ML20129E636: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:$[,m Jg                           UNITED STATES 3             NUCLEAR REGULATORY COMP"3SION O                 f 4                                             WASHINGTON, D.C. 20555 4 001 8                                   October 1, 1996
{{#Wiki_filter:$[,m Jg UNITED STATES 3
        . . . . . ,o Mr. James E. Quinn, Projects Manager LMR and SBWR Programs GE Nuclear Energy 175 Curtner Avenue, M/C 165 San Jose, California 95125
NUCLEAR REGULATORY COMP"3SION O
f 4
WASHINGTON, D.C. 20555 4 001 8
.....,o October 1, 1996 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs GE Nuclear Energy 175 Curtner Avenue, M/C 165 San Jose, California 95125


==SUBJECT:==
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE ELECTRIC (GE) PANDA TRANSIENT INTEGRAL SYSTEMS T REPORTS
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE ELECTRIC (GE) PANDA TRANSIENT INTEGRAL SYSTEMS T REPORTS


==Dear Mr. Quinn:==
==Dear Mr. Quinn:==
 
By your {{letter dated|date=August 16, 1996|text=letter dated August 16, 1996}}, you submitted the subject PANDA Tran-sient Integral Test Data Transmittal Reports and requested that they be withheld from public disclosure.
By your letter dated August 16, 1996, you submitted the subject PANDA Tran-sient Integral withheld      from Test publicData  Transmittal Reports and requested that they be disclosure.
This request was made in accordance with 10 CFR 2.790 and is supported by affidavit executed by Joseph F. Quirk, dated August 15, 1996, which claims in part that the information identified by a bar in the right-side margins is classified as proprietary because it contains Simplified Boiling Water Reactor (SBWR) test facility results for use in conjunction with TRACG qualification analysis results, and scaling information on SBWR testing.
This request was made in accordance with 10 CFR 2.790 and is supported by affidavit executed by Joseph F. Quirk, dated August 15, 1996, which claims in part that the information identified by a bar in the right-side margins is classified as proprietary because it contains Simplified Boiling Water Reactor (SBWR) test facility results for use in conjunction on  SBWR testing. with TRACG qualification analysis results, and scaling information ment by GE and its associates for more than seven years, at a tota tens of millions of dollars.         In addition, the affidavit identifies the following reasons for maintaining the information as proprietary:
ment by GE and its associates for more than seven years, at a tota tens of millions of dollars.
: 1. Information that discloses a supporting data and analyses, process, method, or apparatus, includin tors without over            license from GE constitutes a competitive economic advantage other companies; 2.
In addition, the affidavit identifies the following reasons for maintaining the information as proprietary:
Information which, if used by a competitor, would reduce his expenditures of resources or improve his competitive position in the design, manufac-ture, similar  shipment, product; installation, assurance of quality, or licensing of a
1.
: 3. Information which reveals aspects of past, present, or future GE customer-funded development plans and programs, of potential commercial value to GE.
Information that discloses a supporting data and analyses, process, method, or apparatus, includin tors without license from GE constitutes a competitive economic advantage over other companies; 2.
We have reviewed your letter and the material in accordance with the require-ments of 10 CFR 2.790 and, on the basis of your statements, have determined that the subject reports contain trade secrets or proprietary commercial information. Therefere, the PANDA Transient Integral Systems Tests data Transmittal Reports will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5 The nonprop)rietary versions of PANDA Transient Integral Systems                       y ,g) Test Transmittal Reports have been placed in the Nuclear Regulatory Commission's           (
Information which, if used by a competitor, would reduce his expenditures of resources or improve his competitive position in the design, manufac-ture, shipment, installation, assurance of quality, or licensing of a similar product; 3.
Information which reveals aspects of past, present, or future GE customer-funded development plans and programs, of potential commercial value to GE.
We have reviewed your letter and the material in accordance with the require-ments of 10 CFR 2.790 and, on the basis of your statements, have determined that the subject reports contain trade secrets or proprietary commercial information. Therefere, the PANDA Transient Integral Systems Tests data Transmittal Reports will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5 The nonprop)rietary versions of PANDA Transient Integral Systems Test
,g) y Transmittal Reports have been placed in the Nuclear Regulatory Commission's
(
(NRC's) Public Document Room.
(NRC's) Public Document Room.
Q euooao22eeach;Q                                                                             \
euooao22eeach;Q h cn* CM Q
PDR A
\\
ADOCK 05200004 PDR                     rMf         pJg{,   h cn* CM ws
PDR ADOCK 05200004 A
PDR rMf pJg{,
ws


                    ..                    . . - .          . . .                    ..    . --          .-              - . - =         -    -        . . .
-. - =
Mr. James E. Quinn                                                                       October 1, 1996 i
Mr. James E. Quinn October 1, 1996 i
Withholding from public inspection ~shall not affect the right, if any, of                                                                       I persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
Withholding from public inspection ~shall not affect the right, if any, of persons properly and directly concerned to inspect the document.
If the basis for withholding this information from public. inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also                                                                       l understand that the NRC may have cause to review this determination in the future, for example, if the scopo of a Freedom of Information Act request includad your information. In all review situations, if the NRC needs i
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.                                                                                       j Sincerely, original signed by: Theodore R. Quay                                     ;
If the basis for withholding this information from public. inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scopo of a Freedom of Information Act request includad your information.
Son Q. Ninh, Project Manager Standardization Project Directorate Division of Reactor Program Management                                     ,
In all review situations, if the NRC needs i
Office of Wuclear Reactor Regulation                                       '
additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Docket No.'52-004'                       ~
j Sincerely, original signed by: Theodore R. Quay Son Q. Ninh, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Wuclear Reactor Regulation Docket No.'52-004' f
f cc: See next page                               s DISTRIBUTION.                     '
~
cc: See next page s
DISTRIBUTION.
I i
: Docket File PDST R/F TMartin PUBLIC '
BGrimes TQuay
.DScaletti WDean, EDO EJordan, T-4 D18 JMoore, 0-15'B18 J
ACRS (11)
MPSiemien, 0-15 B18 t
. DOCUMENT NAME: A: PROP-GE.47 (2B SBWR DISK)
Ta seeshe e espy of this document, indeses in the bes: 'C' = Copy without attachment / enclosure
*E* = Copy with attachment / enclosure
*N" = No copy 0FFICE PM;PDST:DRPM l
PM:PDST:DRPM1 OGC JT.
D:PDST:DRPM l NAME SQNfnh DCScalettif LV) MPSiemienr//9 TRQuay 48W DATE 09P4/96 09/M/96 W 09/K./96 '
99/g /96 0FFICIAL RECORD COPY W
I i
I i
: Docket File                            <
6
                                                                        .        PDST R/F                    TMartin
            #    PUBLIC '                                                  ,    BGrimes                      TQuay
                .DScaletti                                                                                    EJordan, T-4 D18 WDean, EDO JMoore, 0-15'B18                          J ACRS (11)                    MPSiemien, 0-15 B18 t
  . DOCUMENT NAME: A: PROP-GE.47                                    (2B SBWR DISK)                                                                              <
Ta seeshe e espy of this document, indeses in the bes: 'C' = Copy without attachment / enclosure *E* = Copy with attachment / enclosure  *N" = No copy 0FFICE        PM;PDST:DRPM                l      PM:PDST:DRPM1                    OGC          JT. D:PDST:DRPM l NAME          SQNfnh                              DCScalettif LV) MPSiemienr//9                        TRQuay 48W 09/M/96 W                                            99/g /96 DATE          09P4/96                                                              09/K./96 '
0FFICIAL RECORD COPY          W I
i 6


1
1
* i ''
* i ''
Mr. James E. Quinn                               Docket No. 52-004 GE Nuclear Energy                                                                       {
Mr. James E. Quinn Docket No. 52-004 GE Nuclear Energy
cc: Mr. Rob Wallace                             Mr. Brian McIntyre                     i GE Nuclear Energy                           Westinghouse Electric Corporation       '
{
i                1299 Pennsylvania Avenue, N.W.             Energy Systems Business Unit Suite 1100                                   Box 355                               i j               Washington, DC 20004                         Pittsburgh, PA 15222                   !
cc: Mr. Rob Wallace Mr. Brian McIntyre i
:              Director, Criteria & Standards Division                                             !
GE Nuclear Energy Westinghouse Electric Corporation i
i Office of Radiation Programs U.S. Environmental Protection Agency                                               '
1299 Pennsylvania Avenue, N.W.
401 M Street, S.W.
Energy Systems Business Unit Suite 1100 Box 355 j
1               Washington, DC 20460 i       -
Washington, DC 20004 Pittsburgh, PA 15222 Director, Criteria & Standards Division Office of Radiation Programs i
Mr. Sterling Franks U.S. Department of Energy                                                           1
U.S. Environmental Protection Agency 401 M Street, S.W.
:              NE-42 Washington, DC 20585 Mr. Robert H. Buchholz                                                             i GE Nuclear Energy                                                                   i
1 Washington, DC 20460 i
!                175 Curtner Avenue, MC-781                                                         '
Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, DC 20585 Mr. Robert H. Buchholz i
]'             San Jose, CA 95125 1
GE Nuclear Energy i
Mr. Steven A. Hucik GE Nuclear Energy 175 Curtner Avenue, MC-780 San Jose, CA 95125 Mr. Tom J. Mulford, Manager SBWR Design Certification Electric Power Research Institute 3412 Hillview Avenue
175 Curtner Avenue, MC-781
:              Palo Alto, CA 94304-1395 i
]'
San Jose, CA 95125 1
Mr. Steven A. Hucik GE Nuclear Energy 175 Curtner Avenue, MC-780 San Jose, CA 95125 Mr. Tom J. Mulford, Manager SBWR Design Certification Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94304-1395 i
1 l
1 l
i 1
i 1
4 i
4 i
a}}
a}}

Latest revision as of 11:33, 12 December 2024

Advises That GE Panda Transient Integral Test Data Transmittal Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960816 Request
ML20129E636
Person / Time
Site: 05200004
Issue date: 10/01/1996
From: Son Ninh
NRC (Affiliation Not Assigned)
To: Quinn J
GENERAL ELECTRIC CO.
References
NUDOCS 9610030228
Download: ML20129E636 (3)


Text

$[,m Jg UNITED STATES 3

NUCLEAR REGULATORY COMP"3SION O

f 4

WASHINGTON, D.C. 20555 4 001 8

.....,o October 1, 1996 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs GE Nuclear Energy 175 Curtner Avenue, M/C 165 San Jose, California 95125

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE ELECTRIC (GE) PANDA TRANSIENT INTEGRAL SYSTEMS T REPORTS

Dear Mr. Quinn:

By your letter dated August 16, 1996, you submitted the subject PANDA Tran-sient Integral Test Data Transmittal Reports and requested that they be withheld from public disclosure.

This request was made in accordance with 10 CFR 2.790 and is supported by affidavit executed by Joseph F. Quirk, dated August 15, 1996, which claims in part that the information identified by a bar in the right-side margins is classified as proprietary because it contains Simplified Boiling Water Reactor (SBWR) test facility results for use in conjunction with TRACG qualification analysis results, and scaling information on SBWR testing.

ment by GE and its associates for more than seven years, at a tota tens of millions of dollars.

In addition, the affidavit identifies the following reasons for maintaining the information as proprietary:

1.

Information that discloses a supporting data and analyses, process, method, or apparatus, includin tors without license from GE constitutes a competitive economic advantage over other companies; 2.

Information which, if used by a competitor, would reduce his expenditures of resources or improve his competitive position in the design, manufac-ture, shipment, installation, assurance of quality, or licensing of a similar product; 3.

Information which reveals aspects of past, present, or future GE customer-funded development plans and programs, of potential commercial value to GE.

We have reviewed your letter and the material in accordance with the require-ments of 10 CFR 2.790 and, on the basis of your statements, have determined that the subject reports contain trade secrets or proprietary commercial information. Therefere, the PANDA Transient Integral Systems Tests data Transmittal Reports will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5 The nonprop)rietary versions of PANDA Transient Integral Systems Test

,g) y Transmittal Reports have been placed in the Nuclear Regulatory Commission's

(

(NRC's) Public Document Room.

euooao22eeach;Q h cn* CM Q

\\

PDR ADOCK 05200004 A

PDR rMf pJg{,

ws

-. - =

Mr. James E. Quinn October 1, 1996 i

Withholding from public inspection ~shall not affect the right, if any, of persons properly and directly concerned to inspect the document.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public. inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scopo of a Freedom of Information Act request includad your information.

In all review situations, if the NRC needs i

additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

j Sincerely, original signed by: Theodore R. Quay Son Q. Ninh, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Wuclear Reactor Regulation Docket No.'52-004' f

~

cc: See next page s

DISTRIBUTION.

I i

Docket File PDST R/F TMartin PUBLIC '

BGrimes TQuay

.DScaletti WDean, EDO EJordan, T-4 D18 JMoore, 0-15'B18 J

ACRS (11)

MPSiemien, 0-15 B18 t

. DOCUMENT NAME: A: PROP-GE.47 (2B SBWR DISK)

Ta seeshe e espy of this document, indeses in the bes: 'C' = Copy without attachment / enclosure

  • E* = Copy with attachment / enclosure
  • N" = No copy 0FFICE PM;PDST:DRPM l

PM:PDST:DRPM1 OGC JT.

D:PDST:DRPM l NAME SQNfnh DCScalettif LV) MPSiemienr//9 TRQuay 48W DATE 09P4/96 09/M/96 W 09/K./96 '

99/g /96 0FFICIAL RECORD COPY W

I i

6

1

  • i

Mr. James E. Quinn Docket No.52-004 GE Nuclear Energy

{

cc: Mr. Rob Wallace Mr. Brian McIntyre i

GE Nuclear Energy Westinghouse Electric Corporation i

1299 Pennsylvania Avenue, N.W.

Energy Systems Business Unit Suite 1100 Box 355 j

Washington, DC 20004 Pittsburgh, PA 15222 Director, Criteria & Standards Division Office of Radiation Programs i

U.S. Environmental Protection Agency 401 M Street, S.W.

1 Washington, DC 20460 i

Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, DC 20585 Mr. Robert H. Buchholz i

GE Nuclear Energy i

175 Curtner Avenue, MC-781

]'

San Jose, CA 95125 1

Mr. Steven A. Hucik GE Nuclear Energy 175 Curtner Avenue, MC-780 San Jose, CA 95125 Mr. Tom J. Mulford, Manager SBWR Design Certification Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94304-1395 i

1 l

i 1

4 i

a