYSTEMS AND COMPONENTS:
        ..NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES):
        .NO INPUT Prev!DED.
        ' MANAGERIAL' ITEMS:
NO INPUT'PROVIDED.
PLANT STATUS
* PS INPUT PROVIDED.
LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED.
INSPECTION REPORT N08 MO IMPUT PROVIDED.
REPORTS          FR0M        LICENSEE
          ==================================================================================================================================
NUMBER    DATE OF '  DATE OF    SUBJECT EVENT    REPORT                                                _= -___ - _ _ _ = . . . - - _ _    - ....................... ..
NO INPUT PROVIDED.
          ==================================================================================================================================
PAGE 2-053
 
1 Decket:      50-318        0PERATING              STATUS                                MMMMMMMMMWNNNMMMMNNNMWMMMMMMMMMMMMNN
: 2. Reporting Period: 03/01/84 N            CALVERT CLIFFS 2
* Outage + On-line Hrs: 744.0                            MMwMumMuuMMMumMwwwM*wwwwwwwwwwwwwwww
: 3. Utility
 
==Contact:==
EVELYN BEWLEY (310) 787-5365 AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWE):                      2700
: 5. Nameplate Rating (Gross MWe):
CRLVERT CLIFFS 2 1012 X O.9 = 911
: 6. Design Electrical Rating (Net MWe):                                              '
845
  -.7. Maximum Dependable Capacity (Gross MWe):                                                        DESIGN ELEC. RATING -        845 860
                                                                                                ...... ImX. DEPDO. Cfr. -            825 (100%)
: 8. Maximum Dependable Capacity (Net MWe):              825 9.' If Changes Occur Above Since Last Report, Give Reasons:
NONE
: 18. Power Level To Which Restricted, If Any (Het MWe):
11 Reasons for Restrictions. If Any 1000-NONE rec OPN gg mwenen Lammt crf!Mm. OmeITIous MONTH        YEAR      CUMULATIVE                                                                                                              Q
  ,12. Report Period Mrs              744.0    2.184.0        61.368.0                        ---------------------------------- as%,                                        -100 E
: 13. Hours Reactor Critical          744.0    2.184.0        52.111.8
: 14. Rx Reser've Shtdwn Hrs              .0          .0          958.1            hf                                                                                        - so g}
: 15. Mrs Generator On-Line          744.0    2.184.0        51.299.2
: 16. Unit Reserve Shtdwn Mrs            .0          .0              .0 500-                                                                                - so 17.' Gross Therm Ener (MWH)    1.995.055  5.773.913 127.615.606
: 14. Gross Elec Ener (MWH)        652.581  1.897.883 41.967.169
                                                                                                                                                                              -40
: 19. -- Net Elec Ener (MWH)        625.072  1.817.597    40.021.359
: 28. Unit Service Factor              100.0        100.0            83.6
                                                                                                                                                                              ~
: 21. Unit Avail Factor                100.0      100.0            83.6
: 22. Unit Cap Factor (MDC Net)        101.8      100.9            79.6M
: 23. Unit Cap Factor (DER Het)        99.4        98.5            77.2                  0                  ,.      ,
0              l0      l5      2'o      2's~                              s'o
: 24. Unit' Forced Outage Rate            .0          .0            5.6                                            DAYS
: 25. Forced Outage Hours'                .0          .0        3.045.2
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                                MRRCH 1984 REFUELING 8 UNIT GENERAL INSPECTION-4/84 - 10 WKS.
27.'If Currently Shutdown Estimated Startup Date N/A            M Item calculated with a Weighted Average                                                            PAGE 2-054
 
NMMMMMMMMMMMMMMNNNNNNNNMMMMNNMMMMMMM
* UNIT      SHUTD0WNS / REDUCTIOHS                      N        CALVERT CLIFFS 2                                N Report Period MAR 1984                                                                        MMMMMMMMMMMMMWWNNWNNMMMMMMMMMMMMMMMW Be.      Bate    IEEE Hours Reason          LER Number _ System Comoonent        Cause & Corrective Action to Prevent Recurrence N9NL e
emeneseemen      CALVERT CLIFFS 2 OPERATED ROUTIMELY DURING THE REPORT PERIOD.
E $4NGERY a asammenamma Rammen                          Method          Svstem 8 Component Tuna F-Forced -A-Equip Failure F-Admin          1-Manual        Exhibit F & H S-Sched    B-Maint er Test 6-Oper Error  2-Manual Scram Instructions for C-Refueling      M-Other        3-Auto Scram    Preparation of D-Regulate n Restriction        4-Continued      Data Entry Sheet a
E-Operator Training              5-Reduced Load Licensee Event Report 4 License Examinatten        9-Other          (LER) File (NUREG-016fl                                                                  PAGE 2-055
 
mummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmu a          CALVERT CLIFFS 2            m mamamunummunummmmmmmmmmmmmmmmmmmmmmu                FACILITY        DATA                                          Report Period MAR 1984 FACILITY BESCRIPTION UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                    UTILITY STATE.,.................. MARYLAND LICENSEE................. BALTIMORE GAS 8 ELEC COUNTY...................CALVERT                            CORPORATE ADDRESS........P.O. BOX 147S BALTIMORE, MARYLAND 21203 DIST AND DIRECTION FRDM NEAREST POPULATION CTR.. 48 MI 5 0F                      CONTRACTOR ANNAPOLIS, MD                    ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING                    .
DATE INITIAL CRITICALITY... NOVEMBER 30, 1976                  CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... DECEMBER 7, 1976 TURBINE SUPPLIER......... WESTINGHOUSE DATE' COMMERCIAL OPERATE.... APRIL  1,  1977              PEGULATORY INFORMATION CONDENSER COOLING RETHOD...ONCE THRU                        IE REGION RESPONSIBLE......I
  , CONDENSER COOLING WATER....CNESAPEAKE BAY                  IE RESIDENT INSPECTOR......R. ARCHITZEL ELECTRIC RELIABILITY                                        LICENSING PROJ MANAGER.....D. JAFFE COUNCIL..................MID-ATLANTIC                        DOCKET NUMBER............S0-318 AREA COUNCIL LICENSE 8 DATE ISSUANCE....DPR-69, NOVEMBER 30, 1976 PUBLIC DOCUMENT ROOM.......CALVERT COUNTY LIBRARY FOURTH STREET PRIHCE FREDERICK, MARYLAND 20678 InfSPECTION SUPW9ARY IN5PECTION            5TATUS NO INSPECTION INPUT PROVIDED.
EleFORCEMENT SupWIARY NONE OTNER ITERS SYSTEMS AND COMPONENTS:
-NO INPUT PROVIDED.
FACILITY ITERS (PLANS AND PROCEDURES)*
-NO INPUT PROVIDED.
PAGE 2-056
 
                      .                        - - . . _ . . .          ...- . ~ ~ - - .              .. . . _ . . _ ~              . . . - .        . - .. ----            . - - - - - - -
ununuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum m                  CALVERT CLIFF 5 2                  m Seport Perled MAR 1984                    IN5PECTION                      5TATUS - (COMTINUED)                        ununuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum STME ITERS
      ' MEAGERIAL ITEMS:
_ NO IWWT PROVIDEB.
PLANT STATUS: ..
50 IlrWT PROVIDED.
LAST"IE SITE INSPECTitu MTE: NO INPUT PROVIDED.
INSPECTISIB REPORT NO: NO INPtlT PROVIDED.
REP 0RT5                FR0M LICEN$EE                                                                                          ,
T.1 X*._'===========================.~.==================================================================================================
INNSER            MTE OF  DATE OF    SUBJECT EVENT    REPORT                                                                            ___ .- __--_.=                _=_    - .___
IIB INPWT Pt991 DES.
        ==========================================================================================================
t i
l i
r
{
l i
              .=
N j
t i
PAGE 2-057              !
1 O                                                                                                                                                                                                .
1 h
I w-                - --
: 8. Dechet:    58-315          0PERATING                    STATUS                    NMMNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN N                      COOK 1                    M
: 2. Reporting Period: 03/81/84      Outage + On-line Hrs:          744.0            MNNNNNNNNMMMMNNNNNNNNNNNNNNNNNNNNNNN
: 3. Utility
 
==Contact:==
W. T. GILLETT (616) 465-5901 AVERAGE DAILY POWER LEVEL (MWe) PLOT
    -4. Licensed Thermal Power ( N t):                          3250
: 5. Nameplate Rating (Gross Mue):                    1280 X 0.9 : 1152 COOK 1
: 6. Design Electrical Rating (Net P5Je):                      1030            1500
: 7. Maximum Dependable Capacity (Gross Ne):                  1056
___                              [            g
: 8. Maximum Dependable Capacity (Net N e):                    1020
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NONE
: 18. Power Level To Which Restricted, If Any (Net N e):                                    poc cnN at rurwenm tsect ortgret. copeITIcess St. Reasons for Restrictions, If Any:                                                .---- --                              ----- -- -        100 7-NOME g
MONTH              YEAR      CUMULATIVE                                  -
: 12. Report Period Mrs                744.0          2.184.0      81.072.0
                                                                                                                                                -80
: 13. Hours Reactor Critical            744.0          2.007.1      59.625.3  3                            I
: 14. Rx Reserve Shtdan Mrs                .0              .0        463.0
: 15. Hrs Generator On-Line            744.0          1.992.9      58.336.6                                                                  ~80
: 16. Unit Reserve Shtdun Mrs              .0              .0        321.0
: 17. Gross Thern Ener (FE4)      2.279.795      5.962.957 170.044.571
: 14. Gross Elec Ener (fgel) -                                                                                                                -10 749.358        f.962.e40 55.888.330
: 19. Net Elec Ener (MlJN)          721.988        1.888.538  53.768.870 -
: 28. Unit Service Facter                100.0            91.3          73.8                                                                  go
: 21. Unit Avail Facter                  100.8            91.3          73.8
: 22. Unit Cap Factor (MDC Net)          95.1            84.8          66.7
: 23. Unit Cap Facter (DER Met)          94.2            84.0          63.9      0 o          's      l'c      l's  do        is'    do
: 24. Unit Forced Outage Rate              .e              8.8            7.8                                    DMS
: 25. Forced Sutage Neurs                  .8            191.1      4.271.9
: 26. Shutdeuns Sched over Next 6 Months (Type,Date, Duration):                                            MfiRCH 1984 Itosegr
: 27. If Currently Shutdown Estimated Startup Date                  N/A PAGE 2-058
 
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                  UNIT      5NUTD0WN5 / REDUCTIONS                                      N            COCK 1                                                                N MNNNNNMMMMMNNNNNMMNNNNNNNNMMNNNNNNNN No. Data s.))]j Nours Reason Method LER Humber $vstem domoonent                          Cause a Corrective Action to Prevent Recurrence
    ~214'    03/11/84      F    0.0    H      5                  HF      HTEXCH    REACTOR POWER REDUCED TO 55% TO REMOVE THE MAIH FEED PUMPS
                      '                                                            FROM SERVICE (ONE AT A TIME) TO CLEAN THE FEED PUMP TURBINE CONDENSER WATER B0XES. POWER RETURHED TO 90% THE SAME DAY.
215  #
03/22/84-    F    0.0    H      5                  HF      HTEXCH    REACTOR POWER REDUCED TO 71% TO REMOVE TURBINE CONDENSER HALVES FROM SERVICE FCR CLEANING OF CONDENSER WATER BOXES.
POWER FURTHER REDUCED TO 55% TO PERMIT REMOVAL OF ONE FEED PUMP AT A TIME TO CLEAN THE FEED PUMP TURBINE CONDENSERS.
POWER INCREASED TO 100% OH 03/25/84.
216 '  03/29/84      F    0.0    8    '5                  HC      HTEXCH    REACTOR POWER REDUCED TO 70% TO REMOVE C-SOUTH CONDENSER HALF FROM SERVICE FOR A TUBE LEAK CHECK. ONE TUBE WAS PLUGGED. POWER RETURNED TO 100% ON 03/30/84.
217- ' 03/31/84      F    0.0  -L      5                  HC      HTEXCH    REACTOR POWER REDUCED TO 70% TO REMOVE B-NORTH CONDENSER HALF FROM SERVICE FOR A TUBE LEAK CHECK. REACTOR POWER WAS AT 70% AT THE END OF THE MONTH. ONE TUBE WAS PLUGGED IN B-HORTH CONDENSER.
A 4
ENNNNNNNMMM.        COOK 1 OPERATED WITH 4 REDUCTIONS DURING MARCH.
O
 
==SUMMARY==
N t;NNNNNNNNMM Tvna        Reason'                          Method          System 8 Comoonent F-Forced :A-Equip Failure F-Admin            1-Manual        Exhibit F & H S-Sched    B-Maintior Test G-oper Error 2-Manual Scram      Instructions for C-Refueling        H-Other        3-Auto Scram    Preparation of
                'D-Regulatory Restriction        .4-Continued      Data Entry Sheet
                .E-Operator. Training              5-Reduced Load  Licensee Event Report
                    & License Examination        9-Other          (LER) File (NUREG-0161)
PAGE 2-059
 
LNMMMNNNNNNNNMMMNNNMMMNNMMMMNNNNNNNN 0-                COOK 1                    N LMMMMMMNNNNNNMMMMMMNNMMMMMMNNMMMMNNM                      FACILITY          DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                              HJILITY & CONTRACTOR INFORMATION LOCATION                      -
UTILITY STATE.................... MICHIGAN                              LICENSEE................. INDIANA & MICHIGAN ELECTRIC COUNTY...................BERRIEN                                CORPORATE ADDRESS....... 1 RIVERSIDE PLAZA COLUMBUS, OHIO 43216 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 11 MI S OF                          CONTRACTOR BENTON HARBOR, MI                ARCHITECT / ENGINEER.......AMERICAN ELEC. POWER SERVICE CORP, TYPE OF REACTOR............PWR                                      HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INIT!At CRITICALITY... JANUARY 18, 1975                        CONSTRUCTOR..............AMERICAN ELEC. POWER SERVICE CORP.
DATE ELfC ?>eiR IST GENER... FEBRUARY 10, 1975                      TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCI AL OPERATE. . . . AUGUST 27, 1975                REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                            IE REGION RESPONSIBL E. . . . . . III
      . CONDENSER COOLING WATER.... LAKE MICHIGAN                        IE RESIDENT INSPECTOR......E. SWANSON ELECTRIC RELIABILITY                                            LICENSING PROJ MANAGER.....D. WIGGINTON COUNCIL.................. EAST CENTRAL AREA                      DOCKET NUMBER...........      50-315 RELIABILITY COORDINATION AGREEMENT                    LICENSE & DATE ISSUANCE....DPR-58, OCTOBER 25, 1974 PUBLIC DOCUMENT ROOM.......MAUDE PRESTON PALENSKE MEMORIAL ".IBRARY 500 MARKET STREET ST. JOSEPH, MICHIGAN 49085 INSPECTION            STATUS INSPECTION
 
==SUMMARY==
 
INSPECTION ON FEBRUARY 13-17, (84-05): ROUTINE, ANNOUNCED INSPECTION OF THE FOLLOWING AREAS OF THE EMERGENCY PREPAREDNESS PROGRAM: EMERGENCY DETECTION AND CLASSIFICATION; PROTECTIVE ACTION DECISION-MAKING; HOTIFICATIONS AND COMMUNICATIONS; CHANGES TO THE EMERGENCY PREPAREDNESS PROGRAM; SHIFT STAFFING AND AUGMENTATION; KNOWLEDGE AND PERFORMANCE OF DUTIES (TRAINING); DOSE CALCULATION AND ASSESSMENT; PUBLIC INFORMATION PROGRAM; LICENSEE AUDITS; AND, METEOROLOGY. THE INSPECTION INVOLVED 134
      . INSPECTION-HOURS ONSITE BY (WO NRC INSPECTORS AND TWO CONSULTANTS. DNE APPARENT ITEM OF NONCOMPLIANCE WAS IDENTIFIED: FAILURE TO
  .(CEET SCHEDULAR EMERGENCY PLAN AND PROCEDURE REQUIREMENTS.
i!)
  'cNFORCEMENT
 
==SUMMARY==
 
-L UNITS 1 AND 2 TECHNICAL SPECIFICATION 3.7.9.4.A ALLOWS 14 DAYS TO RETURN AN INOPERABLE HALON SYSTEM TO OPERABLE STATUS OR, SUBMIT A SPECIAL REPORT TO THE COMMISSION WITHIN 30 DAYS OUTLINING THE ACTIONS TAKEN. THE CAUSE OF THE OPERABILITY AND THE PL ANS AND
  ' SCHEDULE FOR RETURNING THE SYSTEM TO OPERABLE STATUS. CONTRARY TO THE ABOVE, WHEN THE HALON SYSTEM WAS DECLARED INOPERABLE ON APRIL 5, 1983 (UNIT 1) AND APRIL 14, 1983 (UNIT 2) AND NOT RETURNED TO SERVICE WITHIN 14 DAYS A SPECIAL REPORT PROVIDING THE REQUESTED.INFORMATION W4S NOT SUBMITTED.
(8321 5)
PAGE 2-060
 
n                                                                                        -        . . - _ ,
MMMNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Eeport Period MAR 1984                    IN5PECTION              5TATUS              -
(CONTINUED)              N              COOK 1                    N NNNNNMMMMNNNMMMMNNNNMMMMNNNNNNNNNNFM
    ,    OTNER ITEMS
            -SYSTEMS AND COMPONENT PROBLEMS:
            .MONE
: FACILITY ITEMS (PLANS AND PROCEDURES):
            ' NONE -
MANAGERIAL ITEMS:
NONE PLANT STATUS's SUNIT IS OPERATING ROUTINELY.
LAST"IE SITE INSPECTION DATE: MARCH 13 - APRIL 23, 1984 INSPECTION REPORT NO: 84-06 REPORTS      FR0M            LICENSEE
              =========== ======================================================================================================================
                -NUMBER-    DATE OF        DATE Or-      SUBJECT EVENT          REPOR's
                                                                                - = ---- -------          -------------===---              ------ - =-  - -------------
            -............=_        -.....-      . __..._      _.---
NOME
              =========================================r======================================== ===============================================
t-t PAGE 2-061
 
+
          '1. Docket:  50-316          0PERAT'ING              STATUS                      MuuuuuuMMMMuummuwwwwMuuumwMNunMuwwww
                              .                                                              M                                COOK 2                          M
: 2. Reporting Period    03/01/84    Outage + Dn-line Hrs        744.0            MMMMMMMNNNMMMNNMMMMNNMMMMMMMMMMMMNNN S
LO    :3.- Utility
 
==Contact:==
W. T. GILLETT (616) 465-5901                                AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                        3411 m                                                                                                                      COOK 2
: 5. Nameplate Rating (Gross MWe):              _1333 X 0.85 = 1133
          - 6. Design' Electrical Rating (Net MWe):                1100            1883
: 7. Maximum Dependable Capacity (Gruss MWe):            1100                              DESIGN ELEO. RATING - 1100
                                                                                                ....NRX.      DEPEND. CRP - 1000 (100%3 l
f.. 8. Maximum. Dependable Capacity (Net MWe):              1060
          ;9. If Changes Occur Above Since Last Report, Give Reasons
      )
NOME                                                                        peo one se rwwenen tammt erfirst oose171ons
  $!'  110. Power Level.To Which Restricted, If Any (Net MWe):
                                                                                            ......... 2 ............................ -100 11 Reasons for Restrictions, .If Any:                                                          9 gagg ,
NONE' MONTH        YEAR      CUMULATIVE
: 12. Report Period Mrs                744.0    2.184.0        54.768.0                                                                                  -so go
: 13. Hours Reactor Critical-          220.6    1.636.8      39.422.0 19? Rx Reserve Shtdwn Mrs                .0          .0            .0 l                                                                              -mo
        .15.. Hrs Generator On-Line            220.1    1.628.0      38.428.2 116. Unit-Reserve Shtdwn Hrs              .6            .0            .0
: 17. Gross. Therm Ener (MWH)      733.977    5.405.184 123.858.152 n18. Gross Elec Ener (MWH)          244.500    1.793.180    40.019.610
:19.' Net Elec Ener (MWH)          236.235    1.731.606    38.584,959
: 20. 'Unit. Service Factor              29.6      74.5            73.4                                                                                -20
        -21. ~ Unli Avall' Factor
            ^
29.6      74.5            73.4
        .22.' Unit Cap Factor (MDC Net) 30.0      74.8            70.1 0                    \
: 23. Unit Cap' Factor (DER: Net)        28.9      72.1            68.9 0'
                                                                                                      ~
5    ' 1'o                        l's 2'O ' ~25'        Io
: 24. Unit Forced Outage ~ Rate            .0        1.9            13.4                                                  DRYS 25., Forced Outage Hours                  .0      32.1        5.883.0
        '26.. Shutdowns Sched Over Hext 6. Months (Type.Date, Duration):                                      MARCH 1984 NONE 27.'If Currently Shutdown Estimated Startup Date:            06/09/84                                                                                      PAGE 2-062
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR 1984                                                          UNIT      SHUTC0WHS / REDUCTIONS                            M              COOK 2                                      N MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No.          Date      lidi Hours Reason                                          LER Number System Comoonent              Cause 8 Corrective Action to Prevent Recurrence 147          03/13/84      5' 523.9                                    C    .1                    ZZ    ZZZZZZ    THE UNIT WAS REMOVED FROM SERVICE AT 0403 HOURS ON 03/10/84 FOR SCHEDULED CYCLE IV-V REFUELING / MAINTENANCE OUTAGE. IN ADDITION TO THE REFUELING MAJOR MAINTENANCE WORK INCLUDES STEAM GENERATOR EDDY CURRENT TESTING AND TUBE PLUGGING, R.C.P. MOTOR MODIFICATIONS, MAIN TURBINE CONDENSER RETUBING AND APPENDIX "R" DESIGN CHANGES. THE UNIT IS SCHEDULED TO RETURN TO SERVICE ON JUNE 9,  1984.
CMMMMMMMMMM                COOK 2 SHUTDOWN ON.MARCil 10TH FOR REFUELING AND MAINTENANCE.
0
 
==SUMMARY==
M:
EMMMMMMMMMM
        - Twee            'Reamen'                                                          Method              System 8 Comoonent F-Forced 'A-Equip Failure F-Admin                                                  1-Manual          Exhibit F 8 H S-Sched          B-Maint.or Test .G-Oper Error 2-Manual Scram Instructions for C-Refueling                                        'H-Other      3-Auto Scram      Preparation  of
                          'D-Regulatory Restriction                                          4-Continued        Data Entry Sheet 4
y
: E-Operator' Training 5-Reduced Load Licensee Event Report 8 License Examination                                        9-Other            (LER) File (NUREG-0161)
  * '                                                                                                                                                                                                  PAGE 2-063
 
i 4
                    .tumanunumanummmwwwwuummuununnuunuunu .
                    .U-            .
COOK 2        . N
                    'CumannummunummuumunununummuunnumMWMM                              FACILITY              DATA                                                Report Period MAR 1984 FACILITY DESCRIPTION                                                        UTILITY 8 CONTRACTOR INFORMATION
                          ; LOCATION                                      .
UTILITY STATE.................... MICHIGAN                                      LICENSEE................. INDIANA 8 MICHIGAN ELECTRIC COUNTY.~..................BERRIEN
                                                  ~                                                      CORPORATE ADDRESS....... 1 RIVERSIDE PLAZA COLUMBUS, ONIO 43216 DIST-AND DIRECTION FROM
                              . NEAREST. POPULATION CTR.. 11 MI $ OF                                CONTRACTOR BENTON HARBOR, MI                          ARCHITECT / ENGINEER.......AMERICAN ELEC. POWER SERVICE CORP.
                          *[{
                          ' TYPE OF. REACTOR............PWR                                              HUC STEAM SYS SUPPLIER... WESTINGHOUSE
                          .DATE INITIAL CRITICALITY... MARCH IB, 1978                                    CONSTRUCTOR..............J. A. JONES CONSTRUCTION
                          'DATE ELEC ENER IST GENER... MARCH 22, 1978                                    TURBINE SUPPLIER......... BROWN BOVERI b IDATE COMMERCIAL OPERATE.... JULY 1, 1978                                        REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                    IE REGION RESPONSIBLE......III
: CONDENSER COOLING WATER.... LAKE MICHIGAN                                IE RESIDENT INSPECTOR......E. SWANSON ELECTRIC RELIABILITY-                              -
LICENSING PROJ MANAGER.....D. WIGGINTON
        '    *s                COUNCIL.................. EAST CENTRAL AREA                            DOCKET NUMBER...........        50-316 RELIABILITY COORDINATION
                                                                ' AGREEMENT                          LICENSE 8 DATE ISSUANCE....DPR-74, DECEMBER 23, 1977 PUBLIC DOCUMENT ROOM.......MAUDE PRESTON PALENSKE MEMORIAL LIBRARY 500 MARKET STREET ST. JOSEPH, MICHIGAN 49085 I N 5 P E'C T I 0'N        STATUS INSPECTION
 
==SUMMARY==
 
INSPECTION ON FEBRUARY 13-17,'(84-05):              ROUTINE, ANNOUNCED INSPECTION OF THE FOLLOWING AREAS OF THE EMERGENCY PREPAREDNESS PROGRAM: EMERGENCY DETECTION AND CLASSIFICATION; PROTECTIVE ACTION DECISION-MAKING; HOTIFICATIONS AND COMMUNICATIONS; CHANGES TO
                          'THE EMERGENCY PREPAREDNESS PROGRAM; SHIFT STAFFING AND AUGMENTATIDH; KNOWLEDGE AND PERFORMANCE OF DUTIES (TRAINING); DOSE
                        --CALCULATION AND ASSESSMENT; PUBLIC INFORMATION PROGRAM; LICENSEE AUDITS; AND, METEOROLOGY. THE INSPECTION INVOLVED 134 INSPECTION-HOURS CNSITE BY TWO NRC INSPECTORS AND TWO CONSULTANTS. DNE APPARENT ITEM OF HONCOMPLIANCE WAS IDENTIFIED: FAILURE TO MEET. SCHEDULAR EMERGENCY PLAN AND PROCEDURE REQUIREMENTS.
ENFORCEMENT SUPW1ARY
                    -UNITS 1 AND 2 TECHNICAL SPECIFICATION 3.7.9.4.A ALLOWS 14 DAYS TO RETURN AN INOPERABLE HALON SYSTEM TO OPERABLE STATUS OR, SUBMIT
                    'A SPECIAL REPORT TO THE COMMISSION WITHIN 30 DAYS OUTLINING THE ACTIONS TAKEN, THE CAUSE OF THE OPERABILITY AND THE PLANS AND
                      ' SCHEDULE FOR RETURNING THE SYSTEM TO OPERABLE STATUS. CONTRARY TO THE ABOVE, WHEN THE HALON SYSTEM WAS DECLARED INOPERABLE OH l APRIL 5. -1983 (UNIT 1) AND APRIL 14, 1983 (UNIT.2) AND HOT RETURNED TO SERVICE WITHIN 14 DAYS A SPECIAL REPORT PROVIDING THE h              RE4UESTED INFORMATION WAS NOT SUBMITTED.
                    '(4322 5)                                                                                                                                                                                    l l
PAGE 2-064 If
 
                                    ..                                                                                            MMMMMMMMMMMMMMMMMMMMMhMMMMMMMMMMMMMM Report Period MAR 1984                          IN$PECTION                              STATUS - (CONTINUED)              M                  COOK 2                          M
-.. ,                                                                                                                              MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM DTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NOME FACILITY ITEMS (PLANS AND PROCEDURES):
            - NONE MANAGERIAL' ITEMS:
NOME PLANT STATUS:
            - THE. UNIT SMUT DOWN ON 3/10/84 TO BEGIN A 90 DAY REFUELING OUTAGE.
LAST IE SITE-INSPECTION DATES- MARCH 13 - APRIL 23, 1984 INSPECTION' REPORT NO: 84-06 .
REPORTS                    FR0M LICENSEE
                ==================================================================================================================================
NUMBER          DATE OF  DATE OF              SUBJECT EVENT    REPORT.
___        _ ______          _= ---      __ _ _ - - _ _ _ _ _
          ' 8 84-02/              02/18/84  03/16/84            TURBINE TRIP / REACTOR TRIP OCCURRED FROM FULL POWER.
                ==================================================================================================================================
      ,s %
        +
        'n'4'
          ~.
s i  i PAGE 2-065
  ?-
o
 
s
: 1. Docket: '50-298            0PERATIHG              STATUS                      MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M                    COOPER STATION                                              N
: 2. Reporting Period: 03/01/84      Outage + On-line Hrs:        744.0            MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM 3.. Utility
 
==Contact:==
P. L. BALLINGER (402) 825-3811                            AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                        2381 COOPER STRTION
:5. Nameplate Rating (Gross MWe):              983 X 0.85 : 836 I880
: 6. Design Electrical Rating (Het MWe):                    778 OCSIGN ELEC. RATING -                                  778
: 7. Maximum Dependable Capacity (Gross NWe):                787                    -----.NRX. DEPEND. Cfr. -                                          764 (100%)
: 8. Maximum Dependable Capacity (Het MWe):                  764
: 9. If Changes occur Above $1nce Last Report, Give Reasons:
NOME ilt. Power" Level To Which Restricted, If Any (Net MWe):
: 11. Reasons for Restrictions, If Any:                                      1003-NONE' MONTH        YEAR        CUMULATIVE                                                                                                        R
: 12. Report Period Hrs                744.0    2.184.0        85.489.0                                                                                                        E
                                                                                              - - - - - - - - - - - - - - - - - - =                                      -_====    -100 13._ Hours Reactor Critical 744.0    2.158.0        69,161.0
: 14. Rx Reserve Shtdwn Hrs
                                  ~
                                                    .0          .0              .0 hf                                                                                                  g
                                                                                                                                                                                    ' 80
: 15. Mrs Generator On-Line            744.0    2.140.6        68.058.9
        ' 16.:, Unit Reserve Shtdwn Hrs            .0-        .0              .0    500 -
                                                                                                                                                                                    -so
: 17. Gross Therm Ener (MWH)      1.530.624  4.369.128 134.882.286 18, Gross Elec Ener (MWH)          512.748  1.475.871      42.882.226
                                                                                                                                                                                    -40
: 19. Het Elec-Ener (MWH)            491.524  1.413.205      41.329.864
        '20. Unit Service Factor                105,1        98.0            79.6
                                                                                                                                                                                    '*U
: 21. Unit Avail Factor'                100.c        98.0            79.6 22.' Unit Cap. Factor (MDC Net)        86.5        84.7            63.3
    ''                                                                                  U
        .23.' Unit Cap Factor (DER Net)          84.9        83.2    _
62.1          o'        'S ~          l'o        ' 1'5 '                    ~2 h'  ~2 5'        ~h 3
gg                                                                DAYS
: 24. Unit Forced Outage Rate                .0                        3.7
: 25. Forced Outage Hours
                                                    .0      43.4        2.000.7
        '26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration),
MARCH 1984 MAINTENANCE. APRIL 7. 1984. 9 DAYS.
: 27. If Currently Shutdown Estimated Startup.Date:              N/A                                                                                                            PAGE 2-066
  . f:
y
 
NNMMMMNNNNNNNNMMMMMMNNNNNNNNNMMMMMNN Report Period MAR 1984                UNIT      SHUTD0WHS / REDUCTIONS                      N        COOPER STATION                                                              N MNNNNNNMMMMMMMMMMMMMMMMNNNWMNNNNNNNM Mo. Date    Tv5. Hours Reason        LER Number System Comoonent          Cause & Corrective Action to Prevent Recurrence MONE'
      ,,J-t NNNNNNNNNNN -    COOPER STATION OPERATED ROUTINELY DURING THE REPORT PERIOD WITH M
 
==SUMMARY==
N      NO REPORTED REDUCTIONS.
NNNNNNNNNNN
          ~ Tyne    Reason                        Method            Svstem 8 Comoonent
          ' F-Forced A-Equip' Failure F-Admin        1-Manual          Exhibit F 8 H S-Sched, 8-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling.,      H-Other    3-Auto Scram      Preparation of
                    ,D-Reculatory Restriction      4-Continued        Data Entry Sheet E-Operator Training            5-Reduced Load Licensee Event Report
                          & License Examination      9-Other          (LER) File (HUREG-0161)
PAGE 2-067
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMNNNM N            COOPER STATION                        N MummuumMMNunuunnummuununuMwMNNuMMMuu                          FACILITY        DATA                                                            Report Period MAR 1984
- FACILITY DESCRIPTION                                                    UTILITY 8 CONTRACTOR INFORMATION
      -LOCATION                                                            UTILITY STATE.................... NEBRASKA                                    LICENSEE................. NEBRASKA PUBLIC POWER DISTRICT COUNTY...................NEMAHA                                      CORPORATE ADDRESS........P.O. BOX 499 COLUMBUS, HEBRASKA 68601 DIST AND DIRECTION FROM HEAREST POPULATION CTR.. 23 MI S OF                                CONTRACTOR NEBRASKA CITY, NES              ARCHITECT / ENGINEER....... BURNS 8 RDE TYPE OF REACTOR. . . . . . . . . . . .BWR                              HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL' CRITICALITY... FEBRUARY 21, 1974                          CONSTRUCTOR.............. BURNS 8 ROE DATE ELEC ENER 1ST GENER...MAY 10, 1974                                TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCI AL OPERATE. . . . JULY 1,          1974              REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                IE REGION RESPONSIBLE......IV CONDENSER COOLING WATER.... MISSOURI RIVER                          IE RESIDENT INSPECTOR......D. DUBOIS ELECTRIC RELIABILITY                                                LICENSING PROJ MANAGER.....B. SIEGEL COUNCIL...........'.......MID-CONTINENT AREA                          DOCKET NUMBER........... 50-298 RELIABILITY COORDINATION AGREEMENT                  LICENSE 8 DATE ISSUANCE....DPR-46, JANUARY 18, 1974 PUBLIC DOCUMENT ROOM....... AUBURN PUBLIC LIBRARY 1118 15TH STREET AUBURN, NEBRASKA 68305 IN5PECTION            STATUS INSPECTION
 
==SUMMARY==
 
INSPECTION CONDUCTED OCTOBER 18-21, 1983 (8328): ROUTINE, UNANNOUNCED INSPECTION OF THE SECURITY PLAN AND IMPLEMENTING PROCEDURES; SECURITY PROGRAM AUDIT; LOCKS, KEYS, AND COMBINATIONS; PHYSICAL BARRIERS - PROTECTED AREA; ALARM STATIONS; APPENDIX B cTO 10 CFR,' PART 73; AND INDEPENDENT INSPECTION EFFORT. WITHIN THE SEVEN AREAS INSPECTED, ONE VIOLATION AND TWO OPEN ITEMS WERE IDENTIFIED.
INSPECTION CONDUCTED JANUARY 1 - FEBRUARY 29, 1984 (8401): ROUTINE ANNDUNCED INSPECTION OF OPERATIONAL SAFETY VERIFICATIONS, MONTMLY SURVEILLANCE AND MAINTENANCE OBSERVATIONS, PLANT TRIP - SAFETY SYSTEM CHALLENGES, LICENSEE EVENT FOLLOWUP, IE BULLETINS, FOLLOWUP OF PREVIOUSLY IDENTIFIED ITEMS INCLUDING VIOLATIONS AND UNRESOLVED ITEMS, COLD WEATHER PREPARATION, AND PLANT PROCEDURES REVIEW. WITHIN THE AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
TINSPECTION CONDUCTED MARCH 15, 1984 (8405): ROUTINE ANNOUNCED INSPECTION TO DETERMINE THE STATUS OF THE 1984 EXERCISE SCENERIO DEVELOPMENT. WITHIN THE AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
    .MONE' .
PAGE 2-068
 
o NNMMMMMMNNNNNNNNNNNMNNNMMMMNNNNNMMMM Report Period MAR.1984                            INSPECTION                  STATUS - (CONTINUED)                  N              COOPER STATION                                        N NNMMMMMMMMMMNNNNMMMMMMMMMNNNMNNMMMNN OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS's NONE FACILITY ITEMS (PLANS AND PROCEDURES):
NOME
            ' MANAGERIAL ITEMS:-
            .NONE.
            -PLANT STATUS:
            ' ROUTINE POWER OPERATION LAST'IE' SITE INSPECTION DATE: . MARCH 15, 1984 INSPECTION REPORT ~MO:  50-298/8405 REP 0RTS            FR0M      LICENSEE
              ==================================================================================================================================
NUMBER  DATE OF    DATE OF                SUBJECT EVENT      REPORT
__=____          . =-  _ _ . . .-      =_____=        . _ -_ .___=-- ..____=__________________________.                                      ______
                . NOME '
g-            ==================================================================================================================================
p r ..
.h' f ..
  !                        4 PAGE 2-069
: 1. D5cket          50-302                              0 P E R'A T I N G      STATUS                    MNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNM
          - -                                                                                                    M            CRYSTAL RIVER 3                                    N
: 2. Reporting Period:              '03/L1/84                0utage + On-line Hrs      744.0            NNNNNNNNNMMNNNMMMMNNNNMMNNNMMNNNNMMM
: 3. Utility Contacts              D. BOGART (104) 795-6486                                              AVERAGE DAILY POWER LEVEL (MWei PLOT
: 4. Licensed Thermal Power (MWt):                                                2544 5 Nameplate Rating (Gross MWe):                                        989 X 0.9 : 890
: 6. Design Electrical Rating (Het MWe):                                          825              1923 7.. Maximum Dependable Capacity (Gross MWe):                                    850                              DESIGN ELEO. RATING -            825
                                                                                                                ......MRX. DEPDC. Cfr. -                  821 (100%)
: 8. Maximum Dependable Capacity (Net MWe):
821
: 9. If Changes Occur Above Since Last Report, Give Reasons:
MDC CHANGE BASED ON OPERATIN W RLENCE
      -10. Power Level To Which Restricted, If Any (Het MWe):
11.. Reasons for Restrictiers, If Anyt tomo-NDHE m m K m m mim anese
                              .                                  MONTH        YEAR    CUMULATIVE
: 12. Report Period Hrs                                        744.0      2.184.0    61.824.0                ss        -      _. -  _4
                                                                                                                                                                            ~m 3,g ll
                                                                                                                                              \r - _ _pr
: 13. Hours Reactor Critical                                  '730.1      2.116.0    39.686.0                                                                                ,
14.'Rx Reserve Shtdwn Hrs                                        .0          .0      1.275.5    W                                                                          -so E
: 15. Hrs Generator On-Line                                    722.3      2.087.9    38.707.0
: 16. Unit Reserve'Shtdwn Mrs                                      .0          .0          .0 800-                                                                    -so 17.iGross Therm Ener (MWH)                              1.733.874    5.008.081  86.972.416
: 18. Gross Elec Ener (MWH)                                  602.702    1.745.677  29.672.413
                                                                                                                                                                                    ~ *U
: 19. Met Elec'Ener (MWH)                                    574.586    1.664.827  28.181.910
: 20. Unit Service. Factor'                                    97.1        95.6          62.6 97.1        95.6-        62.6                                                                                -am 21.: Unit Avall Factor
: 22. Unit Cap _ Factor (MDC Met)                              94.1        92.8          55.5 23.. Unit Cap Factor (DER Met).                              93.6        92.4          55.3        0  -
                                                                                                                                                                        ,-    .,    0 0      5        to      15    30                    25      30
: 24. Unit Forced Outage Rate                                    2.9          3.0          23.2                                    DAYS
: 25. Forced Ou'tage Hours                                      21.7        63.9    11.679.2
      .26.! Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                                            MRRCH 1984 FEEDWATER LEAK REPAIRS - 04/05/84.
27,.?If Currently Shutdown Estimated Startup Date s                                N/A                                                                                          PAGE 2-070
 
NNNNNNNMMMNNNNNNNNMKNNNNNNNNNNNNNNNW Report Period MAR 1984                      U H.I T    SHUTD0WN5 / REDUCTIONS                                N        CRYSTAL RIVER 3            N NNNNNMMMMMMMMMMMMMMMMNNMMMMMMNNWMMNN Ho.      Date    liii Hours Reason Bhthod LER Number Svstem Comoonent                          Cause & Corrective Action to Prevent Recurrence 84-12 93/03/84          F  O.O      A      5                          HC      HTEXCH    REDUCED POWER TO 75% FP TO LOCATE A SALTWATER LEAK IN "A" WATERBOX.
84-13 03/08/84          S'  O.0      2      5                          HC      HTEXCH    REDUCED F0WER TO 75% FP TO CLEAN AND EP0XY COAT THE "A" WATERBOX OUTLET TUBE SHEET TO PREVENT LEAKAGE.
84-14 03/22/84          F  15.7      A      1                          CB      MOTORX    SHUTDOWN TO INVESTIGATE A HIGH OIL LEVEL ALARM OH RCP-B.
84 03/29/84        F    6.0      A      1                          CB      MOTORX    SHUTDOWN TG INVESTIGATE A HIGH OIL LEVEL ALARM ON RCP-B.
f 5
NNNNNNNNNNN      -CRYSTAL RIVER 3 OPERATED WITH 2 REDUCTIONS AND 2 OUTAGES DURING N
 
==SUMMARY==
N        MARCH.
NNNNNNNNNNN Twee        Rem men                            Method                    System 8 Component F-Forced A-Equip. Failure F-Admin'              1-Manual                  Exhibit F 8 H S-Sched ':8-Maint or Test G-Oper Error 2-Minual Scram                  Instructions for C-Refueling          H-Other      3-Auto Scram              Preparation of
                -D-Regulatory Restrict?on'          4-Continued                Data Entry Sheet
                'E-Operator Training                5-Reduced Load          Licensee Event Report 8 License Exaeination            9-Other                    (LER) File (HUREG-0161)
PAGE 2-071 m
 
                        --  ,                          ._      _.~  _..            _  _ ._                _ _ _ _ _ _ _                      . . . _ _    _ _ _ _ _ _ _ _      _ _ . _ _ _ _
t--
nummmmmmmmmmmmmmuuammmmmmmmmmmmmmuum a              CRYSTAL RIVER'3              m
      .mmmmmmmmmmmmmmmmmmmmmmmmmmanummmuuum                    FACILITY          DATA                                                                      Report Period MAR 1984 FACILITY DESCRIPTION                                              UTILITY & CONTRACTOR INFORMATION
        ' LOCATION                                                        UTILITY STATE.................... FLORIDA                              LICENSEE................. FLORIDA POWER CORPORATION
: COUNTY................... CITRUS                              CORPORATE ADDRESS. . . . . . . 3201 34TH STREET SOUTH ST PETERSBURG, FLORIDA 33733
              ' DIST AND DIRECTION FROM        . .
NEAREST POPULATION CTR.. 7 MI NW OF                        CONTRACTOR ORYSTAL RIVER, FLA ARCHITECT / ENGINEER....... GILBERT ASSOCIATES TYPE OF REACTOR............PWR                                    NUC STEAM SYS SUPPLIER... BABCOCK & WILC0X DATE INITIAL CRITICALIT(. .. JANUARY 14, 1977                      CONSTRUCTOR..............J. A. JONES CONSTRUCTION                                                                  l DATE ELEC'ENER IST fLNER... JANUARY 30, 1977                      TURBINE SUPPLIER......... WESTINGHOUSE                                                                              !
DATE COMMERCIAL 0;ERATE.... MARCH 13, 1977                    REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                            IE REGION RESPONSIBLE......II CONDENSER COOLING WA71R.... GULF OF MEXICO                      IE RESIDENT INSPECTOR......T. STETKA                                                                                  l
        . ELECTRIC RELIABILITY                                            LICENSING PROJ MANAGER.....R. HERNAN                                                                                  L COUNCIL................. 50UTHEASTERN ELECTRIC                DOCKET NUMBER...........      50-302                                                                              !
RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-72, JANUARY 28, 1977                                                                    i PUBLIC DOCUMENT ROOM....... CRYSTAL RIVER PUBLIC LIBRARY 668 N.W. FIRST CRYSTAL RIVER, FLORIDA 32639 IN$PECTION              STATUS INSPECTION
 
==SUMMARY==
 
            + INSPECTION FEBRUARY 21-24 (84-03): THIS ROUTINE, UNANN0UNCED INSPECTION INVOLVED TWENTY-HINE INSPECTOR-HOURS ON SITE IN THE AREAS OF REACTOR COOLANT SYSTER LEAK RATE MEASUREMENT. NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
i          INSPECTION FEBRUARY 6-7 (84-04): THIS SPECIAL, UNANNOUNCED INSPECTION INVOLVED 19 INSPECTOR-HOURS ON SITE IN THE AREA 0F AH EMERGENCY PREPAREDNESS INSPECTION OF PROTECTIVE ACTION RECOMMENDATIONS. IN THE AREA INSPECTED, H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
* INSPECTION FEBRUARY 13-17 (84-05): THIS INSPECTION INVOLVED 40 INSPECTOR-HOURS ON SITE BY ONE NRC INSPECTOR. THE INSPECTION WAS
          . BEGUN DURING AN OFFSHIFT PERIOD; 10 INSPECTION HOURS WERE ACCOMPLISHED DURING OFFSHIFT PERIODS. INCLUDED REVIEW OF SECURITY PLAN                                                      i AND IMPLEMENTING PROCEDURES; SECURITY ORGANIZATION-PERSONNEL AND RESPONSE; SECURITY PROGRAM AUDIT; RECORDS AND REPORTS; TESTING                                                        l AND MAINTENANCE; PHYSICAL BARRIERS-PROTECTED AND VITAL AREAS; SECURITY SYSTEM POWER SUPPLY; ASSESSMENT AIDS; ACCESS                                                                    '
CONTROL-PERSONNEL, PACKAGES AND VEHICLES; DETECTION AIDS-PROTECTED AND VITAL AREAS; ALARM STATIONS AND COMMUNICATIONS. THE LICENSEE WAS FOUND TO BE IN COMPLIANCE WITH NRC REQUIREMENTS WITHIN THE 17 AREAS EXAMINED DURING THE INSPECTION EXCEPT FOR THE
          'FOLLOWING THREE VIOLATIONS: RECORDS AND REPORTS; TESTING AND MAINTENANCE; AND ACCESS CONTROL-PERSONNEL.
ENFORCEMENT
 
==SUMMARY==
 
NONE1 PAGE 2-072        l
 
    .j. .
MNNMMMMMMMMMMMMMMMMMMMNNNNMMNNMMMMMM Report Period MAR 1984      '
INSPECTION          '
STATUS - (CONTINUED)                                                  N                    CRYSTAL RIVER 3                                                      N MMMMMMMMMMMMMMNNMMMMMMMMMMNNMMMMMMMM OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NOME.
: FACILITY ITERS (PLANS AND PROCEDURES):
NOME.
MANAGERIAL ITEMS:
NONE.
PLANT STATUS:
NORMAL OPERATIONS.
JLAST IE SITE INSPECTION DATE: FEBRUARY 21-24, 1984 +
INSPECTIOb REPORT NO: 50-102/84-03 +
REPORTS          FR0M            LICENSEE
            '==================================================================================================================================
NUMBER'          DATE OF    DATE OF        SUBJECT-EVENT-    REPORT
              --=      ------------------- _-              __- _ =------=_
____==-==____==------------------------- ___                                                      __=                -____-_- ___-------------
44-001/          01/13/84  02/10/84'      END CAP OF PENETRATION IN REACTOR CONTAINMENT BLDG, INCORRECTLY CUT OFF, DUE TO PERSONNEL ERROR.
,        4        84-002/          02/02/84  02/17/84' . A LIQUID RELEASE TOOK PLACE WITNOUT CONTINUOUS RECORDING OF THE RELEASE FLOW RATE AND RADI0 ACTIVITY.
                ==================================================================================================================================
(
I PAGE 2-073
 
                                          =-.          -_          . . .      -          .-        -      .      _ _ -          .-. -
: 1. Docket    50-346          0PERATIHG                  STATUS                              MNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN N              DAVIS-BESSE 1                                                            M 2.' Reporting Period: 03/01/84      Outage + On-line Hrst 744.0                            NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
: 3. Utility Contacts BILAL SARSOUR (419) 259-5000 X384                                      AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                          2772                                              g g_        .g g
                                                                                                            )
: 5. Hameplate Rating (Gross MWe):                1069 x 0.9 : 962 I'"U
: 6. Design' Electrical Rating (Het MWe):                    906 DESIGN a1EC. RRTING -            SOS l    7. Maximum Dependable Capacity (Gross MWe)                918                            ......HRX. DEPEND. ORP. -                    874 (1mIO
: 8. Maximum Dependable Capacity (Het MWe):                  874 9.'If Changes Occur Above Since Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted. If Any (Het MWe):
11 Reasons for Restrictions, If Anyt                                            10mD-NOME MONTH        YEAR      CUMULATIVE                  i--------------------------------------                                                        -100
: 12. Report Period Hrs                744.0      2.184.0      49.705.0
: 13. Hours Reactor Critical.          609.2      1.666.3      29.168.7                                      f                                                                          ~*
: 14. Rx Reserve Shtdun Mrs            134.8        134.8        4.014.1      hf
: 15. Mrs Generator On-Line            596.8      1.633.2      27.785.0
                                                                                                                                                                                            -80
: 16. Unit Reserve Shtdun Hrs                .0          .0      1.732.7          gag.
: 17. Gross Thern Ener (MWH)      1.537.462    4.233.842 65.277.655
: 18. Gross Elec Ener (MWH)          506.233    1.397.283    21.689.476                                                                                                                  _ ,a
: 19. det Elec Ener (MWH)            475.956    1.310.565 20.309.264
: 20. Unit Service Factor              80.2        74.8                55.9                                                                                                                            i
                                                                                                                                                                                            -20
: 21. Unit Avail Factor                80.2        74.8                59.4
: 22. Unit Cap Factor (MDC Het)        73.2        68.7                46.8 66.2                45.1
                                                                                        *      ~    ~
: 23. Unit Cap Factor (DER Net)        70.6                                            a            s      l'O '      ' t's    '30 '  'as '                                      IO
: 24. Unit Forced Outage Rate          19.8        25.2                19.0                                            DAYS
: 25. Forced Outage Hours              147.2        550.8        7.134.8
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                                MARCH 1984 mont
: 27. If Currently Shutdown Estimated Startup Dates            N/A                                                                                                                            PAGE 2-074
 
NNNNNNNNNNNNNNNNNNNNNNMMNNNNNNNNNNNM Report Period MAR.1984                UNIT      $HUTD0WN5 / REDUCTIONS                        M        DAVIS-BESSE j                                N NNNNNNNMMMNNNNNNNNNNMWNNNNNNNNNNNNNN No. Date    IEEE Neurs Reason          LER Number System Component          Cause & Corrective Action to Prevent Recurrence 2      03/02/84. F  147.2    A    3    84-03          IA    INSTRU  THE REACTOR PROTECTION SYSTEM TRIPPED THE REACTOR ON HIGH FLUX DUE TO A DEFECTIVE OPTICAL ISOLATOR IN THE RELAY DRIVER CARD FOR STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM CHANNEL 4 CONTROL RELAY.
musumMMMumu      DAVID-BASSE OPERATED WITH 1 OUTAGE FOR EQUIPMENT FAILURE.
0
 
==SUMMARY==
N MumMMMmMMMu
'Twee      Rameen                          Method            lystem 8 Comoonent F-Forced A-Equip Failure F-Admin          1-Manual          Exhibit F & H 5-Sched  B-Maint or Test, G-Oper Error 2-Manual Scram Instructions for C-Refueling .      H-Other      3-Auto Scram      Preparation of D-Regulatory Restriction        4-Continued        Data Entry Sheet                                      *
          ,E-Operator Training            5-Reduced Load Licensee Event Report
              & License Examination        9-Other          (LER) File (NUREG-0161)
PAGE 2-075
 
muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun u            DAVIS-BESSE 1                          m muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu                            FACILITY        DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                                      UTILITY & CONTRACTOR INFORMATION LOCATION                                                                UTILITY STATE................... 0HIO                                            LICENSEE................. TOLEDO EDISON COUNTY.................. 0TTAWA                                          CORPORATE ADDRESS.. . . . . . 300 MADISON AVENUE TOLEDO, OHIO 43652 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 21 MI E OF                                  CONTRACTOR TOLEDO, OH                      ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                            HUC STEAM SYS SUPPLIER... BABCOCK & WILCOX DATE INITIAL CRITICALITY... AUGUST 12, 1977                                CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... AUGUST 28, 1977                                TURBINE SUPPLIER......... GENERAL ELECTRIC
  ' DATE COMMERCI AL OPERATE. . . . JULY 31, 1978                        REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER                              IE REGIDH RESPONSIBLE......III CONDENSER CO3 LING WATER.... LAKE ERIE                                  IE RESIDENT INSPECTOR......W. ROGERS ELECTRIC RELIABILITY                                                    LICENSING PROJ MANAGER.....A. DEAGAZIO COUNCIL.................. EAST CENTRAL AREA                              DOCKET NUMBER........... 50-346 RELIABILITY COORDINATION AGREEMENT                  LICENSE 8 DATE ISSUANCE....HPF-3, APRIL 22, 1977 PUBLIC DOCUMENT ROOM....... UNIVERSITY OF TOLEDO LIBRARY GOVERNMENT DOCUMENTS COLLECTION 2801 WEST BANCROFT AVEHUE TOLEDO, OHIO 43606 INSPECTION            STATUS INSPECTION
 
==SUMMARY==
 
INSPECTION ON FEBRUARY 21-24, (84-03): AREAS INSPECTED INCLUDED A REVIEW OF SECURITY PLANS AND IMPLEMENTING PROCEDURES; SECURITY ORGANIZATION-MANAGEMENT RESPONSE; DETECTION AIDS-VITAL AND PROTECTED AREAS; ACCESS CONTROLS-PERSONNEL-PACKAGES; SECURITY PROGRAM AUDIT; PHYSICAL BARRIERS ~- PROTECTED AND VITAL AREAS; ASSESSMENT AIDS; ALARM STATIONS; COMMUNICATIONS; AND FOLLOWUP ON PREVIOUS ITEM OF HONCOMPLIANCE. THE INSPECTION INVOLVED 28 INSPECTOR HOURS ONSITE BY ONE HRC INSPECTOR. THE LICENSEE WAS FOUND TO BE IN
  -COMPLIANCE WITH NRC REQUIREMENTS WITHIN THE AREAS EXAMINED EXCEPT FOR THE FOLLOWING THREE AREAS.                        DETECTION AIDS - VITAL AREAS:
SOME INTRUSION ALARMS DID NOT MEET SECURITY PLAH CRITERIA. DETECTION AIDS - TROTECTED AREAS: SOME INTRUSION ALARMS DID NOT MEET SECURITY PLAN CRITERIA. SECURITY ORGANIZATION - MANAGEMENT: ONE SECURITY EVENT WAS NOT REPORTED WITHIH THE TIME CRITERIA REQUIRED BY 10 CFR 73.71(C). THE TWO ITEMS OF HONCOMPLIANCE NOTED IN THE PREVIOUS INSPECTION REPORT WERE CLOSED. ONE ITEM OF CONCERN PERTAINING TO IMPROVED OPERABILITY FOR CERTAIN INTRUSION DETECTION SYSTEMS REMAINED OPEN. IMPROVEMENT IN THIS AREA WAS NOTED.
ENFORCEMENT
 
==SUMMARY==
 
:10 CFR 50, APPENDIX B, CRITERION III, STATES IN PART THAT " MEASURES SHALL BE ESTABLISHED TO ASSURE THAT APPLICABLE REGULATORY REQUIREMENTS AND THE DESIGN BASES...ARE CORRECTLY TRANSLATED INTO SPECIFICATIONS, DRAWINGS, PROCEDURES, AHD INSTRUCTIONS."
CRITERION III ALSO STATES, " DESIGN CHANGES, INCLUDING FIELD CHANGES, SHALL BE SUBJECT TO DESIGN CONTROL MEASURES COMMENSURATE WITH PAGE 2-076
 
NNNNNNMMNNNNNNNNNNhMNNNNNMMMMMMMNNMM Report Period MAR 1984                            IN5PECTION      5TATUS - (CONTINUED)            M        DAVIS-BESSE 1                                                              N NNNMMNNMMMMMNNNNNNMMMMMMNNNNMMMNNNNN ENFORCEMENT
 
==SUMMARY==
 
THOSE APPLIED TO THE ORIGINAL DESIGN...." DRAWINGS M-190 AND M-050 ARE SHOWN AS CONTROLLED IN THE LICENSEE'S DRAWING PRINT INDEX.
CONTRARY TO THE ABOVE, THE LICENSEE'S DESIGN PROCESS HAS NOT ENSURED THE INFORMATION ON CONTROLLED DRAWINGS IS CORRECT. EXAMPLES:
(A) PIPING SPECIFICATION 602, AN. ATTACHMENT TO DRAWING M-190, AND THE UPDATED SAFETY ANALYSIS REPORT TABLE 6.3.-2 ARE NOT IN AGREEMENT. TABLE 6.3-2 STATES THAT THE PIPING FROM THE BORATED WATER STORAGE TANK TO THE HIGH PRESSURE INJECTION SUCTION CHECK VALVES IS RATED AT 75 PSI /300 DEGREES F VERSUS 75 PSI /150 DEGREES F IN PIPING SPECIFICATION 602.        TABLE 6.3-2 STATES THAT THE PIPING FROM THE HIGH PRESSURE INJECTION PUMP DISCHARGE TO THE DISCHARGE CHECK VALVE IS RATED AT 200 PSI /300 DEGREES F AND THEN 3050 PSI /300 DEGREES F TO THE STOP CHECK VALVE. PIPING SPECIFICATION 602 STATES THAT PORTIONS OF THE 3050 PSI /300 DEGREES F PIPING IS 2000 PSI /300 DEGREES F, AND (B) DRAWING M-050, STEAM FEED RUPTURE CONTROL SYSTEM LOGIC DIAGRAM, WAS NOT ANNOTATED AS REQUIRING UPDATING IN THE DESIGH WORK PACKAGES OF FCR 80-042 AND FCR 79-184 EVEN THOUGH THE LOGIC OF THE SYSTEM WAS MODIFIED BY THESE FCRS.
(8324 4)
TECHNICAL SPECIFICATION 6.8.1.A REQUIRES WRITTEN PROCEDURES BE ESTABLISHED, IMPLEMENTED AND MAINTAINED COVERIi.) THE ACTIVITIES REFERENCED IN APPENDIX "A" 0F REGULATORY GUIDE 1.33, NOVEMBER, 1972.          REGULATORY GUIDE 1.33, NOVEMBER, 1972, APPENDIX A, SECTION 7.E(5) REQUIRES RADIATION PROTECTION PROCEDURES BE ESTABLISHED, IMPLEMENTED AND MAINTAINED COVERING RESPIRATORY PROTECTION.
        ' HEALTH PHYSICS PROCEDURE HP 1605.C2.11, SECTION 6.2.2.4, REQUIRES "EACH INDIVIDUAL CERTIFIED TO USE RESPIRATORY PROTECTION EQUIPMENT SHALL COMPLETE A REFRESHER TRAINING SESSIGH AND BE RECERTIFIED ANNUALLY." CONTRARY TO THE ABOVE A MAINTENANCE INDIVIDUAL WAS AUTHORIZED TO USE RESPIRATORY EQUIPMENT BY CHEMISTRY AND HEALTH PHYSICS DEPARTMENT IN MID-DECEMBER OF 1983 EVEN THOUGH THE INDIVIDUAL'S CERTIFICATION EXPIRED ON OCTOBER 26.          1983.
(8324 5)
OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NONE FACILITY ITEMS (PLANS AND PROCEDURES):
NOME-MANAGERIAL ITEMS:
NOME PLANT STATUS:
THE UNIT IS OPERATING NORMALLY.
LAST IE SITE INSPECTION DATE: MARCH 6 - MAY 16, 1984
          -INSPECTION REPORT NO: 84-07 PAGE 2-077
 
                                                                    . _ . .                  _        _ .            - _        m II                                  It                                                              e0 Of                                  18                                                              W II                                  It                                                              O Il                                  II                                                              I 49                                  Il                                                              N XXX                  Il                                  il X        X          Il                Il                St                                                              W X        X          II                  l              It                                                              O X        X    " Il                                      B8                                                              eC E        X          Il                                  II                                                              L X        X          Il                                  il X        X          ll                  l              59 X        X          ll                  I              la X        X          tl                I-                Il X        X          II                1.                Il X        X          ll                I                le X        F'          il                                  Il X        b          II                  I              18 X ** X              45                                  il X        X          Il                                  il X 143 X              85                                  08 X 4fl X              88                  I              BB X t/l X              tl                11                Il X LaJ X              Il                Il                il XmX                  Il                                  B0 X 0 X                18                                  80 XMM                  15                                  BS X >4 X              10                                  It
      .*>X                10                                  ll M aC X              II                                  la 3r Q R              ll                  i              II 3        X          II                  i              90 X        X          ll                                  II X        X          tl                  .              II
* X                  80                  I              ll X        X          09                                  64 X        X          34                  i il X        X          al                  i              11 X        X          ll                  l              Il X        X          lt                                  Il X 3; X              pa                                  10 00                                  80 II                                  II 1B                                  it IB                    .            Il II                    I            le 80                    1            Il 90                    1            II Il                    I            et il                    l            II 60                    I            il it                    i            II 18                                  tl R&J            tl                                  II il                                  II W              II                                  at It                                  90 t/l            il                                  II le                                  el Z              03                    i            99 10                -1              It R&J              Il                    l            It il                    I            la Q              ll                    1            la II                                It
            >4          - 10                                    lt II                                  II J              II                    i            Bt II                      i            BB la                il                it II                .I                80 E                19                    I            II II                                  il '
O                el                                  el ll                                  98 E                Il                                  18 Il                                  II la.              Il                                  59 91                ll              10 II                il              ll il                .I              80 Oft              Il                      I          DI II                      i          le
            >=              18                      i BB lt -                    1          il M                Il                i                II II                I                il O                el '              i                18 10                8                50 L                00      8-        l                BI la      Q          l                It l&J              10      laJ -      ll              80 Il      "1            1            18 M                II ' S                  I          15 31      D                          II .
90      tfl                        18 18                                  88 80                            ' il
                          - 11                                  It II                                  15 40      la. >=                      18 '
il      OWI                        BB II -        O                  - II Il      R&J A                    . Il 18      >= laJ                      ll Il .. ( g              i          18 19      O 8                        II 88                  1                II -
98              'I                  la
                        ' it                                    il 9                80                              - ll 4                Il ' lb                            ft .
e                el OH                              lt
            =              ll          E                    - 88
                        - ls $4J LAJ                      ' 50 W
4
                        -88''>=>
                        . il    ' 4 LBJ BB .
19 E                il '. O            8-              98 II                              - 98 D                BS                                  Be O              88                              ~ II ,
es=              $$                                  88 -
          'L            - ll -- g .                              it S              19      IIJ                        18
        - e.                It
_ II -
a'                  W Is E      11
        -cde                ll '
i O
L'.            H 10 ll i ~-- E - II !
II
                                                              . Il                    <
* l 85                  !I
                                                                $8 '.
i .                                                                                      .            .
p, -
T                                                                              \                -' _
                                                                                                      -      2 j'h,-    # %      - -
                  . ..                                                        _          -:n-
 
m N
O I
N LLI O
4 A
W Z
4 J
53 H
6 tha
              .J
              .J J
4 Z
Q M
5 Z
M LLI C
4 L
en M
Z s
c
                                            -,1 r
                                            .a
    ~
      ~ A as    y' j5 fqv
* t- &    j'  k
 
                  - - - - - - - ~ - - --- - - , - - - - , - - - - - _ - ----- -- -_,.,,--- ---- , - - - - - - - - - - - -- - - -- ---,                                                                                                                  _.    ,--
: 1. Docket    58-237                                                                                            0PERATIHG                              STATUS                              MMMMNNNMMMMMNNNNNMMMNNNNNNNNNNNNNMMM N                                                              DRESDEN 2                N
: 2. Reporting Period                                                  03/01/84                                                        Outage + On-line Hrs: Zii.d                          MMNNNMMMMMMNNMMNNNNMMMMNNMMMMMMMMMMM
: 3. Utility Contacts BEN SCHROEDER (815) 942-2920                                                                                                                                            AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                                                                                                        2527
: 5. Hameplate Rating (Gross MWe):                                                                                                                920 X 0.9 = 828 DRESDEN 2
: 6. Design Electrical Rating (Het MWe):                                                                                                                    794                        1800 DESIGN ELEC. RATING = 794
: 7. Maximum Dependable Capacity (Gross MWe):                                                                                                              812                                                                                                      CN". - 772 (100%)
                                                                                                                                                                                              .----.rwut.                                                  DEPEM3.
: 8. Maximum Dependable Capacity (Het MWe):                                                                                                                772
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions. If Any:
N0sdE MONTH        YEAR    CUMULATIVE                                                                                                                      o
: 12. Report Period Mrs                                                                                                                  744.0    2.184.0    121.704.O                            MD0 GRM mE '=== Lammt arrieuu. cosettInns                                                  g
: 13. Hours Reactor Critical                                                                                                              744.0    2.184.0    94,409.5                        " C "-- --- -- p .---- --- a -100
: 14. Rx Reserve Shtdun Mrs                                                                                                                  .0          .0            .0          g
                                                                                                                                                                                                                                                                                        -so
: 15. Hrs Generator On-Line                                                                                                              744.0    2.162.1    90.063.0
: 16. Unit Reserve Shtdun Mrs                                                                                                                .0          .0            .0 500-
                                                                                                                                                                                                                                                                                        -so
: 17. Gross Therm Ener (MWH)                                                                                              1.765.915            5.069.897 181.807.493
: 18. Gross Elec Ener (MWH)                                                                                                            577.334  1.658.227  58.161.394 4
: 19. Het Elec Ener (PRdH)                                                                                                              548.778  1.580.224  54.977.668
: 20. Unit Service Factor                                                                                                                100.0      99.0          74.0 74.0                                                                                                                  -30
: 21. Unit Avail Factor                                                                                                                  100.0      99.0
: 22. Unit Cap Factor (MDC Met)                                                                                                            95.5      93.7          58.5 0
'23. Unit Cap Factor (DER Net)                                                                                                            92.9      91.1          56.9                    0  -
g-    g-g-  .g.    .g
: 24. Unit Forced Outage Rate                                                                                                                .0        1.0          11.7                                                                                          DRYS 25.~ Forced Outage Hours                                                                                                                  .0      21.9      4.442.1
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):                                                                                                                                                                                              MflRCH 1984 MAY 19.1984 FOR SNUBBER INSPECTION.
.27. If Currently Shutdown Estimated Startup Date                                                                                                            N/A                                                                                                                            PAGE 2-080
 
          . , , , .                                                                                  NMMNNNNNNMMNNMMNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                      UNIT        S H U T D 0 W H S'  / REDUCTIONS            W                      DRESDEN 2                                    N N N M M M M M M M M N N N N M M N N N N N N N M M M M M M N N N M M N!;
No.        Dat.        Isii HEEEn Rea.on        teR nume.r Syste,comoon.nt            caos. a corr.c+iv. ac+ ion to erovent R currene.
NONE s
tummunusuna            DRESDEN 2 CPERATED ROUTINELY DURING THE REPORT PERIOD.
O
 
==SUMMARY==
N tuumuumunum Twee            E.a son                          M.thod          System & Comoonent F-Forced A-Equip Failure F-Admin                1-Manual        Exhibit F & H S-Sched: B-Maint or Test .G-Oper Error 2-Manual Scram ~ Instructions for C-Refueling .      H-Other      3-Auto Scram    Preparation of
              -D-Regulatory Restriction          4-Continued      Data Entry Sheet E-Operator Training-            5-Reduced Load Licensee Event Report
                      & License Examination        9-Ciher          (LER) File (HUREG-0161)
PAGE 2-081 D
 
CNNNNNMMNNNNNNNNMMMMMMNNNNNNNNNNNNMM O            DRESDEN 2                N F A'C I L I T Y-  DATA                                              Report Period MAR 1984 tNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN FACILITY DESCRIPTION                                            UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                      UTILITY STATE....................ILLIN0IS                              LICENSEE................. COMMONWEALTH EDISON COUNTY...................GRUNDY                                CORPORATE ADDRESS........P.O.        BOX 767 CHICAGO, ILLINOIS 60690 DIST AND DIRECTION FROM HEAREST POPULATION CTR.. 9 MI E OF                          CONTRACTOR MORRIS, ILL                        ARCHITECT / ENGINEER.......SARGENT 8 LUNDY
              . TYPE OF REACTOR............BWR                                  HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... JANUARY 7, 1970                      CONSTRUCTOR.............. UNITED ENG. 8 CONSTRUCTORS
              ~DATE ELEC ENER IST GENER... APRIL 13, 1970                      TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 9, 1970                    REGULATORY INFORHATION IE REGION RESPONSIBLE......III C.ONDENSER COOLING METHOD... COOLING LAKE CONDENSER COOLING WATER....KANKAKEE RIVER                      IE RESIDENT INSPECTOR......T. TONGUE ELECTRIC RELIABILITY                                          LICENSIN3 PROJ MANAGER. . . . .R. GILBERT COUNCIL..................MID-AMERICA                          DOCKET HUMBER........... 50-237 INTERPOOL NETWORK LICENSE & DATE ISSUANCE....DPR-19, DECEMBER 22, 1969 PUBLIC DOCUMENT ROOM....... MORRIS PUBLIC LIBRARY 604 LIBERTY STREET INSPECTION              STATUS INSPECTION
 
==SUMMARY==
 
!:            NO INSPECTION SUMMARIES RECEIVED FOR THIS TIME PERIOD.
t.
ENFORCEMENT
 
==SUMMARY==
 
10 CFR'50, APPENDIX B, CRITERION V, AS IMPLEMENTED BY COMMONWEALTH EDISON COMPANY TOPICAL REPORT CE-1-A, SECTION 5. REQUIRES THAT
          ~ ACTIVITIES AFFECTING QUALITY SHALL BE PRESCRIBED BY AND ACCOMPLISHED IN ACCORDANCE      13, WITH DOCUMENTED DATED HOVEMBER 1, PROCEDURES  APPROPRIATE 1980, " CONDUCT        TO THE OF OPERATION."
CIRCUMSTANCES.    (A) HUCLEAR STATIONS DIVISION VICE-PRESIDENT'S DIRECTIVE NO.
STATES IN PART, "THE ONLY READING MATERIAL ALLOWED (IN THE CONTROL ROOM) WILL BE PROFESSIONAL, JOB RELATED LITERATURE APPROVED BY THE STATION SUPERINTENDENT. EXAMPLES OF READING MATERIAL NOT ALLOWED ARE NEWSPAPERS, NOVELS, NON-PROFESSIONAL MAGAZINES AND OTHER NON-JOB RELATED MATERIAL." THE DIRECTIVE ALSO REQUIRES THAT THOSE RESTRICTIONS BE INCLUDED IN THE STATIONS' ADMINISTRATIVE PROCEDURES, (B) DRESDEN ADMINISTRATIVE PROCEDURE 7-5 REQUIRES THE RECORDING OF POWER LEVEL CHANGES IN UNIT LOGS, (C) DRESDEN WAREHOUSE PROCEDURE (DWP)-8, " PACKAGING, RECEIVING, HANDLING AND STORAGE OF ITEMS IN THE STORER0OM," REQUIRES THAT COMPONENTS AND OPENINGS IN COMPONENTS BE PROPERLY PACKAGED AND PROTECTED TO PREVENT DAMAGE BY OR ENTRY OF FOREIGN MATERIALS, AND (D) DWP-12,
            " LEVELS OF STORAGE," SPECIFIES REQUIREMENTS FOR THE ENVIRONMENT IN STORAGE AREAS FOR SAFETY-REL ATED EQUIPMENT AND COMPONENTS INCLUDING CONTROLS ON DUST, DEBRIS AND ADVERSE CHEMICALS. CONTRARY TO THE ABOVE: (A) RESTRICTIONS ON THE PRESENCE AND USE OF NON-JOB REL ATED READING MATERIAL IN THE CONTROL ROOM WERE NOT PRESCRIBED IM ST ATION ADMINISTRATIVE PROCEDURES AND, DURING THE PERIOD MAY 8 THROUGH JUNE 3, 1983, AN INSPECTOR OBSERVED MUCLEAR STATION OPERATORS ON TWO DIFFERENT SHIFTS READING MAGAZINES IN PAGE 2-082
 
t J?                          '
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR 1984                  IN$PECTION              STATUS - (CONTINUED)            M            DRESDEN 2                          M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT
 
==SUMMARY==
 
      'THE' CONTROL ROOM,'(B) THE FINAL REACTOR POWER WAS NOT RECORDED IN UNIT LOGS FOLLOWING THE POWER LEVEL CHANGE IN UNIT 2 ON MAY 18, 1983, (C) A NUMBER OF SAFETY-RELATED ELECTRIC MOTORS, HYDRAULIC PUMP PARTS, STAINLESS STEEL PIPE FITTINGS AND VALVES AND OTHER COMPONENTS WERE OBSERVED WITHOUT PROPER PROTECTION OR PACKAGING TO PREVENT DAMAGE BY OR ENTRY OF FOREIGN MATERIALS, AND (D)
EXCESSIVE DUST WAS APPARENT ON STORAGE SHELVES FOR SAFETY-RELATED COMPONENTS, TWO SACKS OF CHEMICALS WERE RUPTURED SUBJECTING
      . EQUIPMENT TO EXCESSIVE DUST, AND SPRAY CANS CONTAINING CLEANING FLUID AND WAX, MOSQUITO REPELLANT AND PENETRATING OIL (ALL WITH UNKNOWN NALOGEN CONTENT) WERE OBSERVED.NEAR STAINLESS STEEL SAFETY-RELATED PARTS.
(5332 4) 10 CFR, APPENDIX B, CRITERION XIV, AS IMPLEMENTED BY COMMONWEALTH EDISON COMPANY TOPICAL REPORT CE-1-A, SECTION 14, REQUIRES TH4T MEASURES SHALL BE ESTABLISHED TO CONTROL THE OPERATING STATUS OF SYSTEMS AND COMPONENTS OF SYSTEMS TO PREVENT INADVERTENT OPERATION.        10 CFR, APPENDIX B, CRITERI0H V, AS IMPLEMENTED BY COMMONWEALTH EDISON COMPANY TOPICAL REPORT CE-1-A, SECTION 5,
      . REQUIRES THAT ACTIVITIES AFFECTING QUALITY BE ACCOMPLISHED ACCORDING TO WRITTEN INSTRUCTIONS, PROCEDURES, OR DRAWINGS. CONTRARY T0 THE ABOVE, ISOLATION CONDENSER DRAIN VALVE 2-1808-501, WHICH WAS REQUIRED TO BE MAINTAINED LOCKED IN A CLOSED POSITION IN ACCORDANCE WITH THE UNIT 2 " LOCKED VALVE CHECKLIST", WAS FOUND IN THE CLOSED POSITION BUT NOT CHAINED AND LOCKED. MORE0VER, HO WRITTEM PROCEDURES EXIST ESTABLISHING CRITERIA FOR SELECTION OF VALVES TO BE LOCKED, CONTROLLING THE OPERATION OF LOCKED VALVES, AND CONTROLLING OF ISSUANCE OF KEYS ASSOCIATED WITH LOCKED VALVES.
        '(8332 5)'
10 CFR 50,' APP'ENDIX B, CRITERION'V, AS IMPLEMENTED BY COMMONWEALTH EDISON COMPANY TOPICAL REPORT CE-1-A, SECTION 5, REQUIRES THAT
      ' ACTIVITIES AFFECTING QUALITY SHALL BE PRESCRIBED BY AND ACCOMPLISHED IN ACCORDANCE WITH DOCUMENTED PROCEDURES APPROPRIATE TO THE CIRCUMSTANCES. DRESDEN-GENERAL PROCEDURES, DGP.2-4, " UNIT 2/3 SHUTDOWN FROM POWER OPERATIDH FROM HOT STANDBY" AND DGP 3-4,
          " CONTROL R0D MOVEMENT        CONTROL ROD SEQUENCES", PROVIDE SPECIFIC DIRECTION FOR MOVEMENT OF CONTROL RODS IN THE REACTOR. CONTRARY
        'TO THE ABOVE, ON JANUARY 9,      1984, CONTROL ROD MANIPULATIONS WERE NOT CONDUCTED IN ACCORDANCE WITH THE CONTROL ROD SEQUENCE PACKAGE RESULTING IN THE SKIPPING OF TWENTY STEPS IN THE SHUTDOWN SEQUENCE
* PRIOR TO ITS DISCOVERY AND CORRECTION BY LICENSEE PERSONNEL.
DRESDEN. ADMINISTRATIVE PROCEDURF, DAP 3-5, " IMPLEMENTATION PROCEDURE FOR COMMONWEALTH EDISON PRODUCTION INSTRUCTIDH 1-3-A-1 AND
        't-3-A-29 (0UT OF SERVICE AND PERSONNEL PROTECTION", PROVIDES THE MECHANISM FOR REMOVING EQUIPMENT FROM SERVICE IN ORDER TO EVALUATE SYSTEM CONFIGURATIONS BEFORE, DURING AND AFTER OUTAGES. CONTRARY TO THE ABOVE, ON JANUARY 9, 1984 THE ROD WORTH MINIMIZER WAS REMOVED FROM SERVICE AND LEFT IN THAT CONDITION. THIS WAS DONE WITHOUT THE KNOWLEDGE OR PERMISSION OF OPERATIONS PERSONNEL. IN ADDITION, ON NUMEROUS DCCASIONS IN THE PAST, THAT SYSTEM WAS REMOVED FROM SERVICE WITHOUT USE OF THE OUT-OF-SERVICE TAGGING SYSTEM AND WAS NOT. RECORDED IN APPROPRIATE RECORDS.
(4402 4).              s OTNER ITEMS SYSTEMS AND COMPONENT'PROBLEMST NOME
          ' FACILITY ITEMS.(PLANS AND PROCEDURES)*
NOME MANAGERIAL ITEMS:
NOME '
PLANT. STATUS:'
PAGE 2-083
_ _ _ _b
 
NNNNMMMMNNNNNNNNNNNNNNNNNMMMNNNNNNNN Report Period MAR 1984                          IN5PECTI0N                            5TATUS - (CONTINUED)                          N          DRESDEN 2                            N NNNNNNNMMMMMMMMMNDMNNNNNNNNNNNNNNNMW GTHER ITEMS THE UNIT IS' OPERATING NORMALLY.
          .LAST-IE SITE INSPECTION DATE: MARCH 27 - MAY 15, 1984 INSPECTION REPORT NO: 84-06 REPORT 5                  FR0M    LICEN5EE
            ==================================================================================================================================
NUMBER            DATE OF      DATE OF      SUBJECT EV ENT-      REPORT
            -----..........---------                  _----.        _---------.------- _____ __=-            ..-__=____          _ _________            .-----==____=_ __                ___
84-03/            -02/21/84    03/19/84      FAILURE OF M02-1402-25A TO OPERATE.
              .84-04/--            02/22/84    -03/20/84. CORE SPRAY MG-2-1402-3A FAILED TO CLOSE.
            =================================== ==============================================================================================
O
        +
k PAGE 2-084
 
i THIS PAGE INTENTIONALLY LEFT BLANK 4
l l  s I
PAGE 2-085 1
kgw __e.
 
                                      "s
: 1. Dockett  50-249          0PERATING            STATUS                      NNNNNMMMMMMMMMMMMMMMMMNNNMMMNNNNNNNN N                        DRESDEN 3                                                      N
,    2. Reporting Period    03/01/84    Outage + On-line Hrst    744.0              MMMMMMMMMMMMMMMMMMNNNNMMMNNNMMMMMMMM
: 3. Utility Contact    BEN SCHROEDER (815) 942-2920                              AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                      2527 g                                        3
: 5. Homeplate Rating (Gross MWe):              920 X 0.9 : 828 6.-Design Electrical Rating (Net MWe)*                  794              I"U
                                                                                      .            DESIGN ELEC. RATING -                                            794
: 7. Maximum Denndable Capacity (Gross MWe):              812
                                                                                      .._. m. m.                                                      Crr. --      77'5 ti m )
: 8. Maximum Dependable Capacity (Net MWe):              773
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NGGE
: 10. Power Level To Which Restricted, If Any (Net MWe):
: 11. Reasons for Restrictions, If Any                                      3 ,,,,
MONE
  ~12. Report Period Hrs                4    .0 2 8  .0        8,Y                  NO NET POWER OUTPUT THIS MONTH                                                                  ll
                                                                                    ~~~~~~-~~~~~-----~~~~~-~~~~~~~~-~~~~~~~                                                        ~I"'
: 13. Hours Reactor Critical          123.1      123.1      82.958.2
: 14. Rx Reserve Shtdun Mrs                  .0      .0            .0 ll                                                                                                      ~'
: 15. Mrs Generator On-Line                  .0      .0      79.862.4
: 16. Unit Reserve Shtdun Hrs
                                              .0      .0            .0      ,,,,
: 17. Gross Therm Ener (MWH)                  0        0 159.963,004
: 14. Gross Elec Ener (MWH)                  0        0  51.952.909
                                                                                                                                                                                    ~ *U
: 19. Met Elec Ener (MWH)          -5.172      -10.182    49.220.401
: 28. Unit Servica' Factor                  .0      .0          71.8
                                                                                                                                                                                    - 30
: 21. Unit Avail Factor                      .0      .0          71.8
  '22. Unit Cap Factor.(MDC Net)              .6      .0          57.2
: 23. Unit Cap Factor (DER Met)              .0      .0          55.7          0,-          - s'          1'o '          ~1 's '
                                                                                                                                                            ~ ~
20    is'    so
  -24.' Unit Forced Outage Rate                .0      .0          12.6                                                  DRYS
  .25.' Forced Outage Hours                  .0      .0      6.415.2
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                              MARCH 1984 NDNE r
: 27. If Currently Shutdown Estimated Startup Date:          04/29/84                                                                                                                  PAGE 2-086
 
wwwwwumuunwwwwmunumwwwuwwwwwwwwwwwww M
Report Period MAR.1984                          UHIT      SHUTD0WHS / REDUCTIOHS                                                N                DRESDEN 3 MMMMMwMNwMMMMMwMwMwMwMMMMMMWwMMMMMMM Ho.      Date    TV3e Hours Reason Method LER Number Svstem comoonent                                        Cause 8 Corrective Action to Prevent Recurrence REFUEL, ISI, AHD TURBINE OVERHAUL OUTAGE CONTINUES.
8-      09/30/83    5 744.0          C        4 i
NNNNwMMMMMM        DRESDEN 3 REMAINS SHUTDOWH IN A CONTINUING REFUELING AND MAINTENANCE OUTAGE.
    .M
 
==SUMMARY==
M MMMMMMMMMMM Tvon      Reason                                    Method                  Svstem 8 Comoonent F-Forced- A-Equip' Failure F-Admin                  1-Manual                Exhibit F & H S-Sched .8-Maint or Test G-Oper Error 2-Manual ScramPreparation                Instructionsoffor C-Refueling              H-Other          3-Auto Scram D-Regulatory Restriction                4-Continued            Data Entry Sheet E-Operator Training                      5-Reduced Load Licensee Event Report 8 License Examination                9-Other                  (LER) File (NUREG-0161)                                                                            PAGE 2-087
                                                                        *'                                                                                                                          . ;q;
      , '; h S :. f .* - l l l '                                                                                      ,,5 -: t A_. . ~.
R. . . L 'l Q _~~.] '.- l \ . ; ~ -, !}l 1 y;; . ' J
~
  ';                              s,' { 9 ~. 'Lg5k l. <.  .' '
_ l?._ _ ' ) {* I .'; -l.'.l* s.- *. .l ' j_ '[ ~_;:                    , s:                                                      ,.
 
l
          . frumummmmmuunn'umpuuuummuunnunuumununu
              'DL        . .-    DRESDEN 3                                    N tummuunnummanumwwwwwunuMMMMNNNNWWNMM                                          F"ACILITY        DATA                                                                          Report Period MAR 1984    ,
FACILITY DESCRIPTION                                                                  . UTILITY 8 CONTRACTOR INFORMATION
_ LOCATION'                                                .
UTILITY STATE......'.............
                                            .                              ILLINOIS                          LICENSEE................. COMMONWEALTH EDISON
                        . COUN TY. . . .'. . '. . . . . . . . . . .' . . GR UNDY -                          CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINDIS 60690
                        .DIST AND DIRECTION FROM
        ~-              ; NEAREST. POPULATION CTR.. 9 MI E OF                                              CONTRACTOR MORRIS, ILL                        ARCHITECT / ENGINEER.......SARGENT & LUNDY iTYPE;0F REACTOR............BWR                                                            HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATEIIMITIALLCRITICALITY... JANUARY 31, 1971                                              CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS
                  .DATE ELEC ENER IST-GENER... JULY 22, 1971                                                TURBINE SUPPLIER......... GENERAL ELECTRIC DATE CDMMERCIAL;0PERATE.... NOVEMBER 16, .1971 J                                    REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING LAKE'                                              IE REGION RESPONSIBLE......III CONDENSER COOLING WATER....KANKAKEE RIVER                                              IE RESIDENT INSPECTOR......T. TONGUE
~
                  . ELECTRIC RELIABILITY                                            .
LICENSING PROJ M4 NAGER.....R. GILBERT COUNCIL..................MID-AMERICA                                  -
DOCKET NUMBER........... 50-249 INTERPOOL NETWORK LICENSE & DATE ISSUANCE....DPR-25, MARCH 2, 1971
                                                                                                        .PUBLIC DOCUMENT ROOM....... MORRIS PUBLIC LIBRARY 604 LIBERTY STREET MORRIS, ILLINDIS 60450 INSPECTION            5TATUS INSPECTION
 
==SUMMARY==
 
NO INSPECTION SUMMARIES RECEIVED FOR THIS TIME PERIOD.
ENFORCEMENT
 
==SUMMARY==
 
                      ~
                <10 CFR 58, APPENDIX B,' CRITERION V, AS IMPLEMENTED BY COMMONWEALTH EDISON COMPANY TOPICAL REPORT CE-1-A, SECTION 5, REQUIRES THAT JACTIVITIES'AFFECTING 9UALITY SHALL'BE PRESCRIBED BY AND ACCOMPLISHED IN ACCORDANCE WITH DOCUMENTED PROCEDURES APPROPRIATE TO THE CIRCUMSTANCES. -(A) MUCLEAR. STATIONS DIVISION VICE-PRESIDENT'S DIRECTIVE NO.                                  13, DATED NOVEMBER 1, 1980. " CONDUCT OF OPERATION,"
              ' STATES IN PART,~ "THE ONLY READING MATERIAL ALLOWED (IN THE CONTROL ROOM) WILL BE PRCFESSIONAL, JOB RELATED LITERATURE APPROVED BY THE STATION SUPERINTENDENT. EXAMPLES OF READING MATERIAL NOT All0WED ARE NEWSPAPERS, NOVELS, HON-PROFESSIONAL MAGAZINES AND OTHER ENON-JOB RELATED MATERIAL.* THE DIRECTIVE ALSD REQUIRES THAT THOSE RESTRICTIONS BE INCLUDED IN THE STATIONS' ADMINISTRATIVE
              ~ PROCEDURES, (B) DRESDEN ADMINISTRATIVE PROCEDURE 7-5 REQUIRES THE RECORDING OF POWER LEVEL CHANGES IN UNIT LOGS, (C) DRESDEN
                .WAREN0USE PROCEDURE (DWP)-1, " PACKAGING,. RECEIVING, HANDLING AND STORAGE OF ITEMS IN THE STORERDOM," REQUTRES THAT COMPONENTS AND OPENINGS IN COMPONENTS BE-PROPERLY-PACKAGED AND PROTECTED TO PREVENT DAMAGE BY OR ENTRY OF FOREIGN MATERT ,S. AND (D) DWP-12,
            ' i' LEVELS OF STORAGE," SPECIFIES REQUIREMENTS FOR THE ENVIRONMENT IN STORAGE AREAS FOR SAFETY-RELATED EQUIPS NT AND COMPONENTS
                -INCLUDING CONTROLS ON DUST,-DEBRIS AND ADVERSE CHEMICALS. CONTRARY TO THE ABOVE:                                              (A) RESTRICTIONS ON TH PRESENCE AND USE OF JNON-J05 RELATED READING MATERIAL IN THE CONTROL ROOM WERE NOT PRESCRIBED IN STATION ADMINISTRATIVE PROCEDURES AND, DURING THE PERIOD MAY S.THROUGH JUNE 3, 1983, AN. INSPECTOR OBSERVED NUCLEAR STATION OPERATORS ON TWO DIFFERENT SHIFTS READING MAGAZINES IN PAGE 2-088
 
NNNNNNNNNNMMMNNNNNNNNNNNNNMMMNNMMMMN M              DRESDEN 3
* Report Period MAR ~1984              INSPECTION            STATUS - (CONTINUED)              MMMNNNMMMMMMMNNNNNNNNMMNNNNNNNNNNMMM ENFORCEMENT
 
==SUMMARY==
 
18, THE    CONTROL ROOM '(B) THE FINAL REACTOR POWER WAS NOT RECORDED IN UNIT LOGS FOLLOWING THE POWER LEVEL CHANGE IN UNIT 2 D 1983, (C) A NUMBER OF SAFETY-RELATED ELECTRIC MOTORS. HYDRAULIC PUMP PARTS, STAINLESS STEEL PIPE FITTINGS AND VALVES AND OTHER COMPONENTS WERE OBSERVED WITHOUT PROPER PROTECTION OR PACKAGING TO PREVENT LAMAGE BY OR ENTRY OF FOREIGN MATERIALS, AND (D)
TWO SACKS OF CHEMICALS WERE RUPTURED SUBJECTING EXCESSIVE EQUIPMENT TO  DUST  WAS APPARENT EXCESSIVE DUST,        ON STORAGE SHELVES FOR SAFETY-RELATED COMPONENTS.AND SPRAY CAHS CONTAINING CLEAHING FLUID AND UNKNOWN HALOGEN CONTENT) WERE OBSERVED HEAR STAIHLESS STEEL SAFETY-RELATED PARTS.
(8330 4)
GTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NOME-FACILITY ITEMS (PLANS AND PROCEDURES):
  -NONE' p  ; MANAGERIAL' ITEMS:-
  .MONE PLANT STATUS:
THE UhIT WAS SHUT DOWN OH 9/30/83 FOR AN EXTENDED REFUELING AND MAINTENANCE OUTAGE.
LAST IE SITE INSPECTION DATE: MARCH 27 - MAY 15. 1984 IN'SPECTION REPORT NO: 05 REPORTS        FR0M    LICENSEE
    -=============================================================================================================
      -NUMBER    DATE OF    DATE OF          SUBJECT
                  - EVENT    REPORT                        _____ _ =------=.      - ----- __-    :---------------------------------------
NOME
    =================================================================================================================
PAGE 2-089
 
        ,1      Docket    50-331                0PERATING                STATU$                  MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 2. Reporting Period: 03/01/84 N                      DUANE ARNOLD                                            M Outage + On-line Hrs: 744.0                MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
      '3.      Utility
 
==Contact:==
MATT ANDERSON (319) 851-7308                                      AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                    1658
: 5. Nameplate Rating (Gross MWe):                          663 X 0.9 : 597 6._ Design Electrical Rating (Net MWe):                              538            1903 7.-Maximum Dependable Capacity (Gross MWe):                          545                                                                              ~
                                                                                                        ......                                                        5        (M
: 15. Maximum Dependable Capacity (Het MWe):                            515 9.; If Changes Occur Above Since Last Report, Give Reasons:
NONE'
    ;10.-Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions,.If Any 10G3-NONE
~
MONTH        YEAR      CUMULATIVE
: 12. Report Period Mrs                            744.0    2.184.0        80.328.0 hf 13.. Hours Reactor. Critical                    '744.0    2.0 18.6      57.953.6
: 14. Rx Reserve Shtdwn Mrs                            .0          .0              .3 g 15.~ Hrs Generator On-Line                      744.0    1.992.9        56.435.6 DEC Opus gg rewn gag lER oPTIPUE. CopCITICIS
    .16. Unit Reserve Shtdwn Hrs                          .0          .0              .0 gao,  .
9                    ,      _ - - - . - - -    -100 17.. Gross Therm Ener (MWH)                  1.169.208  3.044.616    70.793.178                                                                                  y
: 18. Gross Elec Ener' (MWH)                    399.833                                                                                                                          - 80 1.036.674    23.730.731
: 19. Met Elec Ener (MWH)                        377.559    978.580    22.214.950                                                                                                -80
: 20. Unit Service Factor.                          100.0      91.3            70.3
                                                                                                                                                                                      , ,g
: 21. IJnit Avail Factor                            100.0      91.3            70.3
    '22. Unit Cap Factor.(MDC Net)                      98.5      87.0            53.7                                                                                              ~*
: 23. Unit Cap Factor (DER Met)                    -94.3        83.3            51.4        0    -          -
                                                                                                                                                                          .-        . 0 0            5            10                          15    30        35        30
: 24. Unit Forced Outage Rate                          .0        8_. 8          17.0                                                              DRYS
: 25. Forced Outage Hours                              .0      191.1        11.525.4
: 26. Shutdowns Sched Over.Mext 6 Months (Type,Date, Duration):                                                                MARCH 1984 SURVEILLANCE OUTAGE: APRIL 13, 1984 - 2 WEEKS
: 27. If Currently Shutdown Estimated Startup Date:                        N/A PAGE 2-090
 
MMNNMMNNNNNMMMMMMMMKMNNNNNMMNNNNNNNN
' Report Period MAR 1984                  UNIT      SHUTD0WHS / REDUCTIOHS                        N                          DUAHE ARHOLD    N NMMMMNNNNNNNNNNNNNNNNNNNWMNNhWNNNNNN Ho. Date    TUse Hours Reason Method LER Number System comoonent              Cause & Corrective Action to Prevent Recurrence HOME CNNNNNNNNNN -      DUAHE ARMOLD OPERATED ROUTINELY WITH NO OUTAGES OR REDUCTIONS DURING MARCH.
~a
 
==SUMMARY==
.M CNNNNNNNNNN Twee      . Reason                        Method          Svstem 8 Comconent
  'F-Forced ~'A-Equip Failure F-Admin        1-Manual          Exhibit F & H S-Sched 'B-Raint or Test .G-Oper Error . 2-Manual Scram  Instructions for C-Refueling . H-Other      3-Auto Scram    Preparation of D-Regulatory Restriction      4-Continued      Data Entry Sheet E-Operator Training            5-Reduced Load  Licensee Event Report 8 License Examination      9-Other          (LER) File :M11R EG-0161)
PAGE 2-091
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M              DUANE ARNOLD              M MMMMMMMMMMMMMMhMMMMMMMMMMMMMMMMMMMMM                    F,ACILITY            DATA                                                                      Report Period MAR 1984 FACILITY DESCRIPTION                                              UTILITY 8 CONTRACTOR INFORMATION
      . LOCATION                                                          '
UTILITY STATE....................I0WA                                      LICENSEE................. IOWA ELECTRIC POWER 8 LIGHT COUNTY...................LINN                                      CORPORATE ADDRESS........I E TOWERS, P.O. BOX 351 CEDAR RAPIDS, IDWA 52406 DIST AND DIRECTIDH FROM NEAREST POPULATION CTR.. 8 MI HW OF                              CONTRACTOR CEDAR RAPIDS, IA                      ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR ...........BWR                                        HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... MARCH 23, 1974                            CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER...MAY 19, 1974                              TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL' OPERATE.... FEBRUARY 1,    1975              REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER                          IE REGIDH RESPONSIBLE......III CONDENSER C00LIMG MATER.... CEDAR RAPIDS RIVER                      IE RESIDENT INSPECTOR......L. CLARDY ELECTRIC RELIABILITY                                                LICENSING PROJ MANAGER.....M. THADANI COUNCIL..................MID-CONTINENT AREA                        DOCKET NUMBER........... 50-331 RELIABILITY COORDINATION AGREEMENT                        LICENSE & DATE ISSUANCE....DPR-49, FEBRUARY 22, 1974 PUBLIC DOCUMENT ROOM....... REFERENCE SERVICE CEDAR RAPIDS PUBLIC LIBRARY 428 THIRD AVENUE, S.E.
CEDAR RAPIDS, IOWA 52401 INSPECTION                STATUS INSPECTION
 
==SUMMARY==
 
l INSPECTION ON DECEMBER 20-22, AMD JANUARY 19, (83-19): INCLUDED A REVIEW OF SECURITY PLAN AND IMPLEMENTING PROCEDURES: SECURITY ORGANIZATION-MANAGEMENT-PERSONNEL-RESPONSE; SECURITY PROGRAM AUDIT; TESTING AND MAINTENANCt; PHYSICAL BARRIERS-PROTECTED AND VITAL AREAS; ACCESS CONTROL-PERSONNEL-PACKAGES; DETECTION AIDS-PROTECTED AND VITAL AREAS; ALARM STATIONS; SAFEGUARDS INFORMATION; AND LICENSEE'S ACTION ON PREVIOUS INSPECTIDH FINDINGS. THE INSPECTION INVOLVED 40 INSPECTOR-HOURS BY TWO NRC INSPECTORS. ONE OF THE
      '40 INSPECTOR-HOURS WAS ACCOMPLISHED DURING OFF-SHIFT PERIODS. THE INSPECTION BEGAN DURING THE DAY SHIFT. THE LICENSEE WAS FOUND TO BE IN COMPLIANCE WITH HRC REQUIREMENTS WITHIN THE AREAS EXAMINED, EXCEPT AS NOTED. PHYSICAL BARRIERS - VITAL AREAS: THE LICENSEE FAILED TO PROVIDE AN ADEQUATE VITAL AREA BARRIER. ACCESS CONTROL-PERSONNEL: ACCESS CONTROL TO AN AREA CONTAINING VITAL EQUIPMENT DID NOT MEET SECURITY PLAN CRITERIA. SAFEGUARDS INFORMATION: SOME SAFEGUARDS INFORMATION WAS HOT PROTECTED AS REQUIRED BY THE' LICENSEE'S PROCEDURE AND 10 CFR 73-21. SECURITY ORGANIZATION-MANAGEMENT: ONE SECURITY EVENT WAS NOT REPORTED WITHIN THE TIME CRITERIA REQUIRED BY 10 CFR 73.71(C). AREAS OF CONCERN WERE NOTED PERTAINING TO TIMELY RESPONSE TO SOME LICENSEE IDENTIFIED AUDIT FINDINGS AND THE SCOPE OF QUALITY CONTROL SURVEILLANCES OF THE SECURITY PROGRAM. NONE OF THESE CONCERNS CONSTITUTED NONCOMPLIANCE WITH NRC REQUIREMENTS AND THE LICENSEE'S PROPOSED ACTIONS APPEARED ADEQUATE TO RESOLVE THE ISSUES. ON JANUARY 13,
      -1984 AN ENFORCEMENT CONFERENCE WAS HELD TO DISCUSS THE VIOLATIONS, THE LICENEE'S CORRECTIVE ACTIONS, AND ENFORCEMENT OPTIONS AVAILABLE.TO THE NRC.
PAGE 2-092
 
NNNNNNNNNNNNNMMENNNNMMMMMMMMMNNNNNNN Report Period MAR 1984                    IN$PECTION              S.T A T U S - (CONTINUED)            N                          DUANE ARNOLD                    N MNNNMMNNNNNNNNNNNNNNNNNNNNNNMMNNNNNM ENFORCEMENT SupW4ARY TECNNICAL SPECIFICATION 6.8.1 STATES IN PART, " DETAILED WRITTEN PROCEDURES INVOLVING NUCLEAR SAFETY ... SHALL BE PREPARED ...
ALL PROCEDURE!i SHALL BE ADHERED T0." SURVEILL ANCE -TEST PROCEDURE BS-12, " LOW LOW SET INSTRUMENT FUNCTIONAL TEST AND CALIBRATION,"
STEP 4.7, STATES IN PART, " MONITOR PS 4544 USING TERMINALS GG-2 AND GG-9 WITH VOM (VOLT ONM METER) SELECTED FOR OHMS." CONTRARY TO THE AB0VE, THE V0M MAS CONNECTED AT STEP 4.1 CAUSING MAIN STEAMLINE SAFETY RELIEF VALVE PSV-4401 TO OPEN CONTRIBUTING TO A REACTOR SCRAM.
.(8402 4)
OTHER ITEMS
  . SYSTEMS AND COMPONENT PROBLEMS
    'NONE FACILITY ITEMS (PLANS AND PROCEDURES)*
NONE MANAGERIAL ITEMS:
-NONE
-PLANT STATUS:
THE UNIT IS OPERATING NORMALLY.
LAST IE.5ITE INSPECTION DATE: FEBRUARY 1 - MARCH 31, 1984 INSPECTION REPORT N08 S4-84 REP 0RTS        FR0M        LICENSEE
    ==================================================================================================================================
NUMSER    DATE OF    DATE OF        SUBJECT EVENT      REPORT                                                                  _--
84-89/      01/31/84  03/01/84      RHR PUMP DISCHARGE PIPING DEPRESSURIZATION.
84-10/      82/04/84  03/05/84      HPCI STEAM SUPPLY ISOLATION.
      .84-11/      82/95/84  83/06/84      CONTROL ROOM INTAKE STANDBY FILTER UNIT ISOLATION.
84-12/-    02/29/84- 83/29/84      HPCI STOP VALVE AND ADS TIMER FAILURES.
        ================================================================================================================================
PAGE 2-093
 
1 Docket                    50-348 0PERATING                STATUS                  ,          wwwwunnunnunuwwwwwummuunununuwwwwwww M                          FARLEY 1                        M
: 2. Reporting Period: 03/01/84            Outage + On-line Hrs: 744.0                            MuununumwMununummwMMMMWNMMMMMMMNwMNu
: 3. Utility contact: DENNTS NERRIN (205) 899-5156 AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                              2652
: 5. Nameplate Rating (Gross MWe):                    1945 X 0.85 = 888 FFtRLEY 1
: 6. Design Electrical Rating (Met MWe):                          829                        lams
: 7. Maximum Dependable capacity (Gross MWe):                    845                                            DESIGN ELCO. RRTING -              829
                                                                                                                ...... tWIX. DEPD e.                    CN". -    804 (200%)
: 8. Maximum Dependable Capacity (Net MWe):                      804 9..If Changes Occur Above Since Last Report, Give Reasons:
NONE 10... Power Level To Which Restricted. If Any (Net MWe):
: 11. Reasons for Restrictions, . If. Any:
1033-NONE MONTH        YEAR        CUMULATIVE                          NO NET POWER DUTPUT THIS NONTH 17,' Report Period Mrs                    744.0    2.184.0          55.512.0,
                                                                                                              ........................................                        -100
: 13. Hours Reactor Critical                    .0      938.0        36.061.2
: 14. Rx Reserve Shtdun Hrs                    .0          .0        3.650.7
                                                                                                                                                                              -80
: 15. Hrs Generator On-Line                    .6      904.5        35.007.9 16.' Unit Reserve Shtdwn Hrs                  .0          .0              .0
                                                                                                                                                                              ~
: 17. Gross Therm Ener (MWH)                      0 2.360.784      88.462.308
: 18. Gross Elec Ener (MWH)                      0  751.662 27.993.526
                                                                                                                                                                              ~ *O
: 19. Met Elec Ener (MWH)                  -4.676    701.994 26.403.056
: 28. Unit Service Factor                      .0        41.4            63.1
          - 21. Unit Avail Factor                        .6        41.4            63.1                                                                                      -20 22... Unit Cap-Factor (MDC Net)              .6        40.0            59.7M
: 23. Unit Cap Factor (DER Net)                .0        38.8            57.4-                  0    -
                                                                                                                          ,-          ,            ,      ,-      ..      . O O            5          to            15    20      25    30
: 24. Unit' Forced Outage Rate-                .0        8.1            15.2                                                        DRYS
    ^
          -25. Forced Outage Hours                      .0        79.5          6.246.0 7
: 26. Shutdowns Sched Over Next 6 Months (Type.Date. Duration):                                                                MARCH 1984
  +              NOME
: 27. If Currently' Shutdown Estimated Startup Date:                  04/21/84      M Item calculated with a Weighted Average                                            PAGE 2-094 VO
 
4 C MNNNNNNNNMMNNNNNNNNNNNNMMNNNNNNNNNNN Report Perled MAR 1984                UNIT      SHUTD0WNS / REDUCTION 5                        N              FARLEY 1              M NMMMNNNNNNNNNNNNNNNMMMMNNNNNNNNNNUNN No. Date    TU3e Nours Reason          LER Number System comoonent            Cause & Corrective Action to Prevent Recurrence 3      82/10/84    5 744.0      C    -4  84-002-08        RC    FUELXX  THE CYCLE V-VI REFUELING OUTAGE CONTINUES.
NNMmMNNNNNN    ^ FARLEY 1 REMAINS SHUTDOWH IN A CONTINUING REFUELIH/ MAINTENANCE OUTAGE.
C
 
==SUMMARY==
N NNNNNNNNNNM Twee      Reason                          Method            Svstem 4 Comoonent F-Forced A-Equip Failure F-Admin          1-Manual          Exhibit F & H S-Sched  B-Maint or Test G-oper Error 2-Manual Scram Instructions for C-Refueling        H-Other      3-Auto Scram      Preparation of D-Regulatory Restriction        4-Continued      Data Entry Sheet E-Operator Training              5-Reduced Load Licensee Event Report
                  & License Examination        9-Other          (LER) File (HUREG-0161)
PAGE 2-095
 
v.
ununuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum E              FARLEY 1                  m tumuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu                    FACILITY        DATA                                                                                              Report Period MAR 1984 FACILITY DESCRIPTION                                            UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                        UTILITY STATE.................... ALABAMA                                LICENSEE................. ALABAMA POWER CO.
        -COUNTY................... HOUSTON                                CORPORATE ADDRESS....... 600 NORTH 18TH STREET BIRMINGHAM, ALABAMA 35203 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 28 MI SE OF                          CONTRACTOR DOTHAN, ALA                        ARCHITECT / ENGINEER....... SOUTHERN SERVICES INCORPORATED TYPE OF REACTOR............PWR                                      HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... AUGUST 9,      1977                    CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... AUGUST 18, 1977                        TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 1,      1977            REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER                        IE REGION RESPONSIBLE......II CONDENSER COOLING WATER....CHATAH00CHEE RIVER                    IE RESIDENT INSPECTOR......W. BRADFORD ELECTRIC RELIABILITY                                            LICENSING PROJ MANAGER.....E. REEVES COUNCIL................. 500THEASTERN ELECTRIC                  DOCKET NUMBER........... 50-348 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....NPF-2, JUNE 25, 1977 PUBLIC DOCUMENT R00M.......G.S. HOUSTON MEMORIAL LIBRARY 212 W. BURDESHAW STREET DOTHAN, ALABAMA 36301 INSPECTI0N            STATUS INSPECTION
 
==SUMMARY==
 
      + INSPECTION FEBRUARY 6 -IMARCH 16 (84-05): THIS ROUTINE INSPECTION INVOLVED 105 INSPECTOR-HOURS ON SITE IN THE AREAS OF PLANT STATUS, MONTHLY SURVEILLANCE OBSERVATION, MONTHLY MAINTENANCE OBSERVATION, OPERATIONAL SAFETY VERIFICATION, INDEPENDENT INSPECTION EFFORT, PHYSICAL PROTECTION, TECHNICAL SPECIFICATION COMPLIANCE, UNIT 1 MAIN STEAM ISOLATION VALVES, PLANT EVENT REPORTS, UNIT 1 REFUELING. IEB FOLLOWUP AND FOLLOWUP ON PREVIOUSLY IDENTIFIED ITEMS. NO VIOLATIONS OR DEVIATIONS WERE FOUND IN 11 INSPECTION AREAS; ONE VIOLATION WAS'FOUND IN ONE AREA (PARAGRAPH 8-FILLING FUEL TRANSFER CANAL FROM SPENT FUEL POOL WITHOUT PERFORMING A 59.59 REVIEW).
INSPECTION FEBRUARY 21-24 (84-06)* THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 18.5 INSPECTOR-HOURS ON SITE IN THE AREAS OF to CFR 61 IMPLEMENTATION, DEBRIS REMOVAL FROM REACTOR CAVITY DURING UNIT 1 REFUELING OUTAGE, PLANT TOUR AND UNIT 2 OUTAGE. OF THE FOUR AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
NONE OTHER ITEMS PAGE 2-096
 
j,
-ta-NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984              IN5PECTION                        S.TATUS - (CONTINUED)                      N                    FARLEY 1                    W WNNNNNNNNNMMNNNNNNNNNMMNNNNNNNNNNNNN i
OTHER ITEMS
                -SYSTEMS AND COMPONENT-PROBLEMS:
NOME.
FACILITY ITEMS (PLANS AND PROCEDURES):
7              NOME.
MANAGERIAL ITEMS:
x-          NOME.
PLANT STATUS:
SNUTDOWN ON FEBRUARY 18, 1984 FOR REFUELING OUTA3E. +
LAST IE SITE INSPECTION DATE: FEBRUARY 6 - MARCH 16, 1984 +
INSPECTION REPORT NO: 50-348/84-05 +
REP 0RTS' FR0M                  LICENSEE
                ============================ ==========- =========================================================================================
NUMBER  DATE OF    DATE OF    SUBJECT EVENT'      REPORT
___ _ =_      _______ ____            __
                                                                                                      ===._______________________________________________ .____
                                        '01/20/84 890/    12/24/83                RAD MONITORS R-11/R-12 INOPERABLE WHEN VACUUM PUMP TRIPPED ON HIGH FLOW, DUE TO PROCEDURAL L                              INADEQUACY.
83-891/' 12/26/83    01/20/54    RAD MONITOR R-5 IHOPERABLE DUE TO ERRONEOUS INDICATION, CAUSED BY A FAULTY CONNECTION.
  .                  83-L-
    ~
892/-  12/25/83 '01/20/84- . INSTRUMENTATION CHANNEL ASSOCIATED WITH PRESSURE TRANSMITTER PT-494 INOPERABLE, CAUSED BY 83-L                            LOCALIZED FREEZING IN TRANSMITTER SENSING LINES.
                ' 83-893/    12/25/83    01/24/84    IL D/G INOPERABLE THE SERVICE WATER SUPPLY HEADER INLET /0UTLET ISOLATION VALVES CLOSED, CAUSED 03-L                            -BY LOCALIZED FREEZING OF SWITCH.
83-894/  12/26/83    01/24/84    'B'-. TRAIN A/C COMPRESSOR WOULD NOT START, CAUSED BY HI/LO DIL PRESSURE SWITCH TRIPPING.
03-L 43-095/- 12/26/83    01/24/84    TEMP. INDICATOR TI-412C FAILED FLOW, CAUSED BY FAILURE OF A SUMMING AMP CARD.
83-L-83-896/  12/30/83    01/30/841  'A' TRAIN.A/C COMPRESSOR TRIPPING, CAUSED BY THE REFRIGERATIDH UNIT BEING LOW ON FREON.
83-L PAGE 2-097
          '^ '
 
W
                -M.
NNNNNNNNNNNMNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984      REF0RTS              FR0M      LICENSEE          -
(CONTINUED)      N                    FARLEY 1      N NMMMMNNNNMMMMMNNNNNNNNNNNNNNMMMMNNNN 84-001/
01/09/84 02/03/84        REACTOR TRIPPED, DUE TO LOLO LEVEL IN 18 STEAM GENERATOR.
84-002/
02/10/84 03/06/84        REACTOR TRIPPED FROM APPROXIMATE 10% POWER, DUE TO AN INTERMEDIATE RANGE HIGH FLUX SIGNAL.
84-003/      02/18/84 03/09/84        REACTOR COOLANT SYSTEM BORON CONCENTRATION OF 1899 PPM VERSUS GREATER THAN CAUSED BY A MISINTERPRETATION OF THE TECHNICAL SPECIFICATION.
84-004/ ' 02/29/84    03/21/84        SURFACE INDICATIONS DISCOVERED ON 3 0F 6 SHAFTS, INVESTIGATION ONG0lHG.
84-005/,    02/29/84 03/21/84        INDICATIONS DISCOVERED IN UNIT 1 FEEDWATER REDUCER TO STEAM GENERATOR H0ZZLE WELDS AN AUGMENTED INSPECTION PROGRAM ESTABLISHED.
84-006/      02/23/84 03/21/84 -BOTH CONTAIMMENT PERSONNEL AIRLOCK DOORS OPEN AT SAME TIME, CAUSE NOT DETERMINED.
84-007/ - 02/20/84    03/21/84        AUTOMATIC ACTUATION PORTION OF DIESEL BLDG. CARD 0X FIRE SUPPRESSION SYSTEM INOPERABLE, DUE TO A WIRING ERROR.
    .==================================================================================================================================
PAGE 2-098
 
Em O
O N
W C
4 A
hf X
4
  .a n
  >=
L W
  .4
  .a
  .J 4
E O
M
  >=
Z W
  >=
2 M
W O
4 L
GA w
Z
  >=
l
 
    .1  Becket    50-364          0PERATING            $TATUS                          WNMMNNWMMMMMMMNNNNMMNNNNNWWNNNNNNNNM N                                                    FARLEY 2                  N
: 2. Reporting Period: 03/01/84    Outage + On-line Hrs      744.0                  NNNWWMNNNNNNNNMMNNNNMMMMMMMMMNNNNNNN 3.-Utility
 
==Contact:==
DENNIS HERRIN (205) 899-5156                                  AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWE):                    2652
: 5. Nameplate Rating (Gross NWe):                    860
: 6. Design Electrical Rating (Het MWe):              829                gas) 7, Maximum Dependable Capacity (Gross MWe):          855                                                  -DESIGN ELCC. RMTING -                    829
                                                                                        ~~~~                                            '
S. Maximum Dependable Capacity (Net NWe):            814
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME
: 19. Power Level To Which Restricted, If Any (Net MWe):
: 11. Reasons for Restrictions, If Any 10W3-ONE MCMTH      YEAR    CUMULATIVE                      sec ces ut m-- unsa ortssou. ome1 Time
: 12. Report Period Mrs              744.0    2.184.0      23.425.0                                                                                                  _
_- --=....................... m                                    ....m.    -100
: 13. Hours Reactor Critical          731.9    2.147.7      20.684.5
: 14. Rx Reserve Shtdun Hrs              .0        .0        138.4                                                                                                        0
                                                                                                                                                                        -e0
: 15. Hrs Generator On-Line          724.5    2.103.2  . 20.402.0                                                                                                          l3
  '16, Unit Reserve Shtdwn Mrs            .0        .0            .0
                                                                                    ~                                                                                    ~
17., Gross Therm Ener (MWH3-    1.895.910  5.453.396  52.364.088 IS. Gross Elec Ener (MWH)        622.002  f.786.768  16.773.616
                                                                                                                                                                        ~ 83
: 19. Net Elec Ener (MWH)          592.374  1.699.700    15.899.726
: 20. bnit Service Factor              97.4      96.3          87.1
: 21. Unit Avail Factor                97.4      96.3          87.1                                                                                                    - 30
: 22. Unit Cap Factor (MDC Net)        97.8      95.6          83.4
: 23. Unit Cap Factor (DER Net)        96.0      93.9          81.9          0                        ...                              ,      ,.  ,  ...      .,      0 0                        5                          to    15  30    25      30
: 24. Unit Forced Outage Rate            2.6        3.7            5.2                                                                          DAYS
: 25. Forced Outage Hours              19.5      80.8      1.112.6
: 26. Shutdowns Sched Over Next 6 Months (ifpe Date, Duration):                                                                            MARCH 1984 NOME
: 27. If Currently Shutdown EstimateJ Startup Date:          N/A                                                                                                              PAGE 2-100 l
 
    ~
                .                                                                                            NNNNNMMMNNMMMMMMNNNWNNNNMMMMMMMMMMMM Report Period RAR 1984                  UNIT      SHUTD0WN5 / REDUCTION $                        M                    FARLEY 2      N muuMuMMunuwwuMNummuumwNwwwuuNuuMuuum
      ~
Be. Bate    liin Neurs RSA113 Method LER Mumber System Component            Cause 8 Corrective Action to Prevent Recurrence
;        '004    03/27/84      'F  19.5    N    3  34-884-34                        REACTOR TRIP DUE TO LIGHTNING INDUCED SURGES.
r uneemmenene        FARLEY 2 SPERATED WITH 1 OUTAGE DURING MARCH.                                                                              l
        -u
 
==SUMMARY==
a ummeMmeneMu Twem        Raaman                          Method          System 8 Comoonent F-Forced A-Equip Failure F-Admin            t-ManuaI        Exhibit F 4 H S-Sched    B-Naint er Test G-oper Error 2-ManuaI Scrae ' Instructions for C-Refueling          H-Other      3-Auto Scrae    Preparation of D-Regulatory Restriction        4-Continued    Data Entry Sheet E-Sperater Training              5-Reduced Load Licensee Event Report a License Exaeination        9-Other        (LER) FiIe (NUREG-0161)
PAGE 2-101
 
ummunusumummmmmmmmmmmmmmmuumummmmmmu a                FARLEY 2                              m
.mmmmmmmmmmmmmmmmmmmmmmmmmmmmmunummun                                FACILITY        DATA                                            Report Period MAR 1984 FACILITY DESCRIPTIDM                                                        UTILITY 8 CONTRACTOR INFORMATION LSCATION                                                                    UTILITY STATE.................... ALABAMA                                          LICENSEE................. ALABAMA POWER CD.
COUNTY...................N0USTON                                            CORPORATE ADDRESS....... 600 NORTH 18TH STREET BIRMINGHAM, ALABAMA 35203 DIST AND DIRECTION FROM MEAREST POPULATIUM CTR.. 28 MI SE OF                                    CONTRACTOR DOTHAN, ALA                            ARCHITECT / ENGINEER....... SOUTHERN SERVICES INCORPORATED TYPE OF REACTOR . . . . . . . . . . . .PWR                                    HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY...MAY 5,                    1981                    CONSTRUCTOR..............BE0HTEL DATE ELEC ENER IST GENER...MAY 25, 1981                                        TUR%INE SUPPLIER......... WESTINGHOUSE DATE COMMERCI AL OPERATE. .. . JULY 30, 1981                            EEGtfLATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER                                  IE REGION RESPONSIBLE......II CONDENSER COOLING MATER....CHATAN00CHEE RIVER                              IE RESIDENT INSPECTOR......W. BRADFORD ELECTRIC RELIABILITY                                                      LICENSING PROJ MANAGER.....E. REEVES COUNCIL................. 50UTHEASTERN ELECTRIC                              DOCKET NUMBER........... 50-364 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....NPF-8, MARCH 31, 1981 PUBLIC DOCUMENT R00M.......G.S. HOUSTON MEMORIAL LIBRARY 212 W. BURDESHAW STREET DOTHAN, ALABAMA 36301 IN$PECTION            $TATUS 1lfSPECTION SINMARY
    + INSPECTION FEttuARY 6 - MARCN 16 (84-05): THIS ROUTINE INSPECTION INVOLVED 105 INSPECTOR-HOURS ON SITE IN THE AREAS OF PLANT STATUS. MONTHLY SURVEILLANCE OBSERVATION, MONTHLY MAINTENANCE OBSERVATION, OPERATIONAL SAFETY VERIFICATION, INDEPENDENT INSPECTIDH                                  L
  . EFFORT, PHYSICAL PROTECTION, TECHNICAL SPECIFICATION COMPLIANCE, UNIT 1 MAIN STEAM ISOLATION VALVES, PLANT EVENT REPORTS, UNIT 1 REFUELING, IES FOLLOWUP AND FOLLOWUP DN PREVIOUSLY IDENTIFIED ITEMS. NO VIOLATIONS OR DEVIATIONS WERE FOUND IN 11 INSPECTION AREAS; ONE VIOLATION MAS FOUND IN ONE AREA (PARAGRAPH 4-FILLING FUEL TRANSFER CANAL FROM SPENT FUEL POOL WITHOUT PERFORMING A 58.59 REVIEM).-
INSPECTION FEBRUARY 21-24 (44-86): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 18 INSPECTOR-HOURS ON SITE IN THE AREAS OF to CFR 61 IMPLEMENTATION, DEBRIS REMOVAL FROM REACTOR CAVITY DURING UNIT I REFUELING OUTAGE, PLANT TOUR AND UNIT 2 OUTAGE. OF THE F9ut AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS MERE IDENTIFIED.
e ENFMCEB      1 Si ARY NONE STMER ITEMS PAGE 2-102
 
unuwwwumununuwunuwwwmunummuuuuuunnum Report Period RAR 1984                    IN5PECTION                  STATU$ - (CONTINUED)              u                        FARLEY 2                  m MuhMMMMMMMMMMMMMMMWMNNMMMWNNMMMMMNNm CTNER ITEMS SYSTEMS AND COM ONENT PROBLEMS:
NONE.
FACILITY ITEMS (PLANS AND PROCEDURES 32 NONE.
M m GERIAL ITEMS NOME.
PLANT STATUS:                      .
NORMAL OPERATION.
LAST IE SITE INSPECTION DATE FEBRUARY 6 - MARCH 16, 1984 +
INSPECTION REPORT N0*    50-364/84-85 +
REPQRTS          FR0M      LICEN5EE
                ==================================================================================================================================
NUMSER    BATE OF    DATE OF      SUBJECT EVENT      REPORT
                                                                                                              =__              ___----...--- ....--....------
83-865/    12/27/83    81/28/84    INSTRUMENTATION CHANNEL ASSOCIATED WITH TEMP. INDICATOR TI-432D IMOPERABLE, DUE TO ERRONEOUS 83-L                                INDICATION.
83-866/ -12/31/83      31/28/84    INSTRUMENTATION CHANNEL ASSOCIATED WITH FLOW TRANSMITTER FT-476 INOPERABLE, DUE TO ERRONEOUS 03-L                                INDICATION BY SQUARE ROOT EXTRACTION CARD.
83-868/    12/30/83    81/30/44    'B' TRAIN SERVICE WATER RETURN FROM DIESEL BLDG. CLOSED, CAUSED BY MOTOR OPERATOR FOR VALVE S3-L                                DRAWING EXCESSIVE CURRENT.
S4-081/ ' 81/18/84    82/18/84    REACTOR TRIPPED FROM 19% PWR DUE TO LDLO LEVEL IN 2C $/G, CAUSED BY PERSONNEL ERROR.
84-002/    31/24/84    02/27/84    HOURLY FIREMATCH PATROL IN 'B' TRAIN AUX BLDG BATTERY CHARGER ROOM NOT PERFORMED.
403/    81/30/84    82/27/84    REACTOR TRIPPED, DUE TO LOLO LEVEL IN 2C S/G.
                .=======================--- =======================================================================================================
PAGE 2-103
 
1 Docket          50-333        0PERATING              STATUS                          MNNMMNNNNMMMMMNNMMMNNNMMNNNNNNNNNNNM N                FITZPATRICK                                          N
: 2. Reporting Period: 03/01/84        Outage + On-line Hrs:      744.0                  uMuunnunuMuuNumuMumMmMumMuunuMuununu
: 3. Utility
 
==Contact:==
J. COOK (315) 342-3840                                          AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                          2436
: 5. Nameplate Rating (Gross MWe):                981 X 0.9 = 883 FITZPfiTRICK
: 6. Design Electrical Rating (Net MWe):                    82f                    1880
: 7. Maximum Dependable Capacity (Gross MWe):                830 DESIGN ELEC. RRTINS - 821
                                                                                              ..  ..MRK. DEPD03. CRP. -                                  810 1100%)
: 8. Maximum Dependable Capacity (Net MWe):                  810
: 9. If Changes occur Above Since Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted. If Any (Net MWe):
: 11. Reasons for Restrictions, If Any:
som3-NOME MONTH        YEAR      CUMULATIVE
: 12. Report Period Mrs                  744.0    2.184.0      76.081.0                    ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,                                  _ gag
: 13. Hours Reactor Critical            434.3    1.874.3      54.403.1
: 14. Rx Reserve Shtdun Mrs                  .6          .0            .0
                                                                                                                                                                      -80
: 15. Mrs Generator On-Line              361.6    f.801.6      53.001.5
: 16. Unit Reserve Shtdun Mrs                .8        .0            .0
: 17. Gross Therm Ener (MWH)          596.112 4.030.584 191.767.170 18.' Gross Elec Ener (MWH)          192.370  1.348.190    38.005.510
                                                                                                                                                                      -to
: 19. Net Elec Ener (MWM)              185.755  1.304.045    36.802.685
: 20. Unit Service Factor.                48.6        82,5          69.7
                                                                                                                                                                      -30 21 Unit Avail Factor                    48.6        82.5          69.7
: 22. Unit Cap Factor (MDC Net)          30.8        73.7          63.2m 0
: 23. Unit Cap Factor (DER Met)          30.4        72.7          58.9 0      ii                          ib      IN    ib
: 24. Unit Forced Outage Rate            22.2        5.4          14.3                                            DAYS
: 25. Forced Outage Hours                103.4      103.4        8.986.6
  ' 26. Shutdowns Sched Over Next 6 Months (Type,Date Duration):                                                MARCH 1984 SEPTEM8ER - 30 DAY SHUTBOWN FOR IHSI
: 27. If Currently Shutdeun Estimated Startup Date:            N/A        N Item calculated with a Weighted Average                                                          PAGE 2-104
 
O MMMMMMWNNMMMMMMNNMMNNMMMMMMMMMMMMMMM              r Report Period MAR 1984                      UNIT      SHUTD0WN$ / REDUCTION $                      N          FITZPATRICK                      M NMMMMMMMMMMMMMMMMMMMMMMMMNNNMMMMMNNN No.      Bate    liig Hours Reason Method LER Number System Comoonent            Cause & Corrective Action to Prevent Recurrence 3      85/03/84          5 279.8    B    1                                  SHUTDOWN FOR CONTROL ROD DRIVE MAINTENANCE AND IHSI.
4      85/22/84- F          64.2    A    3~  84-009                        REACTOR SCRAM ON LOW LEVEL CAUSED BY A LOSS OF FEEDWATER PUMP "B" DUE TO A WIPED BEARING. FEEDWATER PUMP "A" OUT OF SERVICE FOR MAINTENANCE.
      -5        83/25/84          F  39.2  -A-    3  84-809                        REACTOR SCRAM DURING STARTUP DN LOW LEVEL CAUSED BY LOSS OF FEEDWATER PUMP "A" DUE TO FAILURE OF A CONTROL OIL LINE.
monummummmu -          FITZPATRICK OPERATED WITH 3 OUTAGES AND NO REDUCTIONS DURING MARCH.
O
 
==SUMMARY==
M
      'muuuusumumM c
LTwee          Reason                            Method          Svstem 8 Comoonent F-Forced. A-Equip Failure F-Admin-              1-Manual        Exhibit F 3 H
    ~
      <S-Sched        B-Maint or. Test G-Oper Error 2-Manual Scram Instructions for C-Refueling.,        H-Other      3-Auto Scram    Preparation of
:  D-Regulatory Restriction-        4-Continued    Data Entry Sheet E-Operator Training -            5-Reduced Load Licensee Event Report
                          & License Examination        9-Other        (LER) File (HUREG-0161)
PAGE 2-105 s
 
f unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun u            -FITZPATRICK                u unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum                  FACILITY        DATA                                                                        Report Period MAR 1984 FACILITY DESCRIPTION                                          UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                    UTILITY STATE....................NEW YORK                            LICENSEE................. POWER AUTHORITY OF STATE OF N.Y.
        ' COUNTY.................. 0SWEGO                              CORPORATE ADDRESS. . . . . . . 10 COLUMBUS CIRCLE NEW YORK, NEW YORK 10019 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 8 MI NE OF                        CONTRACTOR OSWEGO, NY                      ARCHITECT / ENGINEER....... STONE & WEBSTER TYPE OF REACTOR............BWR                                  HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY...H0VEMBER 17, 1974                    CONSTRUCTOR.............. STONE & WEBSTER DATE ELEC ENER IST GENER... FEBRUARY 1,    1975                TURBINE SUPPLIER......... GENERAL ELECTRIC
      .DATE COMMERCIAL OPERATE.... JULY 28, 1975                  REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                          IE REGION RESPONSIBLE......I
      . CONDENSER COOLING WATER.... LAKE OHTARIO                    IE RESIDENT INSPECTOR......L. DOERFLEIN ELECTRIC RELIABILITY                                          LICENSING PROJ MANAGER.....H. ABELSON COUNCIL..................MORTHEAST POWER                      DOCKET NUMBER........... 50-333 COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-59, DCTOBER 17, 1974 PUBLIC DOCUMENT ROOM....... STATE UNIVERSITY COLLEGE OF OSWEGO PENFIELD LIBRARY - GOVERNMENT DOCUMENTS COL OSWEGO, NY 13126 (315) 341-2323 IN$PECTION            STATUS INSPECTION
 
==SUMMARY==
 
NO INSPECTION INPUT PROVIDED.
  ' ENFORCEMENT
 
==SUMMARY==
 
CONTRARY TO 10 CFR 50.59(8) THE LICENSEE FAILED TO PERFORM A WRITTEN SAFETY EVALUATION WHEN THE MOTOR ACTUATOR FOR THE RESIDUAL NEAT REMOVAL SUPPRESSION POOL COOLING JO'TBOARD CONTAINMENT ISOLATION VALVE (10MOV39B3 WAS REPLACED WITH A DIFFERENT DESIGN ACTUATOR ON SEPTEMBER 23, 1977.
(8328 4)
OTHER ITEMS                                                                                                                                                                  {
SYSTEMS AND COMPONENTS:
NO INPUT PROVIDED.
PAGE 2-106
 
y-NNNMMMMNNNNNNNNNNMWNMMNNNNNMMMNNNNNN
^
Report Period MAR 1984                    I N S P E C-T I O N              5TATUS - (CONTINUED)                    N                FITZPATRICK                                                      N NNNNNNNNNNMMMMMMMMMMNNNNNNNNNNNMMNNM OTHER ITEMS FACILITY ITEMS (PLANS AND PROCEDURES)
NO INPUT PROVIDED.
MANAGERIAL ITEMS:
NO INPUT PROVIDED.
PLANT STATUS
* NO INPUT PROVIDED.
LAST IE SITE INSPECTION DATE            NO INPUT PROVIDED.
INSPECTION REPORT N08 NO INPUT PROVIDED.
REPORTS            FR0M        LICEN5EE
        ==================================================================================================================================
NLMBER'    DATE OF      DATE OF          SUBJECT
                      -EVENT.      -REPORT
                      -- =    . _ _ _ _ - -      _==___    _ _ _ _ .    ._.___.- ___      .--- - . _ - _ . _  __-.....---------- -..---------..... -_-- ..--
NO INPUT PROVIDED.
      ==================================================================================================================================
PAGE 2-107
:D W_                                                                _                                                                                                    __ -
: 1. Decket    58-285          0PERATING            STATUS                                unnuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu u              FORT CALHOUN 1                              M
: 2. Reporting Period: 03/01/84      Outage + On-line Hrs:    744.0                      unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu
    -3. Utility
 
==Contact:==
T. P. MATTHEMS (402) 536-4733                -
AVERAGE DAILY POWER LEVEL (Ne) PLOT
: 4. Licensed Thermal Power (MWE):                    1500
: 5. Nameplate Rating (Gross PEde):            591 X 0.85 = 502 FORT CRLHOUN 1
: 6. Design Electrical Rating (Net P5de):              478                      1500
: 7. Maximum Dependable capacity (Gross MWe):                                                        DESIGN E1.EO. RATING -      478 461
                                                                                                ...... MPUC. DEPEND. ORP. -            438 (100%3 S. Maximum Dependable Capacity (Net MWe):            438
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME te. Power Level Te Which Restricted. If Any (Net MWe):
11 Reasons for Restrictions, If Any 1000 -
NOME MONTH      YEAR    CUMULATIVE                                                                                              g
: 12. Report Period Mrs              744.8    2.184.0    92.185.0                                                                                              g
: 13. Hours Reactor Critical            58.2    f.490.2    72,104.1
: 14. Rx Reserve Shtdman Mrs              .8        .0      1.309.5
: 15. Mrs Generator On-Line            49.5    1.489.5    70.842.1 16.' Unit Reserve Shtdun Mrs
                                            .8        .6            .0 900-
: 17. Gross Therm Ener (75ml)        49.826  2.152.797  88.912.511                        ,,.... ..... .............. .........                            300 ta. Gross Elec Ener (MWH)          14.816    690.258 29.319.682                                                                                          ,,a
: 19. Net F* *c Ener (f5JH)          13.782    656.538  27.736.398
                                                                                                                                                              -80
: 28. Unit Service Factor                6.7      68.2          76.8
                                                                                                                                                              -40
: 21. Unit Avail Factor                  6.7      68.2          76.8
: 22. Unit Cap Factor (MDC Met)          4.2      68.6          65.6u                                                                                      -20
: 23. Unit Cap Factor (DER Net)          3.9      62.9          62.9                  0            ,        ,        ,        ,        ,            -. 0 0        5        to      15        20    25                30
: 24. Unit Forced Outage Rate              .0        .0          3.5                                                DRYS
: 25. Forced Outage Hours                  .0        .0      1. 3 98d
: 26. Shutdowns Sched Over Next 6 Months (Type,Date. Duration):                                                  MARCH 1984 NOME
: 27. If Currently Shutdown Estimated Startup Date:        05/01/84      m Item calculated with a Weighted Average                                              PAGE 2-108
 
F r
unnumNuuuuuuuMuuuuuuuuuuuuuuuuuuuuuN toport Period MAR 1984                  UNIT      SHUTD0WN5 / REDUCTION $                            u          FORT CALHOUN 1                                  N nuNuNuuNuMuuuNuuuuuuuNuuuuuuuuNuuMuN Ma.      Bate    E Heesrs Reason          LER Mumber System Comoonent                cause 8 Corrective Action to Prevent Recurrence 44-81 03/03/84      S 694.5      C    4                    RC    FUELXX      1984 REFUELING OUTAGE CDPR1ENCED MARCH 3,                      1984.
messenumana        FORT CALHOUN SMUTDOWN ON MARCH 3RD FOR REFUELING AND MAINTENANCE.
u supstaty a amounnameau
      . T-        Raanen                          Method            System 8 Cocoonent F-Forced A-Espsis Failure    F- Admi n    1-Manual          Exhibit F 4 H 5-Sched    4-Maint er Test G-Oper Error 2-Manual Scram Instructions for C-Refueling      M-Other-      3-Auto Scram      Preparation of 9-Regulatory Restriction        4-Continued        Data Entry Sheet E-Sperater Training            5-Reduced Load Licensee Event Report
                      -4 License Examination        9-Other            (LER) File (NUREG-0161)
PAGE 2-109
 
m
                                - -            messensweemammes.
: e.              FORT CALMSUN 1-              5 Report Period MAR 1984 manusessmenswapessummens                FACILITY        DATA FARILITY M IPTIAN                                                    UTILITY A CONTRACTOR INFORMATION
                      'LOCATISE-                                                          UTILITY LICENSEE................ 0MAHA PUBLIC POWER DISTRICT
_        . STATE......'.............NESRASEA COUNTY...................MASHINGTON                              CORPORAT E ADDRESS. . . . . . . 1623 H ARMEY STREET OMAHA,, NEBRASKA 68102 BIST AND DIRECTION FROM NEAREST POPULATION.CTR.. 19 MI N OF                          CONTRACTOR OMANA, MER                        ARCHITECT / ENGINEER.......GIBBS, HILL, DURHAM & RICHARDSON
                      -TTPE OF BEACTOR............PWR                                        NUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING
                    .DATE INITIAL: CRITICALITY... AUGUST 6,.1973                            CONSTRUCTOR..............GIBBS, HILL, DURHAM & RICHARDSON BATE ELEC ENER 1ST. SENER... AUGUST 25, 1973                          TURBINE SUPPLIER......... GENERAL ELECTRIC BATE CefetERCIAL SPERATE.... JUNE 20, 1974                      REGULATORY INFORMATION
  ,                    CONDENSER C00 LING METHOD...ONCE THRU                              IE REGION RESPONSIBLE......IV CONDENSER CSSLING MATER.... MISSOURI RIVER                        IE RESIDENT INSPECTOR......L. YANDELL ELECTRIC RELIABILITY-                                              LICENSING PROJ MANAGER.....E. TOURIGNY 50-285 CONNCIL..................MID-C0NTINENT AREA                      DOCKET NUMBER...........
                                                          . RELIABILITY COORDINATION    LICENSE a DATE ISSUANCE....DPR-40, AUGUST 9, 1973 I ~                                                        . AGREEMENT i
PUBLIC DOCUMENT R00M. . . . . . .W. DAL E CL ARK LIBRARY 215 S. 15TH STREET OMAHA, NEBRASKA 68102 IN5PECTION              $TATUS INSPECTIAN SIEWIARY INSPECTION CSNSUCTED JANUARY t-31,.1984 (84-01): ROUTINE, ANNOUNCED INSPECTION OF OPERATIONAL SAFETY VERIFICATION, ESF SYSTEM MALK90MN, SURVOILL ANCE TESTING, MAINTENANCE ACTIVITIES, SPENT FUEL STORAGE RACK MODIFICATIONS, PREPARATION FOR REFUELING, FOLLOWUP OF IE BULLETINS, AND FOLLOWUP OF NUREG 8737 (TMI) ITEMS. WITHIM THE EIGHT AREAS INSPECTED, HO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
E -                  INSPECTION CONSUCTES FEBRUARY 13-17, 1984 (84-02): RodTIME, UNANNOUNCED INSPECTION OF NONLICENSED TRAINING AND REQUALIFICATION
  '                    TRAINING.. MITNIN THE TWO AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
      "                INPSECTION CONDUCTED FEBRUARY 13-17, 1984 (84-03): ROUTIME, ANNOUNCED INSPECTION OF THE LICENSEE'S RADI0 ACTIVE WASTE MANAGEMENT "F99 GRAM INCLUDING RADIOACTIVE WASTE SYSTEMS, ORGANIZATION AND STAFFING, EFFLUENT RELEASES, RECORDS AND REPORTS OF RADIDACTIVE EFFLUENTS, EFFLUENT CONTROL INSTRUMENTATION, PROCEDURES FOR CONTROLLING THE RELEASE OF EFFLUENTS, TESTING AIR CLEANING SYSTEMS, WITHIN THE MINE AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WRE
: REACTOR CSSL ANT MATER SUALITY - AND SOLID RADI0 ACTIVE WASTE.
                  - IDENTIFIES..
                      . INSPECTION CONSUCTED' FEBRUARY t-29, 1984 (84-84): ROUTIME, ANNOUNCED INSPECTION OF DPERATIONAL SAFETY VERIFICATION,                                ESF SYSTEM i.
MALK90MN, SWRVEILL ANCE TESTING, MAINTENANCE ACTIVITIES, PREPARATION FOR REFUELING AND FOLLOWUP OF LER'S. WITHIN THE SIX AREAS
                    -INSPECTED, NS VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
PAGE 2-110 E
 
NNNNMNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNM Report Period MAR 1984              IN$PECTION              5TATUS - (CONTINUED)            N                  FORT CALHOUN 1                                                    M MNNNNNMMMMNNNNMMMMNNMMNNMMMMMNNNNMMM ENFORCEMENT SUNe&RY NOME OTNER ITERS SYSTEMS AND COMPONENT PROBLER$s NOME FACILITY ITEMS (PLANS AND PROCEDURES):
NOME MANAGERIAL ITEMS 8 NOME PLANT STATUS:
REFUELING OUTAGE LAST IE SITE INSPECTION DATE: -FEBRUARY 1-29, 1984
    ' INSPECTION REPORT NO: 50-245/84-84 REPORT 5        FR0M      LICENSEE
      ==================================================================================================================================
NUMBER        CATE OF DATE OF    SUBJECT EVENT  REPORT                                                                                                                                                      i
___      ..          _=- ___- ......... ----- ____                                  - =----------------                      ,
MONE
      ==================================================================================================================================
PAGE 2-111 o
s.. J -
 
r
: 1. Docket:    58-267          0PERATING            STATUS                  unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum u            FORT ST VRAIN          u
: 2. Reporting Period    03/01/84  Outage + On-line Hrs:  744.0          uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu
: 3. Utility
 
==Contact:==
C. N. FULLER f303) 785-2224                        AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                      842
: 5. Nameplate Rating (Gross MWe):            403 X 0.85 = 343
: 6. Design Electrical Rating (Net MWe):                330        gems
  -7. Maximum Dependable Capacity (Gross MWe):          342                            MIGN E. RRTIM - 330
                                                                              . ... MRX. DEPDC. CRP. - 330 (100%3
  .4. Maximum Dependable Capacity (Het MWe):            330
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME
: 18. Power Level To Which Restricted, If Any (Not MWe):      280
: 11. Reasons for Restrictions, If Any:
10m3-35% PENDING COMPLETION OF 3-0 STARTUP TESTING.
            .. -    -              MONTH      YEAR    CUMULATIVE                                                        o
  -12. Report Period Mrs              744.0    2.184.0    41.665.0                                                        Q
: 13. Hours Reactor Critical              .8    468.0    26.295.3
: 14. Rx Reserve Shtdun Hrs              .0        .0          .0
: 15. Mrs Generater On-Line              .8    446.6    18.250.0
: 16. Un'it Reserve Shtdwn Mrs            .6        .0          .0 300-17.-Gross Thern Ener (MWN)              e  240.819    9.610.571 I  18.' Gross Elec Ener (MWH)              8    77.412    3.230.862 NO NET PO6ER DUTPUT THIS MONTH        . _ ,
: 19. Met Elec Ener (MWH)            -1.919    67.431    2.938.961
                                                                                                                      -e0
: 28. Unit Service Factor                .e      20.4        43.8                                                  ,,,
21 Unit Avail Factor                    .8      20.4        43.8                                                  - e0
: 22. Unit Cap Factor (MDC Net)          _e      9.4        21.4                                                  -30
: 23. Unit Cap Factor (DER Net)          .8      9.4        21.4      o          .,      .,      ,    ,- -,  .,    O o          5    to    15  30  35  30
: 24. Unit Forced Outage Rate            .0      1.5        39.0                                DAYS
: 25. Forced Outage Hours                .e      6.9    11.683.9
: 26. Shutdowns Sched Over Next 6 Months (Type.Date, Duration):                                MfiRCH 1984 EEFUELING 4-1 1 MONTN.
: 27. If Currently Shutdeun Estimated Startup Date:        05/02/84                                                        PAGE 2-112
__=_ _
 
nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmuunu Report Period MAR 1984                  UMIT      5HUTD0WN5 / REDUCTION 5                        m        FORT ST VRAIN            m nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmunum No. Bate    lidd Mours Reason Method LER Number System Comoonent              Cause & Corrective Action to Prevent Recurrence 84-00Z 01/19/84    5 744.0    C      4                    ZZ    ZZZZZZ  REFUELING, TURBINE OVERHAUL, "A" HELIUM CIRCULATOR CHANGE 0UT, ROUTINE CORRECTIVE AND PREVENTIVE MAINTENANCE.
I F-    ..munumammama      FORT ST WRAIN REMAINS $NUTDOWN IN A CONTINUING REFUELING / MAINTENANCE OUTAGE.
i,    , u SuggqARY a l        semanansues Twee      pamaan                          Method            svstem 8 Comoonent
(
F-Forced 'A-Foulp Failure F-Admin          1-Manual          Exhibit F S H S-Sched  8-Maint er Test G-Sper Error    2-Manual Scram Instructions for C-Refueling        N-Other        3-Auto Scram      Preparation of
!                  D-Regulatory Restriction        4-Continued        Data Entry $ beet E-Sperator Training              5-Reduced Load Licensee Event Report
                        & License Examination        9-Other          (LER) File (NUREG-0161)
PAGE 2-113
 
c i
maammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmu O            FORT ST VRAIN                      m nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmu                          FACILITY          DATA                                                      Report Period MAR 1984 FACILITY DESCRIPTION                                                    UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                UTILITY STATE....................C0LORADO                                      LICENSEE.................PUBLIC SERVICE OF COLORADO COUNTY................... WELD                                          CORPORATE ADDRESS........P.O. BOX 840 DENVER, COLORADO 80201 BIST AND DIRECTION FROM MEAREST POPULATION CTR.. 35 MI N OF                                  CONTRACTOR DENVER, COL                        ARCHITECT / ENGINEER.......SARGENT & LUNDY
: TYPE OF REACTOR. . . . . . . . . . . .HT GR                                HUC STEAM SYS SUPPLIER... GENERAL ATOMIC CORP.
DATE INITIAL CRITICALITY... JANUARY 31, 1974                              CONSTRUCTOR..............EBASCO DATE ELEC ENER 1ST GENER... DECEMBER 11, 1976                              TURBINE SUPPLIER......... GENERAL ELECTRIC BATE COMMERCIAL OPERATE.... JULY 1,            1979                  REGULATORY INFORMATION CONDENSER COOLING METHOD...CDOLING TOWER                                IE REGION RESPONSIBLE......IV CONDENSER COOLING MATER....S. PLATTE RIVER                              IE RESIDENT INSPECTOR......G. PLUMLEE ELECTRIC RELIABILITY                                                    LICENSING PROJ MANAGER.....P. WAGNER COUNCIL.................. WESTERN SYSTEMS                                DOCKET NUMBER...........      50-267 COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-34, DECEMBER 21, 1973 PUBLIC DOCUMENT ROOM.......CREELEY PUBLIC LIBRARY CITY COMPLEX BUILDING GREELEY, COLORADO 80631 INSPECTION              STATUS INSPECTION SUPW1ARY INSPECTISM CONDUCTED DECEMBER S-9,              1983 (83-323: ROUTINE, UNANNOUNCED INSPECTION OF SECURITY SYSTEM AUDIT, PHYSICAL BARRIERS -
PROTECTED AREA, PHYSICAL BARRIERS - VITAL AREAS. TESTING AND MAINTENANCE, ALARM STATIONS, AND COLD WEATHER PREPARATIONS. WITHIM SIX AREAS INSPECTED, MO VIDALTIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION CONDUCTED JANUARY 30 - FEBRUARY 3, 1984, (84-02): ROUTINE, UNANNOUNCED INSPECTION OF NONLICENSED TRAINING AND RE4CALIFICATION TRAINING. WITHIN THE TWO AREAS INSPECTED, NO VIOLATIONS OR DEVI ATIONS WERE IDENTIFIED.
INSPECTION CONDUCTED FEBRUARY 6-10, 1984, (84-04): ROUTINE, UNANNOUNCED INSPECTION OF THE LICENSEE'S RADI ATION PROTECTION OPERATIDMS DURING REFUELING INCLUDING: ADVANCED PLANNING AND PREPARATIONS; TRAINING; PROCEDURES; EXPOSURE CONTROL (EXTERNAL AND INTERNAL); RADIATION WORK PERMIT (RWP) PROGRAM; POSTING AND CONTROL OF RADI0 LOGICALLY CONTROLLED AREAS (RCA); RADIDACTIVE AND CONTAMINATED MATERIAL CONTROL; INSTRUMENTATION, EQUIPMENT, AND SUPPLIES; SURVEYS; AND THE ALARA PROGRAM. WITHIH THE TEN AREAS INSPECTED ON VIOLATION WAS IDENTIFIED.
INSPECTION CONDUTED FEBRUARY 13-16, 1984 (84-07): ROUTINE, UNANNOUNCED INSPECTIDH OF CONSTRUCTION ACTIVITIES INCLUDING SITE TOUR, REVIEW OF QA PROCEDURES FOR THE INSTALLATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT, QUALIFICATION OF QC ELECTRICAL PERSONNEL, CBSERVATION OF WORK ACTIVITIES, REVIEW OF NONCONFORMANCE REPORTS, AND REVIEW OF INSPECTION RECEIVING REPORTS. WITHIN THE SIX AREAS INSPECTED NO VIDALATIONS OR DEVIATIONS WERE IDENTIFIED.
PAGE 2-114
 
r wumunummunumwwwwwwwwwwwwwwunuwwwmanu Report Period MAR 1984                                    INSPECTION                    STATUS - (CONTINUED)
* FORT ST VRAIN
* MMMMMMMMMMMMMMMMMMMMMMMMMMMNhMMMMMMM ENFORCEMENT
 
==SUMMARY==
 
              . NOME glHER ITEMS
      .1 SYSTEMS AND COMPONENT PROBLEMS:
            ' MAJOR ELECTRICAL MODIFICATIONS TO THE AUXILIARY ELECTRICAL SYSTEM, INSTRUMENT POWER SYSTEM, 480V AC DISTRIBUTION SYSTEM. AND 4168/480V AC TRANSFORMERS ARE SCHEDULED FOR THIS REFUELING OUTAGE.
FACILITY ITEMS (PLANS AND PROCEDURES):
NDHE 9
    -r
* MANAGERIAL'ITEMSs'
-          ' HONE
            . PLANT STATUS *~
THIRD REFUELING OUTAGE BEGAN JANUARY 19, 1984, AND IS STILL CONTINUING LAST'IE SITE INSPECTION DATE: FEBRUARY 13-16, 1984 INSPECTION REPCRT_N0: 50-267/84-07 REPORTS              FR0M                  LICENSEE
            '-==================================================================================================================================
NUMBER            DATE OF        ' DATE OF          SUBJECT EVENT          REPORT
              ~. ' . ____.......--..                  _------- __        _ _-...... _      ___ = . - - - . . - - - - - - - - - - - - - - - - - - - - - - - _        _----.....---------......--. .....
83-055              12/21/83        1/20/84        DURING REGULARLY SCHEDULED SURVEILLANCE TEST OF THE HELIUM CIRCULATOR PENETRATION SAFETY VALVES.
ONE OF EIGHT SAFETY VALVES WAS FOUND TO RELIEVE AT A SETTING OUTSIDE ACCEPTANCE CRITERIA. LSSS 3.3, TABLE 3.3.1.
44-001                1/1/84      ' 1/31/84        RADI0 ACTIVE GASEOUS EFFLUENT ACTIVITY MONITOR ALARM / TRIP SETPOINTS WERE NOT ADJUSTED IN ACCORDANCE WITH THE OFFSITE DOSE CALCULATION MANUAL CODCM) ELCO 8.1.'..J.
84-002'              1/23/84'      2/22/84        ONE OF THREE BEARING WATER PRESSURE DIFFERENTIAL SWITCHES WAS FOUND IHOPERABLE WHILE PERFORMING A ROUTINE SURVEILLANCE TEST. LCO 4.4.1 84-003                2/12/84 .3/13/84              ON' FEBRUARY 12. 1984. THE REACTOR SCRAM RESULTED DURING INSERTION OF A FUEL BLOCK CONTAINING THE HUETROM STARTUP SOURCE INTO REGION 22 REFUELING PENETRATION. LCO 4.4.1
            .============================x:====================================================================================================
PAGE 2-115
 
                                                                                                                        ~ _-
1 Decket:          50-244'    OPEkATING                STATUS                          muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum u            GINNA                                  N
: 2. Reporting Period: 03/01/84        Outage + On-line Hrs: 744.0                        unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum 3.LUtility
 
==Contact:==
ROBERT E. DODGE (315) 524-4446                                      AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                        1520
: 5. Nameplate Rating (Gross MWe):                608 X 0.85 = 517 GINNA 6.~ Design' Electrical Rating (Met MWe):                '470                    18M3
          '7. Maximum Dependable Capacity (Gross MWe):            490
                                                                                                            "                          ~
                                                                                                                                          ~        (1002)
: 8. Maximum-Dependable Capacity (Met MWe):          _
470
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted, If Any (Net MWeld
: 11. Reasons for Restrictions. .If Any:
10mD-NONE~
MONTH        YEAR      CUMULATIVE                                                                                o
_12.' Report Period Mrs                744.0    2.184.0      125.760.0                                                                              Q
: 13. Hours Reactor Critical            50.1    1.490.1      95.089.5
: 14. Rx Reserve Shtdwn Mrs                .0          .0      1.631.5        g
          '15. Hrs Generator On-Line              49.6    1.489.6      93.000.9
: 16. Unit-Reserve Shtdwn Hrs              .0          .0          8.5
                                                                                                                                                          -880 17.' Gross Thern Ener (MWH) 64.896  2.207.424 128.464.793 18.' Gross Elec Ener (MWH)          21.024    733.488 41.897.859                                                                              -80
          '19. Net Elec Ener (MWH)              16.522    694.289    39.720.533                                                                          -80
: 28. Unit Service Factor                  6.7        68.2          74.0
                    . . . . ..                                                                                                                            -to 21.. Unit Avail Factor                  6.7        68.2          74.0
                                                                                                                                                          ~
        ~ 22J Unit Cap Factor (MDC Met)          4.7        67.6          69.0m
        .23.. Unit. Cap' Factor'(DER Net)          4.7        67.6          69.0u              o        ..    ,.      ,                .      ,      ,  0 0    5    to    15          30            25      30 z 24.. Unit Forced Outage Rate              .0          .0          71                                    DAYS
: 25. Forced Outage, Hours                  .0          .0      3.802.1 26.-Shutdowns Sched Over Next 6 Months (Type,Date. Duration):                                        MARCH 1984
              'NONE
: 27. If Currently Shutdown Estimated Startup Date:              05/06/84  M Item calculated with a Weighted Average                                  PAGE 2-116 !
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
  . Report Period MAR 1984                UNIT      SHUTD0WN5 / R E D U C T-I O N 5                M              GINNA                                                                  N MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date -[EEi Hours Reason Method LER Numhet_ System Component            Cause & Corrective Action to Prevent Recurrence 1      03/03/84    5 694.4    C      1                  RC    FUELXX    UNIT WAS SNUTDOWN AT 0133 HOURS ON 3/3/84 FOR ANNUAL INSPECTION, REFUELING, AND MAINTENANCE.
EMMMMMMMMMM      GINNA SNUTDOWN ON MARCH 3RD FOR REFUELING AND MAINTENANCE.
O
 
==SUMMARY==
'M EMMMMMMMMMM Tvna      Reason                        Epthod          Svstem 8 Comoonent F-Force'd A-Equip Failure F-Admin          1-Manual        Exhibit F 8 H 5-Sched    B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling      H-Other      3-Auto Scram    Preparation of
        .      D-Regulatory Restriction '    4-Continued      Data Entry Sheet E-Operator Training            S-Reduced Load Licensee Event Report
                  & License Examination      9-Other          (LER) File (NUREG-0161)
PAGE 2-117
 
tuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu D                        GINNA                                      u tuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum                                                FACILITY        DATA                                                                        Report Period MAR 1984
: FACILITY DESCRIPTION                                                                        UTILITY 8 CONTRACTOR INFORMATION L'0 CATION                                                                                UTILITY S T A T E . . .' . .' . . . . . . . . . . . . . . . N EW Y O R K                          LICENSEE................. ROCHESTER CAS 8 ELECTRIC COUNTY................... WAYNE                                                            CORPORATE ADDRESS....... 89 EAST AVENUE ROCHESTER, NEW YORK 14604 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 15 MI NE OF                                                    CONTRACTOR ROCHESTER, NY                        ARCHITECT / ENGINEER....... GILBERT ASSOCIATES
          - TYPE OF REACTCR. . . . . . . . . . . .PWR                                                    HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... NOVEMBER 8,                                  1969                CONSTRUCTOR..............BECHTEL
          -DATE ELEC ENER 1ST GENER... DECEMBER 2,                                  1969                TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... JULY 1,                                1970                REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0NCE THRU                                                      IE REGION RESPONSIBLE. . . . . .I CONDENSER. COOLING WATER.... LAKE ONTARIO                                                  IE RESIDENT INSPECTOR......R. ZIMMERMAN ELECTRIC RELIABILITY                                                                      LICENSING PROJ MANAGER.....G. DICK COUNCIL..................MORTHEAST POWER                                                  DOCKET NUMBER........... 50-244 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-18, SEPTEMBER 19, 1969 PUBLIC DOCUMENT RGOM....... ROCHESTER PUBLIC LIBRARY BUSINESS AND SOCIAL SCIENCE DIVISION 115 SOUTH AVENUE ROCHESTER, NEW YORK 14604 INSPECTION              5TATUS INSPECTIDM
 
==SUMMARY==
 
NO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
CONTRARY TO TECHNICAL SPECIFICATION 4.5.2.3.1.C, THE SURVEILL ANCE TEST PERFORMED ON DECEMBER 4,                                                                  1983, TO DETERMINE THE IODINE ms[1. REMOVAL EFFICIENCY OF THE POST ACCIDENT CHARCOAL SYSTEM WAS MEASURED UNDER TEST CONDITIONS OF 266 DEGREES F. RATHER THAN 286
  ,%    DEGREES F AS REQUIRED. FURTHER, THE TEST REPORT DOCUMENTING THE INCORRECT TEST TEMPERATURE WAS REVIEWED AND ACCEPTED BY
        . SUPERVISORY PERSONNEL FROM TWO RESPONSIBLE DEPARTMENTS.
(8324 4)                                              .
OTHER ITEMS
          . SYSTEMS AND COMPONENTS:                                                >
PAGE 2-118
 
e wwumuwwunuwwwwwwwwwwwuumununuwwmunum Repert Period MAR 1984                      INSPECTION            5TATUS - (CONTINUED)        W                                          GINNA                          N MMMMMMMMMWNMMMMdMMWMMMMMMMMMMMMWWMMM C
OTHER ITEMS
_NO ' INPUT;PRCVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES):
NO IMPUT.PROVIDED.
                    ' MANAGERIAL ITEMS:
RNO IMPUT PROVIDED.
t              l PLANT STATilS '
                    'NO INPUT PROVIDED.
l LAST IE SITE INSPECTION DATE: NO IMPUT PROVIDED.
INSPECTION REPORT NO: NO IMPUT PROVIDEC.
REPORTS        FR0M    LICEN5EE
                        =======================================================================-==========================================================
                          ' NUMBER'  DATE OF      DATE OF        SUBJECT EVENT        REPORT
                                .__. ____-    _ ____---- ___            -      __      ---  -    _-= - - ==  ------                        -- ==-------    =--------------
M NO INPUT PROVIDED.
                        ==================================================================================================================================
2 PAGE 2-119 4  >
 
    -1. Docket      50-213--          OPERATIMG              STATUS                          muwwwummwwwwwmummvuummmmmmmmmmunwann m            HADDAM NECK                                            *
: 2. Reporting Period        03/01/84    Outage + On-line Hrs:      744.0                  Mumwwwwmunuwwummmmunawuumununummunum
    '3.LUtility
 
==Contact:==
R.L. EPPINGER f203) 267-2556 X274                              AVERAGE DAILY PCWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                          1825
: 5. Nameplate Rating (Gross MWe):
HRDDRM NECK 667 X 0.9 = 600
: 6. Design Electrical Rating (Het MWe):                      582                  1883 DESIGN ELEC. RRTING -                            582
: 7. Maximum Dependable Capacity (Gross ~MWe):                596                                                                                    589 (100%)
__.... rex. DcrtND. Cnr. -
: 8. Maximum Dependable Capacity (Not MWe):                  569
    .9.'If Changes Occur Above Since Last Report, Give Reasons:
NONE-
: 10. Power Level'To Which Restricted. If Any (Not MWe):
    '11. Reasons for Restrictions, If Anyt 1000-
        ' HONE ~
MONTH        YEAR      CUMULATIVE                                                                                              Q
: 12. Report Period Mrs                  744.0    2.184.0      142.440.0                                                                                              r
: 13. Hours Reactor Critical            744.0    2.184.0      123.385.4
    '14. Rx Reserve Shtdwn Hrs'                .0          .0        1.200.5 hf                            ,
roc one et - tseta crTInm. muo!T!ous
: 15. Hrs Generator On-Line              744.0    2.184.0      118.091.3
                                                                                              ---*o--------    -r--------------------- -100
: 16. Unit Reserve Shtown Mrs                .0          .0          373.7            gag,
: 17. Gross Thern Ener (MHH)        1.331.459                                                                                                                    -80 3.949.670 205.322.230
: 18. Gross Elec Ener (MWH)            442 111  1.314.365    67.427.608                                                                                          - 80
: 19. Met Elec Ener (MWH)              422.733  1.254.928    64.155.629                                      I
: 20. Unit Service Factor                100.,1      100.0            82.9                                                                                        ~iO
  '21    Unit Avail Factor                100.0      100.0            83.2
                                                                                                                                                                      -30
: 22. Unit Cap Factor (MDC Net)            99.9      101.0            82.8W
  '23.' Unit Cap Factor (DER Met)                                      77.0M            0                                                        ~''        ~
97.6        98.7                                o'      5      1'O      l's                              2O  is '    30 24.' Unit Forced Outage Rate                .0          .0            6.1                                      DRYS 25.' Forced Outage Hours                    .0          .0      1.158.0
  ' 26. Shutdowns Sched Over Next 6 Months (Type Date, Duration)
* REFUELING:    08-01-84 (10 WEEKS) 27.' If Currently Shutdown Estimated Startup Date:            N/A        u Item calculated with a Weighted Average                                                  PAGE 2-120
 
                                      /
                    .                                                                                          NNNNMMMNNNNNNNNMMMMMMMMMMNNNNMMMMMNN Report Perled MAR 1984.                      UNIT      SHUTD0WNS / REDUCTIONS                        M                                HADDAM NECK      N MNNNNMMMMMMNNNNNNNMMMMNNNNNNMNNNNNMM
_HRm__    Date        lidi Hours Reason Method LER Number System Component            Cause 8 Corrective Action to Prevent Recurrence 84-1    03/13/84          F-    0.0    F    5                  IB    INSTRU    AN INSTRUMENTATICH MALFUNCTION CAUSED A TURBINE LOAD RUNBACK. THE UNIT CONTINUED THE LOAD REDUCTION TO VERIFY REACTOR SHUTDOWN CAPABILITY OF THE CONTROL
                            ~ N'                                                          RODS. IT WAS BELIEVED THAT A CONTROL ROD RODLET MAY
                              '.                                                          HAVE DROPPED IMITIATING THE LOAD RUMBACK. SUBSEQUENT REVIEW OF INCORE FLUX MAPPING DATA VERIFIED THAT A RODLET HAD HOT DROPPED.
f
        . NNNNNNNNNNN          .HADDAM NECK (CONNECTICUT YANKEE) OPERATED AT FULL POWER N
 
==SUMMARY==
N-          WITH 1 REDUCTION DURING MARCH.
      . NNNNNNNNNNN Twee        Ram een                            Method          Svstem 8 Connonent F-Forced ~ A-Equip Failure F-Admin                1-Manual      Exhibit F & H S-Sched      B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling .        . H-Other    3-Auto' Scram  Preparation of D-Regulatory Restriction            4-Continued    Data Entry Sheet
              >    '.E-Operator Training                  5-Reduced Load Licensee Event Report 4 License Examination            9-Other        (LER) File (HUREG-0161)
PAGE 2-121
 
NNNNNMWNMMMMMMMMMMMMNNNNNNNNNMMMMNNN                                            S M-            HADDAM. NECK .                      N NmMuNumumMuMuNuMwMummuMMMMMMMMMMMNun                            FACILITY        DATA                                                                    Report Period MAR 1984 FACILITY DESCRIPTION                                                      UTILITY 8 CONTRACTOR INFORMATION
      . LOCATION.                                                              UTILITY STATE.................... CONNECTICUT                                    LICENSEE................. CONNECTICUT YANKEE ATOMIC POWER
          . COUNTY...................MIDDLESEX                                      CORPORATE ADDRESS........P.O. BOX 270 HARTFORD, CONNECTICUT 06101 DIST AMD' DIRECTION FROM NEAREST POPULATIDH CTR.. 13 MI E OF                                  CONTRACTOR MERIDEN, CONN                      ARCHITECT / ENGINEER....... STONE 8 WEBSTER TYP E OF REACTOR. . . . . . . . . . . .PWR                                HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... JULY 24, 1967-                                CONSTRUCTOR.............. STONE 8 WEBSTER DATE ELEC ENER 1ST GENER... AUGUST 7,              1967                    TURBINE SUPPLIER. . . . . . . . . WESTINGHOUSE DATE COMMERCIAL OPERATE.... JANUARY 1,              1968              REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0HCE THRU                                    IE REGION RESPONSIBLE......I CONDENSER COOLING WATER.... CONNECTICUT RIVEk                            IE RESIDENT INSPECTOR. . . . . .P.        SWETL AND ELECTRIC RELIABILITY                                                    LICENSING PROJ MANAGER.....J. LYONS COUNCIL..................N0RTHEAST POWER                                DOCKET NUMBER........... 50-213 COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-61                                DECEMBER 27, 1974 PUBLIC DOCUMENT ROOM....... RUSSELL LIBRARY 119 BROAD STREET MIDDLETOWN, CONNECTITCUT 06457 INSPECTIGH            STATUS INSPECTION
 
==SUMMARY==
 
      -NO INSPECTION IMPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
SECTION 2.4.5.1 0F THE ENVIRONMENTAL TECHNICAL SPECIFICATIONS (ETS) REQUIRES THAT MEASUREMENTS SHALL BE MADE TO DETERMINE OR
    . ESTIMATE THE TOTAL CURIE QUANTITY AND PRINCIPAL RADIDHUCLIDE COMPOSITION OF ALL SOLID RADI0 ACTIVE WASTE SHIPPED OFFSITE. SECTION
    .5.5.1 0F THE ETS REQUIRES THAT WRITTEN PROCEDURES SHALL BE PREPARED AND FOLLOWED FOR ALL ACTIVITIES IN CARRYING OUT THE ETS.
CHEMISTRY DEPARTMENT PROCEDURE CHDP 1.8 " ALPHA ANALYSIS AND SAMPLE PREPARATION," WRITTEN PURSUANT TO THE REQUIREMENTS OF SECTION 5.5.1 0F THE ETS, REQUIRES THAT SAMPLES UNDERGO A SAttPLE PREPARATION PROCEDURE PRIOR TO ANALYSIS. CONTRARY TC THE ABOVE, FOR THE PERIOD JANUARY 1983 TO JUNE 1983 THE ALPHA ANALYSIS FOR THE TRANSURANIUM CONCENTRATION LEVELS IN SOLID RADI0 ACTIVE WASTE WAS
: PERFORMED BY DIRECTLY COUNTING THE SAMPLE INSTEAD Of FOLLOWING PROCEDURE CHDP 1.8.
(8326 5) e -
CONTRARY'TO SECTION 8.1.10F EMERGENCY PLAN AND TRAINING PROCEDURE TR 1.6-1.4 SIX INDIVIDUALS WERE PLACED ON CALL PRIOR TO RECEIVING REQUIRED TRAINING.
(8328 4):
PAGE 2-122
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM HADDAM NECK                                                              M
        -Report Period MAR 1984                                                  INSPECTION                    5TATUS - (CONTINUED)        M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT
 
==SUMMARY==
 
OTHER ITEMS                                                            '
          ~ SYSTEMS AND COMPONENTS:
NO INPUT PROVIDED.
FACILITY ITEMS (PLANS' AND 5ROCEDURES):
          -NO INPUT PROVIDED.
MANAGERIAL ITEMS:
NO INPUT PROVIDED.
PLANT STATUS:
NO INPUT PROVIDED.
LAST IE SITE INSPECTION 14TE: NO INPUT PROVIDED.
INSPECTION REPORT NO: *$i INPUT PROVIDED.
REP 0RTS          FR0M        LICENSEE
          ===================================rs=============================================================================================
NUMBER                        DATE-OF-            DATE OF              SUBJECT
                                              . EVENT            REPORT
          -__________                                                                                                                          ______:      _                                  - ______ __=__________
______________                  ---w__  _ ------
NO. INPUT PROVIDED.
:==================================================================================================================================
PAGE 2-123 h %.
                      -A-
 
1.' Docket    50-328                  0PERATING                                                        STATUS                              MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M                                          HATCH I              N
: 2. Reporting Periods 03/01/84 -Outage + On-line Hrs: 244.0                                                                                """*"""""""*"""""""""5""""""""""""*"
: 3. Utility
 
==Contact:==
D.P. RAFEEDfE (912) 367-7851                                                                                tVERAGE DAILY POMER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                                                        2436
: 5. Nameplate Rating (Gross MWe):                                                                1000 X 0.85 = 850 HRTCH 1
: 6. Design Electrical Rating (Het MWe):                                                                    777                    1500 7.. Maximum Dependable Capacity (Gross MWe):                                                              801                                      DESIGN ELEO. RRTING =                          777
                                                                                                                                                -----.MRX. DEPDC. CRP. - 752 (100%)
    'S. Maximum Dependable Capacity (Het MWe):                                                              752
: 9. If Changes Occur Above Since Last. Report, Give Reasons:
NONE
: 10. 7ower Level To Which Restricted, If Any (Het MWe):
    '11. Reasons for Restrictions, If Any ggga, NONE MDMTH                                                  YEAR      CUMULATIVE                                                                                                  o
: 12. Report Period Mrs                          744.0                                          2.184.0      72.312.0 Q
: 13. Hours Reactor Critical                      592.0                                          1.515.5      51.c21.3                    .--------------------------------------- -100
: 14. Rx Reserve Shtdwn Mrs                                            .0                              .0            .0 hf 15.' Mrs Generator On-Line                    512.3                                            1.419.4      47.812.4                                                                                        \;.,- so
: 16. Unit Reserve Shtdwn Mrs                                          .0                            __,1            .0 500-117.. Gross Therm Ener (MWH)              1.014.102                                            3.161.286 100.296.401                                                                                            -so
: 18. Gross Elec Ener (MWH)                316,770                                            1.024.280    32.473.260
: 19. Het Elec Ener (MWH)                  299.371                                              972.904    30.823.395                                                                                          - tD
: 20. Unit Service ~ Factor                            68.9                                          65.0          66.1
  -21. Unit' Avail Factor                              68.9                                          65.0          66.1                                                                                          - 30
: 22. Unit' Cap Factor (MDC Net)                        53.5                                          59.2          56.7
: 23. Unit Cap Factor (DER Net)                        51.8                                          57.3          54.9                0    -      -
0 o        s            to                            as  20  25 so 24.1 Unit Forced.0utage Rate                          31.1                                          32.4          16.6                                                                    DRYS 25.' Forced Outage Hours:                    231.7                                                680.0      9.289.9
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
MRRCH 1984 NDHE 27..If Currently Shutdown Estimated Startup Dates                                                            N/A PAGE 2-124
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR 1984                                                  UNIT      5HUTD0WHS / REDUCTIONS                      M                                            HATCH 1              M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No.      Date                      1255 Hours Reason Method LER Number System Component                          Cause 8 Corrective Action to Prevent Recurrence 84-9  03/01/84                        F 166.3                    A    3                  HA    TURBIH  REACTOR SCRAM FROM TURBINE HIGH VIBRATIDH.
INSPECTIDH REVEALED 13TH STAGE LP TURBINE BUCKETS DAMAGED.
84-10 03/08/84                        5    0.0                  H    5                  SA    VESSEL  RAMPING UP FROM REACTOR SCRAM.
84-11  03/09/84                        F    0.0                  H    5                  CH    HTEXCH  HOLDING AND REDUCING LOAD DUE TO FEEDWATER HEATER PROBLEMS.
84-12 03/10/84                        F    65.4                  A    1                  HA    TURBIN  TURBINE MANUALLY TRIPPED. STILL TRYING TO RESOLVE FEEDWATER HEATER PROBLEMS.
84-13 03/11/84                        F    0.0                  H-    5                  RC    COHROD  REACTOR MANUALLY SCRAMMED BECAUSE OF CONTROL ROD PULL ERROR.
84-14 03/13/84                        5    0.0                  H    5                  SA    VESSEL  RAMPING UP FROM MANUAL TURBINE TRIP.
84-15 03/15/84                        5    0.0                  H    5                  RC    INSTRU  REDUCING AND HOLDING LOAD FOR OD-1 TEST.
''84-16. 03/15/84                        5    0.0                  H    5                  RC    INSTRU  RAMPING TO RATED POWER FROM OD-1 TESTING.
84-17 03/16/84                        S    0.0                  B    5                  RC    CONROD  REDUCING LOAD FOR ROD PATTERN ADJUSTMENT.
84 03/17/84                        S    0.0                  H    5                  RC    CONROD  RAMPING BACK TO RATED POWER FROM ROD PATTERN ADJUSTMENT.
84-19' 03/23/84                      'S    0.0                  H    5                  RC    CONROD  REDUCING LOAD FOR ROD PATTERN ADJUSTMENT 8 WEEKLY TURBINE TEST.
84-20 03/24/84'                        S    0.0                  H    5                  RC    CONROD  RAMPING BACK TO RATED POWER FROM ROD ADJUSTMENT AND TURBINE TEST.
84-21 03/30/84                        5    0.0                  H    5                  RC    CONROD  REDUCING LOAD FOR ROD PATTERH ADJUSTMENT 3 WEEKLY TURBINE TEST.
84-22 03/31/84                        5. 0.0                  H    5                  RC    CONROD  RAMPING BACK TO RATED POWER.
CMMMMMMMMMM                        . HATCH 1 OPERATED WITH 2 OUTAGES AND HUMEROUS REDUCTIONS LISTED IN DETAIL ABOVE.
O
 
==SUMMARY==
M EMMMMMMMMMM
.Tvna                  Reason                                                Method          Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin                                            1-Manual        Exhibit F 3 H S-Sched        ~B-Maint or Test; G-Oper Error 2-Manual Scram Instructions for C-Refueling                      H-Other              3-Auto Scram  Preparation of D-Regulatory Restriction                              4-Continued    Data Entry Sheet "E-Operator Training-                                        5-Reduced Load Licensee Event Report
                                    & License Examination                      9-Other        (LER) File (HUREG-0161)
PAGE 2-125
 
w-  , , -
cumuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu O                    NATCH 1                                N Emuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum                                    FACILITY          DATA                                                          Report Period MAR 1984 FACILITY DESCRIPTION                                                              UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                        UTILITY STATE.................... GEORGIA                                                LICENSEE................. GEORGIA POWER COUNTY...................APPLING                                                CORPORATE ADDRESS....... 333 PIEDMONT AVENUE ATLANTA, GEORGIA 30308
        .DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 11'MI N OF                                          CONTRACTOR BAXLEY, GA                          ARCHITECT / ENGINEER.......BECHTEL TYP E OF ' R E ACT'0 R . . . . . . . .~ . . . . BWR .                              NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... SEPTEMBER 12, 1974                                    CONSTRUCTOR.............. GEORGIA POWER CD.
DATE.ELEC ENER IST GENER...MOVEMBER 11, 1974                                      TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 31, 1975                                  REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER                                        IE REGION RESPONSIBLE......II 1 CONDENSER COOLING WATER....ALTAMANA RIVER                                        IE RESIDENT INSPECTOR......R. CRLENJAK ELECTRIC RELIABILITY                                                            LICENSING PROJ MANAGER.....G. RIVENBARK COUNCIL................. 500TNEASTERN ELECTRIC                                  DOCKET NUMBER........... 50-321 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-57, OCTOBER 13, 1974 PUBLIC DOCUMENT ROOM.......APPLING COUNTY PUBLIC LIBRARY 301 CITY HALL DRIVE BAXLEY, GEORGIA 31563 INSPECTION              STATUS INSPECTION
 
==SUMMARY==
 
      + INSPECTION ~ JANUARY 16-20 (84-02): THIS ROUTIME, UNANNDUNCED INSPECTION INVOLVED 17 INSPECTOR-HOURS ON SITE IN THE AREAS OF EMERGENCY PREPAREDNESS. OF THE AREAS INSPECTED, TWO VIOLATIONS WERE IDENTIFIED; HO DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 21-23 (84-05): 'THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 8 INSPECTOR-HOURS ON SITE IN THE AREAS OF
    ' LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS AND ROUTINE SURVEILLANCE AND INSPECTION OF SNUBBERS. IN THE TWO AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN ONE AREA; ONE APPARENT VIOL ATION WAS FOUND IN ONE AREA (INADEQUATE INSPECTION OF MASONRY WAL*. MODIFICATIONS).
INSPECTION FEBRUARY 27 - MARCH 2 (84-06): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 20 INSPECTOR-HOURS ON SITE IN THE AREAS OF PLANT WATER CHEMISTRY AND INSERVICE TESTING OF PUMPS AND VALVES. OF THE TWO AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
    > INSPECTION JANUARY 2 - FEBRUARY 20 (84-07)*                        THIS INSPECTION INVOLVED 53 INSPECTOR-HOURS ON SITE IN THE AREAS OF TECHNICAL SPECIFICATION COMPLIANCF, OPERATOR PERFORMANCE, DVERALL PLANT OPERATIONS, QUALITY ASSURANCE PRACTICES, STATION AND CORPORATE MANAGEMENT PRACTICES.-CORRECTIVE AND PREVENTIVE MAINTENANCE ACTIVITIES, SITE SECURITY PROCEDURES, RADIATION CONTROL ACTIVITIES, SURVEILLANCE ACTIVITIES, LER REVIEW, DESIGN CHANGE SYSTEM AND INDEPENDENT VERIFICATION (TMI I.C.6). OF THE TEN AREAS INSPECTED, TWO VIOLATIONS WERE FOUND.
    ' INSPECTION FEBRUARY 21-24 (84-08): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 11 INSPECTOR-HOURS ON SITE IN THE AREAS OF PAGE 2-126 i
 
af NNNNNMMMMWNNNMMMMMMMMMMMMMMMMNNNMMMM Report Period MAR 1944                INSPECTION              STATU5- - (CONTINUED)            N            HATCH 1                            N NMMMMMNNNNNNNNNMMMNNNMMMMMMMMMMMMMMM INSPECTION
 
==SUMMARY==
 
RADIATION PROTECTION; ORGANIZATION: TRAINING; AUDITS; EXTERNAL AND INTERNAL EXPOSURE CONTROLS CONTROL OF RADI0 ACTIVE MATERIAL, CONTAMINATION SURVEYS AND MONITORING RADIATION PROTECTION FACILITIES AND EQUIPMENT; ALARA AND OCCUPATIONAL EXPOSURES DURING EXTENDED OUTAGE. OF THE NINE AREAS INSPECTED, HG VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
    ''      INSPECTION MARCH 7-9 (84-09): THIS SPECIAL, UNANNOUNCED INSPECTION INVOLVED 11 INSPECTOR-HOURS ON SITE IN THE AREAS OF EXPOSURE CONTROL AND RECORDS, RADIOLOGICAL CONTROLS AND RADIATION WORKER TRAINING. OF THE THREE AREAS INSPECTED, HO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 21 - MARCH 20 (84-10): THIS INSPECTION INVOLVED 87 INSPECTOR-HOURS ON SITE IN THE AREAS OF TECHNICAL SPECIFICATION COMPLIANCE, OPERATOR PERFORMANCE, DVERALL PLANT OPERATIONS, QUALITY ASSURANCE PRACTICES, STATION AND CORPORATE MANAGEMENT PRACTICES, CORRECTIVE AND PREVENTIVE MAINTENANCE ACTIVITIES, SITE SECURITY PROCEDURES, RADIATION CONTROL ACTIVITIES, SURVEILLANCE ACTIVITIES. IE BULLETIN FOLLOWUP, AND TMI ACTION PLAN REQUIREMENT FOLLOWUP. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
CONTRARY'TO 10CFRSS.47(B)(15), OPERATIONS PERSONNEL WERE INADEQUATELY TRAINING IN CERTAIN EMERGENCY PREPAREDNESS FUNCTIONS.
CONTRARY TO 10CFR50.47(B)(10), THE LICENSEE FAILED TO INCORPORATE A FULL RANGE OF PROTECTIVE ACTIDH RECOMMENDATIONS IN EMERGENCY PLAN IMPLEMENTING PROCEDURES OR AS REQUIRED BY FEDERAL GUIDELINES. CONTRARY TO 10CFR50.47(B)(15), OPERATIONS PERSONNEL WERE INADEQUATELY TRAINING IN CERTAIN EMERGENCY PREPAREDHESS FUNCTIONS. CONTRARY TO 10CFR50.47(B)(10), THE LICENSEE FAILED TO
        ' INCORPORATE A FULL RANGE OF PROTECTIVE ACTION RECOMMENDATIONS IN EMERGENCY PLAN IMPLEMENTING PROCEDURES OR AS REQUIRED BY FEDERAL GUIDELINES.
(8402 4)
OTNER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
          -NOME.
FACILITY ITEMS (PLANS AND PROCEDURES):
NONE.
          ' MANAGERIAL ITEMS:
NOME.
PLANT STATUS:
ROUTINE POWER OPERATIONS.
LAST IE SITE INSPECTION DATE: FEBRUARY 21 - MARCH 20, 1984 +
INSPECTION REPORT NO: 50-521/84-10 +
PAGE 2-127
_d
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMdMMMMMMMM Report Period RAR.1984                        REPORTS                FR0M            LICEN5EE                M            HATCH 1                    M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
    .==================================================================================================================================
NUMBER    DATE OF      DATE OF      SUBJECT EVENT        REPORT
    .------ =__                ___= - __ ____                            = - - - - - - -          --- ___ .___..
w
                                                                                                                                - __== ==__________.. _          __
83-113/    12/20/83    01/13/84    REACTOR BUILDING EXHAUST VENT RADIATION MONITORS WERE INOPERABLE. MONITORS BEING DUT OF 03-L                                CALIBRATION, DUE TO A DECREASED SENSITIVITY OF THE RESPECTIVE DETECTOR'S GEIGER MULLER TUBE.
83-122/. 12/28/83    01/24/84    HPCI HAD AN ERRATIC RESPONSE AND WAS TRIPPED. FAILED RAMP GENERATOR SIGNAL CONVERTER UNIT.
        . 03-L 83-124/  .12/15/83    01/13/84    TRANSVERSE INCORE PROBE "B" DETECTOR CABLE COULD NOT BE WITHDRAWN. THE CAUSE OF THIS EVENT IS 03-L                                COMPONENT FAILURE IN THAT THE TIP DRIVE CABLE WAS BINDING IN ITS INDEXING TUBE.
83-126/  '12/29/83 '01/24/84        HPCI'S A, B,~C, AND D STEAM LINE PRESSURE SWITCHES ACTUATED BELOW THE REQUIREMENTS OF TECH.
83-L THIS EVENT WAS DUE TO THE SWITCHES BEING OUT OF CALIBRATION DUE TO SETPOINT DRIFT.
84-Wet /    02/11/84    03/09/84    THE TURBINE TRIPPED ON HIGH TURBINE VIBRATION AND INITIATED A REACTOR SCRAM.
    ============= ====================================================================================================================
l-i PAGE 2-128
 
N o-B N
W G
L M
Z 4
a 65 H
la.
W
                .J a
J 4
Z O
                >g M
Z W
W Z
ke W
C 4
A e4
                >e Z
                            +
                                  .. d.
',>$h' Sk JF& 'W    p[ g 3      .
 
                          =-                                                                                      .
1 Docket      50-366          0PERATING            STATUS                          MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M                    HATCH 2                        W
: 2. Reporting Period: 03/01/84      Outage + On-line Hrs:    744.0                MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 3. Utility Contacts- D.P. RAFEEDIE (912) 367-7851                                  AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                    2436
      '5. Nameplate Rating (Gross MWe):              1000 X 0.85 = 850 HRTCH 2
: 6. -Design Electrical Rating (Het 'MWe):              784                1380 DESIGN ELEC. RFITING -          784
: 7. Maximum Dependable Capacity (Gross MWe):            806
                                                                                          ...... rW0t. DEPDC. Cfr. -                  748 (100%3 S. Maximum Dependable Capacity (Net MWe):              748
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME
    .10. Power Level To Which Pestricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Any:                                          ,
          ' NOME MONTH      YEAR    CUMULATIVE                                                                                o
: 12. Report Period Mrs              744.0    2.184.0      40.081.0                    NO NET POWER OUTPUT THIS MONTH                            E
: 13. Hours Reactor Critical              .0      308.2    27.547.1                ........................................                  -100
: 14. Ex Reserve Shtdwn Mrs                .0        .0            .0 ll
: 15. Hrs Generator Cn-Line                .0      3(8.2    26.241.1                                                                          - 80 L 16. . Unit Reserve Shtdwn Mrs          .0        .0            .0
: 17. Gross Thorn Ener (MWH)                0  726.912  56.293.208                                                                          - 80
: 18. Gross Elec Ener (MWH)                0  242.640    18.547.990
: 19. Met Elec Ener (MWH)            -2.141'  228.400    17.646.642                                                                          ~ *D
_    20. Unit Service Factor                  .0      14.1          65.5
                              ~
    ' 21. Unit Avail Factor                  .0      14.1          65.5                                                                        - 30
: 22. Unit Cap Factor (MDC Net)            .0      14.0          58.9 23.Hunit Cap Factor (DER Net)            .0      13.3          56.2          0 0'
                                                                                                ~
5        1'O        l'5        3'O  3'S    30
    '24. Unit Forced Outage Rate              .0        .0          11.5                                            DAYS 25; Forced Outage Hours                  .0        .0  _.
3.425.8 26.' Shutdowns Sched Over Next 6 Months (Type,Date, Duration)                                          MARCH 1984 NOME
: 27. If Currently Shutdown Estimated Startuo Date:          N/A                                                                                    PAGE 2-130
 
l' MMMMNNNNNNNNNMMMMMMMNNMMMMMMMMMMMNNM
        '.?opert Period MAR 1984                        UMIT      SHUTD0WHS / REDUCTIOMS                              M            HATCH 2                                                        N NNNNMMMNNMMMMMNNMMNNMMMMMMMMMMMMMMWN
,          ke.        nate    TvEE Hours Reason Method LER Number System Comnonent                Cause 4 Corrective Action to Prevent Recurrence L
F 44-5      51/13/84        5 744.5          H    4                CB    PIPEXX    RECIRC PIPE REPLACEMENT DUTAGE CONTINUES.
twMunummuum          NATCH 2 REMAINS SHUTDOWH IN A CONTINUING REPAIR DUTAGE.
    's  C
 
==SUMMARY==
m' CNMMMMMMMMM-
      ' Tsae          Reason'                              Method          System 8 Comoonent F-Forced' A-Edulp Failure .F-Admin .                1-Manual      Exhibit F 8 H S-Sched-      B-Maint or Test G-Oper Error 2-Manual Scram.        Instructions for
                      'C-Refueling          H-Other          3-Auto Scram    Preparation of
                ,      D-Regulatory Restriction              4-Continued    Data Entry Sheet
                      .E-Operator Training                  5-Reduced Load Licensco Event Report
                          & License Examination              9-Other        (LER) File (HUREG-0161)
PAGE 2-131 L_                                                                                                      _ - . _ .        -
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun u                    NATCH 2                                    m
    .uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum                                          FACILITY            DATA                                            Report Period MAR 1984
.  'FACILITM DESCRIPTION                                                                      UTILITY 8 CONTRACTOR INFORMATION LOCATION-                                                                              UTILITY S T AT E. . . . . . . . . . . . . . . . . . . . G EO R GI A                            LICENSEE................. GEORGIA POWER COUNTY...................APPLING~                                                      CORPORATE ADDRESS....... 333 PIEDMONT AVENUE ATLANTA, GEORGIA 30308 DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 11 MI N OF                                                  CONTRACTOR BAXLEY, GA                            ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BWR                                                            NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE' INITIAL CkITICALITY... JULY 4, 1978                                                  CONSTRUCTOR.............. GEORGIA POWER CD.
        'DATE ELEC ENER IST GENER. . . SEPT EMBER 22, 1978                                          TURBINE SUPPLIER......... GENERAL ELECTRIC
        -DATE COMMERCIAL OPERATE.... SEPTEMBER 5,                            1979              REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER                                              IE REGION RESPONSIBLE......II CCMDENSER COOLING WATER....ALTAMAHA RIVER                                              IE RESIDENT INSPECTOR......R. CRLENJAK ELECTRIC' RELIABILITY                                                                  LICENSING PROJ MANAGER.....G. RIVENBARK COUNCIL................. 500THEASTERN ELECTRIC                                          DOCKET NUMBER........... 50-366 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....HPF-5, JUNE 13, 1978 PUBLIC DOCUMENT ROOM.......APPLING COUNTY PUBLIC LIBRARY 301 CITY HALL DRIVE BAXLEY, GEORGIA 31563 INSPECTION                STATUS INSPECTION
 
==SUMMARY==
 
          + INSPECTION JANUARY 16-20 (84-02): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 18 INSPECTOR-HOURS ON SITE IN THE AREAS OF EMERGENCY PREPAREDHESS. OF THE AREAS INSPECTED, TWO VIOLATIONS WERE IDENTIFIED; NO DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 21-23 (84-05) - THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 8 INSPECTOR-HOURS ON SITE IN THE AREAS OF LICENSEE ACTION DH PREVIOUS INSPECTION FINDINGS AND ROUTINE SURVEILLANCE AND INSPECTION OF SNUBBERS. IN THE AREAS INSPECTED, ONE VIOLATION WAS FOUND (INADEQUATE INSPECTION OF MASONRY WALL MODIFICATIONS).
: INSPECTION FEBRUARY 27 - MARCH 2 (84-06): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 21 INSPECTOR-HOURS ON SITE IN THE AREAS
        .0F PLANT WATER CHEMISTRY AND INSERVICE TESTING OF PUMPS AND VALVES. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE
        . IDENTIFIED.
INSPECTION JANUARY 2 - FEBRUARY 20 (84-07):                              THIS INSPECTION INVOLVED 53 INSPECTOR-HOURS ON SITE IN THE AREAS OF TECHNICAL
          $PECIFICATION COMPLIANCE, OPERATOR PERFORMANCE, DVERALL PLANT OPERATIONS, QUALITY ASSURANCE PRACTICES. STATION AND CORPORATE MANAGEMENT PRACTICES, CORRECTIVE AND PREVENTIVE MAINTENANCE ACTIVITIES, SITE SECURITY PROCEDURES, RADIATION CONTROL ACTIVITIES,
        ' SURVEILLANCE ACTIVITIES, LER REVIEW, DESIGN CHANGE SYSTEM AND INDEPENDENT VERIFICATION (TMI I.C.6).                                      OF THE AREAS INSPECTED, ONE VIOLATION WAS FOUND.
                          ~
INSPECTION FEBRUARY 21-24 (84-08):                              THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 11 INSPECTOR-HOURS ON SITE IN THE AREAS OF RADIATION PROTECTIOH; ORGANIZATION; TRAINING; AUDITS; EXTERNAL AND INTERNAL EXPOSURE CONTROL; CONTROL OF RADI0 ACTIVE MATERIAL, PAGE 2-132
 
Report Period MAR 1944                                                                              MMMNNNNNNNNMMMNNNNNNMMMMMMMNNNNNNNNN INSPECTION            STATUS - (CONTINUED)                    M                                  NATCH 2          N NNNNMMNNNMMMNNNMMMMNNNNNNNNNMNNNNNNN INSPECTION
 
==SUMMARY==
 
CONTAMINATION SURVEYS AND MONITORING RADIATION PROTECTION FACILITIES AND EQUIPMENT; ALARA AND OCCUPATIONAL EXPOSURES DURING EXTENDED OUTAGE. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION MARCH 7-9 (84-09): THIS SPECIAL, UNANNOUNCED INSPECTION INVOLVED 11 INSPECTOR-NOURS ON SITE IN THE AREAS OF EXPOSURE CONTROL AND RECORDS, RADIOLOGICAL CONTROLS AND RADIATION WORKER TRAINING. OF THE AREAS INSPECTED, N3 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 21 - MARCH 20 (84-10):  THIS INSPECTION INVOLVED 87 INSPECTOR-HOURS ON SITE IN THE AREAS OF TECHNICAL SPECIFICATION COMPLIANCE, OPERATOR PERFORMANCE, DVERALL PLANT OPERATIONS, QUALITY ASSURANCE PRACTICES, STATION AND CCRPORATE MANAGEMENT PRACTICES, CORRECTIVE AND PREVENTIVE MAINTENANCE ACTIVITIES, SIT 2 SECURITY PROCEDURES, RADIATION CONTROL ACTIVITIES, SURVEILLANCE ACTIVITIES, IE BULLETIN FOLLOWUP, AND TMI ACTION PLAN REQUIREMENT FOLLOWUP. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NONE.
FACILITY, ITEMS (PLANS AND PROCEDURES)*
RECIRCULATION PIPE REPLACEMENT IN PROGRESS.
MANAGERIAL ITEMS:
NONE.
PLANT STATUS:
SMUTDOWN.
. LAST IE SITE INSPECTION DATE: FEBRUARY 21 - MARCH 20, 1984 +
INSPECTION REPORT No      50-366/84-10 +
l.
PAGE 2-133
 
muunununuurunuuwnuunuununummmunummum Report Period MAR 1984                          REPORTS                FR0M              LICEN$EE                    N              NATCH 2                      N MMMMMMMMMMNNMMMMMMMNNNNNNNMMMMMMMMMM
    ==================================================================================================================================
      . NUMBER    DATE OF          DATE OF    SUBJECT EVENT            REPORT
_.        -- -=    --
_==_______-_-----=__        .__----------------------------- _ - __                      =-      =_    _-____------ ....--------------
83-129/    12/13/83        01/12/84  TESTING OF D/G'S NOT.BEING SCHEDULED PER T.S., DUE TO PERSONNEL ERROR.
03-L
,        83-135/    12/12/83        01/11/84  'C' REACTOR VESSEL STEAM HIGH DOME PRESSURE SWITCH OUT OF CALIBRATION, DUE TO INSTRUMENT DRIFT.
03-L 83-136/    12/13/83        01/12/84  ATTEMPT TO RUN '2B' STANDBY GAS TREATMENT FAN, FAN TRIPPED AND WOULD NOT RESTART, DUE TO A
      '03-L                                    FAILED MOTOR STARTER.
83-137/    12/21/83        01/13/84  SAFETY RELIEF VALVE TAILPIPE TEMP.                RECORDER INOPERABLE, DUE TO A FAILED CHART DRIVE MOTOR AND 03-L                                    IDLER GEAR.
83-139/    .12/14/83        01/13/84  POSITION OF VACUUM BREAKER COULD NOT BE CONFIRMED BECAUSE POSITION INDICATOR LIGHT FUSE HA'D 03-L                                    BLOWN, DUE TO A SHORT IN THE SWITCH.
83-140/    12/25/83        01/24/84  LOW NITRCGEN PRESSURE ALARM RECEIVED ON CONTROL ROD SCRAM ACCUMULATORS, CAUSE OF THE EVENT IS 103-L~                                    UNKNOWN.
83-143/    12/25/83 101/24/84          PLANT SERVICE WATER (PSW) VALVE HAD ISOLATED, STOPPING PSM FLOW TO TURBINE BLDG., ICE IN 03-L                                    PRESSURE CELL CAUSED FALSE CLOSE SIGNAL TO ISOLATION VALVE.
83-144/    12/19/83/ 01/13/84          PRIMARY CONTAINMENT HYDROGEN RECGMBINER WOULD NOT HEATUP, DUE TO CONTROL RELAY CONTACTS BEING 03-L                                    STUCK.
83-148/    12/08/83        01/07/84  LCD NOT IMPLEMENTED ON FIRE DOOR 2L48-2RS3, DUE TO PERSONNEL ERROR AND COMPONENT FAILURE.
03-L 83-149/    12/29/83        01/27/84  BOTH DOORS OF AN AIRLOCK FOR REACTOR BLDG. WERE OPENED, TRANSPORTING AN INJURED PERSON IN AN 03-L                                    EXPEDIENT MANNER.
84-001/    02/03/84        03/21/84  A FRACTURE ON A 66' INCH VENT HEADER IN BAY 5, DUE TO LOW TEMPTURE OF THE VENT HEADER MATERIAL.
84-002/,    02/20/84        03/20/84  5 SRVS FAILED TO LIFT IN 1% TOLERANCE RANGE REQUIRED.
003/      01/15/84        02/14/84  RWCU SYSTEM OUTBOARD ISOLATION VALVE DID NOT CLOSE, REACTOR WATER CLEANUP DUMP FLOW TRANSMITTER INSTALLED INCORRECTLY.
84-004/    01/17/84        02/14/84  DURING PROCEDURE HNP-2-3952 VALVES LEAKING IN EXCESS OF T.S. LIMITS; VALVES WILL BE REPAIRED AND TESTED PRIOR TO STARTUP.
    ==================================================================================================================================
PAGE 2-134
 
T M
                          ==
l N
W O
4 A
M Z
4
                    .J 80
                    >=
L6 IAJ
                    =J
                    .J J
et Z
O M
                    >=
Z W
W Z
M W
O
                    *C A
m
                    >4 Z
                    >=
i r
t    i d
    ~
- 3 'jq -Q ' ~ -& .          .'y
 
i 1 Docket      50-247            0PERATIHG                                    STATUS                                                MMMMMMMMMMMMMMMMMMMMMMMMhMMMMMMMMMMM N              INDIAH POINT 2                                  M
: 2. Reporting Period: 03/01/84 . Outage + On-line Hrs: 11142                                                                        MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMk
: 3. Utility
 
==Contact:==
E. EICH (914) 694-6000 2 f.P.                                                                            AVERAGE DAILY POWER LEVEL (MWe) PLOT 2758
: 4. Licensed Thermal Power (MWt):
DIRN POINT '3
: 5. Nameplate Rating (Gross MWe):                                      1126 X 0.9 = 1013 I" '
: 6. Design Electrical Rating-(Het MWe): ~                                        873        __
                                                                                                                                                    - DESIGN ELEC. Rf1 TING -                    873
: 7. Maximum Dependable Capacity (Gross MWe):                                      900                                              ___ t1RX. DEPDE). Cfir. - 864 (100%)
4<
: 8. Maximum Dependable Capacity (Het MWe):                                        864
: 9. If Changes Occur Above Since Last Report, Give Reasens NONE
: 10. Power Level To Which Restricted. If Any (Het MWe):
St. . Reasons for Restrictions, If Any:                                                                                  ggma .
MONE M0HTH                              YEAR      CUMULATIVE                                        ----- -----        ---_-----------------------                      100 R E
: 12. Report-Period Mrs                        744.0                  2.184.0      85.489.0 v
!!    13. Hours Reactor Critical                    744.0                  1.741.4      57.689.0
                                                                                                                                                                                                              ~8U
: 14. Rx Reserve Shtdwn Hrs                                    .0            .0'      2.119.1                          hf
: 15. Hrs Generator On-Line                    744.0                    1.7 17.5      55.913.0
                                                                                    .0                .0                                                                                                      - 80
: 16. Unit Reserve Shtdwn Mrs                                  .0                                                              900-
: 17. Gross Thern Ener (MWH)        2.038.163                        4.637.918 145,678.417
: 18. Gross Elec Ener (MWH)          648.490                        1.461.680    45.119,256                                                                                                          - 40
      - 19. Het Elec Ener (MWH)            625.008                        1.400.387    43.027.479
: 28. Unit Service Factor                        100.0                      78.6          65.4
                                                                                                                                                                                                              - 30
: 21. Unit Avail Factor                          100.0                      78.6          65.4
: 22. Unit Cap Factor (MDC Het)                      97.2                  74.2          58.6M 0
: 23. Unit' Cap Factor (DER Het) 96.2                  73.4          57.7                                    g          g        l'O '    tis    'ab                  ab'    sh 21.4            9.8                                                              UNTS
      ' 24. Unit Forced Outage Rate                                  .0
: 25. Forced Outage Hours                                        .0        466.5        5.842.7
      -26. Shutdowns Sched Over Hext 6 Months (Type,Date. Duration),                                                                                          MfiRCH 1984 EEFUELING & INSPECTION - 02/02/84.
      . 27. If Currently Shutdown Estimated Startup Dates                                  H/A                          N Item calculated with a Weighted Average                                                  PAGE 2-136
 
l-Report Period RAR 1984 MMMMMMMMMMMMMMMMMMMMMMNMMMMMMMMMMMMM UNIT      SHUTD0WN$ / REDUCTION $                      M        INDIAN POINT 2                                                M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No.            Data    liji Hours Reason Method LER Number System Component            Cause 8 Corrective Action to Prevent Recurrence 83/14/84            F  0.8    A    5                  ED      ELECON    REDUCED LOAD DUE TO HIGH TEMPERATURE ISOPHASE BUS "B".
9 d
h
        ' mMMMMMMMMMM              INDIAN POINT 2 OPERATED ROUTIMELY WITH 1 REDUCTION DURING MARCH.
M
 
==SUMMARY==
M MManMMMMMMM Twas            ; Reason                            Method          System 8 Comoonent
        - F-Forced A-Eauip Failure F-Admin                    1-Manual        Exhibit F 8 H S-Sched          B-Maint.or Test G-Oper Error      2-Manual Scram Instructions for
        ~
C-Refueling          'H-Other    3-Auto Scram    Preparation of D-Regulatory Restriction.          4-Continued      Data Entry Sheet E-Operator Training                5-Reduced Load Licensee Event Report 8LLicense Examination .        9-Other          (LER) File (NUREG-0161)
PAGE 2-137 v'-
n.aa
 
Euuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum 10      .
INDIAN POINT 2              m Luuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum                    F t. C I L I T Y    DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                                UTILITY 8 CONTR4CTOR INFORMATION LOCATION'                                                          UTILITY STATE....................NEW YORK                                  LICENSEE................. CONSOLIDATED EDISON COUNTY.'..................WESTCHESTER                              CORPORATE ADDRESS....... 4 IRVING PLACE NEW YORK, NEW YORK 10003
          ~DIST AND DIRECTION FROM NEA4EST POPULATION CTR.. 25 MI N OF                            CONTRACTOR NEW YORK CITY, NY                    ARCHITECT / ENGINEER....... UNITED ENG. 8 CONSTRUCTORS TYPE OF REACTOR............PWR                                        HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY...MAY 22, 1973                              CONSTRUCTOR.............. WESTINGHOUSE DEVELOPMENT CORP DATE ELEC ENER IST GENER... JUNE 26, 1973                            TURBINE SUPPLIER......... WESTINGHOUSE
      , DATE COMMERCI AL OPERATE. . . . AUGUST  1, 1974                REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                              IE REGION RESPONSIBLE......I CONDENSER COOLING WATER....NUDSON RIVER                            IE RESIDENT INSPECTOR......P. KOLTAY
      ' ELECTRIC RELIABILITY                                              LICENSING PROJ MANAGER.....R. PEDERSEN COUNCIL..................H0RTHEAST POWER                          DOCKET NUMBER........... 50-247 COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-26, SEPTEMBER 28, 1973 PUBLIC DOCUMENT ROOM....... WHITE PLAINS PUBLIC LIBRARY 100 MARTINE AVENUE WHITE PLAINS, NEW YORK 10601 INSPECTION                STATUS INSPECTION
 
==SUMMARY==
HO INSPECTION INPUT PROVIDED.
: ENFORCEMENT
 
==SUMMARY==
 
NONE      .,
  -OTHER ITEMS SYSTEMS AND COMPONENTS:
NO INPUT PROVIDED.
FACILITY ITEMS'(PLANS AND PROCEDURES):
NO INPUT PROVIDED.
PAGE 2-138
 
g y . __                                                                                                        _                                                                  -
fc b--
                                                                                                                                                                                                            +
MNNMWNNNMMMMMMMNNNNNNNMMNNMMNNNNNMMM H            - Report Period MAR.1984                            INSPECTION                  STATUS - (CONTINUED)                                    N              Ih0IAN POINT 2                W NNNNNNNNNNNNNNNNNNNNNNNNNNNMMMMMMNNM u
OTHER ITEMS
.j.
MANAGERIAL ITEMS:
                  . N0 IMPUT PROVIDED.
                - PLANT STATUS '
                  . NO INPUT.PROVIDED.
                - LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED.
: INSPECTION REPORT NO: ' NO INPUT PROVIDED.
REPORTS            F'R 0 M        LICENSEE
                  .. ==================================================================================================================================
NUMBER'    DATE OF-          DATE OF      SUBJECT EVENT-            REPORT-
                      'NO INPUT PROVIDED.
                                                                ~
                    ==================================================================================================================================
l T
s h
PAGE 2-139
          +
    'aic-.
6 6
: 1. Docket:  50-286            0PERATING                STATUS                      MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M              INDIAN POINT 3                                              M
: 2. Reporting Periods _ 03/01/84        Outage + On-line Hrs:        744.0              MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 3. Utility
 
==Contact:==
L. K EL L Y ( 914 ) 739-4200                                  AVERAGE DAILY POWER LEVEL (MWe) PLOT
    .4    Licensed Thermal Power (MWt):                          3025 INDIAN POINT 3
: 5. Nameplate Rating (Gross MWe):                    1126 X r.9 = 1013
: 6. Design Electrical Rating (Het MWe):                      965            tems
: 7. Maximum Dependable Capacity (Gross NWa):                100                              DESIGN ELEO. RRTING = 985
                                                                                          ...... MAX. DEPEND. ORP. -                                  985 (100%)
: 8. Maximum Dependable Capacity (Het MWe):                    965
: 9. If. Changes occur Above Since Last Report, Give Reasons:
NOME 08.. Power LevelJTo Which Restricted, If Any (Net MWe):
11 Reasons for Restrictions, If Anyt 1000 -
NONE                                                                                                                                                          -100 MONTH          YEAR      CUMULATIVE                                                                                                Q
: 12. Report Period Hrs                  744.0      2.184.0      66.505.0                                                                                                M 736.3                                                                                                                      ''
: 13. Hours Reactor Critical                        1.489.4      35.913.9
: 14. Rx Reserve Shtdwn Hrs                  .0          .0              .0
: 15. Hrs Generator On-Line              723.2      1.391.1      34.533.4
                                                                                                                                                                        -so
  .16. Unit Reserve Shtdwn Hrs                  .0-          .0              .0 500 -
: 17. Gross Therm Ener (MWH)        2.058.008      3.601.249    87.971.085 18.~ Gross Elec Ener (MWH)          684.050      1.166.715    27.533.326                                                                                            ~ *U
: 19. Het Elec Ener (MWH)-            658.648      1.119.099    26.363.277
: 20. Unit Service Factor                  97.2        63.Z            51.9
                                                                                                                                                                        -20
: 21. Unit Avail Factor                    97.2        63.7            51.9
  .22. Unit Cap Factor (MDC Net)            91.7        53.1            41.1
~
23.' Unit Cap Factor (DER Het)            91.7        53.1            41.1      0          ,-        ..                                      .  ,-    .      . 0 0        5      to                                      15  20    25    30
: 24. Unit Forced Outage Rate                2.8        36.1            24.2                                                            DAYS
: 25. Forced Outage Hours                  20.8        786.8      10.983.6 26'. Shutdowns Sched Over Next 5 Months (Type,Date,l'uration):                                          MARCli 1984 NONE
: 27. If Currently Shutdown Estimated Startup Dates                N/A                                                                                                    PAGE 2-140
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
      . Report Period MAR 1984                  UNIT          SHUTD0WH$ / REDUCTIONS                          M        INDIAN POINT 3          M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No.      Date    1235 Nours Reason            LER Number System comoonent            Cause 8 Corrective Action to Prevent Recurrence SS      03/09/84      F  20.8    A      3  54-006-00            IA    CKTBRK    TRIP DUE TO BYPASS BREAKER B CELL SWITCH CONTACT MALFUNCTION WHILE PERFORMING REACTOR PROTECTION TRAIN B TEST.
MMMMMhMMMMM      . INDIAN POINT 3 OPERATED WITH 1 OUTAGE FOR EQUIPMENT FAILURE DURING MARCH.
,      M SUPMARY M i,      MMMMMMMMMMM Twee      Reason                            Method                Svstem 8 Comoonent F-Forced -A-Equip Failure. F-Admin            1-Manual            Exhibit F 8 H S-Sched    B-Maint-er Test G-Oper Error 2-Manual Scram Instructions for C-Refueling -      H-Other:      3-Auto Scram          Preparation of D-RequIatory Restriction          4-Continued          Data Entry Sheet E-Operator Training              5-Reduced Load Licensee Event Report
                      & License Examination        9-Other              (LER) File (NUREG-0161)
PAGE 2-141
 
muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummun u          ' INDIAN POINT 3              m unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum                  FACILITY        DATA                                                                              Report Period MAR 1984 FACILITY DESCRIPTION                                          UTILITY & CONTRACTOR INFORMATION LOCATION                                                      UTILITY STATE....................NEW YORK                              LICENSEE. . . . . . . . . . . . . . . . . POWER AUTHORITY OF ST ATE OF N.Y.
COUNTY...................WESTCHESTER                            CORPORATE ADDRESS....... 10 COLUMBUS CIRCLE NEW YORK, NEW YORK 10019 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 25 MI N OF                          CONTRACTOR NEW YORK CITY, NY                ARCHITECT / ENGINEER....... UNITED ENG. 4 CONSTRUCTORS TYPE OF REACTOR............PWR                                    HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... APRIL 6,      1976                    CONSTRUCTOR..............WESTINGNOUSE DEVELOPMENT CORP DATE ELEC ENER IST GENER... APRIL 27, 1976                        TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... AUGUST-30, 1976                  REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                          IE REGION RESPONSIBLE......I CONDENSER COOLING WATER....NUDSON RIVER                        IE RESIDENT INSPECTOR......T. KENNY ELECTRIC RELIABILITY                                          LICENSING PROJ MANAGER.....P. POLK COUNCIL.................. NORTHEAST POWER                      DOCKET NUMBER........... 50-286 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-64, APRIL S, 1976 PUBLIC DOCUMENT R00M.......WNITE PLAINS PUBLIC LIBRARY 100 MARTINE AVENUE WHITE PLAINS, NEW YORK 10601 IN$PECTION            5TATUS INSPECTION
 
==SUMMARY==
 
N0 INSPECTION INPUT PROVIDED.
' ENFORCEMENT
 
==SUMMARY==
 
NOME OTHER ITEMS      .-
x SYSTEMS AND COMPONENTSt NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES):
''NO INPUT PROVIDED.
PAGE 2-142
 
    ..,  y                          .4 '
_w.,
                  ,  v. .            .,
T,            : dt-                                              _... y ,
                                  -                                ,e ,,
rJyl_
            ...Z/,'.              Q>
N %"                                                          ' _ "-
                                            .c  +
g~.      ;f.
J                ;' .                                                                ,
q.
N                                                    --
N N N N N N N N N N N N N N M M M N N N N '!N N N N N N N N M M N N N N Report Period MAR 1984'                                              .I N S P E C.T I O N                                                                    N                  INDIAN POINT 3                                                                    M S T I',T U S - (CCHTIMUED)['                            MMMNNNNMMMMNNNNNNNNNNNENNNNNNNNNNNNN
                                      ~
OTHER ITEMS
                        - MANAGERIAL ITEMS 8
                        ~-NO IMPUT PROVIDED.
PLANT STATUS:
                          >NO:IMPUT'PROVIDED.
                            ' LAST IE SITE INSPECTION DATE:                                N'O INPUT PROVIDED.
                            . INSPECTION REPORT.NO ' NO INPUT PROVIDED.
R E.P O R T S              FR0M          LICEN5EE
                            .============================================================================================================================p=====
NUMBER      DATE OF-              .DATE OF                  SUBJECT EVENT                  REPORT.
:  /,                            MO'IMPUT.'PROVIDED.
                              ========================================================================================================================.=========
4 2 '_
r
                                                      -I g '
a
                        + . ,
PAGE 2-143 x
                      .4,
: l. Docket:        50-305                          0PERATING                                      STATUS                                                        nunununununuuuuuuuuuuuuuuuurunwumann v                    .-                                                                                                                                              N                    KEWAUNEE                                              u
: 2. Reporting Period                          03/01/84                Outage + On-line Hrs:                744.0                                                MMMMMMMMWNNWMMMMNNMMMMMMMMNNNNMMMMWN
: 3. Utility Contacts C.RUITER f414) 388-2560 X207                                                                                                                AVERAGE DAILY POWER LEVEL (MWe) PLOT 1 4. Licensed Thermal Power (MWt):                                                                    1650
: 5. Nameplate Rating (Gross MWe):                                                            622 X 0.9 = 560 KEWRUNEE
        ,6. Design Electrical Rating (Net MWe):                                                                535                                                18M3
: 7. Maximum Dependable Capacity (Gross MWe):                                                          529                                                                - DESIGN ELEC. HRTING - 535
                                                                                                                                                                                                                          -                  503 (1m 4      S. Maximum Dependable Capacity (Net MWe):                                                            503
        - 9. If Changes occur,Above Since Last Report, Give Reasons:
NOME
      -10.' Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Any:
1000-
                'NONE
            .        . .                                            MONTH                          YEAR    CUMULATIVE                                                                                                                                        o E
: 12. Report Period Mrs 744.0                2.184.0    85.849.0
      '13.. Hours Reactor Critical                                            383.7                1.823.7    73.003.8
: 14. Rx Reserve Shtown Hrs                                                  .0                      .0      2.330.5                                      g
: 15. Hrs Generator On-Line                                              383.5                1.823.5    71.636.0
: 16. Unit Reserve Shtdun Hrs -                                              .0                      .0            10.0                                            , ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,                                        ,3 ,,
eeo_
                                                                                                                                                                          ^'^
: 17. Gross Therm Ener (MWH)                                    532.963          2.898.139 111.869.275
                                                                                                                                                                                                                                                          - 80
: 18. Gross Elec Ener (MWH)                                        875.100                    952.300  36.810.400
: 19. Het Elec Ener'(MWH)                                        166.154                      908.523  35.040.559                                                                                                                                  - 80
: 20. Unit Service Factor                                                  51.5                  83.5            83.4                                                                                                                              _ ,3
: 21. Unit Avail Factor                                                    51.5                  83.5            83.5
                                                                                                                                                                                                                                                          - 3D
:22. Unit Cap Factor (MDC Het)                                            44.4                  82.7            78.4M
: 23. Unit Cap Factcr (DER Net)                                            41.7                  77.8            76.3                                          0    .
                                                                                                                                                                                  .        .-        .                    .-                  .-    . 0 0        5        to        15              30                        25    30 J24.; Unit Forced Outage Rate                                                .0                      .0                3.8                                                                  DAYS
: 25. Forced Outage Hours                                                    .0                      .0      2.729.7
: 26. Shutdowns Sched Over Next- 6 Months (Type,Date, Duration):                                                                                                                      MRRCH 1984 NONE
: 27. If. Currently Shutdown Estimated Startup Date:                                                      05/05/84                                M Item calculated with a Weighted Average                                                              PAGE 2-144 )
 
NMMMMMMMMMMMMMNNMMNNMMMMMMMMMMMMMMMM Report Period MAR-1984                    .UHIT      SHUTD0WHS / REDUCTIOHS                          u            KEWAUMEE                                                  u unnuwwwwmuuuuuummmmmmuummumummumuumu
_ Ham _.      Date    1532 Hours Reason Method LER Humber System comoonent              Cause 8 Corrective Action to Prevent Recurrence
    --l-
      '~        l83/14/84.    'S-  0.0    F    5                  ZZ      ZZZZZZ    REACTOR POWER WAS REDUCED BELOW A DAILY AVERAGE OF S0% DUE TO END-OF-CYCLE COAST DOWN.
2'      03/16/84      S 360.5    C'    1                  RC    FUELXX    COMMENCED CYCLE IX-X REFUELING OUTAGE.
i
              > +
EmmMMMNuumM'        KEWAUMEE SHUTDOWN ON MARCH 16TH-FOR REFUELING AND MAINTENANCE.
    -O
 
==SUMMARY==
N EMMMMMMMNNM
      'Tvna          Rea men                        -Method          System 8 Component F-Ferced;A-Equip Failure F-Admin            1-Manual  .      Exhibit F & H
:S-Sched        .B-Maint or Test- G-Oper Error 2-Manual Scram Instructions for C-Refuel'ing<      h-Other      3-Auto Scram    Preparation of D-Regulatory Restriction        4-Continued      Data Entry Sheet
                    'E-Operator Training              5-Reduced Load ' Licensee Event Report 4 License Examination      9-Other          (LER) File (HUREG-0161)
PAGE 2-145 e
 
  'tumunummununummuumunuunummuuuuuuumuu O                            KEWAUNEE .
EmmuumuMuununuMuMuuuuuMMMMMuMNNNuuMM                        FACILITY        DATA                                                                  Report Period MAR 1984 FACILITY DESCRIPTION                                                  UTILITY 8 CCNTRACTOR INFORMATION LOCATION.                                                          UTILITY STATE.................... WISCONSIN                                LICENSEE. . . . . . . . . . . . . . . . . WISCONSIN PUBLIC SERVICE COUNTY...................KEWAUMEE                                  CORPORATE ADDRESS........P.O. BOX 1200 GREEN BAY, WISCONSIN 54305 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 27 MI E OF                              CONTRACTOR GREEN BAY, WI.                    ARCHITECT / ENGINEER....... PIONEER SERVICES 1 ENGINEERING TYPE OF REACTOR............PWR                                        NUC STEAM SYS SUPPLIER...WESTINGNOUSE DATE INITIAL CRITICALITY... MARCH 7,          1974                    CONSTRUCTOR..............PIDHEER SERVICES 8 ENGINEERING DATE ELEC ENER IST GENER... APRIL 8, 1974                            TURBINE SUPPLIER......... WESTINGHOUSE                                                            '
DATE COMMERCI AL OPERATE. . . . JUNE 16, 1974                    REGULATORY INFORMATION
[ CONDENSER COOLING METHOD...ONCE THRU                                IE REGION RESPONSIBLE......III
      ' CONDENSER COOLING WATER.... LAKE MICHIGAN                          IE RESIDENT INSPECTOR......R. NELSON ELECTRIC RELIABILITY'                                              LICENSING PROJ MANAGER.....M. GROTENNUIS COUNCIL..................MID-AMERICA                              DOCKET NUMBER........... 50-305 INTERPOOL NETWORK LICENSE & DATE ISSUANCE....DPR-43, DECEMBER 21, 1973 PUBLIC DOCUMENT ROON.......KEWAUNEE PUBLIC LIBRARY 822 JUNEAU STREET KEWAUNEE, WISCONSIN 54216 INSPECTION              STATUS
  ? INSPECTION
 
==SUMMARY==
 
      -INSPECTION ON FEBRUARY 6-10, (84-01): ROUTINE, ANNOUNCED INSPECTION OF CONFIRMATORY MEASUREMENTS INCLUDING SAMPLING, LABORATORY QUALITY CONTROL AND COMPARISON OF LICENSEE ANALYSES WITH THE REGIDH III MOBILE LABORATORY RADIOLOGICAL ENVIRONMENTAL PROTECTION INCLUDING PROGRAM MANAGEMENT AND IMPLEMENTATION; AND LICENSEE FOLLOW-UP OF ITEMS IDENTIFIED IN PREVIOUS INSPECTIONS. THE INSPECTION INVOLVED 85.5 INSPECTOR-NOURS ON SITE BY 3 NRC INSPECTORS. NO ITEMS OF NONCOMPLI ANCE OR DEVI ATIONS WERE IDENTIFIED DURING THE INSPECTION.
ENFORCEMENT
 
==SUMMARY==
 
MONE-OTHER ITEMS
      ;$YSTEMS AND COMPONENT PROBLEMS:-
NONE PAGE 2-146 a                                                                                _    _.                        . _ _____ _ _ __ - - ___- ___
 
mununununusunununununummmmmmmmuumumm KEWAUNEE                a Report Period MAR 1984                  IN$PECTION                      5TATUS - (CONTINUED)                    m mununummmununununununummmunununuuuum PTHER ITEMS e
FACILITY'. ITEMS (PLANS AND PROCEDURES)*
NONE MANAGERIAL ITEMS:
1              NOME l
l            . PLANT STATUS:
              -THE PLANT SMUT DOWN ON 3/16/84 FOR SCHEDULED REFUELING OUTAGE.
l              LAST IE SITE INSPECTION DATE: MARCH 26-30v 1984 INSPECTION REPORT N0s. 84-03 REPORTS                  FR0M        LICENSEE
                ==================================================================================================================================
NUMBER      DATE OF      DATE OF    SUBJECT
                              . EVENT        REPORT
_ _ . _ _ _        --  - - - _ _ _ = _ - -  - - - - - - _ ----- ._--__.---=--_.--_-_____.._........___________......______
NOME
                ==============================================,============================================================================= =====
1 i
* PAGE 2-147 J
: 1. Dockets. 50-409                                    OPERATING            STATUS                                          MMMMMNNMMNNNNNNNMMMMMMMMMNNNNNNNNNNN N                LA CROSSE                                                N
: 2. Reporting Periods _L3/01/84                            Outage + On-line Hrs:    744.0                                  MununummuuuummumwwwmNummuuMumwNumwww
: 3. Utility Contact ~ G. R. GADOW (608) 689-2331                                                                            AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                              165
: 5. Nameplate Rating (Gross MWe):                                    76.8 X 0.85 = 65 LR CROSSE
      '6. Design Electrical Rating (Net MWe):                                        50                                  1923
: 7. Maximum Dependable Capacity (Gross MWe):                                    50                                                  DESIGN E1EC. RRTING -                                50
__.... rvet. OEPDe. Crr. -                                      48 (100%3
      ,8. Maximum Dependable Capacity (Het MWe):                                    48 w
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NONE
    -10. Power Level To Which Restricted, If Any (Net MWe):
11 Reasons for Restrictions, If Any NOME' MONTH      YEAR    CUMULATIVE                                                                                                                    o
: 12. Report Period Hrs                                      744.0    2.184.0    126.363.0 Q
: 13. Hours Reactor Critical                                744.0    2.059.7      82.804.1
: 14. Rx Reserve Shtown Hrs                                      .0        .0        478.0 ll
    - 15.1 Hrs Generator On-Line                                  744.0    1.955.7      76.792.0
      .16. Unit Reserve Shtdwn Hrs                                    .6        .0          79.0
    .17. Gross Therm Ener (MWH)                                121.471    301.754  10.584.058 14./ Gross Elec Ener (MWH)                                39.338    97.173    3.154.401
: 19. Het Elec Ener (MWH)                                  37.437    92.075    2.919.310
: 20. Unit Service Factor                                    100.0      89.5          60.8 21.Junit Avail Factor                                      100.0      89.5          60.8
: 22. Unit Cap Factor (MDC Net)                              104.8      87.8          48.1                                  sme nes Ne rv w--a .- rwet - - ,,,n
: 23. Unit Cap Factor.(DER Het)                              100.6      84.3          46.2                            0  .
                                                                                                                                                                                                . ,        ,  0 0        5        to      15          20                          25      30
: 24. Unit Forced Outage Rate'                                    .0      1.1              9.3                                                      DAYS
: 25. Forced Outage Hours                                        .0      22.1      6.865.4
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date. Duration):                                                                                MflRCH 1984 NONE
: 27. If Currently Shutdown Estimated Startup Date:                                N/A                                                                                                                        PACE 2-148
 
MMMMMMMMMMMMMMNNMMMMMMMMMMWNNNNNNMMM LA CROSSE              w Report Perled MAR 1944                          UNIT      SHUTD0WHS / REDUCTION 5                    m wMuuuuuuuuummuummumMuuuuumanMuuununu No.      Data          Iran Hours Reason Method LER Number $vstem Component            Cause & Corrective Action to Prevent Recurrence 4
NOME NNL n-
    - nummunummuu              LA CROSSE OPERATED AT FULL POWER DURING MARCH.
M
 
==SUMMARY==
u muumanmunum Twem              Emm een                          Method          Svstem 8 Comoonent FE Forced A-Equip Failure F-Adein                  1-Manual        Exhibit F & H S-Sched .B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling        H-Other        3-Auto Scram    Preparation of D-Regulatory. Restriction <      4-Continued    Data Entry Sheet E-Operator Training              5-Reduced Load Licensee Event Report (LER) File (HUREG-0161)
                            & License Examination          9-Other PAGE 2-149
(
 
mummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm m              LA CROSSE                              N mummmmmmmmmmmmmmmmmmmmmmmmmmmmuumumm                                FACILITY        DATA                                                                Report Period MAR 1984 FACILITY DESCRIPTION                                                        UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                    UTILITY
    -STATE....................WISC0HSIN                                          LICENSEE.................DAIRYLAND POWER COUNTY...................VERNON                                            CORPORATE ADDRESS. . . . . . . 2615 EAST AVENUE SOUTH LACROSSE, WISCONSIN 54601 DIST AND DIRECTION FROM
: NEAREST POPULATIDM CTR..19 MI S OF                                      CONTRACTOR LACROSSE, WISC                    ARCNITECT/ ENGINEER.......SARGENT 8 LUNDY TYPE OF REACTOR. . . . . . . . . . . .BWR                                      MUC STEAM SYS SUPPLIER...ALLIS-CHALMERS DATE. INITIAL CRITICALITY... JULY 11, 1967                                    CONSTRUCTOR.............. MAXON CONSTRUCTION COMPANY DATE ELEC ENER 1ST GENER... APRIL 26, 1968                                    TURBINE SUPPLIER.........ALLIS-CNALMERS DATE COMMERCIAL.0PERATE....MOVEMBER 1,                    1969            REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0HCE THRU                                        IE REGION RESPONSIBLE......III CONDENSER COOLING WATER.... MISSISSIPPI RIVER                                IE RESIDENT INSPECTOR......J. WIEBE ELECTRIC RELIABILITY                                                        LICENSING PROJ MANAGER.....R. DUDLEY COUNCIL. . . . . . . . . . . . . . . . . .MID-CONTINENT AR EA              DOCKET MUMBER........... 50-409 RELIABILITY COORDINATION AGREEMENT                    LICENSE & DATE ISSUANCE....DPR-45, AUGUST 28, 1973 PUBLIC DOCUMENT R00M.......LA CROSSE PUBLIC LIBRARY 800 MAIN STREET LA CROSSE, WISCONSIN 54608 INSPECTION            STATUS INSPECTION
 
==SUMMARY==
 
INSPECTION ON FEBRUARY 6-10. (84-03): ROUTINE, UNANNOUNCED INSPECTION OF OPERATIONAL RADIATION PROTECTION PROGRAM INCLUDING:
MANAGEMENT, STAFFING, TRAINING,-ALARA, EXPOSURE CONTROL, SURVEYS, POSTINGS AND CONTROLS. AND LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS. THE INSPECTION INVOLVED 36 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR. TWO ITEMS OF NONCOMPLIANCE WERE IDENTIFIED (FAILURE TO ADNERE TO RADIOLOGICAL CONTROL PROCEDURES; FAILURE TO PROPERLY CONTROL A HIGH RADIATION AREA).
ENFORCEMENT
 
==SUMMARY==
 
10 CFR 58.-APPENDIX B, CRITERION XII, CONTROL OF MEASURING AND TEST EQUIPMENT, STATES " MEASURES SHALL BE ESTABLISHED TO ASSURE
-THAT TOOLS, GAUGES, INSTRUMENTS, AND OTHER MEASURING AND TESTING DEVICES USED IN ACTIVITIES AFFECTING QUALITY ARE PROPERLY CONTROLLED, CALIBRATED, AND ADJUSTED AT SPECIFIED PERIODS TO MAINTAIN ACCURACY WITHIN NECESSARY LIMITS." CONTRARY TO THE ABOVE, NEITNER THE STATIC TRIP DEVICE TEST SET NOR THE STOP WATCHES USED FOR TECHNICAL SPECIFICATION REQUIRED TIME TESTING WERE CALIBRATED AT SPECIFIED INTERVALS.
-(8322 5)-
OTHER ITEMS PAGE 2-150
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM LA CROSSE                                      N
  - . Report Period MAR 1984                .IN5PECTION                  5TATUS - (CONTINUED)              M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM SYNER ITEMS s
      ; SYSTEMS AND COMPONENT PROBLEMS:
NOME FACILITY ITEMS (#8_4MS AND PROCEDURES):
NOME                                                                                                                                                          ,
MANAGERIAL ITEM'.*
NOME                                                                          b PLANT STATUS *-
THE UNIT-I3.0PERATING NDRMALLY.
        'LAST IE SITE INSPECTION DATE: MARCH 16 - MAY 15, 1984 5 INSPECTION REPOR'T.MO: '84-04 REPORTS          FR0M    LICEN5EE
        ========_======================================================================================
NUMBER ~ . DATE OF  DATE OF            SUBJECT
                      ~ EVENT        REPORT
__ __-  .__---. __    _ ___ -__---        _=_-- ......................... .. ___ ...
84-03/    02/20/84  03/12/84            ECCS START AND CONTAINMENT BLDG ISOLATION DUE TO HIGH CONTAINMENT BLDG PRESSURE SIGNAL,
          =================================================================================================================================
1 PAGE 2-151 9
 
i :q
: 1. Deckets  58-373            0PERATING                  STATUS                                                NNNNNNNNNNNNNNNNMMWNNNNNNMMNNNMMMNNN 2.. Reporting Period
                                                              ..
* LASALLE 1                  m 83/81/84 ' Outage + Or.-line Hrs:                  744.0                                  MununununnuununuwwmunununuwMwuMunnum 3.' Utility Centacts DIANA L. LIN (815) 357-6761 X481                                                          AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power- (MWt):                                3323
        .5..Mameplate Rating (Gross NWe):                1078 L6. Design Electrical Rating (Net MWe):                            1078                                  te25
: 7. Maximum Dependable capacity (Gross MWe):                      1078                                                      """*""~ I
                                                                                                                            ......fWIX.      IEPDC. Dr. - 1078 1100%)
: 8. Maximum Dependable Capacity (Net MWe):                        1078
: 9. If Changes 0ccur Above Since Last Report, Give Reasons:
NONE
      .10. Power Level To Which Restricted, If Any (Nat MWe):
                                                                                                                                                                            ,3 ,,
      .11. Reasons for Restrictions, If Any:
13ms-Most MONTH          YEAR              CUMULATIVE 12.. Report Period Mrs                  744.0    2. 18 4.0              2.184.0                                                                                      -so o
  ,                                                                                                                                                                                g 13.'Heurs Reacter Critical              348.8    1.15' i                1.158.5                                                                                  / .
: 14. Rx Reserve Shtdun Mrs            483.2        992.6                  992.6                        W E                                                          - 30
: 15. Mrs Generater On-Line              388.7    1.035.6                1.035.6
: 16. Unit Reserve Shtdun Mrs                .0            1.0                      1.0 300-
: 17. Gross Therm Ener (MWH)        578.129    8.717.819              8.717.819
                                                                                                                                                                            - 40
: 18. Gross Elec Ener (MWH)          182.356      759.266                759.266
: 19. Not Elec Ener (MWH)            165.238      704.862                704.862
                  ~
: 20. Unit Service Facter                  48.4        '47.4                    47.4
                                                                                                                                                                            -20
: 21. Unit Avail Factor.                    48.4        47.5,                  47.5 22.. Unit Cap Facter (MDC Net)            20.6        29.9                    ?9.9 A 23. Unit Cap Facter (DER Net)            20.6        29.9                    29.9                            0  -
                                                                                                                                    .-      ,-      .-    .-  ,-        . 0 0          5      to      15    20  25        30 24.; Unit Forced Outage Rate              48.8        46.1                    46.1                                                        DAYS 25.-Forced Outage Hours                286.7        884.5                  884.5
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
MfiRCH 1984 McNE
: 27. If Currently Shutdown Estimated Startup Dates                      N/A PAGE 2-152
                        ~.
 
N MMMMMMNNN NNNNMMMMMNNNMMMNNNNNNNMMMM Report Perled MAR 1944                  UNIT      $HUTD0WNS / REDUCTIOH$                      u            LASALLE 1                                                      M MMMMMMMMMNNNMMMMMMMMMMMMNNMMNNMMMMMM No. Data    M E Reason hthod LER Mumber System Component                    Cause & Corrective Action to Prevent Recurrence 6      82/13/84 c5 156.6        3      4                                  CONDENSER BOOT SEAL AND EXTRACTIDH STEAM EXPAHSION JOINT REPAIRED.
7      95/08/84      F 286.7    F      t                                  TEMPORARY DRYWELL VENTILATION DUCTWORK EVALUATED FOR LOADING ON CONTAINMENT STRUCTURAL MEMBERS. ANALYSIS 0.K. NO CORRECTIVE ACTION TAKEN. REMAINED SHUTDOWN TO PERFORM ELECTRICAL CABLE BUTT SPLICES INSPECTION REQUIRED BY HRC.
              ~
ummuMmManuM        LASALLE OPERATED WITH 2 OUTAGES AND H0 REDUCTIONS DURING MARCH.
    .M
 
==SUMMARY==
N
    .muMmMumNuma Twee        Emmeen                          Method          Svstem 8 Comoonent F-Forced: A-Eguip FalIure F-Admin            1-Manual        Exhibit F 3 H S-Sched    B-Maint or Test G-Oper Error    2-Manual Scram Instructions for C-Refueling      H-Other        3-Auto Scram    Preparation of D-Regulatory Restriction        4-Continued    Data Entry Sheet E-Sperator Training --          5-Reduced Load Licensee Event Report
                    & License Embmination        9-Other        (LER) File (HUREG-0161)
PAGE 2-153
 
                                          - - _ -                      .      .. . - . -    -      -    -        -      - - -          . . . - , .              .          ~ - . - -    . _ . , ~ ~        -
sammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm u-                LASALLE 1                                    m sammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm                                              FACILITY' DATA                                                                          Report Period MAR 1984.
FACILITY BESCRIPTION                                                                          ' UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                                        UTILITY                                                                                              I
                . ST AT E. . . . . '. . . . . . . . . . . . . . . IL L INOIS -                                  LICENSEE.................COMM0NWEALTH EDISON COUNTY. . . . . . . . . . . . . . . . . . . L A . S A L L E                                  CORPORATE ADDRESS........P.O. B0X 767
    - '                                                                                                                                                CHICAGO, ILLINDIS 60690 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 11 MI SE OF~                                                      CONTRACTOR OTTAWA..ILL                                  ARCHITECT / ENGINEER.......SARGENT & LUNDY
~
TYPE OF REACTOR............BWR                                                                    HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC TBATE INITIAL CRITICALITY... JUNE 21,.1982                                                          CONSTRUCTOR.............. COMMONWEALTH EDISON                                                      >
            -BATE'ELEC ENER IST-GENER... SEPTEMBER 4, 1982                                                      TURBINE SUPPLIER......... GENERAL ELECTRIC
            - BATE COMMERCIAL OPERATE.... JANUARY 1, 1984                                                REGULATORY INFORMATION                                                                                    I CONSENSER, COOLING METHOD... POND IE REGION RESPONSIBLE......III CONDONSER COOLING WATER.... RESERVOIR                                                          IE RESIDENT INSPECTOR......W. GULDEMOND
            . ELECTRIC RELIABILITY                                                                          LICENSING PROJ MANAGER.....A. BOURNIA COUNCIL..................MID-AMERICA                                                          DOCKET NUMBER........... 50-373
                                                                    .INTERP0GL NETWCRK-LICENSE & D4TE ISSUANCE....NPF-11                    AUGUST 13, 1982 PUBLIC DOCUMENT ROOM....... ILLINOIS VALLEY COMMUNITY COLLEGE RURAL ROUTE NO. 1 OGLESBY, ILLINDIS 16348 INSPECTIAN SMMMARY
            .INSPECTIO4 SN DECEMBER 19,'THROUGH FEBRUARY 10. (83-54): ROUTINE, UNANNOUNCED INSPECTION OF PREVIOUS INSPECTION FINDINGS; PREOPERATIONAL TEST RESULTS REVIEWS- PREOPERATIONAL TEST PROGRAM IMPLEMENTATION; UNIT 1 STARTUP TEST RESULTS: AND LICENSEE'S                                                                          I EVALBATION OF WNIT 1 STARTUP_ TEST RESULTS. THE INSPECTION INVOLVED A TOTAL OF 227 INSPECTOR-NOURS ONSITE BY 3 INSPECTORS INCLUDING 34 INSPECTOR-MOURS DURING OFF-SHIFTS. OF THE 5 AREAS INSrECTED, MO ITEMS OF NONCOMPLI ANCE OR DEVI ATIONS WERE IDENTIFIED
            ~IN 3 AREAS.- WITHIN THE REMAINING AREAS, 2 ITEMS OF NONCOMPLIANCE WERE IDENTIFIED (FAILURE TO NAVE A PROCEDURE TO TEST A SAFETY                                                                        '
DESION FEATURE AND FAILURE TO USE A CALIBRATED INSTRUMENT).
INSPECTION'ON DECEMBER 19,:28, 23, AND JANUARY 16 THROUGH FEBRUARY 10. (84-02): ROUTINE, UNANNOUNCED INSPECTION BY THREE RESIDENT INSPECTORS AND FOUR REGION BASED INSPECTORS OF LICENSEE ACTIONS ON PREVIOUS INSPECTION FINDINGS; OPERATIONAL SAFETY; OPERATOR TRAININGS STARTUP TEST WITNESSING; OPERATING EVENTS; PERIODIC AND SPECIAL REPORTS; AND UNIT 1 DRYWELL OVERTEMPERATURE CONDITIONS.
TNE INSPECTION INSPECTES,      NO ITEMS INWOLVED            341 INSPECTOR-NOURS OF NONCOMPLIANCE                        ONSITE INCLUDING WERE IDENTIFIED            75 INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS. IN THE SEVEN AREAS IN FIVE AREAS.
            .TMS AREAS (PROCEDURE VIOLATION TWO PROCEDURE VIOLATIONS).                                                  THREE ITEMS OF NONCOMPLIANCE WERE IDENTIFIED IN THE REMAINING INSPECTION ON FEBRUARY 21-24, (84-06): ROUTINE.-UNANNOUNCED INSPECTION OF RADIATION PROTECTION PROGRAM, INCLUDING ORGANIZATION f4NS MANAGEMENT CONTROLS; TRAINING AND OUALIFICATIONS; AUDITS; RADIATION PROTECTION PROCEDURES; RETRAINING; EXTERNAL EXPOSURE CONTROL AND DOSIMETRY; INTERNAL EXPOSURE CONTROL AND ASSESSMENT; RESPIRATORY PROTECTION; INSTRUMENT CALIBRATION; CONTAMINATION CONTROLS; UNIT.1 STARTUP RADIATION SURVEYS; AND TECHNICAL EVALUATION OF NEUTRON MEASUREMENT EQUIPMENT. THE INSPECTION INVOLVED 60
            ' INSPECTOR-NOURS ONSITE BY TWO NRC INSPECTORS. -MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
PAGE 2-154 I
 
unnumummmmmmmmmmmmmmmmmmmmmmmmmmmmum Report Period MAR 1984            IN5PECTION              $TATU$ - (CONTINUED)    m            LASALLE 1            m t                                                                                      muumununununununummmmmmmmmmmmmmmmmmm INSPECTION
 
==SUMMARY==
 
l ENFORCEMENT SuretARY NOME OTNER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NOME FACILITY ITEMS (PLANS AND PROCEDURES):
NOME MANAGERIAL ITEMS:
NOME PLANT; STATUS THE UNIT IS OPERATING MORMALLY.
LAST IE SITE INSPECTION DATE: MARCN 26 - APRIL 14, 1984 INSPECTION REPORT Nos 18 I
PAGE 2-155
 
Report Period MAR 1984                                                                    munnununununummmunumwnmuumununummunu
                                          -REPQRT$        FR0M      LICENSEE                  m                              LASALLE 1
* MMMMMmMNNMMMMMM4NmMMmMMMMWNMMMNNMMMM
      ==================================================================================================================================
NUMSER    DATE OF    DATE OF    SUBJECT EVENT      REPORT 84-06/-  01/21/84  02/17/84  -APRM READING LDW.
44-07/    02/03/84  03/28/84  REACTOR SCRAM- IMPROPERLY PLACED OHMMETER CAUSED RCIC TO INITIATE.
54-88/    02/19/84  03/13/84  NONCOINCIDENT SCRAM.
84-11/    02/13/84  03/14/44  REACTOR SCRAM RESULTING FROM LOSS OF VACUUM.
84-12/    02/14/84  03/15/84  CONTAINMENT LEAKAGE LIMIT EXCEEDED.
84-13/    02/14/84  91/15/84  MAIN STEAM LINE FLOW DPIS.
84-14/ -  02/01/84  03/26/84  PROCEDURE ERROR LES-R1-01.
44-15/    02/27/84  03/27/84  INADVERTENT GROUP 14 1V CONTAINMENT ISOLATION.
      ==================================================================================================================================
6 PAGE 2-156
 
Pm an
        ==
0 N
W O
A hf X
4 a
S h.
W J
    > s
    .a 4
E O
M M
E W
    >=
E M
SLB C
4 A
em M
E e
11.
-1
 
1 Dockets        58-389          0PERATING                            STATUS                          ununuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun u          MAINE YANKEE                    N
    -2.      Reporting Period: 83/01/84    Outage + On-line Hrst 744.0                                    uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun
: 3. Utility Contacts      S. BIEMILtER (617) 827-8tes                                                  AVERAGE DAILY POWER LEVEL (P5Je) PLOT
    .4.      Licensed Thermal Power (P54t):                                  2638 864 MRINE YRNKEE
-    5. Nameplate Rating (Gross Ptee):
: 6. Design Electrical Rating (Not P5de):                                  825                  1500 IE
: 7. Maxieue Dependable Capacity (Gross P5de):                            850                                                        [
S. Maxieue Dependable Capacity (Net P5de):                              810
: 9. If Changes occur Above Since Last Report, Give Reasons
* assesE te. Penser Level Te Which Restricted, If Any (Net P54e):
    .11. Reasons for Restrictions,'If Anys 1000-IIeteE MONTH        YEAR                  CUMULATIVE                                                                        o
: 12. Report Period Mrs'                  744.0    2.184.0                  99.876.6                  ... _..    ...........................      -100 g
: 13. Neurs Reactor Critical              712.3    2.125.7                  88.737.2 14.'Rx Reserve Shtdun Hes                    .e                        e            .e      IM I"                                                        -80
: 15. Nem Generator on-Line                789.7    2.187.7                  78.187.4
: 16. Unit Reserve Shtdun Mrs                .e                        .e          .0 500 -                                                -80
: 17. Sress There Ener (PGdH)        1.619.178    5.166.538 174.278,326
: 18. Sress Elec Ener (Ptai)            527.620  1.685.100                57.038.250
                                                                                                                                                          -40
: 19. Net Elec Ener (PldH)              588.183  1.626.808                54.328.510
: 20. Unit Service Factor                  95.4            96.5                    78.3
                                                                                                                                                          '80
: 21. Unit Avail Factor                    95.4            96.5                    78.3
: 22. Unit Cap Factor (MDC Net)            84.3            92.s                    69.3M 82.8            90.3                    67.4M            0          .-    .-                -
                                                                                                                                                        . 0
  -23. Unit Cap Facter (DER Net)                                                                          0 5    to 15      30      '.4    30
: 24. Unit Forced Outage Rate'                .e                2.0                7.5                                    DfWS
  ~25. Forced Outage Hours
  -                                              .e          42.0                  5.455.4 26.-Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                                        MfiRCH 1984 Isesef
: 27. If Currently Shutdown Estleated Startup Date:                            05/10/84  m Item calculated with a Weighted Average                            PAGE 2-158
 
r--
unusuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum u          MAINE YANKEE                      u Report Period MAR 1984                UNIT      SHUTD0WMS / REDUCTIOMS                      unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum No. Date    }53d Hours Reason Method LTR Namber Systes Comoonent            Cause 1 Corrective Action to Prevent Recurrence 83/10/84    F    S.0    8      5                HH    HT EXCH    REDUCED POWER FOR CHLORIDE INLEAKAGE INSPECTIDH.
2-84-7 83/30/84    5    34.3    C      1                                  SCHEDULED REFUELING SHUTDOWN FOR CORE 74L I
r l
i muuuuuuuuum      MAINE YANKEE SHUTDOWN ON MARCH 30TH FOR REFUELING AND MAINTENANCE.
u
 
==SUMMARY==
u unuuuuuuuuu Tvne      Reason                          Method          Svstem & Comnonent F-Forced A-Equip Failure F-Admin            1-Manual      Exhibit F 3 H S-Sched    B-Maint or Test G-Oper    Error 2-Manual ScramPreparation Instructionsoffor C-Refueling      H-Other        3-Auto Scram D-Regulatory Restriction        4-Continued    Data Entry Sheet E-Operator Training .          5-Reduced Lead Licensee Event Report
                    & License Examination        9-Other        (LER) File (NUREG-0161) i PAGE 2-159 l
                                                                                                        -    -          .  .. .  . . .. , , ,.      u .  , , , , ,
 
I nummmmmmmmmmmmmmmm m mm m m m m mm m m m m m m m m m u                    MAINE YANREE                    a summmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm.                              FACILITY              DATA                                                                                Report Period MAR 1984 FACILITY BESCRIPTION                                                              UTILTTY 8 CONTRACTOR INFORMATION LOCATION                                                                        UTILITY STATE.................... MAINE                                                  LICENSEE................. MAINE YANKEE ATOMIC POWER COUNTY................... LINCOLN                                                CORPORATE ADDRESS....... 83 EDISON DRIVE AUGUSTA, MAINE 04366 BIST AND DIRECTION FROM NEAREST POPULATION CTR.. 10 MI N OF                                          CONTRACTOR BATM, ME                                ARCHITECT / ENGINEER....... STONE 8 WEBSTER
      . TYPE OF REACTOR............PWR                                                    HUC STEAM SYS SUPPLIER...COMBUSTIDH ENGINEERING
    ~ BATE INITIAL CRITICALITY.. 0CTOBER 23, 1972                                        CONSTRUCTOR.............. STONE 8 WEBSTER DATE ELEC ENER IST SENER... NOVEMBER 8, 1972                                      TURBINE SUPPLIER. . . . . . . . . WESTINGHOUSE                                                                  i DATE CerW1ERCIAL OPERATE.... DECEMBER 28, 1972                                REGULATORY INFORMATION CONSENSER COOLING METHOD...ONCE TNRU                                            IE REGION RESPONSIBLE......I CONDENSER COOLING WATER....BACK RIVER                                          IE RESIDENT INSPECTOR......C. HOLDEN
    -ELECTRIC RELIABILITY                                                            LICENSING PROJ MANAGER.....K. HEITNER COUNCIL..................NORTNEAST POWER                                        DOCKET NUMBER........... 50-309                                                                                    '
COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-36, JUNE 29, 1973 PUBLIC DOCUMENT R00M.......WISCASSET PUBLIC LIBRARY HIGH STREET WISCASSET, MAINE 04S78
                                                              .I N $ P E C T I O N          5TATUS                                                                                                      ,
IMSPECTIM SWWIARY                                                                                                                                                                                        '
    .NG INSPECTION INPUT PROVISED.
E m f SINWEARY 10 CFR 71.12(A) IS A SENERAL LICENSE ISSUED TO ANY LICENSEE OF THE COMMISSION TO TRANSPORT LICENSED MATERIAL IN A PACKAGE FOR WHICH A CERTIFICATE OF COMPLIANCE NAS BEEN ISSUED BY THE MRC.                          10 CFR 71.12(C) REQUIRES A LICENSEE USING SUCH A PACKAGE TO HAVE A
  . COPY OF THE CERTIFICATE OF COMPLIANCE FOR THE PACKAGE, AND THE LICENSEE MUST COMPLY WITH THE TERMS AND CONDITIONS OF THE CERTIFICATE. 1) CERTIFICATE OF COMPLIANCE NO. 6601 REVISION MO. 12 REQUIRES THAT THE DECAY HEAT LOAD NOT EXCEED 20 WATTS.
  , CONTRARY TO THE ABOVE, TME LICENSEE DID NOT DETERMIME THE DECAY HEAT LOAD OF A PACKAGE OF 85.6 CURIES OF LICENSED MATERIAL SHIPPED ON SCTOBER 3,          1983. NAVING THE C OF C NO. 6601. 2) CONDITION NO. 9 0F CERTIFICATE OF COMPLIANCE NO. 6601 FOR PACKAGE MODEL NO.
CNS S-120, REGUIRES THE BRAIN LINE AND ACCESS PLUGS TO BE APPROPRIATELY PLUGGED AND SEALED PRIOR TO TRANSPORT. CONTRARY TO THE ASOVE, PACKAGE MODEL NO. CNS 8-120, C OF C No.                    6601, WAS USED TO TRANSPORT 85.6 CURIES OF LICENSED MATERIAL ON OCTOBER 3, 1933, AND THE BRAIN LINE AND ACCESS PLUSS WERE NOT VERIFIED TO BE APPROPRIATELY PLUGGED AND SEALED PRIOR TO TRANSPORT. THIS IS A SEVERITY LEVEL IV VIOLATION (SUPPLEMENT V).
(8321 5)                                                                                                                                                                                              '
PAGE 2-160
 
uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum Report' Period MAR 1984                                                  INSPECTION                $TATU$    -
(CONTINUED)              u          MAINE YANKEE                      u muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu OTNER ITEMS SYSTEMS AND COPPONENTS:
NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES)
NO INPUT PROVIDED.
MANAGERIAL ITEMS:
NO INPUT PROVIDED.
PLANT STATUS NO INPUT PROVIDED..
LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED.
INSPECTION REPORT Not NO INPUT PROVIDED.
REPORTS            FR0M    LICEN5EE
            =========================================================================== ======================================================
NUMBER  -DATE OF                                        DATE OF      SUBJECT EVENT                                  REPORT
              .NO INPUT PROVIDED.
--          ==================================================================================================================================
i m
PAGE 2-161
 
  '1  Becket:  58-349          0PERATING            STATUS                      mmwMummunummuumwnnmuunnununununumann M            MCGUIRE 1                                          M
: 2. Reporting Perled: 03/01/84    Outage + On-line Hrs: 744.0                  MMMMNNNNMMMMMMMMMMMMMMMMMMNNMMMMMMMM
: 3. U*.ility
 
==Contact:==
J. A. REAVIS (784) 373-8552                              AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                    3411
: 5. Nameplate Rating (Gross MWe):            1305 MCGUIRE 1
: 6. Design Electrical Rating (Net MWe):              1180          19c3
: 7. Maxieue Dependable Capacity (Gross MWe):          1225
[                                  g S. Maxieue Dependable Capacity (Net MWe):            1983
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NO NET POWER OUTPUT THIS MONTH NSNE                                                                                                                                          -100
: 10. Power Level Te Which Restricted, If Any (Net MWe):
11 Reasons.for Restrictions, If Any 1000 -
NOME                                                                                                                                          -80 MONTH      YEAR      CUMULATIVE                                                                                      o
: 12. Report Period Mrs              744.8    2.184.8      20.448.0                                                                                      g
: 13. Neurs Reactor Critical              .8  1.295.1      13.823.4
: 14. Ex Reserve Shtdun Mrs              .e          .e          .8 g
: 15. Mrs Generator On-Line              .e  1.289.4      13.238.5
~
16.. Unit Reserve Shtdun Mrs            .6          .0          .0 300-
                                                                                                                                                      ~ *O
: 17. Sress There Ener (MWH)              e 4.112.690    31.549.759
: 18. Gross Elec Ener (MWH)                8 1.442.257    10.959.381
: 19. Net Elec Ener (MWM)            -4.295  1.381.746    10.338.001
: 20. Unit Service Factor                .0      59.0        64.7                                                                                  - 20 21.' Unit Avail Factor                  .0      59.0        64.7
: 22. Unit Cap Facter (MDC Net)          .e      53.6        42.8
: 23. Unit Cap Facter (DER Net)          .8      53.6        42.8      0    _
                                                                                      .      ,    ,      ,-                              ,-    ,    0
            .                                                                  0      5    to    15    20                            25      30
: 24. Unit Forced Outage Rate            .e        1.6        19.0                              DAYS
: 25. Forced Outage Neurs                .8      28.8      3.106.3
: 26. Shutdeuns Sched Over Next 6. Months (Type,Date, Duration):                              MRRCH 1984 NONE
: 27. If currently Shutdeun Estimated Startup Date:        04/24/84                                                                                      PAGE 2-162
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR 1984                          UNIT        $HUTD0WNS / REDUCTIONS                      M            MCGUIRE 1                                                        M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No. Date    liig Hours Isason Method LER Mumber System comoonent                    cause a Corrective Action to Prevent Recurrence 3      82/24/84      S 744.8                C 4                RC      FUELXX    CYCLE 1 REFUELING OUTAGE CONTINUES.
MMMMMMMMMMM        MCGUIRE REMAINS SHUTDOWN IN A CCHTINUING G SuretARY M      REFUELING / MAINTENANCE OUTAGE.
MMMMMMMMMMM Twee'      Ram een                                Method          System 8 Comoonent F-Forced A-Equip Failure F-Admin                    1-Manual        Exhibit F 8 H S-Sched    5-Maint er. Test G-Oper Error 2-Manual Scram Instructions for C-Refueling          N-Other          3-Auto Scram    Preparation oV D-Regulatory Restriction                4-Continued      Data Entry Sheet E-Operator Training                    5-Reduced Load Licensee Event Report
                  & License Examination              9-Other          (LER) File (NUREG-0161)
PAGE 2-163
 
                                                                                                                                      ~
monummmmmmmmmmmmmmmmmmmmmmmmmmmmmmum O                MCGUIRE 1                m                                                                                  Report Period MAR 1984 maammmmmmmmmmmmmemummmmmmmmmmmmmunum                  FACILITY          DATA FACILITY DESCRIPTION                                            UTILITY A Cf:ITRACTOR INFORMATION LOCATION                                                      UTILITY STATE....................N0RTN CAROLINA                      LICENSEE................. DUKE POWER COUNTY...................MECKLENBURG                          CORPORATE ADDRESS....... 422 SOUTH          CHURCH CHARLOTTE,    STREET NORTH CAROLINA 28242 DIST AND DIRECTION FROM                                    CONTRACTOR NEAREST POPULATION CTR.. 17 MI N OF                          ARCHITECT / ENGINEER....... DUKE POWER CHARLOTTE, NC NUC STEAM SYS SUPPLIER... WESTINGHOUSE TYPE OF REACTOR............PWR DATE INITIAL CRITICALITY... AUGUST 8, 1981                      CONSTRUCTOR.............. DUKE POWER BATE ELEC ENER IST GENER... SEPTEMBER 12, 1981                  TURBINE SUPPLIER. . . . . . . . . WESTINGHOUSE
      , DATE COMMERCIAL OPERATE.... DECEMBER 1, 1981                  REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......II
        ' CONDENSER COOLING MATER.... LAKE MORMAN                        IE RESIDENT INSPECTOR......W. CRDERS ELECTRIC RELIABILITY                                          LICENSING PROJ MANAGER.....R. BIRKEL DOCKET NUMBER........... 50-369 COUNCIL................. 500THEASTERN ELECTRIC RELIASILITY COUNCIL          LICENSE 8 DATE ISSUANCE....MPF-9, JULY 8, 1981 PUBLIC DOCUMENT R00M.......MS.            DAWN HUBBS ATKINS LIBRARY UNIVERSITY OF HORTH CAROLINA - CHARLOTTE UNCC STATION, CHARLOTTE, NC 28223 L                                                        IN$PECTION              5TATUS INSPECTION SUPWlARY I          + INSPECTION FEBRUARY 13-17 (84-02): THIS ROUTIME, UNANNOUNCED INSPECTION INVOLVED 17 INSPECTOR-HOURS ON SITE IN THE AREAS OF
          . EMERGENCY PREPAREDNESS. OF THE AREAS INSPECTED, MO VIOL ATIONS OR DEVI ATIONS WERE IDENTIFIED.
INSPECTION JANUARY 20 - FEBRUARY 20 (84-04): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 75 INSPECTOR-HOURS ON SITE              OFIN THE THE FOUR AREAS OF DPERATIONS SAFETY VERIFICATION, SURVEILLANCE TESTING, MAINTENANCE ACTIVITIES, AND TMI ACTION ITEMS REVIEW.
AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION MARCH 5-9 (84-05): THIS ROUTIME, UNANNOUNCED INSPECTION INVOLVED 18 INSPECTOR-HOURS ON SITE IN THE AREAS OF FOLLOWUP OF LER's, IE BULLETIN'S,.AMD REFUELING ACTIVITIES. OF THE THREE AREAS INSPECTED, M0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORC58ENT SurmARY ME PAGE 2-164
 
muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum Report Period MAR 1984                INSPECTION                $TATUS - (CONTINUED)            m          MCGUIRE 1                            m muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum STHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NOME.
FACILITY ITERS (PLANS AND PROCEDURES):
NONF.
MANAGERIAL ITEMS:
NOME.
PLANT STATUS:
POWER OPERATIONS.
LAST IE SITE INSPECTION DATE: MARCN 5-9,        1984 +
INSPECTION REPORT NO: 58-369/84-05 +
REP 0RTS          FR0M      LICENSEE
      ==================================================================================================================================
NUMBER      ' DATE OF  DATE OF      SUBJECT EVENT    REPORT
                                                                                                                                              .-_=
83-114/      11/28/83 12/28/83    LOAD SEQUENCING TIMES FOR SEQUENCER 18 LOAD GROUPS 1, 5 AND 10 FAILED TO MEET REQUIRED LOADING 8 3-L-                              TIMES, DUE TO COMPONENT MALFUNCTION.
83-115/ - 11/29/83    81/13/84    WE TRAIN ' A' UNABLE TO MEET REQUIRED VACUUM DECAY TIME, DUE TO POOR SEALING PROVIDED BY THE 03-L                                ANNULUS DOORS.
83-116/      12/02/83 12/29/83    FIRE ALARM FOR ZONE EFA-40 RECFIVED, DETERMINED INVALID AND WOULD NOT RESET, DUE TO DUST AND 83-L                                DIRT ACCUMULATION INSIDE DETECTORS.
85-117/      12/09/83 81/20/84      'B' FEEDWATER PUMP INADVERTENTLY LOST AND WAS MANUALLY TRIPPED.
03-L 83-198/      12/06/83 01/06/84    FIRE ALARM FOR ZONE EFA-77 RECEIVED AND WOULD NOT RESET, DUE TO WATER ACCUMULATION IN 1 0F THE 2 03-L                                DETECTORS.
83-119/      12/14/83 01/13/84    INVALID FIRE ALARM FOR EFA-76 RECEIVED AND WOULD NOT RESET, DUE TO COMPONENT MALFUNCTION.
03-L 83-129/  4 12/21/83 81/20/44    FIRE RETARDANT PACKING DISCOVERED MISSING. INVESTIGATION COULD HOT ESTABLISH A TIME OR REASON S3-L                                FOR REMOVAL.
PAGE 2-165 v_                                                                          -
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuums Report Period MAR 1984    . REP 0RT5          FR0M      LICENSEE - (CONTINUED)                m            MCGUIRE 1                                    m unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunune 43-121/    12/31/83  01/30/84    INVALID FIRE ALARM FOR EFA-S t6 RECEIVED, DUE TO CARBON DUST ON DETECTOR.
SS-L S40-891/ 01/09/84    02/15/84    UNIT 1 VALVE SUPPORT AND CLAMP REMOVED IN AUX. BLDG.
44-942/' . 31/30/84  02/29/84    UNIT 1 REACTOR TRIP WAS INITIATED BY OVERTEMPERATURE DELTA T SIGNAL. THIS EVENT IS ATTRIBUTED
      -                                TO THE FAILURE OF A LEAD / LAG CARD.
    ================================a=================================================================================================
e y
PAGE 2-166 e
 
Pm
              =
0 N
W C
at L
e W
X 4
        .J M
N E
W
        .J b
e
        .J 4
E O
M
        >=
Z W
        >=
E M
W C
4 A
en M
I r
g.9            J- '
 
1 Becket                                58-370                            0PERATINO            5TATUS                                    unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu M              MCGUIRE 2                                                m
: 2. Reporting Periods e3/81/84                                                    Outage + on-line Hrst    744.0                            Nuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum
: 3. Utility Centacts                              J. A.                  REAVI5 EXT (704) 373-7567                                          AVERAGE DAILY POWER LEVEL (MWe) PLOT 3'"
: 4. ucens.d 7h.real r.o.c (MWe):
EME2
: 5. Nameplate Rating (Gross Fede):                                                          1450 Y .9 = 1385 1tse I"
: 6. Besign Electrical Rating (Not Pede):
(ESIGN ELEO. MITINS - 1180
: 7. Maximum n=r                              .s.ble Capacity (Gress MWe):                          1225                                          futt. DEPDE. Ofr. - 1180 1100E3
: 8. Meuleum Dependable capacity (Not Fede):                                                        11se
: 9. If Changes Occur Abewe Since Laet Repert, Giwe Reasens:                                                                                  m aus es comme mist arraset onestles
                                                                                                                                                                              -  -- - -100
: 10. Poseer Level Te Which Restricted, If Any (Met MWe):
: 11. Reesens for Restrictions, If Anys                                                                                              gggg, MONTH      YEAR    CUMULATIVE                                                                                                            Q
,12. Report Period Mrs                                                        ,_, 744.0      744.8          744.8                                                                                                          M
: 13. Newes Reacter Critical                                                        787.0      787.e          707.0 E                                              -80            <
: 14. Em Reserve Shteen Mrs                                                            e          .e            e
: 15. Mrs Generater On-tine                                                        7et.a      7et.a          781.a                g
: 16. Unit Reserve Sht6sn Mrs                                                          8          .e            e 500-
: 17. Sress TP ere Ener (fGBI)                                                  2.386.794 2.306.794    2.386.794
: 18. Scoss Elec Ener (pesi)                                                      328.863    828.363      32a.a63
: 19. Met Elec Ener (paal)                                                        79a.723    79a.723      798.723
                                                                                                                                                                                                                        ~"
: 20. Unit Service Facter                                                            94.3      94.3          94.3
: 21. Unit Avail Facter                                                              94.3      94.3          94.3
: 22. unit Cap Facter (feC Net)                                                      91.0      99.e          91.0 91.s      91.0          91.0                    0    -    _
O
: 23. Unit Cap Facter (DER Net)
: 24. Unit Forced Outage Rate                                                          5.7        5.7            5.7                                              DRYS
: 25. Forced Gutage Neurs                                                            42.2      42.2          42.2
: 26. Shutdensne Sched ever Next 6 Months (Type.Date Duration),                                                                                                MfiRCH 1984
: 27. If Currently Shutdoesn Estimated Startup Dates                                                      N/A                                                                                                                  PAGE 2-168
 
                                              --. .      - . _ -  - . - ~  .-. - - - - - .          . . _ ~ . . . .        . . . . _ . _ . . - . -. - .. __ _ - _ _ _ -- _ ._____
i sognert r esed not isS4                                                                                                          NNNNNNNNNNNNMWNNNNNNENNWWWNNENNNENNN UNIT          SNUTeOMN$ / REDUCTIONS                                                  N                                      MCGUIRE 2    N NNNNNNNNNNNNNNNNNNNNNMENNNNNNNNNNNNN E _ h ". E E h NTN                                LER ikseber Switae Cemeenant                            emune a corrective action to Prevent securrence 9-F.  '03/05/84  -F. 0.0    .3      5                      NI              VALVEX INVESTIGATE 2-3 GPM LEAK INSIDE CONTAINMENT.
2-P    05#84/84    F    8.0  -A        5                      CH              VALVEX FEEDWATER ISOLATION VALVE STUCK OPEN.
L          1      05#84#84    F  27.1  -A        2                      NI              VALVEX REPAIR PACKING LEAK ON STEAM GENERATOR BLOW DOWN VALVE.
3-P    05#85#84    F    0.0    A      5                      IB              INSTRU EXCORE CALIBRATIONS.
4-P    03/07/94    F    0.0    B      5                      CB              PUMPXX REACTOR COOLANT PUMP OVERCURRENT TEST.
        ..9-P . 05/94/84    F-  0.0    3      5                      ZZ              PENETR CONTAINMENT PENETRATION TESTING TO VERIFY INTEGRITY.
2      03/99#44    F  15.1    A      5                      CC              NTEXCN BAD CARD CAUSED STEAM GENERATOR PRESSURE INDICATION                                                  ,
TO FAIL LO.                                                                                          l
        . C-P    05#22/84    5-  0.0    5      5-                      IA              INSTRU REACTOR PROTECTION SYSTEM TESTING.
          .7-P    03/24/84    S    0.0    B      5                      IA              INSTRU REACTOR PROTECTION SYSTER TESTING.
C-P      05/27/84    5    0.0-    B      5                      IA              INSTRU REACTOR PROTECTION SYSTEM TESTING.
0-P    .03/29/84    S    0.0'    B      5                      IA              INSTRU REACTOR PROTECTION SYSTEM TESTING.
c
  ~
                                ~
BEHINGHB555SW    MCOWIRE 2 CefetENCES CefetERCIAL OPERATION ON MARCN f, 1944, AND U SWemRY N        SPERATED ROUTINELY THE REMAINDER OF THE REPORT PERIOD.
essasemmasM-                                                                                                                                                                                    ,
I Itsee      "-
Meehad              Swetem a connenent F-Pereed A-Eguip Failure- F-AdWin            1-Manual            Exhibit F & H S-SJted    B-Heint er Test S-Oper Error 2-Manual Scram -Instructions for                                                                                                                      ,
                    'C-Refueling      N-Other.        3-Auto Scram        Preparation of                                                                                                              '
S-Regulatory Restriction          4-Continued          Data Entry Sheet E-Sperater Training              ,5-Reduced Lead Licensee Event Report
                        & License Examination        ~ 9-Other            (LER) File (NUREG-0161)
PAGE 2-169 l
t 9
 
W:                                ,
                                      - f                              -3, b
st sammemmeneseemannamme 0                    -MCONIRE 2                m DATA                                                    Report Period MAR 1984 amenemexameenmaammmaammmmmmmmmmmaman                          FACILITY FARILITY BRSCRIPTI m                                                  tif f tITY a CONTRACTOR INFORMATION L8 CATION                                                            UTILITY STATE.'...................N0RTH    CAROLINA                      LICENSEE................. DUKE POWER CORPORATE ADDRESS........ POWER BLDG., BOX 2178 CSBNTY...................MECRLENSUR$                                                                          CHARLOTTE, NORTH CAROLINA 28201 DIST AND SIRECTION FROM                                        CONTRACTOR NEAREST POPULATION CTR..CHARLOTTE, 17 MI N OF NC                        ARCHITECT / ENGINEER....... DUKE POWER NUC STEAM SYS SUPPLIER... WESTINGHOUSE TTPE OF REACTOR............Pem M TE IEITIAL CRITICALITY...MAY 8, 1983                                  CONSTRUCTOR. . . . . . . . . . . . . . DUKE POWER MTE ELEC WER IST SENER...MAY 23, 1983                                    TURBINE SUPPLIER......... WESTINGHOUSE
            ' MTE CWWERCIAL SPERATE.... MARCH 1, 1984                          REGULATORY INFORMATION emmasanssa CSSLING METNSD...ONCE THRU            -                  IE REGI0h RESPONSIBLE. . . . . .II camasanssa CSOLINS MATER....LARE NORMAN                              IE RESIDENT INSPECTOR......W. ORDERS ELECTRIC RELIABILITY                                                  LICENSING PROJ MANAGER.....R. EIRKEL DOCKET NUMBER........... 50-370 CONMCIL..................50GTHEASTERN ELECTRIC          ,
RELIABILITY COUNCIL            LICENSE & DATE ISSUANCE....MPF-17, MAY 27, 1983 PUBLIC DOCUMENT R00M.......
UNIVERSITY OF NORTH CAROLINA - CHARLOTTE UNCC STATION, CHARLOTTE, MC 28223
                                            ;                                              STATUS INSPECTION INSPECTIAN SWWEARY
              + INSPECTION FEBRUARY 13-17 (84-02): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 18 INSPECTOR-HOURS ON SITE IN THE AREAS OF WWESENCY PREPAREDNESS. OF THE AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION JANUARY 20 - FEBRUARY 20 (84-84): THIS ROUTII;E. UNANN0UNCED INSPECTION INVOLVED 75 INSPECTOR-HOURS ON SITE IN THE AREAS OF WERATIONS SAFETY VERIFICATION. SURVEILLANCE TESTING, MAINTENANCE ACTIVITIES, AND TMI ACTION ITEMS REVIEW. OF THE F3UR AREAS INSPECTED, NO VIOLATISNS OR DEVIATIONS WERE IDENTIFIED IN TWO AREAS; ONE ITEM OF NONCOMPLIANCE WAS FOUND IN TWO AREAS 2        (FAILME'TS-FDLLOM PROCEDURE RESULTING IN DESTRUCTION OF 2A NV PUMP AND FAILURE TO FOLLOW PROCEDURE RESULTING IN REACTOR
              -(S0-570/84-04-81);- PARAGRAPH 6 AND S3.
  '].                                                -THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 18 INSPECTOR-HOURS SH SITE IN THE AREAS OF FOLLOJUP INSPECTION MARCN 5-9 (84-85):
GF LER'S, IE SULLETIN'S, AND REFUELING ACTIVITIES. OF THE THREE AREAS INSPECTED, HO VIOLATIONS OR DEVI ATIONS WERE IDENTIFIED.
s A    .m    -
                      *4 2 I  ,e  e    4 c
PAGE 2-170
 
m.
                                                                                                                                ~
u
                                                                                                                      /
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period ilAR 1984                IN5PECTION              STATUS - (CONTINUED)                M          MCGUIRE 2                                                            M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS SYSTEMS AMD' COMPONENT PROBLEMS:
MAX POWER LIMIT 50% PENDING STEAM GENERATOR MODIFICATION. DS-416 REACTOR TRIP BREAKER UNDER VOLTAGE COIL PROBLEMS.
FACILITY ITEMS (PLANS AND PROCELURES):
NOME.
MANAGERIAL ITEMS:
NOME.
T-LANT STATUS:
      -COMMERCIAL OPERATION COMMENCED ON 03/01/84.
LAST.IE SITE INSPECTION DATE: MARCN 5-9, 1984 +
INSPECTION REPORT NO: 50-370/84-05 +
REPQRTS      FR0M      LICENSEE
      ==================================================================================================================================
NUMBER    DATE OF-    PATE OF    SUBJECT EVENT
      ..._        ____.....      REPORT'___
_.            __=.__              _-                _
____ =-- _-- -__
83-083/    11/30/83  12/29/83  VALVE 2MF-228 FAILED TO MEET THE CLOSURE TIME OF </- 15 SECONDS, DUE TO COMPONENT MALFUNCTION.
          ~03-L 83-084/    12/C4/83  St/05/84  VALVE 2NV-842A, C FAILED TO CLOSE WITHIN THE REQUIRED CLOSURE TIME OF </- 15 SECONDS, DUE TO AN 85-L :                            ELECTRICAL CONTACT FAILING IN OPEN POSITION.
83-085/    12/08/83  01/06/84  VOLUME CONTROL TANK AND CONTAIMMEhT/ EQUIPMENT SUMP 2A INDICATED A LEAKAGE PROBLEM, DUE TO
        .33-L                                COMPONENT MALFUNCTION.
        '83-086/      12/12/83  01/11/84  INVALID FIRE ALARM RECEIVED FOR EFA-107 AND WOULD NOT RESET, DUE TO BROKEN PINS.
  ~        03-L 83-487/      12/15/83  01/13/84  ANALYZER 28 NOT SATISFACTORILY CALIBRATED, DUE TO COMPONENT MALFUNCTION.
83-L
'i        '83-088/    12/19/83 . 01/18/84
"                                            INVfLID FIRE ALARM RECEIVED FOR EFA-128 AND WOULD NOT RESET, DUE TO A SPURIOUS ALARM.
03-L 83-089/
03-L.
                      '12/22/83 ' 01/20/84    120 VAC VITAL INSTRUMENT AND CONTROL POWER SYSTEM BATTERY INVERTER 2EVIB TRIPPED, ATTRIBUTED TO MUMEROUS COMPONENT FAILURES.
PAGE 2-171
 
i
?
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN MCGUIRE 2                N Report Period MAR 1984                    REP 0RTS          FR0M    LICEMSEE          -
(CONTINUED)      N NNNNNNNhMNNNNNNWMMNNNNNNNNNNNMMMNNNN 83-090/      - 12/23/83              02/03/84  ISOLATION TRANSFORMER FOR 2A GEN. BREAKER SYNCN. CHECK RELAYS OVERNEATED AND BEGAN TO EMIT 03-L                                            SMOKE, DUE TO A SHORT.
  -  83-891/      12/24/83              01/23/84  INVALID FIRE ALARM RECEIVED FOR era-170 AND WOULD NOT RESET, DUE TO DUST ACCUMULATION IN 1 0F 03-L                                            THE DETECTORS.
83-092/      12/31/83              02/08/84  RESIDUAL HEAT REMOVAL PUMP 'B' SHOWING ZERO DISCHARGE FLOW AND SUBSEQUENTLY TRIPPED, DUE TO 63-L                                            PROCEDURAL DEFICIENCIES.
                                                                                                                                            'A' DISCHARGE 84-001/      01/09/84              02/15/84  RESIDUAL HEAT REMOVAL PUMP 'B' SHOWING ZERO DISCHARGE FLOW / ALARM FOR LOW ND PUMP
      --                                              PRESS RECEIVED, ANNUNICATOR ALARM RECEIVED, INCIDENTS DUE TO PROCEDURAL DEFICIENCIES.
02/29/84  OPERATORS CLOSED THE BREAKERS FOR VALVES 2ND-1B AND 2ND-2A. THIS INCIDENT IS AT!RIBUTED TO 84-002/      01/15/84
      --                                              PERSONNEL ERRO
 
==R. PROCEDURE==
S WERE REVISED.
84,-003/      01/22/84              02/21/84  PRESSURIZER PRESSURE EXCEEDED 2385 PSIG, DUE TO PERSONNEL ERROR.
84-004/      01/15/84              02/29/84  CHEMICAL AND VOLUME CONTROL (NV) PUMP 2A WAS DECLARED IMOPERABLE AT 2317 ON JANUARY 15 AFTER THE
      --                                              PUMP WAS STARTED AND RUN FOR APPROXIMATELY 19 MINUTES WITHOUT SOCTION.
84-005/      02/02/84              03/05/84  A UNIT 2 REACTOR TRIP WAS INITIATED. THE TRIP OCCURRED WHEN AN INSTRUMENT AND ELECTRICAL
      --                                              SPECIALIST ACCIDENTLY PUSNED THE RED TRIP PUSHBUTTON.
    '84-006/.      02/03/84              03/05/84  TOTAL DRPI SYSTEM FAILURE. THIS EVENT IS ATTRIBUTED TO FAILURES OF A CENTRAL CONTROL CARD.
e66 ##      6e            ee 6
* ee          e  e    e    e  e 6 6  6 ee  ee  e e    e      e PAGE 2-172
 
84 h
e=
I N
W C
4 A
M Z
4
.a A
>=
6 W
.J
> a
.J 4
E O
M
>=
Z W
>=
Z M
W C
4 A
en M
Z
>=
l
 
L
                  ~
: 1. Decket        50-245                0PERATING                      STATUS                                          NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN N              MILLSTONE 1                                          N
            '2. Reporting Periods. 03/01/34                  Outage + On-line Hrs: 7.fid                                                NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
            -3.' Utility Centacts afoRGE HARRAN (203) 447-1791 X4194                                                                    AVERAGE DAILY POWER LEVEL (MWe) PLOT                                                    -
            ... Lic.ns.d Thermal re e (m e)                                              2. "                                                    MILLSTONE 1
: 5. Nameplate Rating (Gross rede):                                  735 x e.9 = 662 1900
            ,6. Design Electrical Rating (Not rede): -                                    66e                                                                                      880 DESIeN ELEC. RRTING =                                                            t
: 7. Maximus Dependable Capacity (Gross MWe)8                                684                                      ......MRX. DEPDs. Cfr. -                        854 (100X)
            .S. Maximus Dependab)e Capactty (Not so):                                    654          .
            -L9.'.If Changes Occur Above Since Last Report, Give Reasonst                                                                                                                                                        ,
HDNE
          ; 10.' Peneer Level To leich Restricted, If Any (Net MWe):
I
_ . 11.. Reasons for Restrictions, If Anys                                                                  sono.
f MonE
          - 12. Report Perled Mrs MONTH 744.s YEAR 2.184.0 CUMULATIVE 116.928.0 l          I
          ' 13. Hours Reactor Critical                      744.0            2.184.0      88.948.5                                                                                                                          r
                                                                .e-                  .e      2.775.8                                                                                                          too
          '. 14. Ex Reserve Shtdun Mrs
                                                                                                                                      /        V              V
: 15. Mrs Generator On-Line                      744.0            2.184.0      86.201.2 Q                                                                                            -so
: 16. linit Reserve Shtehen Mrs                      .e                  .e            26.5            goo.
l s
          '17. Gross There Ener (Pset)                  1.464 164- 4.393.874 157.352.742                                                                                                                      .co              w
: 18. Gross Elec Ener (PedH)                    499.500      1.473.688        52.836.796
                                                                                                                                                                                                                                )
            ' 9. Net . Elec' Ener (PedH) 1                                            476.229      1.407.293        50.388.558                                                                                                          .e              ,
-      4 - 20. Unit Service Facter                          100.0                100.0            73.7
                                                                                                                                                                                                              -30              ;
: 21. Unit Avail Factor                            tes.e                100.0            73.7 y4 ; 22.~. Unit Cap Facter (MDC Net)                      97.9                98.5            65.9 s'                              io'                  is
                                                                                                                                      ~    ~
          . 23s Unit Cap'Facter (DER Met)                    97.0                97.6            65.3                    o                        1'O '            1's'                              'So
: 24. Unit Forced Outage Rate                          .e                  .e            13.7 i
: 25. Forced Outage. Hours                            .e                  .8      5.673.7 MRRCH 1984                                                                -
: 26. Shutdesens Sched Over Next 6' Months;(Type,Date, Duration):
I APRIL'15. 1984. REFUELING. DURATION oF 15 WEEKS.                                                                                                                                                          !
PAGE 2-174
                                                      ~
: 27. If Currently Shutdoesn Estleated Startup Date s                              N/A r
 
guuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu Report Perled MAR 1984                                      UNIT      SMUTD0WMS / REDUCTIONS                    u          MILLSTONE 1                                                  m unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun l!h          Data        M E Rea= son Method LER Humber $vstem Component                        cause a corrective Action to Prevent Recurrence NONE.
tuuuuuuuuuu~          ' MILLSTONE 1 OPERATED AT OR HEAR FULL POWER DURING THE REPORT
.D
 
==SUMMARY==
u'                PERIOD.
tunnunununu Twee          ' Reason                                        Method          System 8 Comoonent iF-Forced A-Equip Failure F-Admin                                t-Manual      Exhibit F & H S-Sched .B-Maint or Test. G-Oper Error 2-Manual Scram Instructions for
                -C-Refueling          -H-Other                  3-Auto Scram    Preparation of
                'D-Regulatory Restriction                      4-Continued    Data Entry Sheet E-Operator Training                          5-Reduced Load Licensee Event Report 8'Licenso Examination                      9-Other        (LER) File (NUREG-0161)
PAGE 2-175
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun u                      MILLSTONE 1              m muuuuuuuuuuuuuuMMMMMMMMMMMMMMMMNuMMM                          FACILITY          DATA                                                    Report Period MAR 1984 FACILITY DESCRIPTION                                                    UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                              UTILITY STATE....................COMMECTICUT                                    LICENSEE.................MORTHEAST NUCLEAR ENERGY COUNTY...................NEW LONDON                                    CORPORATE ADDRESS........P.O. BOX 270 HARTFORD, CONNECTICUT 06101 DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 5 MI SW OF                                  CONTRACTOR HEW LONDON, CONN                  ARCHITECT / ENGINEER.......EBASCO TYPE OF REACTOR............BWR                                            HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC
    ,DATE IMITIAL CRITICALITY.. 0CTOBER 26, 1970                              CONSTRUCTOR..............EBASCO b'TE ELEC ENER 1ST GENER. ..HOVEMBER 29, 1970                            TURBINE SUPPLIER.........GEhERAL ELECTRIC DATE CDMMERCIAL OPERATE.... MARCH            1, 1971                REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                  IE REGION RESPONSIBLE......I CONDENSER COOLING WATER....LONG ISLAND SOUND                          IE RESIDENT INSPECTOR......J. SHEDLOSKY ELECTRIC RELIABILITY                                                  LICENSING PROJ MANAGER.....J. SHEA COUNCIL..................MORTHEAST POWER                                DOCKET NUMBER...........      50-245 COORDINATING COUNCIL LICENSE a DATE ISSUANCE. . . .DPR-21, OCTOBER 26, 1970 PUELIC DOCUMENT ROOM.......WATERFORD PUBLIC LIBRARY 45 ROPE FERRY ROAD ROUTE 156 INSPECTION              STATUS IMirECT10N_11lfTIARY NO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
SECTION 6.8.1 0F THE TECHNICAL SPECIFICATI0HS REQUIRES THAT WRITTEN PROCEDURES IMPORTANT TO SAFETY SHALL BE ESTABLISHED, IMPLEMENTED AND MAINTAINED. SECTION 6.8.2 WHICH IS REFERENCED BY SECTION 6.8.1 REQUIRES THAT PROCEDURE CHANGES BE REVIEWED SY THE PORC/50RC, AS APPLICABLE, AND APPROVED BY THE UNIT SUPERINTENDENT / STATION SUPERINTENDENT PRIOR TO IMPLEMENTATION. CONTRARY TO THE ABOVE, SECTION 5.6 (H) 0F PROCEDURE CP 809A, LIQUID WASTE DISCHARGE, WAS CHANGED IN JULY 1979 BUT WAS NOT REVIEWED AND APPROVED PRIOR TO THE IMPLEMENTATION AS REQUIRED. SECTION 5.6 (H) 0F PROCEDURE CP 809A DESCRIBES THE HI-HI ALARM SETTING FOR THE LIQUID WASTE MONITOR.'            THIS IS A SEVERITY LEVEL IV VIOLATICH (SUPPLEMENT I).
(8320 4)
OTHER ITEMS PAGE 2-176
 
NNNNMMMMMMMMMMMMMMMMMMMNNMMMMMMMMMMM Report Period MAR 1984                  IN$PECTION                STATUS.-    (CONTINUED)    N          MILLSTONE 1                                                                                            M MMMMMMMMMMMMMMNNNNNNNNNNMMMMMMMMNNNM OTHER ITEMS
    . SYSTEMS AND COMPONENTS:
NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES):
NO IMPUT PROVIDED.
MANAGERIAL ITEMS 8
:NO INPUT PROVIDED.
    . PLANT STATU$t' NO INPUT PROVIDED.
2LAST.IE SITE INSPECTION DATE8 NO,IMPUT.PROVIDED.
      -INSPECTION REPORT NO: NO INPUT PROVIDED.
R E P O R T.S  FR0M  LICENSEE
        =======,===========================================================================================================================
        ' NUMBER        DATE OF DATE OF          SUBJECT EVENT  REPORT
                  .... _                        .                              _ ==._____ __ . - _                        ._
NO INPUT PROVIDED.
      .==================================================================================================================================
PAGE 2-177
 
g I'                                                              OPERATING              STATUS                            NNNNNNMMuuuMMNNNNNNuuMM4MMANNNNuMNNN 1.'Deckets                  50-336' N          MIL' STONE 2                  N
: 2. Reporting Perleds 83/01/84                              Outage + On-line Hrs: 744.0                          NunnunwNwuununununuuuNuNunnuwawunuun 3.-Utility contacts'                        J. arasoN (293) 447-1791 X 4419                                  AVERAGE DAILY POWER LEVEL (MWe) PLOT
:t. Lic.ns.d Th.r                          1 Po-.c (MWt):                      27..
MILLSTONE 2
        -5.cNameplate Rating (Gross MWe):                                      1811 Y e.9 = 91e I'''
: 6. Design Electrical Rating (Met MWe):                                          87e
                                                                                                                              - IESIGN ELEC. IWITINg - 870
: 7. Maximus Dependable Capacity (Gross MWe):                                    895                            ,,,,,, pga. DEFtse. Org'. -  800 (100%)
: 8. Maximum Dependable Capacity (Met P5de):                                      86e
: 9. If Changes Occur Above Since Last Report, Give Reasons
: 10. Power Level.To Which R%stricted, If Any (Not Itee):
: 11. Reasons for Restrictions, If Any                                                                    gigg .
NDNE
                                                                                                                                              -- --------- ==----
MONTH        YEAR      CUMULATIVE                        ------- ----                      F          100 g
: 12. Report Period Mrs                                        744.8- __22141.1      72.456.e                                                      T/
: 13. Hours' Reactor Critical                                  744.s    2.060.9      5s.425.8
: 14. Ex Reserve Shtdun Mrs~                                      .e          .e      2.166.9          hf
: 15. Mrs Generator On-Line                                    744.0    1.758.1      47.940.8
                                                                                                                                                                        -so 16.' Unit Reserve Shtdun Mrs                                    .e          .e        468.2              ,,,,
: 17. Gross There Ener (MWH)                              1.971.567  4.288.871 120.685.247 1.377.601    39.174.973                                                                    . go
: 18. Gross Elec Ener (MWH)                                  642.200
: 19. Net Elec'Ener (MWH)                                    619.880  1.312.988    11,529.729
: 20. Unit Service Factor-                                    its.e        80.5          66.2                                                                    -30
: 29. Unit Avail Factor                                        100.e        88.5          66.8
      - 22. Unit Cap Factor (MDC Net)                                96.8        69.9          61. 6 N
      ' 23.' Unit Cap Factor (DER Net)                              95.6        69.1          6e.7M                  O    ~5~    ~1'0 ' i'5 '    ab'    IN'    IO UAYS 24.. Unit 1 Forced Outage Rate                                  .e        9.e          18.8 J25. Forced Outage. Hours                                        .8      173.4        9.796.2
[26.' Shutdowns Sched Over Next 6 Months (Type Date, Duration):
            ~MeME-
: 27. If Currently Shutdown Estimated Startup Date                            s      N/A          N Itwo calculated with a Weighted Average                          PAGE 2-178 2
4b--
 
l                                                                                                        .
unwummuununuwunuMumwMunuwwwwwmununum Report Period MAR 1984                      UMIT      SHUTD0WMS / REDUCTIOMS                      W          MILLSTONE 2                              N MNNMMMMMMMMMMMNNMMMMMMMMMMMMMMMMMMMM r  . Mo . Date    liii Hours Reason Method LER Number $vstem Gomoonent                Cause 4 Corrective Action to Prevent Recurrence                          i
    ' NOME-
                                      ~
      .ENNNWumuMum      MILLSTOME 2 OPERATED ROUTIMELY DURING THE REPORT PERIOD.
O
 
==SUMMARY==
M.
CNMMMMMMMMM Twne      Rennen                                Method          System 8 Comoonent
    ' ' F-Forced A-Equip Failure F-Admin                1-Manual        Exhibit F & H S-Sched  B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling        H-Other'          3-Auto Scram    Preparation of D-Regulatory Restriction              4-Continued      Data Entry Sheet E-Operator Training                  5-Reduced Load Licensee Event Report
                      & License Examination            9-Other          (LER) File (NUREG-0161)
PAGE 2-179
 
                  .tumuuuuuuuuuuuuuuuuuuuuuuuuuuuununun G                    MILLSTONE 2                m cumuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum                                      FACILITY        DATA                                          Report Period MAR 1984 FACILITY DESCRIPTION                                                              UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                        UTILITY STATE.................... CONNECTICUT                                      LICENSEE.................HORTHEAST NUCLEAR ENERGY
                              -C0UNTY...................NEW LONDON                                        CORPORATE ADDRESS........P.O. BOX 270 HARTFORD. COHHECTICUT 06101 DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 5 MI SW 0F                                      CONTRACTOR NEW LONDOH, CONH                              ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                                    HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY...DCTOBER 17, 1975                                        CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER...HOVEMBER 9, 1975                                        TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 26, 1975                                REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0HCE THRU                                            IE REGIDH RESPONSIBLE......I CONDENSER COOLING WATER....LONG ISLAND SOUND                                    IE RESIDENT INSPECTOR......J. SHEDLOSKY ELECTRIC RELIABILITY                                                            LICENSING PROJ MANAGER.....K. HEITHER COUNCIL..................MORTHEAST POWER                                  DOCKET HUMBER........... 50-336 COORDINATING COUNCIL LICENSE & DATE ISSUANCE....DPR-65, SEPTEMBER 30, 1975 PUBLIC DOCUMENT ROOM.......WATERFORD PUBLIC LIBRARY 45 ROPE FERRY ROAD ROUTE 156 WATERFORD, COHHECTICUT 06385 INSPECTIOH                        STATUS INSPECTION
 
==SUMMARY==
 
NO INSPECTION IMPUT PROVIDED.
ENFORCEMENT SUFMARY TECHNICAL SPECIFICATION 3.3.1.1 REQUIRES THAT A MINIMUM OF 3 REACTOR PROTECTIVE SYSTEM CHANNELS BE MAINTAINED OPERABLE IN THE FUNCTIDHAL AREAS OF HIGH POWER, THERMAL MARGIN / LOW PRESSURE DURING OPERATION IN MODES 1 AND 2 (REACTOR CRITICAL) AND THE FUNCTIDHAL' AREA 0F LOCAL POWER DENSITY DURING OPERATIDH IN MODE 1 (REACTOR CRITICAL AT A POWER LEVEL OF AT LEAST 5% OF RATED
                    ' POWER).          CONTRARY TO THE ABOVE, BETWEEN JANUARY 5 AND JANUARY 17, 1984, THE REACTOR WAS OPERATED IN MODES 1 AND 2 WITH ONLY 2 REACTOR PROTECTIVE SYSTEM CHAHMELS OPERABLE IN THE FUNCTIONAL AREAS OF HIGH POWER, THERMAL MARGIH/ LOW PRESSURE. AHD LOCAL POWER DENSITY.
(8402 3)
OTHER ITEMS PAGE 2-180 s
 
i NNNNNNNNNNNNNNNNNNNNNNNNNNNMMMNNNNNN Report Period MAR 1984                                  INSPECTI0N          5TATUS - (CONTINUED)                      N                          MILLSTONE 2                                                                      N NNNNNNNNNNNNNNNNNNNNNNNNNMMNNNNNNNNN OTHER ITEMS SYSTEMS AND COMPONENTS:
NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES)*
NO INPUT PROVIDED.
MANAGERIAL ITEMS 8 MO INPUT PROVIDED.
PLANT STATUS:
NO IMPUT PROVIDED.
LAST IE SITE INSPZCTION DATE: NO INPUT PROVIDED.
INSPECTION' REPORT NO: NO INPUT PROVIDED.
REPORTS    FROM    LICENSEE
  ==================================================================================================================================
NUMBER        DATE OF        .DATE OF                SUBJECT.
EVENT  _ REPORT
:NO IMPUT PROVIDED.
:==================================================================================================================================
PAGE 2-181
: 1. Beckets 5e-263              0PE, RATING            STATUS                      MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M                    MONTICELLO                              M
: 2. Reporting Perled: 03/01/84          Outage + On-line Hrst 2ib.f.                  MMMMMMMMMMMMMMMMMMMMMMMMMMMMM'4MMMMMM
: 3. Utility Contacts      A. L. Wrabe (612) 295-5151                                  AVERAGE DAILY POWER LEVEL (Mide PLOT                                                    ,
: 4. Licensed Thermal Poseer (Pudt):                        1678 I            O
                    ~5. Nameplate Rating (Gross Pede):                  632 x e.9 = 569
: 6. Design Electrical Rating (Not Ptie):                    545                1" DESIGN ELEC. RnTING =            545
: 7. Maximus Dependable Capacity (Gross MWe):                  553                      .... MnX. DEPDe. Cnr. -                      525 (100%)
S. Maxleue Dependable Capacity (Not Pede):                  525 9.'If Changes Occur Above Since Last Report, Give Reasons
* nonE
                  .,10. Poseer Level Te Which Restricted, If Any (Net P'Ede):
                    '11. Reasons for Restrictions, If Any:                                            1000-
                                            ...            MONTH        YEAR      CUMULATIVE                                                                                      $}
                    .12. Report Period Mrs                    744.s    2.184.e      111.793.0
: 15. Neues Reacter Critical                  .e      ate.5      89.915.4
                  '14. Em Reserve Shtdun Mrs                    .e-          .e        940.7    l 1S. Mrs Generater On-Line                    .e      sea.a      88.e03.0                  NO E POWER OUTPUT THIt, MONTH Q                                                                        "100
: 16. Unit Reserve Shtdun Mrs                  .e          .8            .e        gag.
                                                                                                            ------------===--            -------------------
t/.- Gross There Ener (fem)                    e  a97.,89s 141.233.314                                                                                _,,
14.' Gross Elec Ener (Past)-                    e. 296 t17    45.185.053
                                                                                                                                                                            -go
: 19. Net Eles Ener (feet)                -1,302    277.831 43.19e.137
: 20. Unit Service Facter                      .e        37.e          78.7                                                                              -40
                  .21. Unit Avail Factor                          .e        37.e          78.7
:22. Unit Cap Facter (MDC Net)                .8        24.2          73.6 8
23.. Unit' Cap lFacter (DER Net)              .8        23.3          78.9              g'      -
5        1'o '  A        A          IE        'Io
                  '24. Unit Forced Outage Rate                    .e          .e            5.3                                        DAYS 125.:Perced Outage Hours.                      .e            e      t.2a8.a 26.~Shutdeesns Sched Over Next 6 Months (Type,Date. Duration),                                              M RCH 1984
                  .27. If Currently Shutdoesn Fttimated Startup Date:                1e/24/84                                                                                    PAGE 2-182
 
e NNNNNNNNNNNMMMMNNNNNNNNNNNNNNNNNNNNN MONTICELLO            N Report Period MAR-1984                  UNIT      SHUTD0WHS / REDUCTIOHS                      N MNNNNNNNNNNNNNNNNNNNNNNNNNMMNNMMNNMM No.      Date    1535 Hours kaason Method LER Number System Component            Cause & Corrective Action to Prevent Recurrence 2      02/03/84. S 744.8        C      4                  RC    FUELXX    CONTINUATION OF 1984 REFUELT.HG OUTAGE.
r~    ,
j 1
NNNNNNNNNNM        MONTICELLO REMAINS SHUTDOWN IN A CONTINUING REFUELING / MAINTENANCE N SUfMARY M        OUTAGE.
NNNNMMNNNNN Twee '    .Reamen                          Method          System 8 Comoongni F-Forced A-Equip Failure F-Admin              1-Manual      Exhibit F 4 H                                                                  l
  - S-Sched    B-Maint or Test G-Oper    Error 2-Manual Scram Instructions for C-Refueling        H-Other        3-Auto Scram  Preparation of
;%              D-Regulatory Restriction        4-Continued    Data Entry Sheet E-Operator Training              5-Reduced Load Licensee Event Report A License Examination        9-Other        (LER) File (HUREG-0161)                                            PAGE 2-183
 
w nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmme n              MONTICELLO                  m                    .
nummmmmmmmmmmmmmmmmmununummmmmmmmman                      FACILITY          DATA                                                Report Period MAR 1984 FACILITY DESCRIPTION                                                UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                          UTILITY STATE....................MINNES0TA                                LICENSEE.................HORTHERN STATES POWER COUNTY................... WRIGHT                                  CORPORATE ADDRESS....... 414 NICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 DIST AND DIRECTISM FROM NEAREST POPULATION CTR.. 30 MI NW OF                            CONTRACTOR MINNEAPOLIS, MINN                    ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BWR                                      HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... DECEMBER 18, 1970                        CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... MARCH 5,      1971                      TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 30, 1971                      REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER                        IE REGION RESPONSIBLE......III CONDENSER COOLING WATER.... MISSISSIPPI RIVER                    IE RESIDENT INSPECTOR......C. BROWN l              ELECTRIC RELIABILITY                                              LICENSING PROJ MANAGER.....N. NICOLARAS l                COUNCIL..................MID-CONTINENT AREA                        DOCKET NUMBER...........      50-263 REtIABILITY COORDINATION AGREEMENT                      LICENSE 8 DATE ISSUANCE....DPR-22, JANUARY 9,            1981 n                                                                                PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL CONSERVATION LIBRARY l                                                                                                                  MINNEAPOLIS PUBLIC LIBRARY l                                                                                                                  300 HICOLLET MALL 1
MINNEAPOLIS, MINNESOTA 5540f IN5PECTION              5TATUS INSPECTION SufflARY INSPECTION ON FEBRUARY 6-10. (84-02): ROUTIME, UNANNOUNCED INSPECTION OF RADIATIDH PROTECTION ACTIVITIES DURING A MAJOR OUTAGE.
            ' ACTIVITIES REVIEWED INCLUDED ORGANIZATION AND MANAGEMENT CONTROL, AUDITS, ADVANCE PLANNING AND PREPARATION, TRAINING AND
            'GUALIFICATIONS, EXTERNAL EXPOSURE CONTROL, INTERNAL EXPOSURE CONTROL, ALARA, RADI0 ACTIVE NATERIAL CONTROL, SURVEYS, STATUS OF THE RECIRCULATION PIPING REPLACEMENT PROJECT (RPRP), AND A REVIEW OF PREVIOUS INSPECTION FINDINGS, OPEN ITEMS, AND COMMITMENTS. THE
{'-            INSPECTION INVOLVED 36 INSPECTOR-MOURS ONSITE BY ONE MRC INSPECTOR. NO ITEMS OF NONCOMPLI ANCE OR DEVIATIONS WERE IDENTIFIED.
t ENFORCEMENT SuletARY
          . NOME                                                                                                ,
GTHER ITEMS l            SYSTEMS AND COMPONENT PROBL EMS:
PAGE 2-184 i-I
 
MMMMMMMNNNNNNNNNNMMMMMMNNNMMMMMMMMMM Report Period MAR 1984                  IN5PECTIOM                        STATUS - (CONTINUED)                  N                  MONTICELLO                                  N MMMMMNNMMMNNNMMMMMMMMMMNNNNNMMMMMMMM OTHER ITEMS NONE FACILITY ITEMS (PLANS AND PROCEDURES):
NOME MANAGERIAL ITEMS NOME PLANT STATUS:
THE PLANT IS ! HUT DOWN FOR A 6 MONTH OUTAGE. THE MAJOR ACTIVITY DURING THE OUTAGE WILL BE REPLACEMENT OF THE RECIRCULATIDH SYSTEM PIPING & REFUELING.
LAST IE' SITE IMSPECTION DATE: FEBRUARY 27 - MARCH 9, 1984 INSPECTION REPORT MO: 84-07 REP 0RTS        FR0M          LICEHSEE
    ================================================================================================;=================================
NUMBER    DATE OF    .DATE OF          SUBJECT EVENT      REPORT
___.________                            -- ___-      ----- =-_      =_  --- ==-=_ -                                            -_-___ _______ .. __
84-07/~'  02/06/84  03/05/84          NO. 11 RECIRC. MG SET DRIVE MOTOR BREAKER FAILURE.
84-08/    02/07/84  03/06/84          NO. 11 RECIRC. MG SET FIELD BREAKER FAILURE.
84-09/-    02/07/84  03/08/84          E-MODE OF EFT ACTUATED BY T0XIC CHEMICAL DETECTOR TAPE BREAK.
84-10/    02/17/841  03/16/84          EMERG. FILTER TRAIN TRIPS DUE TO CHLORINE LEAKAGE IN CHLORINE TAHK ROOM.
84-11/. 02/18/84  03/19/84          CRACK INDICATIONS OH PRIMARY SYSTEM PRESSURE BOUNDARY PIPING.
    ==================================================================================================================================
r PAGE 2-185
 
t i
l l
I.
i.
i
: 1. Docket              58-22e  0rERATING                    STATUS                      NNNNNNNNNNNNNNNNNNNNNNNNNNNMMMMMMNNh N          NINE MILE POINT 1                            N i              2. Reporti'ng Periods e3/st/s4        Outage + On-line Hrst J.ib.1                          MMNNNMMNNMMNNNNNNNNNNNNNNNNNNNNNNNNN 3.~ Utility Contacts JAN MALLENBECK (315) 349-2555                                          AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. u. ens.d Th.real rees.r (mt),                                ia5.
NINE MILE POINT 1
: 5. Nameplate Rating (Gross Pede): -                    755 X 8.85 = 642 1e00
: 6. Design Electrical Rating (Not Ptie):                            620
                                                                                                                  - (MlSION ELEC. RRTINS =    620
: 7. Maximum Dependable CapaeIty (Gross MWe)                        630                    ......MRX. DEPDC. Orr. -            610 t100%)
: 8. Maximum Dependable Capacity (Het P5de):
610
: 9. If Changes Occur Above Since Last Report,.Give Reasons NONE
            ' 18. Poeser Level To Which Restricted, .If Any (Het MWe):
            .11. Reasons for Restrictions, If Any'_                                              1e00-NONE
            .12. Report Period Mrs MONTH 744.0 YEAR 2.184.0 CUMULATIVE 126.360.0 g
            '13. Hours Reackor Critical              388.5        1.828.5        88.131.8
            .14.~      Rx Reserve Shtdun Mrs              .0                .8      1.204.2
                                                                                                        '""""""~"~""""'"""""""                                        ~
: 15. Mrs Generater On-Line              385.5        1.825.5          85.313.6 Q
: 16. Unit Reserve Shtdun Mrs                .e                .e          20.2      sea.      --
                                                                                                                                                                      -so
                                                        .                                                                        7
: 17. Gross There Ener (PedH)          589.280  3.862.522 141.156.879 18.: Gross Elec Ener (ledH) -        196.936  1.034.284          46.666.066                                                                            ~80
: 19. Het Elec Ener (Ptml)              190.366  1.001.923          45.196.682
                                                                                                                                                                      -40 20.. Unit Service Factor                  51.8              83.6            67.5
: 21. Unit Avail Factor'                    51.8              83.6            67.5                                                                          -20
: 22. Unit Cap Factor (MDC Net)            41.9-            75.2            58.6
: 23. Unit Cap Factor (DER Net) 41.3              73 2 -          57.7          0        '5 ~      l'O  tit  '2ID '  l5    3IO 24.. Unit. Forced Outage Rate'              .e                .e          17.1
: 25. Forced Outage Hours                        e              .e      12.94e.9
          - 26. Shutdoesn's Sched Over Next 6 Months (Type,Date, Duration)8                                                MARCH 1984 NOME
: 27. If Currently Shutdown Estinated Startup Dater                      e5/15/84                                                                                    PAGE 2-186
 
MMNNNNNNNMMNNNMMMMMMMNNMMMMNNNNNNMMM Report Period MAR 1984'                                          ~ UNIT    SHUTD0WMS / REDUCTIONS                        w        NINE MILE POINT 1                                                  N MMNNNMMMMMMMMMMMMMMMMMMMNNNNMMMMMMMM No. Date                      1555 Nours Reason Method LER Humber System Comoonent                    Cause 4 Corrective Action to Prevent Recurrence 84-6  83/17/84                      5 358.5                C    4                RC    FUELXX    UNIT SHUTD04H FOR BIENNIAL REFUEL AND OVERHAUL.
mununummmmu                      2 NINE MILE POIMT 1 SHUTDOWN CH MARCH 17TH FOR REFUELING AND M
 
==SUMMARY==
M                        MAINTENANCE.
umuMMMNNNNw
    .Twee      Remeen                                                    Method          System 8 Component F-Forced A-Equip Failure :F-Admin                                    1-Manual        Exhibit F & H S-Sched    B-Maint or Test G-Oper Error'                            2-Manual Scram Instructions for C-Refueling -                                H-Other    3-Auto Scram    Preparation of D-Regulatory Restriction                                  4-Continued    Data Entry Sheet
:E-Operator Training                                      5-Reduced Load Licensee Event Report
                                      & License Examination                9-Other        (LER) File (MUREG-0161)
PAGE 2-187 O
f
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM k'        NINE MILE POINT 1                                              M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM                                                                                          FACILITY        DATA                                                                              Report Period MAR 1984 FACILITY DESCRIPTION                                                                                                                  UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                                                                            UTILITY STATE....................NEW YORK                                                                                                    LICENSEE................. NIAGARA MOHAWK POWER COUNTY.................. 0SWEGO                                                                                                      CORPORATE ADDRESS....... 300 ERIE BOULEVARD WEST SYRACUSE, NEW YORK 13202 DIST.AND DIRECTION FROM NEAREST POPULATION CTR.. 8 MI NE OF                                                                                                CONTRACTOR OSWEGO, NY                                                                                ARCHITECT / ENGINEER.......HIAGARA MOHAWK POWER CORP.
TYPE OF REACTOR............BWR                                                                                                          HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... SEPTEMBER 5,                                                                            1969                CONSTRUCTOR.............. STONE 8 WEBSTER DATE ELEC ENER 1ST GENER... NOVEMBER 9, 1969                                                                                            TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 1, 1969                                                                                        REGULATORY INFORMATION CONDENSER COOLING METH00...ONCE THRU                                                                                                  IE REGION RESPONSIBL E. . . . . .I CONDENSER COOLING WATER.... LAKE OMTARIO                                                                                              IE RESIDENT INSPECTOR. . . . . .S. HUDSON ELECTRIC RELIABILITY                                                                                                                  LICENSING PROJ MANAGER.....R. HERMANN COUNCIL..................N0RTHEAST POWER                                                                                              DOCKET NUMBER........... 50-220 COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-63, DECEMBER 26, 1974 PUBLIC DOCUMENT ROOM. . . . . . . STATE UNIVERSITY COLLEGE OF OS!! EGO PEHFIELD LIBRARY - DOCUMENTS OSWEGO, NY 13126 (315) 341-2323 INSPECTION            STATUS Ig3EECTION SUtWlARY
  'NO INSPECTION INPUT PROVIDED.
ENFORCEMENT SUf91ARY 10 CFR 71.12(B)(1)CII) REQUIRES THAT A PERSON USING A PACKAGE TO TRANSPORT LICENSED MATERIAL MUST HAVE A COPY OF THE CERTIFICATE OF COMPLIANCE, AND THE PERSON MUST ALSO COMPLY WITH THE CONDITIONS OF THE CERTIFICATE.                                                                                          1. CERTIFICATE OF COMPLIANCE NO. 9111, REV. NO. 8. RE9 TIRES THAT THE DECAY HEAT LOAD SHALL NOT EXCEED 400 WATTS. CONTRARY TO THE ABOVE, ON FEBRUARY 11, 1983, THE
' LICENSEE SHIPPED ABOUT 14 CURIES OF LICENSED MATERIAL IN A PACKAGE HAVING THE CERTIFICATE OF COMPLIANCE NO.                                                                                                                      9111, AND THE LICENSEE DID NOT DETERMINE THE DECAY HEAT LOAD. 2. CERTIFICATE OF COMPLIANCE NO. 9094, REV.                                                                                                                          NO. 6, REQUIRES THAT THE CONTENTS OF A PACKAGE MUST MEET THE REQUIREMENTS FOR LOW SPECIFIC ACTIVITY MATERIAL. CONTRARY TO THE ABOVE, ON APRIL 22, 1983, THE
. LICENSEE SHIPPED ABOUT 8 CURIES OF LICENSED MATERIAL IN A PACKAGE HAVING THE CERTIFICATE OF COMPLIANCE NO. 9094, AND THE LICENSEE DID NOT DETERMINE THAT THE MATERIAL MET-THE REQUIIREMENTS FOR LOW SPECIFIC ACTIVITY MATERIAL. THIIS A SEVERITY LEVEL IV VIOLATION (SUPPLEMENT V).      10 CFR 71.101(B) REQUIRES EACH LICENSEE TO ESTABLISH A QUALITY ASSURANCE PROGRAM FOR PACKAGES.                                                                                                                    to CFR 71.101(F)
-STATES THAT A COMMISSION APPROVED QUALITY ASSURANCE PROGRAM THAT SATISFIES THE APPLICABLE CRITERIA 0F APPENDIX B 0F PART 50 0F THIS CHAPTER, AND WHICH IS ESTABLISHED, MAINTAINED, AND EXECUTED WITH REGARD TO TRANSPORT PACKAGES WILL BE ACCEPTED AS SATISFYING THE REQUIREMENTS OF PARAGRAPH (B) 0F THIS SECTION. CRITERIA II, APPENDIX B 0F PART 50 0F THE LICENSEE'S PREVIOUSLY APPROVED PAGE 2-188
 
J
[
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMAMMMM Report Period MAR.1984                    IN5PECTION                  $TATUS - (CONTINUED)        M        NINE MILE POINT 1                    M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM EMFORCEMENT
 
==SUMMARY==
 
PROGRAM REGUIRES THE LICENSEE TO IDENTIFY THE STRUCTURES, SYSTEMS, AND COMPONENTS TO BE COVERED BY THE QUALITY ASSURANCE PROGRAM.
            ' CONTRARY TO THE ABOVE, AS OF NOVEMBER 9, 1983 THE LICENSEE STILL HAS NOT IDENTIFIED TRANSPORT PACKAGES AS A STRUCTURE, SYSTEM, OR COMPONENT TO BE COVERED BY THE QUALITY ASSURANCE PROGRAM. A SPECIFIC APPROVAL OF THE LICENSEE'S QUALITY            ASSURANCE PROGRAM FOR TPANSPORT PACKAGES WAS ISSUED BY THE DIVISION OF FUEL CYCLE AND MATERIAL SAFETY ON, OR ABOUT, JUNE f, 1979. THIS IS A SEVERITY
            ' LEVEL IV VIOLATION (SUPPLEMENT V). 10 CFR 71.10S(D) STATES, "THE LICENSEE SHALL PROVIDE FOR INDOCTRINATION AND TRAINING OF PERSONNEL PERFORMING ACTIVITIES AFFECTING QUALITY AS NECESSARY TO ASSURE THAT SUITABLE PROFICIENCY IS ACHIEVED AND MAINTAINED.
(CONTRARY TO THE ABOVE, ONE LICENSEE. EMPLOYEE PERFORMING ACTIVITIES AFFECTING QUALITY HAS NOT BEEN TRAINED IN DOT AND NRC
          ' REGUL ATORY REQUIREMENTS INVOLVED'IM THE TRANSFER, PACKAGING, AND TRANSPORT OF RADI0 ACTIVE MATERIAL TO ASSURE THAT SUITABLE s
          , PROFICIENCY WAS ACHIEVED AND MAINTAINED. THIS IS A SEVERITY LEVEL IV VIOLATION (SUPPLEMENT V).
(8526 4)
STHER ITEMS SYSTEMS AND COMPONENTS:.
NO INPUT PROVIDED.
: FACILITY. ITEMS (PLANS AMD PROCEDURES):
              'NO' INPUT PROVIDED.
MANAGERIAL ITEMS:
NO INPUT PROVIDED.
I              PLANT'STATUSs1 NO, INPUT PROVIDED.
              .LAST IE SITE INSPECTION DATE: NO IMPUT PROVIDED.
              . INSPECTION REPORT Nos NO INPUT PROVIDED.
REP 0RTS            FR0M    LICENSEE
                ==================================================================================================================================
NUMBER-    DATE OF      DATE OF    SUBJECT EVENT        REPORT                                              ------  _--      --__    _ _ _ _ - - - ------------------
NO INPUT PROVIDED.-
                =======s==========================================================================================================================
3 r      ,
PAGE 2-189 t
r
: f. Deckets se-nB              DPERATING            STATUS                    unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum u                HORTH ANNA 1              'u
: 2. Reporting Periods e3/01/84      Outage + On-line Hrs:    744.0            unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun l      3., Utility Contacts  .10AN N. LEE (703) 894-5151 X2527                      AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                      2775 NORTH RNNR 1
      '5. Nameplate Rating (Gross 79de):                      947
: 6. Design Electrical Rating (Net NWe):                  907 DESIGN ELEO. RRTING - 907 l      7. Maximum Dependable capacity (Gross MWe):            930                    ,__g,            m,      y,.      m ggg
  ,    -S. Maximum Dependable Capacity (Het NWe)                883
: 9. If Changes occur Above Since Last Report, Give Reasons:
MDC NET CHANGED TO REFLECT SERVICE LOADS.
: 10. Power Level . To. Which Restricted, If Any (Met MWe):
: 11. : Reasons for Restrictions, If Anys                                1000-see oss et tuommo tempt crTrnm. ome:Trans unu,
                                                                                    -          ~~--v--*-=--                        -
                                                                                                                                      -100 MONTH.      YEAR      CUMULATIVE
: 12. Report Period Mrs                744.0    2.184.s ,    51.025.0                                                                  h
: 13. Hours Reactor Critical            744.0    1.452.6      35.039.7
: 14. Ru Reserve Shtdun Mrs'                .8        7.1      2.182.8
: 15. Mrs Generator On-Line            744.0    1.431.8      34.893.3
                                                .e        .0            .0  gag.                                                    -80
: 16. Unit Reserve Shtdun Mrs
: 17. Gross Thern Ener (fedH)      2.058.504  3.891.696    88.947.473
: 18. Gross Elec Ener (fedH)          699.411  1.317.626    28.701.812                                                            _,
    -19. Not Elec Ener (PEdH)            665.347  1.251.466    27,082.680
: 20. Unit Service Factor              100.0      65.6          66.8
                                                                                                                                      -30
    .'21.. Unit Avail l' actor              100.8      65.6          66.8
: 22. Unit Cap Facter (MDC Net)        101.3'      65.0          60.1 0    .      . .
23.. Unit Cap Factor (DER Net)        98.6      63.2          58.5      c            s    l0      ls-  .2Io '  3's    do
: 24. Unit Forced Outage Rate              ;t-      34.4          13.7                                OIWS
: 25. Forced Outage Hours                  .e      752.2        5.320.4
: 26. Shutdowns Sched Dwer Next 6, Months (Type,Date, Duration):
NFRCH 1984 UNIT 1 REFUELING OUTAGE: e5-11-84
    .2'7. If Currently Shutdown Estimated Startup Dates          N/A                                                                      PAGE 2-190
 
MNNNNNNNNNNNNNNNNNNNNNNNNNMMMMNNNNNN HORTH ANNA 1            M Report Period MAR 1984                              UNIT      SHUTD0WHS / REDUCTI0NS                      N MMMMMNNNNNNNNNNNNNMMMMMMMNNNNNNNNNNN No.              Data    lEii HouEs Reai65 Method LER Number System Comoonent            Cause & Corrective Action to Prevent Recurrence 44-06 03/03/84                    S-    0.0    B. 5                                  UNIT 1 RAMPED DOWN FOR TURBINE VALVE FREEDOM TEST.
UNIT RETURNED TO FULL POWER.
:gx..
84-07 03/10/84                    S    0.0    B    5                                  UNIT 1 REAMPED DOWN FOR TURBINE VALVE FREEDON TEST.
UNIT RETURNED TO FULL POWER.
f 84-0S' 03/17/84 5    .0.0    B    5                                  UNIT 1 RAMPED DOWN FOR TURBINE VALVE FREEDOM TEST.
UNIT RETURNED TO FULL POWER.
44-09 03/24/84                    S    0.0  'B    S                                  UNIT 1 RAMPED DOWN FOR TURBINE VALVE FREEDOM TEST.
UNIT RETURNED TO FULL POWER.
84-10 03/31/84                    S-    0.0    B    5                                  UNIT 1 RAMPED DOWN FOR TURBINE VALVE FREEDOM TEST.
ENDED THIS MONTH WITH UNIT AT 94% POWER LEVEL AT 881 MW FOR TURBINE VALVE FREEDOM TEST.
l F
I NNNNMMNNNNN                  . NORTH ANNA 1 OPERATED ROUTIHELY DURING MARCH.
i      N
 
==SUMMARY==
N I      MWNNNNNNNNM Twee                    Reason                          Method          System 8 Comnonent F-Forced A-Equip Failure F-Admin                        1-Manual        Exhibit F 8 H S-Sched                B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling        H-Other      3-Auto Scram    Preparation of
[
D-Regulatory Restriction.        4-Continued    Data Entry Sheet l,                                                              5-Reduced Load Licensee Event Report
(
                              'E-Operator Training 8 License Examination        9-Other        (LER) File (HUREG-0161) l                                                                                                                                                    PAGE 2-191 F-1 I
l-l-                      ,
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum u              . NORTH ANNA 1                        m ununuuuuuuuuuuuuuuuuuuuuuuuuuuuummuu                                    FACILITY          DATA                                                    Report Period MAR 1984 FACILITY DESCRIPTION                                                            UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                      UTILITY STATE.................... VIRGINIA                                            LICENSEE................. VIRGINIA ELECTRIC 8 POWER
            -COUNTY...................LOUISA                                                CORPORATE ADDRESS........P.O. BOX 26666 RICHMOND, VIRGINIA 23261 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 40 MI NW OF                                        CONTRACTOR RICHMOND, VA                            ARCHITECT / ENGINEER.......ST0HE 8 WEBSTER TYP E OF R EACTOR. . . . . . . . . . . . PWR                              ,      MUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... APRIL 5, 1978                                        CONSTRUCTOR.............. STONE 8 WEBSTER
          'DATE ELEC ENERl1ST.GENER... APRIL 17, 1978                                        TURBINE SUPPLIER......... WESTINGHOUSE
        'DATE COMMERCIAL OPERATE.... JUNE 6,                1978                      REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                          IE REGION RESPONSIBLE......II CONDENSER COOLING WATER.... LAKE ANNA                                          IE RESIDENT INSPECTOR......D. JOHNSON ELECTRIC RELIABILITY                                                          LICENSING PROJ MANAGER.....L. ENGLE COUNCIL................. 50UTHEASTERN ELECTRIC                                DOCKET NUMBER........... 50-338 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....HPF-4, APRIL      1, 1978 PUBLIC DOCUMENT ROOM....... ALDERMAN LIBRARY / MANUSCRIPTS DEPT.
UNIV. OF VIRGINIA / CHARLOTTESVILLE VA 22901 8 LOUISA COUNIt COURTHOUSE, LOUISA, VA 23093 INSPECTION                  STATUS INSPECTION
 
==SUMMARY==
 
          + INSPECTION JANUARY '6 - FEBRUARY 5 (84-01): THIS ROUTINE INSPECTION BY THE RESIDENT INSPECTORS INVOLVED 113 INSPECTOR-HOURS ON SITE IN THE AREAS OF SURVEILLANCE AND MAINTENANCE ACTIVITIES, PREVIOUS INSPECTION FINDINGS, PREVIOUSLY IDENTIFIED ITEMS, SAFETY SYSTEM WALKDOWNS, LICENSEE EVENT REPORTS, TMI ACTIDH PLAN ITEMS. OF THE SEVEN AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE
        . IDENTIFIED.
2
        ' INSPECTION-JANUARY 25-27 (84-02): THIS SPECIAL,' UNANNOUNCED INSPECTION INVOLVED 10 INSPECTOR-NOURS ON SITE IN THE AREAS OF EMERGENCY PREPAREDNESS. OF THE AREAS INSPECTED, TWO VIOLATIONS WERE FOUND IN TWO AREAS (INADEQUATE PROCEDURES FOR PROTECTIVE ACTION DECISION MAKING AND FAILURE TO PROPERLY TRAIN EMERGENCY PERSONNEL IN PROTECTIVE ACTION RECOMMENDATION DECISION MAKING).
THESE WERE DISCUSSED IN PARAGRAPH 5.
INSPECTION FEBRUARY 27 - MARCH 2 (84-05): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 35 INSPECTOR-HOURS ON SITE IN THE AREAS OF EMERGENCY PREPAREDNESS. OF THE AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 27 - MARCH 2 (84-07): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 16 INSPECTOR-:10URS ON SITE IN THE AREAS OF EXTERNAL EXPOSURE CONTROLS, IhTERNAL EXPOSURE CONTROLS, AL ARA ACTIVITIES, POSTING AND LABELING, LICENSEE ACTION ON NUREG-0737 ITERS, AND LICENSEE ACTION ON INSPECTOR FOLLOWUP ITEMS. NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN THE AREAS INSPECTED.
PAGE 2-192
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report. Period MAR 1984              IN5PECTION            STATUS - (CONTINUED)                                              M          HORTH AHMA 1                                        M MMMMMMMMMMMMMMhMMMMMMMMMMMMMMMMMMNNM ENFORCEMENT
 
==SUMMARY==
 
  . CONTRARY TO THE REQUIREMENTS OF 10CFR50.47(B)(15), AS EVIDENCED BY INTERVIEWS WITH SHIFT SUPERVISORS DURING THE INSPECTION, ADE9UATE TRAINING HAS NOT BEEN PROVIDED SHIFT SUPERVISORS FOR EPIP 1.05 " RESPONSE TO GENERAL EMERGENCY", RELATING TO PROTECTIVE ACTION RECOMMENDATIONS. CONTRARY TO THE REQUIREMENTS OF 10CFR50.47(B)(10), IN THE CASE WHERE PROMPT PROTECTIVE ACTION RECOMMENDATIONS ARE WARRANTED BY PLANT CONDITIONS AND SITE BOUNDARY DOSES ARE NOT PROJECTED OR OCCURRING, THE LICENSEE'S EMERGENCY PLAN AND ASSOCIATED IMPLEMENTING PROCEDURES DO NOT REQUIRE CONSIDERATION OF PROTECTIVE ACTION RECOMMENDATIDHS CONSISTENT WITH FEDERAL GUIDANCE.
(8402 4)
FAILURE.TO ISSUE CORRECT STATION IDENTIFICATI0H BADGE.
    .(8403 5)
OTHER ITEMS
    . SYSTEMS AND COMPONENT PROBLEMS:
    ^
NOME.
FACILITY ITEMS (PLANS AND PROCEDURES):
NONE.
MANAGERIAL ITEMS:
MONE.
    . PLANT. STATUS:
ROUTINE OPERATION.
    -LAST IE SI1E INSPECTION DATE: FEBRUARY 27 - MARCH 2,    1984 +
      ' INSPECTION REPORT No  50-338/84-07 +
PAGE 2-193
 
NNNNNNMMMMMNNNNNNNNNNMMMMMMNNNNNNMMM Esport Period RAR 1984                                                                                              REP 0RTS                FR0M    LICENSEE                                                        N                  HORTH ANNA 1                      N MMMMMMMMMMMMMMMMMMMMMMMMNNNNNNNNNNMM
                                ==================================================================================================================================
NUM8ER            DATE OF                                                            DATE OF    SUBJECT EVENT                                                            REPORT-
_ - - - - _ _          _ _ _ _ - - - - - _ _                        _.        == - - - - - - . - -
085/-          12/20/83                                                          01/11/84    CONTAIMMENT PRESSURE CHANNEL IV WAS OBSERVED TO BE DRIFTING AND CAUSING INTERMITTENT ALARMS.
93-L
                                        ~
THE CAUSE OF THE CHANNEL BEHAVIOR COULD HOT BE DETERMINED.
54-001/            01/09/84                                                          02/08/84    UNIT 1 WAS SHUTDOWN DUE TO HIGH RCS UNIDENTIFIED LEAKAGE, DUE TO SEVERAL DEFECTIVE TUBES AND LEAKING TUBE PLUGS.
84-002/            01/18/84                                                          02/10/84    AN IMADVERTENT SINGLE TRAIN EMERGENCY CORE COOLING SYSTEM (ECCS) ACTUATIGH OCCURRED DURING THE REMOVAL OF THE SOLID STATE PROTECTION SYSTEM (SSPS) OUTPUT FUSES.
84-003/'          02/08/84                                                          03/07/84  .A TURBINE TRIP-REACTOR TRIP OCCURRED DUE TO THE RECEIPT OF A RECEIPT OF A SPURIOUS ELECTRO HYDRAULIC. CONTROL (EHC) FLUID RESERVOIR LOW LEVEL TURBINE TRIP SIGNAL.
                                ==================================================================================================================================
4-e PAGE 2-194
( __ __ _ _ _ _ _ _ _ . _ _ _                            _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .                        _                        _ . _ _ _ _ _ _ _ _ _              , __ _ _                        _    _ _ _ _      _ _ _ _ _ . _
 
trl em.
e I
N kJ C
4 L
hf E
4
  .J M
M E
W
  .J h
m a
  .J 4
E O
M k
E W
k E
  >e kJ O
4 L
en M
E s
3
: 1. Deckets- 50-339                          0PERATING                        STATUS                        NNMMMMMMMMMMMMMMMMMMMMMMNNNMMMMMMMMM M                      NORTH ANNA 2                                          w
: 2. Reporting Period 8                  03/01/84          Outage + On-line Hrs: 744.0                        NNNNNNNMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 3. Utility Contact                    JOAN N. LEE (703) 894-5151 X2527                                      AVERAGE DAILY POWER LEVEL (MWe) PLOT 4.' Licensed Thermal Power (MWt)*                                                2775                                          NORTH RNNR 2
: 5. Hameplate Rating (Gross MWe):                                                  947 1500
: 6. Design Electrical Rating (Het MWe):                                            907                                                                                            907
                                                                                                                                -DESION ELEC. RRTING -
: 7. Maximum Dependable Capacity (Gross MWe)*                                      939                        ...... rWDC. DEPEN 3.            Cfr. -                            800 (100%3
: 8. Maximum Dependable Capacity (Het MWe):                                        890
  '9.      If Changes Occur Above Since Last Report, Give Reasons:
NONE
: 10. Power Level To Which Restricted, If Any (Het MWe):
11 Reasons for Restrictions, If Any8                                                                  10m3-NONE                                                                                                ........................................ -100 MONTH                  YEAR 2,184.0 CUMULATIVE 28,896.0
                                                                                                                                'r      -j                  !
3        y 12.. Report Period Mrs                                    744.0
: 13. Hours Reactor Critical                                719.8        2,085.5      21,732.4                                                                                                  _,,
2,243.5 i4. Rx Reserve Shtdun Mrs-                                        .0        3.5
: 15. Hrs Generator On-Line                                713.4        2,041.9      21,319.6 ll                                                                                          -so
: 16. Unit Reserve Shtdwn Mrs                                        .0          .0              .0        gas.
1,895,829            5.327,082    55,748,112
  .17. Gross Therm Ener (MWH) 1,743,196    18,479,563                                                                                                  - 40
: 18. Gross Elec Ener (MWH)                        619,216 587,866            1,653,767    17,505,849
: 19. Het Elec Ener (MWH)
: 20. Unit Service Factor                                          95.9      93.5            73.8                                                                                              -20 21 Unit Avail Factor                                            95.9      93.5            73.8
: 22. Unit Cap Factor (MDC Net)                                  88.8        85.1            68.1 23.' Unit Cap Factor'(DER Het)                                  87.1      83.5            66.8            0          '5          l'O  l'5                                2'O    2'5    Ob DAYS
: 24. Unit' Forced Outage Rate 1.3        5.6            14.3 25.' Forced Outage Hours                                          9.5      121.0      3,568.5 MRRCH 1984
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):
UNIT 2 REFUELING OUTAGE 08-17-84
: 27. If Currently Shutdown Estimated Startup Date                                      04/09/84                                                                                                      PAGE 2-196
 
d                            .  ..    .. ..          .    .
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
            -Report Period MAR 1984                      UMI1          SHUTD0WNS / REDUCTIONS                          M          HORTH ANNA 2            M MMMAMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
                    ~
No.        Date    lida Hours Reason Method LER Number System Component                  Cause & Corrective Action to Prevent Recurrence 84-14    03/04/84    5    0.0    8      5                                      RAMPED DOWN FOR TURBINE VALVE FREEDOM TEST.      UNIT RETURNED TO FULL POWER.
            '84-15 .03/04/84        S    0.0    B      5                                      RAMPED DOWN FOR LOAD FOLLOWING. UNIT RETURNED TO FULL POWER.
84-16    03/09/84    .5    0.0    B      5                                      RAMPED DOWN FOR TURBINE VALVE FREEDOM TEST.      UNIT RETURNED TO FULL POWER.
84-17. 03/13/84        F    9.5    H      3                                      UNIT 2 REACTOR TRIP, DUE TO LOW STEAM GENERATOR LEVEL. STEAM GENERATOR LEVEL DROPPED WHEN "A" MAIN FEED REGULATOR VALVE FAILED SHUT DUE TO A VOLTAGE SPIKE WHICH OCCURRED WHEN A PROCESS RACK POWER SUPPLY WAS REPLACED.
84-17A'03/13/84        F    0.0    H      5                                      REPAIRS WERE MADE. UNIT RETURNED TO FULL POWER, 84-18 03/24/84.' S          0.0    8        5                                      RAMPED DOWN FOR TURBINE VALVE FREEDOM TEST.      UNIT RETURNED TO FULL POWER.
84-19 03/31/84 ~ $        21.1    8        1                                      RAMPED DOWN TO BEGIN SCEEDULED SPRING MAINTENANCE OUTAGE. ENDED THIS MONTH WITH UNIT 2 IN MODE 5.
l-EMMMMMMMMMM          NORTH ANNA 2 OPERAVED ROUTIMELY IN MARCH AND BEGAN SPRING MAINTENANCE ON THE 31ST.
0
 
==SUMMARY==
M cMMMMMMMMMM Twee          Reason                            Method            System 8 Comoonent
,-          F-Forced A-Equip' Failure F-Admin                    1-Manual      Exhibit F 8 H l:          .S-Sched      B-Maint or Test. G-Oper Error 2-Manual Scram Instructions for l                          C-Refueling        H-Other        3-Auto Scram      Preparation of j.,'                      -D-Regulatory Restriction          4-Continued      Data Entry She-t E-Operator Training              5-Reduced Load Licensee Event deport l-                            4 License Examination          9-Other            (LER) File (HUREG-0161) l;                                                                                                                                                    PAGE 2-197
 
m .-
N n
                                                                                                                                                        ~
E nummmmmmmmmmmmmmmm m mmmmmmmmmmm m m m um                                              1-O'              NORTM ANNA 2              m DATA. sL                                          Report Period MAR 1984 tammmmmmmmmmmmmmmmmmmmmmmmmmmmmmunum                      FACILITY FACILITY DESCRIPTION                                                  yJILITY 8 CONTRACTOR INFORMATI0H LOCATION                                                            UTILITY LICENSEE................. VIRGINIA ELECTRIC & POWER STATE.................... VIRGINIA                              '
      -                CSUNTY...................LOUISA                                    CORPORATE ADDRESS........P.O.      BOX 26666 RICHMOND,  VIRGINIA 23261
                              ~
: DIST AND DIRECTION FROM                                          COHTRACTOR MEAREST POPULATION CTR.. 40 M1 NW OF                                ARCHITECT / ENGINEER....... STONE A WEBSTER RICHMOND, VA HUC STEAM SYS SUPPLIER... WESTINGHOUSE TYPE OF REACTOR............PWR BATE INITIAL CRITICALITY... JUNE 12, 1980                              CONSTRUCTOR.............. STONE 8 WEBSTER
                .DATE ELEC ENER IST GENER... AUGUST 25, 1980                              TURBINE SUPPLIER......... WESTINGHOUSE
[    f 3ULATORY INFORMATION h^        -s BATE COMMERCIAL OPERATE.... DECEMBER 14, 1980
: c. 3; dC            CONDENSER COOLING METHOD..;0NCE THRU                                  (E REGION RESPONSIBLE......II CONDEMSER COOLING WATER.... LAKE ANNA                                (E RESIDENT INSPECTOR......D. JOHHSON L.                ELECTRIC RELIABILITY                                                  ICENSING PROJ M3 NAGER.....L. ENGLE DOCKET HUMBER........... 50-339 s
h                      COUNCIL..............'... 50UTHEASTERN ELECTRIC RELIABILITY COUNCIL              LICENSE & DATE ISSUANCE....HPF-7, AUGUST 21, 1980 PUBLIC DOCUMENT ROOM....... ALDERMAN LIBRARY / MANUSCRIPTS DEPT.
UNIV. OF VIRGINIA / CHARLOTTESVILLE VA 22901 8 LOUISA COUNTY COURTHOUSE, LOUISA, VA 23093 INSPECTION                  STATUS IMSPECTIDst SUfflARY
                  + INSPECTION JANUARY 6 - FEBRUARY 5 (84-01): THIS ROUTINE INSPECTION BY THE RESIDENT INSPECTORS                  INVOLVED I S PREVIOUSLY        114 INSPECTOR-HOURS IDENTIFIED                ON ITEMS, SAFETY
                  . SITE IN THE AREAS OF SURVEILLANCE AND MAINTENANCE ACTIVITIES, PREVIOUS INSPECTION FIND NG ,OF THE SEVEN AREAS INSPECTED, HQ VIOLATIONS OR DEVI SYSTEM WALKDCWMS, LICENSEE EVENT REPORTS, TMI ACTION PLAN ITEMS.
                                    ~~
IDENTIFIED.
INSPECTION JANUARY 25-27 (84-02): THIS SPECIAL, UNANNOUNCED INSPECTION INVOLVED 10 INSPECTOR-HOURS OH SITE IN THE AREAS OF
                  . EMERGENCY PREPAREDNESS. ' 0F THE AREAS INSPECTED, TWO VIOLATIONS WERE FOUND IN TWO AREAS (INADEQUATE PROCEDURES FDP PROTECTIVE s''
                  ' ACTION DECISION MAKING AND FAILURE TO PROPERLY TRAIN EMERGENCY PERSOHHEL IN PROTECTIVE ACTION RECOMMENDATION DE                                .
THESE WERE DISCUSSED IN PARAGRAPH 5.
                  -INSPECTION FEBRUARY 27 - MARCH 2 (84-05):        THIS ROUTINE. . UNANNOUNCED INSPECTION INVOLVED 3S INSPECTOR-HOURS OH SITE IN THE AREAS OF EMERGENCY PREPAREDNESS. OF THE AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
THIS ROUTINE, UH'AHNOUNCED INSPECTION INVOLVED 16' INSPECTOR-HOURS ON SITE IN THE AREAS INSPECTION' FEBRUARY 27 - MARCH 2 (84-07)
                  '0F EXTERNAL EXPOSURE CONTROLS, INTERFAL EXPOSURE CONTROLS, ALARA ACTIVITIES, POSTING AND LABELING, LICENSEE ACTION CH HUREG-0737
                ~ ITEMS, AND LICENSEE ACTION ON INSP(CTOR FOLLOWUP ITEMS. NO VIOLATIONS OR DEVIATIDHS WERE IDENTIFIED IN THE AREAS INSPECTED.
PAGE 2-198 i,
m
 
    . , f : : . . J.
                              ?      ,.      .
                                                          ' ~~
                                                                ..  .w    . 's .        >., p    a,              21~ ,              w^ ~ . . ' '  + -    .....;                          ^;        -        - * '
[, .        3 . .[i .          <-
                                      '.-"[ .. [.'.      J .g        .._  g22.,,44h,.5 ."; . , -[; _ - ; _. . 'hd
                                                                                                                              .-  4      .= .-  ,. .
* f-.    ...'    = . . iA 2D : ' . . . d  -
  ;      . j/ '                                                                  ,
                                                                                                                                                    ^
                                                                                                                                                        ,                  u        -
E                      ,
li                                                                                                                                                                            -
I MNNNNNNNMMMNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                              IHSPECTIOM                      STATUS      -
(COMTINUED)            N              HORTH ANNA 2                              M NNNNNNNNNMMNNMMNNNNNNNNNMMMNNNNNNNNN EHFORCEMENT
 
==SUMMARY==
 
                  .MONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
                .HOME.
FACILITY ITEMS (PLANS AND PROCEDURES)*                                                                                                                                                              I l
NONE.                                                                                                                                                                                              l MANAGERIAL ITEMS
                ' HONE.
j                  PLANT STATUS:
ROUTIME OPERATION.
LAST IE SITE INSPECTIDH DATE8 FEBRUARY 27 - MARCH 2,                          1984 +
INSPECTIDH REPORT HO              50-339/84-07 +
R E F' O R T S        FR0M    LICENSEE
                  ==================================================================================================================================
HUMBER      DATE OF          DATE OF            SUBJECT EVENT              REPORT
                      ^83-072/      12/05/83        01/04/84          THE LOW HEAD SAFETY INJECTION PUMP CONTAIHMENT SUMP SUCTION VALVE FAILED TO FULLY OPEN DURING 03-L                                            TESTING. AN ELECTRICAL CORD HAD BEEN HUNG ON AN UHUSED SUPPORT ATTACHED TO THE VALVE.
83-074/- '12/29/83            01/18/84          THE OUTER PERSONNEL HATCH DOOR WAS DETERMINED TO HAVE AN UNACCEPTABLE LEAK RATE.                                        THE OUTER 03-L                                            HATCH SEAL WAS TESTED FOLLOWING MULTIPLE CONTAINMENT ENTRIES.
83-080/      12/21/83        01/18/84          INDIVIDUAL ROD POSITION INDICATOR (IRPI) FOR ROD C-09 DEVIATED FROM THE GROUP DEMAND POSITIDH BY 03-L                                            GREATER THAH 12 STEPS. THE CAUSE OF THE INDICATOR DISAGREEMENT WAS INSTRUMENT DRIFT.
                  ==================================================================================================================================
I P
PAGE 2-199 c
 
L.
h STATUS                          NNNNNNMMMMMMNNNMMMMMMMMMNNNNNNNNNNNN
                ~1.cDeckets      5e-269          0 P E R A T I N.G                                        N                    OCONEE 1                  M Outage + On-Ifne Hrst 744.0                        NNNNNMMNNNNNNNNNNNNMNNMNNMMMMMMMNNMM
                .2.' Reporting.Perled* -03/01/84                  .
:3.. Utility Contacts J. A. REAVIS (704)-373-7567 AVERAGE DAILY POWER LEVEL (PfWe) PLOT
            - 4. Licensed Thermal Power (MWt):                              2568                                          OCONEE 1 S.1 Nameplate Rating (Gross Ptie):                  1938 X 0.9 = 934 1500
: 6. Design Electrical. Rating (Het MWe): -                    887                                    DESIGN ELEC. ftrtTING -    887 899                                .. FmX. DEP D C. Cfr. -        800 (100%)
            '.7.' Maximum. Dependable Capacity;(Gross MWe):                                              .
T8. Maximum Dependable Capacity (Het MWe):                      860
                ~9. If Changes occur.Above Since Last Report, G Wa Reasons:
                    ' a;' e" '
: 10. Power Level To'idhich Restricted, If Any (Het MWe)*
          - 11. Reasons for Restrictions, If Anyt                                                  1000-880 8888 EE DEEEEED 88eER OPftf88. Ome!TIONS NaNE 100
                                .                    e10 NTH 744.0 YEAR 2.184.0 CUMULATIVE 93.889.0
                                                                                                                          --- - = --- -- Y ------------
: 12. Report Period Mrs
          '13. Hours Reactor Critical'                  725.2-    2.165.2    66.706.2
: 14. Rx Reserwe Shtdun Hes                    .0          .0          .0        .
115. Mrs Generator On-Line-                  721.1      2.161.1    63.550.9        h                                                              -so
                                                                          .0          .0            300
: j.          .16. Unit" Reserve Shtdun Mrs                    .0 e      ..
17.4 Gross There Ener (Pent)        1.829.551    5.526.408 151.824.440 1.940.070    52.808.300                                                                      _g
: 18. Gross Elec'Ener (PteH)            642.590 19.-Het Elec Ener (PudH)              614.561    1.856.976    50.022.527 99.0        '67.7
:20. Unit Service Factor                        96.9                                                                                                . . ao 99.0          67.7
: 21. Unit Avall' Factor                    96.9
: 22. Unit-Cap Factor (MDC Net)              96.0        98.9          61.8N O                                                          o
            '.23.. Un"t. Cap Factor (DER Het) 93.1        95.9          60.1N              o        's'    1'o '    t's  ~aIO    ~2!5    3'o DfW S 24.~ Unit Forced Outage Rate                3.1          1.0        17.0
          ' 25.' Forced Outage Hours                      22.9        22.9      12.370.5
;r MARCH 1984
: 26. ,Shutdesens Sched Over. Hext 6 Months (Type,Date. Duration):
mwE N/A        N Item calculated with a Weighted Average                                  PAGE 2-200 b              27. If Currently Shutdown Estimated Startup Date          s
- - =                                  _ _ _ .
 
W:
2
  .'; l' 9 ,
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984-                    UNIT        SHUTD0WN5 / REDUCTION 5                        N            OCONEE I              N NNNNNNNNNNNNNNNNNNNNNNNMMNNNNNNNNNNN No.        Date    1EEE Hours kaason tb shod tER Number System Component              Cause 4 Corrective Action to Prevent Recurrence 1          03/02/84    F    22.9    D    1                  CE      ZZZZZZ    "A" CORE FLOOD TANK BOROM CONC. DUT OF SPEC.
4-P        03/07/84    F    0.0    "A    5                  HJ      PIPEXX    REPAIR "E" BLEED STEAM EXTRACTION LINE.
5-P.      ~03/15/84'  F    0.0    A    5                  AA      VALVEX    CONDENSATE COOLERS BYPASS VALVE FAILED CLOSED.
6-P        03/20/84    F    0.0. A    5                  RB      CRDRVE    RUNBACK DUE TO LOSS OF GROUP TWO CONTROL R0D OUT INDICATION.
l NNNNN'NNNNN N            OCONEE 1 EXPERIENCED 1 SHUTDOWN IN MARCH; CORE FLOOD TANK BORON CONCENTRATION OUT OF
: N
 
==SUMMARY==
N          . SPECIFICATION.
NNNNNNNNNNN Twee          Reason'                          . Method          Svstem a component
          - F-Forced . A-Equip Failure F-Admin                1-Manual        Exhibit F 8 H
          .5-Sched 'B-Maint or. Test _G-Oper Error *2-Manual Scram Instructions for C-Refueling        H-Other-      3-Auto Scram    Preparation of D-Regulatory Restriction          4-Continued    Data Entry Sheet E-Operator Training              5-Reduced Load Licensee Event Report
                              -4 License Examination        9-Other          (LER) File (NUREG-0161)
PAGE 2-201 I
 
'uuuuuuuuuuuuuuuuuuuuuuuuuuuuuununum m
u              OCONEE'1                          m unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum                        FACILITY        DATA                                                              Report Period MAR 1984 FACILITY DESCRIPTION                                                  UTILITY & CONTRACTOR INFORMATI0H LOCATION                                                            UTILITY STATE................... 50UTH CAROLINA                              LICENSEE................. DUKE POWER COUNTY.................. 0COMEE                                      CORPORA 1E ADDRESS....... 422 SOUTH CHURCH STREET CHARLOTTE, NORTH CAROLINA 28242 DIST AMD DIRECTIDH FROM NEAREST POPULATION CTR.. 30 MI W OF                              CONTRACTOR GREENVILLE, SC                  ARCHITECT / ENGINEER....... DUKE & BECHTEL TYPE OF REACTOR. . . . . . . . . . . .PWR                              NGC STEAM SYS SUPPLIER...BABC0CK & WILCOX DATE IMITIAL CRITICALITY... APRIL 19 1973                              CONSTRUCTOR.............. DUKE POWER DATE ELEC ENER 1ST GENER...MAY 6,              1973                    TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMCRCIAL OPERATE.... JULY 15, 1973                          REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0NCE THRU                                IE REGIDH RESPONSIBLE......II CONDENSER COOLING MATER.... LAKE KE0 WEE                            IE RESIDENT INSPECTOR. . . . . .J. BRYANT ELECTRIC RELIABILITY                                                LICENSING PROJ MANAGER.....H. HICOLARAS COUNCIL................. 50UTHEASTERN ELECTRIC                      DOCKET NUMBER........... 50-269 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-38, FEBRUARY 6, 1973 PUBLIC DOCUMENT R00M...... 0COMEE COUNTY LIBRARY S01 W. SOUTH BROAD ST.
WALHALLA, SOUTH CAROLINA 29691 INSPECTION            5TATUS INSPECTION
 
==SUMMARY==
 
  + INSPECTION JANUARY 11 - FEBRUARY 10 (84-03): THIS ROUTIME, UNANNOUNCED INSPECTIDH INVOLVED 94 RESIDENT INSPECTOR-HOURS ON SITE IN.THE AREAS OF OPERATIONS, MAINTENANCE, SURVEILLANCE, ORGANIZATION AND CALIBRATION. OF THE FIVE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION MARCH 5 (84-05): THIS SPECIAL, ANNOUNCED INSPECTION INVOLVED 3 INSPECTOR-HOURS ON SITE IN THE AREAS OF HEATING, VENTILATION AND AIR CONDITIONING (HVAC). NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 11 - MARCH 10 (84-06): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 77 INSPECTOR-HOURS ON SITE IN THE AREAS OF OPERATIONS, SURVEILLANCE, MAINTENANCE, UNUSUAL EVENT FOLLOWUP AND LICENSEE ACTION OH PREVIOUS INSPECTION FINDINGS. OF THE FIVE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
NOME-OTHER ITEMS PAGE 2-202
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR 1984,                        IN5PECTION              5 T A T.D S - (CONTINUED)              M            OCONEE 1                                                          M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM OTHER ITEMS                                                  -
      . SYSTEMS AND COMPONENT PROBLEMS NOME.
FACILITY ITEMS (PLANS'AND PROCEDURES):
      - NOME.'
                    ~
I MANAGERIAL' ITEMS NOME.
PLANT' STATUS:-
POWER. OPERATION.'
LAST IE SITE INSPECTION DATE: FEBRUARY 11 - MARCH 10, 1984 +
        -INSPECTION REPORT"N0s- 50-269/84-06.+
REP 0RTS      FPOM        LICEN5EE
        ==================================================================================================================================
          ' NUMBER'    DATE OF        DATE OF          SUBJECT EVENT-        REPORT
                                    ..          ___.                ____..                          _ __=_              _____ ...
\
83-020/    12/09/83        12/20/84        UNIT l'S CONTROL ROD DRIVE AC BREAKER NO.        10 EXPERIENCED A DELAYED TRIP. THE APPARENT CAUSE OF SI-T                                        THIS EVENT WAS COMPONENT FAILURE. THE BREAKER TRIP SHAFT BEARING ASSEMBLY WAS STICKING.
          .83-921/    12/25/83- 01/24/84              THE BWST LEVEL CHANNEL 1 FAILED LOW WHEN MOISTURE IN THE INSTRUMENT AIR LINES FROZE.
03-L
        ================================================================= ================================================================
PAGE 2-203
: 1. Deckett  50-270          .0PERATIMG              STATUS                                    NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN N                      OCONEE 2                    N
: 2. Reporting Periode e3/01/84      Outage + On-line Hrst        744.0                          NNNMMMMNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
: 3. Utility Contacts    J. ..
A  RE4WIS (704) 373-7567                                              AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                          2568 OCONEE 2
: 5. Nameplate Rating (Gross MWe) -            1838 X e.9 = 934
: 6. Design Electrical Rating (Net MWe):                    887 DESIGN ELEC. RRTINS - 887
  -7. Maximum Dependable Capacity (Gross MWe):                899                                  ,,,,,,npDC.          DEPDC. Cfr. - 800 (100%)
: 8. Maximum Dependable' Capacity (Not MWe):                860                                                                                                                        ,
: 9. If Changes Occur _Above Since Last Report, Give Reasons
* NOME
: 10. Power Level.To Which Restricted, If Any (Met MWe):
  ' 11. Reasons for Restrictions, If Any                                                    1000-NOME                                                                                                                        _
MONTH        YEAR        CUMULATIVE                          = -' - -      ---            - -- '- ------------
                                                                                                                                      '/                    -100 h 12.', Report Period Mrs            744.0    2. 18 4.0      83.809.0
: 13. Hours Reactor Critical          744.0    2.184.0        59.497.8
                                                                                                                                                            '80
: 14. Rx Reserve Shtdun Mrs              .e          .e              .0          h
: 15. Hrs Generator On-Line          744.s    2.184.0        58.344.5            gg
                                                        .e                                                                                                  -so
:16. Unit Reserve Shtdun Mrs            .0                            .0                  eso.
l  17. Gross There Ener (MWH)      1.914.657  5.614'143
                                                    .        138.184.809 14.. Gross Elec Ener (MWH)        659.23e  1.938.730        47.043.586                                                                                  _,,
19.'Not Elec Ener (MWH)          632.817  1.860.482        44.672.051 20.' Unit Service Factor            100.0      -100.0            69.6
                                                                                                                                                            - 3D
  =21. Unit Avail Factor              100.8        100.0            69.6 22.-Unit Cap Factor (MDC Net)        98.9        99.1            61. 8 N 0    ~
: 23. Unit Cap Factor (DER Net)        95.9        96.0            60.2M                      0          ~5'      ' 1'O '  ' 1'5 '    ab'  ' 2'5 ' 3h 00YS 24.. Unit. Forced Outage Rate          .e          .0            16.0 25.~ Forced Outage Hours                .6          .0        10.256.1
  '26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
MARCH 1984 NaNE
: 27. If Currently Shutdown Estimated Startup Date s            N/A          N Item calculated with a Weighted Average                                                PAGE 2-204
 
NNMMMMMMMMMMNNNNNNNNNNNNNNNNNNNNNNNN
  -Report Period MAR 1984'                                                            UNIT        SNUTD0WHS / REDUCTIONS                      N            OCONEE 2                                                N MMMMNNNNNNNNNMMMMMMNNNNMMMMMNNNNNNNN No.                          Date                      liii Nours Reason Met 5od LER Number 8vstem domeonent                  Cause 8 Corrective Action to Prevent Recurrence 4-P                  03/16/84                                  S      8.8    5    5                  CC    VALVEX    TURBINE AND CONTROL VALVE MOVEMENT TESTS.
NNNMMNNNNNN .                                            OCONEE 2 OPERATED ROUTINELY IN MARCH WITH NO SHUTDOWHS REPORTED.
  .N
 
==SUMMARY==
N, MNNNMMNNNNN Twee                            Reason                                                Method            System 8 Component F-Forced A-Equip Failure 'F-Admin                                                      1-Manual        Exhibit F 8 H S-Sched ~:B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling                                N-Other    3-Auto Scram    Preparation of D-Regulatory Restriction                              4-Continued      Data Entry Sheet
                                  'E-Operater Training                                      5-Reduced Load Licensee Event Report 4 License Examination                      9-Other          (LER) File (NUREG-0161)
PAGE 2-205
 
p-y s-        muuammusumununummununununummuuuuuuum u                                            OCONEE 2          N FACILITY                        DATA                                            Report Period MAR 1984 nummmmmmmununumummmmununununumMMMuMM FACILITY DESCMIPTION                                                                          UTILITY 8 CONTRACTOR INFORMATION
(              LOCATION                                                                                  UTILITY STATE................... 50UTH CAROLINA                                                          LICENSEE................. DUKE POWER COUNTY.................. 0COMEE                                                                  CORPORATE ADDRESS....... 422 SOUTH      CHURCH STREET CHARLOTTE, NORTH CAROLINA 28242 l                  DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 30 MI W OF                                                    CONTRACTOR GREENVILLE, SC                                  ARCHITECT / ENGINEER....... DUKE & BECHTEL
              -TYPE OF REACTOR............PWR                                                                        HUC STEAM SYS SUPPLIER... BABCOCK 8 WILCOX DATE IMITIAL CRITICALITY... NOVEMBER 11, 1973                                                        CONSTRUCTOR.............. DUKE POWER DATE ELEC.ENER IST GENER... DECEMBER 5, 1973                                                        TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE. . . . SEPT EMBER 9,                      1974                  REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0HCE THRU                                                      IE REGICH RESPONSIBLE......II CONDENSER COOLING WATER.... LAKE KE0 WEE                                                  IE RESIDENT INSPECTOR......J. BRYANT ELECTRIC RELIABILITY-                                                                    LICENSING PROJ MANAGER.....H. HICOLARAS DOCKET NUMBER........... 50-270 COUNCIL................. 50UTHEASTERN ELECTRIC RELIABILITY COUNCIL                  LICENSE 8 DATE ISSUANCE....DPR-47, OCTOBER 6, 1973 PUBLIC DOCUMENT R00M...... 0C0 HEE COUNTY LIBRARY 501 W. SOUTH BROAD ST.
WALHALLA, SOUTH CAROLINA 29691 IMSPECTIOH                            STATUS INSPECTION
 
==SUMMARY==
 
                  + INSPECTION JANUARY 11 - FEBRUARY 10 (84-03): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVE' 91 RESIDENT INSPECTOR-HOURS ON SITE IN THE AREAS OF OPERATIONS, MAINTENANCE, SURVEILLANCE, ORGANIZATION AND CALIBRATION. OF THE Fivd AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIDHS WERE IDENTIFIED.
              .IMSPECTION MARCH 5 (84-05): THIS SPECIAL, AHHOUNCED INSPECTIDH INVOLVED 2 INSPECTOR-HOURS ON SITE IN THE AREAS OF HEATIHG, VENTILATION AND AIR CONDITIONING (HVAC). H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
                ' INSPECTION FEBRUARY 11 - MARCH 10 (84-06): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 77 INSPECTOR-HOURS ON SITE IN THE AREAS
              '0F OPERATIONS, SURVEILLANCE, MAINTENANCE, UNUSUAL EVENT FOLLOWUP AND LICENSEE ACTIDH OH PREVIOUS INSPECTION FINDINGS. OF THE FIVE
              . AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
: NOME OTHER ITEMS PAGE 2-206 I
 
unnununuwwwununuwamunuwauwunununuuun Report Period MAR 1984              IN5PECTION            $TATUS - (CONTINUED)              W            OCOMEE 2                        m NNMMMMMMMMMMMMMMMNNMMMMMMMMMMMMMMMMM OTNER ITEMS -
        " SYSTEMS AND COMPONENT PROBLEMS:
NOME.
FACILITY ITEMS (PLANS AND PROCEDURES):
NOME
        ' MANAGERIAL ITEMS:
NOME.
PLANT STATUS 8:
l' t          POWER OPERATIONS.
i I'        LAST IE SITE INSPECTION DATE: FEBRUARY 11 - MARCH 10, 1984 +
INSPECTION REPORT NO: 270/84-06 +
REP 0R1S        FR0M .LICEN5EE
        .==================================================================================================================================
l MUMBER    DATE OF    DATE OF  SUBJECT EVENT      REPORT NOME.
          ==================================================================================================================================
PAGE 2-207
 
i 50-287                                          0PERATIHG              STATUS                          NNNNNNNNNNNNNNNNNNNNNMMNNNNNNNNNNNNN
: i.      1. Deckets                                                                                                              N                    OCONEE 3                    N
: 2. Reporting Period                                    03/01/84        Outage + On-line Hrs:      744.0                NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
: 3. Utility Contacts                          J.              A. REAVIS (704) 373-7567                                    AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                                          2568
: 5. Nameplate Rating (Gross MWe):                                                  1938 X 0.9 : 934
[
: 6. Design' Electrical Rating (Het NWe):                                                      887 DESIGN ELEC. RRTING = 887
: 7. Maximum Dependable Capacity (Gross MWe):                                                  899                          .~.. W. M.                    Cru'. - 880 (1 2 1 S. Maximum Dependable Capacity (Het MWe):                                                    860 9..If Changes Occur Above Since Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted, If Any (Het MWe):
11 Reasons for. Restrictions, If Anys                                                                              gago.
MONE YEAR      CUMULATIVE                          ..................................          30o o
: 12. Report Period Mrs' M0 NTH 744.0    2.184 J        81.456.0                                                                        g          _
: 13. Hours Reac+or Critical                                              180.7    1.619.6        58.329.5
                                                                                                                                                                                    -80
: 14. Rx Reserve Shtdun Mrs                                                  .0          .0            .0        l
    ~
: 15. Mrs. Generator 0*-Line                                              178.5    't.615.5        57.198.8        g
                                                                                                                                                                                    -00
: 16. Unit Reserve Shtdun Hrs
                                                                                    .0          .0            .0            500
: 17. Gross Therm Ener (194H)                                          377.668  4.048.036 139.540.599 l
IS~. Gross Elec Ener (MWH)                                          130.180 't.397.550      48.212.144                                                                    -10 19.'Het Elec Ener (fedH)                                            121.349  1.337.195      45.904.315
: 20. Unit Service Factor                                                  24.0        74.0            70.2
: 21. Unit Avail Factor                                                    24.0        74.0            70.2
: 22. Unit Cap Factor (MDC Net)                                            19.0        71.2            65.3M 0
o'
                                                                                                                                      - ~
: 23. Unit Cap Factor (DER Het)                                            18.4        69.0            63.6M                        5        t'0      l's~    3IO~  3Is  $
                                                                                                .2          14.8                                          OfES
: 24. Unit Forced Outage Rate                                                .0
: 25. Forced Outage Hours                                                    .0        3.0        10.145.0 "26. Shutdowns Sched'Over Hext 6 Months (Type,Date, Duration):                                                                                MARCH 1984 NOME
: 27. If Currently Shutdown Estimated Startup Date:                                                05/18/84  M Item calculated with a Weighted Averaga                            PAGE 2-208 1
 
l i
NMMMNNNNNNNNNNNNNMMMMMNNNNNNNNNNNNNN Report Period MAR 1984                          UNIT          SHUTS 0WHS / REDUCTIONS                                                  N                        OCONEE 3                            N NNNNMMNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Mo.      Date    lY23 Hours Reason Method LER Number System Comoonent                                          Cause & Corrective Action to Prevent Recurrence 2-P        03/05/84    5    0.0    H          5                      RC          ZZZZZZ        ECONOMIC DISPATCH.
2          03/08/84    5 565.5      .C          1                      RC          FUELXX        CYCLE 7 REFUELING OUTAGE COMMENCES.
NNNNNNNNNNN          OCOMEE 3 SHUT DCWH ON MARCH 8 FOR CYCLE 7 REFUELING.
N
 
==SUMMARY==
N NNNMMNNNNNM Tvoe          Reason                              Method                System 8 Component F-Forced A-Equip Failure F-Admin                    1-Manual              Exhibit F 8 H 5-Sched      B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling        H-Other          3-Auto Scram        Preparation of D-Regulatory Restriction            4-Continued          Data Entry Sheet E-Operator Training                  5-Reduced Load Licensee Event Report
                      & License Examination              9-Other              (LER) File (HUREG-0161)
PAGE 2-209
: .;                                                  .;. -j.},;.3J. [._., 2. :,e;
~~  -    ,' ..
_-  r                                ; ~ ,_ r .:        = :- ' ' '' . _ . -          , a. 3. . .. '
                                                                                                                                                                  's. ..f j ~~, ," ,:g..., ;. gs .-v ;-} .,_ ''Y.;q
* j *; l-
                          " [ ;g' _ ;; :, , , ' ; '                                          ,.
                                                                                                                                                                                            . .. ,            . . , ,. 3,.,_. ,,
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum D            OCONEE 3                  m tuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum                FACILITY          DATA                                              Rsport Period MAR 1984 FACILITY DESCRIPTION                                        UTILITY 8 CONTRACTOR INFORMATION LOCATIDH                                                      UTILITY STATE.................... SOUTH CAROLINA                      LICENSEE................. DUKE POWER COUNTY.................. 0COMEE                              CORPORATE ADDRESS....... 422 SOUTH CHURCH STREET CHARLOTTE, NORTH CAROLINA 28242 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 30 MI W 0F                        CONTRACTOR GREENVILLE, SC                    ARCHITECT / ENGINEER....... DUKE a BECHTEL TYPE OF REACTOR............PWR                                  HUC STEAM SYS SUPPLIER... BABCOCK 8 WILCOX DATE INITI AL CRITICALITY. . . SEPTEMBER 5,  1974              CONSTRUCTOR.............. DUKE POWER DATE ELEC ENER 1ST GENER... SEPTEMBER 18, 1974                  TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER 16, 1974              REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                          IE REGION RESPONSIBLE......II CONDENSER COOLING WATER.... LAKE KE0 WEE                      IE RESIDENT INSPECTOR......J. BRYANT ELECTRIC RELIABILITY                                          LICENSING PROJ MANAGER.....H. HICOLARAS COUNCIL................. 50UTHEASTERN ELECTRIC              DOCKET NUMBER...........      50-287 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....DPR-55, JULY 19, 1974 PUBLIC DOCUMENT ROOM...... 0CONEE COUNTY LIBRARY 501 W. SOUTH BROAD ST.
WALHALLA, SOUTH CAROLINA 29691 INSPECTION            5TATUS INSPICIION
 
==SUMMARY==
 
  + INSPECTION JANUARY 11 - FEBRUARY 10 (84-03): THIS ROUTIME, UNANNOUNCED INSPECTION INVOLVED 93 RESIDENT INSPECTOR-HOURS ON SITE IN THE AREAS OF OPERATIONS, MAINTENANCE, SURVEILLANCE, ORGANIZATION AND CALIBRATION. OF THE FIVE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION MARCH 5 (84-05): THIS SPECIAL, ANNOUNCED INSPECTION INVOLVED 2 INSPECTOR-HOURS ON SITE IN THE AREAS OF HEATING, VENTILATION AND AIR CONDITIONING (HVAC). N0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 11 - MARCH 10 (84-06): THIS ROUTIME, UNANNOUNCED INSPECTION INVOLVED 77 INSPECTOR-HOURS ON SITE IN THE AREAS OF OPERATIONS SURVEILLANCE, MAINTENANCE, UNUSUAL EVENT FOLLOWUP AND LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS. OF THE FIVE AREAS INSPECTED, M0 VIOLATIONS OR DEVIATISHS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
NOME.
OTHER ITEMS PAGE 2-210
 
MMMMMNNNNNNNNMMNNNNNNNNNNMWNNNNNNNNN OCONEE 3                      N Report Period MAR 1984              INSPECTION            5TATUS - (CONTINUED)              N MMMMNNMMMNNNNMMNNNNNNNNNNNNNNNNNNNNN STHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NOME.
      ' FACILITY ITEMS (PLANS AND PROCEDURES)*
NOME.
MANAGERIAL ITEM $s NOME.
PLANT STATUS
* 1 j      POWER OPERATION.
LAST IE SITE INSPECTION DATE: FEBRUARY 11 - MARCH 10, 1984 +
INSPECTION REPORT N08 50-287/84-06 +
REPORTS          FR0M    LICEN5EE l-      ==================================================================================================================================
i          NUMBER    DATE OF    DATE OF    SUSJECT t                      EVENT. REPORT                                                                    __ ____          __. ...-- _==----...
83-014/  -12/26/83  01/25/84  CHAMMEL 'B' RPS 'A' HOT LEG TEMPERATURE (TH) INSTRUMENT WAS DISCOVERED INDICATING AH 03-L                            UNACCEPTABLE AMOUNT LOWER THAH THE OTHER THREE CHANNELS.
44-001/    01/05/84  02/06/84    LOAD SHED SOURCE B FUSE BLOCK DISCOVERED HOT TO BE INSTALLED, FUSE BLOCK WAS MANUALLY PULLED BY
          --                              AN UNKNOWN PERSON.
        ==================================================================================================================================
PAGE 2-211
: 1. Docket      50-219          0PERATING              STATU$                                      wwwunuuuuuuuuuuummunuuuuuuuuuuuummun N              OYSTER CREEK 1                              m
: 2. Reporting Periods e3/et/84        Outage + On-11ne Hrs:          744.0                          MMMMMMMMMMMMMMNuMMMMMunuMMNuMMMMMMMM
: 3. Utility Contacts JOSEPH R. M0tesAR (689) 971-4699                                              AVERAGE DAILY POWER LEVEL (We) PLOT
: 4. Licensed Thermal Poeser (F1Wt):                        193e 722 X .9 = 65e OYSTER CREEK 1
: 5. Nameplate Rating (Gross fede):
I 1880
: 6. Design Electrical Rating (Met Pede):                    65e
                                                                                                                                            . MIM - 850
              .7. Plexious Dependable Capacity (Gross rede):            658
                                                                                                                  ---. FWIX. IEPDo). OFF. - 830 (100%)
: 8. Plaximus Dependable Capacity (Net MWe):                  628
: 9. If Changes occur Above Since Last Report, Give Reasons:
seesef -
: 10. Poeser Level To Which Restricted, If Any (Met Pale):
: 11. Reasons for Restrictions, If Any                                                        gg,, .
seesef 790 NTH      YEAR        CUMULATIVE 12._ Report Period Mrs                744.0    2.184.8        125,1 M                                                                                                  g
(
: 13. Hours Reacter Critical                  .e    696.e        85.319.9 14.- Rx Reserve Shtchen Mrs                .e        .e            458.2            g              NO ET POER OUTPUT THIS MONTH
                                                                                                                ' ~ ~ ~ ~ ~ = = = = ~ = ~ ~ ~ ~ ~ - - - - - - - - - - - - - -  -100
: 15. Mrs Generator On-Line                  .e        .e      82.693.8                g
: 14. Unit Reserve Shtchen Mrs                .e        .e                .o
                                                                                                                                                                                -80 17.. Gross There Ener (Pe#1)                e          e 136. 301.26 e SS. Gross Elec Ener (PEIH)                  e          e 46.e56.905                                                                                              -80
: 19. Net Elec Ener (PEIH)            -1.830      -3.821      44.281.862
                                                                                                                                                                                ~80
            '28. Unit Service Factor                    .e        .e              66.1
: 21. Unit Avail Factor                      .e        .o              66.1
                                                                                                                                                                                -20
: 22. Unit Cap Factor (PtDC Net)              .e        .8              57.fm
                                                                    .o              54.5                  0          .,.                                                      0
: 23. Unit Cap Factor (DER Net)              .8 0          5 to        15        30        35        30
: 24. Unit Forced Outage Rate                .e        .e              11.6                                                  DMS
: 25. Forced outage Hours                    .e        .0          8.916.8
: 26. Shutdeesns Sched Over Next 6 Plonths (Type.Date, Duration):                                                      MARCH 1984
                  " seeset
: 27. If Currently Shutdoesa Estimated Startup Dates              e6/11/84          M Ites calculated with a Weighted Average                                            PAGE 2-212
 
NNNNNNNNNNNNNMMWNMMMMMNNNNNNNNNNNNNM OYSTER CREEK 1          M Report Period MAR 1984                  UMIT        $HUTD0WM5 / REDUCTION 5                      N NNNNNNNNNNNNNNNMMMMMNNNNNNNNNNMMMMMN No. Date  liii Hours Reason Method LER Mumber System Comoonent              cause a Corrective Action to Prevent Recurrence 5 744.8-    C    4                ZZ    777777    1983 REFUELING AND MAINTENANCE OUTAGE CONTINUES.
31      02/11/83 NNNNNNNNNWW      OYSTER CREEK REMAINED SHUT DOWN FOR REFUELING AND MAINTENANCE FOR THE ENTIRE MONTH OF MARCH.
N $UMMARY N WNNNNNNNNNN Method        System 8 Comoonent Twee      Reason F-Forced A-Equip Failure F-Admin            f-Manual      Exhibit F 4 H S-Sched    B-Maint or Test-G-Oper    Error 2-Manual ScramPreparation Instructionsoffor C-Refueling        H-Other      3-Auto Scram  Data Entry Sheet D-Regulatory Restriction        4-Continued E-Operator Training              5-Reduced Load Licensee Event Report
              & License Examination        9-Other        (LER) File (NUREG-Of61)                                              PAGE 2-213
 
nummmmmm1mmmmmmmmmmmmmmmmmmmmmmmmmmm C              OYSTER CREEK 1          m unummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmma                    FACILITY            DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                              UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                          UTILITY
      . STATE....................NEW JERSEY                              LICENSEE.................GPU NUCLEAR CORPORATION COUNTY................... OCEAN                                    CORPORATE ADDRESS....... 100 INTERPACE PARKWAY PAR $1PPANY, NEW JERSEY 07054 DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 9 MI 5 0F                              CONTRACTOR TDMS RIVER, NJ                        ARCHITECT / ENGINEER.......BURHS 8 ROE TYPE OF REACTOR............BWR                                      HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY...MAY 3,      1969                          CONSTRUCTOR..............BURHS 8 ROE DATE ELEC ENER 1ST 8ENER... SEPTEMBER 23, 1969                        TURBINE SUPPLIER......... GENERA'L ELECTRIC DATE COMMERCIAL OPERATE.... DECEMBER      1, 1969                REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0MCE THRU                              IE REGIDH RESPONSIBLE......I CONDENSER COOLING WATER....BARNEGAT BAY                            IE RESIDENT INSPECTOR......C. COWGILL ELECTRIC RELIABILITY                                              LICENSING PROJ MANAGER.....J. LOMBARDO COUNCIL..................MID-ATLANTIC                              DOCKET NUMBER........... 50-219 AREA COUNCIL LICENSE 8 DATE ISSUANCE....DPR-16, AUGUST      1, 1969 PUBLIC DOCUMENT R00M...... 0CEAN COUNTY LIBRARY 101 WASHINGTON STREET TOMS RIVER, NEW JERSEY 08753 IN5PECTION                $TATUS INSPECTION SUFMARY NO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
CONTRARY TO TECHNICAL SPECIFICATION 3.12E, BETWEEN 7:30 A.M. OCTOBER 15, 1983 TO 11:00 A.M. OCTOBER 17, 1983, AND 1:30 A.M.                TO
  -8:00 A.M. OCTOBER 18, 1983, MO NOURLY FIRE WATCH PATROL WAS IN FORCE IN THE DIESEL GENERATOR BUILDING (A SAFETY RELATED FIRE
  . AREA), WITH THE FIRE DOOR BETWEEN DIESEL GENERATOR BAYS (A PENETRATION FIRE BARRIER) OPEN AND FOULED BY TEMPORARY ELECTRICAL CABLE. THIS IS A SEVERITY LEVEL IV VIOLATIDH (SUPPLEMENT I).
(8323 43 18 CFR PART 58, APPENDIX B CRITERION III STATES IN PART " MEASURES SHALL BE ESTABLISHED TO ASSURE THAT APPLICABLE REGULATORY REGUIREMENTS AND THE DESIGN BASIS ... ARE CORRECTLY TRANSLATED INTO SPECIFICATIONS, DRAWINGS, PROCEDURES AND INSTRUCTIONS." ANSI M45.2.11 - 1974 (ENDORSED IN THE LICENSEE'S QUALITY ASSURANCE PLAN) REQUIRES, " METHODS SHALL PROVIDE FOR RELATING THE FINAL DESIGN BACK TO THE SOURCE OF DESIGN ... THE DESIGN ACTIVITIVES SMALL BE DOCUMENTED IN SUFFICIENT DETAIL TO PERMIT VERIFICATION AND AUDITING..." CONTRARY TO THE ABOVE, AS OF OCTOBER 27, 1983, THE FOLLOWING DESIGN ACTIVITIES (AS IDENTIFIED IN NUREG-0737 AND ENDORSED BY THE LICENSEE'S LETTER DATED JUNE 30, 1983) WERE NOT DOCUMENTED:          1) TPd ACCURACY AND RESPONSE TIME SPECIFICATION OF THE CONTAINMENT PRESSURE MONITOR SNALL BE PROVIDED AND JUSTIFIED TO BE ADEQUATE FOR THEIR INTENDED FUNCTION. 2) THE ACCURACY PAGE 2-214
 
v MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M          OYSTER CREEK 1            M Report Period MAR 1984            INSPECTION                STATUS - (CONTINUED)              MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM ENFORCEMENT
 
==SUMMARY==
 
RE9UIREMENTS OF THE CONTAINMENT WATER LEVEL MONITOR SHALL BE PROVIDED AND JUSTIFIED TO BE ADEQUATE FOR THEIR
: 3) THE ACCURACY AND PLACEMENT OF THE CONTAIHMENT HYDROGEN MONITORS SHALL BE PROVIDED AND JUSTIFIED TO BE ADEQUAT INTENDED FUNCTION. THIS IS A SEVERITY LEVEL V VIOLATION (SUPPLEMENT II).
(8324 5)
IN PART, THAT A MONTHLY PROPORTIONAL COMPOSITE SAMPLE OF EACH LIQUID EFFLUENT TECHNICAL SPECIFICATION 4.6.B.2.C REQUIRES,CONTRARY  TO THE ABOVE, NO MONTHLY PROPORTIONAL COMPOSITE SAMPLE FROM LIQUID EFFLUENT DISCHARGE BATCH BE ANALYZED FOR TRITIUM.                                          ALSO, H0 TRITIUM ASSAY WAS CONDUCTED ON SAMPLES DISCHARGE BATCH 58-82, RELEASED ON AUGUST 22, 1982, WAS ANALYZEC FOR TRITIUM.
THIS IS A SEVERITY LEVEL V VIOLATION (SUPPLEMENT IV).
FROM THE TWO LIQUID EFFLUENT DISCHARGE BATCHES RELEASED DURING MARCH 1982.
(8325 5) 18 CFR 71.12(A) IS A GENERAL LICENSE ISSUED TO ANY LICENSEE OF THE COMMISSION TO TRANSPORT LICENSED MATERIAL IN A PACKAGE F WHICH A CERTIFICATE OF COMPLIANCE HAS BEEN ISSUED BY THE HRC. 10 CFR 71.12(C) REQUIRES A LICENSEE USING SUCH A PACKAGE TO HAVE A COPY.0F THE CERTIFICATE OF COMPLIANCE FOR THE PACKAGE, AND THE LICENSEE MUST COMPLY WITH THECNS    TERMS  AND CONDITIONS OF THEREQUIRES THE DRAIN LI 8-120, CERTIFICATE. CONDITION N0. 9 0F CERTIFICATE OF COMPLIANCE HO. 6601 FOR PACKAGE      MODEL MO.
CONTRARY TO THE ABOVE, PACKAGE MODEL HO. CNS 8-120,
    'AND ACCESS' PLUGS TO BE APPROPRIATELY PLUGGED AND SEALED PRIOR TO TRANSPORT.66D1 WAS USED1983                    AND THE DRAIN TO TRANSPORT    42LINE CURIES OF LICENSE CERTIFICATE OF COMPLIANCE NO.                                                                      THIS IS A SEVERITY LEVEL V AND ACCESS PLUGS WERE NOT VERIFIED TO BE APPROPRIATELY PLUGGED AND SEALED PRIOR TO TRANSPORT.
* VIOLATION (SUPPLEMENT V).
(8327 5)
OTHER ITEMS SYSTEMS-AND COMPONENTS:
      'NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES):
NO INPUT PROVIDED.
l    MANAGERIAL ITEMS:
NO INPUT PROVIDED.
PLANT STATUS:
NO INPUT PROVIDED.
I    LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED.
INSPECTION REPORT NO: NO INPUT PROVIDED.
PAGE 2-215
 
il            $              la H              l            te e
e it            $              le H            B              11 89 6
tt            I              si N
EEE          il            l              18 E      E      H            l E      E      la 01 II W
E      E      tt                          98 C
E      E      80 aC It A
i E      E      $1          j.            49 E      E      It          l              II E      E      10                          II E      E      al                          98 E      E      DI                          Bt E      E      H                          It E      E      il                          59 EeE          10          ll              It E      E      89                l        10 EME          H                          10                          '
E IAJ E      H                          04 X A&J K      H                          st E GC E        06                          41 EOE          68                          14 E      E      H                          ll XWX          H                i et E IAJ E      il                I        H E >= E        08                1        41 E th X        18                l        15 E )= E        58                i        64 IQR          88                          II E      E      18                          It E      E    80                          18 E      E    90                          30 E      E    tl                          10 E      E    H                            II E      E    H                I          et E      E      It              I          98 E      E    tl                I          48 E      E    98          4              Il XXX          01                          H 08                          H ll                          Of II                          tl II          .I              08 it          !I              18 18                          II H                            10 11                          II 88                          H tl                          80 H                          H ll                          19 W        BB                          II It                          It W        tt                          il It                          H tf3      it                          10 48                          10 E        la                          il 90                          It W        l?              I          H 14              I          II e      O        H                I il t              il                          te M        $8              l 45 to                          48 I
      .m&      H                          tl 10                          et H                          ll j                ll                          GB E        H                          ll et                          et Q        St          $              it es          i              et M        H            $              It 98          $              It b        E8          9              ft H            t              to 10              I          le H                I          80
      @        H                I          lt i
II                          60
      >=      H                            al 18                          Il M        ll              i 80 if          $              ll o        to                          et es                          se
      &        II  >=                      10 95  O                      89 W        H    W          I            la il  7      .
Il M        H    G      $                II H    3      $              le Il  M $                    98 et          I              se H          $              H le                          H le                          II 09    hk                    II f              St    OM                    H
            . 60      g                  te It    lee k                  et H    B- W 4                89 II    18 M 4                H H
08
                    & l  s 30 Il le          ly              H H                            le f        H            I
* H G        H    & $ S . Og
* et 85i W el e        is      E8            S ll 188484
                    >>s l ' DM H il                          19 M        li e        H    eWI                  'H E        N    4 l                    N Il          y                H 1e      H                            H H                      >H          $
ses      H                            H H                      E N
      &.      M N
M    M N
    -t      'H E:  H H          -l-              H
 
h
                                                                                                                                                                                                                                                                                                ==
N e
N W
O 4
b M.
                                                                                .a
                                                                            . S L
                                                                            -W ed a
ed 4
5 5
E M
5.:
b M
E
                                          ~
                                                                              +
                                                                                                                                                                                                                                                                            .a N
s 9
a w                                                                            9 4
                                                                                                                                    =
r                                                                                                                                                                                                                              .T Y                t        L                                      'n                                                                                                                                                                                                                                    .s d { -' '
                                                      's'$    __
                                                                                    .                                                                                                                                                                                                                                    ,h N
                                                                                                                                                                                                                                                                                                                        ,t._t,..
iQ 4                                                                                                                                                                              2 d.[                                                                                                                  -1 4
r*
rJbk 4n-I s
t                _u.                                                                                                          > u. .
                                                            #                                                                                                                                7                                                                                                              J-UQ>-
5
                                                                                            ..,                                                                                                                                            4o
                                                                                                                                                                                                                                                                                                                                .}h_,
g)                                        4'                                                                    .c1m-                                                t            (    i'    n,r4 ,'
                                                                                                                                                                                                                                                      ^
  ''                      3%                                                  ,
i
                                                                                                                                                                                                                                ^p
_(
sc f
iq o,        4 4                                ;;,: fn;r                                                                                                  .%..                  c_4il'    ,
3
                                                                                                                                                                                                                                    ,h                                                    \
y.
                          , us .
o                                                                                                                                                                                                                      _a;
                                                                                                                                                                                                                                                                                                                                <  ge
                                                                                                                                                                                                                                ; f,V.; W e
                                                                                                                                                    '                                                                                                                                                                                    di
: g. , .. < - :              b.
  * $    I                                                                                                            '
                                                                                                                                                        ' ,* '                                              ' . t s
                                                                                                                                                                                                                                ' 4,; s.v , 4.'y
                                                                                                                                                                                                                                                                    ' Yj                                                                & f f'
      ' '.i -
                    ,
* 4
                                                                                                                                                                  .' \'                                      -{i                            k
:              ,                  i R      ,
                                                                                                                                                                                                                                                                                                                                        ,5
                                                                                                                                                                                                                                                        .e~
                                                                                                                                                                                  ' I. k-g    3    g
                                                                                                                                                                                                                                          ~        ;                , um ysqg:; - ,                                ,
                                                                                                                                                                                                                                                                                                                                    --);;A g      **                              g f                                                          .
__ ( . _ _,p ,
                                                                                                                                                                                                                                'S<
                                                                                                                                                                                                                                                                                                          ~ ,_ ,.                    ? 04
                                                          ,            s
                                                                                                                            ,                                i                                                                                        ~ ' '.s''                      4_                                      %3 x
                                                                                                      ',-                            y                                                  -      -
[.j $''                                  '.y-g i 4'l',Q 4, 3. r,y ,.'
                                                                                                                                                                                                                                                                                                                        .'- '                      a T            m. y ;, )                                                  . , t )) a f a                  9 5                  y
                                                                                                                                                                                                        ,,'j-$
                                                                                                                                                                                                                                                  ,s.,          4 e_      . !. 4 :c
                                                              ,                                                      n                                                                                                                                                                    '
f 7    e
                                                                                  ^                            r4, -
                                                                                                                                        <    d, t
F              b    'r-                '-
                                                                                                                                                                                                                                                                                                                            .'-%.i'.4.
                                                                                                                                                                                                                                                                                                                                                  . h '-
I F -
 
                                                          'y
                                                                                                          ! [ ' ' gr, "]: T.                                                                            h
[A '[.      ~~_,.                                              $
                                                                            }{'{      _, _
                                                                                                ,    [            ..                      ..
7% ,' t . .}.        { _ j *.    -.Q    . T. .J.".~
: m.  .-
                              .j k /*h. - r; " # .e ?. ,. .  -b. V "~ N.    .O ' ,. . , y ' ) {  .
                                                                                                              '.,'%_I
                                                                                                                              " ' ..: , 44. l.
                                                                                                                                                      . , l U    , O.ig .. ; C. . ' + . : -        ..? T I ,
1 Docket:          50-255              0PERATIHG                STATUS                                      uwwmMuuuummuuuunuwwwunnunummunnunnum u                    PALISADES                          *
: 2. Reporting Period: 03/01/84              Outage + On-line Hrs:          744.0                              ununumwwwwmummmwwwumwwwwwwummunwwumm
: 3. Utility contacts            A. F. DIENES (616) 764-8913                                                    AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWh):                                  2530
: 5. Haeeplate Rating (Gross MWe):                        955 X 0.85 : 812 PRLISRDES
: 6. Design Electrical Rating (Het MWe):                                                                1500 805
: 7. Maximum Dependable Capacity (Gross MWe):                        675                                                DESIGN ELIC. PJtTING -              805
: 8. Maximum Dependable Capacity (Het MWe):                          635 j                9. If Changes Occur Above Since Last Report, Give Reasons:
l                      NOME l
: 10. Power Level To Which Restricted, If Any (Het MWe):
91 Reasons for Restrictions, If Any                                                                    gggg ,
HOME
: 12. Report Period Hrs                            .0    2      .0                $                              NO NET POWER OUTPUT THIS MONTH                              g
: 13. Hours Reactor Critical                        O          .0        59.259.7
                                                                              .0                  .0                                                                                        O
: 14. Rx Reserve Shtdwn Hrs                        .0 f        -----------------==-=-----------------                    -100h
: 15. Hrs Generator On-Line                        .0          .0        56.278.5 g
16.. Unit Reserve Shtdwn Mrs                    .0          .0                  .0 500-
                  ,                                                                                                                                                                      -00
: 17. Gross Therm Ener (MWH)                        0              0 115.360.224
: 18. Gross Elec Ener (MWH)                        0              0  35.750.440                                                                                          -00
: 19. Het Elec Ener (MWH)                          0              0  33.628.014
: 20. Unit Service Factor                          .0          .0              52.3
  ;            21. Unit Avail Factor                            .0          .0              52.3
                                                                                                                                                                                        -20
: 22. Unit cap Factor (MDC Net)                    .0          .0              49.2
: 23. Unit Cap Factor (DER Het)                    .0          .0              38.8                      0          ,-          -                  -
                                                                                                                                                                              .-        0 0
5          to      15        20          25 3C
: 24. Unit Forced Outage Rate                      .0          .0              32.1                                                    DfWS
: 25. Forced Outage Hours                          .0          .0        12.525.6
: 26. Shutdowns Sched Over Hext 6. Months (Type,Date, Duration):                                                                    MflRCH 1984 NOME
: 27. If Currently Shutdown Estimated Startup Date:                      05/15/84                                                                                              PAGE 2-218
 
ummunununumwnuummuwmuunununumunuwwww PALISADES              u Copert Period MAR 1984                UNIT      SHUTD0WHS / REDUCTIONS                      w MMMMMMMMMMMMMMMMMMMMMMMMMuMMMMMMMMMM No. Date    JEdi Hours Reason 9ethod LER Number System Cocoonent          cause a Corrective Action to Prevent Recurrence 1      08/12/83    5 744.0      C-    4                  RC    FUELXX    REFUELING 8 MAINTENANCE OUTAGE CONTINUES.
t MMNNummumMM      PALISADES REMAINS SHUT DOWN FOR REFUELING AND MAINTENANCE.
O
 
==SUMMARY==
u tunnuununum Twee      -Reamen                          Method          Svstem 8 Component F-Forced .A-Equip Failure -F-Admin          1-Manual      Exhibit F 8 H S-Sched    B-Maint or Test G-Oper Error 2-Manual Scram Instructions for
              'C-Refueling        H-Other      3-Auto Scram    Preparation of D-Regulatory Restriction      4-Continued    Data Entry Sheet E-Operator Training            5-Reduced Load Licensee Event Report 8 License Examinatten      9-Other        (LER) File (HUREG-0161)
,;g PAGE 2-219 ,
t
 
maammmunumammmmmmmmmwammwommmunummun a                  PALISADES                u mammunummuumunummmmunummmmmmunwanwMu                          FACILITY            DATA                                                Report Period MAR 1984 FACILITY DESCRIPTION                                                    UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                              UTILITY STATE.................... MICHIGAN                                  LICENSEE.................CONSUM RS POWER COUNTY...................VAMBUREN                                  CORPORATE ADDRESS....... 212 WEST MICHIGAN AVENUE JACKSON, MICHIGAN 49201 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI S OF                              CONTRACTOR SOUTH HAVEN, MI                          ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                          HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY...MAY 24, 1971                                  CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... DECEMBER 31, 1971                            TURBINE SUPPL'*R. . . . . . . . . WESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 31, 1971                      REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWERS                            IE REGION RESPONSIBLE......III CONDENSER COOLING WATER.... LAKE MICHIGAN                              IE RESIDENT INSPECTOR......B. JORGENSON
;          ELECTRIC RELIABILITY                                                  LICENSING PROJ MANAGER.....W. PAULSON l                COUNCIL.................. EAST CENTRAL AREA                        DOCKET HUMBER........... 50-255 RELIABILITY COORDINATION
    ';                                        AGREEMENT                          LICENSE & DATE ISSUANCE....DPR-20, OCTOBER 16, 1972 t                                                                                  PUBLIC DOCUMENT ROOM.......KALAMAZOO PUBLIC LIBRARY
[                                                                                                                        315 SOUTH ROSE STREET I                                                                                                                        REFERENCE DEPARTMENT KALAMAZOO, MICHIGAN 49007 INSPECTIOH                      $TATU$
INSPECTION SUPW1ARY INSPECTION DURING FEBRUARY 1 THROUGN FEBRUARY 29, (84-03): ROUTIME, UNANNOUNCED INSPECTION BY RESIDENT INSPECTOR OF PLANT SAFETY; MORK ACTIVITIES; IE BULLETINS; REPORTABLE EVENTS; AND INDEPENDENT INSPECTIDH AREAS.                        THE INSPECTION INVOLVED A TOTAL OF 98 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR INCLUDING 26 INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS. H0 ITEMS OF NONCOMPLIANCE OR DEVI ATIONS WERE IDENTIFIED IN FOUR OF THE FIVE AREAS INSPECTED. ONE ITEM OF HONCOMPLIANCE, WHICH WAS IDENTIFIED AND REPORTED BY TME LICENSEE (PLANT CRITICAL BELOW 525 DEGREES F) AND FOR WHICH NO NOTICE OF VIOLATION IS BEING ISSUED, WAS IDENTIFIED IN THE
        -REMAINING AREA.
ENFORCEMENT SUFMARY
        '1B CFR 71.5 PRONIBITS TRANSPORT OF ANY LICENSED MATERIAL DUTSIDE THE CONFINES OF A PLANT OR OTHER PL ACE OF USE OR DELIVERY OF LICENSED MATERIAL TO A 0.tuRIER FOR TRANSPORT UNLESS THE LICENSEE COMPLIES WITH APPLICABLE REGULATIDHS OF THE DEPARTNENT OF TRANSPORTATION IN 49 CFR PANTS 170-189. 49 CFR 173.392(C)(1) STATES THAT LOW SPECIFIC ACTIVITY RADI0 ACTIVE MATERIAL SHIPPED AS EXCLUSIVE USE MUST BE PACKAGED IN STRONG, TIGHT PACKAGES 50 THAT THERE IS HO LEAKAGE OF RADI0 ACTIVE MATERIALS UNDER HORMAL TRANSPORT CONDITIONS. CONTRARY TO THE ABOVE, ON JUNE 21, 1983, A SHIPMENT OF LOW SPECIFIC ACTIVITY RADI0 ACTIVE WASTE TO RICHLAND, MASNINGTON CONTAINED A 55-GALLON DRUM THAT LEAKED RADI0 ACTIVE MATERIAL FROM A SMALL CRACK NEAR THE BOTTOM.
(8401 3)
PAGE 2-220 i
_ _ _ .        -- -- ____        -    _ __        - . ~ _- -          ,-      , , , _
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR 1984                INSPECTION            STATUS - (CONTINUED)              M            PALISADES                    M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMhMM ENFORCEMENT SUPMARY
      - 18 CFR 59.54(H)' STATES THAT THE LICENSEE SHALL BE SUBJECT TO THE PROVISIONS OF THE RULES, REGULATIONS, AND ORDERS OF THE COMMISSION. ON MARCH 14, 1983 THE COMMISSION ISSUED AN ORDER CONFIRMING THE LICENSEE'S COMMITMENTS ON POST-TMI RELATED ISSUES.
THE ORDER STATES, IN PART, THAT THE LICENSEE SHALL IMPLEMENT AND MAINTAIN THE SPECIFIC ITEMS DESCRIBED AS COMPLETE IN THE ATTACHMENTS TO THE ORDER. ATTACHMENT 1 TO THE ORDER LISTS THE LICENSEE'S COMPLETION SCHEDULE DATED FOR HUREG-0737 ITEM II.F.1.1,
        " NOBLE GAS EFFLUENT MONITOR" AS JULY 1, 1983. NUREG-0737 ITEM II.F.1.1, CLARIFICATION HO. 1 REQUIRES CONTINUOUS MONITORING AND A DISPLAY WNICH READS OUT IN MICR0 CURIES PER CUBIC CENTIMETER OR AS EQUIVALENT XE-133 CONCENTRATIONS. CONTRARY TO THE ABOVE, THE ALSD, THE LICENSEE'S NOBLE GAS EFFLUENT MONITOR READS OUT IN COUNTS PER MINUTE ON THE LOW RANGE AND MR/HR ON THE HIGH RANGE.
CONTINUOUS MONITORING MUST BE INTERRUPTED IN ORDER TO CHANGE THE PARTICULATE FILTER AND IODINE CARTRIDGE.
(8481 4)
TECHNICAL SPECIFICATION 6.2.2 STATES THAT THE PLANT ORGANIZATION SHALL BE AS SHOWN ON FIGURE 6.2-2, WHICH SHOWS THE HEALTH THYSICIST (RADIATION PROTECTION MANAGER) REPORTING DIRECTLY TO THE GENERATING PLANT SUPERINTENDENT. CCHTRARY TO THE ABOVE, THE
      -CHEMISTRY AND HEALTH PHYSICS SUPERINTENDENT-(RADIATION PROTECTION MANAGER) HAS BEEN REPORTING TO THE OPERATIONS AND MAINTENANCE SUPERINTENDENT SINCE AT-LEAST DECEMBER 1982.
(8401 5)
OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
j    -INDICATISMS OF MAJOR STEAM GENERATOR TUBE DEGENERATION ARE BEING INVESTIGATED AND EVALUATED.
FACILITY ITEMS (PLANS AND PROCEDURES)*
NOME
        -MANAGERIAL ITEMS:
NOME i
PLANT STATUS:
l THE PLANT SHUTDOWN ON S/13/83 TO START A REFUELING AND MAINTENANCE OUTAGE. RESTART SCHEDULED FOR MAY, 1984.
l LAST IE SITE INSPECTION DATE: MARCH 1-31, 1984' INSPECTION REPORT NO: 84-08 REPORTS        FR0M      LICEN5EE
          ==================================================================================================================================
NUMBER-    DATE OF    DATE OF    SUBJECT EVENT      REPORT                                                                      -      -    _    .....---------
p-      s::::::::::::::::::==s ========s::==== ==:========================================================================================
PAGE 2-221 l
l
: 1. Becket                    se-277            0PERATIN6              5TATUS                                        nuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun u            PEACH BOTTOM 2                  m
: 2. Reporting Period                      es/s1/a4    Outage + On-line Mrs            E                        -unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum
: 3. Utility Centacts                      M. M. Alden (215) 841-se22                                                  AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thereat Peneer (Ptet):                                      3293
: s. m.meplat. Ratin (er.ss Pos.).                                tras x ., - 1152 PEfiCH BOTTOM 2
: 6. Sesien Electrical Rating (Not Ptee)                                  1065                              1000 DESIGN E12C. MATING - 1085
: 7. Maxieue Sependable' Capacity (Gross rude):                            1898
                                                                                                                                      -----.FW4X.      IMlPDE. ENF. - 1051 (100%)
O. nouisue Dependable Capacity (Net Ptee):                                1051 9.-If Changes Occur Above.Since Last Report, Give Reasons 8 l
l l                          meme-St. Peuer Level To Which Restricted, If Any (Net MWe)*
9----------------------------                      -100
: 11. Reasons for Restrictions, If Any:
MenE                                                                                                                                        %
f10 NTH      YEAR    CUMULATIVE 744.0    2.184.8    85.392.0                                                                                  -so f
: 12. Report Period Mrs                                                                                                                                                        l
: 13. Neurs Reacter Celtical                              744.8    1.931.9    61.631.0 13.'Ru Reserve Shtdnen Mrs                                  .e        .6                            .0 l                                                            -80
: 15. Mrs Generater On-Line                                744.e    1.894.6      59.906.4
          -16. Unit Reserve Shtdwn Mrs                                    .e        .0                            .0 000-
: 17. Gross There Ener (Ptet)-                      2.338.'778  5.943.562 176.498.172
                                                                                                                                                                                      -40 58,103.990 18.-Sress Elec Ener (MWM)                            754,13e    1.932.900 19.: Net Elec Ener (PedH)                            731.249    1,873.943  55.716.373 20.-Unit Service Facter                                  '180.0      86.7                      78.2
                                                                        -                                                                                                              30 21.' Unit Avall Facter                                      16e.0      86.7                      70.?
: 22. Unit cap Facter (MOC Net)                                93.5      a1.6                      62.1 61.3            0                                                        g
: 23. Unit O w Factor.(DER Net)'                              92.3      80.6                                            .
0          5      to      t'5. .2ID '  ' 2'5 ' 3'o
: 24. Unit Forced Octagt Rate                                    .e        5.s                      1s.a                                        DAYS ts. Forced Octage Neves                                        .0    116.4        7.975.6 26." Shutdoesno Sched Over Next 6 Months (Type,Date, Duration):                                                                        MARCH 1984 REFUELING S PIPE REPLACEMENT: e4/27/84-34 WKS
: 27. If Currently Shutdown Estloated Startup Date s                              N/A                                                                                            PAGE 2-222
 
e NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN PEACH BOTTOM 2        N Copert Period RAR 1984                  UMIT            SHUTD0WHS / REDUCTIOMS                      N NNNNNMMMNNNMMMMNNNNNNNNNNNNNMMNNNNNN No. Date    1535 Hours Reason Method LER Humber System Comconent                  Cause 3 Corrective Action to Prevent Recurrence
          .. O      e5/02/44    -S    8.8    5. S                      HC    ZZZZZZ    LOAD REDUCTIDH FOR WATER BOX INSFECTION AND REPAIR AND CONTROL ROD PATTERN ADJUSTMENT.
NNNNNNNNNNN        PEACH BOTTOM 2 OPERATED ROUTIMELY IN MARCH WITH HD SHUTDOWNS REPORTED.
            -O
 
==SUMMARY==
N' NNNNNNNNNNN Method              System 8 Comoonent
            .Twee      teamen F-Forced A-Equip Failure' F-Admin            1-Manual          Exhibit F & H S-Sched    B-Maint or Test G-Oper Error      2-Manual Scram Instru:tions for C-Refueling        H-Other        3-Auto Scram      Preparation of D-Regulatory Restriction            4-Continued        Data Entry Sheet E-operator Training                5-Reduced Load Licensee Event Report a License Exaeination          9-Other            CLER) File (NUREG-O f 6 f)
PAGE 2-223
 
      , mammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmuum O'                  PEACM BOTTOM 2              m maammmmmmmmmmmmmmmmmmmmmmmmmmmmuunnu                                      FACILITY          DATA                                          Report Period MAR 1984 FACILITY DESCRIPTION                                                                UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                            UTILITY STATE.................... PENNSYLVANIA                                              LICENSEE................. PHILADELPHIA ELECTRIC COUNTY................... YORK                                                      CORPORATE ADDRESS....... 7301 MARKET STREET PHILADELPHIA, PENNSYLVANIA 19105 DIST AND DIRECTION FROM
            -NEAREST POPULATION CTR.. 19 MI $ OF                                              CONTRACTOR LANCASTER, PA                                  ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR. . . . . . . . . . . . BWR                                            NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY...SEPTEM8ER 16,1973                                          CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... FEBRUARY 14, 1974                                          TURBINE SUPPLIER......... GENERAL ELECTRIC BATE COMMERCIAL OPERATE.... JULY 5, 1974                                        REGULATORY INFORMATI0H CONDENSER COOLING METHOD...ONCE THRU                                                IE REGION RESPONSIBLE......I CONDENSER COOLING WATER. ...SUSOUENAMMA RIVER                                      IE RESIDENT INSPECTOR......A. BLOUGH ELECTRIC RELIABILITY                                                                LICENSING PROJ MANAGER.....G. GEARS COUNCIL..................MID-ATLANTIC                                              DOCKET NUMBER........... 50-277 AREA COUNCIL LICENSE 8 DATE ISSUANCE....DPR-44, DECEMBER 14, 1973 PUBLIC DOCUMENT ROOM....... GOVERNMENT PUBLICATIONS SECTION STATE LIBRARY OF PENNSYLVANIA FORUM BUILDING COMMONWEALTH AND WALNUT STREET HARRISBURG, PENNSYLVANIA 17105 INSPECTION                        $TATUS INSPECTION Suf5HRY
        .NO INSPECTION INPUT PROVIDED.
ENFORCEMENT SUfetARY CONTRARY TO TECM SPEC 6.4,-REG GUIDE 1.33 AND PROCEDURE A-30, AT 12:30                            P.M., JANUARY 26, 1983, THE FIRE DOOR BETWEEN UNIT 3 RHR ROOMS 'B' AND 'D' WAS BLOCKED OPENS AND AT 11:20 A.M. FEBRUARY 7,                            1983, THE FIRE DOOR TO THE DIESEL DRIVEN FIRE PUMP ROOM WAS BLOCRED SPEN. NEITHER OF THESE DOORS WAS OPEN TO ACCOMMODATE THE MOVEMENT OF PERSONNEL OR EQUIPMENT.
(8302 5)
IS CFR 50, APPENDIX R, SECTION.III.I REGUIRES THAT THE FIRE BRIGADE TRAINING PROGRAM SHALL ENSURE THAT THE CAPABILITY TO FIGHT 4      - POTENTIAL FIRES IS ESTABLISHED AND MAINTAINED AND SHALL INCLUDE THE FOLLOWING: -- REGULAR PLANNED MEETINGS HELD AT LEAST EVERY
        'THREE MONTHS FOR ALL-FIRE BRIGADE MEMBERS. -- PRACTICE SESSIONS IN ACTUAL FIRE EXTINGUISHMENT AT LEAST ONCE PER YEAR FOR EACH SRIGADE MEMSER. CONTRARY TO THE ABOVE, DURING CALENDAR YEAR 1983, AS OF HOVEMBER 14, 1983, -- FIVE MEMBERS OF THE FIRE BRIGADE
_. MAD NOT ATTENDED REGULAR PLANNED MEETINGS AT LEAST EVERY THREE MONTHS. -- SIX MEMBERS OF THE FIRE BRILADE HAD NOT PARTICIPATED IN PRACTICE SESSIONS AT LEAST ONCE PER YEAR. THIS IS A SEVERITY LEVEL V VIOLATION (SUPPLEMENT I) APPLICABLE TO DPR-44 AND DPR-56.
PAGE 2-224
 
i mammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm PEACH BOTTOM 2          m Report Period MAR 1984              IN$PECTION              5TATU$ - (CONTINUED)              m nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmum ENFORCEMENT Sum 4RY (8331 5)
CONTRARY TO. TECH SPEC 6.4. 10 CFR 58. APP. A. AND PROCEDURE A-50. WITH RESPECT TO THE 1983 REQUALIFICATION PROGRAM LECTURE SERIES. THE FOLLOWING CONDITIONS OCCURREDI    t) ONE OPERATOR DID HOT PARTICIPATE IN A LECTURE IN AN AREA ON WHICH HE HAD SCORED LESS TNAM SS ON THE 1982 WRITTEN EXAM. ONE SENIOR OPERATOR DID HOT PARTICIPATE IN TWO LECTURES IN AREAS ON WHICH HE HAD SCORED LESS THAM 80 OM-THE 1982 WRITTEN EXAM. 2) IN HINE CASES. SUPPLEMENTARY TRAINING WAS NOT COMPLETED FOR OPERATORS OR SENIOR DPERATORS WHO SCORED LESS - THAN 88 CM QUIZZES ASSOCIATED WITH THEIR MANDATORY LECTURES.
(8337 4)
PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 TECH SPEC SECT. 6.8.1 STATES: " WRITTEN PROCEDURES AND ADMIN POLICIES1972)...."
SHALL BE ESTABLISHED. IMPLEMENTED AND MAINTAINED THAT MEET THE REGMTS OF... APPENDIX "A" 0F USAEC REGULATORY GUIDE 1.33 (NOV.
USAEC REGULATORY GUIDE 1.33 (NOV 1972) APPENDIX A PARA I.5 DISCUSSES GENERAL PROCEDURES FOR THE CONTROL OF MODIFICATION WORK.
ADMINISTRATIVE PROCEDURE A-14 (REV. 9) IMPLEMENTS THE ABOVE REQMTS. CONTRARY TO THE ABOVE. THE IMPLEMENTATION OF THE ADMINISTRATIVE PROCEDURE WAS IMADEQUATE IN THAT: 1) THE DRAWING REVISIGHS FOR SEVERAL MODIFICATIONS WERE NOT COMPLETED (I.E COMPLETED MODIFICATIONS MOD 21 MOD 510. MOD 576. AND MOD 655. ISSUED PRIOR TO 1982). 2) THE MRF FOR SEVERAL MODIFICATI0HS WERE
                    .NOT COMPLETED AND RETURMED TO THE ASSISTANT MODIFICATION COORDINATOR FOR CLOSE OUT (I.E. CCMPLETED N005 MOD 270. MOD 271 AND MOD 437 ISSUED PRIOR TD 1979). 3) THE CARBON CONTENT IN THE PIPING FOR MOD 389. CORE SPRAY PIPING REPLACEMENT. WAS INCORRECTLY RECORDED ON THE CONSTRUCTION DRAWINGS ( 11187-022-N-415 SERIES). 4) THE RESPONSE TIMES OF THE INSTALLED CONT AINMENT PRESSURE INDICATOR CHANNELS WERE NOT. MEASURED TO ASSURE THAT THE ACTUAL RESPONSE TIMES ARE CONSISTENT WITH THE DESIGN ASSUMPTIONS. 5) A REVISION TO PROCEDURE A-14 INITIATED IN 1981 TO ADDRESS CONCERNS RAISED BY THE NRC AND THE LICENSEE'S AUDITS WAS NOT COMPLETED.
: 6) A TRAINING PROGRAM WAS NOT EST ABLISHED FOR THE ASSISTANT MODIFICTION COORDINATOR IN ACCORDANCE WITH THE REQUIREMENTS OF ANSI N45.2.11-(COMMITTED BY THE LICENSEE'S QUALITY ASSURANCE PROGRAM DESCRIPTION). 7) THE CORRECTED PLANT MOOTFICATICH CONTROL SHEET (PMCS) FOR MODIFICATION 518 WAS NOT MAINTAINED IN ACCORDANCE WITH THE LICENSEE'S LETTER DATED APRIL 28. 1580. THE ABOVE COLLECTIVELY COMSITITUTES A SEVERITY LEVEL IV VIOLATION (SUPPL EMENT I) APPLICABLE TO BOTH DPR-44 AND DPR-56.
(8482 4)
OTHER ITEMS SYSTEMS AND COMPONENTS:
NO IMPUT PROVIDED.
FACILITY ITERS (PLAN % AND PROCEDURES):
NO INPUT PROVIDED.
RAMAGERIAL ITEMS 2
                      -NO INPUT.PROVIDED.'
PLANT < STATUS:
NO INPUT PROVIDED.      ,
g h !E SITE INSPECTION DiTE8 .NO INPUT PROVIDED.
  ,            ' . %-,.s
                      ' INSPECTION' REPORT N0* _NO INPUT PROVIDED.
PAGE 2-225
    - < . . - ~ . -        ..
 
                  =          -
                              -                =                                      6
                  =            _              =                                      2
                  =            _              =                                      2
                  =            _              =                                      -
                  =                            =                                      2 nmm        =            _              =
u      u  =            _              =                                      E m      m  =            _              =                                      G mm        =                            =                                      A u      u  =                            =                                      P u u        =                            =
u      u  =            _              =
u  u      =            _              =
u  u      =            _              =
u      u  =            _
                                .              =
u  u      =            _              =
u  u      =                            =
u2u        =                            =
u        u =              _            =
uMu        =              _            =
uOu        =              _            =
uTu        =              _            =
uTM        =                            =
uOu        =                            =
uBM        =                            =  .
u u        =                            =
uHu        =                            =
uCu        =                            =
uAu        =                            =
uEu        =                            =
uPu        =                            =
u u        =                            =
u u        =                            =
u u        =                            =
u        u =                            =
u u        =                            =
u u        =                            =
u        u =                            =
u u        =                            =
m n        =                            =            I uuu        =                            =
                  =                            =                                        _
                  =                            =                                        _
                  =                            =                          /
                    =            -_            =
                    =                          =
                    =                          =
                    =                          =
                    =                          =
                    =            -              =
                    =                _          =
                    =                          =
                    =                          =
E      =                _          =
                    =                _          =
E      =                          =
                    =                          =
            $      =                          =
                    =                          =
N      =                _          =
                    =                          =
E      =                            =
N                =                            =
C      =                            =
                    =                            =                      k I      =                            =
                    =                .          =
L      =                _          =
                    =                            =
                    =                            =
                    =                            =
M      =                            =
                    =                            =
0      =                            =
                    =                            =
R      =                            =
                    =                            =
F      =                            =
                    =                            =
                    =                            =
                    =                            =
5      =                            =
-                  =                            =                            4 T      =                            =
                    =                            =
R      =                            =
                    =                            =
0      =                            =
                    =                            =        e P      =    T            _
                                        .        =
                    =    C            _        =
E      =    E                      =
                    =    J          ._          =
R      =    B                      =
                    =    U                      =
                    =    S                      =
                    =                          =
                    =                            =  *
                    =              .            =
                    =                            =
                    =    FT -                    =
                                                  =
                    =    OR
                    =      O                    =                %
s
                    = EP                        =
                    =    TE                      =
                    =    AR                      =
                    = D                          =                  b
                    =                .          =                  M
                    =                            =
s 4
o    =
                    =
                                      ~
                                      .      . =
                                                  =
        ~
4      =    F                D =
9      =    OT              _ E =
1      =      N            _ D =
                    =    EE              _ I    =
        % 'R        =    TV              _ V =
          .A        =    4E                O =
          .M        = D                    R =
                    =                      P =
d      =                            =
          <o i
                    =
                    =
T =
U =
r    = R                    P =
e    =    E                N =
P      =    B                I    =
                    = M                          =
t      = U                    O =        SN r    = N                    N =
o    =                            =
p    =                  .        =
e R~ ;
          ~
M P
          > .                                                                    M s                                              m=w ie              '
E
 
N N
      -I                N 8
N W
O 4
L W
r.
9 E
4
              .a n
              >=
6 W
              .J s  a      >=
              .4 J
4 E
O M
9=
E W
6-E M
W O
4 L
eft M
E
              >=
s 4
q' r
[.x k-          '              ,~ G
(;        - ,/    s ku    a  -b
 
      .1. Decket      50-278          0PERATING            STATU$                          unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum u            PEACH BOTTOM 3                m                  ,
: 2. Reporting Period    03/01/84_ Outage + On-line Hrs:        744.0                  unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnan
: 3. Utility
 
==Contact:==
W. M. Alden (215) 841-5022                                    AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                        3293
: 5. Ham. prat. Ratino (oross MWe):              3280 x 0.,    = 1 52 NEHMUM3
: 6. Design Electrical Rating (Het MWe):                  1065                  1800
                                                                                                      #8"M*NN~                I"
: 7. Maximum Dependable Capacity (Gross MWe):            1998
                                                                                            -----.fWDC. DEPDC. Crr. - 1035 (100%)
    '8. Maximum Dependable Capacity (Het MWe):                1035
    ;9. If Changes Occur Above Since Last Report, Give Reasons:
        ' NOME les tues et m-n tammt cr71put 00se171cus
: 10. Power Level'To Which Restricted. If Any (Het MWe):                                                    _
                                                                                                --------------- J ---  -- -----------      -100 11 Reasons for Restrictions. If Any 1000-NOME MONTH      YEAR      CUMULATIVE
: 12. Report' Period Hrs                744.0 A 184.0        81.288.0                                                                  -so  h 13.. Hours Reactor Critical            744.0    1.881.3      58.681.4 O
: 14. Rx Reserve Shtdwn Mrs                  .0        .0            .0      g                                                        -e0  n-15.'Mrs Generator On-Line              744.0    1.849.5      57.165.7
    .16. Unit Reserve Shtdwn Hrs                .0        .0            .0 500 -
: 17. Gross Therm Ener (MWH)        2.401.963  5.861.301 166.899.606-
                                                                                                                                            -40
: 18. Gross Elec Ener (MWH)            807.480  1.951.650    5A.766.770
  - 19. Het Elec Ener'(ftlH)-            785.881  1.896.799    52.560.584 Y
: 20. Unit Service Factor'              100.0      84.7          70.3 21... Unit Avail Factor-100.0      84.7          70.3
: 22. Unit Cap, Factor (MDC Met)        102.1      83.9          62.5 99.2      81.5          60.7            0                                                      O
: 23. Unit Cap Factor (DER Het)                                                                  ,      ,      ,  .,.
30 25 30 0        5      10    15
  ' 24. Unit' Forced Outage Rate                .0      15.3          7.6                                      DAYS
  ': 25. Forced Outage Hours                    .8    334.5        4.665.4
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date Duration):                                            MARCH 1984 NONE                                                            .._
  . 27.'If Currently' Shutdown Estimated Startup Date      s      N/A                                                                            PAGE 2-228
 
NNNNNNNNNNMMWNNNNNNNNNNWMNNNNNNNNNNN Report Period MAR 1984                    UNIT      SHUTD0WHS / REDUCTION $                              M        PEACH BOTTOM 3                                                      N NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Ho.      Date    1XP.2 Hours Reason Method LER Number System Component                  Cause 4 Corrective Action to Prevent Recurrence
~
3      93/f6/84      S  0.0    5    5                  HC      ZZZZZZ    LOAD REDUCTION FOR B-1 WATER BOX REPAIR AND A CONTROL ROD PATTERN ADJUSTMENT.
              .    . t' NNNNNNNNNNM -
  'N PEACH BOTTOM 3 OPERATED ROUTIMELY IN MARCH WITH NO SHUTDOWNS REPORTED.
 
==SUMMARY==
M
  - NNNWNNNNNNN
  'Tvna          Reason                          Method          System 8 Comoonent F-Forced A-Equip Failure F-Admin              1-Manual        Exhibit F 8 H 5-Sched      B-Maint or Test G-Oper. Error 2-Manual Scram    Instructions for C-Refueling        H-Other      3-Auto Scram    Preparation of D-Regulatory Restriction        4-Continued      Data Entry Sheet E-Operator Training            5-Reduced Load  Licensee Event Report 8 License Examination        9-Other          (LER) File (NUREG-0161)
PAGE 2-229
 
3 -- 'wwwumanamnunumunwammuunuwnwuunnunuum N              PEACH BOTTOM 3                          N muummumununnmmmmmuunnmuunununununumM                                FACILITY        DATA                                                Report Period MAR 1984 FACILITY DESCRIPTION                                                        UTILITY 8 CONTRACTOR INFORMATION
        ' LOCATION                                                                  UTILITY STATE.................... PENNSYLVANIA                                    LICENSEE................. PHILADELPHIA ELECTRIC COUNTY................... YORK                                            CDP.PORATE ADDRESS....... 2301 MARKET STREET PHILADELPHIA, PENNSYLVANIA 19105 DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 19 MI $ OF                                    CONTRACTOR LANCASTER, PA                        ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR. . . . . . . . . . . .BWR                                    HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE IMITIAL CRITICALITY... AUGUST 7, 1974                              ,    CONSTRUOTOR..............BECHTEL DATE ELEC ENER 1ST GENER... SEPTEMBER 1,                1974                TURBINE SUPPLIER. . . . . . . . .GENER AL ELECTRIC
        ' DATE COMMERCI AL OPERATE... . DECEMBER 23, 1974                          REGULATORY INFORMATION
        -CONDENSER COOLING METHOD.. 0HCE THRU                                      IE REGION RESPONSIBLE......I
        ' CONDENSER COOLING WATER.. . . SUS 9UEHANNA RIVER IE RESIDENT INSPECTOR......A. BLOUGH ELECTRIC RELIABILITY                                                      LICENSING PROJ MANAGER.....G. GEARS COUNCIL..................MID-ATLANTIC                                      DOCKET NUMBER........... 50-278 AREA COUNCIL LICENSE & DATE ISSUANCE....DPR-56, JULY 2, 1974 PUBLIC DOCUMENT ROOM....... GOVERNMENT PUBLICATIONS SECTION STATE LIBRARY OF PENHSYLVANIA FORUM BUILDING COMMONWEALTH AND WALNUT STREET HARRISBURG, PENNSYLVANIA 17105 IN$PECTION            $TATUS INSPECTION
 
==SUMMARY==
 
NO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
CONTRARY TO TECH SPEC 6.8, REG GUIDE 1.33 AND PROCEDURE A-30, AT 12:30 P.M., JANUARY 26, 1983. THE FIRE DOOR BETWEEN UNIT 3 RHR 1983, THE FIRE DOOR TO THE DIESEL DRIVEN FIRE PUMP ROOM WAS ROOMS 'B' AND 'D' WAS BLOCKED OPEN; AND AT 11:20 A.M. FEBRUARY 7, BLOCRED GPEM. NEITHER OF THESE DOORS WAS OPEN TO ACCOMMODATE THE MOVEMENT OF PERSONNEL OR EQUIPMENT.
(8302 5)-
      ' te CFR '50,' APPENDIX R SECTION III.I REQUIRES THAT THE FIRE BRIGADE TRAINING PROGRAM SHALL EMSURE THAT THE CAPABILITY TO FIGHT POTENTIAL FIRES IS ESTABLISHED AhD MAINTAINED AND SHALL INCLUDE THE FOLLOWING: -- REGULAR PLANNED MEETINGS HELD AT LEAST EVERY THREE MONTH 3 FOR ALL FIRE BRIGADE MEMBERS. -- PRACTICE SESSIONS IN ACTUAL FIRE EXTINGUISHMENT AT LEAST CNCE PER YEAR FOR EACH BRIGADE MEMBER. CONTRARY TO THE ABOVE, DURING CALENDAR YEAR 1983, AS OF NOVEMBER 14, 1983 -- FIVE NEMBERS OF THE FIRE BRIGADE MAD NOT ATTENDED REGULAR PLANNED MEETINGS AT LEAST EVERY THREE MONTHS. -- SIX MEMBERS OF THE FIRE BRIGADE HAD HOT PARTICIPATED IN PRACTICE SESSIONS AT LEAST ONCE PER YEAR. THIS IS A SEVERITY LEVEL V VIOLATION (SUPPLEMENT I) APPLICABLE TO DPR-44 AND DPR-56.
PAGE 2-230
 
r ib.
              .    - .                                                                                          NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNMMNNN Report' Period MAR 198%                  IN$PECTIGH              STATUS - (CONTINUED)                M          PEACH BOTTOM 3            M MNNNNMMMMMMMMNNNNNNNNNNNNNNNNNNMMMMM ENFORCEMENT
 
==SUMMARY==
 
            '(8329 5)
CONTRARY TO TECH SPEC 6.4, 10 CFR 50, APP.        A, AND PROCEDURE A-50. WITH RESPECT TO THE 1983 REQUALIFICATION PROGRAM LECTURE SERIES, THE FOLLOWING CONDITIONS OCCURRED          13 ONE OPERATOR DID NOT PARTICIPATE IN A LECTURE IN AN AREA ON WHICH HE HAD SCORED LESS THAN 80 ON THE 1982 WRITTEN EXAM. ONE SENIOR OPERATOR DID NOT PARTICIPATE IN TWO LECTURES IN AREAS ON WHICH HE HAD SCORED
:LESS THAN 80 DM THE 1982 WRITTEN EXAM.        2) IN MINE CASES, SUPPLEMENTARY TRAINING WAS NOT COMPLETED FOR OPERATORS OR SENIOR OPERATORS WHO SCORED LESS THAN 80 DN QUIZZES ASSOCIATED WITH THEIR MANDATORY LECTURES.
(8335 4)
PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 TECH SPEC SECT. 6.8.1 STATES: " WRITTEN PROCEDURES AND ADMINISTRATIVE POLICIES SHALL BE ESTABLISHED, IMPLEMENTED AND MAINTAINED THAT MEET THE REQUIREMENTS          OF... APPENDIX "A" 0F USAEC REGULATORY GUIDE 1.33 (NOV 1972)....".USAEC REGULATORY GUIDE 1.33 (NOV 1972) APPENDIX A PARA I.5 DISCUSSES GENERAL PROCEDUR"! (FOR THE CONTROL OF MODIFICATIUM WORK.        ADMINISTRATIVE PROCEDURE A-14 (REV. 9) IMPLEMENTS THE ABOVE REQUIREMENT. <wnTRARY TO THE ABOVE, THE
            -IMPLEMENTATION OF THE ADMINISTRATIVE PROCEDURE WAS INADEQUATE IN THATs 1) THE DRAWING REVISIONS FOR SEVERAL MODIFICATIONS WERE NOT COMPLETED (I.E. COMPLETED MODIFICATIONS MOD 21, NOD 510, MOD 576, AND MOD 655, ISSUED PRIOR TO 1982).              2) THE MRF FOR SEVERAL MODIFICATIONS WERE NOT COMPLETED AND RETURNED TO THE ASSISTANT NODIFICATION COORDINATOR FOR CLCSEOUT(I.E. COMPLETED MODIFICATIONS
          ~ MOD 270, MOD 271, AND MOD 437 ISSUED PRIOR TO 1979).          3) THE CARBON CONTENT IN THE PIPING FOR Mac 389, CORE SPRAY PIPING REPLACEMENT, WAS INCORRECTLY RECORDED ON THE CONSTRUCTION DRAWINGS (11187-022-M-415 SERIES). 4) THE RESPONSE TIMES OF THE INSTALLED COHTAIMMENT PRES $URE INDICATOR CHANNELS WERE NOT MEASURED TO ASSURE THAT THE ACTUAL RESPONSE TIMES ARE CONSISTENT WITH
          -THE DESIGN ASSUMPTICMS. 5) A REVISION TO PROCEDURE A-14. INITIATED IN 1981 TO ADDRESS CONCERNS RAISED BY THE HRC AND THE LICENSEE'S AUDITS, WAS NOT COMPLETED. 6) A TRAINING PROGRAM WAS NOT ESTABLISHED FOR THE ASSISTANT NODIFICATION COORDINATOR IN
          ' ACCORDANCE WITH THE REQUIREMENTS OF ANSI N45.2.11 (CDMMITTED BY THE LICENSEE'S QUALITY ASSURANCE PROGRAM DESCRIPTION). 7) THE CORRECTED PLANT MODIFICATION CONTROL SHEET (PMCS) FOR MODIFICATION 510 WAS NOT MAINTAINED IN ACCORDANCE WITH THE LICENSEE'S LETTER DATED APRIL 28, 1980.        THE ABOVE COLLECTIVELY CONSTITUTES A SEVERITY LEVEL IV VIOLATION (SUPPLEMENT I) APPLICABLE TO BOTH DPR-44
            'AND DPR-56.
f(8402 4) .
OTHER ITEMS
              ~$YSTEMS'AND COMPONENTS:
NO INPUT PROVIDED.
        ,      FACILITY ITEMS (PLANS AND PROCEDURES):
NO INPUT PROVIDED.
            -MANAGERIAL-ITEMS NO INPUT PROVIDED.
PLANT STATUS:
: N0' INPUT PROVIDED.
LAST'IE'5ITE~ INSPECTION DATE: NO INPUT PROVIDED.
              ' INSPECTION REPORT NO: NO IMPUT PROVIDED.
-                                                                                                                                                  PAGE 2-231 1                            e
                                  . m.
 
(Y 00                                                  ft e4 II                                                  Il Il N
05                                                                                                              9 19 08 81 N
30                    l EEE                  08                                                  10 W
E        E          It                                                  II Q
E        E          il                      I                            81 4
E        E          H                      l                            II L
3        E          $$                    1                            59 E        E          80                      i                            91 E        E          08                      I                            il B        5          90                      I                            H E        E          80                      i                            54 ll"      E          $4                      I                            H
    &        E          Il                  Il                              98 E        E          B0                  t                                H E 14 E              H                                                    88 E        E          10                                                  II EEE                  80                                                  H EOE                  Il                                                  it 3 >= E              10                                                  41 eke                  It                                                  H EOE                  80                        I                          H Eea                  le                                                  el E        E          SI                        i                          St EEE                  II                        I                          11 3oE                  H                        i                          tt E4E                  10                        l                          SI E lAJ E              It                                                  le ELE                  19                                                  H E        E          10                                                  H E        E          tt                                                  it E        E          08                                                  H E        E          St                                                  II E        E          il                                                  el E        E          II                      -1                            10 E        1          H                                                    01 E        E          05                          i                        90 E        E          ll                                                    it EEE                  94                                                    80 II                          l                        It ,
it                                                  50 It                                                  GI II                                                  It il                                                  91 W      19                                                  40 Il                                                    80 m          W      Il                        1                          11 H
O                  09                        li LAJ        eft    10                                                    08 10 3                  il E          E        80                          I                      il M                  88                                                  H k          W        08                                                  01 E                  40                                                  H O          O in                                                          It u                  Il                                                  it w          M to                                                          II It                                                  10 of        H                            i                      il l                Il                                                  te it                                                  It 90                                                  Il M          E        10                                                  40 50                                                  II 3        O        H                                                    tt 89                              1                    89
          >=        M        H                                                    II 40                                                  II
(        L        H It                            i 06 II -
          >=                  89                            l                    II 15                            l                    90
          @        eft      90                          $                        80 II                                                  18
                    >=        Il                                                  94 Os                                                    H M        H i
40 It It E        O        H                                                    ll 99                                                    10 O        L          H                                                    H tt                                                  Il M        W          It                                                  H ti                                                  il
            >=      M          99                                                  Os 10 il O                  lt                                                  II 99 10      0-W                  St      O                                            II 14      W                                            19 L,                  II      *3                                            H It      e                                            Il
            @                  H      3                                            H 00      trb                                          II E                  80                                                    Il 00 il                              1 M                    H                              4                    It il                            l                    It 89      Lkj                                          40 H      OM$                                          80 II          OI                                      80 ft      WAI                                          et H      >= taJ $                                    tt il      4N$                                          ll it      O $                                          H 00                              l                    II 99                              l                    80 St                              I                    le                                                            ,
e                  to                              4 I
O H It G                  60      18.                                    '4 S                  la OHI                                  tha . II
              **                to          E$                        -Q
                            ' 99        4AJ 4AA                    i    M ^ 80      10
          .W                    il ' 0- >                              >            00 g                  50    <W                              O            10 3;              - II      O                                M          90 to                                      A          14 5                  98                                  l            - et '
08                              9,. >                H
              .E.                Il                              1 3 - et L                  #9    M G                  H - tha ,                        'I<t ' 'EA . IlII -
M:'H
          ~b                  .' M H
II'."O      , II
            - alp                  tl ,                                                II '
l    E
                                                ^
        ' .' b '                It . (                                                80 H
N.                                3 .-
N                                  I                  H.
n
                                                                                              ~                                ~.. -      _ ,d %,
e 9
                                                                                                - --_x___-_ _ . _ _ _ _ _ _ _ _
 
                                                  \
M M
  '                                                N e
N LAJ O
at A
M Z
at
              .J 63 44.
LaJ a
J
              .a at Z
O M
              >=
Z LaJ
              >=
Z M
LIJ O
at A
vt M
Z
              >=
6
                                                          ~
    - ~ - ----    ---_.-______m__ ___ ._ _ _ _ _
 
50-293          0PERATING            5 T A T U ;l          unnuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum
: 1. Decket:                                                                u              PILGRIM 1                  m Outage + On-line Hrs: Jiial            unnuNuNuuuuuuuuuuuuuuuuuuuMuuuuuuuum
: 2. Reporting Period: 03/et/84
: 3. Utility
 
==Contact:==
P. HAMILTON (617) 746-7905                        AVERAGE DAILY POWER LEVEL (MWe) PLOT 1998
: 4. Licensed Thermal' Power (MWt):                                                        PIlGRIt1 1
: 5. Nameplate Rating (Gross MWe):              780 X 0.87 = 678 655        1883
:6. Design Electrical Rating (Het MWe):                                                                        655 DESIGN ELEC. ftRTING -
: 7. Maxirium Dependable Capacity (Gross MWe):          690                                      .
                                                                                                                    -  670 t m l
        '8.~ Maximum Dependable. Capacity (Het MWe):            570
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME j
: 10. Power Level.To Which Restricted, If Any (Net MWe):
: 11. Reasons for Restrictions, If Any                                      ,
NOME l
MONTH      YEAR      CUMULATIVE 744.0    2.184.0      99.144.0                                                              hf
        ,12. Report Period Hrs
: 13. Hours Reactor Critical              .0        .0    69.733.9
                                                  .0        .0            .0
                                                                                      .. N,0,,q,{,0,g,,0,U,1{U,T,,{@ S,,MOtJ,T,H,, ,,,,
[      :14. Rx Reserve Shtdwn Hrs 0        .0    67.521.6
: 15. Hrs Generator On-Line                                                                                                  - 83
                                                            .0            .0 16.dUnit Reserve Shtdwn Hrs            .0                            500-0        0 116,932.632
(.      ~17. Gross.Thern Ener (MWH)                                                                                                  -80
: 18. Gross Elec Ener (MWH)                0        0  39.228.314 0        0  37.693.409                                                        ,
: 19. - Het Elec Ener (MWH) i 20; Unit Service Factor                  .0        .0          68.1 68.1                                                        - 20 b    '21.' Unit Avail Factor                  .0        .0
: 22. Unit Cap Factor (MDC Net)            .0        .0          56.7 0- - - = - ,        .    ..    ..      .      ,  0
: 23. Unit Cap Factor (DER Het)            .0        .0          58.0                5              15    20    25    30 0                to
                                                            .0          9.2                              DAYS
: 24. Unit Ferced Outage Rate              .0
: 25. Forced Outage Hours"                  1        .0      6.842.5 MARCH 1984
        -26. Shutdowns Sched Over Hext 6 Months (Type Date Duration):
r-NONE PAGE 2-234
: 27. If Currently Shutdown Estimated Startup Date:          09/12/84 L  _                                          m
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR 1984                                  UNIT        SHUTD0WHS / REDUCTIONS                                        M              PILGRIM 1                  M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No.        Date    Ivne Hours Reason Method tER Number ivstem comoonent                                          Cause 4 Corrective Action to Prevent Recurrence 16          12/10/83      S 744.0            C        4                      RC        FUELXX          SHUTDOWN FOR REFUELING AND RECIRCULATION PIPE REPLACEMENT CONTINUES.
NMMMMMMMMMM            PILGRIM i REMAIh5 SHUT DOWH FOR REFUELING AND MAINTENANCE.
u
 
==SUMMARY==
M MMMMMMMMMMM Tvoe'        ; Reason                                        Method              Svstem 8 Comoonent F-Forcud A-Equip Failure F-Admin                              1-Manual            Exhibit F & H S-Sched        B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling              H-Other              3-Auto Scram        Preparation of D-Regulatory Restriction                      4-Continued        Data Entry Sheet E-Operator Training                            5-Reduced Load Licensee Event Report
                          & License Examination                      9-Other            (LER) File (NUREG-0161)
PAGE 2-235 e r3 g ~  .y i._.4.-  . g _;*
                                      .1 - ' , ' o i ' : ,', l ' { I. ~ - [ '
_ j, 4 ~ .. ~ ....".1,i
                                                                                                  ,. ' ' ~ .;' ,5-' J.g :J;i.[V i- j- .
                                                                                                                                        ^
S' 'k g '
                                                                                                                                                        -)
                                                                                                                                                        ..    .  ; (.!h '[ I Y I .
                                                                                                                                                                                            ~-'
                                                                                                                                                                                                          ,).I
 
v tummmmmmmmmmmmmunummmunummmmmmmmmmmm
                                -PILGRIM t-                                  a                                                                                                                  Report Period MAR 1984 p'    *
            .Q FACILITY            DATA
          ,  tummmmmmmmmmmmmmmmmmmmuummmmmuumumma FACILITY DESCRIPTION                                                                      UTILITY & CONTRACTOR INFORMATION j;
ha                LOCATION-                                                                            UTILITY ST AT E. . . . . . . . . . .'. . . . . . . . . MAS 5 ACHUSETTS                        LICEN'" ................ 80STON EDISON COUNTY..'.................PLYM0UTH                                                    CORPORATE ADDRESS....... 800 BOSTON,                              BOYLSTON  STREET MASSACHUSETTS  02199
[?
DIST AND DIRECTION.FROM                                                            CONTRACTOR NEAREST POPULATION CTR..PLYMOUTH,                4 MI SE OFMASS                      ARCHITECT / ENGINEER...... "iCHTEL
    - t NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC TYPE OF. REACTOR............BWR
                'DATE INITIAL CRITICALITY... JUNE 16, 1972                                                CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... JULY 19, 1972                                                TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL UPERATE.... DECEMBER 1, 1972                                        REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU IE REGION RESPONSIBLE......I CONDENSER COOLING WATER.... CAPE C00 BAY                                              IE RESIDENT INSPECTOR. . . . . .J. JOHNSON ELECTRIC RELIABILITY.                                                                LICENSING PROJ MANAGER.....P. LEECH DOCKET NUMBER...........                                        50-293
                    . COUNCIL.................'.MORTHEAST POWER C00RDINATING COUNCIL            LICENSE 8 DATE ISSUANCE....DPR-35, SEPTEMBER 15, 19.?
PUBLIC DOCUMENT ROOM....... PLYMOUTH PUBLIC LIBRARY 11 NORTH STREET PLYMOUTH, MASSACHUSETTS 02360 INSPECTION                STATUS INSPECTION SUPW1ARY NO IMSPECTION IMPUT PROVIDED.
ENFORCEMENT SUff1ARY CONTRARY TO 10 CFR 50, APP. B, CRITERION XVIII, ANSI M45.2.12-1977, AND QAPD PROCEDURE 18.01 WHICH AUDITS.                                                            REQUIRECONTRARY THE PREPARATION To to CFROF 50, AUDIT PLANS AND SCHEDULES, THERE WAS NO SCHEDULE FOR EXTERNAL (OUTSIDE OF BOSTON EDISDN COMPANY)
              ' APP. 8, CRITERIA          V    AND      BELD    QA  MANUAL  PARAGRAPH  18.3.3 WHICH  REQUIRE  THAT  AUDIT    DEFICIENCIES                                    BE ENTERED INTO  THE DEFICIENCY IHJECTION
              . REPORT AMD BE PROPERLY DISPOSITIONED, NUMEROUS DEFICIENCIES FOUND DURING AUDIT 82-17, "HIGH PRESSURE COOLANT
              ' CONFIGURATION" WERE RECORDED AS ACTION ITEMS RATHER THAN ON DEFICIENCY REPORTS AND APPROPRIATE CORRECTIVE ACTI
              -(4321 5)-
CONTRARY TO TECHNICAL SPECIFICATION 4.6.A.1 CH DECEMBER 11, 1983 BETWEEN 11 A.M. AND 4 PM.                                                                      A C00LDOWN OF THE REACTOR VESSEL WAS
                . PERFORMED (VI A TNE HEAD SPRAY MODE OF THE RESIDUAL HEAT REMOVAL SYSTEM) FROM 390 DEGREES F TO 150 DEGREES F WITHOUT L
                'RE9UIRED TEMPERATURES EVERY 15 MINUTES.
(4324l4)
PAGE 2-236 i '
 
D Report Period MAR 1984                                                                          unuuuuuuuuuuuuuuuuuuuuuuuuwuuuuununu IMSPECTIOM              STATUS - (CONTINUED)            u          PILGRIM i                u unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuman fMPARCEBEHL_
 
==SUMMARY==
 
STHER ITEMS SYSTEMS AND COMP 0MENTS:
NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AhD PROCEDURES):
M0 IMPUT PROVIDED.-
MANAGERIAL ITEMS:
NO INPUT PROVIDED.
PLANT STATUS:
NO IMPUT PROVIDED.
LAST IE SITE IMSPECTION DATES- MO IMPUT PROVIDED.
          ' INSPECTION REPORT NO: MO IMPUT PROVIDED.
REP 0RTS      FR0M  LICEN5EE
          ===================================================================================================================
NUMBER'  .DATE OF    DATE OF-      SUBJECT EVENT    REPORT
        .______=        ____                _____-                          ___________-_ -
                                                                                              -- =- -____________________________________
M0 IMPUT PROVIDED.
          ===================================================================================================================
n f                                                                                                                                    PAGE 2-237 b
 
50-266          0PERATING            STATUS                          ununuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum
: 1. Docket                                                                          u            POINT BEACH 1                M
: 2. Reporting Period: 03/01/84      Outage + On-line Hrs
* 744,0                    annuuNuuuuuuuuuuuuuuuuhuuuuuuuuunnum 3.: Utility Contact    C.W. FAY (414) 277-2811                                      AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                      1518
: 5. Nameplate Rating (Gross MWe):              582 X 0.9 = 524
: 6. Design Electrical Rating (Het MWe):                497                  1933 DESIGN ELEC. RRTDd3 -  497 7.~ Maximum Dependable Capacity (Gross MWe):          519
                                                                                                .  .. FWLX. DEPDO.      CRP. -  485 t100%)
: 8. Maximum Dependable Capacity (Het MWe):              485
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME 10.~ Power Level To Which Restricted, If Any (Het NWelt
: 11. Reasons for' Restrictions, If Anyt 1000 -
!              NONE MONTH        YEAR    CUMULATIVE 12.-Report Period Mrs              744.0    2.184.0    117.480.0                                                                          ff 13." Hours Reactor Critical            .0          .0    94.078.5 0
: 14. Rx Reserve Shtdwn Hrs              .0          .0        625.4
: 15. Hrs Generator On-Line              .0          .0    91.607.5
                                                              .0        793.5 h            NO NET POWER OUTPUT THIS MONTH 16.? Unit Reserve Shtdun Mrs            .0 so0 - ._______________________________________      _ goo
: 17. Gross'There'Ener (MWH)              0          0 123.535.312
                                                                                                                                              - 80 18." Gross Elec Ener (MWH)              0          0  41.395.980
        -19. Het'Elec Ener (MWH)                  0          0  39.367.882                                                                  -80
: 20. Unit' Service Factor-              .0          .0        78.0                                                                  - 40                    ,
t      21. Un'lt Avail Factor-                .0          .0        78.7
                                                                                                                                              -20
      ' 22. Unit Cap Factor (MDC'Het)            .0          .0        68.5M 67.4              0                                .,      ,    _,    0 123.-Unit Cap Factor (DER Het)                                                                        ,.      ,
                                                  .0          .0                                      ...
0        5    to      15      20  25      30
        '24.' Unit Forced Outage Rate            .0          .5          2.7                                        DAYS
        -25. Forced Outage Hours'                .0          .0      2.406.3
: 26. Shutdowns Sched Over.Hext 6 Months (Type Date, Duration):                                          MARCH 1984 NONE p-m Item calculated with a Weighted Average                              PAGE 2-238
: 27. If Currently Shutdown Estimated Startup Date:          04/05/84 l
 
g MMMMNNNNNNNNNNNNNNNNNNNNNNMMNNNNNMMM Report Period MAR 1984
                  ' '                                        UNIT      $HUTDDWNS / REDUCTIONS                        M        POINT BEACH 1            M MMMNNNNNNNNNNNMMMMMNNNMMMMMNNNMMMMMM No.            Date    Yvoe Hours Reason Method LER Number System Comoonent              Cause & Corrective Action to Prevent Recurrence
        '3-          - 10/01/83      S. 744.0      C      4                RC    FUELXX
                                          ~
CONTINUATIDH OF 26-WEEK REFUELING AND STEAM GENERATOR REPLACEMENT DUTAGE.
      . C NN N N M M MM NN l.      POINT BEACH'1 REMAINED SHUT DOWN IN MARCH FOR REFUELING AND STEAM GENERATOR REPLACEMENT.
C
 
==SUMMARY==
N TNMMMMNNNNN ,
y        Tvee-              Reason                            Method          System 8 Comoonent
      .F-Forced, A-Equip Failure F-Admin                      1-Manual        Exhibit F & H S-Sched            B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling-    .... H-Other.      3-Auto Scram    Preparation of
                            'D-Regulatory Restriction          4-Continued    Data Entry Sheet s          .E-Operator. Training          ,    5-Reduced Load Licensee Event Report
                              ' 8 License Examination          9-Other        (LER) File (HUREG-0161)
PAGE 2-239 f;                      _
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum u .          POINT BEACH 1                        m FACILITY        DATA                                              Report Period MAR 1984 unnuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu FACILITY DESCRIPTION                                                    UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                              UTILITY STATE.....'..............WISC0NSIN LICENSEE................. WISCONSIN ELECTRIC POWER COMPANY C0UMTY...................MANITOWOC                                    CORPORATE ADDRESS....... 231 WEST MICHIGAN STREET MILWAUKEE, WISCONSIN 53201 DIST AND DIRFCTION FROM MEAREST POPULATION CTR.. 15 MI N OF                                CONTRACTOR MANITOWOC,.WISC                  ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR. . . . . . . . . . . .PWR                              HUC STEAM SYS SUPPLIER...WESTINGMOUSE DATE INITIAL CRITICALITY...MOVEMBER 2, 1970                            CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER...M0VEMBER 6,              1970                TURBINE SUPPLIER......... WESTINGHOUSE DATE CDMMERCIAL OPERATE.... DECEMBER 21. 1970                      REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                IE REGIDH RESPONSIBLE......III CONDENSER COOLING WATER.... LAKE MICHIGAN                            IE RESIDENT INSPECTOR......R. HAGUE ELECTRIC RELIABILITY                                                LICENSING PROJ MANAGER.....T. COLBURN COUNCIL..................MID-AMERICA                                  DOCKET NUMBER........... 50-266 INTERPOOL NETWORK                                                                  1970 LICENSE 8 DATE IdSUANCE....DPR-24, OCTOBER 5, PUBLIC DOCUMENT ROOM....... JOSEPH MANN PUBLIC LIBRARY 1516 16TH ST.
TWO RIVERS, WISCONSIN S4241 INSPECTION            5TATUS INSPECTION SUPMARY INSPECTION ON DECEMBER 13-16, 1983 AND JANUARY 10-13, 1984 (83-20): THIS ROUTIME, UNANNOUNCED INSPECTION INVOLVED 62 INSPECTOR-MOURS ONSITE IN THE AREAS OF MODIFICATION PROGRESS, STEAM GENERATOR REPLACEMENT PROJECT, AND PRESERVICE INSPECTION. OF THE THREE AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN TWO AREAS; ONE APPARENT VIOLATION WAS FOUND IN ONE AREA (FAILURE TO FOLLOW SGRP PROCEDURES).
ENFORCEMENT
 
==SUMMARY==
 
    ~18 CFR 58. APPENDIX B, CRITERION VI, AS IMPLEMENTED BY THE POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SECTION 1.8.6 INCLUDING A COMMITMENT TO ANSI M18.7-1976, REQUIRES MEASURES BE ESTABLISHED TO CONTROL THE ISSUANCE OF DOCUMENTS, SUCH AS INSTRUCTIONS, PROCEDURES, AND DRAWINGS, INCLUDING CHANGES THERETO AND THAT THE MEASURES ASSURE THAT THE DOCUMENTS AND CHANGES            CONTRARYARE TOREVIEWED              THE ABOVE,  FOR THE ADEQUACY AND APPROVED FOR RELEASE AND USED AT THE LOCATION WHERE THE PRESCRIBED (A)                  ACTIVITY IS PERFORMED.
THE INSTRUMENT AND CONTROLS DEPARTMENT DID FOLLOWING EXAMPLES OF FAILURE TO COMPLY WITH THESE REQUIREMENTS WERE IDENTIFIED:                                                                  AND PROCEDURE MOT ANNOTATE OR UPDATE DRAWINGS IN THE SHOP WHEN DCHS WERE ISSUED AS REQUIRED BY SECTION 5.2.15 0F ANSI N18.7-1976 PBNP 2.2.4, (B) DCNS 83-43 AND 83-78 WERE NOT INCORPORATED INTO CONTROLLED DRAWINGS M-201 AND M-207 IN THE CONTROL                          ROOM, AUXILIARY FEEDWATER PUMP ROOM AND AUXILIARY BUILDING AS REQUIRED BY SECTION 5.2.15 0F ANSI N18.7-1976 AND PBNP 2.2.4, (C) Mi!NTENANCE                                SEPTEMBER 30,
    . PROCEDURE PT-M-1 WAS PERFORMED ON BATTERIES D05 AND D06 FROM JULY 31 THROUGH OCTOBER 31, 1975 AND ON BATTERY D06 ..I 1983, WITN OUT-0F-DATE REVISIONS OF THE PROCEDURE, (D) THE MAINTENANCE DEPARTMENT DID NOT NAINTAIN INDICES OR ANOTHER SYSTEM TO PAGE 2-240
(
 
m g ( : W .;  <4. , b. m .m.cc.b .;g C T .- ' m. . . z i . ;  y: ;.,~ ,; ..      ? / n., =  ~ v.: ,  a v      e.    + .w    ., ,        .,..a.  ., , . ,, .. . a ammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmuna Report Per,3d MAR 1984                INSPECTION                STATUS - (CONTINUED)                      m          POINT BEACH 1                        m nummmmmmmmmmmmmmmmmemummmmmmmmamemum ENFORCEMENT
 
==SUMMARY==
 
INDICATE REVISIDH STATUS OF MAINTENANCE PROCEDURES AS REQUIRED BY SECTION 5.2.15 0F ANSI N18.7-1976, AND (E) CONTROLLED COPIES OF PROCEDURES ICP 2.3. ICP 2.15. AND ICP 10.2 IN THE CONTROL ROOM AND AVAILABLE FOR USE WERE NOT THE LATEST REVISION.                        10 CFR 50, APPENDIX B, CRITERION II, AS IMPLEMENTED BY THE POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SECTION 1.8.2 REQUIRES THAT PERSONNEL PERFORMING ACTIVITIES AFFECTING QUALITY BE TRAINED AS NECESSARY TO ASSURE THAT SUITABLE PROFICIENCY IS ACHIEVED AND MAINTAINED.
CONTRARY TO THE ABOVE, INSPECTION TRAINING WAS NOT PROVIDED TO PERSONNEL PERFORMING INSPECTIONS IN THE INSTRUMENT AND CONTROL AND MAINTENANCE AND CONSTRUCTION DEPARTMENTS. WHILE THE TECHNICAL QUALIFICATIONS OF THESE PERSONNEL IS NOT IN QUESTION, THEY HAD RECEIVED NO TRAINING IN THE INSPECTION PROCESS. INSPECTOR RESPONSIBILITIES, ETC.                10 CFR 50, APPENDIX B.      CRITERION V,    AS IMPLEMENTED BY THE POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SECTICH 1.8.5 INCLUDING A COMMITMENT TO ANSI N18.7-1976 REQUIRES THAT ACTIVITIES AFFECTING QUALITY BE PRESCRIBED BY DOCUMENTED INSTRUCTIONS AND PROCEDURES AND ACCOMPLISHED IN ACCORDANCE WITH THOSE INSTRUCTIONS AND PROCEDURES WHICH INCLUDE APPROPRIATE QUANTITATIVE AND QUALITATIVE ACCEPTANCE CRITERIA FOR DETERMINING THAT IMPORTANT ACTIVITIES HAVE BEEN SATISFACTORILY ACCOMPLISHED. CONTRARY TO THE ABOVE, THE FOLLOWING EXAMPLES OF FAILURE TO HAVE OR FOLLOW APPROPRIATE PROCEDURES OR INSTRUCTIONS WERE IDENTIFIED:          (A) NO PROCEDURE OR REQUIREMENT EXISTED FOR PERFORMING THE DOCUMENTED EVALUATION REQUIRED BY SECTION 5.2.16 0F ANSI N18.7-1976 WHEN MEASURIHG AND TEST EQUIPMENT WAS FOUND OUT OF CALIBRATION. AN EXAMPLE WAS IDENTIFIED BY THE INSPECTORS IN WHICH A DOCUMENTED EVALUATION WAS NOT MADE WHEN THREE TORQUE WRENCHES WERE FOUND OUT OF CALIBRATION, (B) NO PROCEDURE OR REQUIREMENT EXISTED FOR INDEPEHDENT VERIFICATION OF JUMPERS AND LIFTED LEADS AS REQUIRED BY SECTICH 5.2.6 0F ANSI N18.7-1976, (C) THE DISASSEMBLY, REPAIR, AND REASSEMBLY OF UNIT 2 2P15A SAFETY INJECTION PUMP WERE ACCOMPLISHED IN JUNE 1983 (AN ACTIVITY BEYOND NORMAL CRAFT SKILLS) WITHOUT THE USE OF APPROVED MAINTENANCE PROCEDURES AS REQUIRED BY SECTION 5.2.7 0F ANSI N18.7-1976, (D) NO INDEPENDENT TECHNICAL REVIEW WAS PERFJRMED FOR MODIFICATION 82-114 AS REQUIRED BY PROCEDURE PBNP 3.1.2, REV.      13, (E) NO PROCEDURE EXISTED FOR THE SETTING OF TORQUE SWITCHES ON LIMITORQUE VALVES, AN ACTIVITY BEYOND NORMAL CRAFT SKILLS, AS REQt' IRED BY SECTION 5.2.7 0F ANSI N 18.7-1976, AND (F) A REVIEW OF FOUR CCMPLETED MAINTENANCE REQUESTS (MRS) REVEALED THAT THEY HAD HOT BEEN PROCESSED IN ACCORDANCE WITH THE MR FORM IN THAT THE REQUIRED MAINTENANCE PROCEDURE TITLES OR NUMBERS WERE NOT RECORDED ON THE MR BY MAINTENANCE SUPERVISION. 10 CFR 50.59 REQUIRES THAT A WRITTEN SAFETY EVALUATION BE PREPARED AND MAINTAINED FOR CHANGES IN THE FACILITY AS DESCRIBED IN fHE SAFETY ANALYSIS REPORT DOCUMENTING THE B% SIS FOR THE DETERMINATION THAT THE CHANGE DOES NOT INVOLVE AN UNREVIEWED SAFETY QUESTION. CONTRARY TO THE ABOVE THE FOLLOWING DESIGN CHANGES WERE IMPLEMENTED OR APPROVED FOR IMPLEMENTATION WITHOUT THE PREPARATION OF THE REQUIRED SAFETY EVALUATION:    (A) 82 RELOCATION OF FUEL OIL LINE BETWEEN THE EMERGENCY DIESEL GENERATORS AND THE EMERGENCY FUEL OIL TANK, (B) 82 IMPROVEMENT OF SHIELDING WALL AROUND THE REACTOR PLANT DEMINERALIZERS, (C) 83 INSTALLATION OF SHIELD WALL CLOSE TO REACTOR COOLANT FILTERS. AND (D) 83 PROVIDE ELECTRICAL POWER FOR STEAM GEHERATOR DUTAGE UTILIZING REACTOR COOLANT PUMP POWER LEADS.
(8321 4) 10 CFR 50, APPENDIX B CRITERICH II, AS IMPLEMENTED BY THE POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SECTION 1.8.2 REQUIRES THAT ACTIVITIES AFFECTING QUALITY BE CONDUCTED UNDER SUITABLY CONTROLLED CGHDITIONS. INCLUDING CLEANLINESS. CONTRARY TO THE ABOVE, THE FOLLOWING EXAMPLES OF FAILURE TO MAINTAIN CLEAHLINESS WERE IDENTIFIED DURING A W4LKTHROUGH INSPECTION ON OCTOBER 11,                        1983:      (A)
LOOSE ITEMS (TOOLS, LENS CAPS, PAPER) ON THE REFUELING BRIDGE CRANE WHILE PEOPLE WERE WORKING OVER THE REFUELING POOL, AND (B) GUM WRAPPERS AND CANDY WRAPPERS IN THE RESIDUAL HEAT REMOVAL PUMP ROOM (POSTED AS NO SMOKING OR CHEWING AREA).                        TECHNICAL SPECIFICATION 15.6.5.3.8 REQUIRES THAT AUDITS BE PERFORMED UNDER THE COGNIZANCE OF THE OFFSITE REVIEW COMMITTEE (OSRC)
ENCOMPASSING CONFORMANCE OF FACILITY OPERATION TO PROVISIGHS CONTAINED IN THE TECHNICAL SPECIFICATIONS AND APPLICABLE LICENSE CONDITIONS AT LEAST ONCE PER YEAR AND THE RESULTS OF ACTIONS TAKEN TO CORRECT DEFICIENCIES OCCURRING IN FACILITY EQUIPMENT, STRUCTURES, SYSTEMS OR METHOD OF OPERATION THAT AFFECT NUCLEAR SAFETY AT LEAST TWICE PER YEAR.                  CONTRARY TO THE ABOVE, DURING THE PERIOD NOVEMBER 1980 THROUGH MAY 1983:      (A) NO AUDITS WERE PERFORMED UNDER THE COGNIZANCE OF THE OSRC OF TECHNICAL SPECIFICATIONS CONTAINED IN SECTIONS 15.6 (ADMINISTRATIVE CONTROLS), 15.2 (LIMITING SAFETY SYSTEM SETTINGS), 15.5 (DESIGN FEATURES), (B) CHLY LIMITED AUDITS WERE PERFORMED OF TECHNICAL SPECIFICATIONS CONTAINED IN SECTION 15.3 (LIMITING CONDITIONS FOR OPERATION), AND (C)
NO AUDITS WERE PERFORMED OF THE RESULTS OF ACTIONS TAKEN TO CORRECT DEFICIENCIES. WHILE REVIEWS WERE PERIODICALLY PERFORMED IN THESE AREAS (ESPECIALLY OF IDENTIFIED PROBLEMS), AUDITS WERE NOT PERFORMED.              10 CFR 50. APPENDIX B, CRITERION XVIII, AS IMPLEMENTED BY POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SECTION 1.8.18 INCLUDING A COMMITMENT TO ANSI N45.2.12, ANSI H45.2.23 AND ANSI N18.7-1976 REQUIRES THAT A COMPREHENSIVE SYSTEM OF PLANNED AND PERIODIC AUDITS BE CARRIED OUT IN ACCORDANCE WITH WRITTEN PROCEDURES OR CHECKLISTS BY APPROPRIATELY TRAINED PERSONNEL AND THE RESULTS DOCUMENTED AND REVIEWED BY MANAGEMENT HAVING RESPONSIBILITY IN THE AREA AUDITED. CONTRARY TO THE ABOVE, THE FOLLOWING EXAMPLES OF FAILURE TO MEET THESE REQUIREMENTS WERE PAGE 2-241 l
: :, .  . f.,Qi:      . g OJ M.f' _ 'y G.]}*j % f ll[$ [ T.QJf?J:.f9n Q f.igh%)l.Tl % $.)..
                                                                                                          .                                                              . .fN
 
mummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm m          POINT BEACH 1 Report Period MAR 1984                                      IN$PECTION                    5TATUS      -
(CCHTINUED) nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm ENFe2 CEMENT
 
==SUMMARY==
 
IDENTIFIED * (A) AUDITS WEREWHILE                          PERFORMED THESE PERSONNEL BY POINT      BEACH SITE HAD APPROPRIATE          PERSONNEL TECHNICAL  QUALIFICATIONS,AFD OSRC      MEMBERS THEY LACKED  TRAININGNOT      HAVING APPROPR IN AUDIT REQUIRED BY ANSI M45.2.23-1978.                                                                                                                    EVALUATION STATEMENT OF TECHNIQUES AND REQUIREMENTS, (B) AUDIT REPORTS BY THE QUALITY ASSURANCE DIVISION DID HOT ALWAYS CONTAIN AN                                                          (C) AUDIT THE EFFECTIVEMESS OF THE QUALITY ASSURANCE PROGRAM ELEMENTS AUDITED AS REQUIRED BY SECTION 4.4.4 0F ANSI N45.2.12-19 RESPONSES THE LAST 2 YEARS,      WERE          NOT ALWAYS SIX RESPONSES                      SUBMITTED WITHIH WERE LATE.                        THE 30-DAY TIME PERIOD.OF THE RESPONSES 70 THE 55 FINDINGS OF THE A 23 WERE LATE BY 27 TO 56 DAYS, AND (D) THE OSRC ISSUED NO REPORTS OF ITS REPRESENTATIVE FOR THE QUALITY ASSURANCE COMMITTEE, NOR DOES IT MAINTAIN RECORDS OF        10AUDIT    PROCEDURES CFR 50,                OR CHECKLISTS APPENDIX B, CRITERION      XV ASAS REQUIRED BY SECTION AS AUDITS              5.2 0FREQUIRED THE STANDARD.BY SECTION 4.4 0F ANSI H45.2.12-1976 AUDIT RESULTS WERE SUMMARIZED                                                                          IN OSR IMPLEMENTED BY THE POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SECTION 1.8.f5                                        PARTS, OR COMPONENTS WHICH DO NOT CONFORM TO THAT PROCEDURES AND PRACTICES BE ESTABLISHED AND DOCUMENTED TO CONTROL MATERIALS, CONTRARY TO THE ABOVE, NO DOCUMENTED PROGRAM EXISTED TO REQUIREMENTS IN ORDER TO PREVENT THEIR INADVERTENT USE OR IhST ALLATION.                                              to CFR 50, APPENDIX B, CRITERION XVII. AS PREVENT          THE USE OF MATERIAL FROM " READY STORES" THAT HAD EXCEEDED ITS SHELF LIFE.f.8.17 REQUIRESFLOODING, IMPLEMENTED BY THE POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SECTION THAT SUFFICIENT THEFT,    RECORD FURNISH EVIDENCE OF ACTIVITIES AFFECTING QUALITY AHD THAT THESE RECORDS BE STORED TO PREVENT DESTRUCTION OR DETERIORATIDH BY ENVIRONMENTAL CONDITIONS. CONTRARY TO THE ABOVE, THE ONLY COPIES OF MRS DATlNG FROM 1978 AND RECORDS OF MICROFILMED FOR DUPLICATE RECORD STORAGE.
SURVEILLANCE TESTS PT-M-1 (1971-83), PT-S-2 (1976-83), PT-A-1 (1971-83) WERE STORED OM OPEN SHELVES IN THE MAINTENANCE                                                            OFFICE AN IN HCH-FIRE RATED CABINETS IN THE 18C OFFICE.
            -(8321 5)
TECHNICAL SPECIFICATION 15.6.8.1 STATES IN PART, "THE PLANT SHALL BE OPERATED AND MAINTAINEDREV.                IN ACCORDANCE WITH APPROVEDIP SECTION 4.5 " HOUSEK EFFICIENT PROCEDURES....".                                      MORRISDN KNUDSEN GENERAL HOUSEKEEPING 8 CLEANLINESS PR EXECUTION OF CONSTRUCTION ACTIVITIES AND MINIMIZE FIRE HAZARDS.
4.5.4 STATED "THE DEPLOYMENT OF CONSTRUCTION TOOLS, PUMPS, AIR COMPRESSORS,                                          THE GS WILL  HOSES,  WELDING RESOLVE            AND POWER INTERFERENCES".          LEADS STEP 4.7.6 AND OTHER SHALL BE HEAT AND ORDERLY AND MINIMIZE INTERFERENCE WITH CONSTRUCTION ACTIVITIES.THEY                                                          SHOULD                  NO STATED
* CYLINDERS OF COMBUSTIBLE COMPRESSED GAS SHALL BE SECURED UPRIGHT. STEP 4.7.9"...ANY                                                    WOOD, STATED        FOR ANY PURPOSE, FROM SOURCE IN PART BE KEPT    AWAY STORAGE HOT ACTUALLY      OF    ANYUSED, BEING        CYLINDERS SHALL BE REMOVEDWITHIH THE FROMCONT      AINMENT STRUCTURE IS ALLOWED'.THERE SHALL BE NO STORAGE OF WOOD IN CONT CONTAINMENT.
ABOVE ON DECEMBER 4,                1983, A FIRE IN CONTAIHMENT RESULTED WHEN WELDING SLAG LANDED ON AN ACETYLENE HOSE ATTACHED T BOTTLE          THAT      WAS THE 66 FOOT LEVEL OF CONTAIMMENT. NOT IN USE AND              WAS NOT MOVED TO A SAFER LOCATION.THERE WERE A HUMBER OF UNPROTECTED ELECTR IN ADDITION, LYaHG ON THE WALK-WAY ADJAENT TO THE AREA USED TO MOVE EQUIPMENT IN AND OUT OF CONTAINMENT.
(8326 4)
OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
                .MONE FACILITY ITEMS'(PLANS AND PROCEDURES)8 MONE MANAGERIAL ITEMS
* PAGE 2-242
  ~
                                                                                  , , ,,        ."b
                                                                                                                                                                                  .fb
: r. 4    -
                                        . g.-                                                                                                                                            ' i,
    ,.j % ^                  -+(i    6
                                                    ,y  _,r  , _. ,        ,
5                        O
                                                                                                      *                ,}  O                y      ._            .,.
k~hhi                                        ,,f
                                                                                                                                                          .. w . .
X                                                        .
l f ' '[ '  .
 
muuuunununnunununununummunarmuuuunum 5TATUS - (CONTINUED)                                                  POINT BEACH f                  a Report Perled MAR 1984                  IN$PECTION                                                                          m MMMNNNMMMNNuNuMMMuMuMNNNuMMMMMMMMMMM OTHER ITERS NOME PLANT STATUS THE UNIT IS SNUTDOWN FOR REFUELING AND STEAM GENERATOR REPLACEMENT DUTAGE.
            ..LAST IE SITE INSPECTION DATE: MARCH 29 - APRIL      1, 1984 INSPECTION REPORT NO: 84-05 REPORTS          FR0M              LICEN5EE
              =========i========================================================================================================================
                  - NUMBER  DATE OF  DATE OF        SUBJECT EVENT  REPORT
__ . ---=_                          __-    ==_-------- __                  _---------------------- -                            ----------
l MONE
              ==================================================================================================================================
i t
l i
k i
,~.
l l-F l
l' L
l l'                                                                                                                                                                    PAGE 2-243 f
f
 
.        1 al. Deckets                  58-381                                                            0PERATING              STATUS                                                  NFNhhMMNNNM4MMMMMMMMMNNMMMMMMMMMMMMM M          POINT BEACH 2                              N
: 2. Reporting Periods 83/01/84                                                                      Outage + On-line Hrs:          744.0                                      muwMuummumMWuummmuunwunnummummmmanum 3, Utility Contacts- C.W. FAY (414) 277-2811                                                                                                                                  AVERAGE DAILY POWER LEVEL (MWe) PLOT 4.' Licensed Thermal Power (MWt):                                                                                        if18
: 5. Nameplate Rating (Gross MWe):                                                                                582 X 0.9 = 524 1500
: 6. Design Electrical Rating (Met MWe):                                                                                    497 DESIGN ELEC, RRTING -                  497
              .7.-Maximum Dependable Capacity (Gross MWe):                                                                                519                                                ,,,,,,g,      g,      y, ,                    gg ggg
                -S. Maximum Dependable Capacity (Het MWe):                                                                                  495
: 9. If. Changes Occur Above Since Last Report, Give Reasons
                    -NOME 19.' Power Level.To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Any:
NOME MONTH        YEAR      CUMULATIVE                                                                                                        o Q
              ..12. Report. Period Mrs                                                                              744.0    2.184.0        102,265.0
: 15. Hours Reactor' Critical                                                                          744.0    2.184.0          90.612.2 14; Rx Reserve Shtdwn Hrs.                                                                              .0            .0'          198.3 l
  -);          15. Mrs Generator On-Line                                                                            744.0    2.184.0      _ 89.086.8
              !16.' Unit Reserve Shtdun Hrs                                                                              .0            0          182.7 500-                                                          --too
      . f;  . 17. Gross Thern Ener ,(MWH) .                                                                    1.125.590  3.288.250 124.183.027 18.' Gross Elec Ener (MWH)                                                                        379.060  1.108.710      42.068.54C
                                                                                                                                                                                                                                                        -80
: 19. Met Elec Ener.(MWH)                                                                            362.985  1.061.615      40.066.880
              - 20. Unit Service Factor                                                                              100.0        100.0              87.1                                                                                                4
              . 21. Unit Avail Factor                                                                                100.0        100.0              87.3
                                                                                                                                                                                                                                                        -20
: 22. Unit Cap Factor (MDC Net)                                                                          98.6        98.2              79.7M 78.8                                  0                                                              o
: 23.) Unit cap Factor (DER Pet):                                                                      98.2        97.8                                                                      .
g 24'. Unit Forced Outage Rate                                                                              .0
                                                                                                                                      .0              1.4                                                      DfWS
              . 25.. Forced Outage Hours                                                                                .6            .0          692.2 26..Shutdosens Sched Over Next 6 Months (Type,Date, Duration):                                                                                                                                MARCH 1984 NDHE E
: 27. If Currently Shutdown Estimated Startup Dates                                                                                N/A                              N Itge Calculaked with a Weighted Average                                    PAGE 2-244
 
NNNNNNNNNNNNNNNNNNNNNNNNNNNNMMNNNNNN Report Period MAR 1984                    UNIT      SHUTD0WH$ / REDUCTIOHS                      N          POINT BEACH 2          N NNNNNNNNNNNNNNNNNNNMMMMMMMMNNNNNMMMN No.      Date      Type Hours Reason :sthod LER Number System comoonent            Cause 8 Corrective Action to Prevent Recurrence HOME 9
( ..
!              : NNNNNNNNNN          POINT BEACH 2 OPERATED ROUTIMELY IN MARCH WITH NO SHUTDOWNS OR POWER REDUCTIONS REPORTED.
l              C
 
==SUMMARY==
N ENNNNNNNNNN
            . .Twee        ; Ram een                          Method          Svstem 8 Comoonent
              'F-Forced; A-Equip Failure F-Admin              1-Manual        Exhibit F 8 H
              'S-Sched ;B-Maint or Test G-Oper Error          2-Manual Scram Instructions for C-Refueling        H-Other      3-Auto Scram    Preparation of D-Regulatory Restriction        4-Continued      Data Entry Sher,t
,-                                                            5-Reduced Load Licensee Even'. Report 2 E-Operator Training
                                -4 License Examination        9-Other          (LER) File (',UREG-0161)
PAGE 2-245
 
CNMMMNNMNNMMNNMMMMMMMMMMNNMMNNMMNNMM u                POINT BEACH 2                                  W Report Period MAR 1984 tuummuunumanMuummunununununumwnMNNNN                                          FACILITY          DATA FACILITY DESCRIPTION                                                                    UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                              UTILITY ST AT E. . . . . . . . . . . . . . . . . . . .WISC0HSIN                            LICENSEE................. WISCONSIN ELECTRIC POWER COMPANY COUNTY...................MAHIT0 WOC                                                CORPORATE ADDRESS....... 231 WEST MICHIGAN STREET MILWAUKEE, WISCONSIN S3201 DIST AND DIRECTION FROM NEAREST POPULATIDH CTR.. 15 MI H OF                                              CONTRACTOR MAHITOWOC, WISC                      ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                                          NUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY...MAY 30, 1972                                                CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... AUGUST 2, 1972                                              TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE... 0CTOBER                            1, 1972              REGULATORY INFORMATI0H CONDENSER COOLING METHOD.. 0MCE THRU                                                  IE REGION RESPONSIBLE......III
            ' CONDENSER COOLING WATER.... LAKE MICHIGAN                                            IE RESIDENT INSPECTOR......R. HAGUE
              !LECTRIC RELIABILITY                                                                  LICENSING PROJ MANAGER.....T. COLBURN COUNCIL..................MID-AMERICA                                              DOCKET NUMBER........... 50-301 INTERPOOL HETWORK                                                          MARCH 8,  1973 LICENSE & DATE ISSUANCE....DPR-27 PUBLIC DOCUMENT RGOM....... JOSEPH MANN PUBLIC LIBRARY 1516 16TH ST.
TWO RIVERS, WISCONSIH 54241 IN$PECTION              STATUS INSPECTION
 
==SUMMARY==
 
INSPECTION CH DECEMBER 13-16, 1983 AND JANUARY 10-13, 1984 (83-20): THIS ROUTIHE, UNANNOUNCED INSPECTION INVOLVED 62 INSPECTOR-HOURS ONSITE IN THE AREAS OF MODIFICATION PROGRESS, STEAM GENERATOR REPLACEMENT PROJECT, AHD PRESERVICE INSPECTION. OF l
i              THE THREE AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN TWO AREAS; OHE APPARENT VIOLATION WAS FOUND IN ONE AREA (FAILURE TO FOLLOW SGRP PROCEDURES).
?
ENFORCEMENT
 
==SUMMARY==
 
10 CFR 50, APPENDIX B, CRITERICH VI, AS IMPLEMENTED BY THE POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SECTION 1.8.6 INCLUDING A COMMITMENT TO ANSI N18.7-1976. REQUIRES MEASURES BE ESTABLISHED TO CCNTROL THE ISSUANCE OF DOCUMENTS, SUCH AS INSTRUCTIONS, PROCEDURES, AND DRAWINGS, INCLUDING CHANGES THERETO AND THAT THE MEASURES ASSURE THAT THE DOCUMENTS AND                                          CHANGESTOARE CONTRARY          THEREVIEWED ABOVE, THE FOR ADEQUACY AND APPROVED FOR RELEASE AND USED AT THE LOCATION WHERE THE PRESCRIBED                                      (A)ACTIVITY  IS PERFORMED.
THE INSTRUMENT  AHD CONTROLS DEPARTMENT DID FOLLOWING EXAMPLES OF FAILURE TO COMPLY WITH THESE REQUIREMENTS WERE IDENTIFIED:                                                                                  AND PROCEDURE NOT ANNOTATE              OR UPDATE DRAWINGS IN THE SHOP WHEN DCNS WERE ISSUED AS REQUIRED BY SECTION 5.2.15 0F ANSI N18.7-1976 (B) DCHS 83-43 AND 83-78 WERE HOT INCORPORATED INTO CONTROLLED DRAWINGS M-201 AND M-207 IN THE CONTROL ROOM, AUXILIARY PBNP 2.2.4, FEEDWATER PUMP ROOM AND AUXILIAR( BUILDING AS REQUIRED                                BY SECTION 5.2.15 0F ANSI N18.7-1976 AND PBNP 2.2.4, (C) MAINTENANCE FROM JULY 31 THROUGH OCTOBER 31, 1975 AND ON BATTERY D06 ON SEPTEMBER 30, PROCEDURE 1983, WITH OUT-OF-DATE PT-M-1 WAS                PERFORMED REVISIGHS                OH BATTERIES OF THE PROCEDURE, (D) DOS AND D06THE MAINTENANCE DEPARTMENT DID NOT MAINTAIN INDICES OR ANOTHER PAGE 2-246
                                                                                                                        -          -      -            -      -- __.- , .          ,  ,_  ,,m, , ,
 
nummmmmmmmmmmmmmmmmmmmmmmmmmmhamanum Report Period MAR 1984                    INSPECTION.            5TATUS - (CONTINUED)                m            POINT BEACH 2                                                                    m
.                                                                                                      nummmmmunummmmmmmmmmmmmmmmmmmmmmmmmu ENFORCEMENT
 
==SUMMARY==
 
INDICATE REVISION STATUS OF MAINTENANCE rx0CfDURES #* 2EQUIRED BY SECTION 5.2.15 0F ANSI N18.7-1976, AND (E) CONTROLLED COPIES OF PROCEDURES ICP 2.3. ICP 2.15, AND ICP 10.2 TP TRd CONTROL RDJM AND AVAILABLE FOR 95E WERE NOT THE LATEST REVISION.                                        10 CFR 50.
APPENDIX B, CRITERION II, AS IMPLEMENTED BY THE POIN7 BEACH QUALITY ASSURANC8 ~ uJAAM. FSAR SECTION 1.8.2 REQUIRES THAT PERSONNEL PERFORMIhG ACTIVITIES AFFECTING QUALITY BE TRAINED AS HECESSARY TO ASSURE THAT SUITABLE PROFICIENCY IS ACHIEVED AND MAINTAINED.
CONTRARY TO THE AB0VE. INSPECTION TRAIN 1MG WAS NOT PROVIDED TO PERSONNEL PERFORMIlic INSPECTIONS IN THE INSTRUMENT AND CONTROL AND MAINTENANCE AND CONSTRUCTION DEPARTMENTS. WHILE THE TECHNICAL QUALIFICATIONS OF THESE PERSONNEL IS NOT IN QUESTION, THEY HAD RECEIVED NO YRAINING IN THE INSPECTION E ROCESS, INSPECTCR RESPONSIBILITIES, ETC.          13 CFR 50, APPENDIX B, CRITERION V,                                            AS IMPLEMENTED BY THE POINT BEACH QUALITY =?9URANCE PROGRAM, FSAR SECY10N 1.8.5 INCLUDYNG A COMMITMENT TO ANSI N18.7-1976 REQUIRES
  -THAT ACTIVITIES AFFECTING QUALITY BE PRESCRIBED BY DOCUMENTED INSTRUCTIONS AND PROCfrVRES AND ACCOMPLISHED IN ACCORDANCE WITH THOSE INSTRUCTIONS AND PROCEDURES WHICH INCLUDE APPROPRIATE QUANTITATIVE AND QUALITarIVE ACCEPTANCE CRITERIA FOR DETERMINING THAT IMPORTANT ACTIVITIES HAVE BEEN SATISFACTCPILY ACCOMPLISHED. CONTRARY TO THE ABOVE, THE FOLLOWING EXAMPLES OF FAILURE TO HAVE OR FOLLOW APPROPRIATE PROCEDURES OR INSTRUCTIONS WERE IDENTIFIED:          (A) NO PROCEDURE OR REQUIREMENT EXISTED FOR PERFORMING THE DOCUMENTED EVALUATION REQUIRED BY SECTION 5.2.16 0F ANSI N18,*-1976 WHEN MEASURING AND TEST EQUIPMENT WAS FOUND OUT OF CALIBRATION. AN EXAMPLE WAS IDENTIFIED BY THE INSPECTORS IP 4A!?H A DOCUMENTED EVALUATION WAS NOT MADE WHEN THREE TORQUE WRENCHES
  .WERE FOUND OUT OF CALIBRATION, (B) NO PROCEDURE OR REQUIRErtdT EXISTED FOR INDEPENDENT VERIFICATION OF JUMPERS AND LIFTED LEADS AS REQUIRED BY SECTIaN 5.2.6 0F ANSI N18.7-1976, (C) THE DISASSEMBLY, REPAIR, AND REASSEMBLY OF UNIT 2 2P15A SAFETY INJECTION PUMP WERE ACCOMPLISHED IN JUNE 1983 ( AM ACTIVITY BEYOND NORMAL CRAFT SKILLS) WITHOUT TPE USE OF APPROVED MAINTENANCE PROCEDURES AS REQUIRED BY SECTION 5.2.7 0F ANSI N18.7-1976, (D) NO INDEPENDENT TECHNICAL REVIEW WAS PERFORMED FOR MODIFICATION 82-114 AS REQUIRED BY PROCEDURE PBNP 3.1.2, REY.        13, (E) NO PROCEDURE EXISTED FOR THE SETTING OF TORQUE SWITCHES ON LIMITORQUE VALVES, AN ACTIVITY BEYOND NORMAL CRAFT SKILLS, AS REQUIRED BY SECTION 5.2.7 0F ANSI N18.7-1976, AND (F) A REVIEW OF FOUR COMPLETED MAINTENANCE REQUESTS (MRS) REVEALED THAT THEY HAD NOT BEEN PROCESSED IN ACCORDANCE WITH THE MR FORM IN THAT THE REQUIRED MAINTENANCE PROCEDURE TITLES OR HUMBERS WERE NOT RECORDED ON THE MR BY MAINTENANCE SUPERVISION. 10 CFR 50.59 REQUIRES THAT A WRITTEN SAFETY EVALUATION BE PREPARED AND MAINTAINED FOR CHANGES IN THE FACILITY AS DESCRIBED IN THE SAFETY ANALYSIS REPORT DOCUMENTING THE BASIS FOR THE DETERMINATION THAT THE CHANGE DOES NOT INVOLVE AN UNREVIEWED SAFETY QUESTION. CONTRARY TO THE ABOVE THE FOLLOWING DESIGN CHANGES WERE IMPLEMENTED OR APPROVED FOR IMPLEMENTATION WITHOUT THE PREPARATION OF THE REQUIRED SAFETY EVALUATION 2  (A) 82 RELOCATIDH OF FUEL OIL LINE BETWEEN THE EMERGENCY DIESEL GENERATORS AND THE EMERGENCY FUEL OIL TANK, (B) 82 IMPROVEMENT OF SHIELDING WALL AROUND THE REACTOR PLANT DEMINERALIZERS, (C) 83 INSTALLATION OF SHIELD WALL CLOSE TO
  -REACTOR COOLANT FILTERS, AND (D) 83 PROVIDE ELECTRICAL POWER FOR STEAM GENERATOR OUTAGE UTILIZING REACTOR COOLANT PUMP PCWER
  . LEADS.
(8320 4) 10 CFR 50, APPENDIX B, CRITERION II, AS IMPLEME1TED BY THE POINT BEACH QUALITY ASSURANCE PROGR AM, FSAR SECTION 1.8.2 REQUIRES THAT ACTIVITIES AFFECTING QUALITY BE CONDUCTED UNDER SUITABLY CONTROLLED CONDITIONS, INCLUDING CLEANLINESS. CONTRARY TO THE ABOVE, THE FOP. LOWING EXAMPLES OF FAILURE TO MAINTAIN CLEAN'.INESS WERE IDENTIFIED DURIEG A WALKTHROUGH INSPECTION CH OCTOBER 11, 1983:                                                                    (A)
LOOSE ITEMS (TOOLS, LENS CAPS, PAPER) ON THE RE*UELING BRIDGE CRANE WHILE PEOPLE WERE WORKING OVER THE REFUELING POOL, AND (B) GUM WRAPPERS AND CANDY WRAPPERS IN THE RESIDUAL HEA T REMOVAL PUMP ROOM (POSTED AS NO SMOKING OR CHEWING AREA).              TECHNICAL SPECIFICATION 15.6.5.3.8 REQUIRES THAT AUDITS B E PERFORMED UNDER THE COGNIZANCE OF THE OFFSITE REVIEW COMMITTEE (OSRC)
ENCOMPASSING CONFORMANCE OF FACILITY OPERATION TO PROVISIONS CONTAINED IN THE TECHNICAL SPECIFICATI0HS AND APPLICABLE LICENSE CONDITIONS AT LEAST ONCE PER YEAR AND THE RESULTS OF ACTIONS TAKEN TO CORRECT DEFICIENCIES OCCURRING IN FACILITY EOUIPMENT, STRUCTURES, SYSTEMS OR METHOD OF OPERATION THAT AFFECT NUCLEAR SAFETY AT LEAST TWICE PER YEAR.              CONTRARY TO THE ABOVE, CURING THE PERIOD NOVEMBER 1980 THROUGH MAY 1983:        (A) NO AUDITS WERE PERFORMED UNDER THE COGNIZANCE OF THE OSRC OF TECHNICAL SPECIFICATIONS CONTAINED IN SECTIONS 15.6 (ADMINISTRATIVE CONTROLS), 15.2 (LIMITING SAFETY SYSTEM SETTINGS), 15.5 (DESIGN FEATURES), (B) CHLY
  . LIMITED AUDITS WERE PERFORMED OF TECHNICAL SPECIFICATIONS CONTAINED IN SECTION 15.3 (LIMITING CONDITIONS FOR OPERATIDH), AND (C)
NO AUDITS WERE PERFORMED OF THE RESULTS OF ACTIONS TAKEN TO CORRECT DEFICIENCIES. WHILE REVIEWS WERE PERIODICALLY PERFORMED IN THESE AREAS (ESPECIALLY OF IDENTIFIED PROBLEMS), AUDITS WERE NOT PERFORMED.          10 CFR 50, APPENDIX B, CRITERION XVIII, AS IMPLEMENTE3 BY POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SEC(ION 1.8.18 INCLUDING A COMMITMENT TO ANSI N45.2.12                                ANSI N'5.2.23 AMD' ANSI N18.7-1976 REQUIRES THAT A COMPREHENSIVE SYSTEM OF PLANNED AND PERIODIC AUDITS BE CARRIED OUT IN ACCORDANCE WITP WRITTEN PROCEDURES OR CHECKLISTS BY APPROPRIATELY TRAINED PERSONNEL AND THE RESULTS DOCUMENTED AND REVIEWED BY MANAGEMENT HAVING
: RESPONSIBILITY IN THE AREA AUDITED. CONTRARY TO THE ABOVE, THE FOLLOWING EXAMPLES OF FAILURE TO MEET THESE REQL'IREMENTS WERE PAGE 2-247
 
  + .        Vr~
J'          b' (t '
I )          -k i e
a N N M M M M M N N N N N N N N N M M !1 k N N N M M N N N N N M M M W W W Report' Period MAR 1984              IN$PECTION                $TATUS - (CONTINUED)                                                    M                  POINT BEACH 2                                      m unumanwwammunnummmwpumMNummununuummm ENFORWfdNN SUPW1ARY IDENTIFIED: (A) AUDITS WERE PERFORMED BY POINT BEACH SITE PERSONNEL AND OSRC MEMBERS NOT HAVING APPROPRIATE AUDIT TRAINING AS F.EQUIRED BY ANSI M45.2.23-1978. WHILE THESE PERSONNEL HAD APPROPRIATE TECHNICAL QUALIFICATIONS. THEY LACKED TRAINING IN AUDIT TECHNIQUES AND REQUIREMENTS, (B) AUDIT REPORTS BY THE QUALITY ASSURANCE DIVISION DID NOT ALWAYS CONTAIN AN EVALUATION STATEMENT OF
_THE EFFECTIVEMESS OF THE QUALITY ASSURANCE PROGRAM ELEMENTS AUDITED AS REQUIRED BY-SECTION 4.4.4 0F ANSI N45.2.12-1976, (C) AUDIT RESPONSES WERE NOT ALWAYS SUBMITTED WITHIN THE 30-DAY TIME PERIOD. FOR EXAMPLE, OF A SAMPLE OF TEN AUDITS PERFORMED BY QAD WITHIH THE LAST 2 YEARS, SIX RESPONSES WERE LATE.      OF THE RESPONSES TO THE 55 FINDINGS OF THE AUDIT LED BY A GILBERT / COMMONWEALTH REPRESENTATIVE FOR THE QUALITY ASSURANCE COMMITTEE, 23 WERE LATE BY 27 TO 56 DAYS, AND (D) THE OSRC ISSUED NO REPORTS OF ITS AUDITS AS REQUIRED BY SECTION 4.4 0F ANSI M45.2.12-1976 NOR DOES IT MAINTAIN RECORDS OF AUDIT PROCEDURES OR CHECKLISTS AS REQUIRED BY SECTION 5.2 0F THE STANDARD. AUDIT RESULTS WERE SUMMARIZED IN OSRC MEETING MINUTES.                                          10 CFR 50, APPENDIX B, CRITERION XV AS IMPLEMENTED BY THE POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SECTION 1.8.15 INCLUDING A COMMITMENT TO ANSI N18.7-1976 REQUIRES THAT PROCEDURES AND PPACTICES BE ESTABLISHED AND DOCUMENTED TO CONTROL MATERIALS, PARTS, OR COMPONENTS WHICP DO NOT CONFORM TO
        ' REQUIREMENTS IN ORDER TO PREVENT THEIR INADVERTENT USE OR INSYALLATION. CONTRARY TO THE ABOVE, HO DOCUMENTED PROGRAM EXISTED TD PREVENT THE USE OF MATERIAL FROM " READY STORES" THAT HAD EXCEEDED ITS SHELF LIFE. 10 CFR 50, APPENDIX B, CRITERION XVII. AS
        -IMPLEMENTED BY THE POINT BEACH QUALITY ASSURANCE PROGRAM, FSAR SECTION 1.8.17 REQUIRES THAT SUFFICIENT RECORDS FE MAINTAINED TO FURNISH EVIDENCE OF ACTIVITIES AFFECTING QUALITY AND THAT THESE RECORDS BE STORED TO PREVENT DESTRUCTIGN BY FIRE, FLOCDING, THEFT, OR DETERIORATION BY ENVIRONMENTAL CONDITIONS. PR3CEDURE PBNP 2.2.1 REQUIRES THAT THESE RECORDS BE STOKED IN THE VAULT OR MICROFILMED FOR PUPLICATE RECORD STORAGE. CONTRAFV TO THE ABOVE, THE ONLY COPIES OF MRS DATING FROM 1978 AND RECORDS OF SURVEILLANCE TESTS PT-M-1 (1971-83), PT-5-2 (1976-43), PT-A-1 (1971-83) WERE STORED ON OPEN SHELVES IN THE NAINTENANCE OFFICE AND IN MON-FIRE RATED CABINETS IN THE ISC OFFICE.
(8520 5)-
OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NOME FACILITY ITEMS (PLANS AND PROCEDUCLs)8 MONE MANAGERIAL ITEMS:
NOME
          ' PLANT STATUS 8 THE UNIT- IS OPERATING NORMALLY.-
LAST IE SITE INSPECTION DATE: FEBRUARY 1 - APRIL 15, 1984
          , INSPECTION REPORT NO: 84-03 PAGE 2-248
 
il          0                88                                                      @*
H          l                Il                                                      f i
It          $                H                                                        N ll          I                88                                                        0 H                t            98                                                      @$
EEE                la              I            80 E        E        H                l            Of                                                      W X        X        09 -            l            H                                                        O E        E        H                            II                                                      4 X        X        08                            H                                                        A E        E        il                            II E        E        St                            It E        E        19                          40 E        E        80          l-              H E        E        H          I                II E        E        at                          II E        E        90                          la E        E        08                          H ENE                as              i            It E        E        il                          H EEE                $t                          88 EOE                il                          $$
M4E                It                          II EWE                80          l'              91 E S3 E            GI                          II E        E        14                          40 E De E            It              i II EZE                80                          H EMN                Bt                          It EO*                80                          et XAX                89                          II E        E        18              I            88 E        E        St                          H E        E        te                          H E        E        H                            H E        E        18                          59 E        E        H                            86 E        E        il            1            34 X        X        et            I            18 E        N        40            l            10
  ,                    EEF                80                          H Of                          it II                          le 10                          It Il                          Il 3
68                          09 la                          14 08                          18 16                          II el                          31 is                          II H                            11 41                          It W            90                          11 18            I            88 W            H              I            tt H              l            H eft          la            I            fl H              I            H E            18            1            08 H                            H W            II
* H H                    W 81 O            88                  O      tt as                  Z se he            88                  W      08 10                  Z      09
                            .J            'l                  O      H It                          it 18                  th      H tl                  9=      II E            10                          II tl                  O      18 O.            le              , >=        tl H          I                99 M            B0          1        M      tl II          I Q      Il 4            H                    M      90 99                  M      H H                    A      ti it                          il
                        ' 44            II                  Q      01 II                  W el M            II                  >      16 H                    O      H M            It            I Q      H It                  nas    II O            88            i    M      80 48              i            80
                            &            le    t=              M      H tt  O              W      ll W            90    W              e      II 10  7              m3      Il M            90    6              3      il Il  3              E - la it ' en              eft    H
,                                        H                            09 j                                      - il '                          00 H                            t0 80            I ' f          II 88    4 >=    l W 40 i                                        10 'OM        i N at l                                        II      O            In - H H    WL
* 18 le    t= W I          N      II II    (M              M      99 4!    Q              p      H B0                          88
                                      . II                          H B0                          H
: f.          90                  - f      88                                                            %/
e-          se E .              e - le 6            80 . O >=            N le        ' r
                        .*-            it      E          . M      88    ,
H. WW-            N'      it
                        .N              N    >=>.            N      H d            H    4W$            N es :
C'          et glb .I' to e et le tt          0              - H --
                        'w  ]-      _ 08          .$-              il l
                            =            N          l                8B '
L          80    M --'4N _H
                        ,g.            H    W/ $          e. H-AC        ' 00 ,        $ . L. 9        H-N            3          4''  H att        89 '        9 k          N      E-    0 ' fW' . Il
* 89
                                                                                                                      'i '
                                  . It        'l-              .H'.
                                      .H,          ^$
                                                              ~
_ 90      .g, + , jp '      m 0 )
V                          e
    -I e                                  ,
5
                                                                                                  ~ ~
                                                                                          ~ NN
        . . -      _ -h > _ ~                                      + ?A'                                              s..,..
 
I
        't.' Docket  50-282          0PERATING              STATUS                    NMMMMMumununumwWMumwwwwwunnununumann W            PRAIRIE ISLAND 1            M
: 2. Reporting Periods- 03/01/84      Outage + On-line Hrs:    744.0            muunnumuwwwaumanuununuwumwwwmuummuun
: 3. Utility Contacts- DALE DUGSTAD (612) 388-1121                              AVERAGE DAILY POWER LEVEL (MWe) PLOT Licensed Thermal Power (MWt):                    1650
        '4.
PRRIRIE ISLRND 1
: 5. Hameplate Rating (Gross MWe):              ,659 X 0.9 = 593 530              1883
: 6. Design Electrical Rating (Met MWe):
: 7. Maximum Dependable Capacity (Gross MWe):            534
[        1100%)
        - 8. Maximum Dependable Capacity (Het MWe):              503
: 9. If Changes Occur Above Since Last Report, Give Reasons 8 NDHE
      ' 10. Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Anyt                                      g,,_
NONE MONTH        YEAR    CUMULATIVE
      - 12. Report Period Hrs                744.0    2.184.0    90.216.0                                                                  h!
: 13. Hours Reactor Critical            744.0    2.134.4    73.807.4    3
: 14. Rx Reserve Shtdwn Hrs                .0          .0      5.571.1 ll 15.~ Hrs Generator On-Line            744.0    2.113.0    72.494.1                  ,,,_
                                                                                                                                  ^
: 16. Unit Reserve Shtdun Mrs              .0          .0            .0          ,  ,,,, , ,,;,;, , ,,,;,,,,,,,,,,, ,,;3g,,7 _gg, 3.371.053 113.682.215                                y
: 17. Gross Thern Ener (MWH)      1.212.731
                                                                                                                                        - 80
: 18. Gross Elec Ener '(MWH)        407.980  1.131.540  37.011.340
                                                                                                                                        -e0
: 19. Met Elec Ener (MWH)-          387.867  1.073.870  34.665,299
: 20. Unit Service Factor                100.0      96.7          80.4                                                            , ,o
                    ~
: 21. Unit Awall Factor                  100.0      96.7          80.4
                                                                                                                                        -20
: 22. Unit Cap Factor (MDC Het)        '103.6      97.8          76.4 0                                .-    -
                                                                                                                                    - . 0
: 23. Unit Cap Factor (DER Net)          98.4      92.8          72.5                -
                                                                                                              ' 15 20    25        30 0        5    to
: 24. Unit Forced Outage Rate                0          .0          8.3                                  DAYS
      ' 25.. Forced Dutage Hours                .0          .0      2.920.9 26.-Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                    MRRCH 1984 NOME "27. If Currently Shutdown Estimated Startup Dater          H/A      __
PAGE 2-250 9
 
n' MMMMMMMMMMMMMMW4MMMMMMMMMMMMMMMMMMMM Report Perio'd MAR 1984                                  UMIT      SHUTD0WN5 / REDUCTIONS                          M        PRAIRIE ISLAND 1                    M WMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No.          Date        1535 Hours Reason Method LER Number System Comoonent                  Cause & Corrective Action to Prever.t Recurrence 03/04/84            5    0.0    5          5                                    TURBINE VALVE TEST.
03/11/84~            5  ' 0. 0  .B          5                                    ADDED OIL TO REACTOR COOLANT PUMP, CHECKED FEEDWATER
_                                                                                PUMP COUPLINGS.
7-p Y
N'        ;
4    ''uxunummNu u u -            ' PRAIRIE ISLAND 1 OPERATED ROUTINELY IH MARCH.
M
 
==SUMMARY==
'M
            , NNNNNNNNNNM-
                    -y:                                                                                                                                                                c
            ' Twee              Reanen                                    Method          System 8 Comoonent
            -'p-Eorced [A-Equip Failure F-Admin                            1-Manual        Exhibit F & H S-Sched          1B-Maint or Test G-Oper Error- 2-Manual Scram Instructions for
  '?
C-Refueling              H-Other          3-Auto Scram    Preparation of D-Regulatory Restriction                  4-Continued      Data Entry Sheet E-Operator Training                        5-Reduced Load Licensee Event Report
                                    & License Examination                  9-Other        (LER) File (NUREG-0161)
PAGE 2-251
 
NNNNNNNNNNNNNNNNNMPMNNNNNNNNNNNNNNNN N            PRAIRIE ISLAND 1                    N Report Period MAR 1984 NNNNNNNMMNNNNNNNNNNNNNNNNNNNNNNNNNNN                          FACILITY        DATA 1 FACILITY DESCRIPTION                                                  UTILITY 4 CONTRACTOR INFORMATION
~
                                  . LOCATION                                                            UTILITY STATE....................MIMMES0TA                                    LICENSEE................. NORTHERN STATES POWER
                                    -COUNTY...................G00DNUE                                      CORPORATE ADDRESS....... 414 HICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 DIST AND DIRECTION FROM HEAREST POPUL ATIDH CTR.. 28 III SE OF                            CONTRACTOR MIMMEAPOLIS, MINN                ARCHITECT / ENGINEER....... FLUOR PI0HEER, INC.
TYPE OF REACTOR. . . . . . . . . . . .PWR -                              NUC STEAM SYS SUPPLIER...WESTINGNOUSE DATE INITIAL CRITICALITY... DECEMBER 1,              1973                CONSTRUCTOR.............. NORTHERN STATES POWER COMPANY DATE ELEC ENER IST GENER...CECEMBER 4,              1973                TURBINE SUPPLIER......... WESTINGHOUSE DATE CDMMER_CIAL OPERATE.... DECEMBER 16, 1973                      REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWERS                            IE REGION RESPONSIBLE......III CONDENSER C30 LING WATER.... MISSISSIPPI RIVER                        IE RESIDENT INSPECTOR......J. HARD ELECTRIC RELIABILITY                  .
LICENSING PROJ MANAGER.....D. DIIANNI COUNCIL..................MID-CONTINENT AREA                          DOCKET NUMBER........... 50-282 RELIABILITY COORDINATION AGREEMENT                  LICENSE 8 DATE ISSUANCE....DPR-42, APRIL 5, 1974 PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL CONSERVATION LIBRARY MINNEAPOLIS PUBLIC LIBRARY 300 NICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 INSPECTION            STATUS INSPECTION
 
==SUMMARY==
 
INSPECTION ON DECEMBER 11, - FEBRUARY 10. (83-24): ROUTINE RESIDENT INSPECTION OF PLANT OPERATIONAL SAFETY, MAINTENANCE, SURVEILLANCE, EMERGENCY PLANNING, LICENSEE EVENT REPORTS, IE BULLETINS, STRIKE PLANS, MEETINGS WITH STATE AND LOCAL OFFICIALS, REFUELING OUTAGE INSPECTION, NILLS-MCCANNA ACTUATORS, AND REACTOR COOLING SYSTEM HIGN POINT VENTS. THE INSPECTION INVOLVLD A TOTAL OF 384 INSPECTOR-NOURS ONSITE B/ 3 NRC INSPECTORS INCLUDING 39 INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS. NO ITEMS OF
                                . NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
INSPECTION ON FEBRUARY 15-17, (84-03): SPECIAL ANNOUNCED INSPECTION OF IMPLEMENTATION OF 10 CFR PART 20 AND 10 CFR PART 61 RE9UIREMENTS FOR DISPOSAL OF LOW-LEVEL RADI0 ACTIVE WASTES INCLUDING MANAGEMENT CONTROLS, QUALITY CONTROL, TOUR OF THE FACILITY, AND IMPLEMENTATION OF WASTE FORM AND WASTE CLASSIFICATI0H REQUIREMENTS. THE INSPECTION INVOLVED 26 INSPECTOR-HOURS ONSITE BY TWO
                                <NRC INSPECTORS. NO ITEMS OF NONCOMPLIANCE OR DEVIATIDMS WERE IDENTIFIED.
ENFORCEMENT SupW1ARY i
MONE PAGE 2-252
 
munummuunnunutummunummanunummmmmmmmm Report Period MAR 1984            IN$PECT ION            5TA TUS - (CONTINUED)            m        PRAIRIE ISLAND 1          m nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm        ,
l QIMER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
HOME FACILITY ITEMS (PLANS AND PROCEDURES):
HONE MANAGERIAL ITEMS:
NOME PLANT STATUS:
THE UNIT IS OPERATING NORMALLY.
LAST IE SITE INSPECTION DATEa MARCH 12-16, 1984 INSPECTION REPORT ND:  84-05                                                                                                        ,
REP 0RT$      FR0M      L ICEN S EE
  ==================================================================================================================================
HUMBER    DATE OF    DATE OF    SUBJECT EVENT      REPORT HONE
  =====================-============================================================================================================
PAGE 2-253
 
O                          -
0P ERAT ING                STA T US                    mammmmmm**mmmmmmmmmmmmmmmmmmmmmmmune
: 1. Pecket. T. 3 0)._                                                                                                                a a                PRAIRIE ISLAND 2
: 2. Resorting Period    03e01/84    Outage + On-line Hrs:            744,0            wumummmm******** man ******mummmmuuman
  . ' . ,csilty Contact _ pA88M QOSTAD (612) 388-1121                                    AVERAGE DAILY P')W E R LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                            1650
: 5. Nameplate Rating (Gross MWe):                  659 X 0.9 : 593 _
PRRIRIE ISLRND 2                                                        i j
: 6. Design Electrical Rating (Net MWe):                      530                1500 DESIGN ELES. RATINo -  530
: 7. Maximum Dapendable Capacity (Gross MWe):                  53,
                                                                        ^ ' ~
_ _ _ _ _ . MPLY . OCPDd). CMP. - 500 t100%)
: 8. Maximum Dependable Capacity (Net M.Je;                    500        _
: 9. I# Changes Occur Above Since Last Report, Give Reasons:
MONE
: 10. Power Level To Which Restricted, If Any (Het MWe):
11 Reasons for Restrictions, If Any: _                                                                                                                                    l NOME l
MONTH            YEAR      CUMULATIVE
: 12. Recort Period Hrs                744.0        2,184.0      81,334.O                                                                        f 744.0        2, 184.0  ._'0,434.3                                                                                                    l
: 13. Hours Reactor %ritical
: 14. Rx Reserve Shtdwn Hrs            _ _ __J
                                                          .0        1,516.1 h                          !
: 15. Hrs Generator On-Line          l_* 4J        2.184.0      69.477.2        [
: 16. Unit Reserve Shtdwn Hrs              .0            .0                J
: 17. Grs.ss Therm Ener (MWH)    1,167,259      3,*92 M 109,223,997
: 18. Gro g Ejec Ener (MWH)        392.270      1.174.290    35,281,690 1.1i9,071    33,093,954                                                                    -60
: 19. Not Elec Ener (MWH)          373.470
: 20. Unit Service Factor              100.0            100.0            85.4                                                                _,g i
21 Unit Avail Factor                100.0            100.0            85.4                                                                                                l
                                                                                                                                              -20
: 22. Unit Cap Factor (MDC Net)        100.4            102.5            81.4 96.7            76.8          0                                                      0
: 23. Unit Cap Factor (DER Het)        94.7                                                            ,        ,      ,    ,    ,
25 30 0            5        to    15  20
: 24. Unit F.,rced Outage Rate              .0            .0      _
4.4                                        nays                                                    ;
: 25. Forced Outage Hours                  .0            .0        3,315.5
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                                    MRRCH 1984 1
I REFUELING OUTAGE IN AUGUST OF 1984.
: 27. If Currently Shutdown Estimated Startup Date:              N/A                                                                            PAGE 2-254
 
r MMMMNNMMMMMMMMMMMNNNNNNMMNNMMMMMMMMM Report Period MAR-1984                                                      UNIT      SHUTD0WN$ / REDUCTIOMS                      u        PRAIRIE ISLAND 2          W
        ~
MMMMMMNNMMMMNNMMMMMMMMMNNMMMMMMMMMMM No.            Date          E E Reason Method LER Mumber System comoonent                                        cause a corrective Action to Prevent Recurrence 03/18/84                    5 0.0                        5      5                                AXIAL OFFSET TEST.
                          . 03/25/84; S                  0.0                        3      5                                TURBINE VALVES TEST.
Y
                        . Y-
            +-
N IMMMNNNNNNN                      PRAIRIE ISLAND'2 OPERATED ROUTIHELY IN MARCH.
            - 0
 
==SUMMARY==
M
              'CMMMMMMMMNN Tvne            - Reason                                                      Method          Svstem 8 Comoonent F-Forced f.-Equip Failure .F-Admin                                              1-Manual      Exhibit F 3 H
              'S-Sched '
                                  .B-Maint or Test G-Oper Error 2-Manual Scram . Instructions.for C-Refueling ,              H-Other                          3-Auto Scram    Preparation of
                                -D-Regulatory Restriction                                '
4-Continued    Data Entry Sheet
                                . E-Operator Training                                          5-Reduced Load Licensee Event Report sf                                    8 License Examination                                    9-Other        (LER) File (HUREG-0161)
PAGE 2-255 h                  ,
 
m -
  +
nummununusuwwwununummmmmmmuuunnummun
        .m s          -PR/.IRIE ISLAND 2-                                  -
M
: mmuunununummunummununumunummunununum                                                  FACILITY              DATA                                        Report Period MAR 1984 FACILITY DESCRIPTION                                                                            UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                                    UTILITY
                -STATE....................MINNE50TA'                                                          LICENSEE.................HORTMERN STATES POWER
: COUN TY. . . . . . . . . . . . ; . . . . . . G00 DNU E -                                    CORPORATE ADDRESS....... 414 NICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 DIST'AND DIRECTIDH FRDM MEAREST POPULATION CTR.. 28 MI SE OF                                                      CONTRACTOR MINNEAPOLIS, MINN                    ARCHITECT / ENGINEER....... FLUOR PIONEER, INC.
TYPE OF REACTOR............PWR                                                                  HUC STEAM SYS SUPPLIER...WESTINGNOUSE DATE INITIAL CRITICALITY... DECEMBER 17, 1974                                                  CONSTRUCTOR..............NORTMERN STATES POWER COMPANY DATE ELEC ENER IST GENER... DECEMBER 21, 1974                                                  TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 21, 1974                                              REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWERS                                                  IE REGION RESPONSIBLE. . . . . .III                                                                ,
CONDENSER COOLING WATER.... MISSISSIPPI RIVER                                                IE RESIDENT INSPECTOR......J. HARD ELECTRIC RELIABILITY.                                                                        LICENSING PROJ MANAGER.....D. DIIANNI COUNCIL..................MID-CONTINENT AREA                                                  DOCKET NUMBER........... 50-306 RELIACILITY COORDINATION
                                                                          ' AGREEMENT                      LICENSE 8 DATE ISSUANCE....DPR-60, OCTOBER 29, 1974 PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL CONSERVATION LIBRARY MINNEAPOLIS PUBLIC LIBRARY 300 NICOLLET MALL MINNEAPOLIS, MINNESOTA 55401 INSPECTION                      5TATUS INSPECTION
 
==SUMMARY==
 
INSPECTION ON DECEMBER 11, - FEBRUARY 10,-(83-24): ROUTIME RESIDENT INSPECTIDH OF PLANT OPERATIONAL SAFETY, MAINTENANCE, CSURVEILLANCE,--EMERGENCY PLANNING, LICENSEE EVENT REPORTS, IE BULLETINS, STRIKE PLANS, MEETINGS WITH STATE AND LOCAL OFFICIALS,
: REFUELING DUTAGE INSPECTION, HILLS-MCCANNA ACTUATORS, AND REACTOR COOLING SYSTEM NIGH POINT VENTS. THE INSPECTIDH INVOLVED A TOTAL OF 384 INSPECTOR-MOURS ONSITE BY 3 HRC INSPECTORS INCLUDING 39 INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS. NO ITEMS OF
: NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
INSPECTION 0N FEBRUARY 15-17, (84-02):                                    SPECIAL ANNOUNCED INSPECTION OF IMPLEMENTATION OF 10 CFR PART 20 AND 10 CFR PART 61 REQUIREMENTS FOR DISPOSAL OF LOW-LEVEL RADI0 ACTIVE WASTES INCLUDING MANAGEMENT CONTROLS, QUALITY CONTROL, TOUR OF THE FACILITY, TAND' IMPLEMENTATION OF WASTE FORM AND WASTE CLASSIFICATION REQUIREMENTS. THE INSPECTION INVOLVED 26 INSPECTOR-MOURS ONSITE BY TWO
              'NRC. INSPECTORS. NO ITEMS OF MONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT SUPW1ARY
            'MONE
* k Y
PAGE 2-256
 
w.
                            -c f
MNNNNMMMMMNNNNNNNNNNNNNNMMNNNNNNNNMM (Report' Period MAR 1984.                                      I N.S P E C T I O N    STATUS - (CONTINUED)                  N        PRAIRIE ISLAND 2                    N NNNNMMMNNNNNNNNNNNNNNNNNNNNNNNNMMMMM
        ''        OTHER NTEMS
                      -SYSTEMS AND COMPONENT PROBLEMS:
NOME ,            -
FACILITY ITEMS'(PLANS AND PROCEDURES):
NOME.                                                                -
JcMANAGERIAL ITEMS:
                      ;MONE PLANT STATUS *'
                      ~THE UNIT.IS OPTRATING MORMALLY.
LAST IE SITE' INSPECTION DATE: ; MARCH 12-16, 1984
                      ' INSPECTION REPORT NO                    ~84-05 4
REPQRTS                FR0M  LICENSEE n================================================================a================================ ================================
              ,          [ NUMBER
                            '              ' DATE OF            DATE OF -        SUBJECT
: REPORT
_'_ EVENT -
                  ,k
                  ,l    -                        - _ _
__        _ . _ _    - = . .
                                                                                        -      ________      _____      .-._  __= _
  ,                            .MONE-3-;            1==================================================================================================================================
                      '$      t        j k "
        ''                      y    i L
T s
A 4
PAGE 2-257 e.
                                                            < 1 1,
                                                              }'
 
St. Dockett    50-254                                0 P-E R A T I H G    STATUS                  unuwwwwwwwwwwwwwwum*wwwwwwwwwwwwwunn w              QUAD CITIES 1                                W
      '2. Reporting Period                            03/01/A4  Outage + On-line Hrs:    744.0          uwwwwwwwwwwwwwwwwwwwwwwwwwnwwwwwwwww
: 3. Utility Centacts ALEX MISAK (309) 654-2241 X194                                                AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                            2511
: 5. Nameplate Rating (Gross MWe):                                    920 X 0.9 = 828
: 6. Design Electrical Rating (Het MWe):                                        789            1sm3 DESIGN ELEC. RATING -    789
      -7. Maximum Dependable Capacity (Gross MWe):                                  813
                                                                                                            ...... MX. DCPDC. CFr. -            769 (100%3
: 8. Maximum Dependable Capacity (Het MWe):                                    769
      = 9. If Changes occur Above Since Last Report, Give Reasons:
NOME
      .10.-Power Level To Which Restricted, If Any (Het MWe):
: 11. Peasons'for Resirtettons, If Anyt 1000 -
NONE MONTH      YEAR      CUMULATIVE
: 12. Report ~ Period Hrs.                                  744.0    2.184.0    104.208.0                                                                                              ll 122.1  1,562.1      85.117.7            ---------------------------------------                                    -100
: 13. Hours Reactor Critical
    .14. Rx Reservs Shtdwn Hrs                                      .0        .0      3.421.9 gl
                                                                                                                                                                                        - 80  Q-15.tHrs Generator On-Line                                  121.2  1.561.2      81,908.3  ,
    .16.EUnit Reserve Shtdwn Hrs                                    .0        .0        909.2 5J0 -
3,659,732 168,766,438                                                                                          -80 176 Gross Therm Ener (MWH)                              252.848
: 18. Gross Elec ' Ener (MWH)                              83,636  1,213.148    54.471,876 1.152,950 .50,758.210                                                                                          - +0
    ~19. Het Elec Ener (MWH)                                    79,579
                                        ~
: 20. Unit Service Factor                                      16.3      71.5          78.6
                                                                  ~16.3      71.5          79.5                                                                                        -20 21." Unit Avail Factor 22..' Unit Cap Factor (MDC Het)                              13.9      68.6          63.3
    .23'.
:    Unit Cap Factor'(DER Het)                                13.6      66.9          61.7      0          .,
                                                                                                                              ,      .      ,        ,                                ,  0 0          5      to    15      30      25                          30
    .24. Unit Forced Outage Rate                                    .0        .0          5.9                                  DAYS
    ~25. Forced Outage Hours                                          .0        .0      2.728.0
    ' 26.. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):                                                          MARCH 1984 NONE-
: 27. If Currently Shutdown Estimated Startup Date8                                07/30/84                                                                                              PAGE 2-258
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
                . Report Period MAR 1984                                UNIT      $HUTD0WHS / REDUCTIONS                          M        QUAD CITIES 1            M MMMMMMMMMMMMMMMMMMMMMMMMMM4MMMMMMMMM Mo.              Date        1535 Hours Reason Method LER Number System Comoonent                  Cause 4 Corrective Action to Prevent Recurrence 84-12 03/04/84                    S    0.0      B      5                  HA    XXXXXX      REDUCED LOAD TO PERFORM WEEKLY TURBINE TESTS.
c84-13 03/05/84                    LF  .0.0      5      5  84-1            SF    VALVEX      REDUCED LOAD FOR DRYWELL ENTRY TO INSPECT '1E' ELECTROMATIC RELIEF VALVE.
84-14''03/06/84                l5 6?2.8        C'    1  84-1            RC    FUELXX      UNIT ONE SHUTDOWN FOR END OF CYCLE SEVEN REFUELING AND            l MAINTENANCE.
l$;
  ~,
s
                    ~,.
'S
.j.-
d d
l'
              -EMFMMMMMMMM'                    QUAD CITIFS 1. BEGAN A REFUELING AND Mt.INTENANCE SHUTDOWN ON MARCH 6.
              , 0
 
==SUMMARY==
M.
              '.CMMMMMMMMMM
                                                                                ~
Tvne          '
                                  ' Reason                                Method          System 8 Comoonent F-Forced 1A-Equip'Fallure F-Admin                          1-Manual          Exhibit F 1 H
              'S-Sched-      "
5-Maint or Test G-Oper Error 2-Manual Scram . Instructions for C-Refueling . - - H-Other.            3-Auto Scram    Preparation of
                                  'D-Regulatory Restriction              4-Continued      Data Entry Sheet
          ,                        'E-operator" Training.                  5-Reduced Load Licensee Event Report
                                      -4 License Examination              9-Other          (LER) File ( NUR EG-0161 )
o                                                                                                                                      PAGE 2-259
            ~                                ..
a--        . - =
 
tuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu a                9UAD CITIES 1                                    m Report Period MAR 1984 quuuuuuuuuuuuuuuuuuMuuuuuuuuuuuhumuu                                            FACILITY          DATA FACILITY DESCRIPTION                                                                      UTILITY 8 CONTRACTOR INFORMATION
      .          . LOCATION                                                                              UTILITY
: r-                ST AT E.' . . . . . . . . . . . . . . . . . . . IL LIN0IS                            LICENSEE................. COMMONWEALTH EDISON CORPORATE ADDRESS........P.O.        BOX 767
                ^
COUNTY................... ROCK ISLAND                                                                                  CHICAGO, ILLINDIS 60690 E                            -
                        ~DIST AND DIRECTIDH FROM NEAREST POPULATION CTR.. 20 MI NE OF                                              CONTRACTOR MOLINE, ILL                            ARCHITECT / ENGINEER.......SARGENT 8 LUNDY
  -                  TYPE OF REACTOR............BWR                                                          HUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY.. 0CTOBER 18, 1971                                            CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS DATE ELEC ENER IST GENER... APRIL 12, 1972                                              TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... FEBRUARY 18, 1973                                      REGULATORY INFORMATI0H CONDENSER COOLING METHOD.. 0HCE THRU                                                  IE REGION RESPONSIBLE......III CONDENSER COOLING WATER.... MISSISSIPPI RIVER                                        IE RESIDENT INSPECTOR......A. MADISON ELECTRIC RELIABILITY                                                                LICENSING PROJ MANAGER.....R. BEVAN DOCKET NUMBER........... 50-254 COUNCIL..................MID-AMERICA INTERPOOL HETWORK              LICENSE & DATE ISSUANCE....DPR-29, DECEMBER 14, 1972 PUBLIC DOCUMENT ROOM....... MOLINE PUBLIC LIBRARY                                  )
504 17TH STREET                                ]
MOLINE, ILLINDIS 6126S                          i INSPECTION                3TATUS                                                                      1 l
INSPECTION
 
==SUMMARY==
INSPECTION ON' AUGUST 4, SEPTEMBER 16, 20, DCTOBER 5-6, 12-13, 31, NOVEMBER 4-5, 15, DECEMBER 7, 21, JANUARY 5, 9-10, 12 AND FEBRUARY 2. (83-24): REVIEW OF INSERVICE INSPECTION (ISI) ACTIVITIES, REPLACEMENT OF THE REACTOR WATER CLEANUP (RWCU) SYSTEM PIPING, TORUS MODIFICATION, IE BULLETINS, LICENSEE EVENT REPORTS (LER), EROSION OF PUMP CASINGS OF RHR SERVICE WATER, AND MEETINGS "AT-EPRI-NDE CENTER AND THE NRC HEADQUARTERS. THIS INSPECTION INVOLVED A TOTAL OF 120 INSPECTOR-HOURS BY TWO NRC INSPECTORa INCLUDING 12 INSPECTOR-NOURS ONSITE DURING OFF-SHIFTS. NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
INSPECTION ON NOVEMBER 17, THROUGH JANUARY 24. (83-31): SPECIAL, UNANNOUNCED INSPECTION BY THE RESIDENT INSPECTORS OF AN EVENT INVOLVING THE DEFEATING OF SECONDARY CONTAINMENT INTEGRITY DURING OPERATION. THE INSPECTION INVOLVED A TOTAL OF 78 INSPECTOR-NOURS ON SITE BY TWO                            IN NRC INSPECTORS THE AREA        AND INSPECTED,  33 ITEMS TWO  HOURS OFBY 11 HRC PERSONNEL HONCOMPLIANCE              IN THE REGION WERE IDENTIFIED      III 0FFICES (EXCEEDING      DURING THE ENFORCEMENT TECHNICAL
                  -CONFERENCE OH JANt'ARY 24, 1984.
                  ' SPECIFICATION LIMITING CONDITION FOR OPERATION FOR SECONDARY CONTAINMENT INTEGRITY; AND HOT HAVING A PROCEDURE FOR CONTROLLING
                    . STATUS OF THE MAIN STEAM ISOLATION VALVE ROOM).
              ' ENFORCEMENT
 
==SUMMARY==
 
NOME PAGE 2-260
 
MMMMNNNNMMMNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR-1984                                      .IN5PECTIOh                  STATUS - (CONTINUED)                      M            QUAD CITIES 1                M NNNNNNNNNNNMMMMNNNNNNMMMMMMNNMMMNNNN OTHER ITEMS e        -
SYSTEMS AND COMPONENT PROBLEMS:-
                      'NONE'
                      ' FACILITY; ITEMS (PLANS AND PROCEDURES):-
NOME-
                  ; MANAGERIAL-ITEMS -
* NOME
                    -PLANT STATUS THE UNIT IS,5 NUT DOWN FOR REFUELING.
LAST IE SITE INSPECTION DATE ' MARCH 20-23, 1954
                    ' INSPECTION REPORT NO: 84-03 REP 0RTS            FR0M          LICENSEE
                  .==================================================================================================================================
                          -NUMBER                      DATE OF    .DATE OF      SUBJECT
                                                      -EVENT        REPORT
                        ---- _ _= _ _--=__                      _ - - __        ---
                                                                                          = =. _ _ _ - -    - = = - - _ _  -                --
                                                                                                                                                    ==-----------------------------------------
84-02/-                    03/07/84-  03/22/84      LEAK RATE FROM ALL VALVES & PENETRATIONS FOUND IN EXCESS CF TECHNICAL SPECIFICATIONS.
                                                          ~
x '-
                        =================================================================================================================== ==============
L t
1
..                                                >                                                                                                                                          PAGE 2-261 I
l' i
 
l unumwwunununununuwwwuuuuuuuwwwununumM 1 Dockets        50-265-            OPERATING              STATUS                      M            QUAD CITIES 2 744.0            MMMuMMMMuMuMMMuuMMMMMMMMuMMMMMW4MMMN
: 2. Reporting Period          03/01/84- Outage + On-line Hrst AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 3. Utility Contacts ALEX MISAK (309) 654-2241 X194 2511
: 4. Licensed Thermal Power (MWt):                                                                  QURD CITIES 2
: 5. Nameplate Rating (Cross MWe):                    920 X 0.9      828 ISG3 6.. Design Electrical Rating (Het MWe):                        789
: 7. Maximum Dependable Capacity (Gross MWe):                    813
[        (m
: 8. Maximum Dependable Capacity (Net MWe)8                      769                                    .
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NONE
: 10. Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Any                                              1000-NOME                                                                                                                                        o MONTH 744.0 YEAR
: 2. 184.0 CUMULATIVE 103.318.O                reo cree et mmm testm OrtrevL cosett!ONS              Q
: 12. Report Period Hrs                                                                                        -    -- --    - --- -'---    -100 744.0        989.5      78.907.1
: 13. Hours Reactor Critical l
: 14. Rx Reserve Shtdwn Hrs                    .0          .0      2.985.8  g{                                                            ~ 80 744.0        904.3      76.ff4.1
: 15. Hrs Generator On-Line
                                                  .0          .0          702.9
: 16. Unit Reserve Entdwn Hrs                                                      800-                                                      -80
: 17. Gross Thern Ener (NWH)            1.783.500  1.977.283 157.359.371 583.515    641.733 50.077.491
: 18. Gross Elec Ener (MWH)                                                                                                                    - to
: 19. Met Elec Ener (MWh)                554.974    608.312 46.943.186 100.0        41.4          73.7
: 20. Unit Service Factor                                                                                                                      -30 100.0        41.4          74.4
: 21. Unit Avail Factor 36.2          59.t
: 22. Unit Cap Factor (MDC Met)              97.0
                                                                                                                                            -,    0 57.6        0          ,-      ,-  ..-      -..
20 25      30
: 23. Unit Cap Factor (DER Net)              94.5        35.3                          0        s      to    'Is DAYS
                                                    .0        10.6            8.6
: 24. Unit, Forced Outage Rate
                                                    .0      t07.7      3.297.8
: 25. Forced Outage Hours MRRCH 1984
    .26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):
NONE -
PAGE 2-267
* 27. If Currently Shutdown Estimate'd Startup Date            s      H/A
 
      , i, .      . . .      .          .
j '(
              ,'                                                                                                                                          MNNhWNNNNNNNNNNhMNNNNNNNNNNNNNNNNNNM Report Period MAR 1984                                    UNIT      SHUTD0WHS / REDUCTIONS                                            N                          QUAD CITIES 2        N NNNNNNNNMMMNNhMNNNNNNNMMNNNNNNNNMMMM No.              Date-    1222 Hours Reason Method LER Humber System Component                                    Cause & Corrective Action to Prevent Recurrence 5            03/03/84- F            0.0        8      5                                HG    DEMINX    REDUCED LOAD DUE TO CONDENSATE DEMINEfALIZER PROBLEMS.
84-6            03/05/84 rF            0.0 ' ' 8          5                                HG    DEMINX    REDUCED LDAD DUE To CONDENSATE DEMIN';RALIZER PROBLEMS.
84-7-.        ~03/06/84^      F.  '0.0          B      5                                  HG    DEMINX    REDUCED LOAD DUE TO CONDENSATE DEMINERALIZER PROBLEMS.
                '84-8            03/07/84        5    0.0          8      5                                CD.  .VALVEX    REDUCED LOAD FOR WEEKLY MSIV TESTING.
84'9 ~03/07/84 F  .0.0,          B    'SJ                                HA    TURBIN    REDUCED LOAD DUE TO HIGH TURBINE VIBRATION.
T  L84-10 03/10/84                  :S  . 0 '. 0      5      5                                  RB    CONROD    REDUCED LOAD FOR CONTROL ROD PATTERN ADJUSTMENTS.
E
                  '84 11 l83/17/84                F    0.0          B      5                                  CH    VALVEX    REDUCED LOAD DUE TO FAILED FEEDWATER REGULATING VALVE.
                .84-12            03/24/84- 5        ;0.0          8      5                                  CB    ZZZZZZ    REDUCED LOAD FOR FLOW CONTROL LINE DETERMINATI0H AND SINGLE RECIRCULATION LOOP OPERATION DATA i                                                                                                                                COLLECTION.
i 5
n                                          ,      ,
k NNNNNNNNNNN-                  QUAD CITIES 2 OPERATED ROUTINELY IN MARCH.
N
 
==SUMMARY==
N          z s NNNNNNNNNNN'                                                                                                                                                                                        ,
Yvne ~              Reason                                    Method                          system 8 Component F-Forced- A-Equip FalIure F-Admin                              1-Manual                        Exhibit F & H L                                                                G-oper Error 2-Manual Scram Instructions .for LS-Sched  *V'      :B-Maint'or.
C-RefuelingTest ' H-Other                3-Auto Scram                    Preparation of "D-Regulator Restriction                    4-Continued                    Data Entry Sheet E-Operator _ rainings .                  5-Reduced Load Licensee Event Report
                                            & License Eramination              9-Other                        (LER) File (NUREG-0161)
PAGE 2-263
 
unassummuuuuuuuuuuuuuuuuuuuuuuuummuu OUAD CITIES 2                m u
FACILITY          DATA                                            Report Period MAR 1984
                'muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuum
[_
i                FACILITY DESCRIPTION                                                  UTILITY a CONTRACTOR INFORMATION 1 LOCATION-                                                          UTILITY STATE....................ILLIN0IS                              LICENSEE................. COMMONWEALTH EDISDN N                            COUNTY...................R0CK ISLAND                            CORPORATE ADDRESS........P.O.      BOX 767 CHICAGO, ILLINOIS 60690
                            -DIST'AND DIRECTIOk FROM                                      CONTRACTOR NEAREST POPULATION CTR.. 28 MI NE OF                            ARCHITECT / ENGINEER.......SARGENT & LUNDY
                                                        -MOLINE, ILL
                    ~ TYPE OF REACTOR............BWR-                                        MUC STEAM SYS SUPPLIER... GENERAL ELECTRIC
            \"      'DATE INITIAL CRITICALITY... APRIL 26, 1972                              CONSTRUCTOR.............. UNITED ENG. 4 CONSTRUCTORS DATE ELEC'ENER[1ST GENER...MAY 23,'1972                            TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... MARCH to, 1973                    REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                            IE REGION RESPONSIBLE......III CONDENSER COOLING WATER.. iMISSISSIPPI' RIVER                    IE RESIDENT INSPECTOR......A. MADISON ELECTRIC RELIABILITY                                            LICENSING PROJ MANAGER.....R. BEVAN DOCKET NUMBER........... 50-265 C00MCIL..................MID-AMERICA
                        -                                  INTERPOOL NETWORK            LICENSE & DATE ISSUANCE....DPR-30, DECEMBER 14, 1972
_s-            . /-
PUBLIC DOCUMENT R00M.......M0LIHE PUBLIC LIBRARY
                                                  ^                                                                        504 17TH STREET MOLINE, ILLINOIS 61265 INSPECTION              $TATUS j      INSPECTION SufflARY 12-13, 31, NOVEMBER 4-5, 15, DECEMBER 7, 21, JANUARY 5, 9-10, 12 AND INSPECTION ON AUGUST 4,' SEPTEMBER 16, 20, OCTOBER 5-6, FESRUARY 2, (83-23): '~ REVIEW OF INSERVICE INSPECTION (ISI) ACTIVITIES, REPLACEMENT OF THE REACTOR WATER CLEANUP (RWCU) SYSTEM
                    -PIPING, TORUS MODIFICATION, IE BULLETINS, LICENSEE EVENT REPORTS (LER), FROSION OF PUMP CASINGS OF RHR SERVICE WATER, AND MEETINGS
              ~
: AT EPRI-NDE CENTER AND THE MRC HEADQUARTERS. THIS                  INSPECTION NO ITEMS          INVOLVEDOR OF NONCOMPLIANCE        A TOTAL  OF 120 DEVIATIONS    INSPECTOR-HOURS WERE  IDENTIFIED.        BY TWO NRC INSPECT INCLUDIN0jt2 INSPECTOR-HOURS ONSITE DURING OFF-SHIFTS.
_ INSPECTION ON NOVEMBER-17. THROUGH JANUARY 24, (83-30): SPECIAL, UNANNOUNCED INSPECTION BY THE RESIDENT INSPECTORS OF AN EVENT THE INSPECTION INVOLVED A TOTAL OF 78
                    -INVOLVINO THE DEFEATIMG OF SECONDARY CONTAINMENT INTEGRITY DURING OPERATION.11 NRC PERSONNEL IN THE REGION III 0FFICE
                    , INSPECTOR-NOURS ON~Gali BY TWO NRC          INSPECTORS AND 33 HOURS BYTWO ITEMS OF HONCOMPLIANCE WERE IDENTIFIED (EXCEEDING TECHNICAL CONFERENCE ON JAMbARY'I4, 1984. IN~THE AREA INSPECTED, SPECIFICATION LIMITING CONDITION FOR OPERATION FOR SECONDARY CONTAIMMENT INTEGRITY; AND NOT HAVING A PROCEDURE FOR CONTROLLING STATUS OF THE MAIN ST'.AM ISOLATION VALVE ROOM).
ENFORCEf" LINT SufflARY NOME 1
  )+
m PAGE 2-264
                      'd>-
E:
 
  ~m
  .+
Report Period MAR 1984                                                                                                muunuwwunnuwunununnununuunununummunu IN$PECTIoN                    $TATU$ - (CONTINUED)              M        QUAD CITIES 2
* MNNNNNNWMMMMMMMNNNNNNMMMNNNNNNNMMNNM m;
j STHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NOME FACI (ITY ITEMS (PLANS AND PROCEDURES):
NOME MANAGERIAL ITEMS *'
                    ' NOME PLANT. STATUS THE UNIT IS OPERATING NORMALLY.
LAST IE SITE INSPECTI9N DATE: FEBRUARY 1 - MARCH 30, 1984 INSPECTION REPORT NO: 84-02 t'                                                                '
      ,                                                                            REPORT $              FR0M              LICENSEE
                        ============================================== ====================================================
NUMBER . DATE OF        DATE OF          . SUBJECT EVENT          REPORT
_ ___ ___. ________.              ----  ____ __=-_.
44-03/'      02/11/84      03/08/84 LOSS OF 480 VT ESSENTIAL SERVI 0c BUSES 28 8 29 WHILE THE UNIT WAS SHUT DOWN.
84-04/.      02/15/84 ' 03/13/84 REACTOR SCRAM WHILE SHUT DOWN CAUSED BY FAULTY 10% CLOSURE LIMIT SWITCH ON MSIV A0-2-203-2A.
                      ====================================================================================================
r I
                                      'S osa.
: g.            -
PAGE 2-265
:9:
 
g,. .
'i 50-312                0PERATING              STATUS                    NNNNNNNNNNNNNNNNNMMNNNNNNNNNNNNNNNNM
: 1. Decket                                                                              N              RAhCHO SECO 1                    N 03/81/84          Outage + On-line Hrs: 744.0                NNNNNNNNNMMNNNNNNNNNNNNNNNNNNNNNNNNN
: 2. Reporting Period
: 3. Utility
 
==Contact:==
RON COLOMBO (916) 452-3211                                        AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thersal Power (MWt):                              2772    _
: 5. Nameplate Rating (Gross MWe):                      1070  X 0.9 ? 963
: 6. Design Electrical' Rating (Het MWe):                        918 DESIGN ELEO. RATING -        918
: 7. Maximum Dependable Capacity (Gross MWe):                    917                    ......PMX. DEPEND. CRP. -              G73 (10C%)
: 8. Maximum Dependable Capacity (Het MWe):                      873
: 9. If Changes.0ccur Above Since Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted, If Any (Het NWe):
11.. Reasons fo6 Restrictions, If Any                                          1003-t:            HONE
                                                                                                  ------------------------------------...                -100 MONTH          YEAR    CUMULATIVE
: 12. Report Period Hrs                        744.0    2.184.0    78.505.0 13.. Hours Reactor Critical                  454.3    1.888.1    46,2).9 m 1
                                                                                                                                                          - 80 9.603.5 hf
: 14. Rx Reserve Shtdwn H.s-                    289.7      289.7 15.' Hrs Generator On-Line                    442.5    f.876.3    44.418.5
                                                                                                                                                          - 80
: 16. Unit Reserve Shtdwn Hrs                      .0        .0      1.210.2    500-
: 17. Gross Therm Ener (MWH)            1.077.476    4.540.307 110.451,o49
: 18. Gross Elec Ener (MWH)                355.757    1.519.329  36.915.401                                                                    ,
: 19. Het Elec Ener (MWH)                  333.1(9 '1 429.380      34.803.704
: 20. Unit Service Factor                        59.5      85.9          56.6                                                                    ~
: 21. Unit Avail Factor                          59.5      85.9          58.1
: 22. Unit Cap Factor (MDC Net)                  51.3      75.0          50.8 0
: 23. Unit Cap Factor (DER Het)                  48.8      71.3          48.3        0          5        1'O      l's      '20  2's  '3h 27.4                                    D8YS 24.. Unit Forced Outage Rate                  40.5        14.1
: 25. Forced Outage Hours                      301.5      307.7      16.717.7 MARCH 1984
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):
NONE PAGE 2-266 27; If Currently Shutdown Estimated Startup Date:                  04/19/84
                                          ~ - '
 
NNMMMMMWNWMMMNNNNMMMMMWNMMMMMMMMMMMM
              . Report Period MAR 1984                            UNIT      SHUTD0WH$ / RED 3CTIONS                        w          RANCHO SECO 1          m wwwwwnwumunnunummwwwumuwwwwummuuuunu
                                                                                                                                                                    ~~
No.              Date      lyng Hours keason Method LER Number System Comoonent              Cause & Corrective Action to Prevent Recurrence 4            -02/29/84          F  11.3    A    4  84-7          EA                PG8E LOSS OF TRANSMISSION LINES CAUSED LOW VOLTAGE FREQUENCY. PLANT COULD NOT HANDLE LOAD DEMAND ON 3 RCP OPERATION.
5            193/19/84  '
F 290.2    .A    2  8%-15          HA                HYDROGEN EXPLOSION IN EXCITER ENCLOSURE. CORRECTIVE ACTION UNDER INVESTIGATION.
L
          .                                                                                                                                                              i i
I s,
r_ w n u u n n u n u m .-      RANCN0 SECO EXPERIENCED 2 SH'JTDOWNS IN MARCH AS DESCRIBED
            -O
 
==SUMMARY==
-M                    ABOVE.
              ;muwungwunn
            - Twee'                Reason                            Method          Svstem 8 Component F-Forced A-Equip Failure F-Admin-                      1-Manual        Exhibit F & H
            - S-Sched              B-Maint or Test G-Oper Error' 2-Manual Scram . Instructions.for C-Refueling .      ' H-Other-    3-Auto Scram    Preparation of D-Regulatory Restriction          4-Continued      Data Entry Sheet E-Operator Training'              5-Reduced Load Licensee Event Report 4 License Examination      9-Other          (LER) File (NUREG-0161)
PAGE 2-267
 
                                      . .          _    _ _  m    .          __.          _        _      _        .              _  ~    _              .
teammmmmmmmmmmmmmmmmmmmmmmmmmunummum D              RANCHO SECO 1                m "tummmmmmmmmmmmmmmmmmmuummmmmmmmmmmuu                      FACILITY              DATA                                                  Report Period MAR 1984 FACILITY DESCRIPTION                                                    UTILITY 8 CONTRACTOR INFORMATION
        -LOCATION                                                              UTILITY STATE.................... CALIF 0RMIA LICENSEE................. SACRAMENTO MUN. UTIL. DISTRICT COUNTY................... SACRAMENTO                                CORPORATE ADDRESS....... 6201 S STREET P.O. BOX 15830 SACRAMENTO, CALIFORNIA 95813 DTST AND DIRECTION FROM fMEAREST POPULATION CTR.. 25 MI SE OF                              CONTRACTOR SACRAMENTO, CA                        ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                            HUC STEAM SYS SUPPLIER... BABCOCK 8 WILCOX DATE IMITIAL CRITICALITY... SEPTEMBER 16, 1974                            CONSTRUCTOR..............BECNTEL DATE ELEC EMER IST GENER.. 0CTOBER 13, 1974                              TURBINE SUPPLIER. . . . . . . . . WESTINGHOUSE EDATE COMMERCIAL OPERATE.... APRIL 17, 1975                          REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWERS                            IE REGION RESPONSIBLE......V CONDENSER COOLING MATER....FDL50M CANAL                              IE RESIDENT INSPECTOR......N. CANTER ELECTRIC RELIABILITY                                                  LICENSING PROJ MANAGER.....S. MINER COUNCIL.................. WESTERN SYSTEMS                            DOCKET NUMBER........... 50-312
                                              -COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-54, AUGUST 16, 1974 PUBLIC DOCUMENT ROOM....... BUSINESS AND MUNICIPAL DEPARTMENT SACRAMENTO CITY - COUNTY LIBRARY 828 I STREET SACRAMENTO, CALIFORNIA 95814 IN5PECTI0M                STATUS INSPECTION SUPMARY
          + INSPECTION ON MOVEMBER 7-18, 1983 (REPORT NO.
50-312/83-35) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
          +-INSPECTION ON FEBRUARY 7 - 10, 1984 (REPORT NO.          50-312/84-02) AREAS INSPECTED: SPECIAL INSPECTION OF VARIOUS PAS TEAM FINDINGS AT RANCHO.SECO. THE INSPECTION INVOLVED 28. INSPECTOR-NOURS ONSITE BY ONE NRC INSPECTOR.
RESULTS: 'TNIRTEEN OF THE PAS FINDINGS WERE IDENTIFIED TO BE VIOLATIONS. TWO ITEMS WERE NOT REVIEWED BECAUSE THEY WERE REPORTED IN INSPECTION REPORT NO. 312/83-34.
          *3 INSPECTION ON FEBRUARY 13 - 17, 1984 (REPORT HO.          50-312/84-03) AREAS INSPECTED: THIS WAS A ROUTINE, ANNOUNCED, CONFIRMATORY MEASUREMENTS INSPECTION INVOLVING THE REGIDH V MOBILE LABORATORY. THE INSPECTION INVOLVED 34 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR.
RESULTSt' NO ITEMS OF NOMCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
        .+ INSPECTION ON JANUARY 9 - FEBRUARY 24, 1984 (REPORT NO. 50-312/84-04) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF 0PERATIONAL SAFETY VERIFICATION; SPENT FUEL STORAGE MODIFICATION; EMERGENCY PLANNING; PART 21 REPORT FOLLOWUP; MEDIA CONTACT; RADIOLOGICAL CONTROLS TRAINING; TMI MODIFICATIONS; AND ENVIRONMENTAL SAMPLING. THE INSPECTION INVOLVED 211 INSPECTOR-HOURS ONSITE BY TWO NRC INSPECTORS.                                                                                                                          PAGE 2-268
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum Report Period MAR 1984              IN$PECTION.                5TATUS - (CONTINUED)                u          RANCHO SECO 1              m unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu INSPECTION
 
==SUMMARY==
 
_RESULTS ' MO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
              + INSPECTION ON APRIL 9 - 13, 198% (REPORT NO.      50-312/84-05) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
              + INSPECTION ON MARCH 9 - 13, 198%-(REPORT HD.      50-312/84-06) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
EkFORCEMENT
 
==SUMMARY==
 
TECHNICAL SPECIFICATION 6.8.3.A STATES, " TEMPORARY CHANGES TO PROCEDURES OF 6.8.1 ABOVE MAY BE MADE PROVIDED:(A) THE INTENT OF THE ORIGINAL PROCEDURE IS NOT ALTERED." CONTRARY TO THE REQUIREMENT, ON OCTOBER 25, 1983 AN INTENT CHANGE WAS NADE TO OPERATING
            . PROCEDURE A.31, DIESEL GENERATOR SYSTEM, THAT BYPASSED A LIMIT AND PRECAUTION STATEMENT WHICH PROHIBITED THE OPERATION OF TWO
          - DIESEL GENERATORS IN PARALLEL WITH THE 220KV SYSTEl*. AT THE SAME TIME.
            . TECHNICAL SPECIFICATION 6.8.3.A STATES, " TEMPORARY CHANCES TO PROCEDURES OF 6.8.1 ABOVE MAY BE MADE PROVIDED:          (A) THE INTENT 60F s            THE ORIGINAL PROCEDURE IS NOT ALTERED." CONTRARY TO THE REQUIREMENT, ON DECEMBER 14, 1983, AN INTENT CHANGE WAS MADE TO SURVEILLANCE PROCEDURE SP200.04, INCORE INSTRUMENT SURVEILLANCE, WHICH BYPASSED A LIMIT AND PRECAUTION STATEMENT THAT REQUIRED EQUILIBRIUM XEMON BE PRESENT PRIOR TO PERFORMING THE TEST.
          .(8334 4)
TECHNICAL SPECIFICATION 6.8.1 STATES IN PART, " WRITTEN PROCEDURES SHALL BE ESTABLISHED, IMPLEMENTED AND MAINTAINED COVERING THE ACTIVITIES REFERENCED BELOW      A. THE APPLICABLE PROCEDURES RECOMMENDED IN APPENDIX "A" 0F REGULATORY GUIDE 1.33, NOVEMBER, 1972."
APPENDIX "A" 0F REGULATORY GUIDE 1.33, NOVEMBER, 1972 STATES THAT EQUIPMENT CONTROL ADMINISTRATIVE PROCEDJRES SHOULD BE IN PLACE
          .AT THE PLANT. ADMINISTRATIVE PROCEDURE 26 (AP.26) STATES IN PARAGRAPH 5.52, "... FOREMAN OF CRAFTSMAN CLOSES OUT ENTRY IN SHIFT SUPERVISOR'S LOG AND RELEASES EQUIPMENT TO OPERATIONS TO BE PLACED IN SERVICE. LOWER PART OF TAG IS DESTROYED." CONTRARY TO THE REQUIREMENT, ON NOVEMBER 7,    1983, AT 8:40 AM THE INSPECTOR DISCOVERED THE LOWER PART OF ABNORMAL TAGS 3035 AND 3036 ON THE CONTROL ROOM STATUS MANGER AND THE ABNORMAL TAG LOG INDICATED THESE TAGS WERE STILL HUNG. IN FACT, THE TWO T AGS WERE REMOVED AND THEIR STATUS NOT UPDATED.
(8334 5)
TECHNICAL SPECIFICATION 6.8.1 STATES IN PART THAT " WRITTEN PROCEDURES SHALL BE ESTABLISHED, IMPLEMENTED AND MAINTAINED..." A TEMPORARY' CHANGE:TO OPERATING PROCEDURE A.52, HYDROGEN MONITOR AND PURGE SYSTEM REQUIRED IN STEP 7.27 THAT ONE IS TO "CPEN WGS-097," THE HYDROGEN PURGE BLOWER SUCTION VALVE TO ENSURE THAT AIR WOULD FLOW INTO THE REACTOR BUILDING. THE CHANGE REQUIRED IN
                                    ~
STEP.7.2.8 THAT ONE IS TO "CLOSE WGS-097 WHEN REACTOR BUILDING PRESSURE APPROACHES -0.25 PSIG ON THE TREND RECORDER." CONTRARY TO THIS REQUIREMENT,'BETWEEN 1305 AND 1533 ON DECEMBER 29, 1983, A.52, STEPS 7.2.7 AND 7.2.8 WERE NOT FOLLOWED IN THAT HGS 005 AND NGS 010 WERE MANIPULATED IN ACCORDANCE WITH THE ORIGINAL PROCEDURE RATHER THAN HGS 097 AS PER THE TEMPORARILY CHANGED PROCEDURE.
VIOLATION ASSESSED CIVIL PENALITY: TECHNIOAL SPECIFICATION 3.5.1.2 REQUIRES, "IN THE EVENT THE NUMBER OF PROTECTION CHANNELS
          -OPERABLE FALLS BELOW THE LIMIT GIVEN UNDER TABLE 3.5.1-1, COLUMNS A AND B, OPERATION SHALL BE LIMITED AS SPECIFIED IN COLUMN C.                IN THE EVENT-THE NUMBER OF OPERABLE PROCESS INSTRUMENTATION CHANNELS IS LESS THAN THE TOTAL NUMBER OF CHANNEL (S), RESTORE THE
          ' INOPERABLE CHANNELS TO OPERABLE STATUS WITHIN SEVEN DAYS, OR BE IN AT LEAST HOT SHUTDOWN WITHIN THE NEXT 12 HOURS.              IF THE NUMBER 10F OPERABLE CHANNELS- IS LESS THAN THE MINIMUM CHANNELS OPERABLE, EITHER RESTORE THE INOPERABLE CHANNELS TO OPERABLE, WITHIN 48 HOURS'OR BE IN AT LEAST HOT SHUTCOWN WITHIN THE NEXT 12 HOURS." TECHNICAL SPECIFICATION TABLE 3.5.1-1,            ITEM 1 UNDER PROCESS INSTRUMENTATION LISTS 3 TOTAL PRESSURIZER WATER LEVEL CHANNELS IN COLUMN A AND ONE MINIMUM CHANNEL CPERABLE IN COMUMN B. COLUMN C
          . REFERS ONE TO SECTION 3.5.1.2. TECHNICAL SPECIFICATION 1.3 DEFINES OPERABLE AS FOLLOWS: "A COMPONENT OR SYSTEM IS OPERABLE WHEN "IT IS CAPABLE OF PERFORMING ITS INTENDED FUNCTION WITHIN THE REQUIRED RANGE.          THE COMPONENT OR SYSTEM SHALL BE CONSIDERED TO HAVE THIS CAPABILITY WHEN:      (1) IT SATISFIES THE LIMITING CONDITIDHS FOR OPERATION DEFINED IN SPECIFICATION 3, AND (2) IT HAS BEEN TESTED PERIODICALLY IN ACCORDANCE WITH SPECIFICATION 4, AND HAS MET ITS PERFORMANCE REQUIREMENTS." CONTRARY TO THESE REQUIREMENTS, THE PLANT WAS~0PERATED BETWEEN THE THIRD SHIFT ON OCTOBER 29, 1983 AND THE THIRD SHIFT ON DECEMBER 15, 1983 OUTSIDE THE
          ; PERFORMANCE REQUIREMENTS FOR PRESSURIZER WATER LEVEL INSTRUMENTS.
PAGE 2-269 6
d__
 
ununumununumwwwwwwwunummununununuwwwm N                  RANCHO SECO 1 Report Period MAR 1984            IN5PECTIOH        STATUS  -
(CONTINUED)
WWMMMMMMMMMMMMMMMwWMMMMMMMMNNNNMMMPM ENFORCEMENT
 
==SUMMARY==
 
(8336 4)
OTPER ITEMS SYSTEM AND COMP 0HENT PROBLEMS:                                                                          PRINCIPAL GENERATOR AND
: 19. 1984.
  +  LEAKAGE OF HYDROGEM FROM THE MAIN ELECTRICAL GENERATOR RESULTED IN AN EXPLOSIDH O EXCITER COMPONENTS WERE NOT DAMAGED.
SYSTEMS AND COMPONENT PROBLEMS:
FACILITY ITEMS (PLAHS AND PROCEDURES):
HOME
  -MANAGERIAL ITEMS 8 HOME PLANT STATUS 8
  + THE PLANT RESUMED OPERATION ON MARCH f UPSET. OPERATIDH CONTINUED AT FOLLOWING A FEBRUARY 29 TRIP WHICH RESULTED FROM A FEE
  .THE MAIN GENERATOR / EXCITER HOUSING. 90 PERCENT POWER UNTIL MARCHTHE PLANT WAS PLACED IN COLD SHUTDOWN F MID-APRIL, 1984.
LAST IE SITE INSPECTION DATE: 04/09-13/84+
INSPECTION REPORT N08 50-312/84-05+
PAGE 2-270
 
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNMMWNNN Report Period MAR 1984                                  REP 0RTS            FR0M    LICENSEE                      N          RANCMD SECO 1                  N NNNNNNNNNNNNNNNNNNNNNNNNNNNNNMMMNNNN
      =========================================================================================================:-:=======e==============
NUMBER    DATE OF    DATE OF        SUBJECT EVENT      REPORT                                                                                            -------------------
___ ___ _ _                  _                __        _=    -    ___.      ... _ _            -------------------==
83-28      89-19-83  10-03-83        POWER-OPERATED RELIEF FAILED OPEN AT LOW PRESSURE (30 PSIG)
                    -81T-0 83-30      08-29-83  89-27-83      XEMOM-133 IN MITROGEN GAS SYSTEM 01L-S 83-33      09-01-83  89-29-83        IMPROPER REVIEW OF MSRW PUMP SURVEILLANCE TEST 01L-0 83-34      09-12-83  10-11-83        DVERDUE PERFORMANCE OF AUXILIARY FEED SURVEILLANCE TEST
                  ~91L-0 43-35'    09-20-83  10-11-83        ACTIVITY IN COMPONENT COOLING WATER SYSTEM 01L-8 83-36      09-19-83  10-18-83      -SLAL LEAKAGE IN  'B' DICAY MEAT PUMP
                  .01L-0 83-40      12-C9-83  81-09-84        IMPROPER CALIBRATIOP OF AUXILIARY FEEDWATER FLOW INDICATORS 01L-0 84-83      01-17-84  02-17-84      APPROVAL OF SURVEILLANCE PROCEDURE IN CONFLICT WITH TECH SPECS 01L-8 84-04      01-24-84 .
83-02-84        FAILURE OF POWER SUPPLY TO METEOROLOGICAL TOWER SIL-0
                                  ~
54-05      01-10-84  02-17-84      .IN0PERABILITY OF EMERGENCY EVACUATION SIRENS B1L-0 84-06  'l 81-31-84    03-02-84' ,50ME FIRE BRIGADE MEMBERS DID NOT ATTEND REQUIRED TRAINING SESSION 01L-0
      ==================================================================================================================================
PAGE 2-271
 
STATUS                    unnuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum
  ,1. Docket  50-261          0PERATING                                      u                ROBIHSON 2              m Outage + On-line Hrs:    744.0          unuuuuuuuuuuuuuuuununuwwwwwwwwwwnuun 2._ Reporting Period    03/81/84 H. RAY MORRIS (883) 385-4524                          AVERAGE DAILY POWER LEVEL (MWe) PLOT 3.-Utility. contact
: 4. Licensed Thermal Power (MWt):                    2500                                ROBINSON 2
: 5. Nameplate Rating (Gross MWe):            854 X 0.9 = 769 1500
: 6. Design Electrical Rating (Met MWe):                700                                                    700 OESIGN ELEC. RRTING -
700                    .. .. tutX , DEFEPs). Ofr. -  885 t100%)
: 7. Maximum Dependable Capaeity (Gross NWe)*
: 4. Maximum Dependable Capacity (Net MWe):            665
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NOME
:18. Power Level To'Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Anyt                                  goas.
MONE CUMULATIVE R
MONTH      YEAR                                                                              E
: 12. Report Period Mrs              744.0    2.186.0    114.630.0 616.t      84.196.8              NO NET POWER OUTPUT THIS PKMCni
: 13. Hours Reactor Critical              .8 f.675.5            -----------========-------------------- -10D
: 14. Ex Reserve Shtdun Mrs              .6      38.9
: 15. Hrs Generator On-Line              .0      615.8    82.065.9 l                                                    - 30
                                            .e        .0          23.2    ses-16;.. Unit Reserve Shtdun Hrs
: 17. Gross Thers'Ener (MWH)              0  783.895 162.875.180                                                          -80 0  246.810  52.344.876
: 18. Gross Elec Ener-(MWH) 49.438.457                                                          . go
: 19. Het Elec Ener (MWH)            -2.680    218.833 28.2          71.6
: 20. Unit' Service Factor                .0
                                                                                                                              -20 21 Unit Avail Factor                    .e      28.2          71.6
: 22. Unit Cap Factor (MDC Net)          .0      15.1          64.9 0        ~~
                                            .0      14.3          61.6        o        5    l'o    l's  ~b 2    '25 '  '30
: 23. Unit Cap Factor (DER Met)
UOYO
: 24. Unit Forced Outage Rate            .e      17.2          14.6
                                            .8      128.2      8,233.5
: 25. Forced Outage Mours MARCH 1984
  ' 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):
NONE PAGE 2-272
: 27. If. Currently Shutdown Estimated Startup Date:        10/25/84 1
 
unuunummuunnumwwwwwwwwwwumununummunu Report Period RAR 1984                  UNIT -5HUTD0WMS / REDUCTION 5
* ROBINSON 2
* NMMMNNMMMMMMMMWNNMMNNMWNNNNWMWNMMMMM No. Date    IEig Hours Reason Nethod LER Numbet_ Systei Component            Cause 8 Corrective Action to Prevent Recurrence 8301  01/26/84      5 744.0      'C    4                CJ '    HTEXCH    CONTINUATION OF REFUELING AND STEAM GENERATOR REPLACEMENT DUTAGE.
numswammunu      ROBINSON 2 REMAINS SHUTDOWN FOR REFUELING AND MAINTENANCE.
M
 
==SUMMARY==
M-
          .ummmuumumuu Tvoe      Reason                          Method          Svstem 8 Component F-Forced A-Equip Failure F-Admin            1-Manual      Exhibit F 8 H S-Sched-.B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling      -H-Other      3-Auto Scram  Preparation of D-Regulatory Restriction-      4-Continued    Data Entry Sheet E-Operator Training            5-Reduced Load Licensee Event Report 4 License Examination        9-Other        (LER) File (HUREG-0161)
PAGE 2-273
 
ruuuuuuuuuuuuuuuuuuuuuuuuuuuuuuzumum 0        .
ROBIMSON 2                m tuuuuuuuuuuuuuuuuuuuuuuuuuuuuuurunum                FACILITY          DATA                                          Report Period MAR 1984 FACILITY DESCRIPTION                                          UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                      UTILITY STATE................... 50UTH CAROLINA                      LICENSEE................. CAROLINA POWER 8 LIGHT COUNTY...................DARLINGTON                          CORPORATE ADDRESS....... 411 FAYETTEVILLE STREET RALEIGH, NORTH CAROLINA 27601 DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 5 MI NW OF                        CONTRACTOR HARTSVILLE, SC                      ARCHITECT / ENGINEER.......EBASCO TYPE OF REACTOR............PWR                                  HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE IMITIAL CRITICALITY... SEPTEMBER 20, 1970                  CONSTRUCTOR..............EBASCO DATE ELEC ENER IST GENER... SEPTEMBER 26, 1970                  TURBINE SUPPLIER......... WESTINGHOUSE
  'DATE COMMERCIAL OPERATE.... MARCH 7, 1971                  REGULATORY INFORMATION CONDENSER COOLING METHOD... RECIRCULATION                    IE REGION RESPONSIBLE......II CONDENSER COOLING WATER.... ROBINSON IMPOUNDMENT              IE RESIDENT INSPECTOR......S. WEISE ELECTRIC RELIABILITY                                          LICENSING PROJ MANAGER.....G. REQUA COUNCIL................. 50UTHEASTERN ELECTRIC                DOCKET NUMBER........... 50-261 RELIABILITY COUNCIL                                                  SEPTEMBER 23, 1970 LICENSE 8 DATE ISSUANCE....DPR-23 PUBLIC DOCUMENT R10M.......HARTSVILLE MEMORIAL LIBRARY 220 H. FIFTH ST.
HARTSVILLE, SOUTH CAROLINA 29550 INSPECTION              STATUS IMSPECTION
 
==SUMMARY==
 
  + INSPECTION FEBRUARY 11 - MARCH 10 (84-03): THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 13S INSPECTOR-HOURS ON SITE IN THE AREAS OF TECHNICAL SPECIFICATI0H COMPLIANCE, PLANT TOUR, OPERATIONS PERFORMANCE, REPORTABLE OCCURRENCES, HOUSEKEEPING, SITE SECURITY, SURVEILLANCE ACTIVITIES, MAINTENANCE ACTIVITIES, QUALITY ASSURANCE PRALTICES, RADIATION CONTROL ACTIVITIES, OUTSTANDING ITEMS REVIEW, ENFORCEMENT ACTION FOLLOWUP, GENERIC LETTER 83-28 FOLLOWUP, DEFUELING ACTIVITIES, AND INDEPENDENT INSPECTION. OF IHE 15 AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN 13 AREAS; TWO VIOLATIONS WERE FOUND IN TWO AREAS (FAILURi IC MAINTAIN PROCEDURES, PARAGRAPH 5.B; IHADEQUATE SURVEILLANCE TESTING, PARAGRAPH 10).
IMSPECTION FEBRUARY 19-24 (84-04): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 51 INSPECTOR-HOURS ON SITE IN THE AREAS OF PREPARATION FOR REFUELING (UNIT 2); REFUELING ACTIVITIES (UNIT 2); AND SPENT FUEL POOL ACTIVITIES (UNIT 2). OF THE THREE AREAS INSPECTED,-NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 21-22 (84-05) . THIS SPECIAL, UNANNOUNCED INSPECTIDH INVOLVED 14 INSPECTOR-HOURS ON SITE IN THE AREAS OF CONTROL - OF PERSONNEL EXPOSURE, CONTROL OF MORK IN THE CONT AINMENT . IE INFORMATION HOTICE NO.      82-51, AND QUALIFICATION OF CONTRACT HP TECHNICIANS. .iOF THE FOUR AREAS INSPECTED, ND VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN THREE AREAS; ONE APPARENT VIOLATION
  .WAS FOUND IN OME AREA (PARAGRAPH 5).
INSPECTION MARCH 6-9 (84-06): THIS INSPECTION INVOLVED 28 INSPECTOR-HOURS ON SITE BY ONE NRC INSPECTCR. THE INSPECTION WAS BEGUN DURING AN OFFSNIFT PERIOD; 12 HOURS WERE ACCOMPLISHED DURING OFFSHIFT PERIODS. THE IHSPECTION INCLUDED REVIEW OF SECURITY ORGANIZATION-PERSOMMEL AMD RESPONSE; PHYSICAL BARRIERS-PROTECTED AND VITAL AREAS; ASSESSMENT AIDS; ACCESS CONTROL-PERSONNEL AND PAGE 2-274
 
f-MNNNNNNMMMNNNNNNNAMMNNNNNNNNNNNNNNNM ROBINSON 2              N Report Period MAR 1984                INSPECTI-0N            STATUS - (CONTINUED)              M MNNNNNNNMMMNNNNMMMNNMMMMMMNNNNNNNNNM INSPECTION
 
==SUMMARY==
 
PACKAGES; DETECTION AIDS-PROTECTED AND VITAL AREAS; ALARM STATIONS; COMMUNICATIONS; REVIEW OF CONCERNS NOTED IN REPORT NO.
50-261/83-29; CORRECTIVE ACTIONS NOTED IN REPORT NO. 50-261/85-22 AND CP8L COMMITMENTS NOTED IN REPORT NO. 50-261/83-25.
THE LICEN5EE WAS FOUND TO BE IN COMPLIANCE WITH NRC REQUIREMENTS WITHIN THE 14 AREAS EXAMINED DURING THE INSPECTIDH EXCEPT FOR THE FOLLDWING ITEM: ALARM STATIONS.
I'            INSPECTION MARCH 6-9 (84-07): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 20 INSPECTOR-HOURS ON SITE IN THE AREAS OF SEISMIC ANALYSIS FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS (IEB 79-14), PIPE SUPPORT BASEPLATE DESIGNS USING CONCRETE EXPANSION ANCHORS l
(IEB 79-02), AND SG REPLACEMENT LIFTING AND RIGGING PROCEDURES. OF THE AREAS INSPECTED, NO VIOLATIDHS OR DEVIATIONS WERE I
            . IDENTIFIED.
            -CONFERENCE FEBRUARY 23 (84-08): AN ENFORCEMENT CONFERENCE WAS HELD IN THE REGION II 0FFICE. THE DIVISION DIRECTOR OF PROJECT AND RESIDENT PROGRAMS (DPRP) OPENED THE MEETINO BY DISCUSSING AN ENFORCEMENT ISSUE RESULTING FROM AN UNAUTHORIZED ENTRY INTO THE REACTOR CAVITY AT ROBINSON. A FURTHER ISSUE DEALT WITH THE HARRIS QUALITY ASSURANCE PROGRAM AS IT RELATES TO PROCUREMENT OF SERVICES AND MATERIALS FROM VENDORS. FOLLOWING THE OPENING REMARKS, THE LICENSEE PRESENTED THE FINDINGS OF THEIR REVIEW OF THESE EVENTS AND AN OVERVIEW 0F PLANNED CORRECTIVE ACTIONS. THE DIRECTOR, DPRP, SUMMARIZED THE ISSUES AND CONCERNS OF THE NRC.
ENFORCEMENT
 
==SUMMARY==
 
NONE -
OTHER ITEMS
            . SYSTEMS AND COMPONENT PR3BLEMS:
            -'-NOME.-
FACILITY ITEMS (PLANS AND PROCEDURES):
            . NOME.
MANAGERIAL ITEMS:
            - NOME.
            - PIANT STATUS:
ROUTINE OPERATION.
LAST_'E SITE INSPECTION DATE: FEBRUARY 11 - MARCH 10, 1984 +
INSPECTION REPORT NO    50-261/84-03 +
PAGE 2-275
_,,e-
 
av                                                                                                                                                                            '
                                                                                                                                                          'e f_3 - .3_,
p s
L,.
i
                                ~
NNMMNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN                                '
                    - Report Period MAR 1984                              REP 0RTS  FR0M        LICEN5EE                                    N                ROBINSON 2                                                N i                                                                                                                                            MNNNNNNNNNNNNNMMMMNNNNNNNNNNNNNNNNNN i
P-
                      ==================================================================================================================================
r NURSER    DATE OF        DATE OF    SUBJECT EVENT          REPORT 43-933/    12/24/83        01/23/84 . INSTRUMENT LINES TO THE TURBINE FIRST STAGE PRESSURE TRANSMITTER, THd STEAM PRESSURE 03-L                                  TRANSMITTER, AND THE STEAM DRIVEN AFW PUMP DISCHARGE PRESSURE SWITCH FROZE.
84-001/ - 01/26/84        02/24/84    1 0F THE 2 SOURCE RANGE DETECTORS FAILED HIGH CAUSING A SHUTDOWN BANK TRIP.                                            THE CAUSE OF FAILURE WAS MORMAL END OF LIFE OF THE DETECTOR.
                      ================================================================================.==========================================
                          .g PAGE 2-276
          ~ ~ - - -                -  -
 
:= .
                                                                        ' ' , . . . , n .. es* .rq 'gji.k..,;;,;. :f;, fi .c. .' .:C;7 y, 4.} _. *+
. }. . .. j M.: .. . . ' ' . .. ,., .
r .. . _.            .
                                                                                                                  ._  ,.r
_          a-              .
N N
4 N
LL3 O
4 A
W Z
at e
N3 LA.
W
                                        .a
                                        > s me et Z
Q H
Z W
Z M
LLS O
4 L
M M
Z
 
am OPERATING              STATUS                    NNNNNhMNNNNNNNNNNNNNNNNNNNNNNNNNNNNM I d ~~Q 1.t Deckets''50-272                                                                                                M                5ALEM 1                      M
        *j2. Reporting Periodt 03/01/84                                          Outage + On-line Hrst      744.0            NNNNNNNNMMNNNNNNNNNNNNNNNNNNNNNNNNNN
: 3. Utility Contact
* L.      K. MILLER (609) 935-6000 X4455                        AVERAGE DAILY POWER LEVEL (MWe) PLOT
            '4. Licensed Thermal Power (MWt):                                                      3338                                  SRLEM i
: 5. Nameplate Rating (Gross MWe):                                                1300 X 0.9 = 1170
: 6. Design Electrical. Rating.(Het MWe):                                                  1090
                                                                                                                                    - DESIGN EXEC. RATINS - 1000
: 7. Maximum Dependable Capacity,(Gross MWe):                                              1124                    ...  .MRX. DEPEtc. CRP. - 1079 (100%)
: 8. Maximum Dependable Capacity (Het MWe):                                                1079 9.'If Changes Occur Above Sinca Last Report, Give Reasons:
"C;                NOME                                                                                                          NO NET POWER OUTPUT THIS MONTH
: 10. Power Level To Which Restricted, If Any (Het MWe)*                                                            --------------------------------------- ~183
: 11. Reasons for Restrictions. If Any                                                                      gono .
NONE
                                                                                                                                                                                -80 MONTH        YEAR      CUMULATIVE
: 12. Report Period Mrs                                                  744.0    2,184 0      59,209.0 13.1 Hours Reactor Critical                                              .0    1.237.6      34.388.8 54.5      3.088.4                                                            .go
          -14. Rx Reserve Shtdwn Mrs                                                  .0-
: 15. Hrs. Generator On-Line                                                _. 0 1.197.8      32.975.5  g
: 16. Unit Reserve S itdwn prs                                            .0          .0            .0    goo.
                                                                                                                                                                                -10
: 17. Gross Thern Ener-(MWH)                                                  O  3.800.023    99.621.600
          '18. Grcss Elec ' Ener (NH)                                                  0  1,281,380 R ,894,278
: 19. Met Elec Ener (MWH)                                              -6.306    1.217.458    31,188,770
                                                                                                                                                                                -20
: 20. Unit Service Factor.                                                  .0        54.8          55.7
: 21. . Unit Avail Factor                                                    .0        54.8          55.7
: 22. Unit Cap Factor (MDC Het)                                              .0        51.7          48.8 0
: 23. Unit Cap Factor (DER Het)                                              .0        51.1          48.3          0    's      l'O    l'5  ~2Io '        3Is SIO 0
        '24. Unit Forced Oulage_ Rate                                            100.0        45.2          31.2 25." Forced Outage Hours                                                744.0        986.2    15,209.5
: 26. Shutdowns Sched Over HeNt 6 Months (Type,Date, Duration):
                -NOME
: 27. If Currently Shutdown Estimated Startup Date:                                              09/01/84                                                                  PAGE 2-278 l
 
k _
k unuununuwwwumunnunuxuunnununuunummuu SALEM 1              w Report Period MAR 1984                    UNIT      5NUTD0WNS / REDUCTION 5
* NMhMMMMMMMMMMMMMNNWMMMMMMMMNNMMMMMWM Date    1E53 Nours Reason Method LER Number _ System comoonent          Cause & Corrective Action to Prevent Rocurrence No.
4                  RC    FUELXX  REFUELING AND MAINTENANCE OUTAGE CONTINUES.
      . 84-172 92/24/84        F 744.8    A f
n mmmmmmmmmum        .5ALEM 1 REMAINED SHUT DOWN IN MARCH FOR REFUELING AND m
 
==SUMMARY==
m          MAINTENANCE.
nummmmmmmum
      ' Twee        Ram men                          Method          Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin              1-Manual        Exhibit F & H S-Sched      B-Maint    or Test G-Oper  Error 2-Manual. Scram  Instructions for Preparation of C-Refueling        H-Other        3-Auto Scram D-Regulatory Restriction-        4-Continued    Data Entry Sheet E-Operator Training              5-Reducud Load Licensee Event Report
                          & License Examination        9-Other        (LER) File (NUREG-0161)                                            PAGE 2-279
 
I F
muunwunwammunununuununununununumwwww
          -W                  SALEM 1                        m unumummmuunnumwwwunnununummuunuwuMMM                      FACILITY        DATA                                            Report Period MAR 1984
          -FACILITY PESCRIPTION                                                UTILITY 8 CONTRACTOR INFORMATION
          , LOCATION                                                            UTILITY
                  -STATE....................NEW JERSEY                              LICENSEE.................PUBLIC SERVICE ELECTRIC 8 GAS
                  . COUNTY................... SALEM                                  CORPORATE ADDRESS....... 80 PARK PLACE NEWARK, NEW JERSEY 07101 DIST AND DIRECTIDH FROM etEAREST POPULATION CTR.. 20 MI S OF                          CONTRACTOR WILMINGTON, DEL              ARCHITECT / ENGINEER.......PUBLIC SERVICES 8 GAS CO.
TYPE OF REACTOR. . . . . . . . . . . .PWR                            HUC STEAM SYS SUPPLIER...WESTINGNOUSE DATE INITIAL CRITICALITY...DECEMSER 11, 1976.                        CONSTRUCTOR.............. UNITED ENG. 8 CONSTRUCTORS
              .DATE ELEC ENER IST GENER... DECEMBER 25, 1976                        TURBINE SUPPLIER.........WESTINGNOUSE DATE COMMERCI AL OPERATE. . . . JUNE 30, 1977                  REGULATORY INFORMATION
              ,CONDENSEW COOLING METHOD...ONCE THRU                              IE REGION RESPONSIBLE. ....I
_ CONDENSER COOLING WATER.... DELAWARE RIVER                      IE RESIDENT INSPECTOR......T. LINVILLE
              -ELECTRIC RELIABILITY'.                                            LICENSING PROJ MANAGER.....D. FISCHER COUNCIL..................MID-ATLANTIC                            DOCKET NUMBER........... 50-272 AREA COUNCIL LICENSE 8 DATE ISSUANCE....DPR-70, DECEMBER 1,        1976 PUBLIC DOCUMENT ROOM....... SALEM FREE PUBLIC LIBRAR'.'
112 WEST BROADWAY SALEM, NEW JERSEY 08079 INSPECTION
 
==SUMMARY==
 
              -NO INSPECTION IMPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
NOME I .
        - RTHER ITEMS i
p            ~ SYSTEMS AND COMPONENT 5
                  ~
b            ~ NO INPUT PRGVIDED..
FACILITY ITEMS (PLANS AND PROCEDURES)*
            ,NO INPUT PROVIDED.
PAGE 2-280
  =. _.
 
guimumm                    _
i 5*9 3                                                                                                              0 Y&
                                      #        IMAGE EVALUATION                                    /jp[/ /                        '%
g)ffe h
* p//                                TEST TARGET (MT-3)                                                                          4lg,
                                                                                                                            -/k?'          f@N N$+&                                                                                              /q%
{ ^--
* LE la
                                                                          =
l,l liil'8 1.25      1.4        1.6 4                                                150mm
* 4-                                      -
6"                                                    >
4%
  *$1f%p,,                              ,;
                                                                                                  /+4 Rh$
N//                            L'*
                                          .g'.-
4
                                                                                                            *f
_ _ _ _ _ _ _ _ _ - - _ -                    wn        +                  -  - * '''
h
 
m 'b                                      mm h                                          o d$g,
      . *++4++    IMAGE EVALUATION
                    ..., - ., -                ////
                                                    ,  g;.
gyg<>          ,                            , ,
1.0    'd M M yllLE i,i    !'nHM l.8 m
l.25      1.4 1.6
                                =
4                  150mm                  >
I      4                    6"                    >
4    *'                                    'b sb 4f%f[
k 4t                                  h+.Q 4 t  _                    . 1
 
                                                                          )                                  A.        .
i 1
NNNNNNNNNNNNMMNNNNMMMMMMNNNNNMMMMNNN N            SALEM 1
* Report Period MAR 1984                            IN5PECTION                      5TATUS - (CONTINUED)      MMMMMNNMMMMMNNNNNNMMMNNMMMMMMMMMMMMM OTHER ITEMS MANAGERIAL ITEMS:
NO IMPUT PROVIDED.
PLANT STATUS:
NO IMPUT PROVIDED.
LAST IE SITE INSPECTION DATE: NO IMPUT PROVIDED.
INSPECTION REPORT N08 HO IMPUT PROVIDEP.
REP 0RT5                FR0M        LICEN5EE
      ======================================================================================================
NUMBER              DATE OF        DATE OF    SUBJECT EVENT          REPORT
      .....--.==_            _-__==_=_.-----------------        ----- -----._ =_ ==.---===_ ====---------.------------------------------------------------    i J
NO INPUT PROVIDED.
      ======================================================================================================
I l
S PAGE 2-281 O
m__
: l. Docket:                                50-311        0PERATIHG                STATUS                        wwwwwwwmuwwwwwwwwwwwwwwwwwwwwwwwwwwm w                SALEM 2                        w l                                                                                                                  wwwuwwwuMwwwwwwwwwwmnuwwwwwwmwwwwwuu
: 2. Reporting Period: 03/01/84                                Outage + On-line Hrs        744.0
: 3. Utility Contact                              L. K. MILLER (609) 935-6000 X4455                            AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                                  3411 SFREM 2 1162
: 5. Nameplate Rating (Gross MWe):                                                                                                                                                  l
: 6. Design Electrical Rating (Net MWe):                                            1115                U"U
                                                                                                                          -DESIGN ELEC. RATING - 111S
: 7. Maximum Dependable Capacity (Gross MWe):                                        1149                      ......NRX.      DEFEND. CRP. - 1106 tilX)%)
: 8. Maximum Dependable Capacity (Het MWe):                                          1106
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NONE                                                                                                        700 ORN BC EXNm uMER OPTIPWE. MITIONS
                                                                                                                '--------------      -------~~~~~----- --.            100
(  10. Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Any:                                                                  ggg_
                                                                                                                                                                      - 80 MONTH        YEAR      CUMULATIVE                                                                          Q
: 12. Report Period Hrs                                          744.0    2.184.0      21.625.0                                                                          M
: 13. Hours Reactor Critical                                    722.4        741.0      12.449.5 21.6    1.443.0        3.533.6                                                                  .go
: 14. Rx Reserve Shtdwn Mrs                                                                            hf
: 15. Hrs Generator On-Line                                      649.0        649.0      12.066.3
: 16. Unit Reserve Shtdwn Mrs                                          .0          .0              .0      gg).
: 17. Gross Therm Ener (MWH)                                2.059,562    2.064.441    35.535.513                                                                    - tD
: 18. Gross Elec Ener (MWH)                                    670.500    670.500    11.538.790                                                              ,
: 19. Het Elec Ener (MWH)                                      638.998    620.300    10.937.551 87.2        29.7          55.8                                                                  - 30
: 20. Unit Service Factor
: 21. Unit Avail Factor                                            87.2        29.7          55.8
: 22. Unit Cap Factor (MDC Net)                                    77.7        25.7          45.7 0
: 23. Unit Cap Factor (DER Not)                                    77.0        25.5          45.4            0        5      1'O    l's        3'O      '35  IO
: 24. Unit Forced Outage Rate                                      12.8        70.3          32.2                                    UNYS
: 25. Forced Outage Hours                                          95.0    1,535.0        5.718.1
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                                                  MRRCH 1984 NONE
: 27. If Currently Shutdown Estimated Startup Dates                                      N/A                                                                              PAGE 2-282
 
t MMMMMPWNNNMMMMNNNNNNNNNNNMMMMMMMNNNN Report Period MAR 1984                                                                                            UN IT      SHU TD0WHS / REDUCTIONS                              M            SALEM 2              N MMMMNNMMMMMMMMM*MMMMMMMMMMMMMMMMMMMM No.      Date                  Type Hours Reason Method LER Number System Comoonent                                                                          Cause & Corrective Action to Prevent Recurrence 84-010 11/17/83                                  F                  95.0                                    A  4                  HA      GENERA        STATOR CORE IROH GENERATOR.
9
'                                                                                                                        4 s
k e
A
  .NNNNxNNNNNM                            SALEM 2 EXPERIENCED 1 SHUTDOWN IN MARCH FOR GENERATOR ?ROBLEMS.
N
 
==SUMMARY==
N NNMMMNNMMMM Twoe            Reason                                                                                                Method            System 8 Comoonent F-Forced A-Equip Failure F-Admin                                                                                      ,1-Manual        Exhibit F 8 H S-Sched          B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling                                                                    H-Other                3-Auto Scram    Preparation of D-Regulatory Restriction                                                                              4-Continued      Data Entry Sheet E-Operator Training                                                                                    5-Reduced Load Licensee Event Report 8 License Examination'                                                                        9-Other          (LER) File (NUREG-0161)                                          ,
PAGE 2-283
$                                                                                                                                                                        A 4
 
_ . .            _ ~      .            . _ _ . _ _ . . _ _. _ . _ . . _ _ __ _              _.m __. . . -        . __ __ _ _ _ . _ , _ _ . . _ _ _            . _ _ .  . _ _ . _ _ .    ._
i MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMk N            SALEM 2                                          M                                                                                                                                >
MwMwMuwMMuwwMMwwwmumMMMuMwwMwMMMMMMM                                              FACILITY                  DATA                                                      Report Period MAR 1984 FACILITY DESCRIPTION                                                                                UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                                            UTILITY STATE....................NEW JERSEY                                                                  LICENSEE.................PUBLIC SERVICE ELECTRIC 8 GAS COUNTY................... SALEM                                                                      CORPORATE ADDRESS....... 80 PARK PLACE NEWARK, NEW JERSEY 07101 DIST AND DIRECTIDH FROM NEAREST POPULATION CTR.. 20 MI S OF                                                              CONTRACTOR WILMINGTON, DEL                                            ARCHITECT / ENGINEER.......PUBLIC SERVICES 8 GAS CO.                                    i
;            TYPE OF REACTOR. . . . . . . . . . . .PWR                                                              HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... AUGUST 8,                                1980                            CONSTRUCTOR.............. UNITED ENG. & CONSTRUCTORS
!          DATE ELEC ENER IST GENER... JUNE 3, 1981                                                              TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE... 0CTOBER 13, 1981                                                      REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                                                IE REGION RESPONSIBLE. ....I CONDENSER COOLING WATER.... DELAWARE RIVER                                                          IE RESIDENT INSPECTOR......T. LINVILLE
        ,  ELECTRIC RELIABILI11                                                                                LICENSING PROJ MANAGER.....D. FISCHER COUNCIL..................MID-ATLANTIC                                                                DOCKET NUMBER...........            50-311 AREA COUNCIL LICENSE & DATE ISSUANCE....DPR-75, MAY 20, 1981 PUBLIC DOCUMENT ROOM....... SALEM FREE PUBLIC LIBRARY 112 WEST BROADWAY SALEM, NEW JERSEY 08079 INSPECTI0N                        51ATUS INSPECTION
 
==SUMMARY==
 
NO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
NOME OTHER ITEMS SYSTEMS AND COMPONENTS NO IMPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES):
NO INPUT PROVIDED.
4 PAGE 2-284
 
NNNNNNNMMMNNNENNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                                                          IN5PECTION              5TATUS - (CONTINUED)                                      N              SALEM 2                            N NNMMMMMNNNNNNNMMMNNNNNNNNNNNNNNNNMMM OTHER ITEMS MANAGERIAL ITEMS:
NO IMPUT PROVIDED.                                                  ,
PLANT STATUS:
1 NO INPUT PROVIDED.
1 LAST IE SITE INSPECTIDH DATE: NO INPUT PROVIDED.
INSPECTION REPORT NO              NO INPUT PRGVIDED.
4,                                                                                                                                                  REP 0RTS            FR0M              LICEN$EE e      e    e  e          e                    e  e  e  e          e      e                e        me  e                  e      e  e  e                  e        e seem 9
FUMBER          DATE OF      DATE OF                            SUBJECT EVENT        REPORT
___----e..........-------                      =. _ _ _ _ _ _ _ - _ _ ____ __...........-------..--- ===_-- =__- _                    ---- ...............
NO INPUT PROVIDED.
EE          meEmeEEEE E      e EeEE EEEEEI emeEENEeEEEEEeE                        E E        E  e      Ne            e    e  em              e  e    me N  e        eEEEEE EmeEmmEeEEEEEEEEE 1
f i
1 1
L 1
PAGE 2-285
 
i
: 1. Docket                    50-206          0PERATIHG            $TATUS                        MMMMMMMMMMMMMMMNNMMMMMMNNMMMMMMMMMMM N            SAN ONOFRE 1                M
: 2. Reporting Period: 03/01/84                      Outage + On-line Hrs:      744,0              MMMMMMMNNMMMMMMMMMMMMMMMMMMMMMMMMNNM
: 3. Utility contacts                    C. A. NORRIS (714) 492-7700 X56264                        AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                      1347                                              y q
: 5. Nameplate Rating (Gross MWe):                            500 X 0.9 : 450 I" '
: 6. Design Electrical Rating (Het MWe):                                  436 DESIGN ELEC. RATING -  436
: 7. Maximum Dependable Capacity (Gross MWe):                            456
                                                                                                                                    ......MRX. DEPDO. Crr. -    436 1100%)
: 8. Maximum Dependable Capacity (Het MWe):                              436
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NONE
: 10. Power Level To Which Restricted, If Any (Not MWe):
: 11. Reasons for Restrictions, If Any:                                                      1000 -
NOME MONTH      YEAR      CUMULATIVE                                                                o
: 12. Report Period Hrs                                744.0    2.184.0      147,224.0                                                                Q
: 13. Hours Reactor Critical                                .0        .0      88.440.8
: 14. Rx Reserve Shtdwn Hrs                                .0        .0              .0 hf
: 15. Hrs Generator On-Line                                .0        .0      84,821.9
: 16. Unit Reserve Shtdwn Hrs                              .0        .0              .0 500-NO NET POWER DUTPUT THIS MONTH
: 17. Gross Therm Ener (MWH)                                  0          0 108,263,946                                                            _
: 18. Gross Elec Ener (MWH)                                  0          0  36.906.434                                                            ,,,
: 19. Het Elec Ener (MWH)                              -2,325    -7,185    34,934.574
                                                                                                                                                                                - 80
: 20. Unit Service Factor                                    .0        .0            55.5
: 31. Uni t Avail Factor                                    .0        .0            55.5
                                                                                                                                                                                -20
: 22. Unit Cap Factor (MDC Net)                              .0        .0            52.4 0
                                                                                                                                        'S'
                                                                                                                                  ~
: 23. Unit Cap Factor (DER Het)                              .0        .0            52.4          0              1'O    l'5 '  '2b  2'5 '  ' 3'o
: 24. Unit Fc ced Outage Rate                                .0        .0            21.9                              DAYS
: 25. Forced Uutage Hours                                    .0        .0      11.178.3
: 36. Shutdowns Sched Over Hext 6 Months (Tyoe,Date, Duration),                                                    MARCH 1984 THE CURRENT OUTAGE BEGAN FEBRUARY 27, 1982.
: 27. If Currently Shutdown Estimated Startup Date:                              10/01/84                                                                PAGE 2-286
 
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                                  UNIT      5HUTD0WMS / REDUCTION 5                        N          SAM ONOFRE 1            N NNMMMMNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN No.      Date    ]53j Hours Reason Method LER Number System Component                              Cause 8 Carrective Action to Prevent Recurrence 78      02/27/82      5 744.0                        B 4                  ZZ    ZZZZZZ      EXTENDED OUTAGE TO ACCOMPLISH SEISMIC BACKFIT AND MISCELLANEDU$ MAINTENANCE ITEMS.
1 4
1 CNNNNNNNNNN        SAN ONOFRE 1 REMAINS SHU1DOWN FOR SEISMIC BACKFIT AND u
 
==SUMMARY==
N        MAINTENANCE.
KNNNNNNNNNN Tvoe        Reason                                        Method          Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin                            1-Manual      Exhibit F & H 5-Sched      B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Retueling                      H-Other      3-Auto Scram    Preparation of D-Regulatory Restriction                      4-Continued    Data Entry Sheet E-Operator Training                            5-Reduced Load Licensee Event Report
                                                                                    & License Examination                      9-Other        (LER). File (NUREG-0161)
PAGE 2-287
 
;              Cuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnan n                              SAN ONOFRE 1                          m Cuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum                                                FACILITY          DATA                                          Report Period MAR 1984 FACILITY DESCRIPTION                                                                          UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                                UTILITY STATE.................... CALIF 0RNIA                                              LICENSEE................. SOUTHERN CALIFORNIA EDISON COUNTY................... SAN DIEGO                                                CORPORATE ADDRESS....... 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 DIST AND DIRECTIDH FROM NEAREST POPULATION CTR.. 5 MI 5 0F                                              CONTRACTOR SAN CLEMENTE, CA                      ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                                              HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... JUNE 14, 1967                                                  CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... JULY 16, 1967                                                  TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCI AL OPERATE. . . .J ANUARY 1, 1968                                        REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                                    IE REGION RESPONSIBLE......V CONDENSER COOLING WATER.... PACIFIC OCEAN                                                IE RESIDENT INSPECTOR......A. DANGELO ELECTRIC RELIABILITY                                                                    LICENSING PROJ MANAGER.....W. PAULSON COUNCI L . . . . . . . . . . . . . . . . . . WEST ERN SYST EMS                      DOCKET NUMBER........... 50-206 COORDINATING COUNCIL                                                              ,
LICENSE & DATE ISSUANCE....DPR-13, MARCH 27, 1967 PUBLIC DOCUMENT R00M....... SAN CLEMENTE BRANCH LIBRARY 242 AVENIDA DEL MAR SAN CLEMENTE, CALIFORNIA 92672 INSPECTION                STATUS INSPECTION
 
==SUMMARY==
 
                        + INSPECTION ON DECEMBER 12 - 16, 1983 (REPORT NO.                                50-206/83-26) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF QUALITY ASSURANCE PROGRAMS. THE INSPECTIDH INVOLVED 96 INSPECTOR-HOURS ONSITE BY THREE HRC INSPECTORS.
RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
                      + INSPECTION ON JANUARY 22 - FEBRUARY 9,                                1984 (REPORT NO. 50-206/84-05) AREAS INSPECTED: ROUTINE, UNANNOUNCED RESIDENT INSPECTION OF THE OPERATION PROGRAM INCLUDING THE FOLLOWING AREAS: OPERATIONAL SAFETY VERIFICATION, LICENSEE EVENT FOLLOWUP, AND INDEPENDENT INSPECTION EFFORT. THE INSPECTION INVOLVED 68 INSPECTOR-HOURS ONSITE BY THREE NRC INSPECTORS.
RESULTS: NO ITEMS OF MONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
                      + INSPECTION ON FEBRUARY 28 - MARCH 9,                              1984 (REPORT NO. 5C-206/84-06) REPORT CANCELLED.
                    .+ INSPECTION ON MARCH 5 - 9,                              1984 (REPORT NO. 50-206/84-07) AREAS INSPECTED: ANNOUNCED INSPECTION OF RADIATION PROTECTION PROGRAM INCLUDING A REQUEST FOR INSPECTION BY WORKER. THE INSPECTION INCLUDED TOURS OF UNITS 1, 2 AND 3.                                          THE INSPECTION INVOLVED 20 INSPECTOR-HOURS ONSITE BY ONE NRC INSPECTOR.
RESULTS* NO ITEMS OF HONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
PAGE 2-288
 
NNNNNNNNNNNWWWNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                        INSPECTION                  STATUS - (CONTINUED)                M          SAN ONOFRE 1              M NNWWNNNNNNNNNN"MNNNNNNNNNNNNNNNNNNNN INSPECTION
 
==SUMMARY==
 
9
  + INSPECTION ON MARCH 1 - APRIL 3, 1984 (REPORT NO.                  50-206/84-08) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
ENFORCEMENT
 
==SUMMARY==
 
NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NONE FACILITY ITEMS (PLANS AND PROCEDURES):
TI:E PLANT HAS REMAINED SHUTDOWN SINCE LATE FEBRUARY 1982, FOR SEISMIC UP-GRADING, TMI MODIFICATIONS, STEAM GENERATOR TUBE RE-EVALUATION, EMERGENCY CORE COOLING SYSTEM TESTS, AND ROUTINE MAINTENANCE. THESE PROJECTS ARE NEARING COMPLETION AND RESTART IS AWAITING NRC RESOLUTION OF THE SEISMIC ISSUE.
MANAGERIAL ITEMS:
NOME PLANT STATUS:                                                  "
c THE PLANT HAS BEEN IN COLD SHUTDOWN SINCE FEBRUARY 1982, FOR EXTENSIVE SEISMIC REWORK.                    IN JUNE 1983, THE LICENSEE SUBMITTED TO NRR DESCRIPTIONS OF TWO PLANS FOR SONGS UNIT 1 AS WELL AS AN INDICATION OF THE CONTINUING ACTIONS WHICH WILL BE TAKEN UNTIL THE RESUMPTION OF POWER OPERATION. GENERALLY, THE LICENSEE WILL CONTINUE WORK TO COMPLETE NECESSARY MODIFICATIONS TO MAINTAIN THE PLANT IN MODE 5. AT THIS POINT, MODIFICATION EFFORTS WILL CEASE, AND A HOLD ON UNIT 1 ACTIVITIES WILL BE ASSUMED UNTIL AN ACCORD IS REACHED WITH NRR ON THE PLAN FOR RETURNING UNIT 1 TO POWER.
LAST IE SITE INSPECTION DATE:              03/01-04/03/84+
INSPECTION REPORT NO:      50-206/84-08+
REPORTS          FR0M      LICEN5EE
  ===================================================================================================================:==============
NUMBER          DATE OF DATE OF              SUBJECT                                                                                ,
EVENT  REPORT
____-_-____----=_ _          - - _ - _ _ _ _ _ _      =--
                                                                . ---== ____ ----------------= =_-_ ..---------------------------------------------
NOME
  ==================================================================================================================================
PAGE 2-289
 
50-361          0PERATING            STATU$                MuMxuwwuwwwwwwwwumunwwwwwwwwwwwwwwww
: 1. Docket
* 54H ONOFRE 2                  *
: 2. Reporting Period: 03/01/84      Outage + On-line Hrs:    744.0        M4MMMMMMWMMWNMMMMMMMMMMMMMMMMMNNNNMM 7
: 3. Utility Contact    C. A. MORRIS (717) 492-7700 Y56264                  AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                      3410
: 5. Nameplate Rating (Gross MWe):              1127
: 6. Design Electrical Rating (Net MWe):                1070
                                                                                    . DESIGN ELEC. MTING = 1070
: 7. Maximum Dependable Capacity (Gross NWo):          1127                  ......MRX. DEPEND. Cfr. - 1070 (100%)
: 8. Maximum Ds;,endable Capacity (Net MWe):            1070
: 9. If Changes Occur Above Since Last Rep 6rt, Give Reasons:
sec Omt SE ExtEEDED usept OPTINL 00M31710MB
: 10. Power Level To Which Restricted. If Any (Het MWe):                      M                    Nm                    h    -100
: 11. Reasons for Restrictions, If Any                                  1000-NOME YEAR-    CUMULATIVE                                                            - 90 g MONTH
: 12. Report Period Mrs              744.0    2.184.0        5.689.0                                                                M
: 13. Hours Reactor Critical          641.1    1.303.4        3.916.1
: 14. Rx Reserve Shtdwn Hrs              .0          .0          .0
                                                                                                                                -e0  h
: 15. Hrs Generator On-Line          618.8    1.229.2        3.790.9 g                                                                        l
                                                                  .0 16,. Unit Reserve Shtdwn Hrs            .0          .0                gag.
3.902.624    12.396.159                                                            _g
: 17. Gross Thern Ener (MWH)      1.991.958
: 18. Gross Elec Ener (rs4H)        683.114  1.334.582    4.246.546
: 19. Het Elec Ener (MWH)          646.281  1.251.713    4.027.357 83.2        56.3          66.6                                                          - 30
: 20. Unit Service Factor 21 Unit Avail Factor                83.2        56.3          66.6 66.2
: 22. Unit cap Factor (MDC Net)        81.2        53.3 0
                                                                                                                      )
: 23. Unit cap Factor (DER Net)        81.2        53.3          66.2        0'      5      to      l'5 '  30      25    3IO 16.8        11.3          6.4                              OMS
: 24. Unit Forced Outage Rate
: 25. Forced Outage Hours            125.2      156.8        257.7 MfiRCH 1984
: 26. Shutdowns Sched Over Mext 6 Months (Type.Date, Duration),
NOME
: 27. If Currently Shutdown Estimated Startup Date s        N/A                                                                      PAGE 2-290
 
                                                                                              . _ _ _ _ _    .~.        ____      _m . _ _ __ ._.      .
t l
l l
wunnununuwuummuummunuununummunumpuum Caport Period MAR 1984                                  UNIT              5HUTDDWN5 / REDUCTION 5                          N          SAM ONOFRE 2            m NNNMMMMMMMMMMNNMMNNNNNNNNNNNNNNNNWeN No. Date          Tyce Hours Reason Method LER Number System Comoonent                                Cause a Cerrective Action to Prevent Recurrence 3      03/09/84          F  82.8      H                  84-816 1                                            INADVERTENT SIAS, CCAS AND CSAS ACTUATION DUE TO ERROR WHILE PERFORMING SURVEILLANCE TESTING. REACTOR WAS MANUALLY TRIPPED. PROCEDURAL CHANGES WERE MADE IN RESTORATION STEP 5 OR SURVEILLANCE PROCEDURE.
4      03/24/84          F  42.4      A              3  84-019                                    REACTOR AND TURBINE TRIP DUE TO LOW DNBR ON ALL 4 CPC5. CEAC St TRANSMITTED INCORRECT ROD POSITION TO THE CPC5.
t l
I camummummeu            SAN ONOFRE 2 EXPERIENCED 2 SNUTDCWNS IN MARCH AS DISCUSSED n
 
==SUMMARY==
M            ABOVE.
summunumann Tvee      Reason                                          Method                System 8 Connonent F-Forced A-Ecuip Failure F-Ad9in                            1-Manual            Exhibit F 8 H 5-5ched    B-Maint or Test G-Oper Error                    2-Manual Scram Instructions for C-Refueling                H-Other              3-Auto Scram        Preparation of D-Regulatory Restriction                        4-Continued          Data Entry Sheet E-Operator Training                              5-Reduced Load Licensee Event Report 8 License Examination                      9-Other              (LER) File (NUREG-0161)
PAGE 2-291 s
                                                                                                                                                      -                  9 -
 
    .. .-- - -            ...- - ..          - -        -      --        ..__    -_      - . . _ _ _ ~ . _ _ . .
tummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm O                  SAM ONOFRE 2                m tuummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm                            FACILITY            DATA                                                  Report Period MAR 1984 FACILITY DESCRIPTION                                                        UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                UTILITY STATE.................... CALIF 0RMIA                                LICENSEE................ 50UTHERN CALIFORNIA EDISON COUNTY.................. 5AN DIEGO                                    CORPOR AT E ADDRE55. . . . . . . .P.O. BOX 80 0 ROSEMEAD, CALIFORNIA 91770 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI 5 0F                                CONTRACTOR S AN CL EMENTE, CA                      ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                              HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... JULY 26, 1982                                    CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER.. 5EPTEMBER 20, 1982                                TURBINE SUPPLIER.. . ... ... GENERAL ELECTRIC COM (ENG VERSION)
DATE COMMERCIAL OPERATE.... AUGUST 8,          1983                  REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                    IE REGION RESPONSIBLE......V j
CONDENSER COOLING WATER.... PACIFIC OCEAM                                IE RESIDENT INSPECTOR......A. CHAFFEE ELECTRIC RELIABILITY                                                    LICENSING PROJ MANAGER. .. . .H. ROOD COUNCIL..................WESTERM SYSTEMS                              DOCK ET NUMB ER. . . . . . . . . . . 5 0-361 COORDINATING COUNCIL LICENSE & DATE ISSUANCE..... SEPTEMBER 7, 1982 PUBLIC DOCUMENT R00M...... 5AN CLEMENTE LIBRARY 242 AVENIDA DEL MAR SAN CLEMENTE, CALIFORNIA IN5PECTION                  5TATU5 INSPECTION
 
==SUMMARY==
 
f      + INSPECTION ON AUGUST 22 - SEPTEMBER 16, 1983 (REPORT NO. 50-361/83-30) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
        + INSPECTION ON DECEMBER 12 - 16, 1983 (REPORT NO. 50-361/83-41) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF QUALITY ASSURANCE PROGRAMS. THE INSPECTION INVOLVED 96 INSPECTOR-HOURS ONSITE BY THREE NRC INSPECTORS.
RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIDMS WERE IDENTIFIED.
        + INSPECTION ON JANUARY 22 - FEBRUARY 9, 1984 (REPORT NO. 50-361/84-06) AREAS INSPECTED: ROUTINE, UNANNOUNCED RESIDENT INSPECTION OF THE OPERATION PROGRAM INCLUDING THE FOLLOWING AREAS: OPEPATILMe! SAFETY VERIFICATION, LICENSEE EVENT FOLLOWUP, AND INDEPENDENT INSPECTION EFFORT. THE INSPECTION INVOLVED 102 INSPECTOR-HOURS ONSITE AY THREE NRC INSPECTORS.
RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
        + INSPECTION ON FEBRUARY 27 - MARCH 1, 1984 (REPORT NO. 50-361/84-07) AREAS INSPECTED: ANNOUNCED INSPECTION OF THE EMERGENCY PREPAREDNESS EXERCISE AND ASSOCIATED CRITIQUE. THE INSPECTION INVOLVED 140 INSPECTOR-HOURS ONSITE BY THREE NRC INSPECTORS AND FOUR CONTRACTOR TEAM MEMBERS.
RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
PAGE 2-292
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu Report Period MAR 1984              INSPECTION                5TATUS - (CONTINUED)                u          SAN ON0FRE 2              m unmuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum INSPECTION
 
==SUMMARY==
 
      + INSPECTION ON MARCH 26 - 30, 1983 (REPORT NO.      50-361/84-08) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
      + INSPECTION ON MARCH 5 - 9, 1984 (REPORT NO.      50-361/84-09) AREAS INSPECTED: ANNOUNCED INSPECTION OF RADIATION PROTECTION PROGRAM INCLUDING A REQUEST FOR INSPECTION BY WORKER. THE INSPECTION INCLUDED TOURS OF UNITS 1, 2 AND 3.            THE INSPECTION INVOLVED 20 INSPECTOR-HOURS ONSITE BY ONE HRC INSPECTOR.
RESULTS: MD ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
      + INSPECTION ON APRIL 9 - 13, 1984 (REPORT NO.      50-361/84-10) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
      + INSPECTION ON MARCH 1 - APRIL 3,    1984 (REPORT NO. 50-361/84-11) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
ENFORCEMENT
 
==SUMMARY==
 
NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NONE FACILITY ITEMS (PLANS AND PROCEDURES):
NONE                                    ,
MANAGERIAL ITEMS:
LOW POWER FACILITY OPERATING LICENSE WAS TSSUED FEBRUARY 16, 1982.        THE FULL POWER FACILITY OPERATING LICEN'2E WAS ISSUED SEPTEMBER 7,  1982, AS AMENDEMENT 7 TO THE LOW POWER LICENSE. THE PLANT COMMENCED COMMERCIAL OPERATION ON AUGUST 7, 1983.
PLANT STATUS:
STEADY OPERATION AT FULL POWER; PROBLEMS BEING EXPERIENCED WITH SEALS ON ONE REACTOR COOLANT PUMP.
LAST IE SITE INSPECTION DATE:    04/09-13/84+
INSPECTION REPORT NO:    50-361/84-18+
PAGE 2-293
 
a uunnuunumwwwumununuwammunuunusunwwww W            SAN ONOFRE 2
* Report Period MAR 1984                                  REP 0RTS                    FR0M        LICEN5EE                  unuunuunununuwunnunnuunuwpuuuuuummun
        =========================================================================================================================
NUMSER          DATE OF  DATE OF              SUBJECT EVENT        REPORT                                                          ._______________________________________________________ _________
83-91          10-28-83  81-31-84            UV ARMATURES FOR RTB 488 WERE NOT FULLY PICKING-UP BIL-1 83-92          12-18-83  01-13-84            CONTAINMENT AIRBORNE RAD MONITOR 2RT-7804 WAS RENDERED INOPERABLE W/ ASSOC SUMP PUMP MTR BRKR 81L-8                                          TRIPPED 83-117        12-05-83  99-06-84            DG BLDG PRE-ACTION FLAME DETECTOR ALARMED AND COULD NO BE RESET SIL-0
        =================================================================================================================
I PAGE 2-294
 
m,, _ - m w = ~
t I
l THIS PAGE INTENTIONALLY LEFT BLANK l
t e
PAGE 2-295
 
0PERATING                $TATUS                    NNNNNNNNNNNNNNNNNNNNNNNNMMNNNNNMMNNW
: 1. Dockets _12-362                                                              N              SAN ONOFRE 3                    N
: 2. Reporting Period
* 03/01/84    Outage + On-line Hrst        744.0            hMNNNNNNNNMMMNNNNNNNNNNNNNMMNNNNMMNN
: 3. Utility Contact    C.A. MORRIS (714) 492-7700 EXT 56264                    AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (NWt):                        3390
                                                                                                %NMTE3
: 5. Nameplate Rating (Gross MWe):                1127
: 6. Design Electrical Rating (Het MWe):                  1070 OESIBI ELEC. MRTINS = 1070
: 7. Maximum Dependable Capacity (Gross MWe):            1127                      ....NRX.      OEPDC. Ofr. - 1870 1100Z3
: 8. Maximum Dependable Capacity (Not MWe):              1070                                                                                      i
: 9. If Changes Occur Above Since Last Report, Give Reasons:
les est et DNummse tamJt arrtsut omstftme
: 10. Power Level To Which Restricted, If Any (Net MWe):                                                                              -100
: 11. Reasons for Restrictions, If Any _                                    gang,
                                                                                                                                \
NOME MONTH          YEAR    CUMULATIVE                                                                -se W
: 12. Report Period Mrs              744.0        2.184.0      4.518.0                                                                    E
: 13. Hours Reactor Critical        532.7          675.5      2.456.9
: 14. Rx Reserve Shtdwn Hrs                .6          .0            .0 hf                                                          ,,
: 15. Hrs Generator On-Line          481.5          604.5      2.248.1
: 16. Unit Reserve Shtdwn Hrs              .0          .0            .0    gag.
1.831.541    5.380.577                                                                .gG
: 17. Gross Thern Ener (MWH)    s.415.800
: 18. Gross Elec Ener (MWM)        461.630        601.556    1.700.153
: 19. Met Elec Ener (MWH)          427.860        549.306    1.546.373
                                                                                                                                        -se
: 20. Unit Service Factor
: 21. Unit Avail Factor                            NOT IM
: 22. Unit Cap Factor (MDC Net)                  COMMERCIAL 0                                                ~
0'
                                                                                          ~~
: 23. Unit Cap Factor (DER Net)                  OPERATION                                  5      l'8    1's    ab    ~U~
2        50 OOIS
: 24. Unit Forced Outage Rate
: 25. Forced Outage Hours            50.6          50.6          606.9 I  O    IOOS
: 26. Shutdowns Sched Over Next 6 Months (Type Date, Duration)*
MONE
: 27. If Currently Shutdown Estimated Startup Dates            N/A                                                                        PAGE 2-296
 
Report Period MAR 1984                                                                                              unmuununuwwwuuuuuuuuuuuuuuuuuuwmunum UNIT      $HUTD0WN$ / REDUCTIONS                        N          SAN ONOFRE 3            w unnunnunununuuuuuuuuuuuuuuuuuuwwwnum No. Date        IEEE Wouri Reason                      LER Number fysEEu Comoonent            Cause a Corrective Action to Prevent Recurrence 1      01/06/84        5 166.8                  8      4                                    CONTINUATION OF SURVEILLANCE OUTAGE.
2        03/10/84        F  50.6                H      3  84-008                            REACTOR TRIP DUE TO LOSS OF LOAD TURBINE TRIP CAUSED BY LOW CONDENSER VACUUM.
3      03/30/84        5  45.1                B      1 SCHEDULED MAINTENANCE OUTAGE.
timunuununun SAN ONOFRE 3 EXPERIENCED 3 SHUTDOWNS IN MARCH AS a
 
==SUMMARY==
u            DESCRIBED ABOVE.
Cummuununum Tvne        Reason                                            Method              Svstem 8 Comoonent F-Forced A-Equip Failure FAdmin                                1-Manual            Exhibit F 8 H S-Sched      B-Maint or Test G-Oper Error                    2-Manual Scram Instructions fcr C-Refueling            H-Other                    3-Auto Scram        Preparation of D-Regulatory Restriction                          4-Continued        Data Entry Sheet E-Operator Training                              5-Reduced Load Licensee Event Report
                                    & License Examination                          9-Other            (LER) File (NUREG-0161)
PAGE 2-297
 
CNNNNNNNNNNNMMNNNNNNMMMNNNNNNNNNNNNN Q              SAN ONOFRE 3                          M Report Period MAR 1984 CNNNNNNNNNNNNNNNNNNNNNNNMMNNNNNNNNNM                                      FACILITY        DATA FACILITY DESCRIPTION                                                              UTILITY 8 CONTRACTOR INFORMATION LOCATIDH                                                                          UTILITY STATE.................... CALIF 0RNIA                                            LICENSEE................. SOUTHERN CALIFORNIA EDISON COUNTY................... SAN DIEGO                                              CORPORATE ADDRESS........P.O. BOX 800 ROSEMEAD, CALIFORNIA 91770 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI S OF                                            CONTRACTOR SAN CLEMENTE. CA                          ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                                        NUC STEAM SYS SUPPLIER...COMBUSTIDH ENGINEERING 1 ATE INITIAL CRITICALITY... AUGUST 29, 1983                                        CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... SEPTEMBER 25, 1983                                        TURBINE SUPPLIER......... GENERAL ELECTRIC COM (ENG VERSIDH) 2 4 T E COMMERCI AL OPER ATE. . . . N N N N N N M M N N N N N N N N N M          REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                              IE REGION RESPONSIBLE......V CONDENSER COOLING WATER.... PACIFIC OCEAN                                          IE RESIDENT INSPECTOR......A. CHAFFEE ELECTRIC RELIABILITY                                                              LICENSING PROJ MANAGER.....N. ROOD COUNCIL.................. WESTERN SYSTEMS                                        DOCKET NUMBER........... 50-362 COORDINATING COUNCIL LICENSE B DATE ISSUANCE..... NOVEMBER 15, 1982 PUBLIC DOCUMENT R00M....... SAM CLEMENTE LIBRARY 242 AVENIDA DEL MAR SAM CLEMENTE, CALIFORNIA IN5PECTION              STATUS INSPECTION
 
==SUMMARY==
 
  + INSPECTION ON AUGUST 22 - SEPTEMBER 16,1983 (REPORT NO. 50-362/83-28) REPORT BEING PREPARED; TU BE REPORTED NEXT MONTN.
  + INSPECTION ON DECEMBER 12 - 16, 1983 (REPORT N0. 50-362/83-40) AREAS INSPECTED: ROUTINE, UNANNOUNCED INSPECTION OF QUALITY ASSURANCE PROGRAMS. THE INSPECTION INVOLVED 96 INSPECTOR-HOURS ONSITE BY THREE HRC INSPECTORS.
RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
  + INSPECTIDM ON JANUARY 22 - FEBRUARY 9, 1984 (REPORT NO. 50-362/84-06) AREAS INSPECTED: ROUTINE, UNANNOUNCED RESIDENT INSPECTION OF THE OPERATION PROGRAM AND THE STARTUP TEST PROGRAMS INCLUDING THE FOLLOWING AREAS: OPERATIONAL SAFETY VERIFICATION, LICENSEE EVENT FOLLCWUP, AND INDEPENDENT INSPECTION EFFORT. THE INSPECTION INVOLVED 80 INSPECTOR-HOURS ONSITE BY THREE HRC INSPECTORS.
RESTULT      NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
  + INSPECTION ON MARCN 26 - 30, 1984 (REPORT NO. 50-362/84-07) REPORT.BEING PREPARCD; TO BE REPORTED NEXT ModTN.
  + INSPECTION ON MARCN 5 - 9, 1984 (REPORT NO. 50-362/84-08) AREAS INSPECTED: ANNOUNCED INSPECTION                                OF R*.DIATION PROTECTION 1, 2 AND 3. THE INSEPCTION INVOLVED PROGRAM INCLUDING A REQUEST FOR INSPECTION SY WORKER. THE INSPECTION INCLUDED TOURS OF UNITS 20 INSPECTOR-NOURS ONSITE BY ONE NRC INSPECTOR.                                                                                                        PAGE 2-298
 
_ _        _ , , , _ _ , _ _ m  w- a~+m ,=---
                                                          '4-.L  --*
1
! Report Period MAR 1984                                                                            NMMMMMMNNMMNNNNNNMMMMNNMMMMNNNNNNNNM INSPECTION                    STATUS - (CONTINUED)            N          SAN ONOFRE 3                                W MMMNNNNNMMNNNNNNNNNNNNNNNNNNNNNNNMMM INSPECTION
 
==SUMMARY==
 
RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
    + INSPECTION ON MARCH 17 - 29. 1984 (REPORT NO. 50 362/84-09) AREAS INSPECTED: SPECIAL, UNANNOUNCED INSPECTION OF AN OPERATIONAL EVENT INVOLVING THE INOPERABILITY OF BOTN TRAINS CF CONTAINMENT SPRAY AND ONE DIESEL GENERATOR. THE INSPECTION INVOLVED 192 INSPECTOR-NOURS ONSITE BY F3UR HP.C INSPECTORS.
RESULTS: ENFORCEMENT ACTION TAKEN AS A RESULT OF THIS INSPECTION IS TO BE THE SUBJECT OF SEPARATE CORRESPONDENCE.
j ENFORCEMENT
 
==SUMMARY==
 
I  NOME OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
ABNORMALLY HIGH RADIATION LEVELS OBSERVED IN REACTOR COOLANT SYSTEM.
FACILITY ITEMS (PLANS AND PROCEDURES):
SEVEN WEEK OUTAGE FOR REPLACEMENT OF REACTOR COOL ANT PUMP SEALS AND SURVEILLANCE TESTING.
MANAGERIAL ITEMS:
LOW POWER FACILITY CPERATING LICENSE WAS ISSUED NOVEMBER 15. 1982.        THE FULL POWER LICENSE WAS ISSUED SEPTEMBER 16, 1983.
PLANT STATUS:
INITIAL CRITICALITY WAS AUGUST 29. 1983. POWER ASCENSION TESTING WAS COMPLETED ON JANUARY 6, 1984.          THE UNIT WILL NOW BE SNUT DOWN FOR ABOUT SEVEN WEEKS FOR REPLACEMENT OF REACTOR COOLANT PUMP SEALS AND SURVEILLANCE TESTING.
ABh0RMALLY NIGH LEVELS OF RADI0 ACTIVITY NAVE BEEN OBSERVED, AND THE CAUSE AND NECESSARY CORRECTIVE ACTIONS ARE BEING EVALUATED.
LAST IE SITE INSPECTION DATE: 03/26-30/84+
INSPECTION REPORT N0: 50-362/84-07+
t
                                                        ,                                                                        PAGE 2-299
 
m .. . _ _ _ _ -. _ _ _ _ _ _ _ _ _ _ _ _ _ . .                        ___ _      .. _._, _ _ _ _ . _ _ _ . . _ _ __
i unuuuuuuuuuuuuuuuuuuruuuuuuuuuuuuuum Report Period MAR 1984                                              REP 0RTS    FR0M      LICENSEE                              u          SAN ONOFRI' 3                m wuuuuuuuuuuuuuuuuuuurensunnunuunnunu
    ============================================================================================================================ms=
MUMBER    DATE OF              DATE OF                    SUOJECT EVENT                REPORT
    =        ..                  _.              _.....--.......--......--...- .__                ___....--------------------...-----___==.---....---------------...
83-91    10-28-83              01-31-84                  UV ARMATURES FOR R18 488 WERE NOT FULLY PICKING-UP 01L-1 i    83-102    11-16-83              12-15-83                  FAILURE OF CHANNEL "A" 0F PDST-LOCA HYR0 GEN MONITOR 81L-0 83-109    11-11-83              12-12-83                  FAILURE OF GSPD CHANNEL "A" DUE TO A FAILURE IN POWER SUPPLY 01L-0 1      83-110    12-02-83              01-03-84                  MISALIGNMENT OF CONTROL ELEMENT ASSEM0 LIES 01L-0 83-111    12-22-83            01-23-84                  RCS SPECIFIC ACTIVITY EXCEEDED 1.0 MICR0 CURIE /GtAM DE I-131 I    OSL-0 84-00    01-01-84              01-31-84                  UNPLANNED RELEASE OF AIR 80RNE ACTIVITY 01L-1
    ===============================================================================================================================
A t
PAGE 2-300
 
M O
M I
N W
C 4
kt Z
4 a
R
  >=
L W
  .J
  .a J
4 Z
Q M
Z W
Z M
W C
4 A
en M
Z
  >=
l l
1 l
I i
l 1
l i
l 1
l l
I
: 1. Docket:        50-327      0PERAT1MG                      STATUS                              NNNNNNNNNNNMWNNNNNNNNNNNNNNNMNNNNNNN N              SEQUOYAH 1                    N
: 2. Reporting Period          03/01/84          Outage + On-line Hrs: 744.0                            NNNNNNNNNNNNNNNNNMMNNNNNNNNNNNNNNNNN
: 3. Utility
 
==Contact:==
MIKE EDDINGS (615) 870-6248                                                      AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWE):                                    3411 OLHDYFHi 1
: 5. Nameplate Rating (Gross MWe):                                    1220 3"'
: 6. Design Electrical Rating (Het MWe):                              1148 DESIGN E22C. RRf!NS - 1148
: 7. Maximum Dependable capacity (Gross MWe):                        1183                            ...      .MRx. DEPEND. ORP. - lite (103%)
: 8. Maximum Dependable Capacity (Net MWe):                          1948
: 9. If Changes occur Above Since Last Report, Give Reasons:
NO NET POWE3t OUTPUT THIS MONTH NONE                                                                                                                                  -100
: 10. Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions. If Any                                                          gag,_
NONE                                                                                                                                  -SD MONTH          YEAR    CUMULATIVE                                                                            o
: 12. Report Period Hrs                                744.0      2,181.1    24.121.0                                                                            g
: 13. Hours Reactor Critical                              .0      1.014.9      15.456.3
                                                                                                                                                                                                    ~88
: 14. Rx Reserve Shtdwn Hrs                                0            .0            .0  hf 1,5. Hrs Generator On-Line                              .0        961.3      15.074.4
: 16. Unit Reserve Shtdwn Hrs                              .0            .0            .0      ,,,,
                                                                                                                                                                                                    "90
: 17. Gross Therm Ener (MWH)                                0 2.870.308      48.362.108
: 18. Gross Elec Ener (MWH)                                0      956.150  16.337.286
: 19. Het Elec Ener (MWH)                                  0      915.067  15.691.995 62.5                                                                    -an
: 20. Unit Service Factor                                    .0        44.0
: 21. Unit Avall Factor                                      .0        44.0          62.5
: 22. Unit Cap Factor (MDC Net)                              .0 __      36.5          56.7
: 23. Unit Cap Factor (DER Net)                              .0        36.5          5( .7        8,-          - ~
5    d3    ds~  so        is '  ~ic
: 24. Unit Forced Outage Rate                                .0        21.4          19.5                                        DRYS
: 25. Forced Dutage Hours                                    .0        262.2        3.642.9
: 26. Shutdowns Sched Over Next 6 Months (Type.Date, Duration):                                                              MFIRCH 1984 NONE
: 27. If Currently Shutdown Estimated Startup Date:                              04/13/84                                                                            PAGE 2-302
 
l l
l l
l I
Report Period MAR 1984                                                                                                      MNNNNNNNNNNNNNNNNNNNNNNNNNNNhMMNNNNM UMIT        SHUTD0WMS / REDUCTIONS                          N          SEQUDYAH 1              N r                                                                                                                                      NNNNNNNNNNNNNNNxNNNNNNNMMNNNNNNNNNNN No. Date  lyng Hours Reason Nethod LER Number System Comnonent                                          Cause a Corrective Action to Prevent Recurrence 5      02/20/84      5 744.0        C                        4                                    REFUELING OUTAGE CORE 02 CONTINUES.
                                                                                                                                                    ~
l k
ENNNNNNNNNM        SEQUOYAH 1 REMAINS SHUTDOUM FOR REFUELING.
O
 
==SUMMARY==
M cNNNNNNNNNN Twee        Reason                                                  Method          System E Component F-Forced A-Equip Failure F-Adein                                    1-Manual        Exhibit F & H S-Sched      B-Maint or. Test G-Oper Error 2-Manual Scram Instructions for C-Refueling            H-Other                        3-Auto Scram    Preparation of D-Regulatory Restriction                                4-Continued    Data Fntry Sheet E-Operator Training                                    5-Reduced Load. Licensee Event Report a License Examination                                9-Other        (LER) File (NUREG-0161)
PAGE 2-303
 
l unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum u              SEGUOYAN 1              m                                                                                                                        -
,uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunuunu                FACILITY            DATA                                                        Report Period MAR 1984 FACILITY DESCRIPTION                                            UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                      UTILITY STATE.................... TENNESSEE                            LICENSEE. . . . . . . . . . . . . . . . . TENNESSEE VAL L EY AUTHORITY COUNTY...................HAMILT0N                              CORPORATE ADDRESS........S$$A CHESTNUT STREET TOWER II CHATTAM00GA, TENNESSEE 37401 DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 9.S MI NE OF                      CONTRACTOR CHATTANDOGA, TN                      ARCHITECT / ENGINEER....... TENNESSEE VALLEY AUTHORITY TYPE OF REACTOR............PWR                                    HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE IMITIAL CRITICALITY... JULY 5, 1980                          CONSTRUCTOR. . . . . . . . . . . . . .T ENNESSEE VAL L EY AUTHORITY DATE ELEC ENER IST GENER...J1LY 22, 1988                          TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCI AL OPERATE. ... JULY 1, 1981                  REGULATORY INFORMATION CONDENSER COOLING METHOD...OMCE THRU                          IE REGION RESPONSIBLE......II CONDENSER COOLING WATER....CHICKAMAUGA LAKE                    IE RESIDENT INSPECTOR. . . .. .E. FORD ELECTRIC RELIABILITY                                          LICENSING PROJ MANAGER.....C. STAHLE COUNCIL................. 50UTHEASTERN ELECTRIC                DOCKET NUMBER...........                  50-327 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....DPR-77, SEPTEMBER 17, 1980 PUBLIC DOCUMENT ROOM....... CHATTANOOGA - HAMILTON BICENTENNIAL LIBRARY 1881 BROAD STREET CHATTANOOGA, TENNESSEE 37402 IN5PECTION                5TATUS INSPECTION
 
==SUMMARY==
 
    + INSPECTION FEBRUARY 7-18 (84-02): THIS ROUTINE. UNANNOUNCED INSPECTION INVOLVED 26 INSPECTOR-HOURS ON SITE IN THE AREAS OF EMERGENCY DETECTION AND CLASSIFICATION. PROTECTIVE ACTION DECISION MAKING, CHANGES TO THE EMERGENCY PREPAREDNESS PROGRAM, SHIFT STAFFING AND AUGMENTATION, AND EMERGENCY RESPONSE TRAINING. OF THE FIVE AREAS INSPECTED. ONE 'JIOLATION WAS IDENTIFIED IN THE AREA
  '0F CHANGES TO THE EMERGENCY PREPAREDMESS PROGRAM; MO DEVIATIONS WERE IDENTIFIED. THIS VIOLATION IS DISCUSSED IN PARAGRAPH 7.
INSPECTION JANUARY 30 - FEBRUARY 3 (84-84): THIS ROUTINE, UNANN0UNCED INSPECTION INVLLVED 16 INSPECTOR-HOURS ON SITE IN THE AREAS OF HEALTH PHYSICS STAFFING; EXTERNAL AND INTERNAL EXPOSURES; CONTROL OF RADI0 ACTIVE MATERIALS, CONTAMINATION CONTROL, AND RADIATION SURVEYS; RADIATION PRCTECTION FACILITIES AND EQUIPMENT; REVIEWED PROCEDURE FOR MULTIBADGING PERSONNEL; REVIEWED WORK ON UNIT 2 CVCS MIXED BED DEMINERALI2ER; REVIEWED WORK ON FUEt UP-ENDER IN THE FUEL TRANSFER CANAL; REVIEWED CONTAINMENT AND AUXILIARY BUILDING ISCLATIONS; OBSERVATIONS DURING PLANT TOURS; AND REVIEW OF ITEMS FROM LAST INSPECTION (REPORT 83-28). OF THE TEM AREAS INSPECTED, MO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN MINE AREAS; ONE APPARENT VIOLATION WAS FOUND IN ONE AREA. VIO-84-04-01, PARAGRAPH to 0F THE REPORT DETAILS.
INSPECTION FEBRUARY 6 - MARCN 5 (84-86): THIS ROUTINE INSPECTION INVOLVED 74 INSPECTOR-HOURS ON SITE IN THE AREAS OF OPERATIONAL SAFETY VEPIFICATION. ESF SYSTEM OPERABILITY, SURVEILLANCE, MAINTENANCE AND MODIFICATIONS. LICENSEE EVENT REPORT REVIEW, COLD WEATHER PREPARATIONS, AND INDEPENDENT INSPECTION EFFORT. NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN THE SEVEN AREAS INSPECTED.
INSPECTION FEBRUARY 27 - MARCN 2 (84-87):    THIS ROUTIME, UNANNOUNCED INSPECTION INVOLVED 2B INSPECTOR-MOURS ON SITE IN THE AREAS PAGE 2-304
 
ununummmmmmmmmmmmmmmmunusuurmmmmmmmu Report Period MAR 1944                IN5PECTION                                      5TATUS - (CONTINUED)                                                                  m          SEGUOYAH t                    #
mammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmum INSPECTION
 
==SUMMARY==
 
OF ELECTRICAL MAINTENANCE WORK. WORK ACTIVITIES AND RECORDS. OF THE AREAS INSPECTED. NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT SUP91ARY 18 CFR 58. APPENDIX E. PARAGRAPH V REQUIRES THAT LICENSEE 5 WHO ARE AUTHORIZED TO OPERATE A NUCLEAR POWER FACILITY SHALL SUBMIT ONE COPY  OF ANY APPENDIX  D. CHANCES  TO THE EMERGENCY PLAN OR PROCEDURES TO THE ADMINIISTRATOR OF THE APPROPRIATE REGIONAL OFFICE. SPECIFIED IN 10 CFR PART 20. AND TWO COPIES TO THE DOCUMENT CONTROL DESK WITHIM 38 DAYS OF SUCH CHANGES. CONTRARY TO THE ABOVE.
REVI510NS TO THE CENTRAL EMEFGENCY CONTROL CENTER IMPLEMENTING PROCEDURES DOCUMENT DATED NOVEMBER 9, 1933. THE DIVISION OF NUCLEAR POWER EMERGENCY CENTER IMPLEMENTING PROCEDURES DOCUMENT DATED NOVEMBER 9 AND NOVEMBER 10. 1983. AND THE MUSCLE SH0ALS EMERGENCY CENTER IMPLEMENTING PROCEDURES DOCUMENTED DATED OCTOBER 4. 1983. WERE SENT TO THE APPROPRIATE NRC OFFICES ON JANUARY 3, 1984.                                                                                            18 CFR 58. APPENDIX E. PARAGRAPH V REQUIRES THAT LICENSEES WHO ARE AUTHORIZED TO CPERATE A NUCLEAR POWER FACILITY SHALL SUBMIT ONE COPY OF ANY CHANGES TO THE EMERGENCY PLAN OR PROCEDURES TO THE ADMINIISTRATCR OF THE APPROPRIATE REGIONAL OFFICE, SPECIFIED IN APPENDIX D. 18 CFR PART 28. AND TWO COPIES TO THE DOCUMENT CONTROL DESK WITHIN 30 DAYS OF SUCH CHANGES. CONTRARY TO THE ABOVE.
REVISIONS TO THE CENTRAL EMERGENCY CONTROL CENTER IMPLEMENTING PROCEDURES DOCUMENT DATED NOVEMBER 9. 1983. THE DIVISION OF HUCLEAR POWER EMERGENCY CENTER IMPLEMENTING PROCEDURES DOCUMENT DATED NOVEMBER 1 AND NOVEMBER 10. 1983. AND THE MUSCLE SHOALS EMERGENCY CENTER IMPLEMENTING PROCEDURES DocurtENTED DATED OCTOBER 4 1983. WERE SENT TO THE APPROPRIATE NRC 0FFICES ON JANUARY 3, (8482 5)                                                                                                                                                                                                  1984.'
l OTHER ITEMS SYSTEMS AND Cow 0NENT PROBLEMS:
NONE FACILITY ITEMS (PLANS AND PROCEDURES):
NONE MANAGERIAL ITEMS NOME PLANT STATUS:
    + OUTAGE FOR REFUELING.
LAST IE SITE INSPECTION DATE: FEBRUARY 6 - MARCH 5. 1984 +
INSPECTION REPORT NO    58-327/84-96 +
PAGE 2-385
 
  . - - -                      -            .--.            . -..-_ - -                                _-_-._--__                .-,----- - -~-                                .          -
maammmmmmmmmmmmmmmmmmmmmmmmmmmmmmans a                  SEGUOYAN t                                                  u Report Period RAR 1984                                            REPORT 5                FROM          LICEN5EE                                      ammmmmmmmmmmmmmmmmmmmmmmmmmmmmmmaman i
1 1                    ==================================================================================================================================
1 i                      NUMBER              DATE OF        DATE OF              SUBJECT EVENT          REPORT j
i i                      33-178/              12/96/83        81/84/S4              THE 'G' WASTE GAS DECAY TANE WAS FOUNO WITN AN 0xvGEN CONCENTRATION OF 2.2% EXCEEDING THE 2%
83-L                                                      LIMIT. NITROGEN WAS ADDED TO THE T ANC IN ORDER TO REDUCE THE OXYGEN CONCENTRATICN.
I                      13-188/              12/56/83        81/84/84              THE THERMAL OVERLOAD DEVIC _5 DN SEVERAL MOTOR-OPERATED WALVES FAILED TO TRIP CHECK TEST. THE 1                      83-L                                                      THERMAL OVERLOAD REL AY HEATER 5 WHICH FAILED THE TEST WERE DETERMINED TO BE IMPROPER.
l 53-182/              12/96/33        81/84/84              ESSENTIAL RAW COOLING WATER PUMP JA TIME RELAY ST-fA FAILED. THE DELAY WAS IMMEDIATELY ADJUSTED 83-L                                                      AMD RETURNED TO SERVICE.
i 33-183/              12/32/83        12/3B/83              STEkN SUPPLY VALVE FAILED TO MEET SURVEILLANCE REQUIREMENTS. TROUBLESN00 TING THE FAILED VALVE 83-L                                                      REVEALED THAT THE LIMITCRGUE CPERATOR GEARED LIMIV SWITCH FAILED.
15-186/              12/81'83        St/86/84              DIESEL GENERATCR 14-1 TRIPPED C4 HIGN CRAMECASE PRES 5URE. INVESTIGATION REVEALED A SROKEN i                      83-L                                                      PISTON. TW3 CRACKED LINERS. AND PLANETARY GEAR TRAIM DAMAGE (IL THE TURSOCHARGER3.
83-187/              12/31/83        81/27/84              RADIATION MCMITOR5. THE ESSENTIAL RAW COOLING WATER LIOUID MONITORS FOR HEADER A. WERE DECLARED S3-L                                                      IMCPERASLE. THE SAMPLE PUMP MOTOR FAILED ON THE EFFLUENT MONITORS WHILE IN SERVICE.
44-881/              31/s2/84        81/31/84              A HIGH RADIATION ALARM EAS ACTUATED WHICH CAUSED A CONTAIMMENT VENT ISOLATION.
14-382/              31/t2/84        82/SS/84              HIGH RAD ALAtM ACTUATED CAUSING AN AUX BLDG. VENTILATION ISOL ATION TO 3CCUR. ALARM RESET AND
                      --                                                        MONITOR RETURMED TO SERVICE.
l j                      S4-333/              31/28/84        82/17/84              A MIGH RADIATICM ALARM EA5 ACTUATED WHICH CAUSED A CONTAIMMENT VENTILATION ISOLATION TO OCCUR.
I S4-854/              31/14/44        82/13/84              HIGN RAD ALARM ACTUATED CAUSING A CONTROL ROOM ISOLATION TO OCCUR. ALARM RESET AND MONITOR
                      --                                                        RETURNED TO SERVICE.
54-225/              81/31/84        32/86/34              SDRCN SAMPLES INDICATED THE SOROM CCKCENTRATION OF ACCUMULATOR WAS APPROXIMATELY 2138/2158 PPM.
S4-886/              Stett/84        82/08/84              UNIT 1 EXPERIENCED A TURSINE AND REACTDR TRIP. CAUSED BY HIGH-HIGH LEVEL IN 84 STEAP GENERATOR.
l                      _
S4-887/              81/13/84        82/88/84              UNIT 1 EXPERIENCED A TURRINE AND REACTOR TRIP. CAUSED BY HIGH-HIGN LEVEL IN 03 STEAM GENERATOR.
        =            S4-sts/              31/24/84        82/22/34              A HIGE RADIATION ALARM WA5 ACTUATED MNICH CAUSED AN AUXILIAR? SUILDING 150LATIDM (ABI) TO OCCUR.
                      --                                                        TW3 SEPARATE CAUSES: THE RELIEVING OF PRESSLEE AND THE OVERFLOWING CF THE CONDENSATE.
                  . 34-331/              31/28/84        32/27/84              NIGN RAD ALARM ACTUATED CAUSING A CCNTAIMMENT VENTILATION ISOLATIDM TO DCCUR. ROOT VALVE ON
                      --                                                        PRE 55URIZER WAS LEACING THRU THE PACKING.
PAGE 2-306 l
4
      - -- , - -          - , . . , , , -        . ,_ ,,,              - - , -          - - - - - , -    , , -  r - -      w.-          - - - - - - - - - --          -c,      w - , - .                -,--->v-      . - - - = - - - , - - , - -
 
1                *                  ::
5 o
8"        ..
W      3                  u N              I
                ...                              .      -      o        a        o                                                      '
:    :                          5      a w
8 .o.              .a.        u..                            5 E
1~                                                                                                                          '
: :        :                    m      C      "J J                          ::
n===
g
                                                =5            g "5  .                E. E.        4: =*    o E                ..
:.:        -    :
* 5      32            2 :            ::
:=.*. *w.
                                                -. E "zw  a        .5.            ::
t
                      .        a                g      .            = or m, w              ..                                          .
: 8:
                ...                              W
                                                        .      O.n
                                                              .        o. "E o.  "        u.
2      S      ""
E" E            g  ::
l.
l l E:  IE                      E. 5. *5*==          == *0
* a
                . .        8 E  o a
                                                        ". -.=.,.-a>.  .- .
5 >.        s w
                          "    y                3 U
                                                        ~
E7 22 :                    E  u
:.:                                                                      S  ::                                          ;
I    w                E      E      UE sw "w        d2 "s            5  :                                          !
0      55 *.              *
* u s    -                      w      .a        <a                .    .
                  -        3 W
* ai o! a                    w  ::                                        i
.'                                              5                                          ::
S            l:'                                w p.
N        E y                                    3 "E-      .w      a
                  -        2'  5
                                                =      a      30 30          .
3        d w
.                E o
* 5
* R 8
5,5              5        :
a E
2                3      -:    5 3
5    35          3  ::
i                  .
                          =
r.~
                                -s              E l'    .5. n5 w        w      w.
a i                w            '3 "                    $      24 :# 0                    g w        a
                          -    ~E. n            -
:      e e e uE ua. u                  w  ::::
                  =        E. U.3"            auEJ-W        *: *c.* *e c.
W s
In. an 3 :
4
                          *    ** *~ "                                                      ::
i                w g                    . .
                          .n. wa" :*:                        gs a
                                                              "5        g"5 ss ** *~
!                w        RO u-C'Eu w        22  a        W
                                                                    =
                                                                        *~  =          X  ".:.
                          *: M*"SX*E E E lu . ! 0 5- ::.5 ". !.
i c        s.: 55.
                  .        ** M" #C "5 25 E5 E                                            M  ::                                        r w        ..        e.                                                  a  u
:" e.s              :E.. B55 :s5 :i :3**                  e  ::
5    **                      - I *
* 2 j
                          .t.gW. 5."I          .
                                                .      'R.E "E  .- <-  "I *.            E w
i                          <    <                <
                                                                                            .                                          l
:                w        A    3
                                ~                .3    4      2        3        3      3  :..                                        !
1 q      .                  .
l 3
A n
A u
A
                                                              .        A.        A 3
y        .    .                1      .      .        .        .      .  ..
i                -            A                >      a      3        3        A      2  ::
V                V      V                V        V l
                                                ~
                                                        .      2        ~
                                                                                  ~
3 u,
1                                                                          ::
3    2
                                .                A. A.    )        A        3
                                                                                  .      S  1:
e
                  .t.      .
                          $1 31 31 31 al El 11 al L:
8
 
f
!  1. Socket: 59-322            0PERATING                              STATUS                    emessessenemonessessassessnessassess e              SEGUDYAH 2                e
: 2. Reportiaq Feriod: 83/tt/94              totage e re-line Mrs:              744.3            esemensmessessessnessmeneesenessenes
: 3. Utility Cantact: CAVIS CU* TEE (695) 973-4543                                                AVERAGE DAILY Polder LEVEL (Pede) PLOT
: 4. Liconsed Thermal Power (Mdt 3:                                      34 1 SEQUOYF1H 2
: 5. Namestate Ratiog (Gross fade):                                        t229 8"'
: 4. Design Electrical tating (Net Pade):                                ties EEStaus ELEC. furf!se - Eles
: 7. Ptaminume cependable Capacity (Gross IEe):                          8153                            ,ggg,  ggyne. Cfr. - ties staEE)
: 8. Maximeme Cependable Capacity (Net fee):                              Stet
: 9. If Champs Cecer Above Since tast tenert. Give Reaseas:
ses aus a sumans asest artamL asettsaus I      W~*E                                                                                                                                    y it. Pos.ee Level Te nasich testricte:f. If Any (Not IEe):
l St. Reasons for testrictions. If Any2                                                    3mg .
32wE                                                                                                                                    ,g I                                          FCGYN                  YEAR    CUME::tATIVE                                                            g
: 12. Report Period Mrs                        744.8              2.134.1      16.t31.9                                                            y,
: 13. Neurs teacter Critical                  744.0              2.t23.5    ._t2.414.9 l
                                                                                      .S
: 14. Em Reserve Shtchen Mrs                      .t                  .1 l
: 35. Mrs Generater C=-Line                    744.9              2.119.6    12.274.9
: 86. Unit Reserve Shtsbei Nrs                    .t                    t              t    p
                                                                                                                                                '8
: 17. Gross hern Ener (?%H)        2.535.229                  7.14s.346  39.544.453
: 15. Gross EIec Ener ( AN)                  979.729            2.477.478  ?!.589.418 t?. Met Elec Ener ( A93                    359.814            2.39?.213  93.ft9.951 97.1          76.3                                                        -ae
: 23. Cait Service Factor                      Str.t
: 21. Cait Avail Facter                        tes.2                97.t          76.3
: 22. Unit Cap Factor (PCC Net)                99.6                95.4          79.5 e                                                8
: 23. Cait Cap Facter (CER Net)                99.4                95.4          79.5          e      '5        N    is    s      s      s
: 24. Unit Ferced Cutage Rate                    .9                  2.9            8.7                                INITS
: 25. Forced Datage Neurs                        .8                64.4        f 966.2
: 26. Shutdensns Sched Cver Next 6 Months (Type,Date Duration):                                                            IE WEFurtIMBIFICATIcts SEPT. , 1984 APP 43Y 55 D4YS.
: 27. If Corrently Shutdames Estimated Startup Dates                          N/A                                                                  PAGE 2-308
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMAAM Report Period MAR 1984                                                                                        UNIT      SHUTD0WHS / REDUCTIONS                      M          SEQUOYAH 2                      M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM No.                                                    Date                              Yv3e Houri Reason Method LER Number System Comoonent            Cause & Corrective Action to Prevent Recurrence
        .NONE UMMMMMMMMMM                                                                              SEQUOYAH 2 OPERATED ROUTIMELY IM ? LARCH WITH F3 SHUTDOWNS OR M
 
==SUMMARY==
M                                                                              POWER REDUCTIONS REPORTED.
KNMMMMMMMMM Tvoe '                                                            Reason                                          Method            System 8 Comoonent F-Forced A-Equip Failure F-Admin                                                                                  1-Manual          Exhibit F 8 H-S-Sched                                                          B-Maint or Test G-Oper Error                    2-Manual Scram Instructions for C-Refueling                        H-Other      3-Auto Scram      Preparation of D-Regulatory Restriction                        4-Continued      Data Entry Sheet E-Operator Training                            5-Reduced Load Licensee Event Report
                                                                                                & License Examination      9-Other          (LER) File (NUREG-0161)
PAGE 2-309
 
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNMMNNNNN N              SEQUOYAH 2                N NMMMMMNNNNNMMMMMNNNNNNNNNNNNNNNNNNNM                              FACILITY                DATA                                                  Report Period MAR 1984
      -FACILITY DESCRIPTION                                                          UTILITY A CONTRACTOR INFORMATION LOCATION                                                                      UTILITY STATE.................... TENNESSEE                                          LICENSEE................. TENNESSEE VALLEY AUTHORITY
;-            'C0UNTY................... HAMILTON                                          CORPORATE ADDRESS....... 831 POWER BUILDING I                                                                                                                            CHATTANDOGA, TENNESSEE 37401 i:            -DIST AND DIRECTION FROM HEAREST POPULATION CTR.. 9.5 MI NE OF                                      CONTRACTOR CHATTANDOGA, TM                                  ARCHITECT / ENGINEER....... TENNESSEE VALLEY AUTHORITY 1
1 TYPE OF REACTOR............PWR                                                  HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE IMITIAL CRITICALITY...HOVEMBER 5,                1981                      CONSTRUCTOR.............. TENNESSEE VALLEY AUTHORITY                                  i DATE ELEC ENER IST GENER... DECEMBER 23, 1981                                  TURBINE SUPPLIER......... WESTINGHOUSE
{
DATE COMMERCIAL OPERATE.... JUNE 1,        1982                          REGULATORY INFORMATION 4
CONDENSER COOLING METHOD.. 0NCE THRU                                          IE REGION RESPONSIBLE......II
.          CONDENSER COOLING WATER....CHICKAMAUGA LAKE                                  IE RESIDENT INSPECTOR......E. FORD ELECTRIC RELIABILITY                                                          LICENSING PROJ MANAGER.....C. STAHLE COUNCIL................. 50UTHEASTERN ELECTRIC                              DOCKET NUMBER........... 50-328 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....DPR-79, SEPTEMBER 15, 1981 PUBLIC DOCUMENT ROOM.......CHATTANDOGA - HAMILTON BICENTENNIAL LIBRARY
,                                                                                                                            1001 BROAD STREET CHATTAN0OGA, TENNESSEE 37402
!                                                                  INSPECTION                      STATUS INSPECTION
 
==SUMMARY==
:          + INSPECTION FEBRUARY 7-10 (84-02): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 26 INSPECTOR-HOURS ON SITE IN THE AREAS OF l-          EMERGENCY DETECTION AND CLASSIFICATI0H, PROTECTIVE ACTION DECISION MAKING, CHANGES TO THE EMERGENCY PREPAREDNESS PROGRAM, SHIFT                                        ,
STAFFING AND AUGMENTATION, AND EMERGENCY RESPONSE TRAINING. OF THE FIVE AREAS INSPECTED, ONE VIOLATION WAS IDENTIFIED IN THE AREA 0F CHANGES TO THE EMERGENCY PREPAREDNESS PROGRAM; NO DEVIATIONS WERE IDENTIFIED. THIS VIOLATION IS DISCUSSED IN PARAGRAPH 7.                                          ,
INSPECTION JANUARY 30 - FEBRUARY 3 (84-04):                  THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 16 INSPECTOR-HOURS ON SITE IN THE AREAS OF HEALTH PHYSICS STAFFING; EXTERNAL AND INTERNAL EXPOSURES; CONTROL OF RADI0 ACTIVE MATERIALS. CONTAMINATION CONTROL, AND                                            ,
RADIATION SURVEYS; RADIATION PROTECTION FACILITIES AND-EQUIPMENT; REVIEWED PROCEDURE FOR MULTIBADGING PERSONNEL; REVIEWED WORK ON UNIT 2 CVCS MIXED BED DEMINERALIZER; REVIEWED WORK ON FUEL UP-ENDER IN THE FUEL TRAHSFER CANAL; REVIEWED CONTAINMENT AND AUXILIARY BUILDING ISOLATIONS; OBSERVATIONS DURING PLANT TOURS; AND REVIEW OF ITEMS FROM LAST INSPECTION (REPORT 83-28). OF THE TEN AREAS l-          INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN HINE AREAS; CNE APPARENT VIOLATION WAS FOUND IN ONE AREA. VID-84-04-01, j          PARAGRAPH 10 0F THE REPORT DETAILS.
t INSPECTION FEBRUARY 6 - MARCH.5 (84-06): THIS ROUTINE INSPECTION INVOLVED 74 INSPECTOR-HOURS ON SITE IN THE AREAS OF OPERATIONAL SAFETY VERIFICATION,.ESF SYSTEM OPERABILITY, SURVEILLANCE, MAINTENANCE AND MODIFICATIONS, LICENSEE EVENT REPORT REVIEW, COLD i,        . WEATHER PREPARATIONS, AND INDEPENDENT INSPECTION EFFORT. NO VIOLATIONS OR D6VIATIONS WERE IDENTIFIED IN THE SEVEN AREAS
;        1 INSPECTED.
+          INSPECTION FEBRUARY 27 - MARCH 2 (84-9?): ~THIS ROUTIME, UNANN0UNCED INSPECTION INVOLVED 19 INSPECTOR-HOURS ON SITE IN THE AREAS PAGE 2-310 s
4
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR 1984                        IN5PECTION            STATUS - (CONTINUED)            M            SEQUOYAN 2          .N EMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM INSPECTION SUMM1RX OF ELECTRICAL MAINTENANCE WORK, WORK ACTIVITIES AND RECORDS. OF THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
NONE OTHER ITEMS
;                            SYSTEMS AND COMPONENT PROBLEMS:
NOME I
FACILITY ITEMS (PLANS AND PROCEDURES):
NOME MANAGERIAL ITEMS:
NOME '
PLANT STATUS:
100%
LAST'IE SITE INSPECTIDH DATE: FEBRUARY 6 - MARCH 5,  1984 +
INSPECTION REPORT NO: 50-328/84-06 +
i 4
PAGE 2-311
 
  ~ _ _ _ _ - _ _ _ . _ - - _ _ - -                                , _ .        _. -__ - . - .                    . .-        ...    .-          .. . - . _ _ .. -_              . . . _ -        .-        --
i NNNNNNNNNNNMWNNNMMMMMNNNNNNNNNNNNMMM
                                    - Report Period MAR 1984 REPORTS            FR0M      LICEN5EE                            N          SEQUOYAH 2              N NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNMMMMM
                                        ==================================================================================================================================                                        ,
,t i                                          NUMBER      DATE OF          DATE OF                SUBJECT EVENT              REPORT
                                        ................_______.......................___====_===.........................................................________........
i,                                        83-171/      12/06/83          01/06/84              D/G-1A-A WAS DECLARED INOPERABLE WHEN THE REMOTE SPEED CONTROL FAILED TO OPERATE PROPERLY.
03-L                                                  INVESTIGATION REVEALED A BAD WINDING IN THE POTENTIOMETER DRIVE MOTOR.
83-181/      12/23/83        01/05/84                120 VOLT AC VITAL INVERTER 1-I HAD BEEN TAKEN OUT OF SERVICE FOR MT-10.6 AND HAD NOT BEEN T                                                  RETURNED TO SERVICE WITHIN 24 HOURS. MAINTENANCE INSTRUCTION 10.6 IS BEING REVISED.
83-184/      12/12/83        01/10/84                THE LOWER CONTAINMENT PERSONNEL AIRLOCK OUTER DOOR WOULD NOT CLOSE. INVESTIGATION REVEALED 03-L                                                  THREE CAM FOLLOWER BEARINGS HAD FAILED IN THE MECHANICAL LINKAGE DUE TO NORMAL WEAR.
83-185/      12/07/83        01/06/84                GLYCOL CONTAIMMENT ISOLATION VALVE WOULD NOT CLEAR ITS OPEN LIMIT SWITCH. AN IMPROPERLY i                                          03-L                                                  TIGHTENED BOLT ALLOWED THE LIMIT SWITCH TO SLIP OUT OF POSITION.
i                                        .83-188/      12/21/83        01/19/84                D/G 1A-A WAS LOADED TO 4 MWE. WHILE ATTEMPTING TO REDUCE LOAD, THE LOAD DROPPED INSTANTLY TO
,                                          03-L                                                  ZERO.
83-189/.      12/24/83        01/19/84                FEEDWATER FLOW CHANNEL 2-FT-3-90 WAS DECLARED INOPERABLE DUE TC A FR0 ZEN SENSE LINE.
03-L                                                  TRGUBLESH00 TING BOTH EVENTS FOUND THE SENSE LINES TO BE FROZEN.
t
;                                          83-190/      12/11/83          --                      THE REACTOR COOLANT SYSTEM SUBC00 LING MARGIN MONITOR WAS DECLARED INOPERABLE, DUE TO THE LOSS OF 03-L                                                  THE UNIT P-250 COMPUTER. THE COMPUTER HALTED MOST PROBABLY DUE TO A PROGRAMMATIC ERROR.                        ,
83-191/. 112/27/83            01/25/84                R0D POSITIDM INDICATOR DECLARED IMOPERABLE, DUE TO ERRATIC BEHAVIOR. HIGH RESISTANCE WAS ON THE                l 03-L
                                                                                                ~
l                                                                                                SECONDARY COIL.
84-001/      01/05/84          02/08/84                HIGH RAD ALARM ACTUATED, CAUSING A CONTAINMENT VENTILATION ISOLATION TO OCCUR, DETERMINED TO BE                :
SPURIOUS AND CHANNEL WAS BLOCKED.
84-002/      01/27/84          02/24/84                HIGH RADIATION ALARM WAS ACTUATED WHICH CAUSED A CONTAINMENT VENTILATION ISOLATION (CVI) TO OCCUR. INVESTIGATION REVEALED THAT A VOLTAGE SPIKE OCCURRED.
                                        ==================================================================================================================================
L i
PAGE 2-312 a
{'
 
THIS PAGE INTENTI0HALLY LEFT BLANK PAGE 2-313
 
1 Docket    50-335            0PERATING              STATUS                  MMMMMMMMMMMMMMMMMMhMMMMMMMMMMMMMMMMM M                  ST LUCIE 1                M
: 2. Reporting Period: 03/01/84        Outage + On-linc Hrs      744.0          MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 3. Utility
 
==Contact:==
N. W. GRANT (305) 552-3675                              AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                        2700
: 5. Nameplate Rating (Gross MWe):                1000 X 0.89 : 890 ST LUCIE 1
: 6. Design Electrical Rating (Net MWe):                    830            1883
: 7. Maximum Dependable Capacity (Gross MWe):              867
_____                                [      3
: 8. Maximum Dependable Capacity (Hr,t MWo):                822
: 9. If Changes Occur Above Since Last Report, Give Reasons:
687 INCREASED 5/25/83 BASED ON !JATER TEMPS
: 10. Power Level To Which Restricted, If Any (Net MWe):
: 11. Reasons for Restrictions. If Any:                                          ,
NONE MONTH        YEAR      CUMULATIVE              NO NET POWER CUTPUT THIS MONTH
: 12. Report Period Hrs                744.0    2.184.0      63.792.0-          ---------------------------------------            100
: 13. Hours Reactor Critical                .0          .0    44.466.3
: 14. Rx Reserve Shtdwn Hrs                .o          .0        205.3 ll                                                        ,,
: 15. Hrs Generator On-Line                .0          .0      43.576.9
: 16. Unit Reserve Shtdwn Hrs              .0          .0          39.3 900-                                                    -80
: 17. Gross Therm Ener (MWH)                0          0 108.667.938
: 18. Gross Elec Ener (MWH)                  0          0  35.373.875
                                                -8,554
                                                                                                                                  ~*
: 19. Het Elec Ener (MWH)              -3.068                33.321.146
: 20. Unit Service Factor                  .0          .0          68.3
: 21. Unit Avail Factor                    .0          .0          68.4                                                            -30
: 22. Unit Cap Factor (MDC Net)            .0          .0          63.5
: 23. Unit Cap Factor (DER Het)            .0          .0          62.g      0          ...      ..        ..      ...    , .,    0 0          5      to        15        to  as  30
: 24. Unit Forced Outage Rate              .0          .0            4.6                                    DAYS
: 25. Forced Outage Hours                  .0          .0      2.104.7
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                      MARCH 1984 NONE
: 27. If Currently Shutdown Estimated Startup Date:            05/10/84                                                                    PAGE 2-314
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR 1984                                                    UNIT      SHUTD0WNS / REDUCTIONS
* ST LUCIE 1              M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
  .No.            Dato            [233 BserroEteson Method LER Humber System Comoonent                                  Cause & Corrective Action to Prevent Reeverence 3              02/26/83                    5 744.0                  C    4                  RC    FUELXX      UNIT 81 REMAINED OUT OF SERVICE FOR REFUELING AND SCHEDULED MAINTENANCE.
j MMMMMMMMMMM                      A REFUELING AND MAINTENANCE SHUTDOWN CONTINUES AT M
 
==SUMMARY==
M                      ST. LUCIE 1 MMMMMMMMMMM Tvoe              Reason                                                    Method          Svstem & Comoonent F-Forced A-Equip Failure F-Admin                                              1-Manual        Exhibit F 8 H S-Sched          B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling                                    H-Other    3-Auto Scram  ' Preparation of D-Regulatory Restriction                                    4-Continued    Data Entry Sheet E-Operator Training                                        5-Reduced Load Licensee Event Report
                        & License Examination                                  9-Other        (LER) File (HUREG-0161)
PAGE 2-315
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM i                            M            ST LUCIE 1                        M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM                        FACILITY            DATA                                              Report Period MAR 1984 FACILITY DESCRIPTION                                                    UTILITY 8 CONTRACTOR INFORMATION L'0 CATION                                                              UTILITY STATE.................... FLORIDA                                      LICENSEE................. FLORIDA POWER 8 LIGHT COUNTY...................ST LUCIE                                      CORPORATE ADDRESS....... 9250 WEST FLAGLER STREET P.O. BOX 529100 MIAMI, FLORIDA 33152 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 12 MI SE OF                                CONTRACTOR FT. PIERCE, FLA                    ARCHITECT / ENGINEER.......EBASCO TYPE OF REACTOR. . . . . . . . . . . .PWR                                  HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... APRIL 22, 1976                                CONSTRUCTOR..............EBASCO DATE ELEC ENER 1ST GENER...MAY 7,              1976                      TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 21, 1976                        REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0HCE THRU                                    IE REGICH RESPONSIBLE......II CONDENSER COOLING WATER.... ATLANTIC OCEAN                              IE RESIDENT INSPECTOR......C. FEIERABEND ELECTRIC RELIABILITY                                                    LICENSING PROJ MANAGER.....D. SELLS COUNCIL................. 50UTHEASTERN ELECTRIC                          DOCKET NUMBER........... 50-335 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....DPR-67, MARCH        1,  1976 PUBLIC DOCUMENT ROOM....... INDIAN RIVER COMMUNITY COLLEGE LIBRARY 3209 VIRGINIA AVENUE FT. PIERCE, FLORIDA 33450 INSPECTION
 
==SUMMARY==
 
                                + INSPECTION JANUARY 11 - FEBRUARY 10 (84-02):              THIS ROUTINE INSPECTION INVOLVED 77 RESIDENT INSPECTOR-NOURS ON SITE IN THE AREAS OF MAINTENANCE OBSERVATION, SURVEILLANCE OBSEkVATION, PLANT OPERATIONS, TMI ACTION ITEMS FOLLOWUP. OF THE FOUR AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 21-24 (84-06): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 14 INSPECTOR-N3URS ON SITE IN THE AREAS OF INSERVICE INSPECTION (ISI) (UNIT 1), CORE BARREL REPAIR (UNIT 1) AND PREVIOUS INSPECTION FINDINGS (UNITS 1 AND 2). NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION MARCH 6-9 (84-07): TNTS ROUTIME, ANNOUNCED INSPECTICH INVOLVED 144 INSPECTOR-NOURS ON SITE IN THE AREAS OF AH
                              -EMERGENCY PREPAREDNESS EXERCISE. OF THE AREAS INSPECTED, H0 VIOL ATIONS OR DEVI ATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
s NONE OTHER ITEMS PAGE 2-316
 
e Report Period MAR 1984                                                                                                                                NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN IN5PECTION            STATUS        -
(CONTINUED)  N          ST LUCIE 1                  M MMMMNNNNNNNMMMNNNNNNNNNNNNNNNNNNNNNN OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
DURING REFUELING OUTAGE, THE THERMAL SHIELD WITHIN THE REACTOR VESSEL WAS FOUND TO BE BROKEN. THE SHIELD IS BEING REMOVED.
FACILITY ITEMS (PLANS AND PROCEDURES):
EXTENDED OUTAGE, RESTART PLANNED IN EARLY 1984.
MANAGERIAL ITEMS:
NONE.
PLANT STATUS:
REFUELING.
LAST IE SITE INSPECTIDH DATE: MARCH 6-9, 1984 +
INSPECTION REPORT NO                50-335/84-07 +
REPORTS        FR0M            LICENSEE
                                                            ==================================================================================================================================
NUMBER          DATE OF          DATE OF                                          SUBJECT EVENT              REPORT
                                                            -- ----.....--...---...--.............._                                                        ----=_ ___.- _ _=____ ......-- -_= =____- =_ _..............=_ ____=__......... ... . ..
e 84-004/        02/09/84          03/09/84                                          MAIN FEEDWATER PUMP TRIPPED, DUE TO LOW SUCTION PRESSURE.
                                                            ==================================================================================================================================
PAGE 2-317
 
. 1. Docket    50-389                                                        0PERATING            STATU$                        MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
'                                                                                                                                  M                ST LUCIE 2                M
: 2. Reporting Period                                03/01/84                      Outage + On-line Hrs        744.0              MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 3. btility
 
==Contact:==
N. W. GRANT (305) 552-3675                                                      AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                                                    2560
-l 1
: 5. Nameplate Rating (Gross MWe):                                                            0850 ST LUCIE 2
: 6. Design Electrical Rating (Net MWe):                                                                804            1953
: 7. Maximum Dependable Capacity (Gross MWe):                                                            832                              DESIGN ELEO. MRTING =    804
                                                                                                                                    ......ftRX. DEPDC. CRP. - 786 1100%)
: 8. Maximum Dependable Capacity (Het MWe):                                                              786
: 9. If Changes Occur Above Since Last Report, Give Reasons:
: 10. Power Level To Which Restricted, If Any (Net MWo):
: 11. Reasons for Restrictions, If Any:
1 ems-NONE K              m i a m !Ti m
: 12. Report Period Hrs                                                                .0    2      .0
                                                                                                                                    ~~~~~~~~ ~~~-~~~~~~~~~~~~~~~~~~~~~----      ~188
: 13. Hours Reactor Critical                                                        744.0    2.165.4          5.392.4
: 14. Rx Reserve Shtdwn Hrs                                                            .0          .0              .0
: 15. Hrs Generator On-Line                                                        744.0    2.029.6          5.160.0 a                                                          - 80 L
: 16. Unit Reserve Shtdwn Hrs                                                          .0          .0              .0 500-
: 17. Gross Therm Ener (MWH)                                                    1.904.246  5.101.877      12.759.821                                                            -so
: 18. Gross Elec Ener (MWH)                                                      640.050  1.715.580      4.258.800
: 19. Het Elec Ener (MWH)                                                        606.787  1.620.468      4.018.054                                                            -to
: 20. Unit Service Factor                                                          100.0        92.9              90.7 21 Unit Avail Factor                                                              100.0        92.9              90.7                                                          -30
: 22. Unit Cap Factor (MDC Net)                                                    103.8        94.4              89.9
: 23. Unit Cap Factor (DER Het)                                                    101.4        92.3              B7.8      0  -
                                                                                                                                        ...      .      .,.    ...    .,.  .,    o 0        5      to      15    30      25  30
: 24. Unit Forced Outage Rate                                                          .0        5.8              8.8                                Days
: 25. Forced Outage Hours                                                              .0      124.3          498.9
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):                                                                                  MRRCH 1984 NONE
: 27. If Currently Shutdown Estimated Startup Date:                                                        N/A                                                                      PAGE 2-318
 
4 MNNNNNNNNNNNNMMNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                                                                  UNIT        SHUTD0WN$ / REDUCTIONS                      N          ST LUCIE 2            N NNNNNNNNNNNNNNMMMMMNNNNNNNNNNNNNNNNN No.                                              Date    lidi Hours Reason          LER Number System domponent        Cause & Corrective Action to Prevent Recurrence NOME 1
4 i
NNNNNNNNNNN                                                      ST. LUCIE 2 OPERATED AT FULL POWER IN MARCH WITH NO SHUTDOWNS N
 
==SUMMARY==
N                                                      OR REDUCTIONS REPORTED.
NNNNNNNNNNN Tvne                                                        Reason                            Method          System 8 Comnonent F-Forced A-Equip Failure' F-Admin                                                            1-Manual        Exhibit F & H S-Sched                                                    B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling        H-Other      3-Auto Scram  Preparation of D-Regulatory Restriction          4-Continued    Data Entry fheet i
E-Operator Training              5-Reduced Load Licensee Event Report
                                                                                                                                              & License Examination          9-Other        (LER) File (HUREG-0161)
PAGE 2-319
 
CMMMMMMMMMMMNNNNNNNMMMNNNNNNMMMNNNNM n                        ST LUCIE 2              M cumanunummuummuunnmuumMuummwMunnumMM                              FACILITY          DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                                          UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                            UTILITY STATE.................... FLORIDA                                LICENSEE................. FLORIDA POWER 8 LIGHT C00HTY...................ST LUCIE                                CORPORATE ADDRESS....... 9250 WEST FLAGLER ST., P.O. BOX 529100 MIAMI, FLORIDA 33152 DIST AND DIRECTION FROM HEAREST POPULATION CTR.. 12 MI SE OF                          CONTRACTOR FT. PIERCE. FLA                        ARCHITECT / ENGINEER.......EBASCO TYPE OF REACTOR............PWR                                          HUC STEAM SYS SUPPLIER... COMBUSTION ENGINEERING DATE INITIAL CRITICALITY... JUNE 2,          1983                        CONSTRUCTOR..............EBASCO DATE ELEC ENER IST GENER... JUNE 13, 1983                                TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... AUGUST 8,          1983                REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                  IE REGION RESPONSIBLE......II CONDENSER COOLING WATER.... ATLANTIC OCEAN                            IE 3ESIDENT INSPECTOR......C. FEIERABEND ELECTRIC RELIABILITY                                                  LICENSING PROJ MANAGER.....D. SELLS COUNCIL................. 50UTHEASTERN ELECTRIC                  DOCKET NUMBER........... 50-389 RELIABILITY COUNCIL LICENSE & DATE ISSUANCE....      JUNE 10, 1983 PUBLIC DOCUMENT ROCM....... INDIAN RIVER COMMUNITY COLLEGE LIBRARY 3209 VIRGINIA AVENUE FT. PIERCE, FLORIDA 33450 IN5PECTION                STATUS INSPECTION
 
==SUMMARY==
 
                                                + INSPECTION JANUARY 11 - FEBRUARY 10 (84-03): THIS ROUTINE. INSPECTION INVOLVED 78 RESIDENT INSPECTOR-HOURS ON SITE IN THE AREAS OF MAINTENANCE OBSERVATION, SURVEILLANCE OBSERVATION, PLANT OPERATIONS. TMI ACTION ITEMS FOLLOWUP. OF THE FOUR AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 13-14 (84-06): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 17 INSPECTOR-HOURS ON SITE IN THE AREAS OF REACTOR COOLANT SYSTEM LEAK RATE MEASUREMENT, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 21-24 (84-08):            THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 14 INSPECTOR-HOURS ON SITE IN THE AREAS OF INSERVICE INSPECTION (ISI) (UNIT 1), CORE BARREL REPAIR (UNIT 1) AND PREVIOUS INSPECTION FINDINGS (UNITS 1 AND 2). NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION MARCH 6-9 (84-09): THIS ROUTINE. ANNOUNCED INSPECTION INVOLVED 144 INSPECTOR-HOURS ON SITE IN THE AREAS OF AN EMERGENCY PREPAREDNESS EXERCISE. OF THE AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
NONE PAGE 2-320
 
Report Period MAR 1984                                                                                                            NNNNNNNNNNNNMMNNNNNMMMMMMMMNNNNNMMNN INSPECTION              5TATUS - (CONTINUED)                N          ST LUCIE 2                  N MMMMMMMMNNNMMMMMMMMMMMNNNNMMMMMMMMMM OTHER ITEMS PERFORMING STARTUP TESTING.
SYSTEMS AND COMPONENT PROBLEMS:
NONE.
FACILITY ITEMS (PLANS AND PROCEDURES):
NONE.
MANAGERIAL ITEMS:
NDHE.
    ' PLANT STATUS:
NORMAL OPERATION.
LAST IE SITE INSPECTION DATE: MARCH 6-9, 1984 +
INSPECTION REPORT NO: 50-389/84-09 +
REP 0RTS      FR0M      L I.C E N $ E E
      ========================================================================================================= ========================
NUMBER                                  DATE OF      DATE OF    SUBJECT EVENT    REPORT
      -------------------------------------------=.
83-076/                                  12/02/83    01/03/84  FIRE DETECTION SYSTEM FAILED 3 HOURS, DUE TO A DEFECTIVE TRANSCEIVER CARD.
03-L 83-077/                                  12/21/83    01/20/84  25 D/G FAILED TO START WITHIN REQUIRED 10 SECONDS DURING PERIODIC SURVEILLANCE, NO CAUSE FOUND 03-!                                                            FOR SLOW START TIME.
84-001/                                01/19/84      02/18/84  TURBINE AND REACTOR TRIPPED, CAUSED BY A GENERATOR GROUND.
84-003/                                01/29/84      02/28/84  HI HI S/G LEVEL TURBINE TRIP OCCURRED, DUE TO A LEAKAGE THRU ' A' MAIN FEED REG VALVE.
      ==================================================================================================================================
PAGE 2-321
 
0PERATING              STATUS                  MMuumuruwwwwwMwwwwwuMwwumMwwwwwwwMww
: 1. Docket: _31-J35_                                                                                          M                    SUMMER 1              N
: 2. Reporting Period: 03/01/84                                    Outage + On-line Hrs: 744.0                MMMwuwMMMMMMmwmMMwwMMMMwMMuwwwwwmMMM
: 3. Utility
 
==Contact:==
G. A. LOIGNON (803) 345-5209                            AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                                      2775 SUMMER 1
: 5. Nameplate Rating (Gross MWe):                                              0900 900            1500
: 6. Design Electrical Rating (Net MWe):
                                                                                                                                                  ~
: 7. Maxirrum Dependable Capacity (Gross MWe):                                            900                                            .
900 (100%)
: 8. Maximum Dependable Capacity (Het MWe):                                              885 l
!  9. If Changes Occur Above Since Last Report, Give Reasons:
: 10. Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Any:                                                                    ,,3, NONE                                                                                                                                                      ~
MONTH          YEAR    CUMULATIVE                    T-se
: 12. Report Period Hrs                                              744.0      2.184.0      2.184.0                                                                hf
: 13. Hours Reactor Critical                                        533.5      1.910.3      1.910.3
                                                                                                                                                                - 30
: 14. Rx Reserve Shtdwn Hrs                                              .0            .0          .0 ll
: 15. Hrs Generator On-Line                                          531.5      1.875.7      1.875.7
                                                                                                                                                                ~ 80
: 16. Unit Reserve Shtdwn Hrs                                            .0            .0          .0
: 17. Gross Therm Ener (MWH)                                    1.459.743    5.122.987    5.122.987 1.713.195    1.713.195                                                            .go
: 18. Gross Elec Ener (MWH)                                        490.650
: 19. Het Elec Ener (MWH)                                          470.812    1.644.612    1.644.612
: 20. Unit Service Factor                                            71.4          85.9          85.9
                                                                                                                                                                - 20
: 21. Unit Avail Factor                                              71.4          85.9          85.9
: 22. Unit Cap Factor (MDC Net)                                      71.5          84.1          85.1
: 23. Unit Cap Factor (DER Net)                                      70.3          83.7          83.7      0            .,        ,_      ,  _.. k.
30 0
0            5    10      15    30    35
: 24. Unit Forced Outage Rate                                            .0          4.9          4.9                                    DAYS
: 25. Forced Outage Hours                                                .0        95.8          95.8
: 26. Shutdowns Sched Over Hext 6 Months (Type Date, Duration):                                                                    MARCH 1984 SCHEDULED REFUELING - SEPTEMBER 1.                                  1984
: 27. If Currently Shutdown Estimated Startup Date:                                          04/18/84                                                                PAGE 2-322
 
_  - . _ . _    __    __,      _            ._m . ._~
Report Period MAR 1984                                                                                                                      NNNNNNNNNNNNNNNNNNNnNNNNNNNNNNNNNNNN UNIT                          SHUTD0WNS / REDUCTIONS                              N            SUMMER 1              N NNNNNNNNNNNNNNNANNNNNNNNNNNNNNNNNNNN No. Date      Yvoe Hours Reason Method LER Number System Comoonent                                                      Cause 8 Corrective Action to Prevent Recurrence 4      03/23/84      5 212.5          E                  1 SPRING MAINTENANCE OUTAGE.
EMNNNNNNNNN SUMMER 1 COMMENCED ITS SPRING MAINTENANCE SHUTDOWN CH MARCH 23.
n
 
==SUMMARY==
N
          . ENNNNNNNNNN Tvoe        Reason                                                  Method                          Svstem 8 Comnonent F-Forced 'A-Equip Failure F-Admin                                      1-Manual                        Exhibit F 8 H
          . 5-Sched    B-Maint or Test G-Oper Error .2-Manual Scram Instructions for C-Refueling            H-Other                            3-Auto Scram                    Preparation of D-Regulatory Restriction                                  4-Continued                      Data Entry Sheet E-Operator Training                                      5-Reduced Load. Licensee Event Report
                            & License Examination                                9-Other                          (LER) File (HUREG-0161)
PAGE 2-323 k
m__..
 
CNNNNNNNNMMMMMMMMNNNNNMMMMNNNNNNNNNN c                          SUMMER 1                                  M Report Period MAR 984 cMMMMMNNNNNNNNNNNNNMMMMMMMMNNNNNNNNM                                                FACILITY        DATA FACILITY DESCRIPTION                                                                          UTILITY 8 CONTRAC10R INFURMATION LOCATION                                                                                      UTILITY STATE................... 50UTH CAROLINA                                                        LICENSEE................. SOUTH CAROLINA ELECTRIC 8 GAS CO.
COUNTY. . . . . . . . . . . . . . . . . . . FAIRFI EL D                                        CORPORATE ADDRESS........P.O. BOX 764 COLUMBIA, SOUTH CAROLINA 29202 DIST AND DIRECTION FROM HEAREST POPULATION CTR.. 26 MI NW OF                                                        CONTRACTOR COLUMBIA, SC                      ARCHITECT / ENGINEER....... GILBERT ASSOCIATES TYPE OF REACTOR............PWR                                                                  HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY.. 0CTOBER 22, 1982                                                      CONSTRUCTOR.............. DANIEL INTERNATIONAL DATE ELEC ENER 1ST GENER... NOVEMBER 16, 1982                                                    TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JANUARY 1,                                      1984            REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                                          IE REGION RESPONSIBLE......II CONDENSER COOLING WATER....MONTICELLO RESERVOIR                                              IE RESIDENT INSPECTOR......C. HEHL ELECTRIC RELIABILITY                                                                          LICENSING PROJ MANAGER.....J. HOPKINS COUNCIL.................. SOUTHEASTERN ELECTRIC                                              DOCKET NUMBER........... 50-395 RELIABILITY COUNCIL LICENSE 8 DATE ISSUANCE....HPF-12, NOVEMBER 12, 1982 PUBLIC DOCUMENT ROOM.......FAIRFIELD COUNTY LIBRARY GARDEN & WASHINGTON STREETS WINNSBORD, SOUTH CAROLINA 29180 INSPECTION            5TATUS INSPECTION
 
==SUMMARY==
 
  + INSPECTION JANUARY 30 - FEBRUARY 29 (84-05): THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 128 INSPECTOR-HOURS ON SITE IN THE AREAS OF PLANT TOUR, PLANT OPERATIONS REVIEW, TECHNICAL SPECIFICATIONS COMPLIANCE, PHYSICAL PROTECTION, MAINTENANCE AND SURVEILLANCE REVIEW, NON-ROUTINE EVENT REPORTS, PREVIOUSLY IDENTIFIED ITEMS, SPECIAL EMERGENCY FEEDWATER SYSTEM REVIEW. OF THE EIGHT AREAS INSPECTED, H0 VIOL ATIONS OR DEVI ATIONS WERE IDENTIFIED IN SEVEN AREAS; TWO APPARENT VIOL ATIONS WERE FOUND IN ONE AREA (FAILURE TO ESTABLISH, IMPLEMENT OR MAINTAIN PROCEDURES, PARAGRAPH 93. .
INSPECTION MARCH 6 (84-06): THIS SPECIAL, ANNOUNCED INSPECTION INVOLVED 9 INSPECTOR-h0URS AT SCEAG HEADQUARTERS IN THE AREAS OF HEATING VENTILATING AND AIR CONDITIONING (HVAC). H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
NONE OTHER ITEMS PAGE 2-324
 
e Report Period MAR 1984                                                        INSPECTION                                                MMNNNNNNNNNNNNNNNNMMNNNNNNNNMMMNNNNN STATUS - (CONTINUED)              M            SUMMER 1              M NNNNNNNNNNNNNNNNMMMMNNNNNNNNNNNMMMMM OTHER TTEMS SYSTEMS AND COMPONENT PROBLEMS:
HONE.
FACILITY ITEMS (PLANS AND PROCEDURES):
NONE.
MANAGERIAL ITEMS:
NONE.
PLANT STATUS:
      + SHUTDOWN ON MARCN 23 FOR MAINTENANCE OUTAGE.
LAST IE SITE INSPECTION DATE: MARCH 6, 1984.+
INSPECTION REPORT NO: 50-395/84-06 +
REP 0RTS        FR0M      LICENSEE
      ======================================================================================================
NUMBER                                                DATE OF    DATE OF    SUBJECT EVENT      REPORT
__ _ ----==_ --- -------------------------------------------------------------------------------------.-__ --    e 83-138/                                              12/05/83  01/04/83    1 FROZEN SNUBBER AND SEVERAL ROTATED PIPE CLAMPS IDENTIFIED, DUE TO WATER HAMMER PROBLEMS DURING 03-L                                                                        STARTUP.
83-139/                                              12/14/83  01/09/84 03-L                                                                        REMOTE INFORMATI0H ACQUISITION CABINET TRIPPED CAUSING INTERMEDIATE BLDG SPRINKLER SYSTEM INTO ALARM MODE, DUE TO WATER ENTERING PANEL AND SHORTING OUT 2 ELECTRONIC CARDS.
83-140/                                              12/24/83  01/06/84 01-T                                                                        INSTRUMENT LINES FROZE FOR REFUELING WATER STORAGE TANK LEVEL TRANSMITTERS, DUE TO INSTRUMENT LINES FREEZING.
83-141/                                              12/15/83  01/12/84  SNUBBER MSH-324 FAILED A FUNCTIONAL TEST AND DECLARED IHOPERAELE, DUE TO A TRANSIENT IN 32" MAIN 03-L                                                                        STEAM LINE.
83-142/                                              12/16/83  01/13/84  LEAKAGE FROM RCS DETERMINED TO BE 10.4 CPM, DUE TO EXCESSIVE LEAKAGE FROM 82 SEAL ON RCP 'C'.
03-L 83-143/                                              12/24/83  01/23/84 03-L                                                                        INDICATION FOR CST LEVEL TRANSMITTER FAILED HIGN BECAUSE OF FR0 ZEN INSTRUMENT LINES.
4        83-144/                                              12/23/83  01/20/84  PL ANT EXPERIENCED ERRATIC BEHAVIOR. FROM POWER RANGE NUCLEAR INSTRUMENT HI-42 DURING 3 EVENTS, 03-L                                                                        CAUSE UNKNOWN.
PAGE 2-325
 
NNNNNMMMMMMMMMMMMMMNNNMMMMMMMNNNNNNM SUMMER 1              N Report Period MAR 1984          REP 0RTS        FR0M      LICEHSEE - (CONTINUED)                M NMMNNNNMMNNNWMMWNMMNNNNNNNNNNNNNNNMM 84-002/  01/11/84        02/02/84  HOURLY ROVINC FIRE WATCH PATROL FOR AUX. BLDG. NOT PERFORMED DURING PREVIOUS 8 HOURS, DUE TO
                                                        --                                    PERSONNEL ERROR.
84-003/  01/12/84        02/08/84  24% OF RMA3/66% RM-A4 QUARTERLY COMPOSITE SAMPLES MISSING A SPECI AL CONTAINER HAS BEEN
                                                        --                                    FABRICATED FOR FILTER STORAGE.
84-004/  01/17/84        01/15/84  2 CABLE JUNCTION BOXES WERE NOT WRAPPED WITH KA0 WOOL, 1 CABLE RUN HAD KA0 WOOL DAMAGED IH 3
                                                        --                                    DIFFERENT AREAS, DUE TO CONSTRUCTION AND MAINTENANCE ACTIVITY IN THE AREA.
84-005/  01/17/84        02/15/84  PLANT TRIPPED FROM 100% PWR BECAUSE OF S/G 'B' LOW LEVEL COINCICENT WITH FEEDWATER FLOW LOW
                                                        --                                    REACTOR TRIP, DUE TO PERSONNEL ERROR.
84-006/  01/31/84        03/01/84  OVERCURRENT PROTECTION DEVICES FOR PLANT PAGING SYSTEM NOT INCLUDED IN TABLE 3.8-1 0F T.S.
                                                        --                                    3.8.4.
84-007/  02/27/84        03/02/84  A POTENTIAL BOMB THREAT WAS RECEIVED. NO BOMB (S) FOUND.
84-008/  02/07/84        03/05/84  REACTOR TRIPPED FROM HORMAL OPERATIONS, LOW-LOW LEVEL IN S/G 'B', AN ELECTRONIC CARD FAILED.
84-009/  G2/03/04        03/05/84  REACTOR TRIPPED FROM 9% POWER OH LO-LO S/G LEVEL.
84-010/  02/09/84        03/05/84  THE REACTOR WAS MANUALLY TRIPPED FROM APPROXIMATELY 8% POWER. THE APPROPRIATE OPERATING
                                                        --                                    PROCEDURE WAS REVISED.
84-012/  02/14/84        03/12/84  L EAK RATE TEST WAS HOT PERFORMED ON THE REACTOR BUILDING EMERGENCY ESCAPE HATCH WITHIH 72 HOURS
                                                        --                                    FOLLOWIP3 CLOSURE, DUE TO PERSOHNEL ERROR.
i                                                    ===========================================================================================================================
PAGE 2-326
 
                                                                                                                , _y  ,    _      __
THIS PAGE INTENTIONALLY LEFT BLANK I
4 i
PAGE 2-327
 
1 Docket:          50-280                          0PERATIHG                STATUS                  MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M                SURRY t                  M
: 2. Reporting Period                          03/01/84      Outage + On-line Hrst    744.0          MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 3. Utility Contacts VIVIAN H. JONES (804) 357-3184                                                  AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                              2441 SURRY 1
: 5. Nameplate Rating (Gross MWo):                                      942 X 0.9 : 848 1500
: 6. Design Electrical Rating (Het MWe):                                        788 DESIGN ELEC. ftftTING = 788
: 7. Maximum Dependable capacity (Gross MWe):                                    811                    -----. MRX. DEPEND.      CMP. - 775 (100%)
: 8. Maximum Dependable Capacity (Het MWe):                                      775
: 9. If Changes occur Above Since Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Anyt                                                          1033-NONE MONTH          YEAR    CUMULATIVE
: 12. Report Period Hrs                                      744.0    2.184.0    98.832.0                                                              hf 60.917.7          '---------------- =--------- ------------ -100
: 13. Hours Reactor Critical                                  508.0    1.818.7                                            pe ~se                -
: 14. Rx Reserve Shtdwn Hrs                                      .0        9.3      3.774.5 ll                                                      - 80
: 15. Hrs Generator On-Line                                  501.0    1.781.0    59.647.8
: 16. Unit Reserve Shtdwn Hrs                                    .0          .0      3.736.2    ,,,,
                                                                                                                                                    - so
: 17. Gross Therm Ener (MWH)                            1.187.048    4.213.335 138.613.948
: 18. Gross Elec Ener (MWH)                              387.015 ,1tl59,440      44.679.283
                                                                                                                                                    - 80 367.491    1.291.367  42,369.103
: 19. Het Elec Ener (MWH)
: 20. Unit Service Factor                                      67.3        81.5          60.4
                                                                                                                                                    - 30
: 21. Unit Avail Factor                                        67.3        81.5          64.1
: 22. Unit Cap Factor (MDC Net)                                63.7        76.3          55.3 0            -
l      .-      .-      -
0
: 23. Unit Cap Factor (DER Het)                                62.7        75.0          54.4        0        s      to    is      30    as 30
                                                                .0        2.2          21.1                                DAYS
: 24. Unit Forced Outage Rate
: 25. Forced Outage Hours                                        .0      39.8      12.251.6
: 26. Shutdowns Sched 'Over Hext 6 Months (Type,Date, Duration):                                                        Mf1RCH 1984 NONE
: 27. If Currently Shutdown Estimated Startup Dates                                  N/A                                                                  PAGE 2-328
 
Report Period MAR 1984                                                                                                                                    MMMMNNMMNNNNNNNNNNNNNNNNNNNNMMMNNNNN UNIT      SHUTD0WNS / REDUCTIONS                      N            SURRY f              M MNNNNNNNNNNNNMMNhMNNNNNNNNNNNNhMNNNN No.                      Data    lEdi Roues Reason Method LER Number System Comoonent Cause a Corrective Action to Prevent Recurrence 84-4                    03/11/84    S 243.0                            H                            1 CONTINUATIDH OF SHUBBER OUTAGE WHICH COMMENCED OH 02-24-84.
NNNNNMWNNNM SURRY 1 REMAINED SHUTDOWN FOR SHUBBER PROBLEMS UNTIL MAP.CH 11 l        N
 
==SUMMARY==
M NNNMMMMMMMM Tvon                        Reason                                                                      Method          Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin                                                                        1-Manual        Exhibit F 4 H 5-Sched                    B-Maint or Test. G-Oper Error 2-Manual Scram Instructions for C-Refueling                  'H-Other                                        3-Auto Scram-  Preparation of D-Regulatory Restriction                                                    4-Continued    Data Entry Sheet E-Operator Training                                                          5-Reduced Load Licensee Event Report
                                        & License Examination                                                    9-Other        (LER) File (NUREG-0161)
PAGE 2-329
 
HMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM u                          SURRY 1              M Report Period MAR 1984 CMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM                          FACILITY            DATA FACILITY DESCRIPTION                                                    UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                      UTILITY STATE....................uTRGTNTA                              LICENSEE................. VIRGINIA ELECTRIC 8 POWER COUNTY...................SURRY                                CORPORATE ADDRESS........P.O. BOX 26666 RICHMOND, VIRGINIA 23261 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 17 MI HW 0F                      CONTRACTOR NEWPORT NEWS, VA                    ARCHITECT / ENGINEER....... STONE 8 WEBSTER TYPE OF REACTOR............PWR                                    HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... JULY  1,  1972                        CONSTRUCTOP............... STONE & WEBSTER DATE ELEC ENER IST GENER... JULY 4, 1972                          TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 22, 1972              REGULATORY INFORMATION CONDENSER COOLING METHOD.. 0HCE THRU                          IE REGIDH RESPONSIBLE......II CONDENSER COOLING WATER.... JAMES RIVER                      IE RESIDENT INSPECTOR......D. BURKE ELECTRIC RELIABILITY                                          LICENSING PROJ MANAGER.....D. NEIGHBORS DOCKET NUMBER...........      50-280 COUNCIL................. 50UTHEASTERN ELECTRIC RELIABILITY COUNCIL          LICENSE 8 DATE ISSUANCE....DPR-32, MAY 25, 1972 i
PUBLIC DOCUMENT R00M.......SWEM LIBRARY COLLEGE OF WILLIAM AND MARY WILLIAMSBURG, VIRGINIA 23185 INSPECTION                STATUS INSPECTION
 
==SUMMARY==
 
                      + INSPECTION JANUARY 10-13 (84-02): THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 17 INSPECTOR-HOURS ON SITE IN THE AREAS OF REVIEW OF TMI ACTION ITEMS, INTERNAL EXPOSURE CONTROL, RADIOLOGICAL SURVEYS, POSTING, LABELING AND CONTROL, RADIATION WORK PERMITS, PROCEDURES REVIEW, QUALIFICATIONS OF HEALTH PHYSICS STAFF, LICENSEE AUDITS, NOTIFICATIONS AND REPORTS, FOLLOWUP ON AN UNPLANNED RCLEASE AND FOLLOWUP DN PREVIOUS ENFORCEMENT AND INSPECTOR IDENTIFIFD ITEMS. IN THE 12 AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 6-10 (84-05): THIS ROUTINE, UHANNOUNCED INSPECTION INVOLVED 17 INSPECTOR-HOURS ON SITE IN THE AREAS OF PREVIOUSLY IDENTIFIED ENFORCEMENT MATTERS; WELDING AND ASSOCIATED NONDESTRUCTIVE EXAMINATION, INSPECTION AND ENFORCEMENT (IE)
BULLETINS,    AND BORIC ACID RETURN PIPING STRESS CORROSION CRACKING. OF THE FOUR AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN THREE AREAS; ONE APPARENT VIOLATIDH WAS FOUND IN ONE AREA (INADEQUATE CORRECTIVE ACTION MEASURES, PARAGRAPH 3.E).
INSPECTION FEBRUARY 27 - MARCH 2 (84-06): THIS INSPECTION INVOLVED 15 INSPECTOR-HOURS ON SITE BY ONE NRC INSPECTOR. THREE INSPECTION HOURS WERE ACCOMPLISHED DURING OFFSHIFT PERIODS. THE INSPECTION INCLUDED REVIEW OF SECURITY ORGANIZATION-MANAGEMENT / PERSONNEL / RESPONSE, RECORDS AND REPORTS. TESTING AND MAINTENANCE, PHYSICAL BARRIERS-PROTECTED AREA, SECURITY SYSTEM POWER SUPPLY, ASSESSMENT AIDS, ACCESS CONTROL-PERSONNEL / PACKAGES, DETECTION AIDS-PROTECTED / VITAL AREA, ALARM STATIONS, AND COMMUNICATIONS. THE LICENSEE WAS FOUND TO BE IN COMPLIANCE WITH HRC REQUIREMENTS WITHIN THE 14 AREAS EXAMINED i
                  ' DURING THE INSPECTION.
l INSPECTION FEBRUARY 1-29 (84-07): THIS INSPECTION INVOLVED 100 INSPECTOR-HOURS ON SITE IN THE AREAS OF PLANT OPERATIONS PAGE                              AND 2-330 l
 
MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM Report Period MAR 1984                                          INSPEOTION                STATUS - (CONTINUED)                M            SURRY 1                M MMMMMMMMMMMMMMMMMMMMMMAMMMMMMMMMMMMM INSPECTION
 
==SUMMARY==
 
OPERATING RECORDS, PLANT MAINTENANCE AND SURVEILLANCE, PLANT SECURITY, FOLLOWUP OF EVENTS AND LICENSEE EVENT REPORTS. IN THE AREAS INSPECTED, NO VIOLATIDHS WERE IDENTIFIED.
* INSPECTION MARCH 5-8 (84-08):                                THIS ROUTINE, SPECIAL UNANNOUNCED INSPECTION INVOLVED 11 INSPECTOR-HOURS ON SITE IN THE AREAS OF INSPECTION AND TESTING OF SHUBBER, AND FOLLOWUP OH LICENSEE IDENTIFIED ITEMS. IN THE AREAS INSPECTED, HG VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION MARCH 6-9 (84-09):                                THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 25 INSPECTOR-HOURS ON SITE IN THE AREAS OF QC INSPECTION CONCERHS, QA/QC INSPECTOR TRAINING, AND IE BULLETINS. OF THE THREE AREAS INSPECTED, H0 VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
CONTRARY TO THE REQUIREMENTS OF 10CFR50.47(B)(1S), AS EVIDENCED BY INTERVIEWS WITH SHIFT SUPERVISORS DURING THE INSPECTION, ADEQUATE TRAINING HAD NOT BEEN PROVIDED SHIFT SUPERVISORS FOR EPIP 1.05 " RESPONSE TO GENERAL EMERGENCY", RELATING TO PROTECTIVE RECOMMENDATIONS. CONTRARY TO THE REQUIREMENTS OF 10CFR50.47(B)(10). IN THE CASE WHERE PROMPT PROTECTIVE ACTION RECOMMENDATIONS ARE WARRANTED BY PLANT CONDITIONS AND SITE BOUNDARY DOSES ARE NOT PROJECTED OR OCCURRING. THE LICENSEE'S EMERGEHCY PLAN AND ASSOCIATED IMPLEMENTING PROCEDURES DO NOT REQUIRE CONSIDERATION OF PROTELTIVE ACTIDH RECOMMENDATIONS CONSISTENT WITH FEDERAL GUIDANCE.
(8401 4)
CONTRARY TO THE REQUIREMENTS OF TECHNICAL SPECIFICATIONS 4.17.C.6, FUNCTIONAL TESTING OF AN ADDITIONAL 10 PERCENT OF EACH TYPE OF SN'JBBER THAT FAILED TO MEET THE ACCEPTANCE TEST CRITERIA WAS NOT PERFORMED.
(8403 4)
OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
N0HE.
FACILITY ITEMS (PLANS AND PROCEDURES):
NONE.
MANAGERIAL ITEMS:
NONE.
PLANT STATUS:
MORMAL OPERATION.
LAST IE SITE INSPECTION DATE: MARCH 6-9,                                  1984 +
INSPECTION REPORT NO: 50-280/84-09 +
PAGE 2-331
 
MMMMMMMMMMMMMNNNNNMMWNMMMMMMMMMMNNNN SURRY 1              M Report Period MAR 1984                INSPCCTIOM              STATUS - (CONTINUED)                M MMMMMMMMNNNNNNNNNNNNNMMMNNNNNNNMMMMM REP 0RTS      FR0M      LICENSEE
                      ==================================================================================================================================
NUMBER    DATE OF    DATE OF      SUBJECT EVENT    REPORT 83-057/    12/15/83  01/06/84    FOLLOWING A REACTOR TRIP FROM 100% POWER, ACTIVITY SAMPLES OF THE RFACTOR COOLANT SYSTEM 03-L                              INDICATED A DOSE EQUIVALENT I-131 LEVEL GRCATER THAH THE T.S.3.1.D.2 LIMIT.
83-058/    12/15/83  01/13/84    'C' FRV DID NOT FULLY CLOSE UP0H RECEIPT OF A LOW TAVE ISOLATION SIGNAL FOLLOWING A REACTOR 03-L                              TRIP, DUE TO A MECHANICAL BINDING.
83-059/    12/25/83  01/24/84    ROD POSITION INDICATORS (RPI) G-3 AND F-12, RESPECTIVELY, WERE INDICATING MORE THAh 12 STEPS 03-L                              FROM THEIR BANK. SIGNAL CONDITIONING MODULE DRIFT CAUSED INDICATOR F-12 TO DEVIATE.
84-001/    01/06/84  02/03/84    REACTOR TRIP CCCURRED AS A RESULT OF AH OVER TEMP / DELTA-T SIGNAL, DUE TO A POWER SURGE INDUCING
                          --                                A VOLTAGE TRANSIENT.
84-002/    08/18/84  02/13/84    NUMEROUS CONTROL ROOM INDICATIONS AND ANNUNCIATORS STARTED BEHAVING ERRATICALLY. LOOSE CABLE
                          --                                BEGAN ARCHING, AND THIS WAS THE CAUSE OF THE ERRATIC INDICATIONS.
I                          84-003/    02/06/84  03/06/84    REACTOR TRIP OCCURRED, LOW S/G LEVEL WITH A STEAM / FEED FLOW MISMATCH IN 'A' S/G CAUSED BY l                          --                                CLOSING A TRIPPED FEEDER BREAKER.
l
!                          84-004/    32/25/84  03/23/84    SPECIFIC ACTIVITY SAMPLE OF REACTOR COOLANT SHOWED A PEAK DOSE EQUIVALENT I-131 LEVEL OF 1.77
                          --                                NICROCURIES/CC, CAUSE UNKNOWN.
l l                      ===================================_==============================================================================================
l
                                                                        ?
PAGE 2-332
 
M M
t N
I                                              W o
4 A
bl Z
4
      .J 53
      >=
6 W
      .a
      .a
      .J 4
Z Q
me Z
W    ,
      >=
Z M
W C
4 A
r to
      >e Z
      >=
                                                  \
: 1. Docket          50-281        0PERATING            $TATUS                    NNNNNNNNNNNMWNNNNNNNNNNNNMWNNNNNNNWM N                SURRY 2                    N
: 2. Reporting Periode c3/01/84          Outage + On-line Hrs:    744.0            NNNNNNNNMMNNNNNNNNNWWNNNNNNWWNNNNNNN
: 3. Utility Contact        VIVIAN H. JONES (804) 357-3184                          AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                        2441
: 5. Nameplate Rating (Gross MWe):                942 X 0.9 = 848
: 6. Design Electrical Rating (Net MWe):                    788            tems
: 7. Maximum Dependable Capacity (Gross MWo):              3g1                                DESIGN ELDC. RRTIMO - TSS
                                                                                        ~~ ~ ~                *
* j    8. Maximum Dependable Capacity (Not MWe):                775
: 9. If Changes occur Above Since Last Report, Give Reasons:
NONE
,    10. Power Level To Which Restricted, If Any (Het MWe):
11 Reasons for Restrictions, If Any 1000 -
NONE MONTH        YEAR    CUMULATIVE
: 12. Report Period Hrs                  744.0    2.184.0    95.712.0                                                                  g
: 13. Hours Reactor Critical            370.0    1.786.2    60.356.8            *---------------------------------------        -153
                                                                                                +
j    14. Rx Reserve Shtdun Hrs                  .0      23.8          23.8 g
: 15. Hrs Generator On-Line              370.0    f.777.1    59.353.1                                                            - 8B l    16. Unit Reserve Shtdwn Hrs                .0        .0            .0 300-
]    17. Gross Therm Ener (MWH)          892.025  4.267.433 138.983.305                                                              - so
: 18. Gross Elec Ener (MWH)            285.250  1.368.470  45.158.329 i
: 19. Het Elec Ener (MWH)              270.614  1.298.460  42.805.520                                                            - eo l
: 20. Unit Service Factor                  49.7      81.4          62.0
: 21. Unit Avail Factor                    49.7      81.4          62.0                                                          -33
: 22. Unit Cap Factor (MDC Net)            46.9      76.7          57.7
: 23. Unit Cap Factor (DER Net)            46.2      75.4          56.8      e          ...      ,      ,.      ,      . .,    0 0          s    to    15      ao      as  so
: 24. Unit Forced Outage Rate              50.3      18.6          14.3                                DRYS
: 25. Forced Outage Hours                374.0      406.9      7.233.5
: 26. Shutdowns Sched Over Next 6 Months (Type Date. Duration):                                      PWiRCH 15H34 NONE                                                                                                                                          '
: 27. If Currently Shutdown Estimated Startup Date:            04/09/84                                                                  PAGE 2-334
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum Report Period MAR 1984                    UNIT      5HUTD0WN5 / REDUCTIONS                          u            SURRY 2                          m unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummun No.      Date    Yvoe HovEs Reason Method LER Number System Comooggni                  Cause & Corrective Action to Prevent Recurrence 84-10 03/06/84      5    0.0    H      5                                    POWER WAS REDUCED TO 86% POWER C680 MW'S) FOR LDAD FOLLOWING.
84-11 03/16/84      5    0.0    H      5                                    POWER WAS REDUCED TO 52% POWER C400 MW's) FOR LOAD FOLLOWING.
84-12 03/16/84      F 374.0      A      3  84-005                          REACTOR TRIP CAUSED BY "B" RCP TRIPPING. THE FAILURE WAS IN THE ELECTRICAL PENETRATION AND LEADS WERE CONNECTED TO A SPARE PEMETRATICd. THE SCHEDULED SNUBBER OUTAGE WAS STARTED EARLY DUE TO THE PLANT TRIPPING.
muunuuunnum      SURRY 2 EXPERIENCED 1 SHUTDDWM IN MARCH AS DISCUSSED ABOVE.
m
 
==SUMMARY==
u muuuuuuuuum Tvne      Reason                            Method          System 8 Comoonent F-Forced A-Equip Failure F-Admin              1-Manual        Exhibit F 8 H 5-Sched    B-Maint or Test G-Oper Error 2-Manual Scram Instructions for 2            C-Refueling        H-Other        3-Auto Scram    Preparation of D-Regulatory Restriction          4-Continued    Data Entry Sheet E-Operator Trainine                5-Reduced Load Licensee Event Report 8 License Examination          9-Other        (LER) File (NUREG-0161)
PAGE 2-335
 
l l
j  mummmmmmmmmmmmunummmmmmmmmmmmmmmmmmu u              SURRY 2                  m mummmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmu                      FACILITY                DATA                                                  Report Period MAR 1984 FACILITY DESCRIPTION                                              UTILITY 8 CONTRACLDR INFORMATION LOCATION                                                          UTILITY STATE.................... VIRGINIA                                    LICENSEE................. VIRGINIA ELECTRIC 8 POWER COUNTY...................SURRY                                        CORPORATE ADDRESS........P.O. BOX 26666 RICHMOND, VIRGINIA 23261 i        DIST AND DIRECTION FROM t
NEAREST POPULATION CTE.. 17 MI NW OF                            CONTRACTOR NEWPORT NEWS, VA                        ARCHITECT / ENGINEER....... STONE 8 WEBSTER I
TYPE OF REACTOR............PWR                                          NUC STEAM SYS SUPPLIER...WESTINGNOUSE DATE INITIAL CRITICALITY... MARCH 7, 1973                              CONSTRUCTOR. . . . . . . . . . . . . . STONE 4 WEBSTER l      DATE ELEC ENER IST GENER... MARCH 10, 1973                              TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE....MAY 1, 1973                          REGULATORY INFORMATION CONDENSER COOLING METHOD. ..ONCE THRU                            IE REGION RESPONSIBLE......II CONDENSER COOLING WATER.... JAMES RIVER                          IE RESIDENT INSPECTOR......D. BURKE f
ELECTRIC RELIABILITY                                              LICENSING PROJ MANAGER.....D. NEIGHBORS l        COUNCIL.................. SOUTHEASTERN ELECTRIC                      DOCKET NUMBER...........                50-281 l                                        RELIABILITY COUNCIL l                                                                        LICENSE 8 DATE ISSUANCE....DPR-37, JANUARY 29, 1973 PUBLIC DOCUMENT R00M.......SWEM LIBRARY COLLEGE OF WILLIAM AND MARY WILLIAMSBURG, VIRGINIA 23185 l  INSPECTION
 
==SUMMARY==
 
      + INSPECTION JANUARY 18-13 (84-02):        THIS ROUTINE, ANNOUNCED INSPECTION INVOLVED 18 INSPECTOR-HOURS ON SITE IN THE AREAS OF REVIEW OF TMI ACTION ITEMS, INTERNAL EXPOSURE CONTROL, RADIOLOGICAL SURVEYS, POSTING, LABELING AND CONTROL, RADIATION WORK PERMITS, PROCEDURES REVIEW, GUALIFICATIONS OF HEALTH PHYSICS STAFF, LICENSEE AUDITS, NOTIFICATIONS AND REPORTS, FOLLOWUP DN AN UNPLANNED i    RELEASE AND FOLLOWUP ON PREVIOUS ENFORCEMENT AND INSPECTOR IDENTIFIED ITEMS. IN THE 12 AREAS INSPECTED, MO VIOLATIONS OR t
DEVIATIONS WERE IDENTIFIED.
INSPECTION FEBRUARY 6-18 (84-05): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 17 INSPECTCR-HOURS ON SITE IN THE AREAS OF PREVIOUSLY IDENTIFIED ENFORCEMENT MATTERS: WELDING AND ASSOCIATED NONDESTRUCTIVE EXAMINATICH, INSPECTION AND ENF0kCEMENT CIE)
BULLETINS, AND BORIC ACID RETURN PIPING STRESS CORROSION CRACKING. OF THE FOUR AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED IN THREE AREAS; ONE APPARENT VIOLATION WAS FOUND IN ONE AREA (INADEQUATE CORRECTIVE ACTION MEASURES, PARAGRAPH 3.E).
INSPFCTION FEBRUARY 27 - MARCN 2 (84-86): THIS INSPECTION INVOLVED IS INSPECTOR-HOURS ON SITE BY ONE NRC INSPECTOR. THREE INSPECTION HOURS WERE ACCOMPLISHED DURING OFFSHIFT PERIODS. THE INSPECTION INCLUDED REVIEW 0F SECURITY ORGANIZATION-MANAGEMENT / PERSONNEL / RESPONSE, RECORDS AND REPORTS, TESTING AND MAINTENANCE, PHYSICAL BARRIERS-PROTECTED AREA, SECURITY SYSTEM POWER SUPPLY, ASSESSMENT AIDS, ACCESS CONTROL-PERSONNEL / PACKAGES, DETECTION AIDS-PROTECTED / VITAL AREA, ALARM i    STATIONS, AND COMMUNICATIONS. THE LICENSEE WAS FOUND TO BE IN COMPLIANCE WITH NRC REQUIREMENTS WITHIN THE 14 AREAS EXAMINED DURING THE INSPECTION.
INSPECTION FEBRUARY 1-29 (84-87): THIS INSPECTION INVOLVED tot INSPECTOR-HOURS ON SITE IN THE AREAS OF PLANT OPERATIONS AND PAGE 2-336
 
NNNNNNNNNMMMNNNNNNNNNNNNNNNNNNNNNNNM Report Period MAR-1984              IN$PECTION                STATUS - (CONTINUED)                M              SURRY 2                                      N MMMMMMMNNMMNNNNNNNNNNNNNNNNNNNMMMMMM INSPECT 11N
 
==SUMMARY==
 
OPERATING RECORDS.-PLANT MAINTENANCE AND SURVEILLANCE, PLANT SECURITY, FOLLOWUP OF EVENTS AND LICENSEE EVENT REPORTS. IN THE l      AP,EAS INSPECTED, MO VIOLATIONS WERE IDENTIFIED.
  ,    INSPECTION MARCH 5-8 (84-08)*    THIS ROUTINE, SPECIAL UNANNOUNCED INSPECTION INVOLVED 12 INSPECTOR-HOURS ON SITE IN THE AREAS OF 4
INSPECTION AND TESTING OF SHUBBER, AND FOLLOWUP DH LICENSEE IDENTIFIED ITEMS. IN THE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS HERE IDENTIFIED...
INSPECTION MARCH 6-9 (84-09):    THIS ROUTINE, UNANh0UNCED INSPECTION INVOLVED 25 INSPECTOR-HOURS ON SITE IN THE AREAS OF QC INSPECTION CONCERNS, QA/QC INSPECTOR TRAINING, AND IE BULLETINS. OF THE THREE AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
ENFORCEMENT
 
==SUMMARY==
 
CONTRARY TO THE REQUXREMENTS OF 10CFR50.47(B)(15), AS EVIDENCED BY INTERVIEWS WITH SHIFT SUPERVISORS DURING THE INSPECTION, ADEQUATE TRAINING HAD NOT BEEN PROVIDED SHIFT SUPERVISORS FOR EPIP 1.05 " RESPONSE TO GENERAL EMERGENCY", RELATING TO PROTECTIVE-RECOMMENDATIONS. CONTRARY TO THE REQUIREMENTS OF 10CFR50.47(B)(10). IN THE CASE WHERE PROMPT PROTECTIVE ACTION RECOMMENDATIONS
      'ARE WARRANTED BY PLANT CONDITIONS AND SITE BOUNDARY DOSES ARE NOT PROJECTED OR OCCURRING, THE LICENSEE'S EMERGENCY PLAN AND ASSOCIATED IMPLEMEH1ING PROCEDURES DO NOT REQUIRE CONSIDERATION OF PROTECTIVE ACTIDH RECOMMENDATIONS CONSISTENT WITH FEDERAL GUIDANCE.
I      (8401.4)
CONTRARY TO THE REQUIREMENTS OF TECHNICAL SPECIFICATIONS 4.17 C.6, FUNCTIONAL TESTING OF AN ADDITIONAL 10 PERCENT OF EACH TYPE OF SHUBBER THAT FAILED TO MEET THE ACCEPTANCE TEST CRITERIA WAS NOT PERFORMED.
(8403 4)
OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
HONE.
FACILITY ITEMS (PLANS AND PROCEDURES)*
      - NONE. -
MANAGERIAL ITEMS:
NONE.
PLANT STATUS:
SHUTDOWN FOR REFUELING AND 10 YEAR IN-SERVICE INSPECTION (ISI).
LAST IE SITE INSPECTION DATE: MARCH 6-9.-1984 +
INSPECTION REPORT NO: 50-281/84-09 +
PAGE 2-337
 
NNNNNNNMMNNNNNNNNNMMMMMNNMMNNNNNNNNN Report Period MAR 1984                                        INSPECTION                      STATUS            -
(CONTINUED)      M            SURRY 2                      N MMMMMNNNNNNNNNNNMMNNNNNMWNNNNNNNNNNN REP 0RTS              FR0M          LICENSEE
                              ==================================================================================================================================
NUMBER                DATE OF    DATE OF      SUBJECT EVENT    REPORT 83-058/                12/28/83  01/24/84    RPI'S F-6 AND F-4, RESPECTIVELY. INDICATED MORE THAN 12 STEPS FROM THEIR BANK.                      SIGNAL 03-L                                          CONDITIONING MODULE DRIF.T CAUSED INDICATIONS F-4 AND F-6 TO DEVIATE.
84-001/
01/13/84  02/13/84    ON 1/13,' A MANUAL REACTOR TRIP WAS INITIATED UPON CLOSURE OF ' A' MAIN STEAM TRIP VALVE.
i                                      84-002/                01/14/84  02/13/84    THE 'A' REACTOR TRIP BREAKER DE-ENERGIZED RESULTING IN A REACTOR TRIP.                  THE BYPASS BREAKER WAS NOT CLOSED, THE JUMPER WAS INSTALLED INCORRECTLY.
84-003/                01/14/84  02/13/84    THE 'A'    STEAM GENERATOR HIGH LEVEL INITIATED A TURBINE TRIP, WHICH TRIPPED THE REACTOR. AM ELBOW IN THE AIR SUPPLY PIPING TO THE 'A' FEED REGULATING VALVE WAS DAMAGED AND LEAKING.
i
                              ==================================================================================================================================
4 PAGE 2-338
 
M M
I N
LA3 0
4 A
W X
4
  .a M
  >=
A W
  .a
  .a
  .J 4
E O
M N
E W
E M
W O
4 A
M E
  >=
l l
l t
l l
l l
i 1
t l
 
1 Docket                    50-387                          0PERATING                STATUS                      wummuuuwunumwwwwwwwwwwmuwwwwwummuunu N            SUSQUEHANNA 1                M
: 2. Reporting Period: 03/01/84                                        Outage + On-line Hrs:        744.0            4MMMMMMMNNMMMMMMMMMMMMMMMNNMMMMMMMMM
: 3. Utility
 
==Contact:==
L. A. KUCZYNSKI (717) 542-2181 AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                                          3293
: 5. Nameplate Rating (Gross MWe):
g                  g 1280 X 0.9 : 1152
: 6. Design Electrical Rating (Net MWe):                                                    1065              I"U
: 7. Maximum Dependable Capacity (Gross MWe):                                                1068                                DESIGN EIEC. RRTING = 1085
                                                                                                                                                        . ___.HRX. OEPDC. Ofr. - 1032 (100%)
: 8. Maximum Dependable capacity (Het MWe):                                                  1032
: 9. If Changes Occur Above Since Last Report, Give Reasons:
: 10. Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Any:                                                                                "------~~~~-~~~~~-------~~---------- --- ~180 gag 3_
,                                    NONE MONTH          YEAR      CUMULATIVE                                                                  g
: 12. Report Period Hrs                                                744.0    2.184.0          7.153.0                                                          -80  M
: 13. Hours Reactor Critical                                          274.1        434.0        4.279.3
: 14. Rx Reserve Shtdwn Hrs                                                .0            .0          156.7 hf
: 15. Hrs Generator On-Line                                            258.6        356.8        4.125.1                                                          '80 16.RUnit Reserve Shtdwn Hrs                                              .0            .0              .0 5,g.
: 17. Gross Therm Ener (MWH)                                        641.658    804.859        12.054.630
: 18. Gross Elec Er.er (MWH)                                        209.280    252.750        3.919.300
: 19. Het Elec Ener (MWH)                                          200,74q    240.920        3.777.293
: 20. Unit Service Factor                                                34.8          16.3            57.7
                                                                                                                                                                                                  -20 21 Unit Avail Factor                                                  34.8          16.3            57.7
: 22. Unit Cap Factor (MDC Net)                                          26.1          10.7            51.2
: 23. Unit Cap Factor (DER Het)                                          25.3          10.4            49.6          0  ~      ~
0      5      l'0  l'5 '  3'O    3'5 ' '30
: 24. Unit Forced Outage Rate                                            65.2          61.6            20.8                                DAYS
: 25. Forced Outage Hours                                              485.4          571.7 __ 1.080.2
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):                                                                          MARCH 1984 NDHE
: 27. If Currently Shutdown Estima'ted Startup Date:                                              N/A PAGE 2-340
 
t MMMMMMMWNMMMMMMMMMMMMMMMMMMMMMMMMMMM N
Report Period MAR 1984                                            UNIT      SHUTD0WHS / REDUCTIDNS                        M        SUSQUEHANNA 1 MwMuwwMununumwwwMuumMuunnuwwunwwwunu g
No.        Date    .Ivoe Hours Reason Nethod LER Number Svstem Component                              Cause & Corrective Action to Prevent Recurrence 2            03/03/84    F 485.4                          A    3  84-013        HA    CKTBRK  AUTOMATIC SCRAM FROM 74% POWER DUE TO A TURBINE TRIP DN TURBINE CONTROL VALVE FAST CLOSURE BELIEVED CAUSED BY A FAILURE WITHIN THE BLOCKING RELAY IN THE THRUST BEARING WEAR DETECTOR CIRCUITRY. THE RELAY WAS REPLACED, SUCESSFULLY RETESTED AND THE SYSTEM RETURNED TO SERVICE. PL ANT ST ARTUP WAS DELAYED DUE TO REPLACEMENT OF THE RECIRC. PUMP DISCHARGE VALVE STEM.
I tuuNunnunnu          SUSQUEHANNA 1 EXPERIENCED A TURBINE TRIP DN CONTROL VALVE FAST G
 
==SUMMARY==
M          CLOSURE ON MARCH 3 AND CONTINUED SHUTDOWN FOR MARCH.
KNMMMMMMMMM Type          Reason                                              Method          Svstem a comoonent F-Forced A-Equip Failure F-Admin                                  1-Manual        Exhibit F & H S-Sched        B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling                            H-Other      3-Auto Scram    Preparation of D-Regulatory Restriction                            4-Continued    Data Entry Sheet E-Operator Training                                  5-Reduced Load Licensee Event Report
                                  & License Examination                            9-Other        (LER) File (NUREG-0161)
PAGE 2-341
 
NNNNNNMMMMMMNNNNNNMMMMMMMMMMMMMMNNNN N          SUSQUEHANNA 1                                                N NmNumunuuuwmmuunnunnuMuuNuuuMMMMMMMM                                                  FACILITY          DATA                                          Report Period MAR 1984    ,
FACILITY DESCRIPTION                                                                          UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                                      UTILITY STATE.................... PENNSYLVANIA                                                        LICENSEE................. PENNSYLVANIA POWER & LIGHT COUNTY...................LUZERNE                                                              CORPORATE ADDRESS....... 2 NORTH MINTH STREET ALLENTOWN, PENNSYLVANIA 18101 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 7 MI NE OF                                                        CONTRACTOR BERWICK, PA                      ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............BWR                                                                  NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY... SEPTEMBER 10, 1982                                                  CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... NOVEMBER 16, 1982                                                    TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... JUNE 8, 1983                                                    REGULATORY INFORMATION CONDENSER COOLING METHOD...CC HNDCT                                                            IE REGION RESPONSIBLE......I CONDENSER COOLING WATER....SUSQUEHANNA RIVER                                                  IE RESIDENT INSPECTOR......R. JACOBS ELECTRIC RELIABILITY                                                                          LICENSING PROJ MANAGER.....R. PERCH COUNCIL..................MID-ATLANTIC                                                        DOCKET NUMBER...........      50-387 AREA COUNCIL LICENSE & DATE ISSUANCE...., NOVEMBER 12, 1982 PUBLIC DOCUMENT R00M...... 0STERHOUT FREE LIBRARY 71 SOUTH FRANKLIN STREET WILKES-BARRE, PENNSYLVANIA 18701 IN$PECTION            STATUS INSPECTION
 
==SUMMARY==
 
NO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
NOME RIMER ITEMS SYSTEMS AND COMPONENTS
* A NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES):
NO INPUT PROVIDED.
PAGE 2-342
 
_ _ _ . . _ - - - _ _ _ _ _ , _              . . . _ - _ _ _ . . . _ - _ - _ _ - . - . . . _ .                __.._ _. _ _...- _ _._.                        _-._-- _.- . _ _ . . -                    . _    ~ , - _ . - - _ . . - .            -
ununuuununuwwwwunuwwwwwuunnuumuwuumu SUSQUEHANNA 1                            M Report Period MAR.1984                                                        IN5PECTION                            5TATUS - (CONTINUED)                            N mMMumMMMNumMuMMMuNuMunuMuunnuMumMuun OTHER ITEMS MANAGERIAL ITEMS:
NO INPUT PROVIDED.                                                                                                                                                                                                              .
PLANT STATUS:
NO IMPUT PROVIDED.
LAST IE SITE INSFECTION DATE: NO IMPUT PROVIDED.
INSPECTION REPORT NO: NO INPUT PROVIDED.
REP 0RT5                          FR0M        LICEN5EE
                        ===============================================================================================================
NUMBER.        DATE OF                      DATE OF                  SUBJECT EVENT                            REPORT                                                -------------___--__      ___ -- _              _ ---------_ --- ---___==____                      --__-___ --
NO INPUT PROVIDED.
l
                        ==========================================================================================================
t h'
I i
h t                                                                                                                                                                                                                                          PAGE 2-343 j
um-        -                      ,
: 1. Docket:  50-289                            0PERATING                  STATUS                                MNNNNNNMMNNNNNMMMMNNNNNNNNNNMMMMMNNM
: 2. Reporting Period: 03/01/84 N      THREE MILE ISLAND 1                    M Outage + On-line Hrs        744.0                        NNNMMMNNNMMMNNMMMMMMMMMMMMMMMNNNNNNN
: 3. Utility Contacts                      C. W. SMYTH (717) 948-8551                                            AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                              2535
: 5. Nameplate Rating (Gross MWe):                                    968 X 0.9 : 871 THREE MILE ISLRND 1
: 6. Design Electrical Rating (Net MWe):                                        819                      1883
: 7. Maximum Dependable Capacity (Gross MWe):
: 8. Maximum Dependable Capacity (Het MWe):
840
                                                                                                                        .                .          [        (100%)
776
: 9. If Changes occur Above Since Last Report Give Reasons:
NONE
: 10. Power Level To Which Restricted. If Any (Net MWe):
: 11. Reasons for Restrictions, If Any:
NONE MONTH          YEAR        CUMULATIVE                          NO NET POWER OUTPUT THIS NONTH
: 12. Report Period Hrs                                    744.0    2.184.0                                                                                                o 83.977.0                                                                                g
: 13. Hours Reactor Critical                                    .0        .0      31.731.8                      ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~            "I"3
: 14. Rx Reserve Shtdwn Hrs                                    .0        .0          839.5 l
: 15. Hrs Generator On-Line                                    .0          .0      31.180.9                                                                          -so
: 16. Unit Reserve Shtdwn Hrs                                  .0          .0              .0 son-
: 17. Gross Therm Ener (MWH)                                    0          0    76.531.071                                                                          -80
: 18. Gross Elec Ener (MWH)                                      0          0    25.484.330
: 19. Net Elec Ener (MWH)                                        0          0    23.840.053                                                                          - to
: 20. Unit Service Factor                                      .0          .0          37.1
: 21. Unit Avail Factor                                        .0        .0            37.1                                                                          - 3D
: 22. Unit Cap Factor (MDC Net)                                .0        .0            36.3M
: 23. Unit Cap Factor (DER Net)                                .0        .0            34.7                0    -
                                                                                                                          ,-      ,-      ,-      ,-      ,-      ,    0 0        5      to      15      3D      a5      30
: 24. Unit Forced Outage Rate                              100.0      100.0            59.3                                            DAYS
: 25. Forced Outage Hours                                  744.0    2.184.0        45.309.5
: 26. Shutdowns Sched Over Next 6 Months (Type Date Duration):                                                                    MARCH 1984 NONE
: 27. If Currently Shutdown Estimated Startup Date:                                N/A        N Item calculated with a Wei'ghted Average                                  PAGE 2-344
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu Report Perled MAR 1984                                                                        UNIT      $HUTD0WN$ / REDUCTIONS                                        u      THREE MILE ISLAND 1        m unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum No.                                      Data                    IEne Ecurs Reason Method LER Number 5vstei Comoonent                    Cause & Corrective Action to Prevent Recurrence 1                                  42/17/79                              F 744.0    D      4                  ZZ    ZZZZZZ        REGULATORY RESTRAINT ORDER CONTINUES.
1 2
muuuuuuuuum                                                        THREE MILE ISLAND 1 REMAIHS SHUT DOWN FOLLOWING THE ACCIDENT u
 
==SUMMARY==
u                                                        AT UNIT 2.
uununuumunu Tvoe                                              Reason                                      Method          System 8 Comoonent F-Forced A-Equip Failure F-Admin                                                              1-Manual        Exhibit F & H S-Sched                                            B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling                  H-Other        3-Auto Scram    Preparation of D-Regulatory Restriction                  4-Continued    Data Entry Sheet E-Operator Training                        5-Reduced Load Licensee Event Report
!                                                                              & License Examination        9-Other        (LER) File (HUREG-0161)                                                            PAGE 2-345
 
Muuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum u        THREE MILE ISLAND 1            m ununuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum                  FACILITY          DATA                                          Report Period MAR 1984.
FACILITY DESCRIPTION                                          UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                      UTILITY STATE.................... PENNSYLVANIA                          LICENSEE.................GPU NUCLEAR CORP.
COUNTY................... DAUPHIN                              CORPORATE ADDRESS........P.O. BOX 480 DIST AND DIRECTION FROM                                                                      MIDDLETOWN, PENNSYLVANIA 17057 NEAREST POPULATION CTR.. 10 MI SE OF                        CONTRACTOR HARRISBURG, PA ARCHITECT / ENGINEER....... GILBERT ASSOCIATES TYPE OF REACTOR............PWR                                  NUC STEAM SYS SUPPLIER...BASCOCK & WILCOX DATE INITIAL CRITICALITY... JUNE 5,    1974                    CONSTRUCTOR.............. UNITED ENG. 8 CONSTRUCTORS DATE ELEC ENER IST GENER... JUNE 19, 1974                        TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE.... SEPTEMBER 2,    1974          REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWERS                    IE REGION RESPONSIBLE......I CONDENSER COOLING WATER....SUSQUEHANNA RIVER                  IE RESIDENT INSPECTOR......R. CONTE ELECTRIC RELIABILITY                                          LICENSING PROJ MANAGER.....J. VANVLIET COUNCIL..................MID-ATLANTIC                          DOCKET NUMBER........... 50-289 AREA COUNCIL LICENSE 8 DATE ISSUANCE....DPR-50, APRIL 19, 1974 PUBLIC DOCUMENT ROOM....... GOVERNMENT PUBLICATIONS SECTION STATE LIBRARY OF PENNSYLVANIA FORUM BUILDING COMMONWEALTH AND WALNUT STREET HARRISBURG, PENNSYLVANIA 17105 INSPECTION
 
==SUMMARY==
 
IN5PECTION            STATUS NO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
NOME OTHER ITEMS SYSTEMS AND COMPONENTS:
NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES):
PAGE 2-346
 
          . _ _ . . - - - - - - _ . - . . . . - - - . . . - - - - . . - . . ~ _ _ . .                                            - - . - . ~ _ .        .~ . _ - . - ~ _ . - .          _ . _ . . - - , . - - - _ - - . - - - - - -              - _ . . . .
I i
I
[.
MMMMMMMMMMMMMMMMMMMNNMMMMMMNNMMMMMMM Report Period MAR 1984                                                                INSPECTION                  STATUS - (CONTINUED)                              M        THREE MILE ISLAND 1                                        N unuwwwmwwuunumwwwununummuumununuunum OTHER ITEMS i
i NO INPUT PROVIDED.
MANAGERIAL' ITEMS:
NO IMPUT PROVIDED.
I PLANT STATUS:
NO INPUT PROVIDED.
LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED.
INSPECTION REPORT NO: NO INPUT PROVIDED.
t REPORTS                FR0M                  LICEMSEE
    ==================================================================================================================================
NUMBER              DATE OF                            DATE OF                    SUBJECT EVENT
    -_                                                  _ . REPORT-_ . -_-----------............---- .....---.....------....--- _                                      _____ _
9 MO INPUT PROVIDED.
    ==================================================================================================================================
l PAGE 2-347 I
 
1 Docket:    50-344          0PERATING            STATUS                  WNNNNNNNNNNNNNNNNNNNNNNNNNNNNWWNNNNN N                    TROJAN                N
: 2. Reporting Period: 03/01/84    Outage + On-line Hrs:    744.0          MMWNMMNNNNNNNMMMMMMMMMNNMMMMMMMNNNNN
: 3. Utility
 
==Contact:==
L. S. PETERSON (503) 556-3713 X496                  AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                    3411
: 5. Nameplate Rating (Gross MWe):            1280 X 0.95 : 1216 TROJRN
: 6. Design Electrical Rating (Het MWe):              1130            ISCI
: 7. Maximum Dependable Capacity (Gross MWe):        1122                              T. SIGN ELEO. RATING = 1130
: 8. Maximum Dependable Capacity (Net MWe):          1080
: 9. If Changes Occur Above Since Last Report, Give Reasons:
HONE
: 10. Power Level To Which Restricted, If Any (Net MWe):
                                                                                ---- ---------------.--- P-- -------        -100 11 Reasons for Restrictions, If Any:
tomD-NOME MONTH      YEAR    CUMULATIVE                                                          -.0
: 12. Report Period Hrs              744.0    2.184.0    66.456.0                                                              g
: 13. Hours Reactor Critical        740.8    2.151.1    41.001.4
: 14. Rx Reserve Shtdwn Hrs              .0        .0      3.975.4 lf                                                    .0
: 15. Hrs Generator On-Line          728.3    2.133.7    39.487.8
: 16. Unit Reserve Shtdwn Hrs            .0        .0      3.237.0    ,,,,
: 17. Gross Therm Ener (MWH)    2.412.831  7.163.253 125.727.106
                                                                                                                            - tD
: 18. Gross Elec Ener (MWH)        781.688  2.311.587  40.887.078
: 19. Het Elec Ener (MWH)          750.510  2.218.354  38.632.380
: 28. Unit Service Factor              97.9      97.7          59.7                                                        -30
: 21. Unit Avail Factor                97.9      97.7          64.6
: 22. Unit Cap Factor (MDC Nat)        93.4      94.0          53.8
: 23. Unit Cap Factor (DER Net)        89.3      89.9          51.4      0  .
                                                                                        .-      .-    .-    .-    .- .. 0 0          5      to    15    30    25  30
: 24. Unit Forced Outage Rate          2.1        2.3          17.4                                  DAYS
: 25. Forced Outage Hours              15.7      50.3      8.352.1
: 26. Shutdowns Sched Over Next 6 Months (Type.Date. Duration):                                  MARCH 1!984 REFUELING - APRIL 27. 1984 (78 DAYS)
: 27. If Currently Shutdown Estimated Startup Date:        N/A                                                                  PAGE 2-348 t
 
MMMMMMNNNNNNNNNNNMMNNNNNMMMMNNNNNNNN Report Period MAR 1984                                                        UNIT              SHUTD0WN5 / REDUCTION 5                          N            TROJAN                                  N MMMMMMMNNNNMMMMMMMMMMMMMMMMMMMMMNNNM No.                        Date                      TEEe Hours Reason Method LER Number System Comoonent                        Cause a Corrective Action to Prevent Recurrence 84-03 03/01/84                                                  F 9.8    H    3  84-04                EC    CRTBRK      REACTOR TRIP OH 'B' STEAM GENERATOR LOW-LOW LEVEL DUE TO NORTH MAIN FEED PUMP TRIP. PUMP TRIPPED WHEN GROUND ON 125-VOLT DC SYSTEM WAS LOCATED IN PUMP TRIP CIRCUITRY. GROUND WAS REPAIRED BUT PLANT REMAINED SNUT DOWN TO PLUG TUBE LEAKS IN CONDENSER 1AB.
85-04 03/02/84                                                  5 0.0    8    5                                          POWER REDUCED FROM 50% TO 25% TO DRAIN 'A' TRAIN FEEDWATER NEATERS FOR TUBE PLUGGING IN FEEDWATER HEATER 1AA/2AA.
85-05 03/02/84                                                  F 5.9    3    4                                          MAIN TURBINE MANUALLY TRIPPED EHEN UNABLE TO MAINTAIN CONDENSER VACUUM DURING IAA/?AA FEEDWATER HEATER TUBE
,                                                                                                                              PLUGGING. REACTOR REMAINED CRITICAL AT <5% POWER.
E c:MMMMMMMMM                                              TROJAN OPERATED ROUTINELY IN MARCH.
O
 
==SUMMARY==
M OZMMMMMMNNN Tvoe                            Reason                                          Method                Svstem a comoonent F-Forced A-Equip Failure F-Admin                                                  1-Manual            Exhibit F 8 H 5-Sched                          B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling                          H-Other      3-Auto Scram        Preparation of D-Regulatory Restriction                        4-Continued          Data Entry Sheet E-Operator Training                      .      S-Reduced Load Licensee Event Report
                                                  & License Examination                9-Other              (LER) File (NUREG-0161)
PAGE 2-349
 
CMMMMMMMMMMMMMMMMMMMMMMMMNNNNNMMMMMM D              TROJAN                  N CMunuununnunununummunununnununuMuaNM                  FACILITY                DATA                                          Report Period MAR 1984 FACILITY DESCRIPTION                                                UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                            UTILITY STATE................... 0REGON                                      LICENSEE................. PORTLAND GENERAL ELECTRIC COUNTY...................C0LUMBIA                                    CORPORATE ADDRESS.......      121 S.W. SALMON STREET PORTLAND, OREGON 97204 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 42 MI N OF                              CONTRACTOR PORTLAND, ORE                          ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                        HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... DECEMBER 15, 1975                          CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... DECEMBER 23, 1975                          TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE....MAY 20, 1976                          REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWERS                          IE REGION RESPONSIBLE. . . . . .V CONDENSER COOLING WATER.... COLUMBIA RIVER                          IE RESIDENT INSPECTOR......G. JOHNSTON ELECTRIC RELIABILITY                                                LICENSING PROJ MANAGER.....C. 7'tMMELL COUNCIL.................. WESTERN SYSTEMS                            DOCKET NUMBER........... 50-144 COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....NPF-1, NOVEMBER 21, 1975 rUBLIC DOCUMENT R00M.......MULTHOMAH COUNTY LIBRARY SOCIAL SCIENCES & SCIENCE DEPARTMENT 801 SW 10TH AVENUE PORTLAND, OREGON 97205 INSPECTION                    $TATUS INSPECTION
 
==SUMMARY==
 
  + INSPECTIDH ON JANUARY 3 - FEBRUARY 10, 1984 (REPORT NO.          50-344/84-02) AREAS INSPECTED: ROUTINE INSPECTIONS OF PLANT OPERATIONS, SECURITY, SURVEILLANCE TESTING, MAINTENANCE, FOLLOWUP DN LICENSEE EVENT REPORTS AND INDEPENDENT INSPECTION EFFORT.
THE INSPECTION INVOLVED 279 INSPECTOR-HOURS ONSITE BY TWO HRC INSPECTORS.
RESULTS: NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED.
  + INSPECTION ON FEPRUARY 13 - 17, 1984 (REPORT NO.        50'344/84-03) REPORT BEING PREPARED; TO BE REPORTED NEXT MONTH.
  + INSPECTION ON FEBRUARY 13 - 17, 1984 (REPORT NO.        50-344/84-04) AREAS INSPECTED: SPECIAL INSPECTION OF THE LICENSED OPERATOR REQUALIFICATION PROGRAM INCLUDING LECTURE MATERIALS, EXAMINATIONS, ADMINISTRATION, SECURITY, AUDITS, RECORDS, AND MANAGEMENT U."JCLVEntNT IN TRAINING. THE INSPECTION INVOLVED 87 INSPECTOR-HOURS ONSITE BY THE HRC INSPECTORS.
RESULTS: NO ITEMS OF N0ffCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED. SEVERAL AREAS WHERE IMPROVED ADMINISTRATION OF THE PROGRAM MAY BE WARkanstu acxE IDtMTIrIED.
  + INSPECTIOh UN FEBRUARY 21 - MARCH 2,      1984 (REPORT NO. 50-344/84-05) REPORT BEING PREPARED; TO BE REPORTED HEXT MONTH.
  + INSPECTIOh CN MARCH 20 - 30, 1984 (REPORT NO.        50-344/84-06) AREAS INSPECTED; FOLLOWUP DN AN APPARENT VIOLATION OF TECHNICAL PAGE 2-350
 
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                                            IN5PECTION              5TATUS - (CONTINUED)                      M            TROJAN                N NNNNNNNNNNNNNNNNNNNNN9NNNNNNNNNNNNNN INSPECTION SufftARY SPECIFICATIONS RELATING TO AUXILIARY FEEDWATER SYSTEMS OPERABILITY. THE INSPECTIDH INVOLVED 24 INSPECTOR-HOURS BY ONE NRC INSPECTOR.
RESULTS: ONE VIOLATION WAS IDENTIFIED RELATED TO THE IMOPERABILITY OF THE AUXILIARY FEEDWATER SYSTEM.
            + MEETING ON FEBRUARY 17, 1984 (MEETING REPORT No. 50-344/84-07) SCOPE: SPECIAL MANAGEMENT MEETING TO DISCUSS THE RESULTS OF THE NRC ASSESSMENT OF THE LICENSEE'S PERFORMANCE FROM SEPTEMBER l. 1982 THROUGH AUGUST 31, 1983, AS PART OF THE NRC'S SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE ($ ALP) PROGRAM. AREAS ADDRESSED INCLUDE: PLANT OPERATIONS, RADIOLOGICAL C0t:TR9LS, MAINTENANCE, SURVEILLANCE, FIRE PROTECTION / HOUSEKEEPING, EMERGENCY PREPARECHESS, SECURITY AND SAFEGUARDS, REFUELING LICENSING ACTIVITIES, DESIGN CHANGES AND REVIEW AND AUDIT.
RESULTS: A
 
==SUMMARY==
OF THE NRC LICENSEE PERFORMANCE ASSESSMENT WAS PRESENTED. NO NEW ENFORCEMENT ACTIONS WERE IDENTIFIED.
            + INSPECTION ON FEBRUARY 13 - MARCH 30, 1984 (REPORT NO.                                    50-344/84-08) REPORT BEING PREPARED; TO BE REPORTED HEXT MONTH.
            + EXAMINATION ON MARCH 1 - 6,                                  1984 (REPORT NO. 50-344/0L-84-01) AREAS EXAMINED: LICENSED OPERATOR REQUALIFICATILM PROGRAM.
RESULTS: THE OVERALL PROGRAM EVALUATION WAS A MARGINAL RATING.
ENFORCEMENT
 
==SUMMARY==
 
NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NOME FACILITY ITEMS (PLANS AND PROCEDURES):
NONE MANAGERIAL ITEMS:
            + AN ENFORCEMENT CONFERENCE AND A SPECIAL MEETING WITH THE LICENSEE HAVE BEEN SCHEDULED FOR APRIL 16, 1984, TO DISCUSS THE SIMULTANEOUS REMOVAL OF BOTH AUXILIARY FEECWATER PUMPS FROM SERVICE CH MARCH 20, 1984 AND TO DISCUSS A CORRECTIVE ACTION PROGRAM RESULTING FROM THE NRC'S MARGINAL RATING OF THE OPERATOR REQUALIFICATION PROGRAM.
PLANT STATUS:
ROUTINE POWER OPERATION.
LAST IE SITE INSPECTION DATE: 02/13-03/30/84+
INSPECTION REPORT NO:                                  50-344/84-08+
                                                                                                            *                                        -                      PAGE 2-351
 
_ . _              _.m ..                  _ . _ _ _    . _              .              , _ _ . .      ...- __.-                                                    . . . - _
MMWNNMMMMMMNNNNNNMMMMNNNNNNNNNNNNNNN Report Period MAR 1984                                REPORTS                        FR0M      LICEN5EE                              N                  TROJAN                              N MMNNNMMNNNNNNNNMMNNMMMMMMNNNNNNNNMMM
                .==================================================================================================================================
NUrtSER DATE OF        DATE OF      SUBJECT EVENT          REPORT 83-21  12-20-83      01-19-84    FAILURE OF MASTER PULSER CARD IN ROD CONTROL SYSTEM 01L-S 83-24  12-89-83      02-88-84    DIESEL FUEL TANK LEVEL TRANSMITTER PREVENTED "B" DIESEL FUEL TRANSFER PUMP FROM STARTING 81L-t 84-02  01-27-84      02-27-84    SAFETY INJECTION PUMP LUBE OIL COOLER SEDIMENT PLUGGING B1L-0
                ==================================================================================================================================
PAGE 2-352
 
THIS PAGE INTENTIONALLY LEFT BLANK b
PAGE 2-353
: 1. Docket:                                50-250                    0PERATING            STATUS                              MNNNN4MMMMMMMNhMMMMMMMMMMMMMMMMMMMMM M              TURKEY POINT 3                      M
: 2. Reporting Period: 03/01/84                                              Outage + On-line Hrs:    744.0                      MMMMMMMMMMMMMMNNNMMMMMMMMMMMMMMMMMMM
: 3. Utility Contact                                              H. W. GRANT (305) 552-3675                                      AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                                              2200
: 5. Nameplate Rating (Gross MWe):                                                      894 X 0.85 = 760 TURKEY POINT 3
: 6. Design Electrical Rating (Net MWe):                                                        693                  ISGD
: 7. Maximum Dependable Capacity (Gross MWe):                                                    700                                          DESIGN ELEC. RATING =        693
                                                                                                                                  ...... IflX. DEPDO. Cfr. - 666 (100%)
: 8. Maximum Dependable Capacity (Not MWe):                                                      666
: 9. If Changes occur Above Since Last Report, Glwe Reasons:
NONE
: 10. Power Level To Which Restricted, If Any (Net MWe):
: 11. Reasons for Restrictions, If Any:
10m3-                -
NONE MONTH      YEAR    CUMULATIVE
: 12. Report Period Hrs                                                        744.0    2.184.0    99.249.6
: 13. Hours Reactor Critical                                                  697.1    1.746.3    69.771.6 see opse at Excessus taunt critMft. caeIT3 cme
: 14. Rx Reserve Shtdwn Hrs                                                        .0        .0        844.3                                  ,,,,,,,,,,,,,,,,,,;,,,,,,,g-
{
                                                                                                                              ,,,,,                                                  , _g ,3
: 15. Hrs Generator On-Line                                                    691.8    1.661.1    67.590.7
: 16. Unit Reserve Shtdwn Hrs                                                      .0        .0        121.8                                                                            - 30 nO*b -
: 17. Gross Therm Ener (MWH)                                              1.516.127  3.509.049 138.997.641
                                                                                                                                                                                        -80
: 18. Gross Elec Ener (MWH)                                                  493.910  1.134.175  44.344.740
: 19. Het Elec Ener (MWH)                                                    469.736  1.070.552- 41.983.569
                                                                                                                                                                                        - e3
: 20. Unit Service Factor                                                      93.0      76.4          68.1 21 Unit Avail Factor                                                          93.0      76.4          68.2                                                                            ,,,
: 22. Unit cap Factor (MDC Net)                                                94.8      73.6          65.3M
: 23. Unit Cap Factor (DER Het)                                                91.1      70.7          61.0              0      .
                                                                                                                                        ,        ,      ,      ,      ...      ,    0 0            5        to      15      30        as    30
: 24. Unit Forced Outage Rate                                                    7.0      17.0          5.7                                            DAYS
: 25. Forced Outage Hours                                                      52.2      342.4      3.522.5
: 26. Shutdowns Sched Over Next 6 Months (Type,Date. Duration):                                                                                      MRRCH 1984 NONE
: 27. If Currently Shutdown Estimated Startup Date:                                                N/A        N Item calculated with a Weighted Average                                        PAGE 2-354
 
            - _ _            -            . - .-        . _  _. _                  -                      .    .~                  .
i Report Period MAR 1984                                                                              ununuunununumuwwuumuuuuuuunnunuuunum UNIT      SHUTD0WMS / REDUCTION 5                      m          TURKEY POINT 3          W NNNNNNNNNNNMMMMNNNMMMMMMNNMMANNNNNNN No. Date        TvEi Hours Reason Nethod LER Number System Component              Cause 8 Corrective Action to Prevent Recurrence 10    02/27/84        F  52.2    A      4                  EB      RELAYX  7tfE UNIT WAS REMOVED FROM SERVICE TO INSPECT, ADJUST AND REPAIR AUXILIARY POWER AIR CIRCUIT BREAKERS.
cumunuununu          TURKEY POINT 3 STARTED UP DN MARCH 3 FOLLOWING A SHUTDOWN FOR a
 
==SUMMARY==
u          INSPECTION AND ADJUSTMENT OF AUXILIARY POWEP AIR CIRCUIT cmummmununu          BREAKERS.
Tvoe      Reason                                Method          Svstem 3 Comoonent F-Forced A-Equip Failure F-Admin                1-Manual        Exhibit F & H S-Sched    B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling          H-Other        3-Auto Scram    Preparation of D-Regulatory Restriction              4-Continued    Data Entry Sheet E-Operator Training                  5-Reduced Load Licensee Event Report
                  & License Examination          9-Other        (LER) File (HUREG-0161)
PAGE 2-355
 
tuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuummum u            TURKEY POINT 3            m cumuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunu                    FACILITY          DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                              UTILITY 8 CONTRACTOR INFORMATION LOCATION                                '
UTILITY STATE.................... FLORIDA                                LICENSEE........... ..... FLORIDA POWER 8 LIGHT COUNTY...................DADE                                    CORPORATE ADDRESS....... 9250 WEST FLAGLER STREET P.O. BOX 013100 MIAMI, FLORIDA 33174 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 25 MI S OF                          CONTRACTOR MIAMI, FLA                            ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                      HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE IMITIAL CRITICALITY.. 0CTOBER 20, 1972                        CONSTRUCTOR..............BECHTEL DATE ELEC ENER IST GENER... NOVEMBER 2, 1972                        TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 14, 1972                  REGULATORY INFORMATION CONDENSER COOLING METHOD... CLOSED CANAL                        IE REGION RESPONSIBLE......II
;    CONDENSER COOLING WATER.... CLOSED CYCLE CANAL                  IE RESIDENT INSPECTOR......R. V0GT LOWELL ELECTRIC RELIABILITY                                            LICENSING PROJ MANAGER.....D. MCDONALD COUNCIL................. 500THEASTERN ELECTRIC                  DOCKET NUMBER........... 50-250 RELIABILITY COUNCIL LICENSE 1 DATE ISSUANCE....DPR-31, JULY 19, 1972 PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL AND URBAN AFFAIRS LIBRARY FLORIDA INTERNATIONAL UNIVERSITY MIAMI, FLORIDA 33199 INSPFCTION
 
==SUMMARY==
 
      + INSPECTION FEBRUARY 15-17 (84-05): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 10 INSPECTOR-HOURS ON SITE IN THE AREA 0F REACTOR CCOLANT SYSTEM LEAK RATE MEASUREMENT AND FOLLOWUP OF OUTSTANDING ITEMS. NO VIOLATIONS OR DEVIA1 IONS WERE IDENTIFIED.                    .
INSPECTION FEBRUARY 6-10 (84-06): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 21 INSPECTOR-HOURS ON SITE IN THE AREAS OF PLANT WATER CHEMISTRY AND INSERVICE TESTING OF PUMPS AND VALVES. OF THE TWO AREAS INSPECTED, NO VIOLATIONS OR DEVIATIONS WERE IDENTIFIED.
INSPECTION MARCH 6-8 8 18-20 (84-10):      THIS INSPECTION INVOLVED 14 INSPECTOR-HOURS ON SITE BY TWO NRC INSPECTORS. A SPECIAL SECURITY INSPECTION WAS CONDUCTED TO REVIEW THE CIRCUMSTANCES SURROUNDING QUESTIONABLE SECURITY PRACTICES OBSERVED BY AH NRC OPERATIONS INSPECTOR DURING AN INSPECTION CONDUCTED FEBRUARY 21 - MARCH 31, 1984. THE LICENSEE WAS FOUND TO BE IN COMPLIANCE WITH NRC REQUIREMENTS WITHIN THE AREAS EXAMINED DURING THE INSPECTIDH EXCEPT FOR THE FOLLOWING ITEM: FAILURE TO MAINTAIN POSITIVE CONTRUL OF AN ESCORTED INDIVIDUAL.                                                                                                                !
ENFORCEMENT
 
==SUMMARY==
 
CONTRARY TO THE REQUIREMENTS OF 50.47(B)(10), IN Tl1E CASE WHERE PROMPT PROTECTIVE ACTION RECOMMENDATIONS ARE WARRANTED BY PLANT CONDITIONS AND SMALL DOSES ARE PROJECTED FOR THE SITE BOUNDARY DUE TO PRESENT SMALL RELEASES, M0 PROTECTIVE ACTIONS ARE ADDRESSED PAGE 2-356
 
Report Period MAR 1984                                                                    NNNNNNNNNNNNNNNNNhMNNNNNNNNNNNNNNNNN IN$PECTION              STATUS - (CONTINUED)            N        TURKEY POINT 3          N NNNNNMMNNNNNNNNNNNMMMMMMMMMMMMMMMMNN ENFORCEMENT
 
==SUMMARY==
 
BY THE IMPLEMENTING PROCEDURES. CONTRARY TO THE REQUIREMENTS OF 10CFR50.47(B)(10). NUCLEAR PLANT SUPERVISORS INTERVIEWED DURING THE INSPECTIDM WERE UNFAMILIAR WITH THE EPIP'S TO THE EXTENT THAT INCORRECT PROTECTIVE ACTION RECCMMENDATION DECISIONS WERE MAD FOR A RANGE OF SITUATIONS AND CORRESPONDING ACTION LEVELS. SIMILARLY. THE NUCLEAR PLANT SUPERVISORS. INITIALLY THE EMERGENCY COORDINATORS. ARE NOT TRAINED TO PERFORM DOSE CALCULATIONS AND WERE GENERALLY UNFAMILIAR WITH THE PROCEDURE. ALSD. INDIVIDUALS SELECTED BY THE PLANT SUPERVISORS. ON OTHER THAN THE DAY SHIFT. TO PERFORM THE DOSE CALCULATIONS (ONE HP AND ONE CHEMISTRY DEPARTMENT STAFF) WERE UNFAMILIAR WITH THE PROCEDURES AND UNABLE TO PERFORM THE REQUIRED CALCULATIONS.
(8401 4)
TWO DEDICATED CCTV CAMERAS FOR PA SURVEILLANCE WERE IMOPERABLE, HD DISCERNIBLE IMAGE ON CCTV MONITORS.
(8403 43 FAILURE OF EMPLOYEE'S TO DISPLAY SECURITY IDENTIFICATION BADGES WHILE WITHIN THE PA.
(8493 5)
I GTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NONE.
FACILITY ITEMS (PLANS AND PROCEDURES)*
NOME.
MANAGERIAL ITEMS:
MONE.
PLANT STATUS:
OPERATING.
LAST IE SITE INSPECTION DATE: MARCH 6-8 8 18-20, 1984 +
INSPECTION REPORT NO: 50-250/84-10 +
PAGE 2-357 i
 
  --                                -    -. - -              .            ._        -          ..          _    -                -                  .      _=    ..
mMNuMNNNNNumMNNuuMNuMuuuNuuuMNNuuNuN Report Period MAR 1984                                      REPORTS          FR0M        LICEN5EE                    N            TURKEY POINT 3                    m MuMNNNNNNuuMMNNNNNNNNNNNNNNuNuMNNuMN
        ==================================================================================================================================
NUMBER        DATE OF          DATE OF          SUBJECT EVENT            REPORT                                                                    -_.-------------------------...__                  _ -----
83-023/        12/01/83        01/04/84        THE UNIT 3 SPENT FUEL PIT EXHAUST RADIATION MONITOR WAS DE-ENERGIZED. THE ROOT CAUSE COULD HOT 03-L                                            BE POSITIVELY DETERMINED.
83-024/        12/08/83        01/09/84        THE UNIT 3 SPENT FUEL PIT EXHAUST RADIATION MONITOR WAS DE-ENERGIZED. MONITOR WAS OUT OF 03-L                                            SERVICE FOR ABOUT 20 HOURS. THE ROOT CAUSE WAS THE 'C' MOTOR CONTROL CENTER BEING DE-ENERGIZED.
83-025/        12/16/83        01/16/84        A SPURIOUS ENGINEERED SAFEGUARDS ACTUATION SIGNAL WAS RECEIVING AND THE 'B' EMERGENCY DIESEL 03-L                                            GENERATOR FAILED To START.
83-026/        12/15/83        02/22/84        PORTABLE AIR COMPRESSOR ROLLING DOWN THE UNIT 3 CONTAINMENT EQUIPMENT HATCH RAMP AND STRIKING 03-L                                            THE EMERGENCY DIESEL GENERATOR FUEL OIL TRANSFER PIPING ADJACENT TO THE STORAGE TANK.
84-001/        01/08/84        02/07/84        REACTOR TRIP OCCURRED DUE TO A SPURIOUS SIGNAL, NO ABHORMALITIES WERE DETERMINED.
i          84-002/        01/08/84        02/07/84        REACTOR TRIPPED DUE TO INITIATION OF 'SI' WITH FLOW NOT REQUIRED TO BE DELIVERED TO THE CORE.
i.
34-003/        01/09/84        02/08/84/ REACTOR TRIP OCCURRED, DUE TO PERSONNEL ERROR.
84-004/        01/04/84        02/22/84        AUXILIARY FEEDWATER SYSTEM.          'A' PUMP STARTED BUT DID NOT PRODUCE THE REQUIRED FLOW, DUE TO BE
          --                                              MISPOSITION OF THE MANUAL GOVERNOR SPEED CONTROL KNOB.
84-005/        01/25/84        02/23/84        REACTOR TRIP OCCURRED, Dtc TO AN ACCIDENTAL TRIP OF A 4160 VOLT BUS FEEDER BREAKER.
84-006/        02/12/84        03/13/84        A REACTOR TRIP OCCURRED, DUE TO AN ELECTRICAL RELAY MALFUNCTION.
84-010/        02/03/84        02/28/84          'B'    WATER ANALYZER HAD ISOLATED DUE TO GROUP 6 ISOLATION SIGNAL CAUSED BY A FAULTY RELAY.
                                                                                                            -          W                            -      W We    eWWWWeW      WWW WWW  W -    W    -    e  6    6  6 -  GW  W    WW      W e          eee ----
i PAGE 2-358
                                                      \
 
in M
9 i              N W
C 4
A t
M        ~
Z 4
          .a 33 LA.
W J
l
          .J J
4 Z
Q M
W Z
W
          >=
Z M
W C
4 L
to M
Z W
I
\
l i
I 1
 
1 Docket                                                      50-251        0PERATING                        STATUS                            uwwwwwwwwwwwwMNwMMMMNNNNNNNMMNNNNMMM M                  TURKEY POINT 4                  N
: 2. Reporting Period                                                    03/01/84  Outage + On-line Hrs:                744.0                    MMMMMMMMMMMMMMMWNNMMMMMM ONNNNNMMMMM
: 3. Utility
 
==Contact:==
N. W. GRANT (305) 552-3675                                                AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWE):                                                                                2200            -
TURKEY POINT 4
: 5. Nameplate Rating (Gross MWe):                                                                      894 X 0.85 : 760 1900
: 6. Design Electrical Rating (Het MWe):                                                                            693
                                                                                                                                                                    - DESIGN ELEC. IUtTINO = 003
: 7. Maximum Dependable Capacity (Gross MWe):                                                                      700                            ,,,,,,putX.        DEPDE3. Dr. - SOS (100Xi
: 8. Maximum Dependable Capacity (Het MWe):                                                                        666
: 9. If Changes Occur tbove Since Last Report, Give Reasons:
NOME
: 10. Power Level To Which Restricted, If Any (Net MWe):
: 11. Reasons for Restrictions, If Any                                                                                                      1000 -
NONE MONTH                YEAR        CUMULATIVE                                                                                M E
: 12. Report Period Hrs                                                              744.0              2.184.0        92.977.0 65.955.4                          pe0 aus as gueuspun teenst artssum. caerfleus
: 13. Hours Reactor Critical                                                        115.5              1.316.6
                                                                                                                                                                      --------------------------------        -100
: 14. Rx Reserve Shtdwn Hrs                                                              .0                      .0        166.6                    ---
: 15. Hrs Generator On-Line                                                          111.4            1.269.3        63.737.7
                                                                                                                                                                                                              -80
: 16. Unit Reserve Shtdwn Hrs                                                            .0                      .0          31.2            se0-
: 17. Gross Thern Ener (MWH)                                                      238.983            2.761.901 134.517.642                                                                                -80
: 18. Gross Elec Ener (MWH)                                                        76.975              898.385      42.619.747 70.703              848.172 40.555.280                                                                                .g
: 19. Het Elec Ener (MWH)
: 20. Unit Service Factor                                                              15.0                    58.1          68.6 68.6
                                                                                                                                                                                                              -30
: 21. Unit Avail Factor                                                                15.0                    58.1
: 22. Unit Cap Factor (MDC Net)                                                        14.3                    58.3          67.3W 0
I5
                                                                                                                                                                ~ ~
: 23. Unit Cap Factor (DER Net)                                                        13.7                    56.0          62.9                  0            5      l'c    ' 1'5 ' /0~            ~IO 00TO
: 24. Unit For:ed Outage Rate                                                          34.4                    21.1          4.9
: 25. Forced Outage Hours                                                              58.3                  340.4      2.882.2 MARCH 1984
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):
NONE 05'09/84  M Item calculated with a Weighted Average                                    PAGE 2-360
: 27. If Currently Shutdown Estimated Startup Date:
 
i muuuuuuuunnuuuuuuuuuuuuuuwwuwmuununu Report Period MAR 1984                  UNIT      $HUTD0WN$ / REDUCTIOMS                          a        TURKEY POINT 4          m muunnununuwwwwwumunuwwwwuununuuununu No.      Date  IEEa RouFs Reason Method LER Humber System Coniconent              Cause a Corrective Action to Prevent Recurrence S      82/27/84    'F  32.3    A      4                  EB      RELAYX    THE UNIT WAS REMOVED FROM SERVICE TO INSPECT. ADJUST AND REPAIR AUXILIARY POWER AIR CIRCUIT BREAKERS.
6      03/06/84    F  26.0    A      1                  CB      VALVEX    UNIT REMOVED FROM SERVICE TO REPAIR LEAKAGE FROM PRESSURIZER SPRAY VALVE PACKING.
7      83/08/84    5 574.3      C      1                  RC      FUELXX    UNIT REMOVED FROM SERVICE FOR REFUELING AND SCHEDULED MAINTENANCE.
I tuuuuuuuuuu        TURKEY POINT 4 BEGAN A REFUELING AND MAINTENANCE SHUTDOWN O
 
==SUMMARY==
u        ON MARCH 8.
tuuuuuuuuum Twee        Reason                          Method          System a conoonent F-Forced A-Equip Failure F-Admin            t-Manual        Exhibit F 8 H 5-Sched    B-Maint or Test G-Opar Ereor 2-Manual Scram Instructions for C-Refueling        H-Other      3-Auto Scram    Preparation of D-Regulatory Restriction        4-Continued      Data Entry Sheet E-Operator Training              5-Reduced Load Licenseo Event Report a License Examination        9-Other          (LER) File (NUREG-0161)
PAGE 2-361
 
_      _ __  __ _ _ _ _ . _ _ _ _ _ _ . . -_          . _ _ . __      __      _ _ _ _ _ _ _ _          . -  m tumuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunu O                                        TURKEY POINT 4                m Report Period MAR 1984 tuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuun                                              FACILITY                              DATA FACftfTY DESCRIPTION                                                                              UTILITY 2 CONTRACTOR INFORMATION LOCATION                                                                                        UTILITY STATE.................... FLORIDA                                                              LICENSEE................. FLORIDA POWER & LIGHT COUNTY...................DADE                                                                  CORPORATE ADDRESS....... 9250      WEST FLAGLER STREET P.O. BOX 013 00 MIAMI, FLORIDA 33174 DIST AND DIRECTION FROM MEAREST POPULATION CTR.. 25 MI S OF                                                      CONTRACTOR MIAMI, FLA                                      ARCHITECT / ENGINEER.......BECHTEL TYPE OF REACTOR............PWR                                                                        NUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... JUNE 11, 1973                                                              CONSTRUCTOR..............BECHTEL DATE ELEC ENER 1ST GENER... JUNE 21, 1973                                                            TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... SEPTEMBER 7, 1973                                              REGULATORY INFORMAff0N CONDENSER COOLING METHOD... CLOSED CANAL                                                        IE REGION RESPONSIBLE......II CONDENSER COOLING WATER.... CLOSED CYCLE CANAL                                                  IE RESIDENT INSPECTOR......R. V0GT LOWELL ELECTRIC RELIABILITY                                                                            LICENSING PROJ MANAGER.....D. MCDONALD COUNCIL..................SCUTHEASTERN ELECTRIC                                                COCKET NUMBER........... 50-251 RELIABILITY COUNCIL                      LICENSE & DATE ISSUANCE....DPR-41, APRIL 10, 1973 PUBLIC DOCUMENT ROOM....... ENVIRONMENTAL AND URBAN AFFAIRS LIBRARY FLORIDA INTERNATIONAL UNIVERSITY MIAMI, FLORIDA 33199 INSPECTION                                $TATUS INSPECTION
 
==SUMMARY==
 
                          + INSPECTION FEBRUARY 15-17 (84-85): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 18 INSPECTOR-HOURS ON SITE IN THE AREA 0F REACIGR CCOLANT SYSTEM LEAK RATE MEASUREMENT AND FOLLOWUP OF OUTSTANDING ITEMS. NO VIOLATIONS OR DEVIATIONS WERE I INSPECTION FEBRUARY 6-18 (84-06): THIS ROUTINE, UNANNOUNCED INSPECTION INVOLVED 22 INSPECTOR-HOURS ON SITE IN THE AREAS OF PLANT MATER CHEMISTRY AND INSERVICE TESTING OF PUMPS AND VALVES. OF THE TWO AREAS INSPECTED, MO VIOLATIONS OR DEVI ATIchS WERE IDENTIFIED.
A SPECIAL IMSPECTION MARCH 6-8 8 18-20 (84-18): THIS INSPECTION INVOLVED 14 INSPECTOR-HOURS ON SITE BY TWO NRC INSPECTOR $.
SECURITY INSPECTION WAS CONDUCTED TO REVIEW THE CIRCUMSTANCES SURROUNDING                                                            QUESTIONABLE      SECURITY        PRACTICES THE LICENSEE WAS FOUND TO BE IN CLMPLIANCE            OBSERVED WITH  BY OPERATIONS INSPECTOR CURING AN INSPECTION CONCUCTED FEBRUARY 21 - MARCH 31, 1984.
NRC REQUIREMENTS WITHIM THE AREAS EXAMINED DURING THE INSPECTION EXCEPT FOR THE FOLLOWING ITEM: FAILURE TO MAINTAIN PO CCNTROL OF AN ESCCRTED INDIVICUAL.
ENFORCEMENT SUF*fARY CONTRARY TO THE REQUIREMENTS OF 58.47(B)(18), IN TE CASE WHERE PROMPT PROTECTIVE ACTION RECOMMENDATIONS ARE WARRANTED BY PLANT CONDITIONS AND SMALL DOSES ARE PROJECTED FOR THE SITE BOUNDARY DUE TO PRESENT SMALL RELEASES, MO PROTECTIVE ACTIONS ARE ADDRESSED
                                '                                                                                                                                                                              PAGE 2-362
 
i l
i
!                                                                                                      mumummmmmmmmmmmmmmmmmmmmuummuummusum
[
Report Period MAR 1944              IN5PECTION              5TATUS            -
(CONTINUED)
* TURKEY POINT 4        m nummununumammmmmmmmmmmmmuunnummuuuum ENFORC NENT
 
==SUMMARY==
 
BY THE IMPLEMENTING PROCEDURES. CONTRARY TO THE REQUIREMENTS OF 18CFR58.47(R)(10), NUCLEAR PLANT SUPERVISORS INTERVIEWED DURING THE INSPECTICM WERE UNFAMILIAR WITH THE EPIP'S TO THE EXTENT THAT INCORRECT PROTECTIVE ACTION RECOMMENDATIDM DECISIONS WERE MADE FOR A RANGE OF SITUATIONS AND CORRESPONDING ACTION LEVELS. SIMILARLY, THE NUCLEAR PLANT SUPERVISOR $, INITIALLY THE EMERGENCY COORDINATORS. ARE NOT TRAINED TO PERFORM DOSE CALCULATIONS AND WERE GENERALLY UNFAMILIAR WITH THE PROCEDURE. ALSD, INDIVIDUALS SELECTED BY THE PLANT SUPERVISORS, ON OTHER THAN THE DAY SHIFT, 10 PERFORM THE DOSE CALCULATIONS (OME HP AND ONE CHEMISTRY DEPARTMENT STAFF) WERE UNFAMILIAR WITH THE PROCEDURES AND UNABLE TO PERFORM THE REQUIRED CALCULATIONS.
(8481 4)
TWO DEDICATED CCTV CAMERAS FOR PA SURVEILLANCE WERE INOPERABLE, NO DISCTRNIBLE IP 4GE ON CCTV MONITORS.
(8483 43 FAILURE OF EMPLOYEE'S TO DISPLAY SECURITY IDENTIFICATION 3.'eES WHILE WITHIN THE PA.
(8483 5)
OTHER ITEMS i
SYSTEMS AND COMPONENT PROBLEMS:
NONE.
FACILITY ITEMS (PLANS AND PROCEDURES):
COMPLETED STEAM GENERATOR REPLACEMENT.
MANAGERIAL ITEMS:
NOME.
PLANT STATUS:
NORMAL OPERATION.
LAST IE SITE INSPECTION DATE: MARCH 6-8 8 18-28, 1984 +
INSPECTION REPORT NO: 58-251/44-10 +
PAGE 2-363
 
_  .,_m  _ , _ __    __ _ _ _ . __ _ . _ _ _ _ _ _ _ _ _ . _ _ . _ _ _
l t
I l
l I
nummmmmmmmmmmmmmmmmmmmmmmmmmmmmmanum
, Report Period MAR 1984                                REPSRT5                FRSM                            LICEN5EE              u                            TURKEY POINT 4                    m mummmmmmmmmmmmmmmmmmmmmmmmmmmmmmaman l
    ==================================================================================================================================
NtNSER          BATE OF            BATE OF  SUBJECT l                        EVENT            REPORT l                                                                                                                          _.            ..--                      ---- -.._... .--.                  __
83-822/          12/19/83          81/18/84 SORON CONCENTRATION REVEALED THAT ALL TNREE TAMES IdERE EXCEEDING TECM $PEC$. LIFIITS 83-L                                        (28.880-22.548 PPM).
84-881/          S2/12/84          03/95/84 A REACTOR TRIP OCCURRED DUE TO AN ELECTRICAL RELAY FIALFUNCTION.
84-882/          82/12/84          03/t3/84 REACTOR TRIP OCCURRED DUE TO STEAM FLOW GREATER TNAM FEED FLOW. DUE TO A HIGH STEAM FLOW READING ON 4A STEAM GENERATOR.
    ==================================================================================================================================
PSSE 2-364
 
THIS PAGE INTENTIONALLY LEFT BLANK 4
PAGE 2-365
: 1. Docket    50-271          0PERATING              STATUS                      MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM M            VERMONT YANKEE 1                                        M
: 2. Reporting Period    03/01/84  Outage + On-line Hrs      744.0              MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 3. Utility
 
==Contact:==
F. J. BURGER (802) 257-7711 X136                          AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWE):                      1593                            VERMONT YRNKEE 1
: 5. Nameplate Rating (Gross MWe):            626 X 0.9 : 563 1500
: 6. Design Electrical Rating (Het MWe):                514 DESIGN ELEC. RnTING = 514
: 7. Maximum Dependable capacity (Gross MWe):            535                      ......Mnx. DEPDC. Cnr. - 504 (100%)
: 8. Maximum Dependable Capacity (Het MWe):              504
: 9. If Changes occur Above Since Last Report, Give Reasons:
NONE
: 10. Power Level To Which Restricted, If Any (Het MWe):
: 11. Reasons for Restrictions, If Anyt                                    10am-NONE MONTH        YEAR 2.184.0 CUMULATIVE 101.042.8 g
'12. Report Period Hrs              744.0
: 13. Hours Reactor Critical        744.0    2.076.6      81.775.1
: 14. Rx Reserve Shtdwn Mrs              .0          .0            .0
: 15. Hrs Generator On-Line          744.0    2.050.7      79.543.2    h          ,,, ,,, ,, ,,,,,,,,,,,,, ,,,,,,L ,,,,,,,,,,
500-                                                                          -1GG
: 16. Unit Reserve Shtdwn Hrs            .0          .0          _mt
: 17. Gross Therm Ener (MWH)    1.157.219  3.185.262 115,345,934                                                                                        ,,,
: 18. Gross Elec Ener (MWH)        393.830  1.081.978    38.375.056
                                                                                                                                                        - SD
: 19. Het Elec Ener (MWH)          377.814  1.038,469    36,403.485 100.0        93.9          78.7                                                                                    - 90
: 20. Unit Service Factor
: 21. Unit Avail Factor              100.0        93.9          78.7                                                                                    _ ,a
: 22. Unit Cap Factor (MDC Net)      100.8        94.3          71.5 5'
                                                                                      ~
: 23. Unit Cap Factor (DER Het)      98.8        92.5          70.1            0              II3        1's  In      ME'                          in
: 24. Unit Forced Outage Rate            .0        6.1          7.3
: 25. Forced Outage Hours                .0      133.3      5.024.5
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):
REFUELING AND MAINTENANCE: 6/16/84-8 WEEKS.
: 27. If Currently Shutdown Estimated Startup Date:        N/A                                                                                                PAGE 2-366
 
                                                                                                                                                            -M MMMMMMNhWNNNNNNNNNNNNNNNNNNNNNNNNNNN Report Period MAR 1984                                                                                        UNIT      SHUTD0WHS / REDUCTIONS                        N        VERMONT YANKEE 1          M NNNNNNNNNNNNNNNNNNNNNNNNNMMMMMMNNNNN No,                                        Date                                          Tvoe Hours Reason Method LER Humber System Comoonent            Cause 3 Corrective Action to Provent Recurrence 84-04 03/03/84                                                                              5    0.0    B      5                  RB      CONROD    POWER REDUCTION FOR CONTROL PATTERN EXCHANGE.
84-05 03/25/84                                                                              S    0.0    B      5                  RB      CONROD    POWER REDUCTION FOR CONTROL ROD EXERCISE.
                                                                                                                                                                                                            -                  l MMMMMMMMNNM                                                                              VERM0HT YANKEE OPERATED ROUTINELY DURING MARCH WITH N0 SHUTDOWNS M
 
==SUMMARY==
M                                                                              REPORTED.
NNMMMMMMNNN Tvoo                                              Reason                                                          Method          System 8 comoonent F-Forced A-Equip Failure F-Admin                                                                                    1-Manual        Exhibit F 8 H
            .S-Sched                                            B-Maint or Test .G-Oper Error 2-Manual Scram Instructions for C-Refueling                                      H-Other      3-Auto Scram    Preparation of D-Regulatory Restriction                                        4-Continued      Data Entry Sheet E-Operator Training                                            5-Reduced Load Licensee Event Report 8 License Examination                    9-Other          (LER) File (NUREG-0161)
PAGE 2-367 a_      _
 
NNNNNNMMMMMMMMMMWNNNNWMNNMMMNNNMMNNN N          VERMONT YANKEE 1                                  N MMMMNNNMMMMMMMMMNNNNNMMMMMMMNNNNMMMM                                      FACILITY          DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                                                  UTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                            UTILITY STATE.................... VERMONT                                                    LICENSEE................. VERMONT YANKEE HUCLEAR POWER COUNTY...................WINDHAM                                                      CORPORATE ADDRESS....... 1671 WORCESTER ROAD FRAMINGHAM, MASSACHUSETTS 01701 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 5 MI S OF                                                CONTRACTOR BRATTLEBORD, VT                      ARCHITECT / ENGINEER.......EBASCO TYPE OF REACTOR............BWR                                                          NUC STEAM SYS SUPPLIER... GENERAL ELECTRIC DATE INITIAL CRITICALITY...MARCN 24, 1972                                              CONSTRUCTOR..............EBASCO DATE ELEC ENER IST GENER... SEPTEMBER 20, 1972                                          TURBINE SUPPLIER......... GENERAL ELECTRIC DATE COMMERCIAL OPERATE....HOVEMBER 30, 1972                                      REGULATORY INFORMATION CONDENSER COOLING METHOD... COOLING TOWER                                            IE REGION RESPONSIBLE......I CONDENSER COOLING WATER.... CONNECTICUT RIVER                                        IE RESIDENT INSPECTOR......W. RAYMOND ELECTRIC RELIABILITY                                                                LICENSING PROJ MANAGER.....V. ROONEY COUNCIL.................. NORTHEAST POWER                                            DOCKET NUMBER...........      50-271 C00ROINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-28, FEBRUARY 28, 1973 PUBLIC DOCUMENT R00M.......BR00KS MEMORIAL LIBRARY 224 MAIN STREET BRATTLEBORD, VERMONT 05301 INSPECTION                STATUS INSPECTION
 
==SUMMARY==
 
NO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
TECHNICAL SPECIFICATION 6.5B REQUIRES, IN PART, THAT RADIATION CONTROL PROCEDURES BE PREPARED, APPROVED AND MAINTAINED AND MADE AVAILABLE TO ALL STATION PERSONNEL. THESE PROCEDURES SHALL BE CONSISTENT WITH 10 CFR PART 20, AND REVIEWED AND APPROVED BY THE PLANT MANAGER, OR HIS DESIGNEE. AND THE MANAGER OF OPERATIONS. CONTRARY TO THE ABOVE RADIATION CONTROL PROCEDURES, NECESSARY TO COMPLY WITN 10 CFR PART 20, FOR THE VAN-MOUNTED PERSONNEL WHOLE BODY COUNTING SYSTEM WERE NOT REVIEWED AND APPROVED BY THE PLANT MANAGER, OR HIS DESIGNEE, AND THE MANAGER OF OPERATIONS. THE SYSTEM WAS USED WITHOUT THE REQUIRED PROCEDURES FROM SEPTEMBER 7, 1983 THROUGN DECEMBER 9, 1983.                          TNIS IS A SEVERITY LEVEL V VIOLATION (SUPPLEMENT IV).
(8333 5)
OTHER ITEMS SYSTEMS AND COMPONENTS:
PAGE 2-368
 
NNNMMMMMNNNNNNNNNNNNNNNNMMNNMMMMNNNM Report Period MAR 1984                                                                        IN$PECTION                                    STATUS - (CONTINUED)              N            VERMONT YANKEE 1                  N NNNNMMMMMMMMMMMMMMMNNNNMMMNNMMMMMMMM OTHER ITEMS NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES):
HD INPUT PROVIDED.
MANAGERIAL ITEMS:
NO INPUT PROVIDED.
PLANT STATUS:
NO INPUT PROVIDED.
LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED.
INSPECTION REPORT NO: NO INPUT PROVIDED.
REPORTS                FR0M    LICENSEE
            ==================================================================================================================================
NUMBER                                                    DATE OF DATE OF          SUBJECT
,                                                                                      EVENT  REPORT
__________________.=                                                                ==__ __=._________________________. _______. ___                            __________      = =- =_
NO INPUT PROVIDED.
            ==================================================================================================================================
c T
4 PAGE 2-369
 
1 Docket      50-029                                                0PERATIHG                      STATUS                                  MMMMNNNMMMMMMNMMNNMMNNMMMMMMMMMMMMMM M              YANKEE-ROWE 1                    N
: 2. Reporting Period    03/01/84                                                    Outage + On-line Hrs:    744.0                          MWMMMMMMMMMMMMMMMMMNNMMMNNNNNNMkMMMM
: 3. Utility
 
==Contact:==
S. WHIPPL E (617) 872-8100                                                                                            AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                                                                      600 YRNKEE-ROWE 1
: 5. Nameplate Ratii.g (Gross MWo):                                                            185 X 1.0 : 185 1500
: 6. Design Electrical Rating (Het MWe):                                                                175 0 SION D.0L RRTIMO =      175
: 7. Maximum Dependable Capacity (Gross MWe):                                                            180                                    ......tWIX. DEPDe. Cfr. -      169 (100%)
: 8. Maximum Dependable Capacity (Het MWe):                                                              167
: 9. If Changes Occur Above Since Last Report, Give Reasons:
ITEM 7 CHANGED TO REFLECT WINTER PERIOD
: 10. Power Level To Which Restricted. If Any (Het MWe):
11 Reasons for Restrictions, If Anyt                                                                                                  10mD-NONE MONTH      YEAR    CUMULATIVE                                                                                                              M
: 12. Report Period Hrs                                                                744.0    2.184.0    204,885.0                                                                                                              E
: 13. Hours Reactor Critical                                                            729.6    1.978.4    163.502.7
: 14. Rx Reserve Shtdwn Hrs                                                                .0        .0            .0
: 15. Hrs Generator On-Line                                                            729.1    1.973.1    158.885.4                  hy
: 16. Unit Reserve Shtdwn Hrs                                                              .0        .0            .0                    smD-
: 17. Gross Therm Ener (MWH)                                                          422.454  1.154.123  86.037.717
: 18. Gross Elec Ener (MWH)                                                          129.971    355.301  26.078.167
: 19. Het Elec Ener (MWH)                                                            121.835    333.288  24.401.677
: 20. Unit Service Factor                                                                98.0      90.3          77.5                              peo cues se comme tasma ortten. omerftens 21 Unit Avail Factor                                                                  98.0      90.3          77.5
                                                                                                                                                                                                -30
: 22. Unit Cap Factor (MDC Net)                                                          98.1      91.0          71.5M 0  .
                                                                                                                                                    ...      ,.    ...    ...    ...    .,    0
: 23. Unit Cap Factor (DER Net)                                                          93.6      87.2          69.1M                        0        5      to      15    30      35      30
: 24. Unit Forced Outage Rate                                                              .0      9.0          5.3
: 25. Forced Outage Hours                                                                  .0    196.0      7.682.4
: 26. Shutdowns Sched Over Hext 6 Months (Type,Date, Duration):
NONE
: 27. If Currently Shutdown Estimated Startup Date:                                                          06/10/84          M Item calculated with a Weighted Average                                                      PAGE 2-370
 
7 . . _ - _ _ . - - _ - - - - _ _ _ _ _ .
MMNNMMNNNNNNNNNNNNNNNNNNNNNNNNMMMNNN Report Period MAR 1984                                                                                        UNIT      SHUTD0WNS / REDUCTIONS                          N            YANKEE-ROWE 1                              M NMMMNNNNMMMMNNNNNNNNNNNNNNNNNNNNNNNN No.                Date                Tvoe Hours Reason Method LER Number System Comoonent                                                              Cause 8 Corrective Action to Prevent Recurrence 84-2            03/31/84                        5                14.9                          C          1                  RC    FUELXX  REFUELING 8 MAINTENANCE OUTAGE COMMENCES.
NNNNNNNNNNN                              YANKEE R0WE OPERATED ROUTINELY UNTIL MARCH 31 WHEN IT WAS N
 
==SUMMARY==
N                                SHUTDOWN FOR REFUELING AND MAINTENANCE.
NNNNNNNMMMM Tuon                Reason                                                                                      Method          Svstem A Component F-Forced A-Equip Failure F-Admin                                                                                1-Manual        Exhibit F 1 H S-Sched              B-Maint or Test G-Oper Error- 2-Manual Scram Instructions for C-Refueling                                                      H-Other                    3-Auto Scram    Preparation of D-Regulatory Restriction                                                                    4-Continued      Data Entry Sheet E-Operator Training                                                                        5-Reduced Load Licensee Event Report
                                                    & License Examination                                                              9-Other          (LER) File (NUREG-0161)
PAGE 2-371
 
NNNMMNNMMMMMNNMMMMMMMMMMMNNNNNNNNNNN N            YANKEE-ROWE 1                                                M unnuMunununnummuuummunnununuwMNuMNNW                                            FACILITY          DATA                                          Report Period MAR 1984 FACILITY DESCRIPTION                                                                      HTILITY 8 CONTRACTOR INFORMATION LOCATION                                                                                UTILITY STATE.................... MASSACHUSETTS                                                  LICENSEE................. YANKEE ATOMIC ELECTRIC COUNTY................... FRANKLIN                                                        CORPORATE ADDRESS....... 1671 WORCESTER RD.
FRAMINGHAM, MASSACHUSETTS 01701 DIST AND DIRECTION FROM HEAREST POPULATION CTR.. 25 MI NE OF                                                  CONTRACTOR PITTSFIELD, MASS                              ARCHITECT / ENGINEER....... STONE 8 WEBSTER TYPE OF REACTOR............PWR                                                              HUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... AUGUST 19, 1960                                                  CONSTRUCTOR.............. STONE 8 WEBSTER DATE ELEC ENER IST GENER... NOVEMBER 10, 1960                                                TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... JULY 1, 1961                                              RfrULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                                      IE REGION RESPONSIBLE......I CONDENSER COOLING WATER....DEERFIELD RIVER                                                IE RESIDENT INSPECTOR......H. EICHENHOLZ ELECTRIC RELIABILITY                                                                      LICENSING PROJ MANAGER.....P. ERICKSON COUNCIL.................. NORTHEAST POWER                                                DOCKET NUMBER...........      50-029 COORDINATING COUNCIL LICENSE 8 DATE ISSUANCE....DPR-3, DECEMBER 24, 1963 PUBLIC DOCUMENT ROOM.......GREENFIELD COMMUNITY COLLEGE 1 COLLEGE DRIVE GREENFIELD, MASSACHUSETTS 01301 IN5PECTIOH              STATUS INSPECTION
 
==SUMMARY==
 
HO INSPECTION INPUT PROVIDED.
ENFORCEMENT
 
==SUMMARY==
 
10 CFR 71.31 REQUIRES PACKAGING TO BE OF SUCH MATERIALS AND CONSTRUCTION THAT THERE WILL BE NO SIGNIFICANT CHEMICAL, GALVANIC, OR OTHER REACTION AMONG THE PACKAGING COMPONENTS, OR BETWEEN THE PACKAGING COMPONENTS AND THE PACKAGE CONTENTS. CONTRARY TO THE ABOVE, OH JULY 22, 1983, THE LICENSEE SHIPPED A 55-GALLON DRUM, CONTAINING 14 MILLICURIES OF LICENSED MATERIAL, AND THE 55-GALLON DRUM WAS NOT OF SUCH MATERIALS AND CONSTRUCTION THAT THERE WOULD BE NO SIGNIFICANT CHEMICAL GALVANIC, OR OTHER REACTION AMONG THE PACKAGING COMPONENTS, OR BETWEEN THE PACKAGING COMPONENTS, AND THE PACKAGE CONTENTS. UPON ARRIVAL AT THE BARNWELL, SOUTH CAROLINA BURIAL SITE, DRUM NO.                    30138 WAS FOUND TO BE LEAKING THROUGH ONE OF NUMEROUS RUSTED-THROUGH PIN HOLES.
(8316 3)
OTHER ITEMS SYSTEMS AND COMPONENTS:
5 PAGE 2-372
 
NNNNNNNNNNNNNNNNNNNNNNNNNNNMMNNNNNNN YANKEE-ROWE 1                              M Report Period MAR 1984                                                    IN5PECTIoN                        STATUS - (CONTINUED)                    M NNMMMMMMNNNNNMMNNNMMNNMMNNNNNNNNNNNN OTHER ITEMS NO INPUT PROVIDED.
FACILITY ITEMS (PLANS AND PROCEDURES)
NO INPUT PROVIDED.
MANAGERIAL ITEMS:
NO INPUT PROVIDED.
PLANT STATUS:
NO IMPUT PROVIDED.
LAST IE SITE INSPECTION DATE: NO INPUT PROVIDED.
INSPECTION REPORT NO: NO INPUT PROVIDED.
REPORTS            FR0M          LICENSEE
    ==================================================================================================================================
NUMBER    DATE OF                            DATE OF                  SUBJECT EVENT                              REPORT                                                                                                - - =_-- ------
    =------_      ------ __---                                      ----_ ---        __-------        --- __ -      =---------- -- -___--      - ----                              =----- =. - --
4 NO INPUT PROVIDED.
,  ==================================================================================================================================
                                                                                                                                            '                                                      PAGE 2-373
 
1 Docket          50-295    0PERATING            STA TUS                  MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 2. Reporting Period: 03/01/84 M                      ZION 1                      M Outage + On-line Hrs: 744.0              MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 3. Utility
 
==Contact:==
GERRI AUSTIN (312) 746-2084 AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWt):                    3250
: 5. Nameplate Rating (Gross MWe):              1220 X 0.9 = 1098 7
: 6. Design Electrical Rating (Het MWe):                1040            I'"*
: 7. Maximum Dependable Capacity (Gross MWe):          1085
                                                                                                                                . - - . . . .              .      [ 1040 (100%)
: 8. Maximum Dependable Capacity (Het MWe):            1040
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NONE
: 10. Power Level To Which Restricted, If Any (Het MWe):
11 Reasons for Restrictions, If Any:                                                                      "
1000-  ~                                            "
NONE MONTH        YEAR      CUMULATIVE
: 12. Report Period Hrs                  744.0    2.184.0      89.856.0                                                                  - 30 hf
: 13. Nours Reactor Critical              744.0    1.264.7      63.340.8
: 14. Rx Reserve Shtdwn Hrs                  .0          .0      2.621.8 hf
: 15. Hrs Generator On-Line              727.3    1.157.5      61.625.8                                                                  ~*8
: 16. Unit Reserve Shtdwn Hrs                .0          .0            .0    ,,,,
f                                            17. Gross Therm Ener (MWH)          2.273.089  3.362.076 173.283.559 i
                                                                                                                                                                                    -40
: 18. Gross Elec Ener (MWH)              748.756  1.099.304  55.819.183
: 19. Het Elec Ener (MWH)                719.967  1.050.210  52.953.515
: 20. Unit Service Factor                    97.8        53.0          68.6
                                                                                                                                                                                    - 30
: 21. Unit Avail Factor                      97.8        53.0          68.6
: 22. Unit Cap Factor (MDC Net)              93.0        46.2          56.7
: 23. Unit Cap Factor (DER Net)              93.0        46.2          56.7      0 0'        5'    l'O '      1'5 ' '30 '    3'S '  3'O
: 24. Unit Forced Outage Rate                  2.2        32.4          13.7                                    DRYS
: 25. Forced Outage Hours                    16.7      554.0      9.166.0
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration),                                          MARCH 1984 NONE i
l                                        27. If Currently Shutdown Estimated Startup Date:                N/A                                                                            PAGE 2-374 l
l l
l l                                                                                                                                                                                          _  _  _ - _ _ _ _ _ _ _ _ _ .
 
NNNMMMNNNNNNNNNNNNNNMMMMMMMMMNNNNNNN Report Period MAR 1984                                                              UNIT      SHUTD0WHS / REDUCTIOHS                      N          . ZION 1                N MMMNNNNNNNNNNNMMMMMMNNNNNNNNMMMMMNNN Ng,    Date    Ivoe Hours Reason Method LER Number System Comoonent                                                      Cause & Corrective Action to Prevent Recurrence 6      03/05/84    F    16.7                              A                    1                                  TURBINE OFF LINE FOR RUPTURE DISC ON HEATER DRAIN TAHK.
d NNNNNNNNNNN      ZIDH 1 OPERATED ROUTINELY IN MARCH WITH 1 SHUTDOWN REPCRTED.
M
 
==SUMMARY==
N MNNNNNNNMMM Twoe      Reason                                                                      Method          Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin                                                      1-Manual        Exhibit F 8 H
  . S-Sched    B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling                    H-Other                                    3-Auto Scram    Preparation of D-Regulatory Restriction                                                    4-Continued    Data Entry Sheet E-Operator Training                                                        5-Reduced Load Licensee Event Report
                  & License Examination                                                    9-Other        (LER) File (NUREG-0161)
PAGE 2-375
 
NNNNMMMMMNNNNNNNNNNNNNNNNNNNNNNMMNNM U                ZION 1                                                              N cNNNNNNNNMMMNNMMMNNNMMMMMNNNMMNNNNNN                                                                    FACILITY              DATA                                            Report Period MAR 1984 FACILITY DESCRIPTION                                                                                                  UTILITY t CONTRACTOR INFORMATION                          .
LOCATION                                                                                                            UTILITY STATE....................ILLIN0IS                                                                                    LICENSEE................. COMMONWEALTH EDISON COUNTY................... LAKE                                                                                      CORPORATE ADDRESS........P.O. BOX 767 CHICAGO, ILLINDIS 60690 DIST AND DIRECTION FROM HEAREST POPULATION CTR.. 40 MI N OF                                                                              CONTRACTOR                      -
CHICAGO, ILL                              ARCHITECT /ENGINEFE.......SARGENT 8 LUNDY TYPE OF REACTOR. . . . . . . . . . . .PWR                                                                            NUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... JUNE 19, 1973                                                                            CONSTRUCTOR.............. COMMONWEALTH EDISON DATE ELEC ENER IST GENER... JUNE 28, 1973                                                                            TURBINE SUPPLIER......... WESTINGHOUSE DATE COMMERCIAL OPERATE.... DECEMBER 31, 1973                                                                    REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                                                                IE REGION RESPONSIBLE......III CONDENSER COOLING WATER.... LAKE MICHIGAN                                                                          IE RESIDENT INSPECTOR......J. WATERS ELECTRIC RELIABILITY                                                                                                LICENSING PROJ MANAGER.....J. NORRIS COUNCIL..................MID-AMERICA                                                                                DOCKET NUMBER........... 50-295 INTERPOOL NETWORK LICENSE & DATE ISSUANCE....DPR-39, OCTOBER 19, 1973 PUBLIC DOCUMENT    R00M....... ZION - BENTON PUBLIC LIBRARY 2400 GABRIEL AVENUE ZION, ILLINOIS 60099 INSPECTION
 
==SUMMARY==
 
INSPECTION ON DECEMBER 21 THROUGH FEBRUARY 9. (83-26): ROUTINE UNANNDUNCED RESIDENT INSPECTION OF LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, PRIMARY LEAK INSIDE UNIT 1 CONTAINMENT, INADVERTENT SAFETY INJECTION, REACTOR TRIPS, STARTUP TESTING-REFUELING, FAILURE OF 1A DIESEL GENERATOR, AUXILIARY FEEDWATER SYSTEM DISCHARGE THROTTLE VALVE SETTING, 1B REACTOR COOLANT PUMP MOTOR REPLACEMENT, OPERATIONAL SAFETY VERIFICATION, ESF SYSTEM WALKDOWN, MONTHLY MAINTENANCE OBSERVATION, MONTHLY SURVEILLANCE    OBSERVATION INSPECTORS INCLUDING                                                        AND LICENSEE 34 HOURS  ONSITE DURINGEVENT OFF-SHIFTS.
REPORT FOLLOWUP. THESE INSPECTIONS INVOLVED A TOTAL OF 187 HOURS BY TWO NRC OF THE THIRTEEN AREAS INSPECTED, NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE APPROVEDIDENTIFIED WRITTENINPROCEDURES).            HINE AREAS AND TWO ITEMS OF NONCOMPLIANCE WERE IDENTIFIED IN THE REMAINING FOUR AREAS (FAILURE TO COMPLY WITH INSPECTION ON HOVEMBER 22-23 AND 29-30, DECEMBER 1-2, 6-9, 15-16, AND 28, AND FEBRUARY 2, (83-27)* ROUTINE, UNANNOUNCED INSPECTION OF RADIATION PROTECTION PROGRAM, INCLUDING: QUALIFICATIONS; AUDITS; TRAINING; RADIATION PROTECTION PROCEDURES; INSTRUMENTS AND EQUIPMENT; EXPOSURE CONTROL; POSTING, LABELING, AND CONTROL; SURVEYS; HOTIFICATIONS AND REPORTS; PREPARATIONS FOR IMPLEMENTATION OF 10 CFR 61; AND OPEN ITEMS. ALSO, LICENSEE ACTIONS RELATED TO A SFJRCE HANDLING INCIDENT, A CONTAIHMENT HIGH AIRBORNE RADI0 ACTIVITY INCIDENT, AND COMPLETION OF TMI ACTION PLAN ITEM II.F.1.1 WERE REVIEWED. THE INSPECTION INVOLVED 136 INSPECTOR-NOURS ONSITE BY TWO NRC INSPECTORS. OF THE FOURTEEN AREAS INSPECTED, NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED IN ELEVEN AREAS; ONE ITEM OF NONCOMPLIANCE WAS IDENTIFIED IN EACH OF THREE AREAS (FAILURE TO FOLLOW PLANT PROCEDURES; FAILURE TO EVALUATE RADIOLOGICAL HAZARDS; AND FAILURE TO CONTROL ACCESS TO A HIGN RADIATION AREA).
PAGE 2-376
 
unuuuuuuuuuuuuuuuuuuuuuuuuuuuuuunnum Report Period MAR 1984                                  IN5PECTION                      STATUS              -
(CONTINUED)        m                ZION 1                    m unnuuuuuuuuuuuuuuuuuuuuuuuuuuuuununu ENFORCEMENT
 
==SUMMARY==
 
NOME OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
HOME FACILITY ITEMS (PLANS AND PROCEDURES):
HOME MANAGERIAL ITEMS:
  .NONE PLANT STATUS:
THE PLANT IS OPERATING ROUTINELY.
LAST IE SITE INSPECTION DATE: MARCH 21 - APRIL 9, 1984 INSPECTIOP REPORT HO:                84-03 REP 0RTS          FR0M            LICEH$EE
    ==================================================================================================================================
NUMBER          DATE OF            DATE OF              SUBJECT EVENT              REPORT                                                                      --.______===        =_____=- _        ______ = _    ______ __
___ _______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - = - - = _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
__ .______=______==
84-06/          02/03/84          03/02/84              LEAVING COLD SHUTDOWN WITH SAFEGUARDS DE-ENERGIZED.
84-07/          02/23/84          03/23/84              MANUAL REACTOR TRIP DURING STARTUP.
84-08/          02/23/84          03/23/84              REACTOR TRIP.
;      84-09/          02/23/84          03/22/84              REACTOR TRIP DN S/G LOOP "A" LEVEL LOW-LOW.
84-10/        02/24/84          03/23/84              REACTOR TRIP DUE TO S/G LOW LEVEL COINCIDENT WITH STEAM FLOW FEED FLOW MISMATCH.
    ==================================================================================================================================
PAGE 2-377
{
: 1. Docket    50-304          0PERATING            STATUS                  MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM N                  ZION 2                  N
: 2. Reporting Period: 03/01/84    Outage + On-line Hrs:    744.0          MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM
: 3. Utility
 
==Contact:==
GERRI AUSTIN (312) 746-2084                            AVERAGE DAILY POWER LEVEL (MWe) PLOT
: 4. Licensed Thermal Power (MWE):                    3250                                      2;}[]pg ;g l
S. Nameplate Rating (Gross MWe):              1220 X 0.9 : 1098 l                                                                        1500 1  6. Design Electrical Rating (Het MWe):              1040 l                                                                                        D!'SION E2E0. MTING - 1040
: 7. Maximum Dependable Capacity (Gross MWe):          1085                    ......MRX. DD1}O. CRP. - 1040 (1mDO l
: 8. Maximum Dependable Capacity (Not MWe):            8040
: 9. If Changes Occur Above Since Last Report, Give Reasons:
NONE
: 10. Power Level To Which Restricted, If Any (Het MWe):
                                                                                                                                ~
: 11. Reasons for Restrictions, If Anyt                                1000-NONE                                                          3 MONTH        YEAR    CUMULATIVE                                                    x            o
: 12. Report Period Hrs              744.0    2.184.0    83.569.0                                                    3    - so p
: 13. Hours Reactor Critical        626.8    2.032.0    61.257.0                                                                ,
: 14. Rx Reserve Shtdwn Hrs              .0        .0      226.1
: 15. Hrs Generator On-Line          625.8    2.017.6    59.544.1  hy
: 16. Unit Reserve Shtown Hrs            .0          .0          .0    me-
: 17. Gross Therm Ener (MWH)      1.730.844  6.204.923 171.121.006                                                            ,,,
: 18. Gross Elec Ener (MWH)        580.911  2.029.823  54.733.860
: 19. Het Elec Ener (MWH)          555.031  1.945.744  52.022.689
: 20. Unit Service Factor              84.1        92.4          71.3                                                          -30
: 21. Unit Avail Factor                84.1        92.4        71 1
: 22. Unit Cap Factor (MDC Net)        71.7        85.7        59.9
                                                                                ~
: 23. Unit Cap Factor (DER Net)        71.7        85.7        59.9          0      5'      1'O '    1'5 '  2'O ' 2's  3'O
: 24. Unit Forced Outage Rate            .0        2.3          17.2                                DAYS
: 25. Forced Outage Hours                .0      48.2    12.424.9
: 26. Shutdowns Sched Over Next 6 Months (Type,Date, Duration):                                              b0 3/27/84 UNIT SHUTDOWN FOR SCHED. REFUELING OUTAGE.
: 27. If Currently Shutdown Estimated Startup Date:        06/09/84                                                                PAGE 2-378
 
l MMNNMMNNMMMMWNMMMMNuMWNMMMMMNNNNWMNN Report Period MAR 1984                                                            UNIT      SHUTD0WHS / REDUCTIONS                          N                        ZION 2                            M munuwwumunumwNwNwwuununuMwuumuuuMumu No. Date                              Tvoe Hours Reason Method LER Nuwber System Comoonent                              Cause 8 Corrective Action to Provent Recurrence 3        03/27/84                                              5    118.2    C    3  84-007        RC    FUELXX        WHILE BRINGING THE UNIT DOWN FOR THE SCHEDULED REFUELING OUTAGE, REACTOR TRIPPED STEAM FLOW / FEED FLOW MISMATCH DURING OVERSPEED TESTING THE TURBINE.
i t
MNuMNNuMMuu                                ZION UHIT 2 EXPERIENCED A REACTOR TRIP WHILE RAMPING DOWN FOR M
 
==SUMMARY==
M                                  REFUELING AS DISCUSSED ABOVE.
NNNNMMMMMMM Tvon      Reason                                                                    Method          Svstem 8 Comoonent
!            F-Forced A-Equip Failure F-Admin                                                    t-Manual      Exhibit F 8 H S-Sched  B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling                                                  H-Other    3-Auto Scram    Preparation of D-Regulatory Restriction                                                  4-Continued    Data Entry Sheet E-Operator Training                                                      5-Reduced Load Licensee Event Report
                              & License Examination                                              9-Other        (LER) File (HUREG-0161)
PAGE 2-379
 
t
        'MMMMWWMMMMMMMMMMMMMMMMMMMMMMWWNWMMM m
M                              ZION 2                        M unuunuunnummwwwwwwwuununuwwwumumMNNW                                          FACILITY                DATA                                                                Report Period MAR 1984 FACILITY DESCRIPTION                                                                        UTILITY 2 CONTRACTOR INFORMATION LOCATION                                                                                    UTILITY STATE....................ILLIN3IS                                                      LICENSEE.................COMM0HWEALTH EDISON COUNTY................... LATE                                                        CORPORATE ADDRESS........P.O. BOX 767 CHICAGO. ILLINDIS 60690 DIST AND DIRECTION FROM NEAREST POPULATION CTR.. 40 MI N OF                                                  CONTRACTOR CHICAGO, ILL                                  ARCHITECT / ENGINEER.......SARGENT & LUNDY TYP E O F R E ACTOR. . . . . . . . . . . . PWR                                                NUC STEAM SYS SUPPLIER... WESTINGHOUSE DATE INITIAL CRITICALITY... DECEMBER 24, 1973                                                CONSTRUCTOR.............. COMMONWEALTH EDISON DATE ELEC ENER IST GENER... DECEMBER 26, 1973                                                TURBINE SUPPLIER.........NONE DATE COMMERCIAL OPERATE.... SEPTEMBER 17, 1974                                          REGULATORY INFORMATION CONDENSER COOLING METHOD...ONCE THRU                                                        IE REGION RESPONSIBLE......III CCNDENSER COOLING WATER.... LAKE MICHIGAN                                                  IE RESIDENT INSPECTOR......J. WATERS ELECTRIC RELIABILITY                                                                        LICEHSING PROJ MANAGER.....J. NORRIS COUNCIL..................MID-AMERICA                                                  DOCKET NUMBER........... 50-304 INTERPOOL NETWORK LICENSE 8 DATE ISSUANCE....DPR-48, NOVEMBER 14, 1973 PUBLIC DOCUMENT ROOM....... ZION - BENTON PUBLIC LIBRARY 2400 GABRIEL AVENUE ZION, ILLINOIS 60099 INSPECTION                      STATUS INSPECTION
 
==SUMMARY==
 
INSPECTION ON DECEMBER 21, THROUGH FEBRUARY 9, (83-27): ROUTIHE UNANHOUNCED RESIDENT INSPECTION OF LICENSEE ACTION ON PREVIOUS INSPECTION FINDINGS, PRIMARY LEAK INSIDE UNIT 1 CONTAINMENT, INADVERTENT SAFETY INJECTION, REACTOR TRIPS, STARTUP TESTING-REFUELING, FAILURE OF 1A DIESEL GENERATOR, AUXILIARY FEEDWATER SYSTEM DISCHARGE THROTTLE VALVE SETTING, 1B REACTOR COOLANT PUMP MOTOR REPLACEMENT, OPERATIONAL SAFETY VERIFICATION, ESF SYSTEM WALKDOWN, MONTHLY MAINTENANCE OBSERVATION, MONTHLY SURVEILLANCE OBSERVATION AND LICENSEE EVENT REPORT FOLLOWUP. THESE INSPECTIONS INVOLVED A TOTAL OF 187 HOURS BY TWO HRC INSPECTORS INCLUDING 34 HOURS ONSITE DURING OFF-SHIFTS. OF THE THIRTEEN AREAS INSPECTED, NO ITEMS OF NDHCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED IN HINE AREAS AND 1WO ITEMS OF HONCOMPLIANCE WERE IDENTIFIED IN THE REMAINING FOUR AREAS (FAILURE TO COMPLY WITH APPROVED WRITTEN PROCEDURES).
INSPECTION ON NOVEMBER 22-23 AND 29-30, DECEMBER 1-2, 6-9, 15-16, AND 28, AND FEBRUARY 2, (83-28): ROUTINE, UNANNOUNCED INSPECTION OF RADIATION PROTECTION PROGRAM, INCLUDING: QUALIFICATIONS; AUDITS; TRAINING; RADIATION PROTECTION PROCEDURES; INSTRUMENTS AND EQUIPMENT; EXPOSURE CONTROL; POSTING, LABELING, AND CONTROL; SURVEYS; NOTIFICATIOHS AND REPORTS; PREPARATIONS FOR IMr;EMENTATION OF to CFR 61; AND OPEN ITEMS. ALSO, LICENSEE ACTIONS RELATED TO A SOURCE HANDLING INCIDENT, A CONTAINMENT HIGH AIRBORNE RADI0 ACTIVITY INCIDENT, AND COMPLETION OF TMI ACTION PLAN ITEM II.F.1.1 WERE REVIEWED. THE INSPECTIDH INVOLVED 136 INSPdCTOR-HOURS ONSITE BY TWO NRC INSPECTORS. OF THE FOURTEEN AREAS INSPECTED, NO ITEMS OF NONCOMPLIANCE OR DEVIATIONS WERE IDENTIFIED IN ELEVEN AREAS; ONE ITEM OF N0HCOMPLIANCE WAS IDENTIFIED IN EACH OF THREE AREAS (FAILURE TO FOLLOW PLANT PROCEDURES; FAILURE TO EVALUATE RADIOLOGICAL HAZARDS; AND FAILURE TO CONTROL ACCESS TO A HIGH RADIATION AREA).
PAGE 2-380
                                    .1.[f [.? 9. .* f.//k .jn43..; s*ds.V.q' ;,rF; %.:-[,*M''] } ; k .[s@..s. .:n~.;                                                                          N,..',., (f. } i.; e.T Q+-P ' .'.
p ,4% ./- [..,.                                                                                                                f 5 ,.Q"f,9,5 ,*[q. [.,,-; qp.I'.'
                                                                                                                                                                  .,! - , 7.*,. ., , *' ;..), .n. ', [.
7 ..W,o" " p.Wif
                                                                                                                                                                                                                  *g .;%...
                                                                                    , . . . .          ~
41-f;. . ... j. "fg..'* ...;7
                                                                                # { * ? . f ' , .M ; f i , w 9 .7, . , ' .. : 0
  "~ -    M                      1',
                                                                                                                                ;      ,t .-                                                              ,- .a    .
                , , . .    .,                      . z.?                  ,..      .,                                                          ,
 
NNNNNNNNNNNMMMMMMMMMMMNNNNNNNNNNNNMM Report Period MAR 1984                                                                    IN$PECTION                                  5TATUS - (CONTINUED)      N                    ZICH 2                            N NNNNNNNNNNNNNNNMMMNNNNNMMNNNWNNNNNNN ENFORCEMENT
 
==SUMMARY==
 
NONE OTHER ITEMS SYSTEMS AND COMPONENT PROBLEMS:
NONE FACILITY ITEMS (PLANS AND PROCEDURES):
MONE MANAGERIAL ITEMS:
NOME PLANT STATUS:
THE PLANT SHUT DOWN ON 3/27/84 TO BEGIN A 78 DAY REFUELING OUTAGE.
LAST IE SITE INSPECTION DATE: MARCH 21 - APRIL 9,                                                                    1984 INSPECTION REPORT NO: 84-03 REP 0RT$                  FR0M    LICEN$EE
,                    =======================================*====-=====================================================================================
NUMBER                                      DATE OF    DATE OF          SUBJECT EVENT      REPORT
__                              ___                    . ----_ =    --------- ___-___=--------_____= = =.-=___=___ _=----- _--                    - _  _ ____
______-------==---. ____-______
NONE
                    ==================================================================================================================================
PAGE 2-381
 
                        $b                R$
4 T
THIS PAGE INTENTIONALLY LEFT BLANK i
I 1
i d
i a
,                                                      i i
l 2
{
1 i
PAGE 2-382 f
a i
5
 
    -...a - _ - _      -s.                - -        --- _
l l
N              -
E o
EE:
La I E
w A
M              n CC i
I i                          _ -._.. _ , -- - - - . -,.-
 
MMMMMMMkMMMMMM M PRESSURIZEDM    STATUS          0F      SPENT            FUEL      ST0 RAGE          CAPABILITY M    WATER  M N  REACTORS M    (a)                                                              REMAINING CAPACITY MMMMMMMMMMMMMM CORE SIZE      PRESENT AUTH.          HD. OF                        IF PENDING REQUEST                      (b)
(NO. OF    STORAGE POOL CAP. ASSEMBLIES REMAINING CAPACITY              APPROVED    NEXT REFUEL WILL FILL PRESENT FACILITY    ASSEMBLIES) (FUEL ASSEMBLIES)        STORED  (NO. OF ASSEMBLIES) (NO. OF ASSEMBLIES) SCHED. DATE    AUTH. CAPACITY MMMMMMMM    MMMMMMMMMM    MMMMMMMMMMMMMMM  MNWMMMMMMM MMMMMMMMMMMMMMMMM        MMMMMMMMMMMMMMMMM  MMMMMMMMMMM MMMMMMMMMMMMMMMMM ARKANSAS 1              177          968            316                652                              N/S          1998 ARKANSAS 2              177          988            168                820                              H/S          2003 BEAVER VALLEY 1        157          833              52                781                              N/S          1995 CALVERT CLIFFS 1      217          1830(c)          796(c)            1034(c)(m)        1170          03-85          1991 CALVERT CLIFFS 2      217                                                                                04-t4          1991 COOK 1                  193        2050(c)          553(c)            1497(c)                            N/S          1994 COOK 2                  193                                                                                N/S CRYSTAL RIVER 3          177        1963              171                992                              H/S          1997 DAVIS-BESSE 1          177          735            140                595                              N/S          1993 DIABLO CANYON 1 FARLEY 1              157          675            114                561              1293            N/S          1991 FARLEY 2              15)          675              62                613              1345            H/S          1994 FORT CALHOUN 1          133          729            305                424                              N/S          1985 GINNA                  121          595            340                  255                              N/S          1992 HADDAM NECK            157        1168            493                  675                              06-84          1994 INDIAN POINT 1            0          288            160                128                              H/S INDIAN POINT 2          193          482            268                  214                980          05-84          1984 INDIAN POINT 3          193          837            140                697                              H/S          1993 KEWAUNEE                121          990            268                  722(m)                            N/S          1991 MAINE YANKEE            217          953            577                  3/6              1678            N/S          1987 MCGUIRE 1              193          500              95                405(n)            1344            N/S          1990 MCGUIRE 2 MILLSTONE 2            217            667            376                  291                              N/S          1987 NORTH ANNA 1            157          966(c)          116(c)              850                              05-84          1991 NORTH ANNA 2            157                                                                                08-84          1990 OCONEE 1                177        1312(I)        1123                  189(I)(n)                        N/S          1991 OCONEE 2                177                                                                                N/S OCONEE 3                177          825              72                753                              N/S PALISADES              204            784            480                  304                              N/S          1988 POINT BEACH 1          121        1058(c)          484(c)            1078(c)                            N/S          1995 POINT BEACH 2          121                                                                                H/S PRAIRIE ISLAND 1        121        1017(c)          561(c)              456(c)(m)          720            N/S          1988 PRAIRIE ISLAND 2        121                                                                                08-84 RANCHO SECO 1          177          579            220                299                              10-84          1987 ROBINSON 2              157          276            152                  124(e)            431            N/S          1985(g)
SALEM 1                193        1170            212                  958                              05-84          1996 SALEM 2                193        1170              72              1098                                N/S          2000 SAN ONOFRE 1            157          216              94                122                              N/S          1985 SAH ONOFRE 2          217          800                0              800                                H/S SAN ONOFRE 3          217          800                0              800                                H/S SEQUDYAH 1              193          800              65                735                                H/S          1993 SEQUDYAH 2(d)          193          800              65                735                                N/S          1994 ST LUCIE 1            217          728            352                376                                N/S          1990 ST LUCIE 2 SUMMER 1                157          682                0              682                1276            N/S SURRY 1                157        1044(c)          556(c)              484(c)                            N/S          1987 SURRY 2                157                                                                                  N/S Report Period MAR 1994                                                                                                            PAGE 3-2
 
  - _ - - _ . _ _ _ _ _ _ _ _ - ~ _ ______ - __ _ _ __ _ _ _ _ _ . .                                    _      _ _.        . - - -
MMMMMMMMMMMMMM M PRESSURIZEDM                        STATUS          0F    SPEHT        FUEL        ST0 RAGE          CAPABILITY M                  WATER        M N              REACTORS M            (a)                                                        REMAINING CAPACITY MMMMMMMMMMMMMM CORE SIZE                          PRESENT AU(H. HD. OF                          IF PENDING REQUEST                          (b)
(NO. OF  STORAGE POOL CAP. ASSEMBLIES REMAINING CAPACITY          APPROVED    HEXT REFUEL WILL FILL PRESENT FACILITY              ASSEMBLIES) (FUEL ASSEMBLIES)  STORED    (NO. OF ASSEMBLIES) (NO. OF ASSEMBLIES) SCHED. DATE    AUTH. CAPACITY MMMMMMMM              MMMMMMMMMM    MMMMMMMMMMMMMMM MMMMMMMMMM MMMMMMMMMMMMMMMMM      MMMMMMMMMMMMMMMMM  MMMMMMMMMMM MMMMMMMMMMMMMMMMM THREE MILE ISLAND 1 177                                752        208                  544                              H/S                1986 THREE MILE ISLAND 2 177                                442            0                442                              N/S                1986 TROJAN                                    193          651        248                  403                              04-84                1990 TURKEY POINT 3                            157          621        445                  175(m)                            N/S                1987 TURKEY POINT 4                            157          621        430                  191                              N/S                1988 YANKEE-ROWE 1                              76          391      22S                  166                496          04-84                1988 ZION 1                                    193        2112(c)    795(c)              1317(c)                            N/S                1992 ZION 2                                    193                                                                          04-84                1992 (a)            At each refueling outage approximately 1/3 of a PWR core and 1/4 of a BWR core is off-loaded.
(b)            Some of these dates have been adjusted by staff assumptions.
(c)            This is the total for both units.                                                                                  ----------            ------
(d)            Plant not in commercial operation.                                                                                H/S : Hot Scheduled (e)            Some spent fuel stored at Brunswick.                                                                              -------------------
(f)            Authorized a total 2772 BWR and 1232 PWRassen.blies for both pools.
(q)            Robinson 2 assemblies being shipped to Brunswick for storage.
Ch)            Capacity is in metric tons of uranium; 1 MTU            2 PWR assemblies or 5 BWR assemblies.
(i)            Ho longer accepting spent fuel.
(j)            Racked for 700 MTU.
*                                  (k)            Reserved.
(1)            This is the station total.
(m)            Installed capacity is less than that authorized.
(n)            McGuire 1 authorized to accept Oconee fuel assemblies.
Report Period MAR 1984                                                                                                                                PAGE 3-3
 
MMMMMMMMMMkMMM N    BOILING M    STATUS          0F      SPEHT        FUEL        ST0 RAGE            CAPAB ILITY M    WATER  M N    REACTORS M    (a)                                                          REMAINING CAPACITY IF PENDING REQUEST                        (b)
MMMMMMMMMMMMMM CORE SIZE      PRESENT AUTH.      HD. OF (NO. OF  STORAGE POOL CAP. ASSEMBLIES REMAINING CAPACITY              APPROVED      HEXT REFUEL WILL FILL PRESENT STORED    (NO. OF ASSEMBLIES) (NO. OF ASSEMBLIES) SCHED.      DATE  AUTH. CAPACITY FACILITY    ASSEMBLIES) (FUEL ASSEMBLIES)                                      MMMMMMMMMMMMMMMMM    MMMMMMMMMMM MMMMMMMMMMMMMMMMM MMMMMMMM    MMMMMMMMMM    MMMMMMMMMMMhMMM  MMMMMMMMMM MMMMMMMMMMMMMMMMM 193        152                    41                289              08-84          1986 BIG ROCK POINT 1        84                                                                                07-84          1985 BROWNS FERRY 1          764        3471        1068                2403 3471          889                  861(m)            2582              08-84          1985 BROWNS FERRY 2          764                                                                                  N/S          1985 BROWNS FERRY 3          764        3471        1520                  398(m)            2650 160PWR+656BWR      2116                                  N/S          1986 BRUNSWICK 1            560          (f)
N/S          1986 BRUNSWICK 2            560                      144PWR+564BWR      2208 848                  1518                                  H/S          1996 COOPER STATION          548        2366                                                                    H;            1990 DRESDEN 1              464          672          221                  451 DRESDEN 2              724        26.)(c)    2014 (c)                996(c)            6129(c)            H/S          1985 724 H/S DRESDEN 3                                                              1474                                  H/S          1998 DUAHE ARHOLD            368        2050          576 560        2244          816                  1428                                  H/S          1991 FITZPATRICK                                                          3021                                  H/S          1999 HATCH 1                560        3021            0 560        2750        1284                  1466                                  N/S          1999 HATCH 2                                                                236                                  N/$
HUMBOLDT BAY            172          487          251 440          207                  233                                  N/5          1990 LA CROSSE                72 l                          LASALLE 1                                                              1048                                04-84          1991 MILLSTONE 1            580        2184        1836 484        2237        1137                  1100                                  N/S          1991
!                          MONTICELLO                                                              807              1788              N/S          1990 l                          HINE MILE POINT 1      532        1984        1177 1800        1375                  425              1225              N/S          1987 OYSTER CREEK 1          560                                                                                04-84          1990 PEACH BOTTOM 2          764        2816        1170                  1646 2816        1212                  1604                                  N/S          1991 PEACH BOTTOM 3          764                                                                                  N/S          1990 PILGRIM 1              580        2320        1708                    62(m)
INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS (h)
MORRIS OPERATIONS                      750 MTU(j) 315                  385 MTU(J)          1990 MTU(J)
HFS(i)                                250 MTU      170 MTU              80 MTU PAGE 3-4 Report Period MAR IBM
 
MMMMMMMMMMMMMM M    BOILING M      STATUS          0F      S P E H.T      FUEL      5T0 RASE          CAPABILITY M    WATER    M N    REACTORS M      (a)                                                          REMAINING CAPACITY MMMMMMMMMMMMMM CORE SIZE      PRESENT AUTN.        NO. OF                        IF PENDING REQUEST                                  (b)
(ND. OF  STORAGE POOL CAP. ASSEMBLIES REMAINING CAPACITY            APPROVED      NEXT REFUEL WILL FILL PRESENT FACILITY    ASSEMBLIES) (FUEL ASSEMBLIES)      STORED  (NO. OF ASSEMBLIES) (NO. OF ASSEMBLIES) SCl!ED. DATE              AUTH. CAPACITY MMMMMMMM    MMMMMMMMMM  MMMMMMMMMhMMMMM    MMMMMMMMMM MMMMMMMMMMMMMMMMM      MMMMMMMMMMMMMMMMM    MMMMMMMMMMM MMMMMMMMMMMMMMMMM QUAD CITIES 1            724        3657          1730                1927                                            N/S          2005 QUAD CITIES 2            724        3897          412                3485                                            N/S          2003 SUSQUENANNA 1            764        2840            0                2840                                            N/S VERMONT YANKEE 1                                                                                                                    1997 368        2000          1082                918                                        06-84            1992 INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS (h)
MORRIS OPERATIONS                      750 MTU(j) 315                  385 MTU(j)          1490 MTU(j)
NFS(l)                                250 MTU      170 MTU            80 MTU (a) At each refueling outage approximately 1/3 of a PWR core and 1/4 of a BWR core is off-loaded.
(b) Some of these dates have been adjusted by staff assumptions.
(c) This is the total for both units.                                                                                        -------------------
(d) Plant not in commercial operation.
(e) Some spent fuel stored at Brunswick.                                                                                      N/S = Not Scheduled (f) Authorized a total 2772 BWR and 1232 PWRassemblies for both pools.
(q) Robinson 2 assemblies being shipped to Brunswick for storage.
Ch) Capacity is in metric tons of uranium; 1 MTU = 2 PWR assemblies or 5 BWR assemblies.
(i)  No longer accepting spent fuel.
                                                                                              .(j)  Racked for 700 MTU.
(k)  Reserved.
(1)  This is the station total.
                                                                                            .(m)    Installed capacity is less than that authorized.
(n)  McGuire 1 authorized to accept Oconee fuel assemblies.
Report Period MAR 1984 PAGE 3-5
                                                                                                                                                                                                                          /
 
(INCLUDES BOTH LICENSED                        REACT 0R YEARS 0F EXPERIENCE AND NON-LICENSED UNITS)                                                                                                                          .
            -----------------------.....-------------.......-----------------....------.....--....-_---__=--------..==-                                                    _ -=                      __=-
IST ELEC                                      1ST ELEC                                              1ST ELEC YEARS CENERATE UNIT                      YEARS GENERATE UNIT                                    YEARS GENERATE UNIT mumwwwwwwwwwwww ----- -------- ----                              ----- -------- ----                                    ----- -------- ----
N    LICENSED        M  9.67 08/01/74 ARKANSAS 1                  5.26 12/26/78 ARKANSAS 2                              7.80 06/14/76 BEAVER VALLEY 1 M    OPERATING M 21.31 12/08/62 BIG ROCK POINT 1                10.46 10/15/73 BROWNS FERRY 1                          9.59 08/28/74 BROWNS FERRY 2 M    ELECTRICAL M 7.55 09/12/76 BROWNS FERRY 3                    7.32 12/04/76 BRUNSWICK 1                              8.93 04/29/75 BRUNSWICK 2 N    PRODUCING M 9.24 01/03/75 CALVERT CLIFFS 1                  7.32 12/07/76 CALVERT CLIFFS 2                        9.14 02/10/75 COOK 1 M          UNITS      M  6.03 03/22/78 COOK 2                      9.89 05/10/74 COOPER STATION                          7.17 01/30/77 CRYSTAL RIVER 3 MMNwMMMMMMwwwMM          6.59 08/28/77 DAVIS-BESSE 1              13.97 04/13/70 DRESDEN 2                              12.70 07/22/71 DRESDEN 3 9.87 05/19/74 DUANE ARNOLD                6.62 08/18/77 FARLEY 1                                2.85 05/25/81 FARLEY 2 9.16 02/01/75 FITZPATRICK                10.60 08/25/73 FORT CALHOUN 1                          7.30 12/11/76 FORT ST VRAIN 14.33 12/02/69 GINNA                      16.65 08/07/67 HADDAM NECK                              9.39 11/11/74 HATCH 1 5.52 09/22/78 HATCH 2                    10.77 06/26/73 INDIAN POINT 2                          7.93 04/27/76 INDIAN POINT 3 9.98 04/08/74 KEWAUNEE                  15.93 04/26/68 LA CROSSE                                1.57 09/04/82 LASALLE 1 11.39 11/08/72 MAINE YANKEE                2.75 06/30/81 MCGUIRE 1                                  .86 05/23/83 MCGUIRE 2 13.34 11/29/70 MILLSTONE 1                8.39 11/09/75 MILLSTONE 2                            13.08 03/05/71 MONTICELLO 14.39 11/09/69 NINE MILE POINT 1          5.96 04/17/78 NORTH ANNA 1                            3.60 08/25/80 NORTH ANNA 2 10.90 05/06/73 OCONEE 1                  10.32 12/05/73 OCONEE 2                                9.58 09/01/74 OCONEE 3 14.52 09/23/69 OYSTER CREEK 1            12.25 12/31/71 PALISADES                              10.12 02/18/74 PEACH BOTTOM 2 9.58 09/01/74 PEACH BOTTOM 3            11.70 07/19/72 PILGRIM 1                              13.40 11/06/70 POINT BEACH 1 11.66 08/02/72 POINT BEACH 2              10.32 12/04/73 PRAIRIE ISLAND 1                        9.28 12/21/74 PRAIRIE ISLAND 2 11.97 04/12/72 QUAD CITIES 1              11.86 05/23/72 QUAD CITIES 2                            9.47 10/13/74 RANCHO SECO 1 13.51 09/26/70 ROBINSON 2                  7.27 12/25/76 SALEM 1                                  2,83 06/03/81 SALEM 2 16,71 07/16/67 SAN ONOFRE 1                1.53 09/20/82 SAN ONOFRE 2                              .52 09/25/83 SAN ONOFRE 3 3.69 07/22/80 SEQUOYAH 1                  2.27 12/23/81 SEQUDYAH 2~                              7.90 05/07/76 ST LUCIE 1
                                      .80 06/13/83 ST LUCIE 2                  1.37 11/16/32 SUMMER 1                              11.74 07/04/72 SURRY 1 11.06 03/10/73 SURRY 2                    1.37 11/16/82 SUSQUEHANNA 1                            9.79 06/19/74 THREE MILE ISLAND 1 8.27 12/23/75 TROJAN                    11.41 11/02/72 TURKEY POINT 3                          10.78 06/21/73 TURKEY POINT 4 11.53 09/20/72 VERMONT YANKEE 1          23.39 11/10/60 YANKEE-ROWE 1                            10.76 06/28/73 ZION 1 10.26 12/26/73 ZION 2 TOTAL 727.93 YRS
            --------------------_          .==.------------------------------------------------------------------------_--                          _ _-------------=_ _                              =--
IST ELEC SHUTDOWN                                                  IST ELEC SHUTDOWN YEARS GENERATE      DATE    UNIT                              YEARS GENERATE              DATE    UNIT uunuwwwwunwwwww ----- -------- -------- ----
M PERMANENTLY W          3.80 08/14/64 06/01/68 BONUS                                  3.04 12/18/63 01/01/67 CVTR
          , M            OR      M 18.54 04/15/60 10/31/78 DRESDEN 1                              4.44 08/24/63 02/01/68 ELK RIVER M INDEFINITELYN 6.32 08/05/66 11/29/72 FERMI 1                                          1.26 05/29/63 09/01/64 HALLAM M      SHUTDOWN N 13.21 04/18/63 07/02/76 HUMBOLDT BAY                              12.12 09/16/62 10/31/74 INDIAN POINT 1 M          UNITS    M  1.19 07/25/66 10/01/67 PATHFINDER                              7.76 01/27/67 11/01/74 PEACH BOTTOM 1 MNuuMMMMMMMMMMM          2.16 11/04/63 01/01/66 PIQUA                                    .93 04/21/78 03/28/79 THREE MILE ISLAND 2 TOTAL 74.77 YRS The total reactor years of experience is as the sum of all calendar days for each unit, from the date that electricity was first generated until a final shutdown date or the status date, whichever comes first, divided by 365.25 days / year. If a date is unknown, the first day of the first month of operation is substituted. Units which have not yet generated electricity but which are licensed are listed but not included in the computation.
Report Period MAR 1964                                                                                                                                                  PAGE 3-6
 
_ _ _        . -  ._        m    _. .      . _
!                MNNNNNNMMNNN N RESEARCH M                    N0N-P0WER                REACT 0RS                    IN  THE  U. S.
E REACTORS M NMMMMMMMMMMM AUTHORIZED STATE            CITY                                                                                          LICENSE DATE OL          POWER LICENSEE                        REACTOR TYPE DOCKET NUMBER        ISSUED LEVEL (KW1
\
ALABAMA            TUSKEGEE              TUSKEGEE INSTITUTE                                      AGM-201 0802 50-406 R-122        08-30-74        0.0001 ARIZONA            TUCSON                UNIVERSITY OF ARIZONA                                    TRIGA MARK I 50-113 R-52          12-05-58      100.0
!                CALIFORNIA          BERKELEY              UNIVERSITY OF CALIFORNIA, BERKELEY COLLEGE CANOGA PARK TRIGA MK. III 50-224 R-tet        08-10-66    1000.0 ROCKWELL INTERNATIONAL CORP.                            L-85            50-375 R-188      01-05-72        0.003 HAWTHORNE            NORTHROP CORP. LABORATORIES                              TRIGA MARK F 50-187 R-90          03-04-63    1000.0 IRVINE                UNIVERSITY OF CALIFORMIA. IRVINE                        TRIGA MARK I 50-326 R-116        11-24-69      250.0 LOS ANGELES          UNIVERSITY OF CALIFORNIA, L.A.                          ARG0HAUT        50-142 R-71 SAN DIEGO            GENERAL ATOMIC COMPANY 10-03-60      100.0 SAN DIEGO TRIGA MARK F 50-163 R-67          07-01-60    1500.0 GENERAL ATOMIC COMPANY                                  TRIGA MARK I 50-089 R-38          05-03-58      250.0 SAM JOSE              GENERAL ELECTRIC COMPANY                                NTR            50-073 R-33      10-31-57 SAN LUIS OSISP0                                                                                                                100.0
:                                    SAN RAMON CALIFORNIA STATE POLYTECHNIC COLLEGE AER0 TEST OPERATIONS, INC.
AGM-201 0100 50-394 R-121        05-16-73        0.0001 SANTA BAR8 ARA TRIGA (INDUS) 50-228 R-98        07-02-65      250.0 l                                                          UNIVERSITY OF CALIFORNIA. SANTA BARBARA                  L-77            50-433 R-124      12-03-74        0.01 COLORADO            DENVER                U.S. GE0 LOGICAL SURVEY DEPARTMENT                      TRIGA MARK I 50-274 R-113        02-24-69    1000.0 4
DELAWARE            NEWARK                UNIVERSITY OF DELAWARE                                  AGM-201 0113 50-898 R-43          07-03-58        0.0001 DIST OF COLUMBIA WASHINGTON                THE CATHOLIC UNIVERSITY OF AMERICA                      AGM-201 0101 50-877 R-31          11-15-67        0.C001 FLORIDA            GAINESVILLE            UNIVERSITY OF FLORIDA ARG0HAUT        50-083 R-56      05-21-59      100.0 GEORGIA            ATLANTA                GEORGIA INSTITUTE OF TECHNOLOGY                          AGM-201 0104 50-276 R-111 l                                    ATLANTA 04-19-68        0.0001 GEORGIA INSTITUTE OF TECHNOLOGY                          HEAVY WATER    50-160  R-97    12-29-64  5000.0 IDAHO              POCATELLO              IDAHO STATE UNIVERSITY                                  AGM-201 0103 50-284 R-110
!                                                                                                                                                      10-11-67        0.0001 ILLINOIS            URBANA                UNIVERSITY OF ILLIN0IS                                  LOPRA          50-356 R-117      12-27-71        10.0    '
1 URBANA                UNIVERSITY OF ILLINOIS                                  TRIGA          50-151 R-115      07-22-69    1500.0 ZION                  WESTINGHOUSE ELECTRIC CORP.                              NTR            50-087 R-119 01-28-72            10.0 INDIANA            LAFAYETTE              PURDUE UNIVERSITY                                        LOCKHEED                          08-16-62 50-182 R-87                      10.0 IOWA                AMES                  IDWA STATE UNIVERSITY                                    UTR-lO 50-116 R-59      10-16-59        12.0 KANSAS              LAWRENCE              UNIVERSITY OF KANSAS                                    LOCKHEED        50-148 R-78      06-23-61 MAhHATTAN 250.0 KANSAS STATE UNIVERSITY                                  TRIGA          50-188 R-88      10-16-62      250.0 MARYLAND            BETHESDA              ARMED FORCES RADI0 BIOLOGY RESEARCH INSTITUTE TRIGA                      50-170  P.-84    06-26-62    1000.0 COLLEGE PARK          UNIVERSITY OF MARYLAND                                  TRIGA          50-166  R-70    10-14-60      250.0 i
i I                                                                                                                                                              PAGE 3 -7 i
i
 
unuuuuuuuuum u RESEARCH u              NON-P0WER          REACT 0RS        IN    THE  U. S.
m REACTORS u NNNNMMMMM4MM AUTHORIZED LICENSE DATE OL                POWER STATE          CITY                          LICENSEE                  REACTOR TYPE DOCKET NUMBER    ISSUED LEVEL (KW)
MASSACHUSETTS  CAMBRIDGE        MASSACHUSETTS INSTITUTE OF TECHNOLOGY        HWR REFLECTED 50-020 R-37    06-09-58 5000.0 LOWELL            UNIVERSITY OF LOWELL                        GE            50-223 R-825  12-24-74              1000.0 WORCESTER        WORCESTER POLYTECHNIC INSTITUTE              GE            50-134 R-61    12-16-59                  10.0 MICHIGAN      ANH ARBOR        UNIVERSITY OF MICHIGAN                      POOL          50-002 R-28    09-13-57            2000.0 EAST LANSING      MICHIGAN STATE UNIVERSITY                    TRIGA MARK I 50-294 R-114    03-21-69              250.0 MIDLAND          DOW CHEMICAL COMPANY                        TRIGA        50-264 R-108  07-03-67                100.0 COLUMBIA          UNIVERSITY OF MISSOURI, COLUMBIA            TANK          50-186 R-103  10-11-66 10000.0 MISSOURI                                                                                    50-123 R-79    11-21-61              200.0 ROLLA            UNIVERSITY OF MISSOURI                      POOL NEBRASKA      DMAHA            THE VETERANS ADMINISTRATION HOSPITAL        TRIGA        50-131  R-57  06-26-59                  18.0 NEW MEXICO    ALBUQUERQUE      UNIVERSITY OF HEW MEXICO                    AGH-201M 0112 50-252 R-102  09-17-66                    0.005 BRONX            MANHATTAN COLLEGE - PYHSICS DEPT.            TANK          50-199 R-94    03-24-64                    0.0001 HEW YORK                                                                                    50-057 R-77    03-24-61            2000.0 BUFFALD          STATE UNIVERSITY OF HEW YORK                PULSTAR TRIGA MARK II 50-157 R-80    01-11-62                  500.0 ITHACA            CORNELL UNIVERSITY ITHACA            CORNELL UNIVERSITY                          ZPR          50-097  R-89  12-11-62                    0.1 NEW YORK          COLUMBIA UNIVERSITY IN THE CITY OF NEW YORK  TRIGA MARK II 50-208 R-128  04-14-77                250.0 TUXEDO            UNION CARBIDE CORP                          POOL          50-054  R-81  09-07-61            5000.0 RALEIGH          NORTH CAROLINA STATE UNIVERSITY AT RALEIGH  PULSTAR      50-297 R-120  08-25-72              1000.0 NORTH CAROLINA CHIO          COLUMBUS          OHIO STATE UNIVERSITY                        Pn0L          50-150  R-75  02-24-61                  10.0 OKLAHOMA      MORMAN            THE UNIVERSITY OF OKLAHOMA                  AGH-211 0102 50-112 R-53    12-29-58                    0.100 CORVALLIS        DREGON STATE UNIVERSITY                      TRIGA MARK II 50-243 R-106  03-07-67              1000.0 CREGON                                                                        TRIGA MARK I 50-288 R-112 07-02-68                  250.0 PORTLAND          REED COLLEGE UNIVERSITY PARK  PENNSYLVANIA STATE UNIVERSITY                TRIGA MK. III 50-005  R-2    07-08-55              1000.0 PENHSYLVANIA RHODE ISLAND  NARRAGANSETT      RHODE ISLAND NUCLEAR SCIENCE CENTER          GE P0OL      50-193 R-95    07-21-64            2000.0 MEMPHIS          MEMPHIS STATE UNIVERSITY                    AGM-201 0108 50-538 R-127    12-10-76                    0.0001 TENNESSEE AUSTIN            UNIVERSITY OF TEXAS                          TRIGA MARK I 50-192 R-92    08-02-63                250.G T EXAS                  .
AGM-201M 0106 50-059 R-23    08-26-57                    0.005 COLLEGE STATION  TEXAS A8M UNIVERSITY COLLEGE STATION  TEXAS A8M UNIVERSITY                        TRIGA        50-128  R-83  12-07-61              100%.0 PROVO            BRIGHAM YOUNG UNIVERSITY                    L-77          50-262 R-109  09-07-67                      0.01 UTAH PAGE 3 8
 
      , MMnMMMMMuMMN
      = M RESEARCH N                  N0N-POWER          REACT 0RS        IN THE U. 5.
b  M REACTORS N NNMMMMMNNNNN k                                                                                                                        AUTHORIZED g                                                                                                    LICENSE DATE OL        POWER STATE            CITY                          LICENSEE            REACTOR TYPE DOCKET NUMBFR _J SSU ED LEVEt (KW) 2 5  UTAH              SALT LAKE CITY    THE UNIVERSITY OF UTAH                  TRIGA MARK I 50-407 R-126      09-3d-75      100.0 g                    SALT LAKE CITY    UNIVERSITY OF UTAH                      AGH-201M 0107 50-072 R-25      09-12-57        0.005 0    VIRGINIA          BLACKSBURG        VIRGINIA POLYTECHNIC INSTITUTE          UTR-10        50-124  R-62    12-18-59      100.0
    $                      CHARLOTTESVILLE  UNIVERSITY OF VIRGINIA                  CAVALIER      50-396  R-123  09-24-74        0.1 CHARLOTTESVILLE  UNIVERSITY OF VIRGINIA                  POOL          50-062  R-66    06-27-60    2000.0
    ;                      LYNCHBURG        BABCOCK & WILCOX COMPANY                LPR            50-099  R-47    09-05-58    1000.0 3
A    WASHINGTON        PULLMAN          WASHINGTON STATE UNIVERSITY            TRIGA          50-027  R-76    03-06-61    1000.0 SEATTLE          UNIVERSITY OF WASHINGTON                ARGONAUT      50-139 R-73    03-31-61      100.0
_?
I
  !::  WISCONSIN        MADISON          UNIVERSITY OF WISCONSIN                TRIGA          50-156  R-74    11-23-60    1000.0 MMNNMMMMMMMMMMMMMMMMMMMMMMMNMMMMNh l      N EXPERIMENTAL AND TEST REACTORS M MMMMMMMMMMMMMMMMMMMMMNNMMMMMMNNNNN CALIFORNIA        SAN JOSE          GENERAL ELECTRIC COMPANY                GETR          50-070  TR-1    01-07-59 50,000.0 DIST OF COLUMBIA WASHINGTON        MATIONAL BUREAU OF STANDARDS            TEST          50-184  TR-5    06-30-70 10,000.0 MuMMMMMMNNNMuMMMMMMMuuMMMMMNNMMMMM M CRITICAL EXPERIMENT FACILITIES N MMMMMMMMMMMMMMMMMMMMMMMMMNNNNNMMMM HEW YORK          TROY              RENSSELAER POLYTECHNIC INSTITUTE                      50-225 CX-22 07-03-64          0.0 VIRGINIA          LYNCHBURG        BABCOCK 8 WILCOX COMPANY                              50-013 CX-10    10-22-58        0.0 WASHINGTON        RICHLAND          BATTELLE MEMORIAL INSTITUTE                            50-360 CX-26    11-29-71        0.0 PAGE 3 - 9
 
l r
      % c  O.. m                                                          o s %wca. Ges.,o      cowv,is.o%            oa ' %wvei a ,.- ,- .. "oc        + %. -
BIBuOGRAPHIC DATA SHEET
!                                                                                                                    NUREG-0020Volde8 Number4 --                    '
t                                                                                              ,        . . .
f i
a verta a%o sue,  e                                                                                          . acc...e%, s acc.ssf %vuan a Licensed          erating r 'ctors                                                                                                /
Status Suna          y Repc.
* oA's a**oa' cria'to MON f ee                      VEAa 6 AvipOmise                                                                                                    y DATE mtept 155utO MON 1H lViAA 9 PHOJ      t.f alarvr0Ra v%et %vvete 3 Pin 6 0.sWsNG OHGA%'4 A f tO% % Awt A4D 'LsNG ADURil$ ,8='inde le cadr, Division of Budget an Analysis Office of Resource Man                    ment                                                          i ~ ~ww.t a U. S. Nuclear Regulatory                        ission Washington, DC 20555 Il 5'?%50Ri%G C8'Ga%62aiscN gawt ago wast *NG ADD      5,fachse le cede #                                    17e tvPt OF MtPOMT Olvision of Budget and Analysi Office of Resource Management U. S. Nuclear Regulatory Commiss                                                                          .i    ia.m coviaio,,-~ ~ ,,.,
Washington, DC 20555 MARCH 1984
              . .  %,.. 401..
l    i L,      Status Suninary Report
    .. .n ra.c ,m        .        ,
The OPERATING UNITS STATUS REPORT - LICE                                D OP ATING REACTORS provides data on the operation of nuclear units as timely and                                cur ely as possible. This infonnation is collected by the Office of Resource Manage                                    from the Headquarters staff of NRC's Office of Inspection and Enforcament, from                                    's Regional Offices, and from utilities.
The three sections of the report are: mont                                    highlights and statistics for commercial operating units, and errata from previous 1 -                                  orted data; a compilation of detailed information on each unit, provided by NRC R onal Offices, IE Headquarters and the utilities; and an appendix for miscellan us i rmation such as spent fuel storage capability, reactor-years of experience nd non wer reactors in the U.S. It is hoped
;      the report is helpful to all agencies d indivi                                        is intercsted in maintaining an awareness of the U.S. energy situatio as a whole.
l                                                                                                                                                            >
tte at , *0805 a%D DOCuve %v ANAL,5tl                                            ige oggcm,PTOAS i                                                    .
l o .... ...      ,s..    %,                                                            ,,,,;,,,,,,c,,,,,,,,,,,,,                          ,, ,,,,, ,,,,,,,
Unlimited                                                                            Tidif~alsiffed
                                                                                          .. .. cv.. . c i .u.. ec. . .n.,                    , . .c .
                                                                                              '$nc'T5ssi fied                                    s
 
                                                                                                                                              )
i e
DISTRIBUTION LIST - HRC l
a INTERNAL' DISTRIBUTION-                ,
EXTERNAL DISTRIBUTION Office of the Commissioners.-                    -
5 Atimic. Safety and Licensing Appeal Panel                        3    SPECIAL REQUESTS Advisory Committoo.on Reactor _ Safeguards                        6
:1-
  .0ffice of Inspector _and Auditor-                                  1    Air Force
                                                                    -1    Congress .                                                  10 OfficeLof' Policy Evaluation                                                          .
Department of Energy                                        32
  .0ffice of the' General Counsel.                                    1 21'
                                                                          ' Government Accounting Office                                .1
  ' Office.of Public. Affairs:              .
Environmental Protection Agoney.
Office cf Congressional Affairs .                                3                                                                  1 Electric Power Research Institute 1
Office of.the Executivo Director.for Operations                  7 2    Argonne National Laboratory                                    3 Office of Administration .
  .0fficolof the Executive Legal Director                .
                                                                    .2    Bureau of Mines                                                1 1  :
Office of Analysis and Evaluation of Operational Data  "
2-  Dopartment.of Agriculture                                                !
1 Office-of. International' Programs                              '3    Department of.tho. Commerce 1
Offico of State Programs                                          1  Department.of the Interior
  - O f f i c e . o f Reu>ur Mangpnwnt            _.
19                                                                53      ~
Office of Huclear Material Safety and Safequards                  2
          ~ -' Division of Fuel Cycle and Material-Safety          -3,
            - Division of Safeguards                                2 E0ffice of Huclear Reactor. Regulation'                          138
            - Division of' Engineering-
            -    Di . . sion of .Safoty Technology                        QTHEP'
            - ~ Division of' Licensing
            - Division,of Systems Integration.                            GPO Depository                                              440
        . - Division of Human Factors Safety'                            GPO Stores . '.      .
75
: Office of Nuclear Regulatory Research                            4    National Technical Information Service.                      25 250 0ffice of' Inspection and Enforcement.                            7  -Subscriptions (NTIS) 11    Collegos and Librarios (including Public Document Rooms)    128
            -.. Region 1I                                                Utilities and Other Requests'                              _227_
                ; Region II                                        10
                                                                    .10                                                              1145
            - Region III
          ' '- Region IV-                                          10 -
                . Region V-                                      _.__7
                                                                -281 m
 
n.,
        ;, -a.
                                                    .rm.              <                <1;
                                                                                              .t s.
m y<                                                                          s ,                                                    ,
                                                                                                ._w -                                                                                                                                                                                                                                                                                                                                    -                                                                                                                                                                                                                                          ,
[* 7                                            ,Y
                                        ^
              .-                      t."                                                    4 j ''-                          _ .
                                                                      , W, , . . .
                                                                                                .. ~$ UNITED STAIE@ , .                                                                                                                                                                                                                                                                                                                                                                                                                                                . nestctass ait
                    .              o.1 NUCLEAR REGULATORY COMMISSION                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              : postast a ms paio usmac w/ " c. . '                                              ' > WASHINGT. ONf D.C. 20666
                                                                                  .                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ' wasa o C
                    ' m                              s, g>.                                        s            1
                                                                                                                                                                  .                                                                                                                                                                                                                                                                                                                                                                                                          - MRuithe.A.6L 4 ' _..
: OFFCAL BUSINESS ?                                                                          .
s                                                  ;    PENETY FOR PRIVATE USE, S3m "                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      '
t .
                                ~                                                                                                            ,                  .
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          .I
                                                                        ,                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          s
                      .w M_- . .-
s t              c ._e k . ,                        4        '
                                                                                                                        ~
                                                                                    . ,?{
                                                                                        ..,                                  -&-              p 9', , .                      'e
: 1. -
f')                              '
c                                                                                                                                                            e                                                                                                                                "
I'              _
p E
, , ' ,                                i,s."'    .
                      ^
},
                                                                            ,~                                                                                                                                                                                                      -
e 7iq                                                                                                                                                                                                                                                                                                                                  ,
a h,
,-            c.                              .
h 'a fc' l                                                                                                                                                                                                                                                                                                            f k
9 4
r 4
e Y                                                                                                                                                                                          .
                                                                                                                                                                                            ~T j .,..
N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            .j      l
: 4.                      -
4' 1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                q g                              T                                                                                                                                                                                                                                                                                                                                                                                                                                                                  2.
y                          7                                                                                                                , - -
n'                            s'--                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  f 4
              ?''-                                                                                                                                                                                                                                          -
4 L-'
:,.2.f 2
s"                                                                                      'I e
G. u "_,''                                                                                                                                                                                                                                                                                            "#
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ,._d..                              ,
Q                                                                                                                                                                                                                                                                                                      a          r4
$                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              s                                                7/
ir                                                                                                                                                                            '"
r.
                                                ~
g                                                                                                                                                                                                                            -                                                                                                                -
                                                                                                                                                                                                                                                                                                                              ,, 4                                                                                                                                                                                                                                                                                                    '
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ;c            .*
m                                                                                                                                                                                                                                                                                                                                                                                                                                                                      1                                                                                                  ;/
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ' $ .y I                                                                  ,'                                                                                                                                                                      f                  -
y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    '4 7'*
st                                                                                                                                                                                                -
3i A g                                                                                                                                                                                                                                                                                                  ea'          :                                                          '                                                                                                                '
r f .w . :
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ._7
                                                                                                                                                                                                                                                                                                                                                                                                                                                        ~
J                                                                                                                                                                                                                                                                                    ,                                                                                                                                                        g r-                                                                                                                                                                            _
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          \.
g                                                                                                                                                                                                                                                                                                                                                                                                                                      l                                                                                                                                                                                                                        4
(
s                                                                                        "
y                                                          g'\ H_ .                  s 1                                                                                                                                                                                                                                        S                                '
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          $                      a(                              .
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ,4                                                9 ;_
s                                                                                                                                                                                                                                                                                                                                                                                                                                      -
                                                                                                                                                                                                                                                                                                                                                                  -                                    f s'3                                                                                          c si?
r                                                                                                                                                                                                                                                                                                                                                                                                                      j                    i          }                      "                        ,.#                                                                                                                                                *- -
k                                                                                                                                                                                                                                                                'O.                                                                                                                    #
              ,                                                                                                                                                                                                                                                                                                                    q
;,                              +                                                                                        -
                                                                                                                                                                                                                                                                                                                                                                                                                                            ,                            ,                        ,                        ''_..J. -
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ' -                                    c
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          - K:: e1'
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      .c t                                                                        a h .'-                                                                                                                                                                                                                                                                                                                                                              s'f.      l,                                                                                                                                                                                                                                            F g
)
                                                                                                                                                                                                                                                                                                                                                                        'fi"s                                                                                                                                          f                                        m o          ,,'4h                                                    ,
y _. .
                                                                                                                                                                .. --              s"                                                                                                                                                            x                                                                                                                                      s 1.~>                                                                                                                                                                                                                                                                                                                                                                _4                                        _
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            +
a y
x-                i
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      - . g .s ,      '
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ,                            , .            g.g'            .
,                                                                                                                                                                        \
f
_                                                                              m                                                                                                                                                                                            .
wr ' } ' ' t ',
jn                                    .,
m                                                              m p                                                                    I- { }'
d-'A* '.
g                    '.'' j[    '                                4 e
f- ,
5.;
y 2zm-
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  -- :p..-.,
--                                                                                                                                                                                                                                            ~
                                                                                                                                                                                                                                                                                                                                                                                                      < , ' \ . 4 .3                                                                                                                                                      > .                                                                                                ,,
__~_
                                                                                                                                                                                                                                    ,                                                                          } .
                                                                                                                                                                                                                                                                                                                    ^
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    )
3-              o g-                                                                                                                                                                                      .                                                                                                              ~ . -
3 y-n.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  ,      c 6,.'f.,+.
8                  #-
p          ,,                                                                                                                                                          S              4
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        .,b                    5[      'y
                                                                                                                                                                                                              ~t
: l.                                                                                                                  2                                                                                                                                                                                            '                                                                                                    '-t'                                                                                                                                                                            ,
_ . -'R',
g                                                                                                                                                                          s                      <
                                                                                                                                                                                                                                                                                                                                                          ,.-tl'.
                                                                                                                                                                                                                                                                                                                                                                -4.'
* e-                      4
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              '['.-
a,.W*
(,) , k .. '.,''
y
            / ,,_                                                                                                                    '-        1                                                                                                                                                                                                                                                          +                      ''
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                -}              ')"'
y                        3                                          s d
( )_'                                                                                                                                                        e                                                                                                                                                        j                                                                                                    3    f~,                                                                  ,l                    ''i                                                    E                                              U g-_*          r.",    s      n ',                                                                                                                                                * , .                                                                                                                                              #                                A g
rt,                                                                            '...r,
,,-                                                p
                                                                  .. 1
                                                                                                                                                                                            -                ~{  e...'            r.
Ap                                                                                            t.g,~- - ,_ j i',
g                                                                                            4                              ,
t                                                        , , ',                          ,
                                                                                                                                                                                                                                                                                                          ,,                                                                                                        r-                                                                                    .            g                    [+                                                                %l        7
                                                                                                                                                                                                                                                                                                                                                                                                              %'N.                    ' ' . ' ,,                                                                                                          ,M                              *' j '.
a lj      a,',
(
                                                                                                                                                                                                                                                                                                                                                                                                                                    ' 44e                          ,-( r' d
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  -                                                    _..p,4
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            , T
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                =#    .-
3        .
: c.                  p                    ,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      - ., .,124
                                                                                                                                                                                                                  .[ w -                                                                                                                                                                                                                                                                                                                                                                                                (
- . ' ' * + . 4, -                                                                                                                                                                                                                                                                                                                                                                                                                    " , , ,                                                                                                                                                                                                                                * ,
t-                                                                                                                                                                                                                                                '                                                                                                                                                                                                                                      . . . .
                                                                                                                                                                                  ,.                                                                                          1 :,                                                          g e
          ,A-                                                                                            -
                                                                                                                                                                            .g' ,\ ,~,                                                                                      a w'                                                                                                                  i _,r*                                                          --
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  !(' <_ --,9..,-~_'            ' -
>.-_i r
                                                                                                                                                                                                                  ~
c                                                      ,. ,?n                                        .r.                                                                                      .              b ' : !:~                                                                                                            >        ,C,                                      .:. %                        .> .
                                                                                                                                                                                                    ,                                                                                    ;5..                    '
:  8f                                                                    .,
t    3-to
_]1,                                                        ,'                                                            )              -
                                                                                                                                                                                                                                                                                                                                              -6_31 - ,                                ,                                                                                                                                                                                                                            s        W3                              .~
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ' , _,'t
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      -M, -. , A s , s_
(                                                                                                                                                                                                                                                                                                                                                                                                                            ,
s L.f                                                                    -                                            ' ' -
a.. .Ly-
/ '                                                                                                                                                                                                  ,                                                                                                                                                                                                                                    . : 3 y , , ,.                      , +;- -
ye                                                                          , ,'                                                                                                ry                  -. .                                      ,                                                  ,        , 1,                                                                                                                              i,g.                                                              ~
r
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        .7.c                                  .,.
                                                                                                                                  &                                                                      .t'                                                      ,                                                                                                                                                                              r'                                                                            ,,,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ..p.,'                        i r / (.-f.
L'*                                                          4 3                    :.K! Es                          "                                                                                                          1
[~ '?,                                                                              *,z                  ,r
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ' g'-*1}
1 3                                                  -                            a
                                                                                      +                                                                                    e-                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ,
..,z.                                                                      - i:,                            5*,,            .,'
x          '2-
                                                                                                                                                                              ?r) 3,w1 .
p.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                .x u:i g
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ---' +              >              >r                                            * .,
                                "l',        _,                                                        ,..                                                                                                      t                                                                                                                                                                                                                f ,                                                                                                          r
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ''                    N
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ' , r' , s . .n ~.
s,;                        x.                                              ,
i                                              ,                          .                        - -                                                                            >:                                - -                                                s                    ; n.;
[
* 1                                                                                                                        t k
n;,                                                                                                                                            ep,..r*w
                                                                                                                                                                                                                                                                                                                                                                            -                    .''                .\                                                                                                      ..q J . t-                                                                                        ,1
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          .h^
D, f                                                                                                      T g                                              +                                                                                                                                                                                                          .
[                                                                                                                                                                      ' ' ' , . - . ,_        .}              ',- '
                                                                                                                                                                                                                                                                                                                                                                                                                                                    +            3                s                                          ',';'_'T
-~            --' f [ r,                                                                                                                                                                                                                                                                                                                                                                *' k.'''A.3            x 1'
I'                                                            s"g_                                                                                                                                                                                                                                                                              '
                                                                                                                                                                                                                                                                                                                                              'sgg 3                                                                                                        z                                                        3 p
                                                                                                                                                                                                                                                                                                                                                                        ,'.e
(
r . ,.j.,
                                                              .L,-                                                                                                                                                                                  ,                      . .
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ,,,,                                                                                                                                                    3 1                                                                                                                  3                                                                                                                  - . e                                                                                                                                                                          "<f.'#.#                                                                                                                                    s
                                                                                                                                                                                                                                                                                                                          ., p yt ,--                                    '                                                                                                                                                              >
                                                                                                                                                                                                                                          #                              -y      .              &                                                                                                                                  y n : .                                                                                                                                                . .. p                    .,
                                                                                                                                                                                                                                                                                                                                                                , ,ss                                                                      sev f[% 4-t
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ..> p' ' ,~ _ 7,1-s-"
:L:
('
g l\-                    9 -
g m%
s.- i, w .  -
e                      V-                      >
a
                                                                                                                                                                                                                                                                                                                                                                                ;                      ,' ''- i.-                  1 t
w,.
2, i
r
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ,                    @4
                              #.    . . ,                                a                            d._      J      N                                                                                  W                                                                                                                                                                                                                                                            b                                                                                      *'
                                                                                                                                                                                                                      '' (
                                                                                                                                                                                                                                                                                                                ,                                                                                                                                                                                                                        lj 7
s W .-                                                                                                                                    ,
                                                                                                                                                                                                                                                  -e 4                        , sc.N-                              2                                                                                                    - . ~ ,                                                        ,
[p
* e                              t 5                                                                                                                                                                                                                                                                                                                                ',                                                                                                                                                                                                                                                                                              /
c-                    'r                                      ;
                                                                                                        ,                        ,                                                                                                                    -f
* Y n .
                                                                                                                                                                                                                                                                                          .-ch'-_._,
* e          4 s                                                      s~,                        n t '{ J --@              _ _ ''
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  %: . i                    .?                J              ^
                                .,.                          'k                                  g_.                                                                                                                                                                                                                                            (
[
b
                                    .y                                              ,e,        j            g    ,                                                                                                                    L                                                                                                                                                                                                                                              *
                                                                                                                                                      *y-, ,                                                                                                                                                                                                                                                                                                                                      7 +
                                                                                                                                                                                                                    . [,.=~ .. a.,s.              -
                                                                      . .a, -                    n. g-2                          . -                                                                                                                                        ,
a' -*g,, gi
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                +.                                .                                                                                  - ;
_~e.+                                            -s                                  1
                                                                                                                            ;..e..-                              - _.<: ; .                                      ~                                      a t                  .
1
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    -e                                                                      -
a:
n.., y;.        t , . , a n.
4-3          gj        4                      .; p a                      .2.e                                                    ,,                                                    i .              I
                                                                                                                                                                                                                                                  ,,y        g                                                                                                  c....                                        r.                                                                                                                                          sp2                                    ;
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    . s                    i
                                                                          ;y!                                          .; 5 Q } , ' ' f,. :._, 5, . s Q_ , , ' + ;..mf. ;f " ,                                                                                                                                                                                                                                                                                                                                                                                                                                                                          g;},
Q-Q 9T:                                                                                    s i                      },.  -
l                    _;_;; 9 m
g
                                                                                                                                                                                                                                                                                                                                                                ,.Q                          *              .-ik,*'^
                                                                                                                                                                                                                                                                                                                                                                                                                                                    -y 4_3 ,, k , _ , . ,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                , r .f, y ;q (                . . . .                                l Gir}}

Latest revision as of 11:52, 13 December 2024

Licensed Operating Reactors Status Summary Report.Data as of March 31,1984.(Grey Book)
ML20091N984
Person / Time
Issue date: 05/31/1984
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0020, NUREG-0020-V08-N04, NUREG-20, NUREG-20-V8-N4, NUDOCS 8406120532
Download: ML20091N984 (407)


Text