| number = ML20133N116
| issue date = 08/06/1985
| title = Notice of Deviation from Insp on 850613-0715
| author name =
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name =
| addressee affiliation =
| docket = 05000293
| license number =
| contact person =
| document report number = 50-293-85-17, NUDOCS 8508130375
| package number = ML20133N089
| document type = NOTICE OF DEVIATION/NONCONFORMANCE FROM A REGULATORY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
See also: [[see also::IR 05000613/2007015]]
 
=Text=
{{#Wiki_filter:.
.
                                          APPENDIX B
                                    NOTICE OF DEVIATION
    Boston Edison Company                                          Docket No. 50-293
    Pilgrim Nuclear Power Station                                  License No. DPR-35
    As a result of the inspection conducted on June 13, 1985 - July 15, 1985, and in
    accordance with the NRC Enforcement Policy, 10 CFR Part 2, Appendix C, 49 FR 8583
    (March 8, 1984), the following deviation was identified:
          The Inservice Testing Program (ISI) submitted to the NRC in a letter dated
          April 13, 1979 required that the setpoint on a vacuum relief valve, VRV-9066,
          in the high pressure coolant injection (HPCI) system, be tested every five
          years. The licensee committed to implement this program on August 1, 1979.
          The second 10 year IST program submitted to the NRC in a letter dated July
          11, 1983, which the licensee committed to implement in the third quarter of
          1983, as revised in a letter dated February 14, 1984, required that the fol-
          lowing tests be conducted quarterly:
          System                    Valve              Test                _
          HPCI                      2301-8              Stroke time to close position
                                    VRV-9066            Stroke time to op1n position
          Diesel Oil Transfer      1 in. No. 223      Stroke to close position
                                    (2 valves)
                                    Foot-Val A and B    Stroke to close position
          Contrary to the above, on June 24, 1985, the VRV-9066, 2301-8, No. 223, and
          Foot-Val A and B valves had not been tested in the manner indicated.
    Boston Edison Company is hereby requested to submit to this office within thirty
    days of the date of the letter which transmitted this Notice, a written statement
    or explanation in reply, including: (1) the corrective steps which have taken and
    the results achieved; (2) corrective steps which will be taken to avoid further
    deviation; and (3) the date when corrective actions will be complete. Where good
    cause is shown, consideration will be given to extending this response time.