ML20141B955: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.       -            -
{{#Wiki_filter:.
        ,                                                                        Tech. Spic. 6.9.A.2
Tech. Spic. 6.9.A.2
'SA
(]
(]
  .        'SA Boeton Edieon Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 May 14,1997 BECo Ltr. 2.97.051 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50.293 License No. DPR-35 April 1997 Monthly Report in accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.2, a copy of the
Boeton Edieon Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 May 14,1997 BECo Ltr. 2.97.051 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50.293 License No. DPR-35 April 1997 Monthly Report in accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is provided in Attachment #1 for your information and planning. Should you have any questions conceming this report, please contact me directly.
!    Operational Status Summary for Pilgrim Nuclear Power Station is provided in Attachment #1 for your information and planning. Should you have any questions conceming this report, please contact me directly.
In addition, Attachment #2 is the second in a series of reports on the progress of establishing a replacement location for the South Weymouth Naval Air Station (SWNAS) Reception Center. These reports will be. submitted on a monthly basis until the new reception center is functional.
In addition, Attachment #2 is the second in a series of reports on the progress of establishing a replacement location for the South Weymouth Naval Air Station (SWNAS) Reception Center. These reports will be . submitted on a monthly basis until the new reception center is functional.
I N. L. Desmond Regulatory Relations Group Manager RLC/dmc/radmisc/297-mrpt Attachments: #1 April 1997 Monthly Report
I N. L. Desmond Regulatory Relations Group Manager RLC/dmc/radmisc/297-mrpt Attachments: #1 April 1997 Monthly Report
                      #2 Progress report on the South Weymouth Naval Air Station Reception Center.
#2 Progress report on the South Weymouth Naval Air Station Reception Center.
cc: Mr. Hubert Miller l           Regional Administrator, Region I                                                                   f 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406                                                                       gh d Mr. John Lusher U.S. Nuclear Regulatory Commission 475 Allendale Road
f cc: Mr. Hubert Miller l
;            King of Prussia, PA 19406 Senior Resident inspector 1
Regional Administrator, Region I 1
                                                      '''' ll    llllllll'' ll!ll i                . _ mn                               11  il 9705160080 970514 PDR     ADOCK 05000293 R                     PDR}}
U.S. Nuclear Regulatory Commission 475 Allendale Road d
gh King of Prussia, PA 19406 Mr. John Lusher U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector 1
i 11 illl llllllll ll!ll
. _ mn 9705160080 970514 PDR ADOCK 05000293 R
PDR}}

Latest revision as of 15:53, 11 December 2024

Forwards Operational Status Summary for Plant & Second Series of Repts on Progress of Establishing Replacement Location for South Weymouth Naval Air Station Reception Center
ML20141B955
Person / Time
Site: Pilgrim
Issue date: 05/14/1997
From: Desmond N
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141B960 List:
References
BECO-2.97.051, NUDOCS 9705160080
Download: ML20141B955 (1)


Text

.

Tech. Spic. 6.9.A.2

'SA

(]

Boeton Edieon Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 May 14,1997 BECo Ltr. 2.97.051 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50.293 License No. DPR-35 April 1997 Monthly Report in accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is provided in Attachment #1 for your information and planning. Should you have any questions conceming this report, please contact me directly.

In addition, Attachment #2 is the second in a series of reports on the progress of establishing a replacement location for the South Weymouth Naval Air Station (SWNAS) Reception Center. These reports will be. submitted on a monthly basis until the new reception center is functional.

I N. L. Desmond Regulatory Relations Group Manager RLC/dmc/radmisc/297-mrpt Attachments: #1 April 1997 Monthly Report

  1. 2 Progress report on the South Weymouth Naval Air Station Reception Center.

f cc: Mr. Hubert Miller l

Regional Administrator, Region I 1

U.S. Nuclear Regulatory Commission 475 Allendale Road d

gh King of Prussia, PA 19406 Mr. John Lusher U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector 1

i 11 illl llllllll ll!ll

. _ mn 9705160080 970514 PDR ADOCK 05000293 R

PDR