ML20134N798: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:N.:;
        'e CONTR ACT NUMBE R NRC f ORM 255 (10 M NRC-03-84-071 OlVISION OF CONTR ACTS                        MODIFICATION NUMBE R U.S. NUCLE AR REGULATORY CGMMISSION                        $
WASHINGTON. D.C. 20355 ONEW              D MOOlFICATION OTH E R (SpecsIrl NOTIFICATION OF CONTRACT EXECUTION CONTRACT BASED ON:
s        TO: Harold R._ Denton, . Director.                                      AUTHORIZATION NUMBE R ITottel NRR-84-071.
Office of Nuclear Reactor Regulation                            o ,7, to man ust.ons                        5 19.g5 C NTRam CuANGES PER THiS AalON pg,        h          [
IContract Sofcaninst) 8 8 85 (Datel Marie Page                                                        Extend Period of Performance Contract Administrator Technical Contracts Branch.
DIVISION OF CONTRACTS. ADM CONTRACTOR (Name & Locaroon)                                            EXECUTION DATE E. C. Rodabaugh Associates, Inc.
0E Hilliard, Ohio 43026                                            TYPE OF CONTRACT Time and flaterial PERIOD OF PERFORMANCE PROECT TITLE Consulting Services of Everet Rodabaugh to                          12/1/83 - 10/15/85 Investigate Nozzle Load Design Limits, Overall                  PRINCIPAllNVESTIGATOR Design Margins and Loading Rate Effects                              Everet C. Rodabaugh NRC AUTHORIZED REPRESENTATIVE E. Sullivan 8&R NUMBER                          FIN NUMBER          .
AMOUNT 20-19-10-12-2                          B8690 NEW NFIC FUNDS                                        $                      FtsfDING
                  ,            TOTAL FY 84_ FUNDING                                  $ 27.000.00 TOTAL NRC OBLIGATIONS                                $ 27.000.00 ATTACHMENT (SI:
GOVE8llNMENT PROPERTY C NTR ACT DOCUMENT 4              I' 8509050362 850829 NRC SCRM 255                  PDR      CCMTR siam                          NC-03-84-071                PDR
_      -}}

Latest revision as of 18:50, 22 July 2020

Notification of Contract Execution,Mod 5,to Consulting Svcs of E Rodabaugh to Investigate Nozzle Load Design Limits,Overall Design Margins & Loading Rate Effects. Contractor:Ec Rodabaugh Assoc,Inc
ML20134N798
Person / Time
Issue date: 08/29/1985
From: Page M
NRC OFFICE OF ADMINISTRATION (ADM)
To: Harold Denton, Sullivan E
NRC, Office of Nuclear Reactor Regulation
Shared Package
ML20134N800 List:
References
CON-FIN-B-8690, CON-NRC-03-84-071, CON-NRC-3-84-71 NUDOCS 8509050362
Download: ML20134N798 (1)


Text

N.:;

'e CONTR ACT NUMBE R NRC f ORM 255 (10 M NRC-03-84-071 OlVISION OF CONTR ACTS MODIFICATION NUMBE R U.S. NUCLE AR REGULATORY CGMMISSION $

WASHINGTON. D.C. 20355 ONEW D MOOlFICATION OTH E R (SpecsIrl NOTIFICATION OF CONTRACT EXECUTION CONTRACT BASED ON:

s TO: Harold R._ Denton, . Director. AUTHORIZATION NUMBE R ITottel NRR-84-071.

Office of Nuclear Reactor Regulation o ,7, to man ust.ons 5 19.g5 C NTRam CuANGES PER THiS AalON pg, h [

IContract Sofcaninst) 8 8 85 (Datel Marie Page Extend Period of Performance Contract Administrator Technical Contracts Branch.

DIVISION OF CONTRACTS. ADM CONTRACTOR (Name & Locaroon) EXECUTION DATE E. C. Rodabaugh Associates, Inc.

0E Hilliard, Ohio 43026 TYPE OF CONTRACT Time and flaterial PERIOD OF PERFORMANCE PROECT TITLE Consulting Services of Everet Rodabaugh to 12/1/83 - 10/15/85 Investigate Nozzle Load Design Limits, Overall PRINCIPAllNVESTIGATOR Design Margins and Loading Rate Effects Everet C. Rodabaugh NRC AUTHORIZED REPRESENTATIVE E. Sullivan 8&R NUMBER FIN NUMBER .

AMOUNT 20-19-10-12-2 B8690 NEW NFIC FUNDS $ FtsfDING

, TOTAL FY 84_ FUNDING $ 27.000.00 TOTAL NRC OBLIGATIONS $ 27.000.00 ATTACHMENT (SI:

GOVE8llNMENT PROPERTY C NTR ACT DOCUMENT 4 I' 8509050362 850829 NRC SCRM 255 PDR CCMTR siam NC-03-84-071 PDR

_ -