: o. hI V, 00LKETED UWC Filed:   March g 1RM -) P343 UNITED STATES OF AMERICA 0FFICE GF shsriAs v NUCLEAR REGULATORY COMMISSION                 E RvlCf, 00CKEigr before the                                           ,
hI V o.
ATOMIC SAFETY AND LICENSING BOARD
00LKETED UWC Filed:
                                                                          )
March g 1RM -)
In the Matter of                       )   Docket Nos. 50-445-OL
P343 UNITED STATES OF AMERICA 0FFICE GF shsriAs v NUCLEAR REGULATORY COMMISSION 00CKEigr E RvlCf, before the ATOMIC SAFETY AND LICENSING BOARD
                                                                          )                 50-446-OL TEXAS UTILITIES GENERATING             )
)
COMPANY et al.                       )
In the Matter of
                                                                          )       (Application for an                 '
)
(Comanche Peak Steam Electric         )       Operating License)
Docket Nos. 50-445-OL
Station, Units 1 and 2)             )
)
                                              =                           }
50-446-OL TEXAS UTILITIES GENERATING
)
COMPANY et al.
)
)
(Application for an (Comanche Peak Steam Electric
)
Operating License)
Station, Units 1 and 2)
)
}
=
ANSWERS TO BOARD'S 14 QUESTIONS (Memo; Proposed Memo of April 14, 1986)
ANSWERS TO BOARD'S 14 QUESTIONS (Memo; Proposed Memo of April 14, 1986)
Regarding Action Plan Results Report VII.c In accordance with the Board's Memorandum; Proposed Memo-randum and Order of April 14, 1986, the Applicants submit the answers of the Comanche Peak Response Team ("CPRT") to the 14 questions posed by the Board, with respect to the Results Report published by the CPRT in respect of CPRT Action Plan VII.c, "Construction Reinspection / Documentation Review Plan."
Regarding Action Plan Results Report VII.c In accordance with the Board's Memorandum; Proposed Memo-randum and Order of April 14, 1986, the Applicants submit the answers of the Comanche Peak Response Team ("CPRT") to the 14 questions posed by the Board, with respect to the Results Report published by the CPRT in respect of CPRT Action Plan VII.c, "Construction Reinspection / Documentation Review Plan."
Opening Request:                                               ,
Opening Request:
Produce copies of any CPRT-generated checklists that were used during the conduct of the action plan.
Produce copies of any CPRT-generated checklists that were used during the conduct of the action plan.
Re.:ponse:
Re.:ponse:
Multiple checklists in the form of Quality Instructions were developed and used during implementation of Issue-specific Action Plan (ISAP) VII.c.
Multiple checklists in the form of Quality Instructions were developed and used during implementation of Issue-specific Action Plan (ISAP) VII.c.
8803040120 880301                                                               d)
8803040120 880301 d)
PDR ADOCK 05000445                                                           LO '
PDR ADOCK 05000445 LO '
G               PDR                                                       37
G PDR 3 7
.                                                                                                              /
/


i The checklists from these instructions delineating the inspec-tion requirements are attached.
i The checklists from these instructions delineating the inspec-tion requirements are attached.
Question No. 1:
Question No. 1:
: 1. Describe the problem areas addressed in the report. Prior to undertaking to address those areas through sampling, what did Applicants do to define the problem areas further?
1.
How did it believe the problems arose? What did it discover about the QA/QC documentation for those areas?
Describe the problem areas addressed in the report.
Prior to undertaking to address those areas through sampling, what did Applicants do to define the problem areas further?
How did it believe the problems arose?
What did it discover about the QA/QC documentation for those areas?
How extensive did it believe the problems were?
How extensive did it believe the problems were?
ResDonse:
ResDonse:
This ISAP was self-initiated to give TU Electric management assurance of the safety of the Comanche Peak Steam Electric Sta-tion (CPSES), regardless of the extent to which issues might have been raised by external sources. ISAP VII.c included a reinspection / documentation review of the safety-related products of construction work activities performed at CPSES that were accepted by Quality Control (QC) . This review was intended to provide additional confidence ensuring that the investigative efforts of the CPRT program were of sufficient depth and breadth   ,
This ISAP was self-initiated to give TU Electric management assurance of the safety of the Comanche Peak Steam Electric Sta-tion (CPSES), regardless of the extent to which issues might have been raised by external sources.
to permit conclusive statements regarding the adequacy of CPSES quality of construction to be extended to the balance of the A-E derign scope for the safety-related portions of the plant. The visual reinspection and documentation review effort also pro-duced data useful for the evaluations performed under other action plans and extended into areas that were specifically identified by external sources.
ISAP VII.c included a reinspection / documentation review of the safety-related products of construction work activities performed at CPSES that were accepted by Quality Control (QC).
This self-initiated action plan was developed and imple-mented primarily because it represented the most direct, reli-able, and achievable method of producing additional confidence 2 -
This review was intended to provide additional confidence ensuring that the investigative efforts of the CPRT program were of sufficient depth and breadth to permit conclusive statements regarding the adequacy of CPSES quality of construction to be extended to the balance of the A-E derign scope for the safety-related portions of the plant.
The visual reinspection and documentation review effort also pro-duced data useful for the evaluations performed under other action plans and extended into areas that were specifically identified by external sources.
This self-initiated action plan was developed and imple-mented primarily because it represented the most direct, reli-able, and achievable method of producing additional confidence 2


that previously-unidentified concerns related to the quality of construction of the hardware ut CPSES vould be identified, evaluated, and resolved. It also provided additional confidence that any adverse impact on installed hardware that might have resulted from potentially inadequate qualification of historical QC inspectors would be identified and addressed.
that previously-unidentified concerns related to the quality of construction of the hardware ut CPSES vould be identified, evaluated, and resolved.
ISAP VII.c consisted of a sample reinspection of accessible QCoaccepted safety-related construction work products, supple-mented by a review of related quality documentation when inspec-tion attributes were generically not recreatable. It covered all Unit 1, Unit 2, and common areas, including those not spe-cifically covered by other CPRT ISAPs.
It also provided additional confidence that any adverse impact on installed hardware that might have resulted from potentially inadequate qualification of historical QC inspectors would be identified and addressed.
ISAP VII.c consisted of a sample reinspection of accessible QCoaccepted safety-related construction work products, supple-mented by a review of related quality documentation when inspec-tion attributes were generically not recreatable.
It covered all Unit 1, Unit 2, and common areas, including those not spe-cifically covered by other CPRT ISAPs.
Question No. 2:
Question No. 2:
: 2. Provide any procedures or other internal documents that are necessary to understand how the checklists should be inter-preted or applied.
2.
Provide any procedures or other internal documents that are necessary to understand how the checklists should be inter-preted or applied.


===Response===
===Response===
Following is a list of quality instructions that were pre-pared to provide the necessary interpretations and understand-ings for each checklist:
Following is a list of quality instructions that were pre-pared to provide the necessary interpretations and understand-ings for each checklist:
QI-008 Reinspection of Conduit /I-E-COUT QI-010 Reinspection of Electrical Equipment /I-E-EEIN QI-011 Documentation Review of Electrical Equipment /
QI-008 Reinspection of Conduit /I-E-COUT QI-010 Reinspection of Electrical Equipment /I-E-EEIN QI-011 Documentation Review of Electrical Equipment /
,                    R-E-EEIN QI-012 Reinspection of Instrumentation Equipment /I-E-ININ QI-013 Documentation Review for Instronentation Equipment /
R-E-EEIN QI-012 Reinspection of Instrumentation Equipment /I-E-ININ QI-013 Documentation Review for Instronentation Equipment /
R-S-ININ
R-S-ININ a
 
a                                                     .
QI-014 Reinspection of Cables /I-E-CABL QI-015 Documentation Review of Cables /R-E-CABL QI-016 Reinspection of Cable Trays /I-E-CATY QI-017 Documentation Review of Cable Tray /R-E-CATY QI-019 Reinspection of Small Bore Pipe Supports /I-S-SBPS QI-020 Documentation Review of Small Bore Pipe Supports /
QI-014 Reinspection of Cables /I-E-CABL QI-015 Documentation Review of Cables /R-E-CABL QI-016 Reinspection of Cable Trays /I-E-CATY QI-017 Documentation Review of Cable Tray /R-E-CATY QI-019 Reinspection of Small Bore Pipe Supports /I-S-SBPS QI-020 Documentation Review of Small Bore Pipe Supports /
R-S-SBPS QI-021 Reinspection of Piping System Bolted Joint /
R-S-SBPS QI-021 Reinspection of Piping System Bolted Joint /
Line 69: Line 86:
I-S-LBSR QI-028 Documentation Review of Large Bore Pipe Supports -
I-S-LBSR QI-028 Documentation Review of Large Bore Pipe Supports -
Rigid /R-S-LBSR QI-029 Reinspection of Iarge Bore Lipe Supports -
Rigid /R-S-LBSR QI-029 Reinspection of Iarge Bore Lipe Supports -
Non-rigid /I-S-LBSN QI-030 Documentation Review of Large . Bore Pipe Supports -
Non-rigid /I-S-LBSN QI-030 Documentation Review of Large. Bore Pipe Supports -
Non-rigid /R-S-LBSN r
Non-rigid /R-S-LBSN r
1 e                                               o QI-031 Reinspection of Containment Liner and Tank Stain-less Steel Liner /I-S-LINR QI-032 Documentation Review of Containment Liner and Tank Stainless Steel Liners /R-S-LINR QI-033 Reinspection of Fuel Building Fuel Pool Liners /
1
-4
 
e o
QI-031 Reinspection of Containment Liner and Tank Stain-less Steel Liner /I-S-LINR QI-032 Documentation Review of Containment Liner and Tank Stainless Steel Liners /R-S-LINR QI-033 Reinspection of Fuel Building Fuel Pool Liners /
I-S-FPLR QI-034 Documentation Review of Fuel Building Fuel Pool Liners /R-S-FPLR QI-035 Reinspection of HVAC Duct Supports /I-S-HVDS QI-036 Documentation Review of HVAC Duct Supports /R-S-HVDS QI-039 Reinspection of HVAC Ducts and Plenums /I-M-DUPL QI-040 Documentation Review of HVAC Ducts and Plenums /
I-S-FPLR QI-034 Documentation Review of Fuel Building Fuel Pool Liners /R-S-FPLR QI-035 Reinspection of HVAC Duct Supports /I-S-HVDS QI-036 Documentation Review of HVAC Duct Supports /R-S-HVDS QI-039 Reinspection of HVAC Ducts and Plenums /I-M-DUPL QI-040 Documentation Review of HVAC Ducts and Plenums /
R-M-DUPL QI-041 Reinspection of Field Fabricated Tanks /I-M-FFTA QI-042 Documentation Review of Field Fabricated Tanks /
R-M-DUPL QI-041 Reinspection of Field Fabricated Tanks /I-M-FFTA QI-042 Documentation Review of Field Fabricated Tanks /
R-M-FFTA QI-043 Reinspection of Concrete Placement /I-S-CONC QI-044 Documentation Review of Concrete Placements /
R-M-FFTA QI-043 Reinspection of Concrete Placement /I-S-CONC QI-044 Documentation Review of Concrete Placements /
R-S-CONC QI-045 Reinspection of Structural Steel /I-S-STEL QI-046 Documentation Review of Structural Steel /R-S-STEL
R-S-CONC QI-045 Reinspection of Structural Steel /I-S-STEL QI-046 Documentation Review of Structural Steel /R-S-STEL QI-047 Reinspection of Small Sore Pipe Welds / Materials /
;                                                                          QI-047 Reinspection of Small Sore Pipe Welds / Materials /
I-M-SBWM QI-048 Documentation Review of Tubing Welds / Material /
I-M-SBWM QI-048 Documentation Review of Tubing Welds / Material /
)                                                                                 R-M-TUW' .
)
i
R-M-TUW'.
i. -


o                 ,
o QI-049 Reinspection of Large Bere Pipe Welds / Materials /
QI-049                       Reinspection of Large Bere Pipe Welds / Materials /
I-M-LBWM QI-050 Reinspection of Pipe Welds / Material /I-M-PIWM QI-051 Reinspection of Pipe Whip Restraints /I-S-PWRE QI-052 Documentation Review of Pipe Whip Restraints /
I-M-LBWM QI-050                       Reinspection of Pipe Welds / Material /I-M-PIWM QI-051                       Reinspection of Pipe Whip Restraints /I-S-PWRE QI-052                       Documentation Review of Pipe Whip Restraints /
R-S-PWRE QI-053 Reinspection of Category I Conduit Supports /
R-S-PWRE QI-053                       Reinspection of Category I Conduit Supports /
I-S-COSP QI-054 Documentation Review of Category I Conduit Supports /R-S-COSP QI-055 Reinspection of Instrument Pipe / Tube Supports /
I-S-COSP QI-054                       Documentation Review of Category I Conduit Supports /R-S-COSP QI-055                     Reinspection of Instrument Pipe / Tube Supports /
I-S-INSP QI-056 Documentation Deview of Instrument Pipe / Tubing Supports /R-S-INSP QI-057 Documentation Review of Fill and Backfill Placement /R-S-FILL QI-059 Reinspection of Mechanical Equipment Installation /
I-S-INSP QI-056                       Documentation Deview of Instrument Pipe / Tubing Supports /R-S-INSP QI-057                       Documentation Review of Fill and Backfill Placement /R-S-FILL QI-059                       Reinspection of Mechanical Equipment Installation /
I-M-ME1H QI-066 Reinspection of Equipment Supports /I-S-EQSP QI-067 Documentation Review of Equipment Supports /R-S-EQSP QI-068 Documentation Review of Cement Grout /R-S-GRTC QI-069 Documentation Review of Epoxy Grout /R-S-GRTE QI-070 Rainspection of Tubing Welds Material /I-M-TUWM QI-071 Reinspection of Lighting cable /I-E-LITG QI-072 Documentation Review of Lighting Cable,R-E-LITG
I-M-ME1H                                                                                                                                                                         '
=(
QI-066                     Reinspection of Equipment Supports /I-S-EQSP QI-067                       Documentation Review of Equipment Supports /R-S-EQSP QI-068                       Documentation Review of Cement Grout /R-S-GRTC QI-069                       Documentation Review of Epoxy Grout /R-S-GRTE QI-070                       Rainspection of Tubing Welds Material /I-M-TUWM QI-071                       Reinspection of Lighting cable /I-E-LITG QI-072                       Documentation Review of Lighting Cable,R-E-LITG
=
                                                                                                                                =(                               =


QI-073 Documentation Review of Pipe Welds / Material /
QI-073 Documentation Review of Pipe Welds / Material /
R-M-PIWM QI-074 Documentation Review of NIS Cable Terminations /
R-M-PIWM QI-074 Documentation Review of NIS Cable Terminations /
R-E-NIST QI-075 Reinspection of Piping Bends Fabrication /I-M-PBFA Please note that some numbers in sequence appear to ba omitted. These numbers were assigned to quality instructions generated for other ISAPs or investigations.
R-E-NIST QI-075 Reinspection of Piping Bends Fabrication /I-M-PBFA Please note that some numbers in sequence appear to ba omitted.
These numbers were assigned to quality instructions generated for other ISAPs or investigations.
Question No. 3:
Question No. 3:
: 3. Explain any deviation of checklists from the inspection report documents initially used in inspecting the same attributes.
3.
Explain any deviation of checklists from the inspection report documents initially used in inspecting the same attributes.


===Response===
===Response===
For each checklist, attributes that have safety signifi-cance were determined according to the following definition:     A safety-significant attribute encompasses one or more characteristics of a component or construction activity that, if not in accordance with applicable design documents, codes, and standards, could impair the ability of the component / activity to perform its safety-related function under design loading conditions.
For each checklist, attributes that have safety signifi-cance were determined according to the following definition:
To determine safety-significant attributes, the QA/QC Review Team reviewed relevant design information, including design drawings, specifications, and other required documents (such as codes and standards) incorporated by reference into the specifications. At the time the CPRT checklists were formu-lated, no comparison was made between the CPRT checklists and the inspection report documents initially used in inspecting the same attributes.     However, if a finding was identified by tl.e CPRT as the result of a reinspection or documentation review conducted under ISAP VII.c, the subsequent root cause evaluation process ofter, examined the original inspection documentation and underlying inspection procedure in pursuit of root cause.
A safety-significant attribute encompasses one or more characteristics of a component or construction activity that, if not in accordance with applicable design documents, codes, and standards, could impair the ability of the component / activity to perform its safety-related function under design loading conditions.
To determine safety-significant attributes, the QA/QC Review Team reviewed relevant design information, including design drawings, specifications, and other required documents (such as codes and standards) incorporated by reference into the specifications.
At the time the CPRT checklists were formu-lated, no comparison was made between the CPRT checklists and the inspection report documents initially used in inspecting the same attributes.
However, if a finding was identified by tl.e CPRT as the result of a reinspection or documentation review conducted under ISAP VII.c, the subsequent root cause evaluation process ofter, examined the original inspection documentation and underlying inspection procedure in pursuit of root cause.
Question No. 4:
Question No. 4:
: 4. Explain the extent to which the checklicts contain fewer attributes than are required for conforman:e to codes to which Applicants are committed to conform.
4.
Explain the extent to which the checklicts contain fewer attributes than are required for conforman:e to codes to which Applicants are committed to conform.


===Response===
===Response===
The appropriate design documents (FSAR, specifications, etc.) conta'ined the criteria to meet code requirements.     These documents were reviewed to determine attributes that have safety significance; i.e., attributes that have a potential to impair a component's or system's ability to perform its safety-related function under design loading conditions.
The appropriate design documents (FSAR, specifications, etc.) conta'ined the criteria to meet code requirements.
These documents were reviewed to determine attributes that have safety significance; i.e.,
attributes that have a potential to impair a component's or system's ability to perform its safety-related function under design loading conditions.
Attributes that were (1) excluded for being non-safety-significant, (2) included in other action plans, or (3) included in documented corrective action programs from the reinspection /
Attributes that were (1) excluded for being non-safety-significant, (2) included in other action plans, or (3) included in documented corrective action programs from the reinspection /
documentation checklists were documented and retained in the VII.c file.
documentation checklists were documented and retained in the VII.c file.
Question No. 5:
Question No. 5:
: 5.     (Answer Question 5 only if the answer to Question 4 is that the checklists do contain fewer attributes.)     Explain the engineering basis, if any, for believi.ng that the safety margin for components (and the plant) has not been degraded by using checklists that contain fewer attributes than are   ,
5.
required for conformance to codes.                           '
(Answer Question 5 only if the answer to Question 4 is that the checklists do contain fewer attributes.)
t
Explain the engineering basis, if any, for believi.ng that the safety margin for components (and the plant) has not been degraded by using checklists that contain fewer attributes than are required for conformance to codes.
' t


===Response===
===Response===
Plearc see the response to question 4.
Plearc see the response to question 4.
Question No. 6:
Question No. 6:
: 6. Set forth any changes in checklists while they were in use, including the dates of the changes.
6.
Set forth any changes in checklists while they were in use, including the dates of the changes.


===Response===
===Response===
Line 121: Line 151:
The working files contain a history of all checklist revisions, including reasons for changes.
The working files contain a history of all checklist revisions, including reasons for changes.
Question No. 7:
Question No. 7:
: 7. Set forth the duration of training in the use of checklists end a summary of the content of that training, including tield training or other practical training. If the train-ing has changed or retraining occurred, explain the reason for the changes or retraining and set forth changes in duration or content.
7.
Set forth the duration of training in the use of checklists end a summary of the content of that training, including tield training or other practical training.
If the train-ing has changed or retraining occurred, explain the reason for the changes or retraining and set forth changes in duration or content.


===Response===
===Response===
Before Quality Instructions and related checklists were issued, they were reviewed in detail with the inspection personnel assigned to the VII.c reinspection program. Before inspections began, each attribute's inspection instruction was reviewed to determine how clear and easily understood it and the accept / reject criteria were. During use, checklists were sometimes revised for the purpose of further clarifying the particular inspection activity. Appropriate training was given for each change. Thus, training was an ongoing activity while inspection was in progress. All training was documented; the VII.c files contain this documentation.
Before Quality Instructions and related checklists were issued, they were reviewed in detail with the inspection personnel assigned to the VII.c reinspection program.
Before inspections began, each attribute's inspection instruction was reviewed to determine how clear and easily understood it and the accept / reject criteria were.
During use, checklists were sometimes revised for the purpose of further clarifying the particular inspection activity.
Appropriate training was given for each change.
Thus, training was an ongoing activity while inspection was in progress.
All training was documented; the VII.c files contain this documentation.
Question Ne. 8:
Question Ne. 8:
: 8. Provide any information in Applicants' possession concern-ing the accuracy of use of the checklists (or the inter-observer reliability in using the checklists). Were there any time periods in which checklists were used with questionable training or QA/QC supervision? If applicable, are problems of inter-observer reliability addressed statistically?
8.
Provide any information in Applicants' possession concern-ing the accuracy of use of the checklists (or the inter-observer reliability in using the checklists).
Were there any time periods in which checklists were used with questionable training or QA/QC supervision?
If applicable, are problems of inter-observer reliability addressed statistically?


===Response===
===Response===
The CPRT QOC Group instituted an overview program of surveillance of the work performed by inspectors.         A portion of each inspector's work was reinspected by another inspector, similarly trained and instructed, using the same checklist, training, and instruction.         This resulted in reliability data for each inspector that was reviewed weekly by the QA/QC Review Team Leader. Any significant change in the inspector's performance was noted, and corrective action was taken.
The CPRT QOC Group instituted an overview program of surveillance of the work performed by inspectors.
A portion of each inspector's work was reinspected by another inspector, similarly trained and instructed, using the same checklist, training, and instruction.
This resulted in reliability data for each inspector that was reviewed weekly by the QA/QC Review Team Leader.
Any significant change in the inspector's performance was noted, and corrective action was taken.
Additionally, please see the response to question 11.
Additionally, please see the response to question 11.
Question No. 9:
Question No. 9:
: 9. Summarize all audits or supervisory reviews (including reviews by employees or consultants) of training or of use       '
9.
of the checklists. Provide the factual basis for believing that the audit and review activity was adequate and that each concern of the audit and review teams has been resolved in a way that is consistent with the validity of conclusions.
Summarize all audits or supervisory reviews (including reviews by employees or consultants) of training or of use of the checklists.
Provide the factual basis for believing that the audit and review activity was adequate and that each concern of the audit and review teams has been resolved in a way that is consistent with the validity of conclusions.


===Response===
===Response===
All QA/QC Review Team activities have been included in audits conducted to date.         Responses and corrective actions were subsequently verified during follow-up audits.
All QA/QC Review Team activities have been included in audits conducted to date.
Responses and corrective actions were subsequently verified during follow-up audits.


Audits of the training of QA/QC Review Team personnel and audits of the procedural checklists they used were performed directly or indirectly. Following is a tabulation of those audits to date for ISAP VII.c:
Audits of the training of QA/QC Review Team personnel and audits of the procedural checklists they used were performed directly or indirectly.
Audit S/N         Method       ISAP         Procedure 86-06         indirect       VII.c     CPP-003, QAP-28 86-03         direct         VII.c     CPP-003 86-02         direct         VII.c     CPP-003 85-03         direct         VII.c     CPP-003 85-01         direct         VII.c     CPP-003 The QA surveillance program continually verified QA/QC Review Team compliance concurrent with specific activities and supp).ied current information to the RTL and key QA/QC personnel regarding:
Following is a tabulation of those audits to date for ISAP VII.c:
          - performance in accordance with program requirements and procedures
Audit S/N Method ISAP Procedure 86-06 indirect VII.c CPP-003, QAP-28 86-03 direct VII.c CPP-003 86-02 direct VII.c CPP-003 85-03 direct VII.c CPP-003 85-01 direct VII.c CPP-003 The QA surveillance program continually verified QA/QC Review Team compliance concurrent with specific activities and supp).ied current information to the RTL and key QA/QC personnel regarding:
          - program activities that required correction Formal corrective actions were tracked and followed to closure.
- performance in accordance with program requirements and procedures
- program activities that required correction Formal corrective actions were tracked and followed to closure.
Question No. 10:
Question No. 10:
: 10. Report any instances in which draft reports were modified in an important substantive way as the result of management action. Be sure to explain any change that was objected to (including by an employee, supervisor, or consultant) in writing or in a meeting in which at least one supervisory or management official or NRC employee was present.
10.
Explain what the earlier drafts said and why they were modified. Explain how dissenting views were resolved.
Report any instances in which draft reports were modified in an important substantive way as the result of management action.
1
Be sure to explain any change that was objected to (including by an employee, supervisor, or consultant) in writing or in a meeting in which at least one supervisory or management official or NRC employee was present.
Explain what the earlier drafts said and why they were modified.
Explain how dissenting views were resolved. 1


===Response===
===Response===
No substantive modification was made to Results Report drafts as a result of management action.
No substantive modification was made to Results Report drafts as a result of management action.
Question No. 11:
Question No. 11:
: 11. Set forth any unexpected difficulties that were encountered in completing the work of each task force and that would be helpful to the Board in understanding the process by which conclusions were reached. How were each of these un-expected difficulties resolved?
11.
Set forth any unexpected difficulties that were encountered in completing the work of each task force and that would be helpful to the Board in understanding the process by which conclusions were reached.
How were each of these un-expected difficulties resolved?


===Response===
===Response===
On January 7, 1986, the NRC identified a concern regarding the differences in results obtained from hardware inspections performed by the CPRT and surveillance inspections perfr,raci by the NRC. These differences were characterized by NRC personnel as occurring at a rather high rate.               Based on this information, the SRT temporarily suspended the CPRT hardware inspection in order to determine the extent and causes of the apparent inspec-tion errors and to institute any appropriate corrective action.
On January 7, 1986, the NRC identified a concern regarding the differences in results obtained from hardware inspections performed by the CPRT and surveillance inspections perfr,raci by the NRC.
These differences were characterized by NRC personnel as occurring at a rather high rate.
Based on this information, the SRT temporarily suspended the CPRT hardware inspection in order to determine the extent and causes of the apparent inspec-tion errors and to institute any appropriate corrective action.
A five-man subcommittee was appointed by the SRT chairman to conduct this investigation.
A five-man subcommittee was appointed by the SRT chairman to conduct this investigation.
The results of the investigation revealed that some NRC concerns wire valid and that the consequent error rate differ-ence was approximately 1%. While this rate is not unacceptably high, the SRT investi.gation did identify opportunities to improve the then-current inspection efforts.
The results of the investigation revealed that some NRC concerns wire valid and that the consequent error rate differ-ence was approximately 1%.
Specific recommendations for program enhancement were made as follows:                                                                 ,
While this rate is not unacceptably high, the SRT investi.gation did identify opportunities to improve the then-current inspection efforts.
t I
Specific recommendations for program enhancement were made as follows:
: 1. Complete review of QIs to eliminate omicsiens and sources of possible interpretive errors.
t ;
: 2. Conduct training and walkdowns on QIs for reinspection personnel and others as necessary.                                 ,
 
: 3. Emphasize to all personnel that the highest priority is completeness and accuracy on the inspections.             Schedule considerations, while important, are secondary to work quality.
1.
: 4. The SRT subcommittee should conduct a debriefing ses-sion for Qoc personnel who participated in the investi-gation and include other interested parties as appropriate.
Complete review of QIs to eliminate omicsiens and sources of possible interpretive errors.
2.
Conduct training and walkdowns on QIs for reinspection personnel and others as necessary.
3.
Emphasize to all personnel that the highest priority is completeness and accuracy on the inspections.
Schedule considerations, while important, are secondary to work quality.
4.
The SRT subcommittee should conduct a debriefing ses-sion for Qoc personnel who participated in the investi-gation and include other interested parties as appropriate.
These recommendations were implemented along with several others described in corrective Action Request (CAR) CP-016.
These recommendations were implemented along with several others described in corrective Action Request (CAR) CP-016.
Included in the CAR action was a reinspection of hardware popu-lations with a high inspection error rate and the recommitment to perform overview inspections.         This overview program described previously in the response to question 8 was just                     ;
Included in the CAR action was a reinspection of hardware popu-lations with a high inspection error rate and the recommitment to perform overview inspections.
,      starting when the VII.c inspections were halted.                 CAR CP-016     ;
This overview program described previously in the response to question 8 was just starting when the VII.c inspections were halted.
confirmed the intent to track the inspection error rates of individual inspectors and discipline groups and to take timely corrective action as necessary.         With implementation of the cor-rective action, the inspections for VII.c were resumed in late
CAR CP-016 confirmed the intent to track the inspection error rates of individual inspectors and discipline groups and to take timely corrective action as necessary.
,      January 1986.       The NRC formally transmitted their findings in inspection report 50-445/86-01; 50-446/86-01, which identified                 i two CPRT deviations related to the failure to comply with                     .
With implementation of the cor-rective action, the inspections for VII.c were resumed in late January 1986.
l
The NRC formally transmitted their findings in inspection report 50-445/86-01; 50-446/86-01, which identified i
two CPRT deviations related to the failure to comply with
. l


approved instructions in performance of reinspections and in-adequate engineering review during preparation of an inspection checklist. TU Electric responded, describing the corrective action taken. No further unexpected difficulties were encoun-tered in this area.
approved instructions in performance of reinspections and in-adequate engineering review during preparation of an inspection checklist.
Another area of difficulty was encountered when the NRC expressed some concern regarding safety significance evalua-tions. On September 1, 1987, TU Electric received NRC inspec-tion report 50-445/87-04; 50-446/87-04. The inspection examined CPRT activity related to the evaluation of inspection and docu-mentation review deviations for safety significance.
TU Electric responded, describing the corrective action taken.
Certain weaknesses, including some of potential generic concern, were identified with respect to the safety significance evaluation (SSE) process and results. Areas of potential generic concern included:   (1) determinations that deviations based on lack of required documentation were not safety-uignificant, (2) improper or inadequate checking of calculations, (3) no consideration of manufacturer criteria and recommendetions in performing SSEs, and (4) apparent lack of consideration of the need to update or rectify certified stress /
No further unexpected difficulties were encoun-tered in this area.
Another area of difficulty was encountered when the NRC expressed some concern regarding safety significance evalua-tions.
On September 1, 1987, TU Electric received NRC inspec-tion report 50-445/87-04; 50-446/87-04.
The inspection examined CPRT activity related to the evaluation of inspection and docu-mentation review deviations for safety significance.
Certain weaknesses, including some of potential generic concern, were identified with respect to the safety significance evaluation (SSE) process and results.
Areas of potential generic concern included:
(1) determinations that deviations based on lack of required documentation were not safety-uignificant, (2) improper or inadequate checking of calculations, (3) no consideration of manufacturer criteria and recommendetions in performing SSEs, and (4) apparent lack of consideration of the need to update or rectify certified stress /
design reports.
design reports.
The CPRT undertook two safety significance evaluation review programs. The first program, "SSE Continuing Review Program," was performed to (1) provide assurance that the SSEs accurately analyzed the deviating plant conditions and identi-fled construction deficiencies or input to Results Reports for trend analysis and (2) ensure that the SSEs conformed to the Safety Significance Evaluation Group procedural requirements, such as problem description, completeness, and justification of L
The CPRT undertook two safety significance evaluation review programs.
conclusions. This program developed a screening process to determine which SSEs were to be subjected te a more detailed review. The objective of the screen was to focus the review on those SSEs that could have led to the failure to identify all construction deficiencies or adverse trends.
The first program, "SSE Continuing Review Program," was performed to (1) provide assurance that the SSEs accurately analyzed the deviating plant conditions and identi-fled construction deficiencies or input to Results Reports for trend analysis and (2) ensure that the SSEs conformed to the Safety Significance Evaluation Group procedural requirements, such as problem description, completeness, and justification of L
The second program, "VII.c Technical Review Program," was conducted to ensure that the trend analysis process of the VII.c program, as implemented, did not fail to identify any adverse or unclassified trends. To accomplish this task, a technical review of the SSEs, as well as the trend analyses conducted for VII.c, was performed. The Technical Review Program included all SSEs and associated calculations, with tne exception of (1) SSEs for deviations that are already covered under CPRT recommenda-tions for corrective action, (2) eleviations that by their nature cannot be safety-significant, and (3) documentation review deviations.
conclusions.
These two review programs resulted in a recommendation that a number of SSEs be revised, primarily for clarification or completeness. These revisions were completed by December 17, 1907.
This program developed a screening process to determine which SSEs were to be subjected te a more detailed review.
The objective of the screen was to focus the review on those SSEs that could have led to the failure to identify all construction deficiencies or adverse trends.
The second program, "VII.c Technical Review Program," was conducted to ensure that the trend analysis process of the VII.c program, as implemented, did not fail to identify any adverse or unclassified trends.
To accomplish this task, a technical review of the SSEs, as well as the trend analyses conducted for VII.c, was performed.
The Technical Review Program included all SSEs and associated calculations, with tne exception of (1) SSEs for deviations that are already covered under CPRT recommenda-tions for corrective action, (2) eleviations that by their nature cannot be safety-significant, and (3) documentation review deviations.
These two review programs resulted in a recommendation that a number of SSEs be revised, primarily for clarification or completeness.
These revisions were completed by December 17, 1907.
As of January 31, 1988, responses have been submitted to the NRC for all open items on NRC inspection report 50-445/87-04; 50-446/87-04.
As of January 31, 1988, responses have been submitted to the NRC for all open items on NRC inspection report 50-445/87-04; 50-446/87-04.
4 Question No. 12:
4 Question No. 12:
: 12. Explain any ambiguities or open items in the Results Repcet.
12.
Explain any ambiguities or open items in the Results Repcet.


===Response===
===Response===
No ambiguities exist in the ISAP VII.c Results Report.       ,
No ambiguities exist in the ISAP VII.c Results Report.
Several items that could not be addressed in the individual appendices (for example, cross-population generic implications) were referred to the Collective Evaluation Report for resolution.
Several items that could not be addressed in the individual appendices (for example, cross-population generic implications) were referred to the Collective Evaluation Report for resolution.
Question No. 13:                                                   I
Question No. 13:
: 13. Explain the extent to which there are actual or apparent conflicts of interest, including whether a worker or super-visor was reviewing or evaluating his own work or supervis-ing any aspect of the review or evaluation of his own work or the work of those he previously supervised.
I 13.
Explain the extent to which there are actual or apparent conflicts of interest, including whether a worker or super-visor was reviewing or evaluating his own work or supervis-ing any aspect of the review or evaluation of his own work or the work of those he previously supervised.


===Response===
===Response===
The CPRT instituted an objectivity evaluation procedure that required personnel involved in CPRT activities carefully to examine possible areas of conflict and to signify whether a con-flict existed. No worker or supervisor has reviewed, evaluated, or supervised any aspect of the review or evaluation of his own work. No conflicts of interest exist.
The CPRT instituted an objectivity evaluation procedure that required personnel involved in CPRT activities carefully to examine possible areas of conflict and to signify whether a con-flict existed.
No worker or supervisor has reviewed, evaluated, or supervised any aspect of the review or evaluation of his own work.
No conflicts of interest exist.
Question No. 14:
Question No. 14:
: 14. Examine the report to see that it adequately discloses the thinking and analysis used. If the language is ambiguous or the discussion gives rise to obvious questions, resolve the ambiguities and anticipate and resolve the questions.
14.
Examine the report to see that it adequately discloses the thinking and analysis used.
If the language is ambiguous or the discussion gives rise to obvious questions, resolve the ambiguities and anticipate and resolve the questions.


===Response===
===Response===
We believe that no ambiguities exist and that no obvious questions are unanswered.
We believe that no ambiguities exist and that no obvious questions are unanswered. -


i Respectfully submitted,                                                               ,
i Respectfully submitted,
Joh/j M. Schauf                      /            l Action Flan VII.c Isd0e Coordinator
()
()
to 3hn L. Hansel           \                   ;
/
l Joh/j M. Schauf Action Flan VII.c Isd0e Coordinator to 3hn L. Hansel
\\
eview Team Leader The CPRT Senior Review Team has reviewed the foregoing responses and concurs in them.
eview Team Leader The CPRT Senior Review Team has reviewed the foregoing responses and concurs in them.
I b
I b
W b
W b
l
. l


Attachment 6.9 QI-008 Rev. 4 Page 1 of 2 CCPJJIG E FE M elsF048r T*Att CEECILtST ror m flos DESC             T R171 car 10s FEC 80.
..9 QI-008 Rev. 4 Page 1 of 2 CCPJJIG E FE M elsF048r T*Att CEECILtST ror m flos DESC T R171 car 10s FEC 80.
Conduit                     I-E-CM'T                                   IAEI I OI 1 hRELESPECTI0a                             O v=tf i EQUImDI MARK / TAG #0.      O noctmidrit:0=         izvtiv           0 watt O co'+ea etuncino.
Conduit I-E-CM'T IAEI I OI 1 hRELESPECTI0a O v=tf i O noctmidrit:0= izvtiv 0 watt EQUImDI MARK / TAG #0.
A ACCIFT           BAJECT     BATE
O co'+ea etuncino.
A ACCIFT BAJECT BATE
: 1) $1:e 6 Material a b
: 1) $1:e 6 Material a b
:).!dentificaties a                                                                   .  .,
:).!dentificaties a b
e
: 3) Origin and Destinat,1on
: 4) Fittines a
b e
b e
: 3) Origin and Destinat,1on
d
: 4) Fittines          a b
$) Espansion Fittings
e d
              $) Espansion Fittings
: 6) Benda
: 6) Benda
: 7) 1.assth and M 1 Potate , ,
: 7) 1.assth and M 1 Potate,,
FADa&ED ST:                                     M IDT D tt:
FADa&ED ST:
SISCIPttut Oct.             Daft                 LEAD 015CIPLlut peCE.     DAtil           '
M IDT D tt:
EsarhIm bis                                       AFF30VE ST:
SISCIPttut Oct.
            & F3 F h W R                 CATE                 LEAD INbPECTOR             CATE l
Daft LEAD 015CIPLlut peCE.
CFF-007.lA. Revtston 0                                                                         l
DAtil EsarhIm bis AFF30VE ST:
& F3 F h W R CATE LEAD INbPECTOR CATE CFF-007.lA. Revtston 0


Attach:ent 6.9 QI-008 Rev. 4 Ia g s 2E2 COWCME PEAR RESPOW5E TEAM CEICR2.!ST PCP N TIOD DESC                                     f n1FICAT10p PKG .40.
Attach:ent 6.9 QI-008 Rev. 4 Ia g s 2E2 COWCME PEAR RESPOW5E TEAM CEICR2.!ST PCP N TIOD DESC f n1FICAT10p PKG.40.
Conduit                                           1 5-CtN'T                         PACE ,L CT 1 vn:T!cAtt0N ACCI?!             R.E.'ECT   DATE                 I
Conduit 1 5-CtN'T PACE,L CT 1 vn:T!cAtt0N ACCI?!
: 8) Tiesible Conduit                   a
R.E.'ECT DATE I
                                                                                                                                                                                                                      ~
: 8) Tiesible Conduit a
~
b c
b c
d I
d I
i
i
: 9) Cable Trey laterface                 a b
: 9) Cable Trey laterface a
f
b f
: 10) Clearance                                                                                                 --
: 10) Clearance a
a b
b
: 11) Fire Steps and Seals               a b     i                                 i e                                             i d
: 11) Fire Steps and Seals a
::) Separation                 at a?                 ,
b i
i e
i d
::) Separation at a?
b:
b:
b, t
b,"
s; c5 t
t s;
er                                                       ._
c5 t
: 13) Junction                     .
er
Bones                     b I
: 13) Junction Bones b
t          t
I t
?                                                                                                             ''.                2. 's .a, s
t
?
: 2. 's
.a, s
2
2


Attach ent 6.1 01-010 Re.. 3 Page 1 of 1 REINSPECTION CRECK11ST ELECTRICAL EQUIPMENT CO.w31 PDJ. Ul?0NSI t!M C31CC I$T P:P'.u ;;;n Otis .             vt1;T;c4 ;cW PKG 30.
Attach ent 6.1 01-010 Re..
c.ie n tCa t s tr e t           t-r-stix                         Pact t Or _L QGA;.17Y 1313bO!!CN Q U DIIEEIIO"                         EN   I Qt-010 L4L;?.~.Di Wi:A0 #0.         O ooc xc<: Art:= intre                 at: 2 COMMcN vit1FICAT:Ch A
3 Page 1 of 1 REINSPECTION CRECK11ST ELECTRICAL EQUIPMENT CO.w31 PDJ. Ul?0NSI t!M C31CC I$T P:P'.u ;;;n Otis.
ACCI7T     RMICT     DATI v
vt1;T;c4 ;cW PKG 30.
1 rhystest                                                               A tdeettfteatten                                     -
c.ie n tCa t s tr e t t-r-stix Pact t Or _L QGA;.17Y 1313bO!!CN Q U DIIEEIIO" EN I
7           '
Qt-010 L4L;?.~.Di Wi:A0 #0.
2 Assembly or g n     ton                                             '
O ooc xc<: Art:= intre at: 2 COMMcN vit1FICAT:Ch A
: a. tecetten                       -    \h/
ACCI7T RMICT DATI v
: b. Ottentation 4 tamate                   i N N l
1 rhystest A
PRI?AA D ST:                                 Af t10%C ST ttSC:Pt wt 1301.             CAtt           LEM CllCl?tiNI EX R. ~   OAit unrE..R 5Y;                                 AJPLOV D si iniLmt                         can           LIA: INS'''*0t           Y cr-x u. no.w o
tdeettfteatten 7
2 Assembly or g n ton
\\h/
: a. tecetten
: b. Ottentation 4 tamate i N N l
PRI?AA D ST:
Af t10%C ST ttSC:Pt wt 1301.
CAtt LEM CllCl?tiNI EX R. ~
OAit unrE..R 5Y; AJPLOV D si iniLmt can LIA: INS'''*0t Y
cr-x u. no.w o


    - -                                                                          Attach ent 6.1     ,
Attach ent 6.1 QI-0!!
QI-0!!             l Rev. I             1 Page 1 of 2 CRECKLIST                                             ,
Rev. I 1
                                                                                                    )
Page 1 of 2 CRECKLIST
i CCMAJ8C11 PEAK I.E.SPCult TIM CEECC.1ST PQFMICM DEsc                 tERITICAT:CM FEG No.
)
Electricot Yquipeest         1.E.t1Is                           Pact t op W 11 D1TECCTICM QI-Cll               OiruSr:CTton                       a est: i EUIrr mi MAM/;AG 30.         @pog;MIFTATIONLITIEW                   pt 2
i CCMAJ8C11 PEAK I.E.SPCult TIM CEECC.1ST PQFMICM DEsc tERITICAT:CM FEG No.
[ C3ecW M IFICATIce       (                               $
Electricot Yquipeest 1.E.t1Is Pact t op W 11 D1TECCTICM QI-Cll OiruSr:CTton a est: i EUIrr mi MAM/;AG 30.
N ACCIFT     BUICT     DATI
@pog;MIFTATIONLITIEW pt 2
                                                                      \A
[ C3ecW M IFICATIce
: 1. Assembly Medif teettee                                     asent Number and lacpector                                                                 '
(
cattifteattee                         a y            n
N
              .. Asse.bly or Modificaties               b             ,
\\A ACCIFT BUICT DATI
: b. laspector h/
: 1. Assembly Medif teettee asent Number and lacpector cattifteattee ay n
Certifiesttee              (
.. Asse.bly or Modificaties b
            !. Assembly Modifiest                                       Document Number and Inspector Certif trat tee -                           N T     V i
h/
: s. Aseeably
: b. laspector Certifiesttee
!      -          Modifies tic   -
(
!. Assembly Modifiest Document Number and Inspector Certif trat tee -
N T
V
: s. Aseeably i
Modifies tic
: b. Inspector certifteattee I
: b. Inspector certifteattee I
: 1. Assembly. Modificaties f
f i
i                                                                      Cocueest Number j               and taspector l
: 1. Assembly. Modificaties Cocueest Number j
Certificatten                               \
and taspector l
Certificatten
\\
: s. Assembly or Medif teetion
: s. Assembly or Medif teetion
: b. laspector certifteattee l
: b. laspector certifteattee MM IT 8 AFFLOT C St; l
MM IT 8                                       AFFLOT C St; 1
1 O W IFL WI EBC1.
O W IFL WI EBC1.               Daft           [M btsc:t;;NE Ext.         Da!I W r m as BTi                                   A F10 m 512
Daft
          '      3* N m    7F                 LEC D$PtC On             ga;g l         CPF 4 ?.lA. tenet,a 0
[M btsc:t;;NE Ext.
Da!I W r m as BTi A F10 m 512 3* N 7F LEC D$PtC On ga;g m
l CPF 4 ?.lA. tenet,a 0


    . .                                                                                Attachment 6.1 QI-011 Rev. 1 CHECKLIST (Cont'd)
..1 QI-011 Rev. 1 CHECKLIST (Cont'd)
COMANCat PEAK ttSPOWlt TEAM CB CK1,1ST PDFllLATION DESC                       vERIFICAT105 FEC #0.
COMANCat PEAK ttSPOWlt TEAM CB CK1,1ST PDFllLATION DESC vERIFICAT105 FEC #0.
Electriest Equipeest                   1-I-Etty                     FACE _ 0F _
Electriest Equipeest 1-I-Etty FACE _ 0F _
V ERIFICATION
V ERIFICATION RMS ACCEPT blJECT DATE
                    #                                                                    RMS ACCEPT     blJECT     DATE
/
: 1. Assembly. Modificettes
Document pueber
                                                %                    /            Document pueber t      tes                                                                           ,,
: 1. Assembly. Modificettes t
: s. Assembly or Modifteattee                                         A   A
tes
: b. !aspector Certificettee                                 /"A       (/h                         i
: s. Assembly or Modifteattee A
: 1. Assembly. Modification Y    Document Dueber      ,
A
and Inspector Certifteattee                 _
: b. !aspector Certificettee
/"A
(/h i
Y Document Dueber
: 1. Assembly. Modification and Inspector Certifteattee
(
(
                                                          '            V
V
: a. Assembly or Modificattee                       h
: a. Assembly or Modificattee h
: b. Inspector                 3 Certifteettee           \ N
: b. Inspector 3
: 1. W eebly                                                           Document pueber
Certifteettee
        .        Cettificatt         -
\\ N
                .. usemb17 er Modif teattee 6                                                      ,
: 1. W eebly Document pueber Cettificatt 6
.. usemb17 er Modif teattee
: b. laspector Certifiesttee
: b. laspector Certifiesttee
: 1. Assembly. Modift attee                                           Document Number sad laspector Certifleaties                                                           ,_
: 1. Assembly. Modift attee Document Number sad laspector Certifleaties
                  . . u.embly .*
.. u.embly.*
Modifteattes
Modifteattes
: b. !aspector
: b. !aspector Certifteettee j
'                    Certifteettee j
i CFt-007.13. Revteteu Q 2
i CFt-007.13. Revteteu Q 2


.  .                                                                                                                                  l
_,,,.1 QI-012 Rev. 1 Page 1 of 1 COMANCHE PE.G. R1570NSE TT.AM Cu CI'I$T-FCPUI.A!!CN CL5C VEM TICA;1on tro 3o, INSUL' MENTATION EQUIFKENT I-E-IKIN FACI 1 CT d QUALITY LN$3UCT10N
_, ,, l Attachment 6.1 QI-012 Rev. 1 Page     1 of 1 COMANCHE PE.G. R1570NSE TT.AM Cu CI'I$T-FCPUI.A!!CN CL5C                 VEM TICA;1on tro 3o, INSUL' MENTATION EQUIFKENT         I-E-IKIN         ,
@ U US?ECTION O cwt: 1 QI-012 LQCl?.".CC P.MA/IAC NO.
FACI 1 CT d QUALITY LN$3UCT10N                                       ...
DOCW DfTATICH HTIIV UNIT 2 Q C0W.05 TERITICATICH A
QI-012                            @ U US?ECTION                                         O cwt: 1 LQCl?.".CC P.MA/IAC NO.               DOCW DfTATICH HTIIV                                     UNIT 2 Q C0W.05 TERITICATICH A       O               ACCIFT                           DATI l11JICT                                    ,
O l11JICT DATI ACCIFT
: 1. Instrusentation Piping /
: 1. Instrusentation Piping /
Tubing and Components                                                                                       .
Tubing and Components 1.1 Material Identification 1.2 Fiping/ Tubing
1.1 Material Identification 1.2 Fiping/ Tubing                                                 \
\\
Site and Marking a.
Site and Marking
                                                                                    )
)
: b.                                       A                 \
a.
1.3 Routten                             A 1.4 slope                             \ NW\
A
1.$ Air Cap                               \1              \V 1.6 Separation                   A             \\Y 1.7     stes lends ,,,.
\\
                                                                  .V
b.
                        ..                -          ~>
A 1.3 Routten
              ~ 1.8 Ties Rose Installation
\\ NW\\
                                              /         M" v
1.4 slope
                                          \ e
\\1
: 2. Insttv3ents 2.1 Identification 2.2 Location                                                                                                       I 2.3 Installation 2.4 Separation
\\V 1.$ Air Cap 1.6 Separation A
: 2. S Carase "PLEIAID 31:                                           MFROVD BT:
\\\\Y 1.7 stes lends,,,.
LEAD DISCIFLINE INCR.                  - DAII Disci?t:NL ENOR.                 DATE D5?LG R AY:                                           MFLOVD 11:
.V
iniina                             DATE               LEAD INS?t: R                             CATE C?? 007.tA, levssion 0
~>
~ 1.8 Ties Rose
/
M" Installation v
\\
e
: 2. Insttv3ents 2.1 Identification 2.2 Location I
2.3 Installation 2.4 Separation
: 2. S Carase "PLEIAID 31:
MFROVD BT:
Disci?t:NL ENOR.
DATE LEAD DISCIFLINE INCR.
- DAII D5?LG R AY:
MFLOVD 11:
iniina DATE LEAD INS?t: R CATE C?? 007.tA, levssion 0


Attacheer.t 6.1 QI-013 Rev. 5 Page   1 of 1 COMANC31 P!M RESPONSE TLui CIEC3::.IST F0P R Il0N DESC               VEF.1 FICA 110W FKG NO.
Attacheer.t 6.1 QI-013 Rev. 5 Page 1 of 1 COMANC31 P!M RESPONSE TLui CIEC3::.IST F0P R Il0N DESC VEF.1 FICA 110W FKG NO.
Instrumentation Equipsent       1.g.ININ.                                 FACILOF d QUALITT LNST1UCT10N qt.og3                         0iEtN5Frctto"                               O cNt! t EQUl?.".EN* .uRJ/1AC NO.       @ DOCU. E ATION R.E71EV                       cNIT 2 O ccie<cN VILITICA!!CN                                               s AU     I ACCIFT       LIJECT     DATI A
Instrumentation Equipsent 1.g.ININ.
FACILOF d QUALITT LNST1UCT10N qt.og3 0iEtN5Frctto" O cNt! t EQUl?.".EN*.uRJ/1AC NO.
@ DOCU. E ATION R.E71EV cNIT 2 O ccie<cN VILITICA!!CN s
AU I
ACCIFT LIJECT DATI A
: 1. Inspection Report and Inspector Certification
: 1. Inspection Report and Inspector Certification
: 2. Instrvsentation Tubing         .
: 2. Instrvsentation Tubing Manufacturing Record Sheet and Inspector
Manufacturing Record Sheet and Inspector Certification                                      [\                                 _
[\\
: 3. Tube lender Qualification Fors 3.1                                     A \
Certification
Z Ovality If Mete Than 81
: 3. Tube lender Qualification Fors A \\
                                                              's     .: .
3.1 Z Ovality If Mete Than 81 fi
y fi                              -
's y
p8 FR.EFAR.D 31:                                     AFFl.7VD ST:
p8 FR.EFAR.D 31:
D15 !PLINE ESOR.               DATE               L     DISCIPLINI EN01.         DATE Ih5FLGIR 51:                                     AFFECVD SY 8
AFFl.7VD ST:
              ;35n;;;;g                     cA;E             LLC INSFECTOR                 DATE
D15 !PLINE ESOR.
        , ,  C?F.007.LA. Levision 0
DATE L
DISCIPLINI EN01.
DATE Ih5FLGIR 51:
AFFECVD SY 8
;35n;;;;g cA;E LLC INSFECTOR DATE C?F.007.LA. Levision 0


Attcchment 6.9 QI-014 Rev. 1 Page 1 of 2 CDMANCdt FIAK RISPCN$1 TIAM C2tCn lst POP',.A;Ich OESC           VERIF!CATICN PEG No.
Attcchment 6.9 QI-014 Rev. 1 Page 1 of 2 CDMANCdt FIAK RISPCN$1 TIAM C2tCn lst POP',.A;Ich OESC VERIF!CATICN PEG No.
CA3LES                       I*t-CABL                           PACI ' 0F d z     QUA1.in IN$71VCTION LILN$PtCTION                       WII l Q1-014 EQUIP.".Dit MAA/ T AC EO. O oce;'xo':4: tea arv:S               O at: 2 O corce"                 -
CA3LES I*t-CABL PACI ' 0F d z
vtR1PICATICN ACCI77     RIJECT   DATE
QUA1.in IN$71VCTION LILN$PtCTION WII l Q1-014 EQUIP.".Dit MAA/ T AC EO.
: 1) Site / Type / Color
O oce;'xo':4: tea arv:S O at: 2 O corce" vtR1PICATICN ACCI77 RIJECT DATE
* h                 '
: 1) Site / Type / Color h
            "                                                            tc.
tc.
* AW Xt A n         .e A
AW Xt A n
:                                                <m         v v
.e A
<m v
v
: 3) Spacing (Power Cables)
: 3) Spacing (Power Cables)
[
[ Y, ww
ww    Y,                 ..
: 4) Slack s
: 4) Slack
/$3
                                      /$3         \[ V s
\\[ V e
e                      I l' --       V d                       A         T
I l' --
V d
A T
: 5) Identification b
: 5) Identification b
: 6) Routleg PRDAAD III                                   Al?&CV C II:
: 6) Routleg PRDAAD III Al?&CV C II:
0:50:Pt;N1 t%R.           :A!!             LEAD !$;;?t:N1 I?01.       3A!!
0:50:Pt;N1 t%R.
IN5HGR 41;                                   Al?tGVD 411
:A!!
                                                        ?<I?!!*!%            DAII
LEAD !$;;?t:N1 I?01.
      .>st!-..a                   :ATI           'IAD C?? C .!A. Revistan 0
3A!!
IN5HGR 41; Al?tGVD 411
.>st!-..a
:ATI
'IAD
?<I?!!*!%
DAII C?? C.!A. Revistan 0


Attachment 6,9 QI-014 Rev. 1 CONANCHE PE!J ttSPCH$t TEAM CHECKL!ST POP N T10N DESC         VttlTICATION FKG >0.
,,9 QI-014 Rev. 1 CONANCHE PE!J ttSPCH$t TEAM CHECKL!ST POP N T10N DESC VttlTICATION FKG >0.
CABLES                 1-t-CABL                       PACE 2 0F 2 VERIFICAT10N ACCIFT   REJECT     DATE "NI
CABLES 1-t-CABL PACE 2 0F 2 VERIFICAT10N "NI ACCIFT REJECT DATE
: 7) Send Radius
: 7) Send Radius
: 8) Supports                                                                       t a
: 8) Supports t
b c
a b
: 9) Sepstation
c
            .                                                            A b                                                         X"/     -
: 9) Sepstation A
: 10) Splices /tepstes b                                             /A       \ 'I e                                            L \T I     V d                                             A '/
b X"/
: 11) Terminations b                                     XX
: 10) Splices /tepstes b
                                                      . 4  \V e                             A         ANN 7 4                           (Cs           X ?
/A
e                           \h N fI                   _        \ VA )
\\ 'I L \\T I V
f2                 /_ )         % \'
e d
f3                 LL'       -    V fa                 V     _T f5                         d1 1 6                     L /
A '/
: 11) Terminations 4
b XX
\\V e
A ANN 7 4
(Cs X
?
e
\\h N fI
\\ V A )
f2
/_
)
% \\'
f3 LL' V
fa V
_T f5 d1 1 6 L /
ay R
ay R
h                                     .
h t
t 3
3 h
h 1
1
: 12) Tie Doe s a
: 12) Tie Doe s a
b                                                                     -
b e
e 4
4 CFP-C07.nl Levasten 0 2
CFP-C07.nl Levasten 0 2
L_
L_


Attechter.: 6.1 QI-015 Rev. 4 Page 1 of 2 CM.V;CXI FI.4 f.I57:531 TIM C3IO:" .:$7 Nf.-a;;;.s ;I5;               it?.;;;;A;;cs tk; ..;.
Attechter.: 6.1 QI-015 Rev. 4 Page 1 of 2 CM.V;CXI FI.4 f.I57:531 TIM C3IO:".:$7 Nf.-a;;;.s ;I5; it?.;;;;A;;cs tk;..;.
cutis                           R-1-CML                                             PA;I ! T 1 G.'A.'N 151:A.;;;;N u.ets                         O ut:: 52::=       =
cutis R-1-CML PA;I ! T 1 G.'A.'N 151:A.;;;;N u.ets O ut::52::= =
0 aut in;2..I;.! .WAi:A; .% .       @ 000W.DrTA!; :t RI?!!v                             ] w;; 2 0 ::w.::
0 aut in;2..I;.!.WAi:A;.%.
vi?.:T;CA7;;N                 {
@ 000W.DrTA!; :t RI?!!v
                  ^       I ID OII AO:27; l R.I.*I;;           DATIl 1.0 Innecter           a   I            l                        I                      ^         - - -
] w;; 2 0 ::w.::
Certt!!catten     b     i           t                         I                   //
vi?.:T;CA7;;N
e                 *                        '                    \\^
{
d                 *                        '                      X'/     -
^
                                  .                                        e               .        \ \/ >
I AO:27; l R.I.*I;;
f                                                     (\             \/'
DATIl ID OII I
                                                                                            \\
l I
2.1 Racevay Astert- e V
1.0 Innecter a
at e fer tvil     b   I           '                        '\\TI e           i                       e X'/
^
i 2.: Full Tensten       a                               -      .
Certt!!catten b
b    i          i
i t
                                                                / \\\ \
I
c   8           8             \ENW\
//
d                                 A h \V e                   A               \W f                 \\\               \/
e
                                                      \ \N, ' \           '
\\\\^
d X'/
e
\\ \\/ >
f
(\\
\\/
\\\\
2.1 Racevay Astert-e
'\\\\TI V
at e fer tvil b
I e
i e X'/
i 2.: Full Tensten a
/ \\\\\\ \\
b i
i c
8 8
\\ENW\\
d A h \\V e
A
\\W f
\\\\\\
\\/
\\ \\N, ' \\
2.3 C4tle Lutricatt N
2.3 C4tle Lutricatt N
77D AAD 3T:                                     MP1;bC SI:
77D AAD 3T:
                                    ~
MP1;bC SI:
0150:?'.;N! Ih;R.             DA;1             '. ! c O ! 5 0 : ?'. . :.1 1:.01.       DA!!
~
iMils!L; lia                                   M!J.;'t R 414 si W ;a                     :C             '. N Bl?!;" t                             DA!!
0150:?'.;N! Ih;R.
DA;1
'. ! c O ! 5 0 : ?'.. :.1 1:.01.
DA!!
iMils!L; lia M!J.;' R 414 t
si W ;a
:C
' N Bl?!;" t DA!!
C??-X I. A. Rev'.st.:n 0
C??-X I. A. Rev'.st.:n 0


Attoch ent 6.1 QI-015 Rev. 4 CCr# CHI PEAK t!$F055t TLt.M CPICKLIST PCP AATICh CE5C               vtR111 CAT LS PAC 50.
Attoch ent 6.1 QI-015 Rev. 4 CCr# CHI PEAK t!$F055t TLt.M CPICKLIST PCP AATICh CE5C vtR111 CAT LS PAC 50.
CABLIS                       R E-CA3L                           PACI L CT 1
CABLIS R E-CA3L PACI L CT 1
                                      % ERIFIC A*lCN
% ERIFIC A*lCN L
* L    I ACCEPT   P. EJECT       DATE Attribute not detu?teted en origital 7"CC0 inspectices.
I ACCEPT P. EJECT DATE Attribute not detu?teted en origital 7"CC0 inspectices.
2.4 teleted                                                  Ceretic IR issued.
Ceretic IR issued.
2.5 :efects/catage l                                   .
2.4 teleted 2.5 :efects/catage l
2.6 Catie Testing     a
2.6 Catie Testing a
                            , ,                                            .      \ .x >
\\.x >
2.7 Catie Jattet/                                                               V Itsulatice Renval 2.8 te:ted           a A      \\
2.7 Catie Jattet/
cerrectices     b
V Itsulatice Renval 2.8 te:ted a
                                                                        \)
cerrectices b
e                              .\l\         '
A
                                                          /MX\
\\\\
.\\l\\
\\)
e
/MX\\
2.9 spitees/
2.9 spitees/
1 m iesis                           g              3 2.10 Feat shrinkatte               g Tubits of Kits               qv- ,
g 3
2.11 tapairs 2.12 Frefabricated a Cables         b e
1 m iesis 2.10 Feat shrinkatte g
t CPP-CC7.11, Sev1stan 0 2
Tubits of Kits qv 2.11 tapairs 2.12 Frefabricated a Cables b
e t
CPP-CC7.11, Sev1stan 0 2


Attachment 6.5 QI-016 Rev. 3 Page 1 of 2   -
..5 QI-016 Rev. 3 Page 1 of 2 CHECKLIST CONA:lC:lt P!AT. RESPON5! TEAM CHECILIST Fvf Qi10h CtX dt?.1FICaf;cs Pr4 30.
CHECKLIST CONA:lC:lt P!AT. RESPON5! TEAM CHECILIST Fvf Qi10h CtX                   dt?.1FICaf;cs Pr4 30.
CAltt T u Y t*t-CATT-FACE 1 0F 2 QUALITY IN5:1WCTION gg gg x Lt1NSFECTION Q UNIT t (QLI?:st.%I rWLAi!AC bO.
CAltt T u Y                             t*t-CATT-                                   FACE 1 0F 2 QUALITY IN5:1WCTION gg gg                       x Lt1NSFECTION                             Q UNIT t (QLI?:st.%I rWLAi!AC bO.         O ooc w crt^tre" alvttv                     0 entt
O ooc w crt^tre" alvttv 0 entt
                                                                                              . O c:xxe" vtR1FICAT10N A D II
. O c:xxe" vtR1FICAT10N A D II
* I ACCIFT         LIJECT     Daft
* I ACCIFT LIJECT Daft
            $ 1 Cable Tray                                                       ,
$ 1 Cable Tray identification and b
identification and
3.1.7
                  ,. ,                                                  .        b 3.1.7
' V>
                                                            > q^           V>>
>q^
                  $ t.3 5.2 Camage T  N            V
$ t.3 T N V
                    $.2                       +         =     '
5.2 Camage
            $.3 Configuretten             {
$.2
                    $.3.1               b s.3.2                 D\
+
5.3.3                       b 5.3.4 5.3.3 s.,.s 3.4 Clearante
=
            $.$ Tire Steps FLIFAAD ST:                                                 AFFLQvta ST 015c!PLtht t>01.                     CAtt                 LEA: DISC PLI.%E tisCR.       CATE IM5FtGILD BY                               -
{
AFFA0n D 81:
$.3 Configuretten
INsu m K                               CA!;               LEAD thSPICTOR               SA!!
$.3.1 bD\\
s.3.2 5.3.3 b
5.3.4 5.3.3 s.,.s 3.4 Clearante
$.$ Tire Steps FLIFAAD ST:
AFFLQvta ST 015c!PLtht t>01.
CAtt LEA: DISC PLI.%E tisCR.
CATE IM5FtGILD BY AFFA0n D 81:
INsu m K CA!;
LEAD thSPICTOR SA!!
CPFaWli.lA. Revistan 0
CPFaWli.lA. Revistan 0


Attachment 6.5 QI-016 Rev. 3 CHECK 11ST (Cont'd)
..5 QI-016 Rev. 3 CHECK 11ST (Cont'd)
CONANCHE PEAK S!$PON$E TEA,M CHECKLIST e POPLLAi!QN DESC           %1Rif1 CAT [VM FLC h0.
CONANCHE PEAK S!$PON$E TEA,M CHECKLIST e
C All.E TRAT               l t-CATT-                       FACE L OF 1
POPLLAi!QN DESC
                                                  %ER!TICATICN A "I ACCEPT     REJtCT     DATE RN5 5.6 Separation Critetta                                                       -
%1Rif1 CAT [VM FLC h0.
                      $.7.1 Leestion                                       b 5.7.2 Wald $1:e                                   -          A 5.7.1 Weld tength                                 (4 S.7.4 Fusion                             /\
C All.E TRAT l t-CATT-FACE L OF 1
                      $.7.5 Cratere                               d 5.7.6 Weld trefiles
%ER!TICATICN A
                      $.7.7 Undercut 5.7.8 Percetty     .m v(s:>A  x/
"I RN5 ACCEPT REJtCT DATE 5.6 Separation Critetta
                      ?.7.9 Overlap
$.7.1 Leestion b
                    $.7.10 Surface $1aa v
5.7.2 Wald $1:e A
5.7.11 Weld Crache               ,                                                      ,
5.7.1 Weld tength (4
5.7.12 Veldere ID tecord Symbol                                       Veldere TD r
S.7.4 Fusion
l CPP-Q?.it. Sevtsten 0 I
/\\
$.7.5 Cratere d
5.7.6 Weld trefiles
$.7.7 Undercut x
vs:>A /
5.7.8 Percetty
.m
(
?.7.9 Overlap
$.7.10 Surface $1aa v
5.7.11 Weld Crache 5.7.12 Veldere ID tecord Symbol Veldere TD r
CPP-Q?.it. Sevtsten 0 I
2
2


Attach snt 6.1 QI-017 Rev. I Page 1 of 1 COMWilt P'u etsP%3t itM Cuttttist NFwVf Wa DL5s                   v LP & T 1011'W Pt #9 rehte Trans                         l'F fAtt                                       FACE I Of 1 M ' 1k&t&wGt&Wu
Attach snt 6.1 QI-017 Rev. I Page 1 of 1 COMWilt P'u etsP%3t itM Cuttttist NFwVf Wa DL5s v LP & T 1011'W Pt #9 rehte Trans l'F fAtt FACE I Of 1 M ' 1k&t&wGt&Wu O esta$rtet*
          ,,,,,,                        O esta$rtet*                                   O att i LQUIPMKAI MA8Asi w No.           @ 00CDDTAfl04 BCTitv                           O att 2 O c==
O att i LQUIPMKAI MA8Asi w No.
vi*titsAtrum
@ 00CDDTAfl04 BCTitv O att 2 O c==
* SIEII ACC!PT     etJfC       CAtt I. Cable Tre? IR                                                       8''''4     8' **
vi*titsAtrum SIEII ACC!PT etJfC CAtt I. Cable Tre? IR 8''''4 8'
: 1. Tre? Cevee 18                                                       8"''8 I' ""*
: 1. Tre? Cevee 18 8"''8 I' ""*
: 3. Weldtes
: 3. Weldtes peterd Dee. he.
            ,,                                                                peterd Dee. he.
_ [
g,                                                _ [               eerd Welder lft
eerd Welder lft g,
: e.                                                       V D
V e.
A         ,
D A
      . . _ ,,,                                        . ,,,e       ...
.,,,e O tte t PL t at test.
O tte t PL t at test .           catt           L t A.D O ll C l P 41'a t l's t .     blE DarlsT G 114                                     Ah t0*LD 4ti
catt L t A.D O ll C l P 41'a t l's t.
      . : an s                         ra,-           t; w ;alf'         's                 e s't c'9..wt ? t a , e s, s e i .e 4
blE DarlsT G 114 Ah t0*LD 4ti
. : an s ra,-
t; w ;alf'
's e s't c'9..wt ? t a, e s, s e i.e 4


1 l
1
Attachment 6.1 COMANCHE PEAK RESPONSE TEAM               QI.o}9 CHECKLIST                       Rev. 4 POPULATION DESC             VERIFICATION PKG NO.                                   1 SMALL BORE PIPE SUPPORTS     I-S-SBPS-                           PAGE 1 0F 6       l QUALITT INSTRUCTION QI-019                       X REINSPECTION O usIt t EQUIPMENT MARK / TAG NO.       DOCUMEKfATION RIVIEW                   UNIT 2
,.1 COMANCHE PEAK RESPONSE TEAM QI.o}9 CHECKLIST Rev. 4 POPULATION DESC VERIFICATION PKG NO.
((] COMMON VERIPICATION A                                                             KZMA##S ACCEPT     REJECT     DATE 1 Identification 2 Location and Orientation 3 Configuration                                                                     e A. Corponents B. Materials               N/A     N/A                 Document Review only' C. Installation D. Clearance E. brouting F. Baseplates G. Edge Distance           N/A     N/A                   Information Only 4 Bolting A. Engagement B. Surface Contact C. Richmond Insert D. Locking Devices E. U-Bolts F. Torque                                                 Wrench No.     Cal. Due PRIPAAED BT:                               APPROVED BY:
1 SMALL BORE PIPE SUPPORTS I-S-SBPS-PAGE 1 0F 6 l
DISCIPLINE ENGR.           DATE             LEAD DISCIPLINE ENGR.         DATE IN5PELIED BY:                               APPROVED BY:
QUALITT INSTRUCTION QI-019 X REINSPECTION O usIt t EQUIPMENT MARK / TAG NO.
IN5FILIVR                   DATE           LEAD INSPECTOR               DATE CPP-007.1A Revision 0
DOCUMEKfATION RIVIEW UNIT 2
((] COMMON VERIPICATION A
KZMA##S ACCEPT REJECT DATE 1 Identification 2 Location and Orientation 3 Configuration e
A. Corponents B. Materials N/A N/A Document Review only' C. Installation D. Clearance E. brouting F. Baseplates G. Edge Distance N/A N/A Information Only 4 Bolting A. Engagement B. Surface Contact C. Richmond Insert D. Locking Devices E. U-Bolts F. Torque Wrench No.
Cal. Due PRIPAAED BT:
APPROVED BY:
DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE IN5PELIED BY:
APPROVED BY:
IN5FILIVR DATE LEAD INSPECTOR DATE CPP-007.1A Revision 0


l l
COMASCHE PEAK RES?ONSE TEAM QI-0M CHICKLIST I M tI M E NhE SUPPORT!
COMASCHE PEAK RES?ONSE TEAM                                 QI-0M                 >
bbbbbhbW 2
CHICKLIST I M tI M E NhE SUPPORT!                           bbbbbhbW
6 PAGs. _ 0F VERITICATION A
* 2        6 PAGs. _ 0F
BUTE ACCEPT REJECT DATE 5 Welding 5.1 Integral A. Location B. Size C. Profile D. Reinforcement E. Undercut F. Surface G. Offset H. Cracks Lack of Fusion
                                                                . , , , . ,                  VERITICATION A     BUTE                                                                                                 '
: 1. welders ID J. Rurt 5.2 Non-integral A. Location B. Site C. Profile D. Reinforcement E. Undercut F. Surface G. Offset H. Cracks, Lack of Fusion I. Welders ID N/A N/)
ACCEPT   REJECT       DATE 5 Welding 5.1 Integral A. Location B. Size C. Profile D. Reinforcement E. Undercut F. Surface G. Offset H. Cracks Lack of Fusion                                                                                                             ,
Document Reviev Only 6 Concrete Expansion Anchors A. Site B. Length
: 1. welders ID J. Rurt 5.2 Non-integral A. Location B. Site C. Profile D. Reinforcement E. Undercut F. Surface G. Offset H. Cracks, Lack of Fusion I. Welders ID                                 N/A         N/)                                 Document Reviev Only 6 Concrete Expansion Anchors A. Site
~
                                                                                                                                                                      ~
C. tabedsent D. Spacing E. Angularity F. Nut Engagement and Bearing G. Concrete Damage
B. Length C. tabedsent D. Spacing E. Angularity F. Nut Engagement and Bearing G. Concrete Damage
..+va
                                          ..        .    ..+va .= 1
.= 1


A i ; .s ; .. , .. ; '.: -
A i ;.s ;..,.. ; '.:
CC'). SCHE PIAK RES?OISE TEAM           QI-019 CHECKLIST                     Rev. 4 NthhhE ['hE SUPPORTS             N-[-NEE
CC'). SCHE PIAK RES?OISE TEAM QI-019 CHECKLIST Rev. 4 NthhhE ['hE SUPPORTS N-[-NEE 3
* 3 PAG.c ,_, OP 6
6 PAG.c,_, OP VERIFICATION AIIE13UIE
                          %, ...      VERIFICATION AIIE13UIE                                                         '^A ACCEPT   REJECT   DATE 7 Component Support Catalog Items A. Snubber
'^A ACCEPT REJECT DATE 7 Component Support Catalog Items A. Snubber
: 1. Angularity
: 1. Angularity
: 2. Jam Nut Torque
: 2. Jam Nut Torque
Line 505: Line 733:
: 5. Bearing Spacers
: 5. Bearing Spacers
: 6. *1hread Engagement
: 6. *1hread Engagement
: 7. Safety Wire                                                                           e
: 7. Safety Wire e
: 8. Eye Rod Threads
: 8. Eye Rod Threads
: 9. Eye Rod Thread Engageeent                                                                         '
: 9. Eye Rod Thread Engageeent
: 10. Binding
: 10. Binding
              / Offset
/ Offset
: 11. Fasteners
: 11. Fasteners
: 12. Sperical Bearing B. Sway Struts
: 12. Sperical Bearing B. Sway Struts
: 1. Hardware
: 1. Hardware
: 2. Rear Bracket Orientation
: 2. Rear Bracket Orientation
: 3. Angularity
: 3. Angularity 4.
: 4. Sperical BearinF
Sperical BearinF
: 5. Eye Rod Threads
: 5. Eye Rod Threads
: 6. Eye Rod Thread Engagement
: 6. Eye Rod Thread Engagement
Line 526: Line 754:
: 13. Parallelism
: 13. Parallelism


As ies h. ;.; ' .
As ies h. ;.; '.
COMA.NCHE PEAK RESPONSE TEAM           QI-019 CHECKLIST                     Rev. 4 kbbhkhhb SkEhIIkbNEPlhESUPPORTS                                                                    4         6 PAC.c ,_, 0 T
COMA.NCHE PEAK RESPONSE TEAM QI-019 CHECKLIST Rev. 4 SkEhIIkbNEPlhESUPPORTS kbbhkhhb 4
                                    -            . . .            VERIFICATION AII IIUII                                                                           REMARXS ACCEPT   REJECT   DATE l
6 PAC.c,_, 0 T VERIFICATION AII IIUII REMARXS ACCEPT REJECT DATE l
7 Component Support Catalog Items (Cont'd)
7 Component Support Catalog Items (Cont'd)
C. Spring Can/
C. Spring Can/
Line 537: Line 765:
: 4. Rod
: 4. Rod
: 5. Threads
: 5. Threads
: 6. Thread                                                                                                 e Engagement
: 6. Thread e
Engagement
: 7. Angularity
: 7. Angularity
: 8. Fasteners                                                                                           e D. Low Friction Bearing Plates
: 8. Fasteners e
D. Low Friction Bearing Plates
: 1. Location
: 1. Location
: 2. Plate type
: 2. Plate type
: 3. Lubricant
: 3. Lubricant
: 4. Corners l           8. Modified Component Support Catalog Items A. NPSI Sway Struts
: 4. Corners l
: 1. Adjustable Struts (                       L)
: 8. Modified Component Support Catalog Items A. NPSI Sway Struts
Weld Site Profile                                                                 Per 5.5.2 (A)
: 1. Adjustable Struts (
Reinforcement                                                           Per 5.5.2 (B)
L)
Undercut                                                                 Per 5.5.2 (C)
Weld Site Profile Per 5.5.2 (A)
Surface of Weld                                                         Per 5.5.2 (D)
Reinforcement Per 5.5.2 (B)
Offset                                                                   Per 5.5.2 (E)
Undercut Per 5.5.2 (C)
Cracks, Lack of Fusion                                                                   Per 5.5.2 (F)
Surface of Weld Per 5.5.2 (D)
Offset Per 5.5.2 (E)
Cracks, Lack of Fusion Per 5.5.2 (F)


A;; ch e ; 5.1 COMASCHE PEAK RES?ONSE TEAM           QI-019 CHECKLIST                   Rev. 4 SNbh0MNb SUPPORTS                   gjf]gjgN     G 0.
A;; ch e ; 5.1 COMASCHE PEAK RES?ONSE TEAM QI-019 CHECKLIST Rev. 4 SNbh0MNb SUPPORTS gjf]gjgN G
5                                       6 pac.c __ 07
0.
                                . . .      VERITICATION ATTRISCTE                                                     REMARKS ACCEPT   REJECT   DATE
5 6
pac.c __ 07 VERITICATION ATTRISCTE REMARKS ACCEPT REJECT DATE
: 8. Modified Component Support Catalog Items (Cont'd)
: 8. Modified Component Support Catalog Items (Cont'd)
: 2. Fixed Sway St ruts (ii)     .
: 2. Fixed Sway St ruts (ii)
Weld Site Profile                                           Per 5.5.2 (A)
Weld Site Profile Per 5.5.2 (A)
Reinforcement                                     Per 5.5.2 (B)
Reinforcement Per 5.5.2 (B)
Undercut                                           Per 5.5.2 (C)
Undercut Per 5.5.2 (C)
Surrace of Weld                                   Per 5.5.2 (D)
Surrace of Weld Per 5.5.2 (D)
Offset                                             Per 5.5.2 (E)                                           .
Offset Per 5.5.2 (E)
Cracks, Lack of Fusion                                             Per 5.5.2 (F) e B. ITT Grinnell Sway St ruts Weld Size Profile                                           Per 5.5.2 (A)
Cracks, Lack of Fusion Per 5.5.2 (F) e B. ITT Grinnell Sway St ruts Weld Size Profile Per 5.5.2 (A)
Reinforcement                                     Per 5.5.2 (B)
Reinforcement Per 5.5.2 (B)
Undercut                                           Per 5.5.2 (C)
Undercut Per 5.5.2 (C)
Surface of Weld                                   Per 5.5.2 (D)                                             t offset                                             Per 5.5.2 (E)
Surface of Weld Per 5.5.2 (D) t offset Per 5.5.2 (E)
Cracks, Lack of Tusion                                             Per 5.5.2 (F)
Cracks, Lack of Tusion Per 5.5.2 (F)
C. Snubber Transition Kits Weld Site Profile                                                 Per 5.5.2 (A)
C. Snubber Transition Kits Weld Site Profile Per 5.5.2 (A)
Reinforcement                                           Per 5.5.2 (B)
Reinforcement Per 5.5.2 (B)
Undercut                                                 Per 5.5.2 (C)
Undercut Per 5.5.2 (C)
Surface of Weld                                         Per 5.$.2 (D)
Surface of Weld Per 5.$.2 (D)
Offset                       _
Offset Per 5.5.2 (E)
Per 5.5.2 (E)
Cracks, Lack of Tusion Per 5.5.2 (F) c 1
Cracks, Lack of Tusion                                                   Per 5.5.2 (F) c 1
3........
      . . . , , - ;>  3........ 3
3


A i i . d . .... . . ; ' .
A i i. d....... ; '.
CCMA.NCHE PEAX RES?ONSE TEAM         QI-019 CHICKLIS7                   Rev. 4 kkkt kbNE P$hE SUPPORTS                 fkbhkkhb                 PAG.c               6
CCMA.NCHE PEAX RES?ONSE TEAM QI-019 CHICKLIS7 Rev. 4 kkkt kbNE P$hE SUPPORTS fkbhkkhb c __6 6
__60F
PAG.
                                                      -  . . - .        VERITICATION AIIEIIUII                                                         REMARKS ACCEP*   REJECT   DATE
0F VERITICATION AIIEIIUII REMARKS ACCEP*
                                  . " !fff f C:r;:n:::
REJECT DATE
*. " !fff f C:r;:n:::
Support Catalog Items (Cont'd)
Support Catalog Items (Cont'd)
D. NPSI Torward Bracke       t Site 1/4 - 10 Bracket Dimensio'ns(i )
D. NPSI Torward Bracke t Site 1/4 - 10 Bracket Dimensio'ns(i )
Bracket Welds (ii)
Bracket Welds (ii)
Weld Site Profile                                                   Per 5.5.2 (A)
Weld Site Profile Per 5.5.2 (A)
Reinforcement                                             Per 5.5.2 (B)
Reinforcement Per 5.5.2 (B)
Undercut                                                 Per 5.5.2 (C)
Undercut Per 5.5.2 (C)
Surface of Weld                                           Per 5.5.2 (D)                       e Offset                                                   Per 5.5.2 (E)
Surface of Weld Per 5.5.2 (D) e Offset Per 5.5.2 (E)
Cracks, Lack of Fusion                                                   Per 5.5.2 (T)                     '
Cracks, Lack of Fusion Per 5.5.2 (T)
Distortion (iii)
Distortion (iii)
E. hPSI Forward Bracke         :
E. hPSI Forward Bracke Size 35 and 100 Bracket Dimensions (1}
Size 35 and 100 Bracket Dimensions (1}
Forward Brackar Weldo(11)
Forward Brackar Weldo(11)
Weld Site Profile                                                   Per 5.5.2 (A)
Weld Site Profile Per 5.5.2 (A)
Reinforcement                                             Per 5.5.2 (B)
Reinforcement Per 5.5.2 (B)
Undercut                                                   Per 5.S.2 (C)
Undercut Per 5.S.2 (C)
Sv.rface of Weld                                           Per 5.5.2 (D)
Sv.rface of Weld Per 5.5.2 (D)
Offset                                                     Per 5.5.2 (E)
Offset Per 5.5.2 (E)
Cracks Lack of Fusion                                                     Per 5.5.2 (F)
Cracks Lack of Fusion Per 5.5.2 (F)
T. Dual Spring Can Assemblies
T. Dual Spring Can Assemblies
: 1. Assembly Dimensions (J )
: 1. Assembly Dimensions (J )
: 2. Weld Sites (ii)
: 2. Weld Sites (ii)
Weld Site Profile                                                     Per 5.5.2 (A)
Weld Site Profile Per 5.5.2 (A)
Reinforcement                                             Per 5.5.2 (B)
Reinforcement Per 5.5.2 (B)
Undercut                                                   Per 5.5.2 (C)
Undercut Per 5.5.2 (C)
Surface of Weld                                           Per S.5.2 (D)
Surface of Weld Per S.5.2 (D)
Offset                                                     Per 5.5.2 (E)
Offset Per 5.5.2 (E)
Cracks Lack of Fusion                                                     Per 5.5.2 (F)
Cracks Lack of Fusion Per 5.5.2 (F) s,.
                            ... s ,.    .


a
..1 a
          ,                                                                                                  Attachment 6.1 QI-020 Rev. 1 Page 1 of 2 COMA,C3E 9          P!M RISPON$t TIAM C310::.15*
QI-020 Rev. 1 Page 1 of 2 COMA,C3E P!M RISPON$t TIAM 9
PGF'.bn;> ;L5;                           7Ekin0An CN PKG 30.
C310::.15*
IMI I OI .
PGF'.bn;> ;L5; 7Ekin0An CN PKG 30.
SyAL SCRI FIFE $'.7 PORTS QCCTI 131TIUC 1CN c1 020 RIV. 1                            OIInir=::=                                   0=t LOG?.   "
IMI I OI.
CG .We 44 % .             @ DOC"METTATION LE71EW                       [ ITNI* 1
SyAL SCRI FIFE $'.7 PORTS QCCTI 131TIUC 1CN OIInir=::=
[ COMMCN v il: T*.0A!!cw       t
0=t c1 020 RIV. 1 LOG?. CG.We 44 %.
                        #        I AC IFT l 1UECT lCA!!l                                         -
@ DOC"METTATION LE71EW
[ ITNI* 1
[ COMMCN v il: T*.0A!!cw t
I AC IFT l 1UECT lCA!!l
: 1. $werett tackase
: 1. $werett tackase
: 2. trawtet tevtsten N/A           WIA
: 2. trawtet tevtsten N/A WIA
: 3. luttert Packste Review
: 3. luttert Packste Review
: 4. Testeeter cetttfteattees
: 4. Testeeter cetttfteattees
: 1. West Musters
: 1. West Musters 6.
: 6. Veldtet A. Procedute Apolteattee B. Veld Material Traces %t!!te C. Velder N a t i f ic a t t oe s D. Procedure Na11f teattees E. IL;act Tests 1.
Veldtet A. Procedute Apolteattee B. Veld Material Traces %t!!te C. Velder N a t i f ic a t t oe s D. Procedure Na11f teattees E. IL;act Tests 1.
11.
11.
111.
111.
PLI?AAID II:                                               Aff EV C Sti CA!!               t! C D 15;' ?'..N1 t'41.     DATE O!!C FLINI EE 2.
Aff EV C Sti PLI?AAID II:
A.PPk0V Q IT:
O!!C FLINI EE 2.
CA!!
t! C D 15;' ?'..N1 t'41.
DATE A.PPk0V Q IT:
ib5FIL.R 314
ib5FIL.R 314
                                                                            '. ; c !?!:- t             7 4?!
:. 5 : ; -
:. 5 : ; -  .a                        3., ' ;
.a 3., ' ;
            ,    '? ? + m! '. .h . t e ". . n ) .
'. ; c
!?!:- t 7 4?!
'? ? + m! '..h. t e ".. n )


Attach ent 6.1 QI-020 Rev. 1 Page 2 of 2 COMANCtt PEAR RESPoult TEAM CEECElst FCFMUQN M5C                   fn1TICAT10W Pt.G 50.                   2 N1 2 0F 5% L 80Rt FIFE SUPPORTS TILIFICATION ADUM               ACCEP*   RIJECT   DATE
Attach ent 6.1 QI-020 Rev. 1 Page 2 of 2 COMANCtt PEAR RESPoult TEAM CEECElst FCFMUQN M5C fn1TICAT10W Pt.G 50.
2 2
N1 0F 5% L 80Rt FIFE SUPPORTS TILIFICATION ADUM ACCEP*
RIJECT DATE
: 6. Velding (Cont'd) tv.
: 6. Velding (Cont'd) tv.
v.
v.
Line 641: Line 884:
: c. Severk D. Role Det11tet
: c. Severk D. Role Det11tet
: t. Setttet e
: t. Setttet e
: p. WDE Docuneetatten
p.
: e. Steetfie ttess A. Torque 1.
WDE Docuneetatten e.
Steetfie ttess A. Torque 1.
11.
11.
111.
111.
Line 648: Line 892:
: 3. Settet Cae setttet C. Sewhat Adaptet thread eetatement D. SesWer ettche CM -MI.ll. Revisken 0
: 3. Settet Cae setttet C. Sewhat Adaptet thread eetatement D. SesWer ettche CM -MI.ll. Revisken 0


Attachment 6.1 COMANCHE PEAK RESPONSE TEAM               QI-021 CHECKLIST                     Rev. 2 F0FVLATION DESC                   VERITICATION FKG NO.
..1 COMANCHE PEAK RESPONSE TEAM QI-021 CHECKLIST Rev. 2 F0FVLATION DESC VERITICATION FKG NO.
Piping Systen Bolted                 I-M-PBOM.                           PACE 1 0F   l Joints / Material QUALITY INSTRUCTION QI-021                             () REINSPECTION                       ((] UNIT 1 "E UI? MENT MARK / TAG S0.               DOCUMENTATION REVIEb'           [ UNIT 2-
Piping Systen Bolted I-M-PBOM.
[] CCMHON VERITICATION RD4AlutS ACCEPT     REJECT     DATE
PACE 1 0F l
Joints / Material QUALITY INSTRUCTION QI-021
() REINSPECTION
((] UNIT 1 "E UI? MENT MARK / TAG S0.
DOCUMENTATION REVIEb'
[ UNIT 2-
[] CCMHON VERITICATION RD4AlutS ACCEPT REJECT DATE
: 1) Bolt / Screw / Cap Screw Diameter
: 1) Bolt / Screw / Cap Screw Diameter
: 2) Nut Neight                                                                             *
: 2) Nut Neight
: 3) Bolt / Scud / Cap Screv Thread Engagement                                                                 ,
: 3) Bolt / Scud / Cap Screv Thread Engagement 4A) Bolt / Stud / Cap Screw and Nut Material 4B) Casket / Dielectric Type
4A) Bolt / Stud / Cap Screw and Nut Material 4B) Casket / Dielectric Type
: 5) Tiange Rating and Type
: 5) Tiange Rating and Type
: 6) Bolted Joint Completeness
: 6) Bolted Joint Completeness
: 7) Gaske Coverage j
: 7) Gaske Coverage j
FRIP ARED BY :                                     APPROVED BY DISCIPLINE $NGR.                 DATE             LEAD DISCIPLINE ENGR.         DATE
FRIP ARED BY :
,                                      INSFELIED BY:                                     APPROVED SY :
APPROVED BY DISCIPLINE $NGR.
IN57!CTOR                         DATE           LEAD INS?ECTOR               DATE
DATE LEAD DISCIPLINE ENGR.
                                        ':?? a07. A. R e v'. n an 0
DATE INSFELIED BY:
APPROVED SY :
IN57!CTOR DATE LEAD INS?ECTOR DATE
':?? a07. A.
R e v'. n an 0


Attachment 6.1 COMANCRE PEAE RESPONSE TEAM             Q1 022           i CEECKLIST                     Rey, 1           l chanee Notice 002 F0FULATION DESC               VERITICATION PKG No.
..1 COMANCRE PEAE RESPONSE TEAM Q1 022 i
Piping Systen Bolted                                                                 I R-M-PBOM-                             PACE 1 0F ,2 ,
CEECKLIST Rey, 1 chanee Notice 002 F0FULATION DESC VERITICATION PKG No.
Joints / Material                                                                     j QUALITT INSTRUCTION QI-022                         ([] REINSPECTION                     (~] UNIT 1 EQUIPMENT MARK / TAG No.     @ DOCUMENTATION REVIEW               D UNtT 2 O como*
Piping Systen Bolted R-M-PBOM-PACE 1 0F,2,
VERIPICATION I                                                       N ACCEPT     REJECT     DATE
Joints / Material j
QUALITT INSTRUCTION QI-022
([] REINSPECTION
(~] UNIT 1 EQUIPMENT MARK / TAG No.
@ DOCUMENTATION REVIEW D UNtT 2 O como*
VERIPICATION I
N ACCEPT REJECT DATE
: 1) Bolt / Stud / Cap Serev Verification 1A) Q.C. Verification / Sign Off
: 1) Bolt / Stud / Cap Serev Verification 1A) Q.C. Verification / Sign Off
: 15) Bolt / Stud / Cap Screv Nut Certification 1" Nominal                                                                     '
: 15) Bolt / Stud / Cap Screv Nut Certification 1" Nominal Diameter and Smaller IC) Bolt / Stud / Cap Screw and Nut Color Code Verification-1" Nominal Diameter and Smaller 1D) Bolt / Stud / Cap Screw and Nut Certi-fication-Greater than 1" Nominal Diameter
Diameter and Smaller IC) Bolt / Stud / Cap Screw and Nut Color Code Verification-1" Nominal Diameter and Smaller 1D) Bolt / Stud / Cap Screw and Nut Certi-fication-Greater than 1" Nominal Diameter
: 2) Deleted
: 2) Deleted
: 3) Deleted
: 3) Deleted
: 4) Alignment Verification
: 4) Alignment Verification
: 5) Deleted PRIPARED ST:                                   APPROVED SY:
: 5) Deleted PRIPARED ST:
DISCIPLINE ENCR.             DATE             LEAD DISCIPLINE ENGR.       DATE IN5FILIED BY                                 APPROVED SY; LM5FILIUR                     DATE           LEAD INSFECTOR               DATE CPP-007.1A. Revision 0
APPROVED SY:
DISCIPLINE ENCR.
DATE LEAD DISCIPLINE ENGR.
DATE IN5FILIED BY APPROVED SY; LM5FILIUR DATE LEAD INSFECTOR DATE CPP-007.1A. Revision 0


Attachment 6.1 COMA.NCHE PEAK RES?ONSE TEAM   QI-022 CHICKLIST             Rev. 1 Channe Notice 001 POP!.*LAT;0N DESC             VERIT; CAT;0N PKG .NO.
..1 COMA.NCHE PEAK RES?ONSE TEAM QI-022 CHICKLIST Rev. 1 Channe Notice 001 POP!.*LAT;0N DESC VERIT; CAT;0N PKG.NO.
P1 Ping System Bolted R-M-PSOM-               PAGE 1 OT 2 Joints / Material VERITICATION AI
P1 Ping System Bolted R-M-PSOM-PAGE 1 OT 2
* IUII                                                       $
Joints / Material VERITICATION AI
ACCE?!   REJECT   DATE
* IUII ACCE?!
REJECT DATE
: 6) Deleted
: 6) Deleted
: 7) QC Inspector Certification l
: 7) QC Inspector Certification l
Line 685: Line 947:
C??-007.13. Rev ston 0
C??-007.13. Rev ston 0


Attachment 6.1 COMANCHE PEAK RESPONSE TEAM               QI-023. Rev. 3
..1 COMANCHE PEAK RESPONSE TEAM QI-023. Rev. 3 CHECKLIST Page 1 of 3 POPULATION DESC VERITICATION PKC NO.
                      .                        CHECKLIST                       Page 1 of 3 POPULATION DESC               VERITICATION PKC NO.
HYAC EQUIPMENT INSTALLATION 1-M-HVIN-PACE 1 0F j QUALITY INSDUCTION QI-023 RIINSPECTION O ew1T t EQUIPMENT MARK / TAG NO.
HYAC EQUIPMENT INSTALLATION       1-M-HVIN-                       PACE 1 0F j QUALITY INSDUCTION QI-023                       RIINSPECTION                     O ew1T t EQUIPMENT MARK / TAG NO.     O DoCvxExTATION REv1Ev               0 uw1T 2 O ConMON VERIFICATION ACCEPT     REJECT     DATE           IIKAIII
O DoCvxExTATION REv1Ev 0 uw1T 2 O ConMON VERIFICATION IIKAIII ACCEPT REJECT DATE
: 1. Identification
: 1. Identification
: 2. Location
: 2. Location
: 3. Orientation                                                                       .
: 3. Orientation
: 4. Duct Connections i
: 4. Duct Connections i
: a. Bolt Tension
: a. Bolt Tension
: b. Casket
: b. Casket
: 1. Continuity r
: 1. Continuity r
: 2. Caps           '
: 2. Caps
: c. Thread Engagement
: c. Thread Engagement
: 5. Flange Site PREPARED ST:                                   APPROVED AT:
: 5. Flange Site PREPARED ST:
DISCIPLINE ENCR.               DAtt             LEAD DISCIPLINE Ehh ,     DATE INSPECTED ST:                                   APPROVID ST:
APPROVED AT:
INSPECTOR                       DATE           LEAD IMSPECTOR             DATE CPP-007.!A, Revision 0
DISCIPLINE ENCR.
DAtt LEAD DISCIPLINE Ehh,
DATE INSPECTED ST:
APPROVID ST:
INSPECTOR DATE LEAD IMSPECTOR DATE CPP-007.!A, Revision 0


  . 7 COMANCHE PDK RESPONSE TEAM                                                                     Attcchsent 6.1 I                                         CRECKLIST                                                                           QI-023 Rev. 3 Page 2 of 3 "POPULATION DESC               VERITICATION PKG NO.
7 COMANCHE PDK RESPONSE TEAM Attcchsent 6.1 I
MVAC EQUIPMENT INSTALLAT10N       1-M-WVIN-                                                                             -t ---$
CRECKLIST QI-023 Rev. 3 Page 2 of 3 "POPULATION DESC VERITICATION PKG NO.
VERITICATION ACCEPT   RIJECT                                                                                     3 DATE
MVAC EQUIPMENT INSTALLAT10N 1-M-WVIN-
-t VERITICATION 3
ACCEPT RIJECT DATE
: 6. Tans
: 6. Tans
: a. Tan Wheel Clearance                                                                                                                                       ,
: a. Tan Wheel Clearance
: b. Tiexible                                                                                                                                         3 Connections
: b. Tiexible 3
: 1. Configuration
Connections 1.
: 2. Connections
Configuration 2.
Connections
: c. (Sub-Attribute Deleted)
: c. (Sub-Attribute Deleted)
: d. Axial Fans
: d. Axial Fans
: 7. Fire Dampers and Penetrations
: 7. Fire Dampers and Penetrations
: a. Configuration
: a. Configuration
: b. Retaining Angles                                                                                                                                 ,
: b. Retaining Angles
: 1. Site
: 1. Site
: 2. Dimensions z
: 2. Dimensions z
: c. Fire Damper /                                                                                                                                     l Sleeve Attachment                                                                                                                               !
: c. Fire Damper /
t C??-007.15. Reauten 0
l Sleeve Attachment t
C??-007.15. Reauten 0


COMANCVE PEJX RESPONSE TEAM       Attachment 601 CRECKLIST                 QI-023. Rev. 3 Page 2 of 1 j            POPVLATION DESC               VERITICATION PKG No.
COMANCVE PEJX RESPONSE TEAM 01 CRECKLIST QI-023. Rev. 3 Page 2 of 1 POPVLATION DESC VERITICATION PKG No.
MVAC EQUIPMENT INSTALLATION     1-M-HVIN-               -$ O F ,_9, VERITICATION 3 TE                                                     3 ACCEPT   REJECT   DATE
j MVAC EQUIPMENT INSTALLATION 1-M-HVIN-
-$ O F,_9, VERITICATION 3 TE 3
ACCEPT REJECT DATE
: 8. Modulating and Isolation Dampers
: 8. Modulating and Isolation Dampers
: a. Configuration 1.Flanga Bolt                                                           -
: a. Configuration 1.Flanga Bolt Spacing i
Spacing i
: 2. Actuator Mounting Brat'st a
: 2. Actuator Mounting Brat'st a
: b. Actuator
: b. Actuator
: 9. Gravity Dampers l                 a. Free Movement
: 9. Gravity Dampers l
: a. Free Movement
(
(
l l                 b. Counterweight 1
l l
: 10. Air Flow Monitoring l                 Stations 1
: b. Counterweight 1
: a. Instrumentation l                     Connection                                                             ;
: 10. Air Flow Monitoring Stations l
I C??-So? 15. Re" s t en 0 t
1
: a. Instrumentation l
Connection I
C??-So? 15. Re" s t en 0 t


l                                                                         Attcchsent 6.1 COMANCRE FEAK RESPONSE TEAM                 QI-025 CRECKLIST                       gey, 4 F0FVLATION DESC               VERIFICATION PKG NO.
l Attcchsent 6.1 COMANCRE FEAK RESPONSE TEAM QI-025 CRECKLIST gey, 4 F0FVLATION DESC VERIFICATION PKG NO.
LARCE BORE PIPING               I-M-LBC0                             FACE 1 0F 3 CONFICL' RATION QUALITT INSTRUCTION QI-025                         ()) REINSPECTION                       [)) UNIT 1 EQUIPMENT MARK / TAG No.           00CIDENTATION REVIEV                 UNIT 2
LARCE BORE PIPING I-M-LBC0 FACE 1 0F 3 CONFICL' RATION QUALITT INSTRUCTION QI-025
[ COMMON
()) REINSPECTION
                                                                -      VERIFICATION ADI       I ACCEPT       REJECT     DATE
[)) UNIT 1 EQUIPMENT MARK / TAG No.
00CIDENTATION REVIEV UNIT 2
[ COMMON VERIFICATION ADI I
ACCEPT REJECT DATE
: 1. PipinR Orientation
: 1. PipinR Orientation
: a. Component Sequence
: a. Component Sequence
: b. Centerline Elevation c . N-S . E-k' Loca t ion                                                             ,
: b. Centerline Elevation c. N-S. E-k' Loca t ion
: d. Linear Dimensions                                                               '
: d. Linear Dimensions
: e. Branch Connections
: e. Branch Connections
: f. Piping Clearances
: f. Piping Clearances
Line 750: Line 1,028:
: b. Stem Angle
: b. Stem Angle
: c. Valve Identification Number
: c. Valve Identification Number
: d. Flev Direetten FREPARED BY:                                   APPROVED BY:
: d. Flev Direetten FREPARED BY:
DISCIPLINE ENGR.             DATE               LEAD DISCIPLINE ENGR.       DATE IN5FICTLD BY:                                   APPROVED BY:
APPROVED BY:
IM5FICTOR                     DATE             LEAD INSPECTOR               DATE CPP-007 lA Revision 0
DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE IN5FICTLD BY:
APPROVED BY:
IM5FICTOR DATE LEAD INSPECTOR DATE CPP-007 lA Revision 0


f o                             '                              .
f P
P COMANCME PIAK RES?0NSE TEAM       Q1-025 CHICKLIST               I*'' '
o COMANCME PIAK RES?0NSE TEAM Q1-025 CHICKLIST I*''
FOPtlLATION DESC                                       VER1TICATION PKG .NO.
FOPtlLATION DESC VER1TICATION PKG.NO.
1.ARGE BORE PIPING                       I-M-LBCO               PAGE 1 0F     3 CONFICt1tATION VER1FICATION Am SC             ACCEPT                              RD'. ARKS REJECT   DATE
1.ARGE BORE PIPING I-M-LBCO PAGE 1 0F 3
CONFICt1tATION VER1FICATION Am SC RD'. ARKS ACCEPT REJECT DATE
: 3. Eccentric Reducers
: 3. Eccentric Reducers
: a. Orientation
: a. Orientation
: 4. Deleted
: 4. Deleted
: 5. Orifice /T1ow Element Assemblies
: 5. Orifice /T1ow Element Assemblies
: a. T1ange Tap                                                                 .
: a. T1ange Tap Orientation
Orientation
: b. Location
: b. Location
: c. Identification                                                             .
: c. Identification
: d. Flow Direction
: d. Flow Direction
)                                                                                                         6. Expansion Joints
)
: 6. Expansion Joints
: a. Identification
: a. Identification
: b. Tie Bars
: b. Tie Bars
Line 774: Line 1,057:
: a. Deleted
: a. Deleted
: b. Deleted
: b. Deleted
,                                                                                                                  c. Joint Sealant 1
: c. Joint Sealant 1
                                                                                                          ''e*** .. .             %C'-.akJS )
''e***...
%C'-.akJS )


o                                                      *
{
{
ms...-...                                         C.;   i COMA.NCHE FEAK RES?0NSE TEAM                                                           QI-025                                                   l CRECKLIST                                                                 I''' '
o ms...-...
f POPULATION DESC                                                                                                                                                                         (
C.;
VERITICA* ION PKG NO.                                                                                                                         t LARGE SORE PIFING             I-N-LSCO CONFIC11tATION                                                                            PAGE J OT J                                                                     !
i COMA.NCHE FEAK RES?0NSE TEAM QI-025 l
VERITICATION A   I ACCIPT   REJECT                                             DATE                 II2'''AE3                                                     !
CRECKLIST I'''
: 8. $ trainers                                                                                                                                                             '
f
i t
(
: a. Identification No,                                                                                                                                                 t
POPULATION DESC VERITICA* ION PKG NO.
t LARGE SORE PIFING I-N-LSCO PAGE J OT J CONFIC11tATION VERITICATION A
I ACCIPT REJECT DATE II2'''AE3
: 8. $ trainers i
t
: a. Identification No, t
: b. Flow Direction
: b. Flow Direction
: 9. Moment Restraints
: 9. Moment Restraints
: a. Identification i
: a. Identification i
: 10. Elbows                                                                                                                                                                 1 i
: 10. Elbows 1
i
: s. Identification I
: s. Identification I
i l
i l
Line 799: Line 1,088:
f i
f i
I i
I i
i
i o.st'.,1, Ed"',b,*+
                                                                          ,,                      o.st'.,1,         Ed"',b,*+ .                                                                                                                                                    ~
~


COMANCHE FEAK RESPONSE TEAM                   Attachment 6.1 CXECKLIST                         nt.026 Rev. 3 g"gg gg                     VERIFICATION PKG NO.
COMANCHE FEAK RESPONSE TEAM.1 CXECKLIST nt.026 Rev. 3 g"gg gg VERIFICATION PKG NO.
1-M-SnCO.
1-M-SnCO.
CONFIGURATION PAGE 1 0F ,_1, QUALITT INSTRUCTION                                                                         ,
PAGE 1 0F,_1, CONFIGURATION QUALITT INSTRUCTION QI-026 (j) REINSPECTION
QI-026                   (j) REINSPECTION                       ((] UNIT 1               I EQUIPMINT MAJK/ TAG No. C DOCtHDffAT10N RIVIEV                 O extT 2
((] UNIT 1 I
((] CCHMON VERIFICATION A   II                                                         RD KKS ACCEPT       RIJECT     DATE
EQUIPMINT MAJK/ TAG No.
C DOCtHDffAT10N RIVIEV O extT 2
((] CCHMON VERIFICATION A
II RD KKS ACCEPT RIJECT DATE
: 1. Piping Orientation
: 1. Piping Orientation
: a. Component Sequence
: a. Component Sequence
: b. Centerline Elevation
: b. Centerline Elevation
: e. N-S.E-V Location
: e. N-S.E-V Location
: d. Linear Dimensions                                                             '
: d. Linear Dimensions
: e. Branch Connections
: e. Branch Connections
: f. Piping Clearances
: f. Piping Clearances
Line 820: Line 1,112:
: a. Elevatten
: a. Elevatten
: b. Stem Angle
: b. Stem Angle
: c. Valve Identification No.                                                                               _  l
: c. Valve Identification No.
: d. Flow Direction PREPARED BY:                                 APPROVED BY:                                   ;
l
DISCIPLINE ENCR.         DATE               LEAD DISCIPLINE ENCR.         DATE IN5FEc;La BY:                               APPROVED BY:
: d. Flow Direction PREPARED BY:
i "IN5FECTOR                   DATE             L EAD INSPECTOR               DATE CFF.007.!A. Revt:1on 0
APPROVED BY:
DISCIPLINE ENCR.
DATE LEAD DISCIPLINE ENCR.
DATE IN5FEc;La BY:
APPROVED BY:
i "IN5FECTOR DATE L EAD INSPECTOR DATE CFF.007.!A. Revt:1on 0


o       .
o COMANCHE PEAK RESPONSE TEM.1 CRECKLIST QI.026 r
COMANCHE PEAK RESPONSE TEM                                 Attachment 6.1 CRECKLIST                                       QI.026             r Rev. 3             ;
Rev. 3 P0F' LATION DESC VERITICA;10N PKG No.
P0F'JLATION DESC                 VERITICA;10N PKG No.                                                         !
J SMALL DORE PIPING PACE ~ ST ~2 l
SMALL DORE PIPING CONFICt' RATION                  I*N*IICO'             PACE ~ ST ~2                                      l L
I*N*IICO' CONFICt' RATION L
VERITICATION                                                             I A
VERITICATION I
ACCEPT   KIJECT                         REMAKXS DATE
A REMAKXS ACCEPT KIJECT DATE
.                3. Eccetstric Reducers                                                                                   [
: 3. Eccetstric Reducers
: a. Orientatten,                                                                                         '
[
A. Deleted
: a. Orientatten, A. Deleted 1
.                                                                                                                          1
5.
: 5.     Orifice /flo.                                                                                     f Element Assemblies
Orifice /flo.
: a. Plange Tap                                                                                       -  !
f Element Assemblies
__ , Orientation t,   ' cation l               c. Identification
: a. Plange Tap
* 4                .d. Flev Direction 1
__, Orientation t,
t             6. Expansion Joints i
' cation l
: c. Identification 4
.d. Flev Direction 1
t 6.
Expansion Joints i
: a. Identification
: a. Identification
: b. Tie Bars                                                                                               i t
: b. Tie Bars i
: c. Dimensions                                                                                           '
t
i
: c. Dimensions i
: 7. Screwed Joints                                                                                     l t
7.
: a. Deleted                                                                                               t I                                                                                                                         i
Screwed Joints l
)                 b. Deleted l
t
: a. Deleted t
I i
)
: b. Deleted l
j
j
: e. Joint Sealant t
: e. Joint Sealant t
t i               8. Strainers                                                                                           ,
t i
: a. Identiffeatian No.                                                                                     ,
8.
l l                 b. Tiov Direction
Strainers
: 9. Moment Restraints
: a. Identiffeatian No.
: a. Identification                       ,
l l
1
: b. Tiov Direction 9.
: 10. Elbows                                                                                                 !
Moment Restraints
: a. Identification                                                                                         [
: a. Identification 1
: 10. Elbows
: a. Identification
[
i l
vw..
I e ' '.00.'. ;, i,
w.,
)
i l
i l
vw..                                                                                  I e ' ' .00 .' . ; , i , w.,    ., )                                                                                i l                                                                                                                          [
[


r   -
r
Attachment 6.1 QI-027         ;
..1 QI-027 Rev. 3 j
Rev. 3         j Page 1 of 3   '
Page 1 of 3 COMANCHE PEAK RESPON5E TEAM CHECKLIST PGP'J.AI'CN OLSC VERITICATICN FKG.10.
COMANCHE PEAK RESPON5E TEAM CHECKLIST PGP'J.AI'CN OLSC               VERITICATICN FKG .10.
LARGE BCRI PIPE SUPP-RIGID I-5-L85R-b QUALITY INSTRUCTION gg,g p
LARGE BCRI PIPE SUPP-RIGID     I-5-L85R-                                       b QUALITY INSTRUCTION gg,g p       .
{LIINSPECTION O trxzT t EQUIPMENT MA11/IAC NO.
{LIINSPECTION                           O trxzT t EQUIPMENT MA11/IAC NO.
O ooc=="T''toa tr'ta O trait 2 0==
O ooc =="T''toa tr'ta                   O trait 2 0 ==
vt11TICATIOC ATTRIBUTE ACCEPT REJECT DATE
vt11TICATIOC ATTRIBUTE ACCEPT     REJECT     DATE
: 1. _Identifiestion
: 1. _Identifiestion
: 2. Location and Orientation                                                 en.
: 2. Location and Orientation en.
: 3. Configuration
: 3. Configuration
_A. Components S. Materials               N/A         N/A C. Insta11stien                                           Tor information only       ,
_A. Components S. Materials N/A N/A C. Insta11stien Tor information only D. Clearance E. Grouting of laseplates/T1oors T. Grouting of SasePlates/
D. Clearance E. Grouting of laseplates/T1oors T. Grouting of SasePlates/
Walle 6 Ceiliese
Walle 6 Ceiliese
: 4. Bolting A. Entagement
: 4. Bolting A. Entagement
: 8. Surface Contatt C. Rietoond Insert D.
: 8. Surface Contatt C. Rietoond Insert D. Lockins Devices
              ~ Lockins Devices E U-bolto T. Torque C. Edae Distance           N/A         N/A N. Grout-In Anchors                                       for information only
~E U-bolto T. Torque C. Edae Distance N/A N/A N. Grout-In Anchors for information only
: 5. Integral Attactment Velds A. Location
: 5. Integral Attactment Velds A. Location
: 5. Site C. Profile D. Reinforcement E. Undercut ue F. Surface Cod ition PRIPAAZD Eit MPtovtD 8f:
: 5. Site C. Profile D. Reinforcement E. Undercut ue F. Surface Cod ition PRIPAAZD Eit MPtovtD 8f:
DISCIPLINt DCR.             DATE IN5F h4 2 III                                   LEAD DISCIPLINE Deck.       DAtt M PECTED ST:
DISCIPLINt DCR.
im h wK DATI             LEAD INSPECTCt             DATE CPP-007.lA. Revision 0
DATE IN5F h4 2 III LEAD DISCIPLINE Deck.
DAtt M PECTED ST:
im h wK DATI LEAD INSPECTCt DATE CPP-007.lA. Revision 0


Attech2ent 6.1 QI-027 Rev. 3
Attech2ent 6.1 QI-027 Rev. 3
::yr cx Pra .tt:?st: : >.x 03!0T.*. * !!
::yr cx Pra.tt:?st: : >.x 03!0T.*. * !!
            '/~}'.'.4!;;N ;!i;               711; ;;A ;;s px; :.;.
'/~}'.'.4!;;N ;!i; 711; ;;A ;;s px; :.;.
LARGE 80KI P!PI St'PP-RIC :D     I-5 Last-                 ?A;I 2 07 3 VER;T;CA!;CN IEMAAE3 AC0!P*
LARGE 80KI P!PI St'PP-RIC :D I-5 Last-
lLI.*!CT DA!!
?A;I 2 07 3 VER;T;CA!;CN lLI.*!CT DA!!
IEMAAE3 AC0!P*
: 5. Integral Attachment Velds (Cont'd)
: 5. Integral Attachment Velds (Cont'd)
C. Offsets H. Cracks / Fusion
C. Offsets H. Cracks / Fusion
: 1. Welder ID               N/A       N/A           For Information only J. Rust
: 1. Welder ID N/A N/A For Information only J. Rust
: 6. Support Velds (NF)                                                               .
: 6. Support Velds (NF)
A. Location                                                                     8 B. Stae C. Profile D. Seinforceteet E. Undercut F. Surface C. Offsete H. Cracks / Fusion
A. Location 8
: 1. 6 elder ID               N/A       N/A             For Inf ormation Only
B. Stae C. Profile D. Seinforceteet E. Undercut F.
: 7. Concrete Espansion Anchors A.   $13e/ length B. Embedeset Length C. Bolt Spacina D. Anaulerity E. Concrete Oamage F. Nut Engagement /
Surface C. Offsete H. Cracks / Fusion
: 1. 6 elder ID N/A N/A For Inf ormation Only
: 7. Concrete Espansion Anchors A. $13e/ length B. Embedeset Length C. Bolt Spacina D. Anaulerity E. Concrete Oamage F. Nut Engagement /
Beatles
Beatles
: 8. Ceaponent Support Catalog Itema A. Sway Strut
: 8. Ceaponent Support Catalog Itema A. Sway Strut
: 1. Hardware
: 1. Hardware
: 2. Rear Bracket Orientation
: 2. Rear Bracket Orientation
: 3. Araularity
: 3. Araularity 4.
: 4. Spherical Bestina S. Eye Rod Thread 7                                                       i
Spherical Bestina S. Eye Rod Thread 7 i
: 6. Eye Rod Thread                                                         '
: 6. Eye Rod Thread Ersagement
Ersagement
: 7. Eve Rod Jaa Nut l
: 7. Eve Rod Jaa Nut l                   8. Sindtes                                                                 t
: 8. Sindtes t
: 9. Fasteners                                                               i
: 9. Fasteners i
: 10. Bearteg Spacer (s)
: 10. Bearteg Spacer (s)
                        / Vertical Lead Pin it. Beartra Spacer (s)
/ Vertical Lead Pin it. Beartra Spacer (s)
: 12. Torque
: 12. Torque
          '7 ' 'd .' . 3 . ' d" . n :e i l
'7 ' 'd.'. 3. ' d". n :e i l
i
i


Attachrent 6.1 QI-027 Rev. 3 I                                       ::.u. ::e.: ?!c 1::? sst : .e XI;;;*. ~ ~
Attachrent 6.1 QI-027 Rev. 3 I
              !;?..       ;;s :11;                   41R;7;;4 ;n ?R :4.
::.u. ::e.: ?!c 1::? sst :.e XI;;;*. ~ ~
LMCI BORI PIPE $UPP RIC10                 1-5-LB19-                 FA;- 3 :T 3 VER;7;;A : N A     *3' I AC;;PI  lRI.*!;Tl3 ATE
!;?..
;;s :11; 41R;7;;4 ;n ?R :4.
LMCI BORI PIPE $UPP RIC10 1-5-LB19-FA;- 3 :T 3 VER;7;;A : N A
*3' I
lRI.*!;Tl3 ATE AC;;PI
: 8. Component Support Catalog Itema (Cont'd)
: 8. Component Support Catalog Itema (Cont'd)
: 13. Clapp Halves B. Low Friction Bearing Plate
: 13. Clapp Halves B. Low Friction Bearing Plate
: 1. Location
: 1. Location
: 2. Plate Tne           *
: 2. Plate Tne
: 3. Lubricant                                   !
: 3. Lubricant 4
Coreers
Coreers
: 9. Modified Component Support Catalog Items A. NP$1 $way $truts                                                       ,
: 9. Modified Component Support Catalog Items A. NP$1 $way $truts
: 1. Adjuetable Struts (i) held Stae           i                       I Profile                                    ,        Per 5.6.1 Retnforcement                               i         Per 5.6.2 Undercut                                              Per 5.6.3 Surface of beld                                    i Per 5.6.6 Offset                                                I'' I'''
: 1. Adjuetable Struts (i) held Stae i
Cracks. Lack of Fusten                                                Per 5.6.6 l                       2. Fized $way Strute(it)
I Per 5.6.1 Profile Retnforcement i
!                          Veld $1re y,,ggg,                                               Per 5.6.1 Reinforcement                                         Per 5.6.2 (ndercut                                             Per 5.6.3 l                           Surf ace of nield                                     Per 5.6.6
Per 5.6.2 Per 5.6.3 Undercut i
[                            Offset                                                I*' I'0*
Per 5.6.6 Surface of beld I''
Cracks. Lack of Tusion                                                Per 5.6.6
I'''
: 8. ITT Crinnell $way
Offset Cracks. Lack of Per 5.6.6 Fusten l
;                        Struts l                           Veld Site pg,ggg,                                              Per 5.6.4 Reinforcement                                        Per 5.6.2 Undereut                                              Per 5.6.3 Surface of weld                                       Per 5.6.6 ngg,,,                                                Per 5.6.5 Cracks. Lack of yy,g,,                                              Per $.6.6 i
: 2. Fized $way Strute(it)
                          ,3,   y,     .
Veld $1re Per 5.6.1 y,,ggg, Per 5.6.2 Reinforcement Per 5.6.3 (ndercut l
* 3
Surf ace of nield Per 5.6.6 I*'
 
I'0*
Attachment 6.1 QI-028 Revision 1 Page 1 of 3 CCMANCHE PEAK RISPONSE TIAM CHICI.IST POPULATION DESC             VERITICATION PKG NO.
[
LARCE BORI PIPE SUPP-RICID   R-S-LBSR-                           P ACE 1 0F _3 QUALITY INS RUCTION QI-028                       0iztx5rictio"                         O est: t EQUIPMENT MARK / TAG NO.     @ DOCMGNTATION RIVIEW                 G ent: 2 O cowHos VIIITICATION ACCIFT     IIJICT     DATE
Offset Cracks. Lack of Per 5.6.6 Tusion
: 8. ITT Crinnell $way Struts l
Veld Site Per 5.6.4 pg,ggg, Per 5.6.2 Reinforcement Per 5.6.3 Undereut Surface of weld Per 5.6.6 Per 5.6.5 ngg,,,
Cracks. Lack of Per $.6.6 yy,g,,
i
,3, y,
3
.1 QI-028 Revision 1 Page 1 of 3 CCMANCHE PEAK RISPONSE TIAM CHICI.IST POPULATION DESC VERITICATION PKG NO.
P ACE 1 0F _3 LARCE BORI PIPE SUPP-RICID R-S-LBSR-QUALITY INS RUCTION QI-028 0iztx5rictio" O est: t EQUIPMENT MARK / TAG NO.
@ DOCMGNTATION RIVIEW G ent: 2 O cowHos VIIITICATION ACCIFT IIJICT DATE
: 1. Support Package
: 1. Support Package
: 2. Drawing Revision
: 2. Drawing Revision
: 3. Support Package Review       N/A         N/A
: 3. Support Package Review N/A N/A
: 4. Inspector Certifications
: 4. Inspector Certifications
: 5. Heat Numbers
: 5. Heat Numbers 6.
: 6. Welding A. Procedure Application B. Weld Material Traceability C. Welder Qualifications D. Procedure Qualificatione PRIPARED ST:                                 APP 10V C ST:
Welding A. Procedure Application B. Weld Material Traceability C. Welder Qualifications D. Procedure Qualificatione PRIPARED ST:
DISCIFLINI ENCE.             DATE             LEAD DISCIPLINI ENGR.     DATI INsFE46w RT:                                 APPROVE BY:
APP 10V C ST:
I iN5FIGGK                     DATE           L EAD IN S P EC*CR         DATE C?P-007.lA. Revision 0 l
DISCIFLINI ENCE.
DATE LEAD DISCIPLINI ENGR.
DATI INsFE46w RT:
APPROVE BY:
I iN5FIGGK DATE L EAD IN S P EC*CR DATE C?P-007.lA. Revision 0 l


Attachmene 6.1 Q2-028 Revision 1 Page 2 of 3 COMANCRE FEAK RESPONSE TEAM CHECILIST F0FU1AT105 DESC             YE11TICAT10N FKG NO.
Attachmene 6.1 Q2-028 Revision 1 Page 2 of 3 COMANCRE FEAK RESPONSE TEAM CHECILIST F0FU1AT105 DESC YE11TICAT10N FKG NO.
LARGE BORZ FIFE SITFF-RICID   R-5-LBSR.                 FACE 2 0F 3 VERIFICATION ACCEPT   REJECT   DATE
LARGE BORZ FIFE SITFF-RICID R-5-LBSR.
FACE 2 0F 3 VERIFICATION ACCEPT REJECT DATE
: 6. Welding (Cont'd)
: 6. Welding (Cont'd)
E. Impact Tests a.
E. Impact Tests a.
Line 950: Line 1,284:
e.
e.
F. Heat Treatment C. Hold Points
F. Heat Treatment C. Hold Points
: 7. Concrete Expansion Anchors A. Hilti Bolt Torque l                   1.
: 7. Concrete Expansion Anchors A. Hilti Bolt Torque l
1.
2.
2.
B. Bole Specina C. Rework D. Hole Drillina E. Settint
B. Bole Specina C. Rework D. Hole Drillina E. Settint 8.
: 8. NDE Docusentation
NDE Docusentation
(
(
i l
i l
l t
l t
I i                                                       4 CFF-007.18. Revision 0
I i
4 CFF-007.18. Revision 0
{
{
 
.1 Q1-028 Revision 1 Page 3 of 3 COMANCRE PEAK RESPONSE TEAM CECKLIST POPtTLATION DESC VERIFICAIl0N FKC NO.
Attachment 6.1 Q1-028 Revision 1 Page 3 of 3 COMANCRE PEAK RESPONSE TEAM CECKLIST POPtTLATION DESC               VERIFICAIl0N FKC NO.
LARGE BOFI FIPE SUPP-RIC1D R-S-LBSR.
LARGE BOFI FIPE SUPP-RIC1D     R-S-LBSR.                 FACE 3 0F 3 VERIFICATION ACCEPT     RZJECT   DATE lZNARK3
FACE 3 0F 3 VERIFICATION lZNARK3 ACCEPT RZJECT DATE 5.
: 5. Specific Items
Specific Items A. Torque 1.
* A. Torque 1.
2.
2.
3.
3.
Line 969: Line 1,304:
t CPP-007.18. Reviston 0
t CPP-007.18. Reviston 0


    .                                                                                                                                      i l
i Attachnent 6.1 QI-029 Rev. 3 Page 1 of 8 1
Attachnent 6.1 QI-029 Rev. 3 Page 1 of 8 1
1 CCFMC3! FLE R$PON$Z !!.L.M CIEC"L
1 CCFMC3! FLE R$PON$Z !!.L.M CIEC"L
* ST NbfNNhkhksePPotTS                                             ~ *
* ST NbfNNhkhksePPotTS
                                                          ~
~
non.arcio (u$w)                      1-s-u$u                                         mz , . er 1.,
~
w e m astu;CTron Q1-029                             @11!NSFICTION                                   [ C7I* 1 m . w : . w n u .4o.                   xC wrme, m:u                                 c e,: :
* 1-s-u$u mz, er 1.,
C C019CN Vn:T CAT :N ACCIPT     LL*tCT             DA!!
non.arcio (u$w) w e m astu;CTron Q1-029
: 1. Identification               *
@11!NSFICTION
: 2. Location and Orientation                                                               ta=
[ C7I* 1 m. w :. w n u.4o.
xC wrme, m:u c e,: :
C C019CN Vn:T CAT :N ACCIPT LL*tCT DA!!
: 1. Identification
: 2. Location and Orientation ta=
: 3. Ceafiguration A. Componest e (Ter Documentation
: 3. Ceafiguration A. Componest e (Ter Documentation
: 3. Materiale                     5/A           N/A                         Review Dely)
: 3. Materiale 5/A N/A Review Dely)
C. Inste11stten i
C. Inste11stten i
D. Clearance I. Grouting for lasepistes/Floore F. Grouting for laaeplates /Valle and ceilinas
D. Clearance I. Grouting for lasepistes/Floore F. Grouting for laaeplates /Valle and ceilinas
: 4. Solting A. Esassement
: 4. Solting A. Esassement
: 3. Surf ace Contact C. R.ic k ed Insert D, t.ockies Devices F1ZFA1Z3 ST                                             MPLCVD 81:
: 3. Surf ace Contact C. R.ic k ed Insert D, t.ockies Devices F1ZFA1Z3 ST MPLCVD 81:
DISC:F'.INE DC3.                   0 An                 t.IAD D I S O F'. n DO R .       DA*!
DISC:F'.INE DC3.
J3 m .a.i ITa                                           M F1CVG lia
0 An t.IAD D I S O F'. n DO R.
                    . nit. . e n                   7;                       '. IAD N$7t; ;e                     34;t 07 '4* '. A . Revt.4. an 1
DA*!
J3 m.a.i ITa M F1CVG lia
. nit.. e n 7;
'. IAD N$7t; ;e 34;t 07
'4*
'. A. Revt.4 an 1


                              . . . . . .        . - ~ - - - - .- - - ---               - - - ~
. - ~ - - - -.- - - ---
8 Attachamt 6.1 QI-029 Rev. 3 COFM CRE PLAK tt3?CNSE Tf.AM CIICI:.15T Fo?'." A!!CN OL5C                 VEk;T;CA!"Om fLG 30.
- - - ~
LARGE SORI FIPE SL'7PCRTS           !=$.L35N-                       Fact~ 2 0F ~8 NON-t!CID (LBSN)
8 Attachamt 6.1 QI-029 Rev. 3 COFM CRE PLAK tt3?CNSE Tf.AM CIICI:.15T Fo?'." A!!CN OL5C VEk;T;CA!"Om fLG 30.
(CRIT! CAT:CN AT3 18CTE               ggggy;                                     N gg7gg;       gg7g 6   sentas wont's;
LARGE SORI FIPE SL'7PCRTS
: t. U-Bolte F. Torque C. Edse Distance             N/A           N/A               (For Informatten Only)
!=$.L35N-Fact 2 0F 8 NON-t!CID (LBSN)
~
~
(CRIT! CAT:CN AT3 18CTE N
ggggy; gg7gg; gg7g 6
sentas wont's;
: t. U-Bolte F. Torque C. Edse Distance N/A N/A (For Informatten Only)
: 3. Crout-In Aachere
: 3. Crout-In Aachere
: 3. Integral Attaciment Welde A. Location
: 3. Integral Attaciment Welde A. Location
: 3. Site C. Profile D. totaforceneet
: 3. Site C. Profile D. totaforceneet
: t. Dadercut                                                   w*
: t. Dadercut w*
F. Surface Condittee C. Offsete
F. Surface Condittee C. Offsete
: 5. Cracks /Pusten
: 5. Cracks /Pusten
: t. Walder ID                 N/A           N/A               fFer Inferestion Ont?
: t. Walder ID N/A N/A fFer Inferestion Ont?
J. Rust
J. Rust
: 6. SupPert Welds (57)
: 6. SupPert Welds (57)
A. Loestion B. Site C. Profile D. Ratafeveseset
A. Loestion B. Site C. Profile D. Ratafeveseset
: t. Cadercut F. Surf ace C. Offsets
: t. Cadercut F. Surf ace C. Offsets
        ?? ^01. 6 3. tr*       '
?? ^01. 6 3. tr*
1
1


Attachznt 6.1 QI-029 Aev. 3 COPMCRE FEM 115?CNSE !!AM CIECI: ST MP'#.A;;GN 0150.                   VE1; FICA!!CN PKC 30.
Attachznt 6.1 QI-029 Aev. 3 COPMCRE FEM 115?CNSE !!AM CIECI: ST MP'.A;;GN 0150.
LARCI Boll! FIPE St'FPORTS           !=5-LS$W.
VE1; FICA!!CN PKC 30.
NCF-8!Cf D (L PS'O                                               Fact L Of 1 VC1:TICA ;0N A
LARCI Boll! FIPE St'FPORTS
* ACCIM    l RL*.1CT DA*!
!=5-LS$W.
Fact L Of 1 NCF-8!Cf D (L PS'O VC1:TICA ;0N A
l RL*.1CT ACCIM DA*!
: 6. Support Welds (Cont'd)
: 6. Support Welds (Cont'd)
N. Cracke/ Fusion I. Welder ID                 N/A           N/A             (For Information Ontv)
N. Cracke/ Fusion I. Welder ID N/A N/A (For Information Ontv)
: 7. Concrete Espansion Anchors
: 7. Concrete Espansion Anchors A. Sise/ Length
* A. Sise/ Length
: 3. tebedeent length C. Belt Specina
: 3. tebedeent length C. Belt Specina
_ D. Annulerit?                                                                         *
_ D. Annulerit?
: t. Cenerete Desame F. Nut Engegement/
: t. Cenerete Desame F. Nut Engegement/
Searles                                                                       .
Searles
: 8. Component Support Catalog Items A. Snubber
: 8. Component Support Catalog Items A. Snubber
: 1. Arrularitt
: 1. Arrularitt
Line 1,026: Line 1,376:
: 6. Fin-to-Pin /
: 6. Fin-to-Pin /
Cold settina
Cold settina
: 5. Beartea Spacers
: 5. Beartea Spacers 6.
: 6. Thread teassenes e l
Thread teassenes e l
7 Safee? Lock Wire
7 Safee? Lock Wire
: 8. tre 904 Threads i
: 8. tre 904 Threads i
                    ..e     ... 4. Rea.stan ;
..e
: 4. Rea.stan ;
i I
i I
3
3


Attechnent 6.1 QI-029 Rev. 3 CO.W:31 PLAK Rt5FON51 !!AM C7t:C ;5T ror'..a ;;N 315;                 VER;FICM;CN PK; 30.
Attechnent 6.1 QI-029 Rev. 3 CO.W:31 PLAK Rt5FON51 !!AM C7t:C ;5T ror'..a ;;N 315; VER;FICM;CN PK; 30.
LARGE SCRI PIPE St'? PORTS         1-5.L35N                 Fact 4 0F 8 NCN.RfCID (tl5W) v!1:TicAT;0N A     II AC tF*   LLit:T   DATE BA. Snubber (Cont'd)
LARGE SCRI PIPE St'? PORTS 1-5.L35N Fact 4 0F 8 NCN.RfCID (tl5W) v!1:TicAT;0N A
II AC tF*
LLit:T DATE BA. Snubber (Cont'd)
: 9. Eye Rod nread tnaarement
: 9. Eye Rod nread tnaarement
: 10. Ifndina/ Offset II. Fastseers
: 10. Ifndina/ Offset II. Fastseers
: 12. $pherical
: 12. $pherical tearina
* tearina
: 5. Struts
: 5. Struts
: 1. Rardware
: 1. Rardware
Line 1,050: Line 1,402:
: 9. Fasteners
: 9. Fasteners
: 10. Saaring Spacers Vertteal Lead Pts
: 10. Saaring Spacers Vertteal Lead Pts
                !!. Searles $ Pacer (s)
!!. Searles $ Pacer (s)
: 12. Toreve of lead Stud
: 12. Toreve of lead Stud
: 13. Para 11elten g
: 13. Para 11elten g
            ..'?.W:..h.          ....... .
..'?.W:..h.
le
le


Attachment 6.1 01-029 Rev. 3 CCWCXE PEAK RE$FCNSE TEM CIECI:.!$T 70r m !;0.1 015C                             VIA!TICA!!CN PLC 30.
..1 01-029 Rev. 3 CCWCXE PEAK RE$FCNSE TEM CIECI:.!$T 70r m !;0.1 015C VIA!TICA!!CN PLC 30.
W CE SCRE PIPE SL*Prott$                     I-$-LB$N                       PACE 5_ 07 L p0M-t!CID (1.3$N)
W CE SCRE PIPE SL*Prott$
VE1 FICAT*0N A U IUII ACCE?"                   DATE lRLIECT C. $pting/Cen Constant Support
I-$-LB$N PACE 5_ 07 L p0M-t!CID (1.3$N)
VE1 FICAT*0N A U IUII lRLIECT ACCE?"
DATE C. $pting/Cen Constant Support
: 1. Stee
: 1. Stee
: 2. Trave! Stepe
: 2. Trave! Stepe
: 3. Seen Attacheent                                                                                 .
: 3. Seen Attacheent
: 4. Support Rod
: 4. Support Rod
              $. P!reade                                                                               '
$. P!reade
: 6. Thread Erneseeent
: 6. Thread Erneseeent
: 7. Anaulerttv                                                                               i
: 7. Anaulerttv i
: 8. Festeners D. Low Friction leerias Plates
: 8. Festeners D. Low Friction leerias Plates
: 1. toestien                                                                                         *
: 1. toestien
: 7. Plate Type
: 7. Plate Type
: 3. Lubricant
: 3. Lubricant
: 4. Corners P. Modified Component Suppett Catalog
: 4. Corners P. Modified Component Suppett Catalog
            !tese A. WP$1 $way Struts
!tese A. WP$1 $way Struts
: 1. Adjustable Struts (1) l l                 Weld Stee l
: 1. Adjustable Struts (1) l l
!                  Profile                                                               Per 5.6.1 telefereesent                                                         Per 5.6.2 1
Weld Stee l
Profile Per 5.6.1 telefereesent Per 5.6.2 1
l
l
          ..r     ......      se.... n ;
..r se....
n ;
I 5
I 5
l
l


Attachment 6.1 01-029 Rev. 3 ComCu rtn ustonst Tru CEECIList PCFilLA!!ON QLSC                   VDITICATICu FG 30.
..1 01-029 Rev. 3 ComCu rtn ustonst Tru CEECIList PCFilLA!!ON QLSC VDITICATICu FG 30.
LAACE 3011 FIP SUPotts             1 5-L15N                         pagg 6 0F-8 Non-11CID (LBSN) rMITICATION arwAart AT M 13UTE             gy         g,1C           DATE
LAACE 3011 FIP SUPotts 1 5-L15N pagg 6 0F 8 Non-11CID (LBSN) rMITICATION arwAart AT M 13UTE gy g,1C DATE
: 9. Modified CouPosest Support Catalog Itene (Cont'd) onderest                                                    Per 5.6.3 Serface of Veld                                             Per $.6.4 offset Per $ 6.5 Cracks. lack of                                             Per $.4.6 Pustes
: 9. Modified CouPosest Support Catalog Itene (Cont'd)
Per 5.6.3 onderest Serface of Veld Per $.6.4 Per $ 6.5 offset Cracks. lack of Per $.4.6 Pustes
: 2. Pized Swe?
: 2. Pized Swe?
Struto (L1)                                                                                 e Veld Sise Proftie                                                  Per 5.6.1 tatafereement                                            Per S.6.2 onderest                                                  Per S.6.3 Parface of Veld                                         Per S.6.4                               _
Struto (L1) e Veld Sise Per 5.6.1 Proftie Per S.6.2 tatafereement Per S.6.3 onderest Parface of Veld Per S.6.4 Per 5.6.5 offest Cracks, lack of Per 5.6.6 Puston
offest                                                  Per 5.6.5 Cracks, lack of Puston                                                  Per 5.6.6 B. ITT             **N
**N B. ITT
[
[
svey                     .;
svey veld k_ ___ _ - - $
veld k_ ___ _ - -
Per $ 6.1 prettie Per 5.6.2 1siaf erc ement Per 5.6.3 onderest Serface of weld Per 5.6.4 Per 5.6.5 offset Cracka Lack of Per S.6.6 Pustos
prettie                                                      Per $ 6.1 1siaf erc ement                                              Per 5.6.2 onderest                                                    Per 5.6.3 Serface of weld                                             Per 5.6.4 offset                                                      Per 5.6.5                               ,
" * ** ?. L t. Lavi s t * ?
Cracka Lack of Pustos                                                      Per S.6.6
            " * ** ? . L t . Lavi s t * ?
e l
e l
l 6
l 6


A2tachment 6.1 Q1-029 Rev. 3 COMA.NCXE PEAK RISPCN$t TIM                       .
A2tachment 6.1 Q1-029 Rev. 3 COMA.NCXE PEAK RISPCN$t TIM CIECII!ST
CIECII!ST PCPJL4 ;c.               1 OI$;               VER;TICAILOW PLG 30.
;c. OI$;
LAACI DCLE PIPE SL*PPORTS                       1 5-L85N                     pacg 7 0F ~0
VER;TICAILOW PLG 30.
                                                                                                            "~
PCPJL4 1
NON-11CID (LBSN) vtt:ricAttcN A
LAACI DCLE PIPE SL*PPORTS 1 5-L85N pacg 7 0F ~0
ACCIPTlLZ.TICT DATT.
"~
NON-11CID (LBSN) vtt:ricAttcN ACCIPTlLZ.TICT A
DATT.
: 9. Modified CoePonent Support Catalog items (Cent't)
: 9. Modified CoePonent Support Catalog items (Cent't)
C. Saubber Tramettion Lite Veld Stae Per $.6.1 Proftte Per $.6.2 seinforcenset Dedereut Per $.6.3 Per $.6.4     '
C. Saubber Tramettion Lite Veld Stae Per $.6.1 Proftte Per $.6.2 seinforcenset Per $.6.3 Dedereut Per $.6.4 Surfece of Wald Per $.6.5 Offset Cracks, Lack of Per 5.6.6 Pusten D. 3751 Forward Bracket
Surfece of Wald Per $.6.5 Offset Cracks, Lack of Per 5.6.6 Pusten D. 3751 Forward Bracket
$1:e 1/4 - 10
                                            $1:e 1/4 - 10
: 1. Brocket Olsenetece (1)
: 1. Brocket Olsenetece (1)
: 2. Bracket Velde (11)
: 2. Bracket Velde (11)
Veld $tse Profile Per $.6.1 Re t af orc ement Per $ 6.2 Dodereue Per S 6.3 Surf ace of Veld Per 5.6.4 Offset                                                  Per S.6.5 Cracks. Lack of                                         Per S.6.6 Pasten Dieterttee (111)
Veld $tse Per $.6.1 Profile Per $ 6.2 Re t af orc ement Per S 6.3 Dodereue Per 5.6.4 Surf ace of Veld Per S.6.5 Offset Cracks. Lack of Per S.6.6 Pasten Dieterttee (111)
                                  ".?? Y17..;
".?? Y17..;
7
7


Attachment 6.1 QI-029 Rev. 3 CCPM CXE PEAK LI$PCN!! TEAM CIECI:.13T PCP'.h !;ou CESC                 VEAIFICA ;cu fL; so.
..1 QI-029 Rev. 3 CCPM CXE PEAK LI$PCN!! TEAM CIECI:.13T PCP'.h !;ou CESC VEAIFICA ;cu fL; so.
1ARCE nott PIPE SUPPORTS         1-$-I.8 SN                                                                                                         pagg ~8op      4 NON-t!ctD (Ltsu)                                                                                                                                                     ~
1ARCE nott PIPE SUPPORTS 1-$-I.8 SN pagg ~ op 4
8 NON-t!ctD (Ltsu)
~
V!1ITICATICN A
V!1ITICATICN A
ACCIFT                   RI. JECT                                                         DATT 9.16edif ted Coeponent SvPport Catalog Itene (Cont'd)
ACCIFT RI. JECT DATT 9.16edif ted Coeponent SvPport Catalog Itene (Cont'd)
E. IrPSI Porward Brecket $tse 3$
E. IrPSI Porward Brecket $tse 3$
and 100 Brecket Dimeestone(t)
and 100 Brecket Dimeestone(t)
Perverd Bracket velde (11)
Perverd Bracket velde (11)
Weld Sise Profile                                                                                                                                         Per 5.6.1 totaforceaset                                                                                                                                   Per $.6.2 Ondereve                                                                                                                                       Per 5.6.3 Serfere of Wald                                                                                                                                 Per 5.6.4 j ffset                                                                                                                                             Per 5.6.5 Cracks, Lack of Puetoe                                                                                                                                           Per $.6.6 P. Dual SprLas Can Assemblies
Weld Sise Profile Per 5.6.1 totaforceaset Per $.6.2 Ondereve Per 5.6.3 Serfere of Wald Per 5.6.4 j ffset Per 5.6.5 Cracks, Lack of Puetoe Per $.6.6 P. Dual SprLas Can Assemblies
: 1. Assembly Diassa t ose (t)
: 1. Assembly Diassa t ose (t)
: 2. Weld Stsee (11) l                     Weld Stas l
: 2. Weld Stsee (11) l Weld Stas l
Profile                                                                                                                                         Per $.6.1 totaforcenest                                                                                                                                   Per 3.4.2 endereut                                                                                                                                         Per 5.6.3 J 9tface of Veld                                                                                                                                     Per $.6.4 offset                                                                                                                                           Per 5.4.5 Crocke, Lath of Puesee                                                                                           '                                              Per 5.6.6
Profile Per $.6.1 totaforcenest Per 3.4.2 endereut Per 5.6.3 J 9tface of Veld Per $.6.4 offset Per 5.4.5 Crocke, Lath of Puesee Per 5.6.6
                  "" **' ' * ~tstee 1 8
"" **' ' * ~tstee 1 8
I                                                       - - - - - - - . - - - - - - . - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                -- - -    ---
I


1 Attcchrent 6.1 l QI-030 Revision 1 Page 1 of 3 COMANCTI PEAK RISPONSE TF.AM CEECI:.IST PDPL'LAtlCN DESC           VERlTICATICN FKG NO.
1 Attcchrent 6.1 QI-030 Revision 1 Page 1 of 3 COMANCTI PEAK RISPONSE TF.AM CEECI:.IST PDPL'LAtlCN DESC VERlTICATICN FKG NO.
LARGE BORE FIFE SUFFORTS     R-5-LISN-                               PAGE L OF -
LARGE BORE FIFE SUFFORTS R-5-LISN-PAGE L OF NON-RICID QUAL;U INSTRUCTION Q1-030 RIV. O CREINSFECTION O ex 7t EQUlFMINT MAAI/ TAG NO.
NON-RICID QUAL;U INSTRUCTION Q1-030 RIV. O               CREINSFECTION                           O ex 7t EQUlFMINT MAAI/ TAG NO. C DOCUMENTATION RIVIEW                 O c"tT 2 COMMON VIRIFICATION ACCIFT     IIJECT     DATI
C DOCUMENTATION RIVIEW O c"tT 2 COMMON VIRIFICATION ACCIFT IIJECT DATI
: 1. Support Feeksne
: 1. Support Feeksne
: 2. Drevina Revision
: 2. Drevina Revision
: 3. Support Packane Review     N/A         N/A
: 3. Support Packane Review N/A N/A
: 4. Inspector Certifications
: 4. Inspector Certifications
: 5. Neat Numbers
: 5. Neat Numbers 6.
: 6. Welding A. Procedure Application B. Weld Material Traceabilit?
Welding A. Procedure Application B. Weld Material Traceabilit?
C. Velder Qualifications D. Procedure Qualificatione PRIFAAID ST:                                 AFFROVD ST:
C. Velder Qualifications D. Procedure Qualificatione PRIFAAID ST:
DISCIPLINE Dect.           DATI             t.IAD DISCIFtLNE ENGR.       DATI LMPEwau II:                                 AFFROVED ST:
AFFROVD ST:
6MFEL.M                   DATI             LEAD IN$PiCTOR               DA*E C:'F-007.1A. Revision 0
DISCIPLINE Dect.
DATI t.IAD DISCIFtLNE ENGR.
DATI LMPEwau II:
AFFROVED ST:
6MFEL.M DATI LEAD IN$PiCTOR DA*E C:'F-007.1A. Revision 0


Attcchm:nt 6.1 QI-030 Revision 1 CWANCEI PEAK RISFONSE TEAM CEICKLIST F0F h T10M DESC           VTRIFICATION FKG No.
Attcchm:nt 6.1 QI-030 Revision 1 CWANCEI PEAK RISFONSE TEAM CEICKLIST F0F h T10M DESC VTRIFICATION FKG No.
2 LAME 50RZ FIFE St'FFCETS   R-5-LBSy.                     FACE  0F NOM-RICID VE11FICATION A                       '
2 LAME 50RZ FIFE St'FFCETS FACE 0F R-5-LBSy.
ACCEPT   RIJECT     DATE E. Impact Tests
NOM-RICID VE11FICATION A
: a.                                                       --
ACCEPT RIJECT DATE E. Impact Tests a.
b.
b.
c.
c.
d.
d.
e.
e.
Y F. Meat Treatment                               -_
Y F. Meat Treatment C. Rold Pointe
C. Rold Pointe
: 7. Concrete Expansion Anchors A. Hilti Belt Torque 1.
: 7. Concrete Expansion Anchors A. Hilti Belt Torque 1.
2.
2.
B. Soit Specina                       .
B. Soit Specina C. Rework D. Bole Drillina E. Settina 8.
C. Rework D. Bole Drillina E. Settina
NDE Documentation 9.
: 8. NDE Documentation Specific Itema 9.
Specific Itema A. Torque 1.
A. Torque 1.
2.
2.
3.
3.
4
4
        ! CFF,007. LA.. Revision 0 2
! CFF,007. LA.. Revision 0 2


I e .  . .
e Attachrent 6.1 QI-030 Revision 1 COMANCHE FEAK RISFONSE TEAM l
Attachrent 6.1 QI-030 Revision 1 COMANCHE FEAK RISFONSE TEAM                                   l CEICILIST F0F h T10M DESC                   YE11FICAT10p FKC po.
CEICILIST F0F h T10M DESC YE11FICAT10p FKC po.
LARGE BORZ FIFE SUFFORTS                                                   3    3 R-5-LB $ig.                         FACE   0F NON-RICID TE11FICAT10M Amm                     ACCEPT       RZJECT     DATE
3 3
LARGE BORZ FIFE SUFFORTS R-5-LB $ig.
FACE 0F NON-RICID TE11FICAT10M Amm ACCEPT RZJECT DATE
: 9. Specific Itene (Cont'd1
: 9. Specific Itene (Cont'd1
: 5. Sprina con Settina C. Snubber Adapter thread enseassent D. Snubber stroke
: 5. Sprina con Settina C. Snubber Adapter thread enseassent D. Snubber stroke CPP-007. L 8. hvision 0 L
                              -              _  _.      _      L          __
CPP-007. L 8. hvision 0           -    '.        - .
3
3


Attsch 2.                   6.1 Q '.       # 2 *.
Attsch 2.
                                                                                                                    .- t . ..
6.1 Q '.
# 2 *.
.- t.....
c CE::r?.!?~
c CE::r?.!?~
C*Fx:~7.I FLG R*S?0::1I Titl!
C*Fx:~7.I FLG R*S?0::1I Titl!
CZI"Z' .* ST P07.~.A ;03 CE50                       vi?.17;cA ;cs Fgc sc.
CZI"Z'
Reins;ect. of Cent. Liner &                                                                 PAC 1 OT 2     ---
* ST P07.~.A ;03 CE50 vi?.17;cA ;cs Fgc sc.
Tank $.S. Liner QUral 1 IN571UC;;CN UN1! 1 Q1-031                               ([] LIIN37EC'!CH E;Lli.*.ENT PuJA/ TAG No.
Reins;ect. of Cent. Liner &
                  .                                O ooc:x ::A:tCs mIvtt;                                     cNt: 2 CCMMON vtR;7;;A;1cs             i RIMAE 5 ACCI?*       RI.*ICI         DA~Il A1       Esse Matarial Local C4eteurs
PAC 1 OT 2 Tank $.S. Liner QUral 1 IN571UC;;CN Q1-031
: s. ran 1 inch gap be tween 6-f oot
([] LIIN37EC'!CH UN1! 1 E;Lli.*.ENT PuJA/ TAG No.
    !                  tesplate and plate i
O ooc:x ::A:tCs mIvtt; cNt: 2 CCMMON vtR;7;;A;1cs i
b.' Max 1 1/2 inch gap i                  between 6 foot tesplate and plate seress veld seae 4
RIMAE 5 ACCI?*
: c. Max 3/8 inch gap berveen 15 inch                                     .
RI.*ICI DA~Il A1 Esse Matarial Local C4eteurs
teselste er.d plate
: s. ran 1 inch gap be tween 6-f oot tesplate and plate i
: d. Max 3/4 inch
b.' Max 1 1/2 inch gap between 6 foot i
* deviation fres 10                                                         -
tesplate and plate seress veld seae 4
foot strait he edte A2 Veld seas offset
: c. Max 3/8 inch gap berveen 15 inch teselste er.d plate
: a. Max 3/32 inch off-
: d. Max 3/4 inch deviation fres 10 strait e edte h
      !                  set for 3/8 inch                                                       ''                    '                    '
foot A2 Veld seas offset
I                  shell plate
: a. Max 3/32 inch off-set for 3/8 inch I
: b. Mas 1/8 inch off-                                                                                                       ,
shell plate
set for 1/2 inch t                  deze plate j                                                 .          . . . .
: b. Mas 1/8 inch off-set for 1/2 inch deze plate t
l                                                                                                                 --
j l
FRIFALID 31:                                               AFFROVED SY:
FRIFALID 31:
i e DISCl?LINE ENC 1.                   DATE                   LEAD DISCIPLINE ENCR.                 DATE                         .
AFFROVED SY:
ls      L.N5?ELiLa BYs                                             AFFRQVCD BY:
i e
        ;j
ls DISCl?LINE ENC 1.
                                                                                                                                                  ~*
DATE LEAD DISCIPLINE ENCR.
              "Th 5 F L sTL E                         DATE               'LLAD IM5FECTOR                         D ATI CPP-007.lA. Revision 0                       .                      a. .                  .
DATE L.N5?ELiLa BYs AFFRQVCD BY:
;j "Th 5 F L sTL E DATE
'LLAD IM5FECTOR D ATI
~*
CPP-007.lA. Revision 0
: a..
4
4


Attach.e.t 6.1 C1.r?'
Attach.e.t 6.1 C1.r?'
                                                                                                                                                                            't..            .
't..
i i
i CF.IC F'. '. !T ( c :. t ' d )
CF.IC F'. '. !T ( c : . t ' d )
i CCYJ2:CEI PEAX RI5?C:*!I II/.M CEICK'.1!T PC? aAiloh DESC VERIFICATICh FKC EO.
CCYJ2:CEI PEAX RI5?C:*!I II/.M CEICK'.1!T PC? aAiloh DESC                                     VERIFICATICh FKC EO.
Reinspect. of Cont. Liner FACE 2 CT 2
Reinspect. of Cont. Liner                                                                                           FACE 2 CT 2
~
                                                                                                                                                                ~             ~
~
6 Tank $.S. Liner V Ee.1F ICAT ICS DATE INI ACCEPT             REJECT
6 Tank $.S. Liner V Ee.1F ICAT ICS INI ACCEPT REJECT DATE
: c. Offset faired at                                                                                                                                                               .
: c. Offset faired at least 3-to-1
least 3-to-1
?
          ?
l A3 Weld Sean Surface i
A3 Weld Sean l                                Surface i
: s. Tree of coarse ripples or grooves.
: s. Tree of coarse
* ripples or grooves.
overlaps, or abrupt tidses er vallevs
overlaps, or abrupt tidses er vallevs
: b. Undercut does not exceed 1/32 inch
: b. Undercut does not exceed 1/32 inch
: c. Tivsh with base                                                                                                                                                                   \
\\
saterial or has uniform crown.
: c. Tivsh with base saterial or has uniform crown.
Reinforcement does not exceed 3/32 inch at each face.
Reinforcement does not exceed 3/32 inch at each face.
t1 Tack 557 Liners i.
t1 Tack 557 Liners i.
Reinstectien
Reinstectien
: a. Wald surface free
: a. Wald surface free of coarse ripples or grooves, over-laps, and abrupt ridges or vallevs.
          '                                of coarse ripples or grooves, over-laps, and abrupt ridges or vallevs.
: b. Undercut does not exceed 1/32 inch
: b. Undercut does not exceed 1/32 inch
: c. Veld surface is                                                                                                                                                 ,
: c. Veld surface is flush with base 1,
flush with base saterial or has                                                                                                                                   -
saterial or has
                                                                                                                                                                                                      .r-1, r
.r-r uniform crevn.
uniform crevn.                                                                                   *                  '
- Reinf orcesent
                                          - Reinf orcesent                 ,
+
                                                                                                                                                                                                          ~   '
~
                                                                                                                                                                                                                +
height does not 2
height does not                                                                   2                 .                            ..
' *[ ',
              <J                                                                  -o+                                      U        -                4 .",         ',      ti,'         , -' *[    ',
4.",
                                        -l exceed 3/32 inch -
ti,'
et each face,                                                                                                                                                   f.g ,
U
                                    ..d.* Exposed, surface . * ,                            ,
<J
                                                                                                      , ~.     ,
-l exceed 3/32 inch -
                                                                                                                                                        . ;j a o f[,1.q',E Q,"( gM,                             /g '.
-o+
                                            .ef S.S. liner is 3         .              , . -        .;***,;;f
et each face, f.g,
                                                                                                                                                                                      ' ', " = -               *
/g '.
                          -                    free of rust.                                                                                                                           e
..d.* Exposed, surface. *
* w
, ~.
                                                                                                        .              . '.s. J. . .        ..
. ;j a o f[,1.q',E Q,"( gM,
                                                                                                                                          . , ,g.. .
.;***,;;f
                                                                                                                                                            . e ,,- ;. . v
.ef S.S. liner is 3
:p j.,s ,.,;; y.e.1,,,.,.
' ', " = -
                                                                                                                                                                                  ;.s ..
free of rust.
                                                                                                                                                                                                              .'s,..'s
. e,,- ;.. v j.,s,.,;; y.e.'s,..'s e
                                                                                                                        , . . .\. '
w
                                                                                                                                                                                                    .a a i c.
..s. J...
                                                      ,y.1y
,. 3:-
                                                          , . 3:-' l ' ' :. ..., .
. i.:...
:- .q-c.h..Q,T'Z. .,.;.%g?
.1,,,.,.
                    . . j:-
,...\\. '
              ..                    ;. : :. .', t'                                 . i .: . . .
: g..
                                                                                                                                                                                        .n s . i- * :,h ?
:p
                                                                                                                                    .s      -
;.s..
                                                                                                                                                        . a. - - ;- . ; s *.                                  ''
.s
                    'I             CPF-C47.ll Revision 0
.q-c.h..Q,T'Z..,.;.%g?
                                                      ~.                 _
,y.1y ' l ' ' :..,.
.a a i c.
.. j:-
;. : :..', t'
. a. - - ;-. ; s *..n s. i- * :,h
?
'I CPF-C47.ll Revision 0
~.
2
2


Attechnent 6.1 QI-032 Rev. 3 Page 1 og 2 CHECK 1.IST CCNA.H"J!! F1AE 115?CN$E T!AM C12CI:.;3 l r;r'.w ;; a GEss             vn;nCAn;n PLC .1C.
Attechnent 6.1 QI-032 Rev. 3 Page 1 og 2 CHECK 1.IST CCNA.H"J!! F1AE 115?CN$E T!AM C12CI:.;3 l r;r'.w ;; a GEss vn;nCAn;n PLC.1C.
FACE 1 CF 1 QtJ C 71 IbstE CI*CN c1-01:                       OEZssrC::c=                           0 est: i
FACE 1 CF 1 QtJ C 71 IbstE CI*CN c1-01:
OEZssrC::c=
0 est: i
(%;P.2:G FAAKt!aC AC.
(%;P.2:G FAAKt!aC AC.
                                          @ DOC"MINTA!!CW 1271     V            [ U3;; 1 O c==
@ DOC"MINTA!!CW 1271
[ U3;; 1 V
O c==
nunar:0.
nunar:0.
A ACCIFT     RL*1C*     DA!!                   N 5.1 ?acord Oravies a .' etat Identifi-eettec h Welder Identifi-caties
A N
* 5.2 neerial Traceantitte a Matettal Certified as SA-537 Ct.2/A240-30&L b Mterial 1.D. La verified by inspecties 5.3 Welstaa a Weld precedure tientttted b Fistehed weld initiated and dated c Weld precedure applicable to 5A-537 CL-2 (CR-3) feeneairm ee eel?)
ACCIFT RL*1C*
DA!!
5.1 ?acord Oravies a.' etat Identifi-eettec h Welder Identifi-caties 5.2 neerial Traceantitte a Matettal Certified as SA-537 Ct.2/A240-30&L b Mterial 1.D. La verified by inspecties 5.3 Welstaa a Weld precedure tientttted b Fistehed weld initiated and dated c Weld precedure applicable to 5A-537 CL-2 (CR-3) feeneairm ee eel?)
d Weld precoh re approved by Gibbs &
d Weld precoh re approved by Gibbs &
R 1 *.1 e Weld Cesplete Column inittsted and dated
R 1 *.1 e Weld Cesplete Column inittsted and dated f1D AAID at t MF10TD 4t DisCtr. vt '31C1.
* f1D AAID at t                                   MF10TD 4t DisCtr. vt '31C1.             Daft             Miic R uft DIGE .                                     DATI part..w s':s                                   gruyn 31:
Daft Miic R uft DIGE.
            . m w.su                     DATI             LLAD 05 M C il                                         DAT%
DATI part..w s':s gruyn 31:
. m w.su DATI LLAD 05 M C il DAT%
CF-27.tA. Revtsua 0
CF-27.tA. Revtsua 0


Attach ent 6. 1 QI-032 Rev. 3 CHECKLIST (cont'd)
Attach ent 6. 1 QI-032 Rev. 3 CHECKLIST (cont'd)
COMANCRE FEAK tt$PCNSE TIAM C11CC 13T FGF'.u i1CM Dt3C           V nITICAf!CN PLC 30.
COMANCRE FEAK tt$PCNSE TIAM C11CC 13T FGF'.u i1CM Dt3C V nITICAf!CN PLC 30.
FACE A 0F 2 VERIFICAT10N I                     LIJECT     DATE IM3 ACCEPT 5.4 Welders /weldies costseere Qus11f1:etten a Valid for period of welding b Valid for veld Precedure
FACE A 0F 2 VERIFICAT10N IM3 I
          !.3 pendestructive tsaminettee (ICE) a IfDE report traceability to weld ietet                                     _ _
ACCEPT LIJECT DATE 5.4 Welders /weldies costseere Qus11f1:etten a Valid for period of welding b Valid for veld Precedure
b IrDE tapert traceability to IrDE                                                         .
!.3 pendestructive tsaminettee (ICE) a IfDE report traceability to weld ietet b IrDE tapert traceability to IrDE stecedure c Irtt evaluator signed off d ladiographic fits evaluated and stamed off.
stecedure c Irtt evaluator signed off d ladiographic fits evaluated and stamed off.                                                            .
e vacuve les Test 3.6 nt Operators /
e vacuve les Test                                                       .,,
3.6 nt Operators /
Inspector Certificaties a Certifiesties valid for period of WDE l
Inspector Certificaties a Certifiesties valid for period of WDE l
l           b Certificaties valid for IfDE Proce ss /1 wpectisa                     .
l b Certificaties valid for IfDE Proce ss /1 wpectisa c 0Ferator/tveluater to e Laret II l
c 0Ferator/tveluater to e Laret II l                                 --
CF' MY.13. Revisies 0 2
CF' MY.13. Revisies 0 2


Attachment 6.1 QI-033 Rev. 1 Page 1 of I CHECKLIST COMMCII PEAK II5FCW5E TIAM CRECC.IST PCF R TICN DE5C               VE11TICAIICM FEC 30.
..1 QI-033 Rev. 1 Page 1 of I CHECKLIST COMMCII PEAK II5FCW5E TIAM CRECC.IST PCF R TICN DE5C VE11TICAIICM FEC 30.
Reinspection of Twel lids.                                       FACI 1 CT ~
Reinspection of Twel lids.
I Fuel Fool Linere QUALITT INSTRUCTION gg.c33                       hLEINSFECTION                     O UNt! t EQ;IFMnt: MAAK/!AG .10.           DOCQGNTATICH IITIEW                 UNIT 2 COMMcN VT11nCATION ATTRIBUTE                                   DA!!
FACI 1 CT I
ACCIFT    R1 JECT
~
: 1. Weld Surface Rainspection
Fuel Fool Linere QUALITT INSTRUCTION gg.c33 hLEINSFECTION O UNt! t EQ;IFMnt: MAAK/!AG.10.
: e. Olet tequired)
DOCQGNTATICH IITIEW UNIT 2 COMMcN VT11nCATION ATTRIBUTE ACCIFT R1 JECT DA!!
: b. Weld surface free of irregularities such as sertations.
: 1. Weld Surface Rainspection e.
Olet tequired) b.
Weld surface free of irregularities such as sertations.
ridges. crevices.
ridges. crevices.
pinholes
pinholes c.
: c. Surface to free of rust / corrosion l
Surface to free of rust / corrosion l
i l
i l
paryAng st:                                   AFF10TED BY 015CinINI DGR.               Dart             LtAD 015C1 FLINT Doct. -~ DATI usarh.w bis                                   AFF10VD ST:
paryAng st:
          ;nrua                         ATI           LEAD IMlFiC*ct             DATE CFF-M7.1A. Levisten 0                                   -              *            '
AFF10TED BY 015CinINI DGR.
Dart LtAD 015C1 FLINT Doct. -~ DATI usarh.w bis AFF10VD ST:
;nrua ATI LEAD IMlFiC*ct DATE CFF-M7.1A. Levisten 0


Attechment 6.1 QI-034 Rev. 2 Page 1 of 3 CHECKl.1ST COMANCHE PEAK RISPCNSE TIM CHECK:. ST PQPl.h ;;cN DESC             vtt;ncA;;cN rt; so.
Attechment 6.1 QI-034 Rev. 2 Page 1 of 3 CHECKl.1ST COMANCHE PEAK RISPCNSE TIM CHECK:. ST PQPl.h ;;cN DESC vtt;ncA;;cN rt; so.
ITIL BLDC. FOOL LINits                                               FACI 1 cr ,,,J,,
ITIL BLDC. FOOL LINits FACI 1 cr,,,J,,
QUAL;TT INS 3UCTION QI.034                           LIINSFECTION
QUAL;TT INS 3UCTION QI.034 LIINSFECTION
[ W:T L EQCIFMEh"I MAJKiTAG so.
[ W:T L EQCIFMEh"I MAJKiTAG so.
                                            @ DOCTMENTATION RIVIEW               [ UNIT 1 O coice" vn 1 M CAT 10N ACCZFT     11 JECT     DATE             N 5.1 Liner Material
@ DOCTMENTATION RIVIEW
[ UNIT 1 O coice" vn 1 M CAT 10N ACCZFT 11 JECT DATE N
5.1 Liner Material
: s. Liner Plate Nterial is type 304L
: s. Liner Plate Nterial is type 304L
: b. k1k hterial issue fres Verehouse is Type 3041 5.2 Welding
: b. k1k hterial issue fres Verehouse is Type 3041 5.2 Welding
Line 1,311: Line 1,692:
: d. Final T.T. of surf ace preparation taitialled and dated
: d. Final T.T. of surf ace preparation taitialled and dated
: e. Repair process sheet welder eyebol
: e. Repair process sheet welder eyebol
: f. Weld & Repair veld procedure valid and a pp roved PLDAAID 3Y:                                     A2?101ED B11 D1sc:Ft1NT '3ct.               Daft               LAAD 0R$CIFtLFt Dact. DATT l         23F N s.u 5":                                   AFFECT 12) BT
: f. Weld & Repair veld procedure valid and a pp roved PLDAAID 3Y:
          *m h
A2?101ED B11 D1sc:Ft1NT '3ct.
* d                       DATI             (EAD IN5FICTOR           DAti C?F-M I.1A. Revtaten 0
Daft LAAD 0R$CIFtLFt Dact.
DATT l
23F N s.u 5":
AFFECT 12) BT
*m h
* d DATI (EAD IN5FICTOR DAti C?F-M I.1A. Revtaten 0


1 Attachcent 6.1 !
1 Attachcent 6.1 QI-034 i
QI-034         i Rev. 2 CHECKLIST (Cont.)
Rev. 2 CHECKLIST (Cont.)
COPM CXI PEAx RIs?0Nst ;IAM CXIC'.:L:s!
COPM CXI PEAx RIs?0Nst ;IAM CXIC'.:L:s!
              ?';?'t ^.; 3 ;II"               vtR;T;;A;;cs 7c so,
?';?'t ^.; 3 ;II" vtR;T;;A;;cs 7c so,
            !"llIL BLOC. P0OL LIFERS                                     FACI ,,2,CF 1 mt:r::A::cs AC0!?!   RIJECT     3 ATE           N3 5.2 Velding (Cont'd)
!"llIL BLOC. P0OL LIFERS FACI,,2,CF 1 mt:r::A::cs AC0!?!
: 3. Isene of VTML or 14GL per Log. and valid for                                                     ,
RIJECT 3 ATE N3 5.2 Velding (Cont'd)
veld procedure l
: 3. Isene of VTML or 14GL per Log. and valid for veld procedure l
5.3 Welder / welding                                                               l i
5.3 Welder / welding l
Operator qualificaties
i Operator qualificaties
: s. Yelid for period of                                                         ,'
: s. Yelid for period of performing velde i
performing velde i
: b. Yelid for the weld l
: b. Yelid for the weld                                                         l procedure                                                                 i 5.4 Mon-destructive Esasiastion (ME)
procedure i
: s. Titel F.T. 6 T.S.                                                         ,
5.4 Mon-destructive Esasiastion (ME)
sianed and dated                                                         l
: s. Titel F.T. 6 T.S.
: b. Weld ember                                 *                              '
sianed and dated l
identified
: b. Weld ember identified
: c. Et procedure identified
: c. Et procedure identified
: d. Et results are sirned sad dated
: d. Et results are sirned sad dated
Line 1,337: Line 1,723:
: f. Repair RE procedures are identified
: f. Repair RE procedures are identified
: 3. Repair Et reevite signed and dated l
: 3. Repair Et reevite signed and dated l
                                                >                                          i
i
          . :...,- .:.     .e.. u . :. >
:...,-.:..e.. u. :. >
2
2


. . . .                                                                              Attach ent 6.1 QI-034         :
Attach ent 6.1 QI-034 Rev. 2 CHECKLIST gCont.)
Rev. 2 CHECKLIST gCont.)
COME C3I PEAK RIs?0NS: :tAy.
COME C3I PEAK RIs?0NS: :tAy.
* CKIC%'.* $!                                 I PCP'.14;;;h ;ISC               ''IR;7;CA;;os
CKIC%'.* $!
                                          .              t u sC, ITEL ILDC. FOOL LINERS                                       ? ACE ,1 0F 1 VER*T CAT;0N
I PCP'.14;;;h ;ISC
                  #            I AC;I?     11;tC;     OA;I             EUMI 5.5 IrDE Operetor                                                                   '
''IR;7;CA;;os t u sC, ITEL ILDC. FOOL LINERS
Qualification Qualification valid for the period of IrDI Ouellfication valid                                                         i for IrDE procedure Operater to e Level II
? ACE,1 0F 1 VER*T CAT;0N I
          $.6 Stud Welding
AC;I?
11;tC; OA;I EUMI 5.5 IrDE Operetor Qualification Qualification valid for the period of IrDI Ouellfication valid i
for IrDE procedure Operater to e Level II
$.6 Stud Welding
: e. Pre-Froduction Test
: e. Pre-Froduction Test
: 1. Weld Procedure Number                                                                 l
: 1. Weld Procedure Number l
: 2. Beed Test i
: 2. Beed Test i
: b. Producties Test
: b. Producties Test
Line 1,360: Line 1,748:
* Inspector le Certifie<
* Inspector le Certifie<
tevel !!
tevel !!
:? *. r ' .:. ' r. . n : .. )
:? *. r '.:. ' r.. n :.. )
3
3


Attcchment 6.1 COMANCHE PE.U* RIS?ONSE TIAM                             QI-035 CHECKI.IST                               Rev. 2 POP'JLA!;0N DESC                                         VERIPICAT;0N PKG N0.
Attcchment 6.1 COMANCHE PE.U* RIS?ONSE TIAM QI-035 CHECKI.IST Rev. 2 POP'JLA!;0N DESC VERIPICAT;0N PKG N0.
EVAC DUCT SUPPORTS                                       I-S-HVDS                                         PAGE 1 OT 4 QUAL;TY INSTRUCTION QI-035                                               ] REINSPECTION                           [iUNIT1 EQUI? MINT MARK / TAG NO.                                   DOCi:MINTATION RIV!EW                 [ UNI 2
EVAC DUCT SUPPORTS I-S-HVDS PAGE 1 OT 4 QUAL;TY INSTRUCTION QI-035
((] COMMON VERIPICATION A             I ACCEPT       RIJECT     DATE R MAIAI l'
] REINSPECTION
: 1. Support Location 1A. Along the duet axis IB. Support Clearance                                   N/A         N/A                   Tor Information Only Check
[iUNIT1 EQUI? MINT MARK / TAG NO.
DOCi:MINTATION RIV!EW
[ UNI 2
((] COMMON VERIPICATION A
I R MAIAI ACCEPT RIJECT DATE l
: 1. Support Location 1A. Along the duet axis IB. Support Clearance N/A N/A Tor Information Only Check
: 2. Support Frame Configuration and Orientation 2A. General Configuration
: 2. Support Frame Configuration and Orientation 2A. General Configuration
: 23. Member                                     ,
: 23. Member Orientation i
Orientation                           i 2C. Member Sire 2D. Member Lengths and Dimensions 2E. Minimum Edge Distances (Steel Members) 2T.1 Attachments within "Cantilever" regions 2T.2 Attachment Locations on "Strip" Plates 2T.3 Spacing of PREPARED SY:                                                             APPROVED 8,Y:
2C. Member Sire 2D. Member Lengths and Dimensions 2E. Minimum Edge Distances (Steel Members) 2T.1 Attachments within "Cantilever" regions 2T.2 Attachment Locations on "Strip" Plates 2T.3 Spacing of PREPARED SY:
DISCIPLINE ENGR.                                       DATE               LEAD DISCIPLINE ENGR.                 DATE IN5FECTED BY:                                                             APPROVED 6Y:
APPROVED 8,Y:
IN5FICTGR                                               DA!;             LEAD INSPECTCR                         DATE C? ?- It) ? . .\ . ?.d"J 4 W n )
DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE IN5FECTED BY:
APPROVED 6Y:
IN5FICTGR DA!;
LEAD INSPECTCR DATE C? ?- It) ?..\\. ?.d"J 4 W n )


CCMA.': CME ?!AK RES? OSSE TEAM             Attachment 6.1 CHICXL*ST                       QI-035 Rev. 2 N h(N Sbk)RTS                       Y FTie F 3 '" * -                 p AG c _2_ OT 4
CCMA.': CME ?!AK RES? OSSE TEAM.1 QI-035 CHICXL*ST Rev. 2 N h(N Sbk)RTS Y FTie F 3 '" * -
                                                    .                VER*FICAT*CN                                               l
p AG c _2_ OT 4 VER*FICAT*CN l
                                          ^III 3                                                               REMAAKS ACCI?*     REJECT   DATE 2G. Support Provided b)
^III 3 REMAAKS ACCI?*
REJECT DATE 2G. Support Provided b)
Existing Structure 2H. Attachment to Duet Equipment 2J. Attachment of Other Supports 2K. Duet Size
Existing Structure 2H. Attachment to Duet Equipment 2J. Attachment of Other Supports 2K. Duet Size
: 3. Welding 3A. Weld Location 3B. Weld Size 3C. Weld Length 3D. Fusion 3E. Craters i
: 3. Welding 3A. Weld Location 3B. Weld Size 3C. Weld Length 3D. Fusion 3E. Craters i
3T. Weld Profiles 3C. Undereut                                                                                     ;
3T. Weld Profiles 3C. Undereut 3H. Porosity 3J. Overlap 3K. Surface Slag 3L. Cracks 3M. Welder ID symbol N/A N/A For Information Only
3H. Porosity                                                                   ,,_,    _
3J. Overlap                                                         ,                    __
3K. Surface Slag                                                       ,
3L. Cracks 3M. Welder ID symbol               N/A             N/A           For Information Only
: 4. Concrete Expansion Anchors 4A. Bolt Size and Numbe?
: 4. Concrete Expansion Anchors 4A. Bolt Size and Numbe?
4A.1 Belt Diameter
4A.1 Belt Diameter


_ s.w e CCFJ2: CME PEAX RES?CSSE TEAM                 Attachment 6.1 CXIC7/.1ST                         QI-035 Rev. 2 P9?'JL.r!!CN DESC             VER;F;CA!;0N ?K; NO.
_ s.w e.1 CCFJ2: CME PEAX RES?CSSE TEAM QI-035 CXIC7/.1ST Rev. 2 P9?'JL.r!!CN DESC VER;F;CA!;0N ?K; NO.
KVAC DUCT SUPPORTS             I-S-HVDS                             ?AC13__ 0F 4
KVAC DUCT SUPPORTS I-S-HVDS
                        .                VER;TICA!!CN l
?AC13__ 0F 4 VER;TICA!!CN l
AI EI3U I             ACCEPT   REJECT     DATE REM. ARKS 4A.2 Bolt Type , Length and Quantity 4B. Embedment 4C. Bolt Spacing 4C.1 Hilti to Hilti 4C.2 Hilti to Richmond
AI EI3U I REM. ARKS ACCEPT REJECT DATE 4A.2 Bolt Type, Length and Quantity 4B.
                ' Bolts, Concrete Edges and Abandoned Bolts / Holes 4C.3 Hilti to Embedded Plate Edges 4D. Angularity 4E. Nut Engagement and Bearing 4E.1 Nut Engagement 4E.2 Sloped Surfaces                                                                     ,
Embedment 4C.
4E.3 Welding Hilti Bolts 4E.4 Nut Bo t t oming
Bolt Spacing 4C.1 Hilti to Hilti 4C.2 Hilti to Richmond
: 5. Richmond Screv Ar.ehors 5A. Minimum Thread Engagement SB. Bolt Tightness 5C. Insert Spacing l
' Bolts, Concrete Edges and Abandoned Bolts / Holes 4C.3 Hilti to Embedded Plate Edges 4D.
5D. Sloped Surface 5E. Richmond Bolt Material             N/A     N/A                     Por Information Only_
Angularity 4E.
Nut Engagement and Bearing 4E.1 Nut Engagement 4E.2 Sloped Surfaces 4E.3 Welding Hilti Bolts 4E.4 Nut Bo t t oming
: 5. Richmond Screv Ar.ehors 5A. Minimum Thread Engagement SB.
Bolt Tightness 5C.
Insert Spacing l
5D.
Sloped Surface 5E. Richmond Bolt Material N/A N/A Por Information Only_


COP.CCHE ?!AX RES?CSSE II.syv         Attachment 6.1    I CMICK' S;                   QT-035 Rev. 2 PO?'J A!!08 DESC               VER;7ICAT*CN ?KC NO.
..1 I
HVAC DUCT SUPPORTS             I-S-HVDS                       ?ACI4   OT 4
COP.CCHE ?!AX RES?CSSE II.syv CMICK' S; QT-035 Rev. 2 PO?'J A!!08 DESC VER;7ICAT*CN ?KC NO.
                                                .                VERITICA!!CN         1                           l
HVAC DUCT SUPPORTS I-S-HVDS
                                      ^     3                                                             '8 ACCI?!   REJECT   DATE
?ACI4 OT 4 VERITICA!!CN 1
: 6. Miscellaneous Bolting 6A. Bolt Size
l
: 68. Bolt Material Type 6C. Thread Engagement 6D. Washers 6E. Torque / Tightness 6T. Sloped Sarface
^
: 7. Touch-up Calvanizing         N/A       N/A                 Tor Information Only I
3
'8 ACCI?!
REJECT DATE
: 6. Miscellaneous Bolting 6A.
Bolt Size 68.
Bolt Material Type 6C.
Thread Engagement 6D. Washers 6E.
Torque / Tightness 6T.
Sloped Sarface
: 7. Touch-up Calvanizing N/A N/A Tor Information Only I
4 9
4 9
e e =b o
e e
=b o


Attachment 6.1 COMANC3E PEAK RES?0NSI TEAM               QI-036 CHECKLIST                       Rev. 2 POP'JLATION DESC                   VERIPICATION PKG 30.
..1 COMANC3E PEAK RES?0NSI TEAM QI-036 CHECKLIST Rev. 2 POP'JLATION DESC VERIPICATION PKG 30.
2 HVAC DUCT SUPPORTS                   R-S-HVDS-                           PAGE 1 OT QUALITY INSTRUCTION
2 HVAC DUCT SUPPORTS R-S-HVDS-PAGE 1 OT QUALITY INSTRUCTION QI-036 CREINSPECTION
{ UNI; 1 QI-036                        CREINSPECTION EQUl? MENT W X/ TAG S0.             X DOCUMENTATION RIV!EW               [, UNI;2
{ UNI; 1 EQUl? MENT W X/ TAG S0.
X DOCUMENTATION RIV!EW
[, UNI;2
((] COMMCN VERIFICATION
((] COMMCN VERIFICATION
                    ^                                                                   REMARKS ACCEPT     REJECT     DATE SA. ERC Reinspection                 NA         NA               For Information Only Drawings 5A.1 Duct Support Detail Drawing                   ,
^
5A.2 Duct Support               NA         NA               Tor Information Only Location Plan (Layout) Drawing 5B. Duct Support Inspector Certifications i
REMARKS ACCEPT REJECT DATE SA. ERC Reinspection NA NA For Information Only Drawings 5A.1 Duct Support Detail Drawing 5A.2 Duct Support NA NA Tor Information Only Location Plan (Layout) Drawing 5B. Duct Support Inspector Certifications i
SC. Weld Procedure Application 5C.1 Base Material 5C.2 Filler Material SD. Welder Qualification 5E. Weld Fit-up Inspection PREPARED BY:                                       APPROVED SY:
SC. Weld Procedure Application 5C.1 Base Material 5C.2 Filler Material SD. Welder Qualification 5E. Weld Fit-up Inspection PREPARED BY:
DISCIPLINE ENCR.                 DATE             LEAD DISCIPLINE ENGR.         DATE IN5PECTED SY:                                       APPROVED SY:
APPROVED SY:
          ;N5?ECTOR                           DA*E           LEAD INSPECTCR               DATI j         Q P- '0 7 . . A . R e".; n a n )
DISCIPLINE ENCR.
DATE LEAD DISCIPLINE ENGR.
DATE IN5PECTED SY:
APPROVED SY:
;N5?ECTOR DA*E LEAD INSPECTCR DATI j
Q P- '0 7.. A. R e".; n a n )


i j
i j
ess.c...mi c.;     I COMA.NCHE ?!AX RES?ONSE TEAM       QI-036             !
ess.c...mi c.;
CHECKLIST                 R*V' 2 POPCLA!!ON DESC NVAC DUCT SUPPORTS          VERIFIgAf!ON?KCNO.
COMA.NCHE ?!AX RES?ONSE TEAM QI-036 CHECKLIST R*V' 2
2       2 PACE   op VERIFICATION AI ElIUI                                                   kCKARXS ACCEPT   RIJECT   DATE SF. Hilti Bolt Torque 5F.1 Torque Wrench Number SF.2 Torque Wrer.ch Calibration ST.3 Torque Value
POPCLA!!ON DESC VERIFIgAf!ON?KCNO.
NVAC DUCT SUPPORTS 2
2 PACE op VERIFICATION AI ElIUI kCKARXS ACCEPT RIJECT DATE SF. Hilti Bolt Torque 5F.1 Torque Wrench Number SF.2 Torque Wrer.ch Calibration ST.3 Torque Value
: 50. Abandoned Roles Covered by Duet Support Members
: 50. Abandoned Roles Covered by Duet Support Members
                  - Spacing 5H. Cut Rebar
- Spacing 5H. Cut Rebar
          $J. Resetting of Hilti Bolts 4
$J. Resetting of Hilti Bolts 4
          ....s-   , , , . . . , .
....s-


1 l
1 Page 1 ef 2.2 COMANCHE PEAK RES?ONSE TEAM QI.036 CHECXI,IST Rev. 2 POPULATION DESC VERITICATION PKG NO.
Page 1 ef 2 Attachment 6.2 COMANCHE PEAK RES?ONSE TEAM                                                 QI.036 CHECXI,IST Rev. 2 l
HVAC DUCT SUPPORTS R-S-HVDS-200 PACE 1 OT j QUALITY INSTRUCTION QI.036 CREINSPECTION
POPULATION DESC                                           VERITICATION PKG NO.
] UNIT 1 EQUI? MENT MARK / TAG NO.
HVAC DUCT SUPPORTS                                     R-S-HVDS-200                                                 PACE 1 OT j QUALITY INSTRUCTION QI.036                                             CREINSPECTION                                                   ] UNIT 1 EQUI? MENT MARK / TAG NO.                                   x00CUMINTATION REV!!W                                         [x UN; 2 DUCT SUPPORT MATERIAL TRACEABILITY                                                                                                         [XC0Fy.ON VERITICATION AW3ME                                                                                                               EIMAEES ACCEPT             REJEC*             DATE Purchase Order No.:
x00CUMINTATION REV!!W
            $K 1 Material                                                                                                                               :
[x UN; 2 DUCT SUPPORT MATERIAL TRACEABILITY
Specification 5K.2 CMTR or C of C SK.3 Inspector's Certification
[XC0Fy.ON VERITICATION AW3ME EIMAEES ACCEPT REJEC*
            ..........................                            .........o.........                .......      ............ .................
DATE Purchase Order No.:
                                              ~
$K 1 Material Specification 5K.2 CMTR or C of C SK.3 Inspector's Certification
Purchase Order No.t SK.1 Meterial                                       ,
.........o.........
Specification 5K.2 CMTR or C of C 5K.3 Inspector's Certification
~
            ..........................                          .........o.........                . . . . . . . ................................
Purchase Order No.t SK.1 Meterial Specification 5K.2 CMTR or C of C 5K.3 Inspector's Certification
.........o.........
Purchase Order No.:
Purchase Order No.:
5K.1 Material Specification l
5K.1 Material Specification l
l 5K.2 CMTR or C of C 5K.3 Inspector's Certification
l 5K.2 CMTR or C of C 5K.3 Inspector's Certification
            . . . . . . . . . . . . . . . . . . . . . . . . . . ,.........o.........                 . . . . . . . ,..............................=
..........................,.........o.........
PREPARD BY:                                                                         APPROV D BY:
.......,..............................=
DISCIPLINE ENGR.                                         DATE                       LEAD DISCIPLINE ENGR.                             DATE T FEG La BY:                                                                         APPROVED BY:
PREPARD BY:
IN 5F EGOR                                               DATE                     L EAD IN SP EC*CR                                 DATE 0?P-407.'.A. Rev;s un ]
APPROV D BY:
DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE T FEG La BY:
APPROVED BY:
IN 5F EGOR DATE L EAD IN SP EC*CR DATE 0?P-407.'.A. Rev;s un ]
L
L


Pag 2 2 ef 2 n66 6n..u6   v..
Pag 2 2 ef 2 n66 6n..u6 v..
COMANCHE PEAK RES?ONSE TEAM                                       Q1-036 CHECKLIST                                       Rev. 2 POPL1A*!CN DESC                                       VERIFICATION PRO S0.
COMANCHE PEAK RES?ONSE TEAM Q1-036 CHECKLIST Rev. 2 POPL1A*!CN DESC VERIFICATION PRO S0.
KVAC DUCT SUPPORTS                                       R-S-HWS-20v                                   PACE     2 0F   2 VERITICATICN A ** **^" '* 3 U *'"'                                                                                           REMARKS ACCEPT             RIJECT             DATE Purchase Order No.:
KVAC DUCT SUPPORTS R-S-HWS-20v 2
2 PACE 0F VERITICATICN A ** ** " '* 3 U *' '
REMARKS
^
ACCEPT RIJECT DATE Purchase Order No.:
SK.! Material Specification 5K.2 CMTR or C of C SK.3 Inspector's Certification
SK.! Material Specification 5K.2 CMTR or C of C SK.3 Inspector's Certification
            ......................o........o.................,,................................                                                        .
......................o........o.................,,................................
Purchase Order No.:
Purchase Order No.:
5K.! Material Specification 5K.2 CMTR or C of C 5K.3 Inspector's Certification
5K.! Material Specification 5K.2 CMTR or C of C 5K.3 Inspector's Certification
            ................................o.................o.................................
................................o.................o.................................
Purchase Order No.:
Purchase Order No.:
SK.1 Material Specification 5K.2 CMTR or C of C SK.3 Inspector's Certification
SK.1 Material Specification 5K.2 CMTR or C of C SK.3 Inspector's Certification
            .......................                      ........o........                    ..........      .................................
........o........
l l
l l
Purchase Order No.:
Purchase Order No.:
5K.1 Material Specification 5K.2 CMTR or C of C 5K.3 Inspector's Certificatios 4
5K.1 Material Specification 5K.2 CMTR or C of C 5K.3 Inspector's Certificatios 4
:,n '   ;z.       ~. . ... .
:,n '
;z.
~......
}
}


        = .    .  .
=
Attach ent 6.1 01-030 CCMANCHE PIAK RES?CNSI IIA'4             Rev. 1 CHECK *.!ST POP 7LAT*0S DESC                 VEy,;y;CA!!ON ?KG N0.
Attach ent 6.1 01-030 CCMANCHE PIAK RES?CNSI IIA'4 Rev. 1 CHECK *.!ST POP 7LAT*0S DESC VEy,;y;CA!!ON ?KG N0.
I-M-DUPL-                             ? ACE 1 0F 3 HVAC Duets and Plenues QUALITY INSTRUCTION QI-039                          ({) REINS?!CT!ON                       [)) UN; 1 EQUIPMENT MARK / TAG NO.             DOCUMENTATION REVIEW             ] UNI :
HVAC Duets and Plenues I-M-DUPL-
((] COMMON VERIFICATION RI23. ARKS ACCIPT     REJECT       DATE
? ACE 1 0F 3 QUALITY INSTRUCTION
({) REINS?!CT!ON
[)) UN; 1 QI-039 EQUIPMENT MARK / TAG NO.
DOCUMENTATION REVIEW
] UNI :
((] COMMON VERIFICATION RI23. ARKS ACCIPT REJECT DATE
: 1. Sheet Metal Duet
: 1. Sheet Metal Duet
: a. Elevation
: a. Elevation
Line 1,489: Line 1,926:
: c. Length
: c. Length
: d. Fusion
: d. Fusion
: e. Craters PRIFARG BY:                                       APPROVED BY:
: e. Craters PRIFARG BY:
DISCIPLINE ENGR,               DATE               LEAD DISCIPLINE ENGR.         DATE IN5PELIED BY                                     APPROVED BY:
APPROVED BY:
                                            ~~
DISCIPLINE ENGR, DATE LEAD DISCIPLINE ENGR.
* IN5PE'*VR                       DATE             LEAD INSPECTOR                 DATE C??-007.1A. Revision 0
DATE IN5PELIED BY APPROVED BY:
IN5PE'*VR DATE LEAD INSPECTOR DATE
~~
* C??-007.1A. Revision 0


Attachesnt 6.1 Q1-039 COMA.NCHE PEAX RESPONSE TEAM       Rev. 1 CHECKLIST POPL'LATION DESC             VERITICATION PKG S0.
Attachesnt 6.1 Q1-039 COMA.NCHE PEAX RESPONSE TEAM Rev. 1 CHECKLIST POPL'LATION DESC VERITICATION PKG S0.
I-M-DUPL-                               3 HVAC Duet. and Plenums                                    PAGE _2_ OP VERIFICATION IEMAEKS ACCEPT   REJECT     DATE
HVAC Duet. and Plenums I-M-DUPL-PAGE _2_ OP 3
VERIFICATION IEMAEKS ACCEPT REJECT DATE
: f. Veld Profiles
: f. Veld Profiles
: g. Undercut
: g. Undercut
Line 1,502: Line 1,943:
: j. Surface Slag
: j. Surface Slag
: k. Cracks
: k. Cracks
: 1. Touch-up Galvanizing
: 1. Touch-up Galvanizing 4.
: 4. Splitter Damper
Splitter Damper
: a. Installation
: a. Installation
: b. Nuts and Bolts
: b. Nuts and Bolts
Line 1,515: Line 1,956:
: b. Geometry
: b. Geometry
: c. Gage
: c. Gage
: 7. , Grille. register and Diffuser
: 7., Grille. register and Diffuser
: a. Location
: a. Location
: b. Installation
: b. Installation
Line 1,531: Line 1,972:
: a. Caps
: a. Caps
: b. Gasket
: b. Gasket
: c. Bolts 095.^o' te     e..4e4mn n
: c. Bolts 095.^o' te e..4e4mn n
* a' *  +                                                            Attechesnt A.'
 
01-039 C0KANCHE PEAK RESPOSSE TEAM       Rev. !
Attechesnt A.'
CHECKLIST POPULATION DESC             VERIFICATION PKG NO.
a'
I-M-DUPL                              3 MVAC D'ict s a-d Plenues                               P AGE _3_ 0F VERIFICATION A                                                     REMARKS ACCEPT   REJECT     DATE
+
01-039 C0KANCHE PEAK RESPOSSE TEAM Rev. !
CHECKLIST POPULATION DESC VERIFICATION PKG NO.
MVAC D'ict s a-d Plenues I-M-DUPL P AGE _3_ 0F 3
VERIFICATION REMARKS A
ACCEPT REJECT DATE
: 11. Tubing Connection
: 11. Tubing Connection
: a. Installation b,. Nuts and bolts
: a. Installation b,. Nuts and bolts
Line 1,565: Line 2,011:
: f. Nut Ingagement and Bearing CPT c'7.lB. Revision 0
: f. Nut Ingagement and Bearing CPT c'7.lB. Revision 0


Attcchsent 6.1 COMANCHE PEAK RESPONSE TEAM             QI-040 CRECKLIST                   Rev. 1 POPULAT!ON DESC             VERITICATION PKG NO.
Attcchsent 6.1 COMANCHE PEAK RESPONSE TEAM QI-040 CRECKLIST Rev. 1 POPULAT!ON DESC VERITICATION PKG NO.
R-M-DUPL-                             PAGE 1 0F 2 MVAC Ducts and Plenuss QUALITY INSTRUCTION QI-040                    CRIINSPECTION                         ] UNI; 1 EQUIPMENT MARK / TAC S0.         DOCUMENTATION REVIEW             [ UNI; 2 BSC Dvs. 2323-M BSC Subsystem                                                       C COMMON VERIFICATION
MVAC Ducts and Plenuss R-M-DUPL-PAGE 1 0F 2 QUALITY INSTRUCTION CRIINSPECTION
                  ^                                                                         EIMAlUt3 ACCEPT       REJECT     DATE
] UNI; 1 QI-040 EQUIPMENT MARK / TAC S0.
DOCUMENTATION REVIEW
[ UNI; 2 BSC Dvs. 2323-M BSC Subsystem C COMMON VERIFICATION
^
EIMAlUt3 ACCEPT REJECT DATE
: 1. Pressure Test
: 1. Pressure Test
: 2. Material Cage
: 2. Material Cage
Line 1,578: Line 2,028:
: a. Welding Procedure
: a. Welding Procedure
: b. Base Material
: b. Base Material
: c. Filler Metal Classification PRIPARID BT:                                   APPROVED BY:                                                                       ,
: c. Filler Metal Classification PRIPARID BT:
t DISCIPLINE ENGR.           DATE               LEAD DISCIPLINE ENGR.                                                         DATE IN5FEa w BY:                                   Apygoygp gy:
APPROVED BY:
NFIGOR                       DATE             LEAD INSPECTOR                                                                 DATE C??-dO7. !A Revuton 0 1                                         __ _
t DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE IN5FEa w BY:
Apygoygp gy:
NFIGOR DATE LEAD INSPECTOR DATE C??-dO7. !A Revuton 0 1


COMANCHE PEAK RESPONSE TEAM               0 CHECKLIST                   g,y, g
COMANCHE PEAK RESPONSE TEAM 0
        ~EdFULAT10N DESC                 VERITICATION PKG NO.
CHECKLIST g,y, g
RVAC Ducts and Plenuss           R-M-DUPL-                       PAGE 2_0F 2 VERIFICATION
~EdFULAT10N DESC VERITICATION PKG NO.
                  ^                                                             REMARKS ACCEPT   REJECT   DATE
RVAC Ducts and Plenuss R-M-DUPL-PAGE 2_0F 2 VERIFICATION REMARKS
^
ACCEPT REJECT DATE
: 6. Welder Qualification
: 6. Welder Qualification
: 7. Inspector's Certification
: 7. Inspector's Certification
Line 1,591: Line 2,047:
: b. Pressure Test
: b. Pressure Test
: c. Material Cage
: c. Material Cage
: d. Turning Vane                                                               -
: d. Turning Vane Installation
Installation
: 8. Material Traceability *
: 8. Material Traceability *
: 9. Valding
: 9. Valding
: 10. Touch-up Galvanizing I
: 10. Touch-up Galvanizing I
* Note Material Traceabi1 Lty for steet meta 1, structural angles and nuts and bolts h.2), R-M-DUPL-151 (see are found in R-M-DUPL-150 (see che:klist Attachment checklist Attachment 6.3) , and R-N-DUPL-15: (see chenklist Attachment 6.4) respectively.
* Note Material Traceabi1 Lty for steet meta 1, structural angles and nuts and bolts are found in R-M-DUPL-150 (see che:klist Attachment h.2), R-M-DUPL-151 (see checklist Attachment 6.3), and R-N-DUPL-15: (see chenklist Attachment 6.4) l respectively.
l d
d CPP 007.15. Revision 0
CPP 007.15. Revision 0


Attachment 6.3 COMANCHE ?!.AK IISPONSE TEAM                                                             QI-040 CHECKLIST                                                                 g,y,   t F0FULAT!,0N DESC           VERITICATION FKG NO.
..3 COMANCHE ?!.AK IISPONSE TEAM QI-040 CHECKLIST g,y, t F0FULAT!,0N DESC VERITICATION FKG NO.
RVAC Ducts and Plenues       R-M-DUPL-150                                                                           FACE L OF 1 QUALITY INSTRUCTION                                                                                     ,
RVAC Ducts and Plenues R-M-DUPL-150 FACE L OF 1 QUALITY INSTRUCTION CREINSPECTION UNI; 1 QI-040 EQUIPMENT MARK / TAG NO.
UNI; 1 QI-040                 CREINSPECTION EQUIPMENT MARK / TAG NO.   @ DOCWENTATION RIVIEV                                                                       UNI; 2 Sheet Metal Material Traceability                                                                                                     COMMON VERITICATION REMARKS ACCIPT                 RIJECT                             DATE Purchase Order                 .
@ DOCWENTATION RIVIEV UNI; 2 Sheet Metal COMMON Material Traceability VERITICATION REMARKS ACCIPT RIJECT DATE Purchase Order Numbert
Numbert
: 1. Material
: 1. Material
: 2. CMTR or COC
: 2. CMTR or COC
Line 1,612: Line 2,065:
: 1. Material
: 1. Material
: 2. CMTR or COC
: 2. CMTR or COC
: 3. Inspector's Certification PRIFARED BY:                                                       APPROVED SY DISCIPLINE ENGR.           DATE                                     LEAD DISCIPLINE ENGR.                                   DATE IN5FEuw 5Y:                                                         APPROVED BY:
: 3. Inspector's Certification PRIFARED BY:
IN57EGOR                   DATE                                   LEAD INSPECTOR                                       ~ DATE CPP-007.lA. Revision 0
APPROVED SY DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE IN5FEuw 5Y:
APPROVED BY:
IN57EGOR DATE LEAD INSPECTOR
~ DATE CPP-007.lA. Revision 0


COMANCHE PEAK RESPONSE TEAM         o CHECKLIST           g,y, g POPUl.ATION DESC             VERIFICATION PKG NO.
COMANCHE PEAK RESPONSE TEAM o
RVAC Ducts and Plenuss       R-M-DUPL-150               PACE L Or 3 VERIFICATION REMARKS ACCEPT   REJECT   DATE Purchase Order Number:
CHECKLIST g,y, g
POPUl.ATION DESC VERIFICATION PKG NO.
RVAC Ducts and Plenuss R-M-DUPL-150 PACE L Or 3 VERIFICATION REMARKS ACCEPT REJECT DATE Purchase Order Number:
: 1. Material
: 1. Material
: 2. CMTR or COC
: 2. CMTR or COC
Line 1,632: Line 2,092:
CPP-607.18. Revision 0
CPP-607.18. Revision 0


Q1f' COMANCHE PEAK RESPONSE TEAM                                         00 CHECKLIST           g,y, g POPULATION DESC                                                               VERITICATION PKG NO.
f' COMANCHE PEAK RESPONSE TEAM Q1 0 0 CHECKLIST g,y, g
HVAC Ducts and 71enuss                                                               R-M-DUPL-150                               PACE 10F A VERITICATION IDIAEES ACCEPT                                                   REJECT   DATE Purchase Order Number
POPULATION DESC VERITICATION PKG NO.
PACE 10F A HVAC Ducts and 71enuss R-M-DUPL-150 VERITICATION IDIAEES ACCEPT REJECT DATE Purchase Order Number
: 1. Material
: 1. Material
: 2. CNTR or COC
: 2. CNTR or COC
: 3. Inspector's Certification Purchase Order Numberi                                                                                                                                         -
: 3. Inspector's Certification Purchase Order Numberi 1
1 l                   1. Material
l
: 1. Material
: 2. CNTR or COC
: 2. CNTR or COC
: 3. Inspector's Certification Purchase order Numbert
: 3. Inspector's Certification Purchase order Numbert
Line 1,644: Line 2,106:
: 3. Inspector's Certification Purchase Order Number
: 3. Inspector's Certification Purchase Order Number
: 1. Material
: 1. Material
: 2. CNTR or COC
: 2. CNTR or COC l
: 3. Inspector's l
: 3. Inspector's l
l                        Certification l
Certification l
l                                                                                                                                         4 l                 CPP-007.lB. Revision 0
l 4
l CPP-007.lB. Revision 0


Attachment 6.3 COMANCHE PEAK RISPONSE TEAM                                 91 04o CRELC.IST                               Rev. 1 POPULATION DESC               VERITICATION FKG NO.
..3 COMANCHE PEAK RISPONSE TEAM 91 04o CRELC.IST Rev. 1 POPULATION DESC VERITICATION FKG NO.
R-M-DUPL-151                                             FACE I 0F 3 RVAC Ducts and Flenuss QUALITY INSTRUCTION QI-040                    [REENSPECTION                                           ] UNIT t EQUIPMENT MARX / TAG S0.     @ DOCUMINTATION REVIEW                                               UNIT 2 Structural Angles l
RVAC Ducts and Flenuss R-M-DUPL-151 FACE I 0F 3 QUALITY INSTRUCTION
Material Traceability                                                                   C COMMott VERIFICATION EUIAAE3 ACCEPT                           REJECT   DATE Purchase Order Numbert
[REENSPECTION
] UNIT t QI-040 EQUIPMENT MARX / TAG S0.
@ DOCUMINTATION REVIEW UNIT 2 l
Structural Angles Material Traceability C COMMott VERIFICATION EUIAAE3 ACCEPT REJECT DATE Purchase Order Numbert
: 1. Material
: 1. Material
: 2. CKIR or COC
: 2. CKIR or COC
Line 1,660: Line 2,126:
: 1. Material
: 1. Material
: 2. CMTR or COC
: 2. CMTR or COC
: 3. Inspector's Certification FEI?AAD IT:                                                     APPROVED BY:
: 3. Inspector's Certification FEI?AAD IT:
DISCIPLINE ENGR.             DATI                               LEAD DISCIPLINE ENGR.               DATE IN5PEGI m &Y:                                                   APPROVED BY:
APPROVED BY:
                                                                          ~
DISCIPLINE ENGR.
NFMK                         DATE                               LEAD INSPEC*0R                     DA*E C??-007. !A. llevuun 0
DATI LEAD DISCIPLINE ENGR.
DATE IN5PEGI m &Y:
APPROVED BY:
~
NFMK DATE LEAD INSPEC*0R DA*E C??-007. !A. llevuun 0


Attachment 6.3 COMANCHE PEAK RESPONSE TEAM   QI.040 CHECKLIST             Rev. 1 POPU1.ATION DESC               VERITICATION PKG No.
..3 COMANCHE PEAK RESPONSE TEAM QI.040 CHECKLIST Rev. 1 POPU1.ATION DESC VERITICATION PKG No.
HVAC Ducts and Plenues           R-M-DUPL-151               PACE L OF 3 VERIFICATION REMARKS ACCEPT   REJECT     DATE Purchase Order Number:
HVAC Ducts and Plenues R-M-DUPL-151 PACE L OF 3 VERIFICATION REMARKS ACCEPT REJECT DATE Purchase Order Number:
: 1. h terial
: 1. h terial
: 2. CMTR or COC
: 2. CMTR or COC
: 3. Inspector's Certification Purchase Order Number:                                                                     .
: 3. Inspector's Certification Purchase Order Number:
: 1. W terial
: 1. W terial
: 2. CNTR or COC
: 2. CNTR or COC
: 3. Inspector's                                                                 ,
: 3. Inspector's Certification Purchase Order Number:
Certification Purchase Order Number:
: 1. h terial
: 1. h terial
: 2. CMTR or COC
: 2. CMTR or COC
: 3. Inspector's Certification                                                   e 4
: 3. Inspector's Certification e
Purchase Order Number:
4 Purchase Order Number:
: 1. h terial l
: 1. h terial l
: 2. CMTR or COC
: 2. CMTR or COC
: 3. Inspector's certificatten                                                   i I
: 3. Inspector's certificatten i
I
(
(
CPP-007.lB Revision 0
CPP-007.lB Revision 0


                        .                      .  . .                                                                                        j Attochment 6.3 COMANCHE PEAK RESPONSE TEAM     QI-040 CHECKLIST             g,y,       1 l
j Attochment 6.3 COMANCHE PEAK RESPONSE TEAM QI-040 CHECKLIST g,y, 1
i POPULATION DESC                   VERIFICATION PKG NO.     l PAGE L Or 3 HVAC Ducts and Plenuse               R-M-DUPL-151 i
i POPULATION DESC VERIFICATION PKG NO.
VERIFICATION RDIARKS           <
l HVAC Ducts and Plenuse R-M-DUPL-151 PAGE L Or 3 i
ACCEPT   REJECT   DATE s
VERIFICATION RDIARKS ACCEPT REJECT DATE s
l                                                   Purchase Order Number:                                                                                 .
l Purchase Order Number:
: 1. Material
: 1. Material
: 2. CWTR or C0C
: 2. CWTR or C0C
: 3. Inspector's Certification                                                               l
: 3. Inspector's Certification l
'                                                                                                                                          [
Purchase Order
Purchase Order Number:                                                                           '
[
Number:
: 1. Material
: 1. Material
: 2. CNTR of COC
: 2. CNTR of COC
Line 1,700: Line 2,171:
: 1. Materisi
: 1. Materisi
: 2. CWrR or COC
: 2. CWrR or COC
: 3. Inspector's                                                                       i
: 3. Inspector's i
;                                                            Certification Purchase Order                                                                       6 I
Certification Purchase Order 6
Number
I Number i
;                                                                                                                                          i i
i
: 1. Materisi
: 1. Materisi I
: 2. CATR or COC I
: 2. CATR or COC l
l
: 3. Inspector's certification t
: 3. Inspector's certification                                                                 .
i t
t i
i l
t i
1 L
l L
CFF-007.18. Revision 0
1 CFF-007.18. Revision 0


Attachment 6.4 COMANCRE FEAK RESPONSE TEAM                 Q1 04o CHECKl.IST                       gev, g F0FULAT10N DESC               VERITICATION FKG No.
..4 COMANCRE FEAK RESPONSE TEAM Q1 04o CHECKl.IST gev, g F0FULAT10N DESC VERITICATION FKG No.
HVAC Ducts and Plenuss         R-M-DUPL-152                               FACE I 0F 3 QUALITT INST 7UCT10N QI-040                  0aftNs?ECr20N                           o UNz! t EQUIPMENT MAJtK/ TAG No.     @ DOCUMENTATION RIVIN                                                             UNIT 2 Nuts and Bolts h terial Traceability O coNxoN VERIFICATION ACCIPT     RIJECT       DATE N
HVAC Ducts and Plenuss R-M-DUPL-152 FACE I 0F 3 QUALITT INST 7UCT10N 0aftNs?ECr20N o UNz! t QI-040 EQUIPMENT MAJtK/ TAG No.
Purchase Order Numbert
@ DOCUMENTATION RIVIN UNIT 2 Nuts and Bolts h terial Traceability O coNxoN VERIFICATION N
ACCIPT RIJECT DATE Purchase Order Numbert
: 1. Material
: 1. Material
: 2. CMTR or COC
: 2. CMTR or COC
Line 1,724: Line 2,195:
: 1. Material
: 1. Material
: 2. CNTR or COC
: 2. CNTR or COC
: 3. Inspector's Certification PaEFAAD ST:                                   AFFROV Q SY; DISCIPLINE ENGR.           DATI               LEAD DISCIPLINI ENGR,                                                               DATE     !
: 3. Inspector's Certification PaEFAAD ST:
IN5fIuw BT:                                   APPROVE SY:
AFFROV Q SY; DISCIPLINE ENGR.
WNM                           DATI             LEAD INSPECTOR                                                                       DATE C??-007 lA. Revuton 0
DATI LEAD DISCIPLINI ENGR, DATE IN5fIuw BT:
APPROVE SY:
WNM DATI LEAD INSPECTOR DATE C??-007 lA. Revuton 0


E                                                                             ,
E 1
1 COMANCHE PEAK RESPONSE TEAM     f*!
COMANCHE PEAK RESPONSE TEAM f*!
* j CHECKLIST             gey, t i
* CHECKLIST gey, t j
POPULATION DESC           VERITICATION PKG NO.
i POPULATION DESC VERITICATION PKG NO.
MVAC Ducts and Plenuss   R-M-DUPL-152               PACE L OF 3 VERIFICATION REMARKS ACCEPT   REJECT     DATE Purchase Order Number     .
MVAC Ducts and Plenuss R-M-DUPL-152 PACE L OF 3 VERIFICATION REMARKS ACCEPT REJECT DATE Purchase Order Number
: 1. h terial
: 1. h terial
: 2. CNTR or COC
: 2. CNTR or COC
Line 1,748: Line 2,221:
CPP-007.18. Revision 0
CPP-007.18. Revision 0


Attachment 6.4 COMANCHE PEAK RESPONSE TEAM       QI-040 CHECKLIST         g,y, 3 POPULATION DESC                   VERIPICATION FKG NO.
..4 COMANCHE PEAK RESPONSE TEAM QI-040 CHECKLIST g,y, 3
HVAC Ducts and Plenues             R-M-DUPL-152                   PAGE L OP 3 VERIFICATION RDIAAKS ACCEPT   REJECT         DATE Purchase Order Number:
POPULATION DESC VERIPICATION FKG NO.
HVAC Ducts and Plenues R-M-DUPL-152 PAGE L OP 3 VERIFICATION RDIAAKS ACCEPT REJECT DATE Purchase Order Number:
: 1. h terial
: 1. h terial
: 2. CMTR or COC
: 2. CMTR or COC
Line 1,755: Line 2,229:
: 1. h terial
: 1. h terial
: 2. CMTR or C0C
: 2. CMTR or C0C
: 3. Inspector's                                                                       ,i Certification i
: 3. Inspector's Certification i
i Purchase Order                                                                       ;
i Purchase Order Number
Number
: 1. hterial
: 1. hterial
: 2. OfTR or COC
: 2. OfTR or COC
: 3. Inspector's i
: 3. Inspector's i
Certification Purchase Order Number:
Certification Purchase Order Number:
l         1. h terial
l
: 1. h terial
: 2. CNTR or COC
: 2. CNTR or COC
: 3. Inspector's Certification                                                                   l 1
: 3. Inspector's Certification l
4 CFP-007.lB. Revision 0
1 4
CFP-007.lB. Revision 0


Attcchsent 6.1 -
Attcchsent 6.1 QI-041 COMANCIE PEAK RIS?ONSE TEAM Rey, t CRE M IST Page t og 3 POPULATION DESC 7ERITICAT10N PEG No.
QI-041 COMANCIE PEAK RIS?ONSE TEAM               Rey, t CRE M IST                       Page t og 3 POPULATION DESC               7ERITICAT10N PEG No.
Field Fabricated Tanks I-M-TTTA-PAGE 1 0F 3 QUALITY INSTRUCTION
Field Fabricated Tanks         I-M-TTTA-                           PAGE 1 0F 3 QUALITY INSTRUCTION QI-041                        @ LIINSPECTION                     O gyIT t EQUIPMENT Mass,/ TAG N0.     ] 00c;MccATIog gzvity               0 Uwt: 2 O councN TIRITICATION N
@ LIINSPECTION O gyIT t QI-041 EQUIPMENT Mass,/ TAG N0.
ACCIPT     REJECT     DATE
] 00c;MccATIog gzvity 0 Uwt: 2 O councN TIRITICATION N
: 1. Name Plate
ACCIPT REJECT DATE 1.
: 2. Shell Top Angle
Name Plate 2.
: 3. Anchor Bolt Ring 4   Anchor Bolt Chairs
Shell Top Angle 3.
: 5. Anchor Solt Tightness
Anchor Bolt Ring 4
: 6. Out of Roundness
Anchor Bolt Chairs 5.
: 7. Longitudinal Weld Sean Offsets
Anchor Solt Tightness 6.
: 8. Sotton Plate Weld Seas of f set
Out of Roundness 7.
: 9. Rozzle Site and Type A. Site B. Type
Longitudinal Weld Sean Offsets 8.
Sotton Plate Weld Seas of f set 9.
Rozzle Site and Type A. Site B. Type
: 10. Nozzle Location
: 10. Nozzle Location
: 11. Nozzle Insert Reinforcement Plate
: 11. Nozzle Insert Reinforcement Plate
!          12. Nossle and Manhole Reinforcing Pads PREPARID BT                                   APPROVED BY:
: 12. Nossle and Manhole Reinforcing Pads PREPARID BT APPROVED BY:
DISCIPLINI DGE.               DATI           LEAD DISCIPLINE ENGR.         DATE IN57EWw BY                                   APPROVID ST:                           ,
DISCIPLINI DGE.
L.W EG UR                     DATE           LEAD INSPECTOR               DATE w        -
DATI LEAD DISCIPLINE ENGR.
CPP-007.1A. Levision 0
DATE IN57EWw BY APPROVID ST:
L.W EG UR DATE LEAD INSPECTOR DATE CPP-007.1A. Levision 0 w


Attachment 6.5 QI-041 COMANCIE PEAK RESPONSI TEAM       Rev. 1 CIECKLIST POPULAIION DESC                 VERIPICATION PKG NO.
..5 QI-041 COMANCIE PEAK RESPONSI TEAM Rev. 1 CIECKLIST POPULAIION DESC VERIPICATION PKG NO.
I-M-TTTA-                 P ACI __,2 0T 3 Tield Tabricated Tanka YERITICATION                                     l tZNARXS ACCITT   REJECT   DATI
Tield Tabricated Tanka I-M-TTTA-P ACI __,2 0T 3
: 13. Seirmic Restraint                                                               :
YERITICATION tZNARXS ACCITT REJECT DATI
l 1                                                                                                                         l A. Installation B. Elevation l
: 13. Seirmic Restraint l
C. Weld 14   Internal Pipe A. Arrangement i
l 1
l                                           B. Dimensions
A. Installation B. Elevation l
: 15. Welds A. Configuration                                                           .
C. Weld 14 Internal Pipe A. Arrangement i
Size and Profile
l B. Dimensions
!                                          B. Butt Veld Rainforcement C. Undercut D. Surfaces of                                                             '
: 15. Welds A. Configuration Size and Profile B. Butt Veld Rainforcement C. Undercut D. Surfaces of Weldo E. Offset of Butt Velds T. Tairing of Offseta G. Cracks. Lack of Tusion and Crater Cracks R. Indications
Weldo E. Offset of Butt Velds T. Tairing of Offseta G. Cracks. Lack of Tusion and Crater Cracks R. Indications
: 16. Base Materials A. Material Identification B. Material Defects d
: 16. Base Materials A. Material Identification B. Material Defects                                                       ,
C??-007. L3. Reva. sun 0
d C??-007. L3. Reva. sun 0


j
j Att chae:t 6.1 QI-041 COMANCE PEAK R15?0NSE TEAM g,y, g
                                    $-                                                            Att chae:t 6.1 QI-041 COMANCE PEAK R15?0NSE TEAM       g,y, g CB CKI,IST POPULATION DESC           YERITICATION PRC 30.
CB CKI,IST POPULATION DESC YERITICATION PRC 30.
I-M-TTTA-                             3 Field Tabricated Tanks                              Pact _3 07 YE11TICATION ACCEPT   RIJECT   DATE IN
Field Tabricated Tanks I-M-TTTA-Pact _3 07 3
YE11TICATION IN ACCEPT RIJECT DATE
: 17. Weld Rust
: 17. Weld Rust
: 18. Material Rust
: 18. Material Rust
Line 1,807: Line 2,285:
C??-407.L3. Rev.ston 0
C??-407.L3. Rev.ston 0


M taehaent 6.1 CI-00 KEV. 1 Pege 1 of 2 COM.A.%"EI PIM II5?CNSE TT.AM 9
M taehaent 6.1 CI-00 KEV. 1 Pege 1 of 2 COM.A.%"EI PIM II5?CNSE TT.AM C11 ll:.IIT 9
C11 ll:.IIT F0F'A.An;N DESC                   TE? H CAUCN Pia 80.
F0F'A.An;N DESC TE? H CAUCN Pia 80.
FA*I 1 CF ".
FA*I 1 CF."
r".D TA3P!!ATT3 TAN 1t3         R-M-7F"A=
r".D TA3P!!ATT3 TAN 1t3 R-M-7F"A=
QCAL*IT D37L"CUCN O izusit:=cw                         0 c:r:: t 01-062 EQIJ17."I.C .u1KtIA.3 Wo.         h DOC MINTinCN RIT!IV               O ow:: 2 C COMMCM run:Ana,             i AC .~?T     LI *In       DCE
QCAL*IT D37L"CUCN O izusit:=cw 0 c:r:: t 01-062 EQIJ17."I.C.u1KtIA.3 Wo.
: 1. Disensional Yorification                                               ,
h DOC MINTinCN RIT!IV O ow:: 2 C COMMCM run:Ana, i
A. Tack Diameter
AC.~?T LI *In DCE
: 3. Shell Disseter         .
: 1. Disensional Yorification A. Tack Diameter
e C. Yassel lead Dlaseter D. Temperat7 Foundation tevel                                                                         _
: 3. Shell Disseter e
E. Taek lettos Crown
C. Yassel lead Dlaseter D. Temperat7 Foundation tevel E. Taek lettos Crown
: 2. Rydrostatic Test A. Borizontal Tank
: 2. Rydrostatic Test A. Borizontal Tank
: 3. Tlat lettos Tank
: 3. Tlat lettos Tank
: 3. Escord Dravtags A. Joint Identifiestion
: 3. Escord Dravtags A. Joint Identifiestion
                              .          5. Veldere Identifiestien C. Welding frecedure
: 5. Veldere Identifiestien C. Welding frecedure Specifiestion D. Record Drawing Table $1 noffs PSIFAAID ST AFF10T C ST:
* Specifiestion D. Record Drawing
015C:7t DI OsC2.
                              .              Table $1 noffs PSIFAAID ST                                         AFF10T C ST:
DaTI LEAD D15CIPLDE DC1.
DATI 015C:7t DI OsC2.                 DaTI             LEAD D15CIPLDE DC1.
DATI L23Fh.w Bla atF10V D ST:
L23Fh.w Bla                                         atF10V D ST:
i.oit w a CATI LIAD mstte Ost DATE C??'007.1A.Rev'1Tien0'
i.oit w a                         CATI             LIAD mstte Ost           DATE C??'007.1A.Rev'1Tien0'


Attachsent 6.1 Q7-042 R E *.* . 1 Page - 1 og . 1 COMA 3C11 !!AK RJ.37CN5% TIAM C11CZ:.: T PCI'.';.an;S 303;                             TD T;32;0N PK3 30.
Attachsent 6.1 Q7-042 R E *.*. 1 Page 1 og 1 COMA 3C11 !!AK RJ.37CN5% TIAM C11CZ:.: T PCI'.';.an;S 303; TD T;32;0N PK3 30.
1-M-T77A-                    IE CI TIII.2 TA31:CA!D TANT.S VTR.:T .A! GN ACO:77 l3.T*ICT'DATI
IE CI TIII.2 TA31:CA!D TANT.S 1-M-T77A-VTR.:T.A! GN l3.T*ICT'DATI ACO:77
: 3. (wont'd)
: 3. (wont'd) t.
: t.                 Et Procedures identified
Et Procedures identified
: 4. U 1d Materials recedure Amorovs1
: 4. U 1d Materials recedure Amorovs1
: 6. Velder and Veldize                                                           ,
: 6. Velder and Veldize Cee?stor Ous11!! cations
Cee?stor Ous11!! cations
: 7. Wendestnctive Examiutions A. Veld Joint 1
: 7. Wendestnctive Examiutions A. Veld Joint 1                             Identificatios
Identificatios
: 3. NCE Procedure / Report Identification   I
: 3. NCE Procedure / Report Identification I
,            C. Leviewer Certificatica
C. Leviewer Certificatica
: 8. Wondestructive
: 8. Wondestructive
              '**=4-ation Personnel Certi.fications A. NDE Personnel Certification
'**=4-ation Personnel Certi.fications A. NDE Personnel Certification
: 5. Vision Test Record 1
: 5. Vision Test Record 1
C. WDE Certifiestion
C. WDE Certifiestion
: 9. Setraic Leatralas As-luilt Dimensions 10.Materisi Verification 4
: 9. Setraic Leatralas As-luilt Dimensions 10.Materisi Verification 4
                                              ~
C?- W.48, aavist'o's 0
C?- W .48, aavist'o's 0
~


Attachment 6.1 QI-Ot.3 Rev. 2 Page 1 of 2 CDMANCII PtAE 115 Poult TTM C11CE.1ST FGF u nas DEK                 vn m CATIce PEG 30.
..1 QI-Ot.3 Rev. 2 Page 1 of 2 CDMANCII PtAE 115 Poult TTM C11CE.1ST FGF u nas DEK vn m CATIce PEG 30.
C05C1.ETS PLACDerf                                                 IMI L Of b um aimCuc.
C05C1.ETS PLACDerf IMI L Of b um aimCuc.
Q1-04)                       @LIU5PICT10W                         C C3:71                   ,
Q1-04)
GG.rMENT MAAKi;a; so.       O occ==r:AT:o= tritiv                 0 cut :
@LIU5PICT10W C C3:71 GG.rMENT MAAKi;a; so.
O C=*eW ro m CA m u ACCIFT     SUICT     DATI                                     .
O occ==r:AT:o= tritiv 0 cut :
: 1. tecettea                                                                   .,
O C=*eW ro m CA m u ACCIFT SUICT DATI 1.
A. Welle. Cel s e.
tecettea A.
Welle. Cel s e.
Piete. Fedestale.
Piete. Fedestale.
Cutbe. Fede S.   $1aba
Cutbe. Fede S.
: c. le es
$1aba c.
: 2. Sist A. Welle. Cutbe.
le es 2.
31obe B. Columme. Piere.
Sist A.
Podestels C. lease
Welle. Cutbe.
: 3. Serfste taopecties A. Welle. Curbs.
31obe B.
Columme. Piere.
Podestels C.
lease 3.
Serfste taopecties A.
Welle. Curbs.
Cal m e. Pters.
Cal m e. Pters.
Podestole. Pode S.   $lebe. Seems PREPA& E lil                                 df t0TD l'' t etst!Ptlyt t3L;t.           tatt           (tg ttsc rt!st N,t.         SATT
Podestole. Pode S.
                              *sars..no ITs                               MPRCvD 31:
$lebe. Seems PREPA& E lil df t0TD l'' t etst!Ptlyt t3L;t.
                              . m t-     =                 ;&n           L LAD !N 57 t p t         ~5att CPPWi.LA. Revuun 0
tatt (tg ttsc rt!st N,t.
SATT
*sars..no ITs MPRCvD 31:
. m t-
=
;&n L LAD !N 57 t p t
~5att CPPWi.LA. Revuun 0


. . . .                                                                                            P AttaChaent 6.1 I
P AttaChaent 6.1 I
Q1-043 Rev. 2 l
Q1-043 Rev. 2 l
I ComApCut PEAR Bt5POPlt TEAM CNECELllt
I ComApCut PEAR Bt5POPlt TEAM CNECELllt PONLATION Dtic V RIFICAT10It PEG N0.
* PONLATION Dtic             V RIFICAT10It PEG N0.                                       ,
PACE 1 0F 1 Co#CttTE PLACDEWT Tp!FIC Afl0li ATTRIDL'TE ACCEPT BEJECT DATE 6.
Co#CttTE PLACDEWT PACE 1 0F 1 Tp!FIC Afl0li ATTRIDL'TE                                                 '
Ceted Roles t
ACCEPT   BEJECT   DATE
s.
: 6. Ceted Roles                                                                     t
tratte n.
: s. tratte
Patches I.
: n. Patches I. Aether Solte A.                                                                                 ,
Aether Solte A.
B,                                                                                 i I
B, i
C.
I C.
: 5. gebodded Flotta                                                                     ,
5.
and $tructural                                                                     !
gebodded Flotta and $tructural the re s L
the re s L
i
i
[
[
r b
r b
r i
r i
i ta' .*i' 45, trvioinn 0                                                                 1 1
i ta'.*i' 45, trvioinn 0 1
l i
1 l
2                                            i 1
i 2
i 1


Attech:ent 6.1 QI-044 Rcv. 3 Page 1 of 3 CHECKLIST CosWK1it itM Rt8 Posts Ttait Ct1CEL181 rurnAuge esss                               entricattos pts as, c et. . rtete.e.
Attech:ent 6.1 QI-044 Rcv. 3 Page 1 of 3 CHECKLIST CosWK1it itM Rt8 Posts Ttait Ct1CEL181 rurnAuge esss entricattos pts as, tact i er.L c et.. rtete.e.
tact i er .L i
i 00 AL tT1 185TEUCT1W OinuiriCtta=
00 AL tT1 185TEUCT1W 414t4                                        OinuiriCtta=                           0     it i W LF 2 rf AAAE/1AG 80.                     @ 90C9mrTAftes agTtw                   Q gutt 1 Ocm
0 it i 414t4 W LF 2 rf AAAE/1AG 80.
                          '                                           vrtirICAftse
@ 90C9mrTAftes agTtw Q gutt 1 Ocm vrtirICAftse '
                              "* "                                                    '                  N actEFT     taJtCT       94TE
N actEFT taJtCT 94TE l.
: l. helge Pts. Centrate
helge Pts. Centrate totablog 6 Ceeveytag i
* totablog 6 Ceeveytag                                                                                       i A. Rised h elge Carde.
A. Rised h elge Carde.
Staedff                                                                                               r
Staedff r
              .*          8. Rised Deatge Carde.
: 8. Rised Deatge Carde.
Steelfled DF The Flete C. ptsed Destys Carde-                                                                     - - -
Steelfled DF The Flete C. ptsed Destys Carde-Frenettiene
Frenettiene e
: 9. letet Fleet testes e
: 9. letet Fleet testes
: f. lateb Ticket F. Treek staese.
: f. lateb Ticket F. Treek staese.
j tevetoete*6 C. Trut 9teekstas flas
j tevetoete*6 C. Trut 9teekstas flas 3.
: 3. Fotos. Esmettoettes Jetate                                                                                                 <
Fotos. Esmettoettes Jetate A. testattettse of i
A. testattettse of i                                 fore nout
fore nout
: 3. testattettee of CasstrestLee Jetote l                                                                                                                             _-
: 3. testattettee of CasstrestLee Jetote l
gr min l'
tenAas sta gr min l' DtlCIPttst luct, 36 7 igag gtgg;rtgyg gjgg.
'                      tenAas sta DtlCIPttst luct,                         36 7               igag gtgg;rtgyg gjgg.       34T5 W FEU38 I14                                                 AFFEMW BTs LIAR talytcT;t             pa;t Ems,as                                    WaT1 I
34T5 W FEU38 I14 AFFEMW BTs Ems,as WaT1 LIAR talytcT;t pa;t Cf f =Wif lA. tectstaa 4 t
!                      Cf f =Wif lA. tectstaa 4 t


1
1 Attach ent 6.1 Q1-044 Rev. 3 CHECKLIST (Cont'd)
  .  . . .                                                                            Attach ent 6.1 Q1-044             l Rev. 3           ;
CHECKLIST (Cont'd)
I f
I f
CesW Cat PLAR tt8 poult TEMI CWIG1lff MFVLATIUB DE5C                 TfttFICAfice FRG 30 FACI 1. Of .J, Cemetete Fleteneet trttFICATIOU I
CesW Cat PLAR tt8 poult TEMI CWIG1lff MFVLATIUB DE5C TfttFICAfice FRG 30 FACI 1. Of.J, Cemetete Fleteneet trttFICATIOU I
ACCEPT     ttJtCT   Beft e
ACCEPT ttJtCT Beft e
C. Seteele att See 9, Post Card flee-off
C. Seteele att See 9, Post Card flee-off 3.
: 3. Rebet. Cedwelde.
Rebet. Cedwelde.
Wateretere. Anther                                                                   ,
Wateretere. Anther talte. tahedded fletei A. Webstellee.
talte. tahedded fletei A. Webstellee.
Spostes. Ceestete Covet & Proper tastellettes S. Cedweld/ Lap lettsee C. Asehetese Length et newete
Spostes. Ceestete Covet & Proper tastellettes S. Cedweld/ Lap lettsee C. Asehetese Length et newete
: 9. Amhet letto.fype
: 9. Amhet letto.fype
: 8. testattettee of waterstate F. leete11stfee of tonedeset 4 Depeettist ud                             -
: 8. testattettee of waterstate F. leete11stfee of tonedeset 4 Depeettist ud Ceneeltaettee
Ceneeltaettee
: a. Pieteneet tete
: a. Pieteneet tete
: 9. Pteeeeeet Lift                                                     ,,
: 9. Pteeeeeet Lift C. flessenet Teeheiene
C. flessenet Teeheiene
: 8. Pfesegeet Ctede
: 8. Pfesegeet Ctede
: f. vthtetere Seeed F. Tinester ces,ett . '
: f. vthtetere Seeed F. Tinester ces,ett.
: 4. Tibreter Penettettee trr.Mr.s e, se,t elee e 2
: 4. Tibreter Penettettee trr.Mr.s e, se,t elee e 2


Attechment 6.1   ;
Attechment 6.1 QI-044 Rev. 3 CHECKLIST (Cont'd)
  '  '                                                                                                l QI-044 Rev. 3 CHECKLIST (Cont'd)
ConoCu rts usrovst TT.AM CE ct2.1ST PorUtAllom DLSC tralricAttou rst. 30.
ConoCu rts usrovst TT.AM       .
CE ct2.1ST PorUtAllom DLSC                   tralricAttou rst. 30.
FACI J OF J Centrete Placement FttirICAttou
FACI J OF J Centrete Placement FttirICAttou
                                            &CCEPT       13 JECT   DatT
&CCEPT 13 JECT DatT 5.
: 5. Attethte Deleted
Attethte Deleted 4.
: 4. la-Process canctete Teste A. Air centent
la-Process canctete Teste A. Air centent
: 3. Slumre C. Coverste Toepersevre
: 3. Slumre C. Coverste Toepersevre 7.
: 7. Coring
Coring
              =.                                                                .
=.
A. Curie 3 Sagwirement e Troperly addrassed l                   9. Chriss Las T.attia_les end tetti
A. Curie 3 Sagwirement e Troperly addrassed l
: 8. Cearteesf.ve Stressth feet Baselte A. Laktstery Cured         . g;, .                                     -
: 9. Chriss Las T.attia_les end tetti 8.
Cearteesf.ve Stressth feet Baselte A. Laktstery Cured
. g;,.
Cvitad o re
Cvitad o re
: 3. Field Cated Cyltaders _.
: 3. Field Cated Cyltaders _.
: 9. 1:2.eettee t-f Me
2 eettee t-f Me 9.
1:
: 10. t upeettes W Test Peteeenal Cartifiest';m i
: 10. t upeettes W Test Peteeenal Cartifiest';m i
l l
l l
l CO?-40' . Lt. levtsten d l
l CO?-40'. Lt. levtsten d 3
3


      .                                                                                                1 1
Attcchment 6.1 QI-045 Rev. 4 Page 1 of 6 CDMANGE PEAI RISPCN5Z TIAM CIECI:.IST F0Pr A!;0N DL5G V nITICAilCN PKG.10.
Attcchment 6.1     l QI-045             !
STRUCTVRA1 STEEL I-5-STtt FACE 1 CF,,j,
Rev. 4             '
QUA.L;TT LN571UCTICH Q1-045
Page 1 of 6 CDMANGE PEAI RISPCN5Z TIAM CIECI:.IST F0Pr A!;0N DL5G               V nITICAilCN PKG .10.
@IIDSPECTTCW
STRUCTVRA1 STEEL                 I-5-STtt                             FACE 1 CF ,,j ,
['CN!!i 1.QGIFMINT MAAA/IAC.10.
QUA.L;TT LN571UCTICH Q1-045                         @IIDSPECTTCW                           ['CN!!i 1.QGIFMINT MAAA/IAC .10.     O occ=rx:A:to" ar'tiv                 0 cst: 2 C019CN VTRIFICAT105 A
O occ=rx:A:to" ar'tiv 0 cst: 2 C019CN VTRIFICAT105 A
ACCIFT     RIJECT     DATI l
ACCIFT RIJECT DATI l
A Member                       N/A Inf'irmation Mneder Al) location A2) Site Information only A3) Meterial Ident     _
A Member N/A Inf'irmation Mneder Al) location A2) Site Information only A3) Meterial Ident W /A.2 A4) Leenth A5) orientatioa l
W /A                 Attachment 6.2 A4) Leenth A5) orientatioa l
A6) Alterattoes N/A Info restion Bander i
A6) Alterattoes             N/A Info restion Bander                                     i a) tocation                                                                         .
a) tocation
_ b) Site                                                                               .
_ b) Site c) Limit of Alteration d) te-entreat Cornere e) Cuts and teles PRIFARED 8t:
c) Limit of Alteration                                                           .
Affl0T D Its DISCIPLIW1 DeC1.
d) te-entreat Cornere e) Cuts and teles PRIFARED 8t:                                   Affl0T D Its DISCIPLIW1 DeC1.               DATE             L M 015C1F'.151 08C8.       DAtt int m s.w ITs                                 A FROTED ST:
DATE L M 015C1F'.151 08C8.
            .n r tu va                     UAn             LEAD INSPEC Ot             0A!!
DAtt int m s.w ITs A FROTED ST:
C?P- C .tA. tevtsun 0
.n r tu va UAn LEAD INSPEC Ot 0A!!
C?P-C.tA. tevtsun 0


    .                                                                                              l l
l Attcchment 6.1 QI-045 Rev. 4 COPANCME FIM 115?CN$l !!A4 l
Attcchment 6.1 l QI-045
i C3E 7.*;5T
            -                                                                      Rev. 4 COPANCME FIM 115?CN$l !!A4                       li C3E 7.*;5T
?^?.b ;;;> ;&i;
            ?^?.b ;;;> ;&i;                 .IR:T;;AT*08 PK; 30.
.IR:T;;AT*08 PK; 30.
PA;I J er    3 stavCnut sTtzt                   t-s-sttt
stavCnut sTtzt t-s-sttt PA;I J er 3
                                              .In:rt:A;:cs
.In:rt:A;:cs
                    ^                   AC0!?!   RIJECT       DATE 5 Connection                   N/A Informatice Needer                             ;
^
ll) tocation
AC0!?!
RIJECT DATE 5 Connection N/A Informatice Needer ll) tocation
: 52) Siz e
: 52) Siz e
: 13) Orientation B&) Velde                   N/A 1Bif ormatite Reader a) toestion b) Weld Site c) Weld Lenath I
: 13) Orientation B&) Velde N/A 1Bif ormatite Reader a) toestion b) Weld Site c) Weld Lenath I
_d ) Fusion                                                                       i I
_d ) Fusion i
e) Cratere                       __
I e) Cratere f) Weld troffles a) Utdareut h) Porootty
f) Weld troffles a) Utdareut h) Porootty
: 1) overlap _
: 1) overlap _
: 1) Surf ace Staa k) Cracks                                               Information Only 5/A               Attachneet 6.3 l
: 1) Surf ace Staa k) Cracks Information Only
: 1) Walder ID Srebel l                55) Strvetersi loltima               N/A 1 oformati pe Eseder j
: 1) Walder ID Srebel 5/A Attachneet 6.3 l
l
: 55) Strvetersi loltima N/A 1 oformati pe Eseder j
s) Solt Diameter b) Material c) Questity i
s) Solt Diameter b) Material c) Questity i
1 i
1 i
d
d
              ?s. w .:.     ~4...,s.'=
?s. w.:.
~4...,s.'=
2 1
2 1


Attachment 6.1 QI-045 Rev 4 CO.*x:CMI P!AK RISPONSE TIM                                     l C *i t C-*. ; 5
..1 QI-045 Rev 4 CO.*x:CMI P!AK RISPONSE TIM C *i t C-*. ; 5
* 1 1
* 1 M P '.~.A
M P '.~.A ;;> 315C                           ''t!t;T;CA!;Cs
;;> 315C
                                                        .                  PK; sc.                               i l
''t!t;T;CA!;Cs PK; sc.
STRUCTt*RAL STEEL                             I-5-STTL                     P ACI J 0T ,,,,,6 vtR;rt:AT;;N A
i STRUCTt*RAL STEEL I-5-STTL P ACI J 0T,,,,,6 vtR;rt:AT;;N lLIJICTlDAIT A
ACCIP!
ACCIP!
lLIJICTlDAIT l     1 l
l 1
: 55) Structural                                                                                     l Solting (Cont'd) d) Vsehere                                                                                             ;
: 55) Structural l
1 e) leveled Vsehere f) Role Coverer.e a) Jos pute I
Solting (Cont'd) d) Vsehere 1
h) Thread Ea goesnt                                                                               I i) Edge Diet ence             a                                                 _
e) leveled Vsehere f) Role Coverer.e a) Jos pute I
: 3) Tiahtentos       _ _ _ _ _
I h) Thread Ea goesnt i) Edge Diet ence a
l__
l
i k) Seering
: 3) Tiahtentos i
: 1) Specief.                                                           --
k) Seering
e) Confinretten                                                     _
: 1) Specief.
: 56) Richrend Inseets                           N/A in f ores t i,pe Eseder                             ,
e) Confinretten
e) Throod Essesseset b) Ti'thenese c) Vasher d) '.oc et toe e) Edse Dietence
: 56) Richrend Inseets N/A in f ores t i,pe Eseder e) Throod Essesseset b) Ti'thenese c) Vasher d) '.oc et toe e) Edse Dietence
: 57) Concrete Espension
: 57) Concrete Espension
(                     Aschefs                           w/A : sformati pe Reeder 57.1 Stae and Dumber e) Diameter b) Tyye. Length.
(
Febee
Aschefs w/A : sformati pe Reeder 57.1 Stae and Dumber e) Diameter b) Tyye. Length.
                                                                              <                                      i
Febee i
            ~~..       .:. *e.. c.:= 1 1
~ ~..
.:. *e.. c.:=
1 1
3
3


. . , .                                                                                                        I AttCchmen8 6.1 QI-045           ,
AttCchmen8 6.1 QI-045
                                                                                                                )
)
            .                                                                                Rev 4 C0Fxic'.4E ?!AK R15?CN11 TEAM CXIC"*.;17
Rev 4 C0Fxic'.4E ?!AK R15?CN11 TEAM CXIC"*.;17
        ?;'.h ;Cs       ES-
?;'.h ;Cs ES-
                                                '.'II;T;;A* ;;N ?G . CN .                           ,
'.'II;T;;A* ;;N ?G. C.
                                                                                  ?ACI &CT 6 1-5-STYL                                         1 STRUCTtM STEEL VER;Tt:At:05                                   l WM ANP.5                           AC ty7         Kgygg;       7A7Z l
N
a 87.2 Embedmont tensch 57.3 Solt Specina                     N/A Informattle Meeder a) Center to Center Specins l           ,
?ACI &CT 6
b) Bilti to               i Richaced c) 511tt to Embed Plates 97.6 Anavlerity                                                                               f St $ Concrete teatas                                                                           l 37.6 Nut Engagenoot and leering                      N/A leformett rt, Easder                               i I
1-5-STYL 1
                  .e', put Eeastseest
STRUCTtM STEEL VER;Tt:At:05 l
                                                                                ~
WM ANP.5 AC ty7 Kgygg; 7A7Z l
b) Seartes                                 - , _ _
a 87.2 Embedmont tensch N/A Informattle Meeder 57.3 Solt Specina a) Center to Center Specins l
e) Bott e t di Weld J
b) Bilti to i
37.7 Configuratios                      N/A l eformati m leader a) Locettoe b) Edae Dietsace
Richaced c) 511tt to Embed Plates 97.6 Anavlerity f
St $ Concrete teatas l
37.6 Nut Engagenoot N/A leformett rt, Easder i
and leering I
.e', put Eeastseest
~
b) Seartes e) Bott e t di Weld J
N/A l eformati m leader 37.7 Configuratios a) Locettoe b) Edae Dietsace
: 18) laseplates
: 18) laseplates
: 89) Crovt 3
: 89) Crovt 3
i
i
          ?~.       ; . ; .. . v. . - >
?~.
;. ;... v.. - >
d
d


Attachment 6.1 QI-045
.....1 QI-045 Rev. 4 C0m XE PIAK RE5?CN$t !!M I
            ,                                                                          Rev. 4 I
C'.4 E 07.; 5I
C0m XE PIAK RE5?CN$t !!M C'.4 E 07.; 5I
?0?.b ;;05 0130
              ?0?.b ;;05 0130                   'ta;7;;A;;;s
'ta;7;;A;;;s px; n,
                                                .                  px; n ,
STRtlCTURAL STEEL I-$-STtt FACI J0T _6 vn:tI AT:cs ACCEPT LI.'t CT DATI RD.AES C) Field Installed i
STRtlCTURAL STEEL                   I-$-STtt                 FACI J0T _6 vn:tI AT:cs
Details N/A Information Needer Cl) location C2) Site C3) Orientation CA) Veld W/A Informatine Header si Loestion b) Weld Site
                    *    '                                                      RD.AES ACCEPT     LI.'t CT     DATI C) Field Installed                                                                   i Details                       N/A Information Needer Cl) location C2) Site C3) Orientation CA) Veld                       W/A Informatine Header si Loestion b) Weld Site                                                                   !
:) Wald Lenath
:) Wald Lenath
: 4) Fustos e) Craters f) Veld Profiles
: 4) Fustos e) Craters f) Veld Profiles
_ J Caderent h) Porosity
_ J Caderent h) Porosity
: 1) Overlap
: 1) Overlap
                  !) Surface Slaa k) Cracks Information only
!) Surface Slaa k) Cracks Information only
: 1) Velder ID Srebel                 W/A                   Attachasnt 6.3 CS) Bottlan                   W /A   sforestipe Reader a) tolt Disaster l               b) Material e) Quantity i
: 1) Velder ID Srebel W/A Attachasnt 6.3 CS) Bottlan W /A sforestipe Reader a) tolt Disaster l
4 l
b) Material e) Quantity i
              .      .  ' t " *. e '. : = 1 1
4
F 5
' t " *. e '. : = 1 l
1 F
5


I i
I i
  .. . . .                                                                                                                          I Attachment 6.1 i QI-045         l Rev 4           )
..1 i
l CCPANCME PIAK 1!$PCNSE TEM CXECn !st                                                           {
QI-045 l
FCP'..a!*;> ;!ic
Rev 4
                                          .11t;-*.CA;;08 PK; :so, STRt'CTtlix, STEEL         1-5-STEL                         P ACI 6 0f ,,,,,J vtur:CAn:N ACCI?*                                                     '3 fR. EJECT3A*!               I C5) Solting (Cont'd) l di Weehere e) leveled Weehere f) Role Coversas a) Jos Nute h) Thread Enneaseent i) Edme Distance
)
CCPANCME PIAK 1!$PCNSE TEM
{
CXECn !st FCP'..a!*;> ;!ic
.11t;-*.CA;;08 PK; :so, STRt'CTtlix, STEEL 1-5-STEL P ACI 6 0f,,,,,J vtur:CAn:N fR. EJECT ACCI?*
3A*!
I
'3 C5) Solting (Cont'd) l di Weehere e) leveled Weehere f) Role Coversas a) Jos Nute h) Thread Enneaseent i) Edme Distance
: 3) Ti g ies I
: 3) Ti g ies I
h) learina                         '
h) learina f
f
_ _z
_ _z                     __
: 1) Specisa el Cosfigurettee
: 1) Specisa               _ _ _ _
-..c 2.
el Cosfigurettee
s,...,,,..
            -..c     2. s,...,,,.. 9                                                                                     1 l
9 1
t 6
l t
L
6 L


Attechtten2 6.1 QI-0/.6 Rev. 2 Page 1 of 3 COMANCRE PEAE RESPONSE TEAM CEECILIST F0FL" ATION DESC               VERITICATION PEG No.
Attechtten2 6.1 QI-0/.6 Rev. 2 Page 1 of 3 COMANCRE PEAE RESPONSE TEAM CEECILIST F0FL" ATION DESC VERITICATION PEG No.
Structural Steel               R-5-STEL.
Structural Steel R-5-STEL.
FACE t 0F 1 QUA.LITT INSTRUCT 10W Ql-U46 012t=5'ect2o=                           0 cvit i EQU1FMENT MAAK/ TAC NO.       X DOCDGNTATION RZY1EV             -
FACE t 0F 1 QUA.LITT INSTRUCT 10W Ql-U46 012t=5'ect2o=
O vatt 2 s
0 cvit i EQU1FMENT MAAK/ TAC NO.
O ===
X DOCDGNTATION RZY1EV O vatt 2 O===
Vtt1FICATIou ATTRIBUTE A.CCEPT     REJECT     DATE A. Cons t ruction
s Vtt1FICATIou ATTRIBUTE A.CCEPT REJECT DATE A.
;              Operation Traveler f               PacLane                   N/A                         INFORMATIONAL NEADER A.1) inspection Package l
Cons t ruction Operation Traveler f
A_.2) Drevinao                           ,
PacLane N/A INFORMATIONAL NEADER A.1) inspection Package l
A.J) Inspector                                                                     '
A_.2) Drevinao A.J) Inspector Certificatter.
Certificatter.           N/A                         INFORMATIONAL NEADER A 3.1) Inspection Report                         -
N/A INFORMATIONAL NEADER A 3.1) Inspection Report A.3.2) Weld Inspection Docuanntation Card A.3.3) Material Requisition i
A.3.2) Weld Inspection Docuanntation Card A.3.3) Material i                   Requisition A.3.4) Structural Aseembly verification Card A.3.5) Construction Operation Traveler A.3.6) Other Documents (list) rtD AnzD af:                                   AFFlovID ST:
A.3.4) Structural Aseembly verification Card A.3.5) Construction Operation Traveler A.3.6) Other Documents (list) rtD AnzD af:
DISCIFtlyt BBCt.             Daft               LEAD D .$CIPLINT EMCt.       Daft uarh6w bis                                     AFFRvwo RT:
AFFlovID ST:
Anarzuwa                       DATI             LEAD IE5FECT05             DATE CFF=007.lA. Levision 0
DISCIFtlyt BBCt.
Daft LEAD D.$CIPLINT EMCt.
Daft uarh6w bis AFFRvwo RT:
Anarzuwa DATI LEAD IE5FECT05 DATE CFF=007.lA. Levision 0


1
1 1
  . . . .                                                                                                  1 At20cheene 6.1 QT-046 P.ev. 2 C::%NCME PEAK RI5?CNSE TEAM C'dICKI,15T PCF'.h !;CN OESC               VER:T; CAT:CN FC NC.
At20cheene 6.1 QT-046 P.ev. 2 C::%NCME PEAK RI5?CNSE TEAM C'dICKI,15T PCF'.h !;CN OESC VER:T; CAT:CN FC NC.
Structural Steel                 R-5-5TEL-                   PACI 2 or       3 VER:r: CAT:CN                                         l
Structural Steel R-5-5TEL-PACI 2 or 3
                  ^# 3UI              ACCIFT                DA*E ltP"AJtXS lR. EJECT
VER:r: CAT:CN l
: 8. Member 5.1 Welding                     N/A                   INFOR.MATIONAL HEADER B.I.1 Weld Procedure Ous3fiestion 3.1.2 Weld Precedure Appliestion           N/A                   INFORMATIONAL NEADER
ltP"AJtXS lR. EJECT
                  .) s .. wec.1 b) Filler Metal c) Material nickne e s                                                             '
^# 3UI DA*E ACCIFT 8.
B.1.3 Velder Qualifications 3.1.4   Strese Relievina                                                                   ,
Member 5.1 Welding N/A INFOR.MATIONAL HEADER B.I.1 Weld Procedure Ous3fiestion 3.1.2 Weld Precedure Appliestion N/A INFORMATIONAL NEADER
8.2 Concrece Er;ansion Anchors                   N/A                   IN70RMATIONAL NIADER 3.2.1   Torque               N/A                     IN70RMATIONAL PEADER a) C611bration b) Torque value 3.2.2   late Spacias 3.2.3   Reverk               N/A                     IN70RMATIOMAL NEADER a) n read Fit b) Restampina 3.2.4   Note Drillina B.2.5   Settina
.) s.. wec.1 b) Filler Metal c) Material nickne e s B.1.3 Velder Qualifications 3.1.4 Strese Relievina 8.2 Concrece Er;ansion Anchors N/A IN70RMATIONAL NIADER 3.2.1 Torque N/A IN70RMATIONAL PEADER a) C611bration b) Torque value 3.2.2 late Spacias 3.2.3 Reverk N/A IN70RMATIOMAL NEADER a) n read Fit b) Restampina 3.2.4 Note Drillina B.2.5 Settina
          ...  ,.....a. Rertsten i 2
,.....a. Rertsten i 2
[
[


Attachrent 6.1 01-046 Rev. 2 CCPMCME P!AK RES?CNSE TEAM CECKI,IST POP'.'.A!;CN 015C VER*TICA!;GN PK; No.
Attachrent 6.1 01-046 Rev. 2 CCPMCME P!AK RES?CNSE TEAM CECKI,IST POP'.'.A!;CN 015C Structural Steel VER*TICA!;GN PK; No.
Structural Steel              R
R
* S-S TIL=
* S-S TIL=
FACE   30T   3 vn;rICA;;ON AW5m                                                                           l ACCI?T                                     IUwtXs l RLIECT    DATE B.3       S truc tural Boltina           N/A INFORMATIONAL HEADER 3.3.1 Tiahtness
FACE 30T 3
: 3. 3.2 Torque               N/A INFORMATIONAL READER a) Torque value b) Calib?aeion B.a Stud Velding             W/A TNFORMAff0NAL READD 3.4.1     Daily Qualiffration Report e
vn;rICA;;ON AW5m l
_tj . 2 Stud Teettas C. Material Ttacesbility i                                                N/A INFORMATION READER               I I
l RLIECT ACCI?T DATE IUwtXs B.3 S truc tural Boltina N/A INFORMATIONAL HEADER 3.3.1 Tiahtness
a) Rest Number Conforufty
: 3. 3.2 Torque N/A INFORMATIONAL READER a) Torque value b) Calib?aeion B.a Stud Velding W/A TNFORMAff0NAL READD 3.4.1 Daily Qualiffration Report e
                                                      ~
_tj. 2 Stud Teettas C.
Material Ttacesbility N/A i
INFORMATION READER I
I a) Rest Number Conforufty
~
b) Material Conformity
b) Material Conformity
                                                                                                                              )
)
4 .' f m . , , * * * = As ... n ;
4.' f m.,, * * * = As... n ;
e 1
e 1
3
3


e   .
o e
o  .
Attachr.ent 6.1 QI-047 Rev. 2 Page 1 of 2 l
l Attachr.ent 6.1   i QI-047 Rev. 2 Page 1 of 2 l
COMANCHE PIAE RESPONSE TEAM C11CC.IST POP h T10N DESC VERIFICATION PEG NO.
COMANCHE PIAE RESPONSE TEAM C11CC.IST POP h T10N DESC                     VERIFICATION PEG NO.
PIPE VE1.DS/ MATERIALS I-M-SBWM-PAGE 1 0F QUALITT INST 1UCTION QI-047
PIPE VE1.DS/ MATERIALS               I-M-SBWM-                           PAGE 1 0F QUALITT INST 1UCTION QI-047                         [IIINSPECTION                             UNIT 1 EQUIPMINT MARK / TAG NO.               DOCUMENTATION RITIEW C UNIT 2 COMMON VIIIFICATION ACCIFT       IIJECT   DATE
[IIINSPECTION UNIT 1 EQUIPMINT MARK / TAG NO.
: 1. WEI.D S A. Configuration B. Site & Profile                                                                       l C. Butt Weld                                                                             l Reinforcement D. Radial Wald                                                                           l Shrinkage E. Undercut                                                                             {
DOCUMENTATION RITIEW C UNIT 2 COMMON VIIIFICATION ACCIFT IIJECT DATE 1.
F. Suzf ar.a oi nialda                                                                   l C. Cracks. I.ack of                                                                     l Fusion. Crstar Cracks PRIFARED BY:                                           APPROTED BY:
WEI.D S A. Configuration B.
DISCIF1,INE ENG1.                   DATE               LEAD DISCIFtlNI DeGt.     DATI LE3FMu RTL                                           AFFlsie 111 LN5FEGUR                             DATI             E SPECTOR                 DATE CPP-007.lA. Revision 0
Site & Profile l
C.
Butt Weld l
Reinforcement D.
Radial Wald l
Shrinkage E.
Undercut
{
F.
Suzf ar.a oi nialda l
C.
Cracks. I.ack of l
Fusion. Crstar Cracks PRIFARED BY:
APPROTED BY:
DISCIF1,INE ENG1.
DATE LEAD DISCIFtlNI DeGt.
DATI LE3FMu RTL AFFlsie 111 LN5FEGUR DATI E SPECTOR DATE CPP-007.lA. Revision 0


r _ _ _ _ _ _ _
r _ _ _ _ _ _ _
1 I
i A22achmen2 6.1 QI-047 Rev. 2 1
i l
C0!'J4:C*'I ?!.'J at:7CN:: -w:
A22achmen2 6.1         l QI-047 Rev. 2 1                             -                C0!'J4:C*'I ?!.'J at:7CN:: -w:
C?.ECX:. ST
C?.ECX:. ST
                            ?0P'J A!!0N DESC                           '/ERIFICA!!CN PKG NO.
?0P'J A!!0N DESC
PIPE WELDS / MATERIALS                         1-M-SBWM-                   ?^0Z L OF L VERITICATION
'/ERIFICA!!CN PKG NO.
                                                                                                                #I ACCEPT                    DATE
PIPE WELDS / MATERIALS 1-M-SBWM-
[                                       R.T. JECT H. Veld Rust                                                                                   l (Stainless steel only)
?^0Z L OF L VERITICATION
N/A                Use Data Recording              l I. Welders ID Symbol           N/A (not accept / reject                                      Form. Attachment 6.6 attribute)
#I
J. ID and Location                                                                           ,
[
: 2.     BASE NATERIAI.S N/A         N/A               Use Data Recording               l A. Esse Material                                            Form. Attachment 6.6 Traceability (not accept /
ACCEPT R.T. JECT DATE l
reject attribute)
H.
: 5. Base Material                                                                             l Defects Base Material tust                                                                        l C.                                               '
Veld Rust (Stainless steel only)
(Stainiees steal only) l
I.
                                      !*h)     . . 'd''',J*.*". )
Welders ID Symbol N/A N/A Use Data Recording l
Form. Attachment 6.6 (not accept / reject attribute)
J.
ID and Location 2.
BASE NATERIAI.S A.
Esse Material N/A N/A Use Data Recording l
Form. Attachment 6.6 Traceability (not accept /
reject attribute) l 5.
Base Material Defects l
C.
Base Material tust (Stainiees steal only) l
!*h)
'd''',J*.*".
)
2
2


Attachment 6.1 COMANCHE PEAK RESPONSE TEAM               QI.04g CHECKLIST                       Rev. 1 POPULATION DESC             VERIFICATION PKG NO.
..1 COMANCHE PEAK RESPONSE TEAM QI.04g CHECKLIST Rev. 1 POPULATION DESC VERIFICATION PKG NO.
Tubing Welds / Material     R-M-TUWM-                           PAGE 1 0F 1 QUALITT INSTRUCTION QI-048                         REINSPECTION
Tubing Welds / Material R-M-TUWM-PAGE 1 0F 1 QUALITT INSTRUCTION QI-048 REINSPECTION
[)) UNIT 1 EQUIPMENT MARK / TAG NO.   ]DOCUMENTATIONREVIEW                     UNIT 2 COMMON VERIFICATION ACCEPT     REJECT     DATE               NW
[)) UNIT 1 EQUIPMENT MARK / TAG NO.
]DOCUMENTATIONREVIEW UNIT 2 COMMON VERIFICATION ACCEPT REJECT DATE NW
: 1. Weld Procedure Application
: 1. Weld Procedure Application
: 2. Base Material Traceability
: 2. Base Material Traceability
: 3. Weld Material Traceability 4, Weld Procedure Qualification
: 3. Weld Material Traceability 4, Weld Procedure Qualification
,            5. Welder Qualifications       ,_
: 5. Welder Qualifications
: 6. 1:old Points
: 6. 1:old Points
: 7. Inspector Certification PREPARED BY:                               APPROVED BY:
: 7. Inspector Certification PREPARED BY:
DISCIPLINE ENGR.           DATE           LEAD DISCIPLINE ENGR.       DATE INSPECTED BY:                             APPROVED BY:
APPROVED BY:
IN5FECTOR                   DATE         LEAD INSPECTOR               DATE o,        :T?-007 lA. Revision 0
DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE INSPECTED BY:
APPROVED BY:
IN5FECTOR DATE LEAD INSPECTOR DATE
:T?-007 lA. Revision 0 o,


Attachment 6.1 QI-049 Rev. 1 Page 1 of 2 j
..1 QI-049 Rev. 1 Page 1 of 2 j
l
l COMANCHE PEAK RISPONSE TEAM ~'
* COMANCHE PEAK RISPONSE TEAM ~'
CRICII,1ST F0F h :10W DESC VERITICATION FKG NO.
CRICII,1ST F0F h :10W DESC                 VERITICATION FKG NO.
PIPE VELDS / MATERIALS I-M-LSWM-FACE 1 0F 1 QUALITT LNST10CTION QI-069
PIPE VELDS / MATERIALS           I-M-LSWM-                             FACE 1 0F 1 QUALITT LNST10CTION QI-069                   @LIINSPECTION                                 UNIT 1 EQU1FMZNT MARK / TAG NO.       ] DOCUMENTATION RITIEW                       UNIT 2 O cowMow             l TERITICATION ACCIFT         RIJECT     DATE
@LIINSPECTION UNIT 1 EQU1FMZNT MARK / TAG NO.
: 1. VELDS A. Configuration B. Site 6 Profile                                                                     '
] DOCUMENTATION RITIEW UNIT 2 O cowMow TERITICATION ACCIFT RIJECT DATE 1.
C. Eutt Wald peinforcement D. Ladial Weld Shrinkage E. Undercut F. $srface of Belds C. Cracks. Lick of Fusion, Crater Cracks
VELDS A. Configuration B.
Site 6 Profile C.
Eutt Wald peinforcement D.
Ladial Weld Shrinkage E.
Undercut F.
$srface of Belds C.
Cracks. Lick of Fusion, Crater Cracks
{
{
F1ZIARZD IT:                                     AFF10TED ST:
F1ZIARZD IT:
DLSCIFtDrt EEGE.             DATI                 LEAD DISCIF%Drt DeG1.     DATE       _
AFF10TED ST:
LaartwAw II:                                     AFFR0v w ht:
DLSCIFtDrt EEGE.
              &nrzbwn                       DATI               LEAD INSPECTOR             DATE CU-007.1A. Revistan 0
DATI LEAD DISCIF%Drt DeG1.
DATE LaartwAw II:
AFFR0v w ht:
&nrzbwn DATI LEAD INSPECTOR DATE CU-007.1A. Revistan 0


Attachment 6.1 QI-049 Rev. 1 CCHANCRZ PEAK RISPONSE TEAM CEECKLIST POPULATION DESC             YERITICATION PKG NO.
..1 QI-049 Rev. 1 CCHANCRZ PEAK RISPONSE TEAM CEECKLIST POPULATION DESC YERITICATION PKG NO.
PIPE VELDS / MATERIALS         I-M-LSWH.                 FACE L OF L                   l YERIFICATION 4
PIPE VELDS / MATERIALS I-M-LSWH.
ACCEPT     RIJICT   DATE H. Veld Rust (Stainless steel only)
FACE L OF L l
I. Welders ID Symbol       N/A       N/A               Use Data Recording (not accept / reject                                                               l Form, Attac hent 6.4 attribute)
YERIFICATION 4
J. ID and Location                                                                     -
ACCEPT RIJICT DATE H.
: 2. BASE MATERIALS A. Base Material           N/A       N/A               Use Data Record #,ng Traceability                                         Fort, Attachment 6.4           l (not accept /
Veld Rust (Stainless steel only)
reject attribute)
I.
: 8. Base Material Defects                                                                             l C. Base Material Raat (Stainises steal                                                                   l only)         ,,
Welders ID Symbol N/A N/A Use Data Recording l
i I C F ,007.it..tevtetoe 8 2
(not accept / reject Form, Attac hent 6.4 attribute)
J. ID and Location 2.
BASE MATERIALS A.
Base Material N/A N/A Use Data Record #,ng l
Traceability Fort, Attachment 6.4 (not accept /
reject attribute) l 8.
Base Material Defects l
C.
Base Material Raat (Stainises steal only) i I C F,007.it..tevtetoe 8 2


Attachment 6.1 QI-051 Rev. 3 Page 1 of 3 a
..1 QI-051 Rev. 3 Page 1 of 3 a
CcewsC1t PtA8 tt3Poelt !!st
CcewsC1t PtA8 tt3Poelt !!st
                                                                    .38CEL;8T                                             I rar. w ;;s ar3c                           . nir!;.afsce FEG e0.
.38CEL;8T I
PIPt W111P t.8$?1AINTS                   !*5 Pvtt Fact . 3P 1 3 4 ITT 181 N GT108 ot cli
rar. w ;;s ar3c
                                                            @ Mt387tCT!=                               [ pt?
. nir!;.afsce FEG e0.
or,m ,                       .m ..       C ac==titta =ta                           C att O-mcm.
PIPt W111P t.8$?1AINTS
                              &TTBt3ffl                   agggy       ggggt         gggg               M
!*5 Pvtt Fact. 3P 1 3 4 ITT 181 N GT108 ot cli
                  !. Identtfttettea
@ Mt387tCT!=
[ pt?
or,m,
.m..
C ac==titta =ta C att O-mcm.
&TTBt3ffl agggy ggggt gggg M
!. Identtfttettea
: 1. Leestfee
: 1. Leestfee
: 3. Otteatettea
: 3. Otteatettea
: 4. Ceaf t#wrettee
: 4. Ceaf t#wrettee
: 4. Cem ,mente
: 4. Cem,mente
: 8. 84tettele il piph Seteegth                                                                                     .
: 8. 84tettele il piph Seteegth le e t na
le e t na
-,86 14e eestestate
                          -,86             14e eestestate
~
                ~
l' Otiere 9/a e/A Dee tr'i sy eele. Betged en att 4.3 C. 1metallettee ti towel 4 Plume ti-Cleeastsee t:( seetretet seettfit
* l'       Otiere                   9/a       e/A     Dee tr'i sy eele. Betged en att 4.3 C. 1metallettee ti towel 4 Plume
                "        ti- Cleeastsee t:( seetretet seettfit
: 9. Rose Ptetes I. P lantes F. a t t et heont e S. Cete A. tevirouseet
: 9. Rose Ptetes I. P lantes F. a t t et heont e S. Cete A. tevirouseet
() Amtleet feep.                 3/A         W/A tti testen Cend.                   sta         rie
() Amtleet feep.
3/A W/A tti testen Cend.
sta rie
: 9. Ces e
: 9. Ces e
Ptgtg3 gt;                                                   a# F1 M n l'     a 311 ;'' ;it Onc t .
Ptgtg3 gt; a# F1 M n l' a
                ..iart. TEE ITa Sait               LEaa S ti::P'.MW 3aN a#FleTED II ur         .u                           ; An             '. I.AD ;11 F Y .~!I 78 $ * '. A . t e * . 4 % e *, I I
311 ;'' ;it Onc t.
Sait LEaa S ti::P'.MW 3aN
..iart. TEE ITa a#FleTED II ur
.u
; An
'. I.AD ;11 F Y.~!I 78 $ * '. A. t e *. 4 % e *, I I
l 1
l 1
l l
l


1 Attcchaent 6.1 QI-051 Rev. 3 c:wcas ita instws: ta                                 l cza.~ :sf I
Attcchaent 6.1 QI-051 Rev. 3 l
r';F.' !W H5;                                   in;f;;a!!38 ft; eO.
c:wcas ita instws: ta cza.~ :sf I
PIPS WIP t!FTRAtFTS                             tel PWR4                 i4EI L Of L
r';F.' !W H5; in;f;;a!!38 ft; eO.
                                                                    , . . , mme
PIPS WIP t!FTRAtFTS tel PWR4 i4EI L Of L
                                                                                                                    -t 4CC M l 18.*8CT$478
,.., mme
-t 4CC M l 18.*8CT$478
: 6. Setstag
: 6. Setstag
: 6. Itse b n d et Des. Berter sal 7.
: 6. Itse b n d et Des. Berter sal 7.
B.     ' etat Detette                       S/A       5/A       Seeerd an attamtmoet 6.6 esber lese ere e
B.
                            .se t .ma poetse is. In t ''emmaammes
' etat Detette S/A 5/A Seeerd an attamtmoet 6.6
' esber lese
' ere e
.se t.ma poetse is.
In t ''emmaammes
: f. Ansbet tette
: f. Ansbet tette
: 4. 018 W Iseette 6 Pie ed ed le t t e i               toe 6 wel
: 4. 018 W Iseette 6 Pie ed ed le t t e i
                                .1     '
toe 6 wel
em i ma l'     t       l
.1 em i ma l' t l
                                            'ess er
s
* e\ V ene
'es er e\\ V ene
                                  .lw Terete et) Bet taAas umet vill Mrsed tagegensht 1%f aiOmpede B. Coastete 8spenetmi asehers'Pitti bell,s)
.l Terete w
                                      .) .,no 6 mr
et) Bet taAas umet vill Mrsed tagegensht 1%f aiOmpede B. Coastete 8spenetmi asehers'Pitti bell,s)
                                          'lB "-t
.)
_ t           ..    )       das M
.,no 6 mr
: 9)         man .ariET
'lB
                                  *)       ';aearete ?
"-t
_ t
)
das M
9) man.ariET
*)
';aearete ?
et) 'Impaganses a d tematan 1
et) 'Impaganses a d tematan 1
: 0. WM
: 0. WM
: a. resagrea usee W1de                   .
: a. resagrea usee W1de ama Lm.
ama Lm.                                                                          .
,e'
                              ,e'
_t T:
_t T:         hMana
hMana
'                            ''      .      'r^^^-
(
T1 ,)             ,ad t.aa t t oes fi l         ilhld laat l
'r^^^-
* Dec. BeTier 9 elf
T1,)
,                            is) be* dets f3                     f/4     t '4         &amete se Mt. 6.It
,ad t.aa t t oes fi l ilhld laat l
            /
Dec. BeTier 9 elf is) be* dets f3 f/4 t '4
                *e                                   e i i
&amete se Mt. 6.It
/
*e e i i
l l
l l
I
I


I Attachaent 6.1 1 QI-051         !
I Attachaent 6.1 1
Rev. 3         '
QI-051 Rev. 3 i
i l
l 1
1 i
i
                                                        *ameC31 Pf4 8187% I8 h 1 04.*** ' I f F F.b C ;1 &3;                             .'T1;T;;anDe l'; #G.
*ameC31 Pf4 8187% I8 h 1 04.*** ' I f F F.b C ;1 &3;
P!Pt W!P IllitAtWTl                     l*S*PWtt                   N1,,,10f y i   srt:1;;4: :S lACC'.F" f 81.TtT f SATI
.'T1;T;;anDe l'; #G.
: 8. BF Welde                                                     ,
P!Pt W!P IllitAtWTl l*S*PWtt N1,,,10f y i
: 1) .Mettee If) lue 4 Prvfile                   t 111 ' l've las                       i 19' Creeks.               1
srt:1;;4: :S lACC'.F" f 81.TtT f SATI
* Vederret           I       f vi;     lar f ac e         L Dee. Beete Dely et t) tieldet's G                 8/A     f/4           leasse se hat. 4.19 C. 41 etbet soles
: 8. BF Welde 1)
                        *    ,) 'etettee.
.Mettee If) lue 4 Prvfile t
t   .      us it   ,    'helse           I tv     (refere           !
111 ' l've las i
e    Pfefile et'     Generent
19' Creeks.
                      . 1) Pereelt?
1 Vederret I
et .if veerles                                     1 J) Ilea a) Creese Bee. BeTies Delf ef) Weldet's G                   S/3   pre St49fd se att. 4.19 e
f vi; lar f ac e L
Dee. Beete Dely et t) tieldet's G 8/A f/4 leasse se hat. 4.19 C. 41 etbet soles
,)
'etettee.
t us it
'helse I
tv (refere e
Pfefile et' Generent
: 1) Pereelt?
et.if veerles 1
J) Ilea a) Creese Bee. BeTies Delf ef) Weldet's G S/3 pre St49fd se att. 4.19 e
e l
e l
* 1     '4   .
1
'4 i
l I
i l
i l
I i
l        .
3
3


i Attachment 6.1     l QI-052 Rev. 2 I
i
Page 1 of 3 CHECKLIST aci.. eas e..
..1 QI-052 Rev. 2 Page 1 of 3 CHECKLIST aci..
C0mC11 FLd 115? oust t!xt                 et OST C3!:21:st                     see. 1 FJP..47.;a 3(56               ggt;7; h;;;p pt; sc, Pipe mit teatratste               8-$-PWI PA:t 1 CF 1 G E P. i3&TL;;;;;m 0t-Os!                         O seus><:r>W                         D a:t i EGw'I:G Ws;4 4.               @ DCCOmrtAT; s arrity               Q gy ; g
eas e..
                            ,et.... ...
C0mC11 FLd 115? oust t!xt et OST C3!:21:st see. 1 FJP..47.;a 3(56 ggt;7; h;;;p pt; sc, Pipe mit teatratste 8-$-PWI PA:t 1 CF 1 G E P. i3&TL;;;;;m 0t-Os!
i,.veie,                                                            O Cac, WTt:r::Attos       6
O seus><:r>W D a:t i EGw'I:G Ws;4 4.
                                        , AC* M     LL*tCT     SA!!l
@ DCCOmrtAT; s arrity Q gy ; g O Cac, i,.veie,
: 8. Coastnettee operactee travelet A. Traveler fetiste S. Drewtate                 3/4       W/A             lateed on Attac h at d.l C. Inspotter
,et....
          .          Cettif test tea
WTt:r::Attos 6
, AC* M LL*tCT SA!!l
: 8. Coastnettee operactee travelet A. Traveler fetiste S. Drewtate 3/4 W/A lateed on Attac h at d.l C. Inspotter Cettif test tea
: 1. Woldtag A. Wide i
: 1. Woldtag A. Wide i
: 5. Wald Procedere ovattfiesttet C. W 14 Precedere App 1&satten
: 5. Wald Procedere ovattfiesttet C. W 14 Precedere App 1&satten
Line 2,261: Line 2,859:
: 3. 4t't S ttkasse D. Welder Qu1111tattees
: 3. 4t't S ttkasse D. Welder Qu1111tattees
: 1. let Walde
: 1. let Walde
: 1. C14! welds isDAAD ST:                                     atit:vc sta 31s**P'.:vt N a.               ta;g             t w pts;;p'.;ig ce;a,       ca;t
: 1. C14! welds isDAAD ST:
            .astLs.G sI;                                   asyge n gg,
atit:vc sta 31s**P'.:vt N a.
              *'- J                       :en           LW :57t; ;t                 Sa?:
ta;g t w pts;;p'.;ig ce;a, ca;t
            **? Wl'. la. levu ten 0 I
.astLs.G sI; asyge n gg,
*'- J
:en LW :57t; ;t Sa?:
**? Wl'. la. levu ten 0 I


i I
i
      .                                                                                              \
\\
l Attech3Gnt 6.1 l QI-052         ,
l Attech3Gnt 6.1 QI-052 Rev. 2 CHECKLIST (Cont'd)
Rev. 2         1 CHECKLIST (Cont'd)
Attenneemt 6.4 Cor.A> Cut PIM 815PChlt itAM gg.031 Catcr.15T te,. t FCF.LA!!3 015C Vit! FICA;;3 P G 3C.
Attenneemt 6.4 Cor.A> Cut PIM 815PChlt itAM   gg.031 Catcr.15T           te,. t FCF.LA!!3 015C             Vit! FICA;;3 P G 3C.
Ptpa Whip teettsinto tal-PVlt IA01 L Of L statFt:Attew AC !PT tilt T D&!!
Ptpa Whip teettsinto         tal-PVlt                   IA01 L Of L statFt:Attew AC !PT                                   3 tilt T   D&!!
3
: 2. weldtes (Cent'd)
: 2. weldtes (Cent'd)
: t. Geld Potate F. $ttees Relief
: t. Geld Potate F. $ttees Relief
Line 2,280: Line 2,881:
: 3. lishmend lasette/
: 3. lishmend lasette/
toteided telte
toteided telte
: 4. Ceestate Esposeten Anthste (311tt's)                                                               .
: 4. Ceestate Esposeten Anthste (311tt's)
A. Tettwo
A. Tettwo
: 1. Celtbeettee
: 1. Celtbeettee
Line 2,289: Line 2,890:
: 1. Teetve
: 1. Teetve
: 1. Celtbrottee k
: 1. Celtbrottee k
              * *
* *
* 6 8. 'ev i s t ee 0 2
* 6 8. 'ev i s t ee 0 2
1
1


l Attach:ent 6.1   1 01-052           !
Attach:ent 6.1 1
Rev. 2 CHECKLIST (Cont'd)
01-052 Rev. 2 CHECKLIST (Cont'd)
I attactment 6.4 CamANC1tt PtAE 911PCN51 TIM   c1432 CFICC151           te,. 1 M !!om CI5C                       vtRITICAT10s PEG #0.
I attactment 6.4 CamANC1tt PtAE 911PCN51 TIM c1432 CFICC151 te,. 1 M !!om CI5C vtRITICAT10s PEG #0.
* Pipe m p Restraints               t*S.PWat                   Pact L Of L vtstr! CAT 10s                               -
Pipe m p Restraints t*S.PWat Pact L Of L vtstr! CAT 10s A I ACCEPT REJECT Datt INI
A I                                                         INI ACCEPT     REJECT   Datt
: 6. Material tracentility A. Mst'1. Certs.
: 6. Material tracentility A. Mst'1. Certs.
: 1. a t t
: 1. a t t
Line 2,304: Line 2,904:
: 7. Set Cet 6
: 7. Set Cet 6
l l
l l
        /P         .l. e,-; gag. Q 3
/P
.l.
e,-; gag. Q 3


Attachment 6.1 COMANCHE PEAK RISPONSE TT.AM                             Q[.053 CHECKLIST Rev. 1 POPU1.ATION DESC Pace 1 of 4 VERIPICAI!ON PKG No.
..1 COMANCHE PEAK RISPONSE TT.AM Q[.053 CHECKLIST Rev. 1 Pace 1 of 4 POPU1.ATION DESC VERIPICAI!ON PKG No.
CATEGORY I CONDUIT SUPPORTS                                                               PACE 1 OP 4 QUALITT INSTRUCTION RIINSPECTION
CATEGORY I CONDUIT SUPPORTS PACE 1 OP 4 QUALITT INSTRUCTION RIINSPECTION
[ UNIT 1 EQUI? MINT .".ARX/TA0 No.
[ UNIT 1 EQUI? MINT.".ARX/TA0 No.
                                          ]DOCiKINTATIONRE7IEW                                           UNI 2 C CCMMON           i VERITICATION                             '
]DOCiKINTATIONRE7IEW UNI 2 C CCMMON i
AMME ACCIPT       RIJECT                     DATE 1.0 Orientation 2.0 Configuration 2.1 Components
VERITICATION AMME ACCIPT RIJECT DATE 1.0 Orientation 2.0 Configuration 2.1 Components
: a. Type, etc.
: a. Type, etc.
: b. Visual Damage 2.2 Dimensions
: b. Visual Damage 2.2 Dimensions
: a. Support Dia.
: a. Support Dia.
: b. Plate Thickness                                                                                   '
: b. Plate Thickness 2.3 Conduit Bearing,
2.3 Conduit Bearing ,                                                     i 2.4   Clamp "t" w brance 2.5 Tube Steel e
i 2.4 Clamp "t" w brance 2.5 Tube Steel Vent Role e
Vent Role 2.6 Base Plates 3.0 Capacity / Span 3.1 Capacity
2.6 Base Plates 3.0 Capacity / Span 3.1 Capacity
: a. Cond. size loc.
: a. Cond. size loc.
: b. Adj . span len.
: b. Adj. span len.
: c. Elec. fit,
: c. Elec. fit,
: d. Gen. layout
: d. Gen. layout
: e. Addt'l. iteps
: e. Addt'l. iteps
: f. M-D sup sketch
: f. M-D sup sketch
: g. Tr. sup. sketch PRIPARID BT:                                   APPROVED ST:
: g. Tr. sup. sketch PRIPARID BT:
DISCIPLINE ENGR.             DATE               LEAD DISCIPLINE ENGR.                         DATE IN5PECID BY:                                   APPROVED BY:
APPROVED ST:
IN 5 F EGQ K                 OATE             LEAD INSPECTOR                                 DATE CPP-007.lA. Revision 0                                                       0144 (POPDES)
DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE IN5PECID BY:
APPROVED BY:
IN 5 F EGQ K OATE LEAD INSPECTOR DATE CPP-007.lA. Revision 0 0144 (POPDES)


            -                                                                                              A::acn.en: 6.
A::acn.en: 6.
01-053 Rev.           QL Page 2 of 4 I
01-053 Rev.
CC2'.\.''Cll: ? FAT AI.3f0!!5C ICRi CHICKLIST furut.ATivM ODC               VLAD LCAfluN FAL 6W.
QL Page 2 of 4 I
i:ATEGORY I CUNDUlf SUPr0A1   g                                         FACE .S OF 4 V ta l p I CAT 1 lH ATTRIBUTE                                                                 '
CC2'.\\.''Cll: ? FAT AI.3f0!!5C ICRi CHICKLIST furut.ATivM ODC VLAD LCAfluN FAL 6W.
ACCEPT     RE.!;CT     DATE 3.2 Span
i:ATEGORY I CUNDUlf SUPr0A1 g FACE
.S OF 4 V ta l p I CAT 1 lH ATTRIBUTE ACCEPT RE.!;CT DATE 3.2 Span
: a. Adj. spans
: a. Adj. spans
: b. Dist. free tan pt.
: b. Dist. free tan pt.
                  .      c. Adj. span w/ fit.
: c. Adj. span w/ fit.
: d. Vall-susp. sup.
: d. Vall-susp. sup.
: e. Tbd. cond w/LSD
: e. Tbd. cond w/LSD
  ,                      f. Addt'1. attr.
: f. Addt'1. attr.
4.0 M.sterist                                                                                         I Verification                                                                                 I i
I 4.0 M.sterist Verification I
4.1 Mark number 6.2 tolting maternal 5.0 Solting 5.1     Engatesent
i 4.1 Mark number 6.2 tolting maternal 5.0 Solting 5.1 Engatesent
: a. Aolts. studs                                                 .
: a. Aolts. studs
: b. Unistrut nuts                                                                   . . _ _ _
: b. Unistrut nuts
(                               '
(
5.2 Vashers
5.2 Vashers
: a. Use
: a. Use
: b. Reveled vashers 5.3 Edge Distance 5.4 R1,bsord Inserts
: b. Reveled vashers 5.3 Edge Distance 5.4 R1,bsord Inserts
;                      a. Thread engagement i                       h. Nuts, bolts
: a. Thread engagement i
\                               ~
: h. Nuts, bolts
\\
~
5.5 Connections
5.5 Connections
: n. Dis.
: n. Dis.
: b. Quantity
: b. Quantity
: c. Spacina J. Untstr. botta. out 5.6 Torque           .
: c. Spacina J. Untstr. botta. out 5.6 Torque
: s. Tor. spec.
: s. Tor. spec.
: b. Nu ter. spect.
: b. Nu ter. spect.
: c. Faluted tyr-vv/.ts, sevassen u                                           ''". U"ou   ' '  /"4'
: c. Faluted tyr-vv/.ts, sevassen u
''". U"ou
/"4'


    .      .                                                                                      Attacr ent 6..
Attacr ent 6..
01-053 Rev. 1 Page 3 of 4 CC.wC:lt PE.u RE*.*u:;5E Tr.M CRECKLIST FvfuLAT1ch DLSC                   VEALTICAI1VN FW :.V.
01-053 Rev.
CATECORY ! CCNDUlf SL7FOR1     5                                     FACE L CF L               l l
1 Page 3 of 4 CC.wC:lt PE.u RE*.*u:;5E Tr.M CRECKLIST FvfuLAT1ch DLSC VEALTICAI1VN FW :.V.
VEA1FICAf!VN ATT118UTE AccEFT   REJECT   DATE 6.0 Concrete Espanelon                                                                           '
CATECORY ! CCNDUlf SL7FOR1 5 FACE L CF L VEA1FICAf!VN ATT118UTE AccEFT REJECT DATE 6.0 Concrete Espanelon Anchors i
Anchors i
6.1 Site and Number
6.1 Site and Number
: a. Dia.
: a. Dia.
: b. Tyre, etc.
: b. Tyre, etc.
i 6.2 !:.b e dse n t 6.)   Bolt Spacing
i 6.2 !:.b e dse n t 6.)
Bolt Spacing
: a. Stac aJj. anchore
: a. Stac aJj. anchore
: b. Spec. to otten etc.
: b. Spec. to otten etc.
: c. Dist, to adj. pits                         ,                                  .
: c. Dist, to adj. pits
: 6. I. Angularity         (
: 6. I.
e 6.5 Concrete Damage                                             ,
Angularity
6.6 Nwt F.n ge r.e s a n t and Bearing
(
: a. Nut engagement b~ Surface contact                                                             _
e 6.5 Concrete Damage 6.6 Nwt F.n ge r.e s a n t and Bearing
: a. Nut engagement b~ Surface contact
: c. Bottoo out
: c. Bottoo out
: d. Velded nut 7.0 Welding 7.1 Location 7.2 Veld Stre 7.3 Veld f.ength 7.4 Tusion 7.5 Craters 7.6 Weld Profile 7.7 Undercut trr-evt.4&. 8.svisive W                                       "I'''  U'''"l ''"'
: d. Velded nut 7.0 Welding 7.1 Location 7.2 Veld Stre 7.3 Veld f.ength 7.4 Tusion 7.5 Craters 7.6 Weld Profile 7.7 Undercut "I''' U'''"l trr-evt.4&. 8.svisive W
: r. .
: r..
l Atta:ncen* -   I l                                                                                           01-053 Rev. 2, Page 4 of 4 CO:w:Clis P:M REST'J:'5E TT.AM                                     l CHECKLIST                                               l PVru1ATION DESC               V L AITILA1lWN FM NW.
Atta:ncen* -
CATECCAT 1 CONDUIT SOFFOR1 5                                       FACEL OF L vex 1FICATita A m tlUTE           ACCEPT   REJECT   DATE 7.0 Velding (Cont'd)
l 01-053 Rev.
                    '?.8   Fotosity 7,. 9 overlap 7.10 Surface Slas                                                                   ;
2, Page 4 of 4 CO:w:Clis P:M REST'J:'5E TT.AM CHECKLIST PVru1ATION DESC V L AITILA1lWN FM NW.
7.11 Cracks                               I 7.12 We!Jer ID
FACEL OF L CATECCAT 1 CONDUIT SOFFOR1 5 vex 1FICATita A m tlUTE ACCEPT REJECT DATE 7.0 Velding (Cont'd)
                                                                                      #                          i e
'?.8 Fotosity 7,. 9 overlap 7.10 Surface Slas I
l l
7.11 Cracks 7.12 We!Jer ID i
I l
e l
Grr-wl. L t. nev 6e 6wk W                                  ''l " %8'V' ~ ) ''*l' #
l I
l r
l
k
''l " %8'V' ~ )
''*l' #
Grr-wl. L t. nev 6e 6wk W l
r k


Attachment 6.1 COMANCHE PEAK RESPONSE TEAM               QI-054 CHECKLIST                     Rev. 1 POPULATION DESC                   VERIFICATION PKG NO.
..1 COMANCHE PEAK RESPONSE TEAM QI-054 CHECKLIST Rev. 1 POPULATION DESC VERIFICATION PKG NO.
        ;ategory I Conduit Supports           R-S-COSP                             PAGE 1 0F     2
;ategory I Conduit Supports R-S-COSP PAGE 1 0F 2
/
/"
QUALITY INSTRUCTION QI-054                           () REINSPECTION                       [)) yNI; 1 EQUIPMENT MARK / TAG S0.         ] 70CUMENTATION REVIEW               C UNI 2 COMMON VERIFICATION
QUALITY INSTRUCTION QI-054
                ^                                                                   REMARKS ACCEPT       REJECT     DATE
() REINSPECTION
[)) yNI; 1 EQUIPMENT MARK / TAG S0.
] 70CUMENTATION REVIEW C UNI 2 COMMON VERIFICATION
^
REMARKS ACCEPT REJECT DATE
: 1. Inspector Certification
: 1. Inspector Certification
: a. Date
: a. Date
Line 2,396: Line 3,015:
: 2. Material Traceability I
: 2. Material Traceability I
: 3. Concrete Expansion Anchors 3.1 Torque
: 3. Concrete Expansion Anchors 3.1 Torque
: a. Calibr. due date                                   I S, . Torque setting
: a. Calibr. due date I
S,. Torque setting
_, 3.2 Eolt Spacing 3.3 Rework
_, 3.2 Eolt Spacing 3.3 Rework
: 4. Welding                                                                           ,
: 4. Welding 4.1 Weld Procedure Application 4.2 Welder Qualification 4.3 Veld Procedure Qualification PREPARED BY:
4.1 Weld Procedure Application                                                                     ,
APPROVED BY:
4.2 Welder Qualification                       ___
DISCIPLINE ENCR.
4.3 Veld Procedure Qualification PREPARED BY:                                       APPROVED BY:
DATE LEAD DISCIPLINE ENGR.
DISCIPLINE ENCR.                 DATE             LEAD DISCIPLINE ENGR.       DATE INSPECIED BY:                                     APPROVED BY:
DATE INSPECIED BY:
IN5FECTOR                         DATE           LEAD INSPECTOR               DA!!
APPROVED BY:
IN5FECTOR DATE LEAD INSPECTOR DA!!
C??-i107.!A. Revision 0
C??-i107.!A. Revision 0


COMANCHE PEAK RESPONSE TEAM           05 CHECKLIST                 Rev. 1 POPULATION DESC                                                                               VERIFICATION PKG NO.
COMANCHE PEAK RESPONSE TEAM 05 CHECKLIST Rev. 1 POPULATION DESC VERIFICATION PKG NO.
Category 1 Conduit Support i                                                                     R-S-COSP                     PAGE 10F 1                                  1 1
PAGE 10F 1 Category 1 Conduit Support i R-S-COSP 1
VERIFICATION RD'JJtKS ACCEPT   REJECT   DATE
1 VERIFICATION RD'JJtKS ACCEPT REJECT DATE
: 5. Stud Welding
: 5. Stud Welding
: a. Daily Qualification
: a. Daily Qualification
: b. Production Studs
: b. Production Studs
: c. Final Visual                                                                                                 ,.
: c. Final Visual
: 6. Structural Bolting
: 6. Structural Bolting
: 7. Drawing Revision
: 7. Drawing Revision
Line 2,419: Line 3,040:
4 CTP 007.12 Revici:r. 0
4 CTP 007.12 Revici:r. 0


Attachment 6.1 0I-055 Rev. 2.
..1 0I-055 Rev. 2.
Page 1 of 3 C0y.ANCII PLG RIS7CW5I TIM C1 ICE.*.37 FQPM;CN DESC                       7E7.;n G CCN ir.G .10.
Page 1 of 3 C0y.ANCII PLG RIS7CW5I TIM C1 ICE.*.37 FQPM;CN DESC 7E7.;n G CCN ir.G.10.
D5TRNINT FIFE /TVlt StTFFORTS           I 3 57                           FACI 1CF[
FACI 1CF[
QUA:.;n D571UCC CN QI-035                               b IIUI?!CUC8                             C C3II L ECUI?:'.CC .*AAK./;AG 30.
D5TRNINT FIFE /TVlt StTFFORTS I 3 57 QUA:.;n D571UCC CN QI-035 b IIUI?!CUC8 C C3II L ECUI?:'.CC.*AAK./;AG 30.
C DCCMCACCN IIT!El                       C UN!! !
C DCCMCACCN IIT!El C UN!! !
                        $7??CET ID                                                                   C CC1M:N FII:nCACCN               4 E
$7??CET ID C CC1M:N FII:nCACCN 4
ACC:7T lII.*ICT l OA;I l                                           ,
E ACC:7T lII.*ICT l OA;I l l
: 1. Location and Crientation                 l
1.
: a.                           !
Location and Crientation a.
: 6.                           I                _
I l
l
6.
: c.           _ _ _ _ _ _
c.
j                                                                   .
j 2.
: 2. Configuration 2.1 Components
Configuration 2.1 Components a.
: a.                                                                               ,
I I
                                                          !            I           I         I 2.2 Cis6nsion s 2.3 suas I
I 2.2 Cis6nsion s I
:.4 laseplates
2.3 suas
: 3. Material ferificarton           N/A         N/A                 I  Tor infersation oni" 4   Solting 4.1   Esgagement 4.1 Surface Contact a.
:.4 laseplates I
: i.                                       I                      I I
Tor infersation oni" 3.
I FID ALD ST :                                           artCyc IT 31!C:7'.3t Dct.                     :A;I               t.Lc 311C;7'.*':I DC1.       3AT!
Material ferificarton N/A N/A 4
                        *M7 hw 41                                             a ptcy c st
Solting 4.1 Esgagement 4.1 Surface Contact a.
                        *N h GK                             DA;;             t, Lc als 7 t.70 R           DAT!
I I
i.
I I
FID ALD ST :
artCyc IT 31!C:7'.3t Dct.
:A;I t.Lc 311C;7'.*':I DC1.
3AT!
*M7 hw 41 a ptcy c st
*N h GK DA;;
t, Lc als 7 t.70 R DAT!
C??-Mf. !A. Revtston 0
C??-Mf. !A. Revtston 0


. .                                                                                                                                                              i AtBachment 6.1 QI-055 Rev. 1 Page 2 of 3 CCyxtCRE FIAK RISPCNSI It.W CHIC *".: 57 FOP L ;;0N ;!!C                         VER;T* CAT *0N FKC 30.
i AtBachment 6.1 QI-055 Rev. 1 Page 2 of 3 CCyxtCRE FIAK RISPCNSI It.W CHIC *".: 57 FOP L ;;0N ;!!C VER;T* CAT *0N FKC 30.
INSTR FIFt/n*3E $*'FFCRTS               I-5-INSF-                       F ACI .3. O F ,,,,),
INSTR FIFt/n*3E $*'FFCRTS I-5-INSF-F ACI.3. O F,,,,),
  ~
~
Vt1LIFICA!!CN A     I                                                                               I ACCI7T           RZJECT       DATI
Vt1LIFICA!!CN A
I I
ACCI7T RZJECT DATI
: 4. Bolting (cont.)
: 4. Bolting (cont.)
4.3 Vashers 4.4     Edge Distance                                                                                                                               .#
4.3 Vashers 4.4 Edge Distance 4.5 Spring Nuts 4.6 Richsend Inserts a.
4.5 Spring Nuts 4.6 Richsend Inserts a.
b.
b.
4.7     Torque
4.7 Torque a.
: a.                             ,
b.
b.
c.
c.
: 5. Concrete Expaesion                                                   .
: 5. Concrete Expaesion Anchors 5.1 Si:e and Number
Anchors 5.1 Si:e and Number
: a. _
: a. _
b.
b.
5.2 E-ted ent 5.3 lolt $ Facing a.
5.2 E-ted ent 5.3 lolt $ Facing a.
b.
b.
: c.                                                                                               !
c.
l 5.4 Angularity 5.5 Concrete Damage i
l 5.4 Angularity 5.5 Concrete Damage i
t                           '
t C??-007. L t. Revis ton 0 t
C??-007. L t . Revis ton 0 t
.,_4
                          , - , , .,_4         ,    -,,..c,-
-,,..c,-


l l
.I.1 QI-055 n.v. 2.
                                                                                                                            .I Attachment 6.1                 l QI-055                         l n.v . 2.
Page 3 cf 3 CCPE CXE FEAK R!!PON$l IF).M CXICX:,:37 F0F'.h;;cs OtsC v!R;F; CAT *CN FKC No.
Page 3 cf 3 CCPE CXE FEAK R!!PON$l IF).M
INSTR FIFI/TVlt,tWFORTS 1-5-INSF-FACI J CF J Vtt: FICA;;0N ACCEPT RIJECT DATI M3
                .                                          CXICX:,:37 F0F'.h;;cs OtsC                     v!R;F; CAT *CN FKC No.
: 5. Concrete ExFansion Anchors (Cont'd) 5.6 Engagement and searing a.
INSTR FIFI/TVlt ,tWFORTS             1-5-INSF-FACI J CF J Vtt: FICA;;0N ACCEPT     RIJECT     DATI                 M3
b.
: 5. Concrete ExFansion Anchors (Cont'd)
* 5.6 Engagement and searing a.
: b.                                              .
c.
c.
d.
d.
: 6. Velding 6.! Location 6.2 Veld Site               l                               l 6.3 Veld Length 6.4   Fusion 6.5 Craters 6.6 Veld Profiles
: 6. Velding 6.! Location 6.2 Veld Site l
l 6.3 Veld Length 6.4 Fusion 6.5 Craters 6.6 Veld Profiles
{
{
6.7 Undercut 6.8 Fotosity                                                                                         l 1
6.7 Undercut 6.8 Fotosity l
6.9 overlap 6.10 Surface Slag 6.11 Cracks                                                                                   .
1 6.9 overlap 6.10 Surface Slag 6.11 Cracks 6.1: Velder ID M/A N/A for Inforsation oniv C??-20 7.13. Revts un J
6.1: Velder ID                   M/A       N/A               for Inforsation oniv         ,
C??-20 7.13. Revts un J                                                                       - - -


Attacheent 6.1 QI-056 Rev. 1 Page 1 of 2 CCyxtC?.I Pt.15. RISPCSSE TI.C4 C7.IO.~ 57 P0f'.~ A!' CS CEIC               VEP.ITIC.C;CN PKC NC.
Attacheent 6.1 QI-056 Rev. 1 Page 1 of 2 CCyxtC?.I Pt.15. RISPCSSE TI.C4 C7.IO.~ 57 P0f'.~ A!' CS CEIC VEP.ITIC.C;CN PKC NC.
Instrument Pipe / Tube             R-S-ISSP-                               PAC: 1 OT 2 Suceerts QL'AL;Tt 135T3''OTICN QI-056 REINSPECT!CN                       [I Cll: 1 EC.U;?.43I ?.A!J.i AC 80.       Q DCCt?.Cr:A* CN RI7 ri                [I C4; 2
PAC: 1 OT 2 Instrument Pipe / Tube R-S-ISSP-Suceerts QL'AL;Tt 135T3''OTICN REINSPECT!CN
[I Cll: 1 QI-056 Q DCCt?.Cr:A* CN RI7 ri
[I C4; 2 EC.U;?.43I ?.A!J.i AC 80.
[1 CC:c'.CM
[1 CC:c'.CM
                                                                                                    ~
~
VERIT CA!!CN         i 3                                                            RCdA?IS ACCIPT    lRI.*EC*   DATIl
VERIT CA!!CN i
RCdA?IS 3
lRI.*EC*
DATIl ACCIPT
: 1. Inspector Certificatica
: 1. Inspector Certificatica
: a. Date
: a. Date
Line 2,498: Line 3,128:
: a. C.*ibt. Joe data
: a. C.*ibt. Joe data
: b. Tereue settine 3.2 Bolt Seacint 3.3 Rework l
: b. Tereue settine 3.2 Bolt Seacint 3.3 Rework l
PRIPARD BY:                                       APPROVED BY:
PRIPARD BY:
DISCIPLINI ENCR.                 CATE             LEAD DISCIPLINE ENC 1.       DATE I.NSF ECID 8't ;                                   APPRCVED BT:
APPROVED BY:
Gi5FECTCR                         DA!;             LEAD IN5?!CTCR             ~ DATE CPF-007.1 A. Revu un 0
DISCIPLINI ENCR.
CATE LEAD DISCIPLINE ENC 1.
DATE I.NSF ECID 8't ;
APPRCVED BT:
Gi5FECTCR DA!;
LEAD IN5?!CTCR
~ DATE CPF-007.1 A. Revu un 0


Attcchnent 6.1 QI-056 Rev. 1 COMASCHE PEAK RESPONSE TE.2.M CHECKLIST POP'AATICN DESC             VERITICA!10N PKC S0.
Attcchnent 6.1 QI-056 Rev. 1 COMASCHE PEAK RESPONSE TE.2.M CHECKLIST POP'AATICN DESC VERITICA!10N PKC S0.
Instruzent Pipe / Tube         g.$.735p.                   PACE L OF 1 Suerorts VERITICA!1CS
Instruzent Pipe / Tube g.$.735p.
                ^                                                        RD%RKS ACCEPT   REJECT     DATE
PACE L OF 1 Suerorts VERITICA!1CS RD%RKS
        '. . Stud Velding
^
ACCEPT REJECT DATE
. Stud Velding
: a. Daily Ovalification
: a. Daily Ovalification
: b. Production Studs
: b. Production Studs
Line 2,511: Line 3,149:
: 5. Drawine Revisien CPP-007.18. Revision 0 7
: 5. Drawine Revisien CPP-007.18. Revision 0 7


Attachment 6.1 COMANCRE PEAK RESPONSE TEAM               QI-057 CHECKLIST                     Rev. 7 POPULATION DESC               VERIPICATION PKG NO.
..1 COMANCRE PEAK RESPONSE TEAM QI-057 CHECKLIST Rev. 7 POPULATION DESC VERIPICATION PKG NO.
Till & Packfill                 R-S-FILL-                             PAGE 1 0F ,_;[
Till & Packfill R-S-FILL-PAGE 1 0F,_;[
Placement (SSI Dae)
Placement (SSI Dae)
QUALITT INSTRUCTION QI-057                             REINSPECTION                     (~) UNIT 1 EQUIPMENT MARK / TAG NO.       X DOCLMENTATION REVIEW                     UNIT 2 Inspector's Daily Report No.                                                                 COMMON VERITICATION ATTRIBUTE                                                       RD(AkKS ACCEPT       REJECT     DATE A SSI DAM A.1 General
QUALITT INSTRUCTION QI-057 REINSPECTION
(~) UNIT 1 EQUIPMENT MARK / TAG NO.
X DOCLMENTATION REVIEW UNIT 2 Inspector's Daily Report No.
COMMON VERITICATION ATTRIBUTE RD(AkKS ACCEPT REJECT DATE A SSI DAM A.1 General
: a. Plans & Specifications
: a. Plans & Specifications
: b. Zone Delineation
: b. Zone Delineation
: c. Datage due to hauling Equipment
: c. Datage due to hauling Equipment
: d. Borrow Sources
: d. Borrow Sources
: e. Foundation Recuirements                                                                   '
: e. Foundation Recuirements A.2 Impervious Material Placement
A.2 Impervious Material Placement     --
: a. Material Blend
: a. Material Blend
: b. Layer Thickness
: b. Layer Thickness
Line 2,528: Line 3,168:
: f. Debris Removal A.3 Rock Fill Placement
: f. Debris Removal A.3 Rock Fill Placement
: a. Layer Thickness
: a. Layer Thickness
: b. Debris Removal A.4 Filter   Placement
: b. Debris Removal A.4 Filter Placement
: a. Layer Thickness
: a. Layer Thickness
: b. Avoid Contamination
: b. Avoid Contamination
: c. Avoid   Segregation
: c. Avoid Segregation
: d. Contamination Avoided A.5 Moisture Control
: d. Contamination Avoided A.5 Moisture Control
: a. Filter Zone Wetting
: a. Filter Zone Wetting
: b. Borrow Pit Irrigation A.6 Processing Impervious Fill
: b. Borrow Pit Irrigation A.6 Processing Impervious Fill
: a. Moisture "PREP ARED BY :                                   APPROVED BY:
: a. Moisture "PREP ARED BY :
DISCIPLINE ENGR.             DATE               LEAD DISCIPLINE ENGR.       DATE IN5PECTED BY:                                   APPROVED BY:
APPROVED BY:
IN5FEcTgR                     DATE             LEAD INSPECTOR               DATE CPP-007.lA, Revision 0
DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE IN5PECTED BY:
APPROVED BY:
IN5FEcTgR DATE LEAD INSPECTOR DATE CPP-007.lA, Revision 0


Attachtent 6.1 COMASCHE PIAK RES?ONSE TEAM                         QI-057 CHECKLIST                               Rev. 7 POPULAT;CN DESC                 VER;FICAT;0N PKC S0.
Attachtent 6.1 COMASCHE PIAK RES?ONSE TEAM QI-057 CHECKLIST Rev. 7 POPULAT;CN DESC VER;FICAT;0N PKC S0.
Fill & Backfill                 R-S-TILL-                 PACE 2-~                  0F 2 Placement (SSI Dam)
Fill & Backfill R-S-TILL-PACE 2 0F 2 Placement (SSI Dam)
-~
VERIFICATION
VERIFICATION
          ^       I                                                                               ^'
^
ACCIPT     REJECT   DATE
I
^'
ACCIPT REJECT DATE
: b. Surface Moistening
: b. Surface Moistening
: e. Over vet Layers A.7. Processing Rockfill
: e. Over vet Layers A.7. Processing Rockfill
: a. Layer Placement
: a. Layer Placement
: b. Stones Distribution
: b. Stones Distribution
: c. Placement Coordinat ion A.8 Compaction Equipment A.9   Impe rvious Fill Compaction
: c. Placement Coordinat ion A.8 Compaction Equipment A.9 Impe rvious Fill Compaction
: a. Number of Passes
: a. Number of Passes
: b. Rolling Pattern
: b. Rolling Pattern
: c. Test Sampling A.10. Filter Compaction A.ll Rock Fill Compaction
: c. Test Sampling A.10. Filter Compaction A.ll Rock Fill Compaction
: a. Number of Passes
: a. Number of Passes
: b. Additional Passes             -
: b. Additional Passes A.12 Testing
A.12 Testing
: a. Frequency of Testina
: a. Frequency of Testina
: b. IDR Test Location
: b. IDR Test Location
Line 2,564: Line 3,210:
: h. Material Testing A.13 Personnel Certification
: h. Material Testing A.13 Personnel Certification


C0KANCRE PLAK RESPONSE TEAM               Attachment 6.2 CRECKLIST                    QI-057 Rev. 7
C0KANCRE PLAK RESPONSE TEAM.2 QI-057 CRECKLIST Rev. 7 POPULATION DESC VERIFICATION PKG NO.
                                      . POPULATION DESC               VERIFICATION PKG NO.
Fill & Backfill Placement R-S-TILL-PACE 1 0F _2_,
Fill & Backfill Placement       R-S-TILL-                             PACE 1 0F _2_,
(Except for SSI Dam)
(Except for SSI Dam)
QUALITT INSTRUCTION QI-057                         ([] REINSPECTION                       ((] UNIT 1 EQUIPMENT MARK / TAC NO.           DOCUMENTATION RIVIEW                   UNIT 2 CC'1 MON VERIFICATION A m IBUTE ACCEPT        REJECT    DATE IINAI#'I B Pill and Backfill (Except For SSI DAM)
QUALITT INSTRUCTION QI-057
([] REINSPECTION
((] UNIT 1 EQUIPMENT MARK / TAC NO.
DOCUMENTATION RIVIEW UNIT 2 CC'1 MON VERIFICATION A m IBUTE IINAI#'I ACCEPT REJECT DATE B Pill and Backfill (Except For SSI DAM)
B.1 Extent of Backfill B.2 Soil Backfill Placement Signature Card
B.1 Extent of Backfill B.2 Soil Backfill Placement Signature Card
: a. IR Notation                     *
: a. IR Notation
: b. Signed and Dated B.3 Stockpiles
: b. Signed and Dated B.3 Stockpiles
: a. Construction
: a. Construction
: b. Identification B.4 Preparation of L'erking Surf ace B.5 Placement of Backfill
: b. Identification B.4 Preparation of L'erking Surf ace B.5 Placement of Backfill
: a. Lift Thickness
: a. Lift Thickness
: b. Moisture Control PREPAAED BY:                                   APPROVED BY:
: b. Moisture Control PREPAAED BY:
DISCIPLINE ENGR.             DATE               LEAD DISCIPLINE ENGR.         DATE IN5PELIED BY:                                   APPROVED BY:
APPROVED BY:
IM5FIcTOR                     DATE             LEAD INSPECTOR                 DATE CPP-007.lA, Revision 0
DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE IN5PELIED BY:
APPROVED BY:
IM5FIcTOR DATE LEAD INSPECTOR DATE CPP-007.lA, Revision 0


Attachtent 6.2 COMASCHE PEAX RES?ONSE TEAM       QI-057 CHECKLIST               Rev. 7 Po?L"LATION DESC               VERIFICA!10N PKG NO.
Attachtent 6.2 COMASCHE PEAX RES?ONSE TEAM QI-057 CHECKLIST Rev. 7 Po?L"LATION DESC VERIFICA!10N PKG NO.
Till & Backf111 Placement         R-S-TILL-               PACE 2 0F 2 (Except for $51 Dam)                                         ~~
Till & Backf111 Placement R-S-TILL-PACE 2 0F 2 (Except for $51 Dam)
VER;FICATION AI II I                                                     '^ $
~~
ACCEPT   REJECT   DATE B.6 Testing i
VER;FICATION AI II I
'^ $
ACCEPT REJECT DATE B.6 Testing i
: a. Frequency of Testing
: a. Frequency of Testing
: b. Inspection Report Test Location
: b. Inspection Report Test Location
Line 2,588: Line 3,242:
: d. Density Criteria Met i
: d. Density Criteria Met i
: e. Reference Applicabil ity
: e. Reference Applicabil ity
: f. Reference Consistene v                                                 ,
: f. Reference Consistene v
: s. Gradation Testing B.7 Preparation of Trench es
: s. Gradation Testing B.7 Preparation of Trench es
: a. Trench Excavation
: a. Trench Excavation
Line 2,598: Line 3,252:
: e. Hand-Taeping B.9 Personnel Certificatien
: e. Hand-Taeping B.9 Personnel Certificatien


l l
l COMANC3E ? EAT. RESPONSE TEAM Attachmen2 6.1 QI-059 C3ECC.:ST Rev. 5
l Attachmen2 6.1 COMANC3E ? EAT. RESPONSE TEAM                                         l QI-059               l C3ECC.:ST Rev. 5
?OPULAI;CS ;il.
          ?OPULAI;CS ;il .
VIRI?! CAT *CN ?KO NO.
VIRI?! CAT *CN ?KO NO.
Mechanical "c.'v.prent I.g.ggtN.                                 ?ACZ 1 07 Installatie-                                                                        3 QUA' * !*! *:iS!?..C!
Mechanical "c.'v.prent Installatie-I.g.ggtN.
* CN q1 059                   (j) REINS?!CT!0N                           ((} CN;   ;
?ACZ 1 07 3
EQUl?.". INT .WJ. !AG S0.
QUA' * !*! *:iS!?..C!
[ DOCTMENTATION REV!!!!                     [ W: :
* CN q1 059 (j) REINS?!CT!0N
(()COMMCN VERITICATION A I       I ACCIPT       REJECT       DATE               kZMA>XS
((} CN; EQUl?.". INT.WJ. !AG S0.
: 1. Equipment Identifiention
[ DOCTMENTATION REV!!!!
: 2. Temporary Coatings and Preservatives
[ W: :
: 3. Rust (Stainless Steel only) 4     Location                       *
(()COMMCN VERITICATION A I I
: 5.   !!evation i
ACCIPT REJECT DATE kZMA>XS 1.
: 6. Orientation             ,
Equipment Identifiention 2.
i
Temporary Coatings and Preservatives 3.
: 7. Levelness                             .
Rust (Stainless Steel only) 4 Location 5.
: 8. Configuration
!!evation i
: 9. Grout i
6.
: 10. Anchor Bolt Location                                                                       '
Orientation i
: 11. Anchor Belt Hardware               ,.            ,.
7.
Levelness 8.
Configuration 9.
Grout i
: 10. Anchor Bolt Location
: 11. Anchor Belt Hardware
: 12. Ancher Bolt Engagement
: 12. Ancher Bolt Engagement
,      13. Anchor Bolt Tightness                                     Required Torque I                                                                                                   ,
: 13. Anchor Bolt Tightness Required Torque I
PREPAAED ST:                                     APPROVED BY:
PREPAAED ST:
DISC:?t:NE ENGR.             DATE               LEAD DISCIPLINE ENGR.           DATI
APPROVED BY:
;      ;N5?Icisa 5Y:
DISC:?t:NE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATI
;N5?Icisa 5Y:
APPROVED SY:
APPROVED SY:
      .35?Ic.;K 3A!!             LEAD .*!!S?!CTOR                 DATI
.35?Ic.;K 3A!!
      ;??- 4R. ' A. Rev. nan 0 l
LEAD.*!!S?!CTOR DATI
;??- 4R. ' A. Rev. nan 0 l


CCP.cCSE ?!AK RIsposst ;;Ag           t                                unt 6.1 C2IC:" :$7 Rev. 5
t unt 6.1 CCP.cCSE ?!AK RIsposst ;;Ag C2IC:" :$7 Rev. 5
      ?0P'~AI;0S DESC               *iER;7;CA!!ON ?KG 30.
?0P'~AI;0S DESC
Mechanical Equipment Ynarm11meten                  1-M-MEIN-                   ? ACE L OF                                  9 VERITICAT!0S AC0!?!     RI.* E CT     DATI       E"M3
*iER;7;CA!!ON ?KG 30.
Mechanical Equipment
? ACE L OF 9
1-M-MEIN-Ynarm11meten VERITICAT!0S AC0!?!
RI.* E CT DATI E"M3
: 14. Parallel Alignment
: 14. Parallel Alignment
: 15. Angular Alignment
: 15. Angular Alignment
: 16. Coupling Cap                                                                                                   .
: 16. Coupling Cap
I
: 17. Seismic Restraints I
: 17. Seismic Restraints 18.-Concrete Expansion Anchors (Hilti)
18.-Concrete Expansion Anchors (Hilti)
Site
Site
: 19. Hilti Type. Length,
: 19. Hilti Type. Length,
        & Nueber
& Nueber
: 20. Hilti Embedment                               t
: 20. Hilti Embedment t
: 21. Hilti Bolt Spacing I             l
: 21. Hilti Bolt Spacing I
: 22. Hilti Angularity               I
l
: 22. Hilti Angularity I
: 23. Hilti Concrete Damage
: 23. Hilti Concrete Damage
: 24. Nilti Nut Engagement and Bearing
: 24. Nilti Nut Engagement and Bearing
Line 2,646: Line 3,313:
: 26. Spent Tuel Storage Rack Installation
: 26. Spent Tuel Storage Rack Installation
: 27. Spent Tuel Storage Rack Leveling Pads t
: 27. Spent Tuel Storage Rack Leveling Pads t
i                                                             !
i


Attcchment 6.1 COMANC'clE PLAT. RESPONSE TP.M       01-066 C3ECXLIST                   Rev. 1 POPULATION DESC                                       VERITICATION PKG NO.
Attcchment 6.1 COMANC'clE PLAT. RESPONSE TP.M 01-066 C3ECXLIST Rev. 1 POPULATION DESC VERITICATION PKG NO.
Equipment Supports                                     I-S-EQSP                                         PAGE 1 0F 3 (EQSP)
Equipment Supports I-S-EQSP PAGE 1 0F 3 (EQSP)
QUALITY INSTRUCTION QI-066                                               @ REINSPECTION                             O estT t EQUIPMENT .%BX/ TAG S0.                                   DOCUMENTATION REVIEW                   C UNIT 2 CCW.0N VERIPICATION
QUALITY INSTRUCTION QI-066
              ^                                                                                                                 RDd.ARIS ACCEPT     REJECT     DATE
@ REINSPECTION O estT t EQUIPMENT.%BX/ TAG S0.
: 1. Identification                                       N/A     N/A
DOCUMENTATION REVIEW C UNIT 2 CCW.0N VERIPICATION
^
RDd.ARIS ACCEPT REJECT DATE
: 1. Identification N/A N/A
: 2. Location & Orientation
: 2. Location & Orientation
: 3. Configuration
: 3. Configuration
: 4. Velding A. AVS Velds (1) Location                                         ,
: 4. Velding A. AVS Velds (1) Location (ii) Size (iii) Length fiv) Tusion (v) Craters (vi) Profiles (vii) l'ndercut (viii) Porosity (ix) Overlap (x) Slas (xi) Cracks PREPARED BY:
(ii) Size (iii) Length fiv) Tusion (v) Craters (vi) Profiles (vii) l'ndercut (viii) Porosity (ix) Overlap (x) Slas (xi) Cracks PREPARED BY:                                                             APPROVED BY:
APPROVED BY:
DISCIPLINE ENGR.                                     DATE             ' LEAD DISCIPLINZ ENGR.                                                                       DATE IN5PEcI m BY:                                                           APPROVED BY:
DISCIPLINE ENGR.
IN5FECTOR                                             DATE             LEAD INSPECTCR                                                                             DATE CPP-007,1.\. Revuun 0
DATE
' LEAD DISCIPLINZ ENGR.
DATE IN5PEcI m BY:
APPROVED BY:
IN5FECTOR DATE LEAD INSPECTCR DATE CPP-007,1.\\. Revuun 0


Attcchment 6.1 COMANCHE PEAK RESPONSE TEAM QI-066 CHECKLIST         gev. 1 POPL'LATION DESC                 VERIFICATION PKC NO.
Attcchment 6.1 COMANCHE PEAK RESPONSE TEAM QI-066 CHECKLIST gev. 1 POPL'LATION DESC VERIFICATION PKC NO.
Equipment Supports               I-S-EQSP                 PACE-- 2 0F   3 (EQSP)
Equipment Supports I-S-EQSP PACE 2 0F 3
VERITICATION REMARKS ACCEPT   REJECT   DATE
(EQSP)
VERITICATION REMARKS ACCEPT REJECT DATE
: 4. Welding (Cont'd)
: 4. Welding (Cont'd)
B. NF Welds (i) location (ii) Site (iii) Undercut (iv) Surface Condition (v) Cracks Lack of Fusion (vi) Walder ID Symbol       N/A       N /A
B. NF Welds (i) location (ii) Site (iii) Undercut (iv) Surface Condition (v) Cracks Lack of Fusion (vi) Walder ID Symbol N/A N /A
: 5. Bolting A. Attachments B. Materials                                             Thd. Rod. =
: 5. Bolting A. Attachments B. Materials Thd. Rod. =
C. Engagement D. Surface Contact
C. Engagement D. Surface Contact
                                        ,, E. Torquing
,, E. Torquing
: 6. Concrete Expansion Anchors A. Size & Type B. Length C. Embedment D. Spacing (1)
: 6. Concrete Expansion Anchors A. Size & Type B. Length C. Embedment D. Spacing (1)
(ii)
(ii)
(iii)
(iii)
E. Angularity 4
E. Angularity 4
                                  ' ? ? -*W . '. 3 . h v '. s
' ? ? -*W. '. 3. h v '. s
* c n 9
* c n 9


Attachment 6.1 COMANCHE PEAK RESPONSE TEAF. QI-066 CHECKI.!ST         Rev. I POPtJLATION DESC           VERIFICATION PKG NO.
..1 COMANCHE PEAK RESPONSE TEAF.
Equipment Supports         1-5-EQSP                   PAGE~ 3 0F                                             3 (EQSP)
QI-066 CHECKI.!ST Rev. I POPtJLATION DESC VERIFICATION PKG NO.
VERITICATION KZNARXS ACCEPT   REJECT     DATE
Equipment Supports 1-5-EQSP PAGE 3 0F 3
~
(EQSP)
VERITICATION KZNARXS ACCEPT REJECT DATE
: 6. Cone.Exp.Ancht (Cont'd)
: 6. Cone.Exp.Ancht (Cont'd)
F. Engagement
F. Engagement
            & Bearing (1)
& Bearing (1)
(ii)
(ii)
(iii)
(iii)
Line 2,687: Line 3,365:
C o-007 l3, Re'us.cn 9
C o-007 l3, Re'us.cn 9


COMANCHE PEAK RESPONSE TEAM                                                     6 CHECC.IST                       Rev. 1 POPULATION DESC                                                                                               VERITICATION PKG NO.
COMANCHE PEAK RESPONSE TEAM 6
Equipment Supports (EOSP)
CHECC.IST Rev. 1 POPULATION DESC VERITICATION PKG NO.
R-S-EQSP                           PAGE 1 0F 1 QUALITY INSTRUCTION QI-067                                                                                                   @ REINSPECTION                       O UNI 1 EQUIPMENT MARK / TAG NO.                                                                                         DOCUMENTATION REVIEW               UNIT 2 CCMd.ON VERIPICATION AW3UTE                                                                                   ACCEPT                                  RDd. ARKS REJECT     DATE
Equipment Supports R-S-EQSP PAGE 1 0F 1 (EOSP)
QUALITY INSTRUCTION QI-067
@ REINSPECTION O UNI 1 EQUIPMENT MARK / TAG NO.
DOCUMENTATION REVIEW UNIT 2 CCMd.ON VERIPICATION AW3UTE RDd. ARKS ACCEPT REJECT DATE
: 1. Support Package
: 1. Support Package
: 2. Operations Traveler
: 2. Operations Traveler
: 3. Inspector Certification
: 3. Inspector Certification
: 4. Welding (i) Weld Procedure Qualification (ii) Weld Procedure Application (iii) Welder Qualifications (iv) Rold Points (v) Stress Relief
: 4. Welding (i) Weld Procedure Qualification (ii) Weld Procedure Application (iii) Welder Qualifications (iv) Rold Points (v) Stress Relief
: 5. Concrete Expansion Anchors (1) Torque (ii) Spacing (iii) Rework (iv) Role Drilling (v) Setting PREPARED BT:                                                                                                                 APPROVED BY:
: 5. Concrete Expansion Anchors (1) Torque (ii) Spacing (iii) Rework (iv) Role Drilling (v) Setting PREPARED BT:
DISCIPLINI ENGR.                                                                                           DATE               LEAD DISCIPLINI ENGR.                             DATE IN5FEuw BY:                                                                                                                 APPROVED BY:
APPROVED BY:
IN5FEGOR                                                                                                     DATE           LEAD INSPECTOR                                   DA*E C??-dO7.lA. Revision 0
DISCIPLINI ENGR.
DATE LEAD DISCIPLINI ENGR.
DATE IN5FEuw BY:
APPROVED BY:
IN5FEGOR DATE LEAD INSPECTOR DA*E C??-dO7.lA. Revision 0


Attachmerit 0.4 CCF).NCHE PEAK RES?ONSE TEAM           QI-067 CHECKLIST                     Rev. 1 SC            VERITICATION PKG NO.
Attachmerit 0.4 CCF).NCHE PEAK RES?ONSE TEAM QI-067 CHECKLIST Rev. 1 POP'aATION D'Iupports VERITICATION PKG NO.
POP'aATION Equipment !D'Iupports R-S-EQSP                 PAGE   2 0F   2 (EQSP)                                                     -
SC Equipment !
R-S-EQSP PAGE 2 0F 2
(EQSP)
VERITICATION
VERITICATION
          ^ '                                                       iLDiARKS ACCEPT   REJECT   DATE
^ '
iLDiARKS ACCEPT REJECT DATE
: 6. Structural Bolting (i) Bearing Joints (ii) Friction Joints
: 6. Structural Bolting (i) Bearing Joints (ii) Friction Joints
: 7. Matrarial Traceability (1) Materiab Certification C??-N7.tE, Revision 0
: 7. Matrarial Traceability (1) Materiab Certification C??-N7.tE, Revision 0


                                                                                                            ^           '    '
^
COMANCRE PEAK RESPONSE TEAM 01 -
COMANCRE PEAK RESPONSE TEAM 01 -
CHECKLIST Rev. 3 POPULATION DESC                 VERIFICATION PKG NO.
CHECKLIST Rev. 3 POPULATION DESC VERIFICATION PKG NO.
CEMENT CRot'T                     R-S-GRTC-                                                               PAGE 1 0F   3 QUALITY INSTRUCTION QI-068                           CREINSPECTION                                                                   UNIT 1 EQUIPMENT MARK / TAG NO.       { DOCUMENTATION RIVIEW                                                         UNIT 2 COMMON VERIFICATION A m Il m                                                                                             REMARKS ACCEPT     RZJECT     DATE
CEMENT CRot'T R-S-GRTC-PAGE 1 0F 3
QUALITY INSTRUCTION QI-068 CREINSPECTION UNIT 1 EQUIPMENT MARK / TAG NO.
{ DOCUMENTATION RIVIEW UNIT 2 COMMON VERIFICATION A m Il m REMARKS ACCEPT RZJECT DATE
: 1. PREPLACEMENT/ PLACEMENT
: 1. PREPLACEMENT/ PLACEMENT
: a. Cleanliness
: a. Cleanliness
Line 2,715: Line 3,405:
: d. Prevetting
: d. Prevetting
: 2. PLACDLENT
: 2. PLACDLENT
: a. Grout Proportions, Mix                                                                                                     ;
: a. Grout Proportions, Mix Time & Temperature
Time & Temperature
: b. Placing and Consolidation
: b. Placing and Consolidation
: c. Surface Temperature
: c. Surface Temperature
: 3. POST-PLACEMENT
: 3. POST-PLACEMENT
: a. Curing
: a. Curing
: b. Compressive
: b. Compressive Strength Test
.            Strength Test
: 4. PERSONNEL CERTIFICATION
: 4. PERSONNEL CERTIFICATION
: a. Valid Certification
: a. Valid Certification
: b. Certified to Procedures PREPARED BY:                                   APPROVED ST:
: b. Certified to Procedures PREPARED BY:
DISCIPLINE ENGR.               DATE             LEAD DISCIPLINE ENGR.                                           DATE_
APPROVED ST:
LRsFIuu BY:                                     APPROVED BY:
DISCIPLINE ENGR.
IN5rEuvR                         DATE           LEAD INSPECTOR                                                   DATE CPP-007.1A. Revision 0
DATE LEAD DISCIPLINE ENGR.
DATE_
LRsFIuu BY:
APPROVED BY:
IN5rEuvR DATE LEAD INSPECTOR DATE CPP-007.1A. Revision 0


Attachment 6.1 COMANCRE PEAK RESPONSE TEAM               QI-069 CHECKLIST                     Rev. 2 POPULATION DESC                 VERIPICATION PKG NO.
..1 COMANCRE PEAK RESPONSE TEAM QI-069 CHECKLIST Rev. 2 POPULATION DESC VERIPICATION PKG NO.
EP0XY GROUT                     R-S-CRTE                                         I PAGE 1 0F QUALITT INSTRUCTION QI-069, REV. 0
I EP0XY GROUT R-S-CRTE PAGE 1 0F QUALITT INSTRUCTION QI-069, REV. 0
[)) REINSPECTION                   ((] UNIT 1 EQUIPMENT MARK / TAG NO.       X DOCUMENTATION REVIEW                   UNIT 2 COMMON VERIPICATION AMIIUI               ACCEPT     REJECT     DATE IINAAES
[)) REINSPECTION
                                                ~
((] UNIT 1 EQUIPMENT MARK / TAG NO.
: 1. Preplacement                                             ,
X DOCUMENTATION REVIEW UNIT 2 COMMON VERIPICATION AMIIUI IINAAES ACCEPT REJECT DATE
: 1. Preplacement
~
a) Equipment Base and Baseplate Gaps b) Placement Holes e) Cleanliness
a) Equipment Base and Baseplate Gaps b) Placement Holes e) Cleanliness
: 2. Placement a) Surface Terp.
: 2. Placement a) Surface Terp.
b) Mixing Operation c) Placing
b) Mixing Operation c) Placing
: 3. Post Placement a) Cure Time b) Compressive Strength Test
: 3. Post Placement a) Cure Time b) Compressive Strength Test
: 4. Personnel Certification a) Valid Certification PREPARED BY                                   APPROVED BY:
: 4. Personnel Certification a) Valid Certification PREPARED BY APPROVED BY:
DISCIPLINE ENOR.             DATE           LEAD DISCIPLINE ENGR.         DATE IN5FELIED BY:                                 APPROVED BY:
DISCIPLINE ENOR.
InsFIctum                -~'*p AT E         LEAD INSPECTOR               DATE CPP-007.lA Revision 0
DATE LEAD DISCIPLINE ENGR.
DATE IN5FELIED BY:
APPROVED BY:
-~'*p AT E LEAD INSPECTOR DATE InsFIctum CPP-007.lA Revision 0


Atttchment e.1 COMANCHE PEAK RESPONSI TEAM                                                             QI-070 CHECKLIST                                           Rev. 2 POPULATION DESC                                                   VERIPICATION PKG NO.                                                                                                     1 Tubing Welds / Material                                               I-M-TUWM-0                                                             PAGE 1 0F                                 1 QUALITY INSTRUCTION QI-070                                                           @ REINSPECTION                                                                       UNIT 1 EQUIPMENT MARX / TAG NO.                                               DOCUMENTATION REVIEW C UNIT 2 O coxxos
Atttchment e.1 COMANCHE PEAK RESPONSI TEAM QI-070 CHECKLIST Rev. 2 POPULATION DESC VERIPICATION PKG NO.
                                        =-
Tubing Welds / Material I-M-TUWM-0 PAGE 1 0F 1
QUALITY INSTRUCTION QI-070
@ REINSPECTION UNIT 1 EQUIPMENT MARX / TAG NO.
DOCUMENTATION REVIEW C UNIT 2 O coxxos
=-
VERIFICATION
VERIFICATION
                                                    ^                                                                                                                                   RIMARKS ACCIPT                       REJECT         DATE
^
RIMARKS ACCIPT REJECT DATE
: 1. IVBING WELDS
: 1. IVBING WELDS
: a. Veld ID and Location
: a. Veld ID and Location
Line 2,754: Line 3,456:
: e. Overlap
: e. Overlap
: f. Cracks Lack of Fusion f
: f. Cracks Lack of Fusion f
: g. Welders ID symbol (not accept / reject                             [// ,/j    /
[/ j f
f (Use Data Recording Tors. Attachment 6.4) attribute)                                                                                                  /
Tors. Attachment 6.4)
/
(Use Data Recording
: g. Welders ID symbol (not accept / reject attribute)
/,/
/
: h. Weld Rust
: h. Weld Rust
: 2. BASE MATERIAL                                               ,/
: 2. BASE MATERIAL
: a. Material                                             ,
,/
(Use Data Racording Traceability                                     (                                       j                       Torm, Attachment 6.4) f (not accept / reject attribute)                                           /                                   .
: a. Material (Use Data Racording Traceability
(
j Torm, Attachment 6.4) f (not accept / reject attribute)
/
: b. Material Defect's'
: b. Material Defect's'
: e. Material Rust PREPARID IT:                                                                                     APPROVED RT:
: e. Material Rust PREPARID IT:
DISCIPLINE DGR,                                             DATE                                 LEAD DISCIPLINE DGR,                                   DATE IN5FEuw bis                                                                                       APPROVED BY:
APPROVED RT:
IN5FECTOR                                                       CATE                           LEAD INSPECTOR                                         DATE C".P-g07.Id. Rey 1sion 0                       ,                    .
DISCIPLINE DGR, DATE LEAD DISCIPLINE DGR, DATE IN5FEuw bis APPROVED BY:
IN5FECTOR CATE LEAD INSPECTOR DATE C".P-g07.Id. Rey 1sion 0


AttaChoent 6.1 QI-071 Rev. 1 Page 1 of I CRECKLIST C0wC21 P!.AK RZ570M11 TTAt CitCC.137 FGF''A!!Ch w        Ot&C             WE11TICA*1QN PEG 3g, tighting cable                   1-t-LITC                                 FACI 1 or 1 QCAL171 D$!!CCTION QI-071                         Otrustre:2oa                             O e=1: 1 racir..cn = < e so.           O ac:=:me" tmrv                         0 mt:
AttaChoent 6.1 QI-071 Rev. 1 Page 1 of I CRECKLIST C0wC21 P!.AK RZ570M11 TTAt CitCC.137 FGF''A!!Ch Ot&C WE11TICA*1QN PEG 3g, w
tighting cable 1-t-LITC FACI 1 or 1 QCAL171 D$!!CCTION QI-071 Otrustre:2oa O e=1: 1 racir..cn = < e so.
O ac:=:me" tmrv 0 mt:
O c===
O c===
Vit!TICAT:on AC0ZFT       L1JICT     CATE
Vit!TICAT:on AC0ZFT L1JICT CATE
: 1. Stee/ Type
: 1. Stee/ Type
: 2. Celer-code                                                       b
: 2. Celer-code b
: 3. testinatten
: 3. testinatten Nv)
      ....e                                                     a s
....e a
Nv)  v
: 5. Correct Vire Jetet
: 5. Correct Vire Jetet                                 _      \xX      .
\\x s
: 6. late Ceeductor                                 !
v X
3 V
: 6. late Ceeductor V\\(
: t. Cet     e.eteren                         a       \(
3
        . ve r.io s .                         Oh M t se. Ceeductors in les
: t. Cet e.eteren a
* e ma the nazimum number of condotters per bos site is computed show celeviation
Oh M
                                              <>                      o. . e t u i. .
. ve r.io s.
FLIFARD 31:                                     Artt0V Q ST:
t se. Ceeductors in les e ma the nazimum number of condotters per bos site is computed show celeviation
        !50:P'.*wt D;t .             cAn               ttAD ::sc:Ptiwt tys;t.         San 73rl .sw lit                                   eJ F1^YD 31:
: o.. e t u i..
      . m :-.eu                       ;An             ' Lc n!?ta t
FLIFARD 31:
                                                      .                              SA!!
Artt0V Q ST:
      *??-407. LA. Revu us 0 L
!50:P'.*wt D;t.
cAn ttAD ::sc:Ptiwt tys;t.
San 73rl.sw lit eJ F1^YD 31:
. m :-.eu
;An
' Lc n!?ta t SA!!
*??-407. LA. Revu us 0 L


COMANC11 PEAK RESPONSE TEAM CEECKLIST FQFULATION DE5C           VERIPICATION PKG NO.
COMANC11 PEAK RESPONSE TEAM CEECKLIST FQFULATION DE5C VERIPICATION PKG NO.
Lighting Cables             R-E-LITG-                                             PAGE 1 0F   1 QUALITY INSTRUCTION QI-072                     Oartus>EcTto"                                         O ext? t EQUIPMENT MAAK/ TAC No.   @DOCUMENTATIONRIVIEW                                   C UNIT 2 COMMON VERIPICATION ACCEPT                                                   KIMAJUt3 R. EJECT     DATE 5.1 Inspector
Lighting Cables R-E-LITG-PAGE 1 0F 1
* Certification 5.2
QUALITY INSTRUCTION QI-072 Oartus>EcTto" O ext? t EQUIPMENT MAAK/ TAC No.
: a. Conduit Swabbed                               '
@DOCUMENTATIONRIVIEW C UNIT 2 COMMON VERIPICATION KIMAJUt3 ACCEPT R. EJECT DATE 5.1 Inspector Certification 5.2
: a. Conduit Swabbed
: b. Lubrication
: b. Lubrication
: c. Damage
: c. Damage
* Record IR No.. Inspector's name and date signed PREPARED BY:                                 APPROVED ST:
* Record IR No.. Inspector's name and date signed PREPARED BY:
DISCIPLINE ENGR.         DATE               LEAD DISCIPLINE ENGR.                       DATE inarEu w BY:                                 APPROVED BY:
APPROVED ST:
AusrEuvR                   DATE             LEAD INSPECTOR                             ~ DATE CP-007. !A. Revuton 0
DISCIPLINE ENGR.
DATE LEAD DISCIPLINE ENGR.
DATE inarEu w BY:
APPROVED BY:
AusrEuvR DATE LEAD INSPECTOR
~ DATE CP-007. !A. Revuton 0


Attachment 6.1 QI-073 Rev. O COMANCRE FEAK RESPOWSE TEAM CitCELI(T FQFVLATION DESC                 VE11FICAT10N FIG NO.
>.1 QI-073 Rev. O COMANCRE FEAK RESPOWSE TEAM CitCELI(T FQFVLATION DESC VE11FICAT10N FIG NO.
Pipe Velde/ Material             R.M.FIVM-                           FACE 10Fb QUALITT INSTRUCTION QI-073                        0i2t=5'ictio"                         O cutt 5 EQUIFKENT MARJ./ TAG NO.       @DOCQMNTATIONREVIEW                   C UNIT 2 O conca vtt1FICAT10N ACCIFT     RIP.CT   DATE
FACE 10Fb Pipe Velde/ Material R.M.FIVM-0i2t=5'ictio" O cutt 5 QUALITT INSTRUCTION QI-073 EQUIFKENT MARJ./ TAG NO.
@DOCQMNTATIONREVIEW C UNIT 2 O conca vtt1FICAT10N ACCIFT RIP.CT DATE
: 1. Base Material Traceability
: 1. Base Material Traceability
: 2. Weld Material Traceability
: 2. Weld Material Traceability
Line 2,805: Line 3,531:
: 6. Rold Pointe
: 6. Rold Pointe
: 7. Inspector Certifiestion.
: 7. Inspector Certifiestion.
: 8. flydrostatic Test FR.EFAAED ST:                                   AFFLOVED ST:
: 8. flydrostatic Test FR.EFAAED ST:
LEAD DISCIPLINI ENGL. DATE DISCIFLINE EIICE.              DATE 23rNw IT                                       AFFROVED RI:
AFFLOVED ST:
m r tcTus.                     DATI           LEAD IN1FEC' TOR         DA!!
DISCIFLINE EIICE.
DATE LEAD DISCIPLINI ENGL.
DATE 23rNw IT AFFROVED RI:
m r tcTus.
DATI LEAD IN1FEC' TOR DA!!
w -
w -


AttcCheert 6.1 QI-074 Rev. O Page 1 of I Cowcar rtAs ustoN$t Tru C11CILIST F9F R T10N DE5G             Vn1TICAT10m PEG .10.
AttcCheert 6.1 QI-074 Rev. O Page 1 of I Cowcar rtAs ustoN$t Tru C11CILIST F9F R T10N DE5G Vn1TICAT10m PEG.10.
N1$ CA3tt TrtMINATION$       t.E.N15T                             FACI [ CT ]
N1$ CA3tt TrtMINATION$
oca.m almCit0E Q1 074                     ] UIN5?tcTt0N                         C CNIT 1 EQUIPMDfI MAni/IAC NO.     C DCCMDrTATION RITIIV                 O C"tt C COMICN VH1FICATION A   I ACCI7T     11 JECT   DATF.
t.E.N15T FACI [ CT ]
3.1 leapector Certificetton 5.2 imetallation of MIS Cable VV Connectore 5.3 N18 Cable v          -
oca.m almCit0E Q1 074
toevletten and testatence feettet S.4 Coupling of Contwe tore v
] UIN5?tcTt0N C CNIT 1 EQUIPMDfI MAni/IAC NO.
5.3 Seldered Connectione
C DCCMDrTATION RITIIV O C"tt C COMICN VH1FICATION A
                                                    \<  >
I ACCI7T 11 JECT DATF.
fj FED A&E ST :                                 AFFROVO ST 015CIPLIW1 DhCR.           CAft             LEAD D!$C17t!W1 DeCL.       DATI mrh.w H4                                     AFFECfD 81 m n w.a                     DATI           LEAD LN5P!C"Ot             DATE l     .
3.1 leapector Certificetton VV 5.2 imetallation of MIS Cable Connectore v
JPP-lp!.14. Levtsten Q ..
5.3 N18 Cable toevletten and testatence feettet S.4 Coupling of Contwe tore
5
\\<
v 5.3 Seldered Connectione fj FED A&E ST :
AFFROVO ST 015CIPLIW1 DhCR.
CAft LEAD D!$C17t!W1 DeCL.
DATI mrh.w H4 AFFECfD 81 m n w.a DATI LEAD LN5P!C"Ot DATE l
JPP-lp!.14. Levtsten Q 5


Attachment 6.1 COMANCHE PEAK RESPONSE TEAM CHECKI,IST QI.075 Rey, o POPULATION DESC               VERITICATION PKG Ho.
..1 COMANCHE PEAK RESPONSE TEAM QI.075 CHECKI,IST Rey, o POPULATION DESC VERITICATION PKG Ho.
PIPING BEND TAERICATION       1-M-PBTA                           PAGE 1 0F                                 1 QUALITY INSTRUCTION QI-075                       @ REINSPECTION                       O out: t EQUIPMENT MARK / TAG NO.         DOCUMENTATION RIVIEW                                   UNIT 2 O coxxon VERITICATION
PIPING BEND TAERICATION 1-M-PBTA PAGE 1 0F 1
            ^
QUALITY INSTRUCTION QI-075
ACCEPT     REJECT     DATE                               IZMAAE3
@ REINSPECTION O out: t EQUIPMENT MARK / TAG NO.
DOCUMENTATION RIVIEW UNIT 2 O coxxon VERITICATION
^
ACCEPT REJECT DATE IZMAAE3
: 1. Radius
: 1. Radius
: 2. Ovality i
: 2. Ovality i
: 3. Buckling / Flattening t
: 3. Buckling / Flattening t
i i
i i
                  .                                                                                                    i 1
i 1
1 PREPARED ST:                                 APPROVED ST:
1 PREPARED ST:
I DISCIPLINE ENGR.             DATE             LEAD DISCIPLINE ENGR.                         DATE IN5FI'4w BT:
APPROVED ST:
APPROVED BT:                                                         '
I DISCIPLINE ENGR.
t IM5FILwK                     DATE           LEAD INSPECTOR                               DATE                   I i
DATE LEAD DISCIPLINE ENGR.
CPP-007.lA. Revision 0 w                               ;              a
DATE IN5FI'4w BT:
APPROVED BT:
t IM5FILwK DATE LEAD INSPECTOR DATE I
CPP-007.lA. Revision 0 i
w a


00(KETED                 ,
00(KETED UNITED STATES OF AMERICA USPGC NUCLEAR REGULATORY COMMISSION M MAR -1 P3:43 before the OCkifuYfnhj$[*
UNITED STATES OF AMERICA                                         USPGC                 -
ATOMIC SAFETY AND LICENSING BOARD BRANCH
NUCLEAR REGULATORY COMMISSION                                                               '
)
M MAR -1 P3:43 before the ATOMIC SAFETY AND LICENSING BOARD                               OCkifuYfnhj$[*        ,
I In the Matter of
BRANCH
)
                                                                            )                                                                         I In the Matter of                                     )     Docket Nos. 50-445-OL
Docket Nos. 50-445-OL
                                                                            )                                 50-446-OL                             [
)
TEXAS UTILITIES GENERATING                           )
50-446-OL
I COMPANY et al.                                   )
[
                                                                              )           (Application for an                                         ,
TEXAS UTILITIES GENERATING
                                                                                                                                                      ~
)
(Comanche Peak Steam Electric                       )               Operating License)
I COMPANY et al.
Station       Units 1 and 2)                     )                                                                       ,
)
                                                                              )
)
(Application for an (Comanche Peak Steam Electric
)
Operating License)
~
Station Units 1 and 2)
)
)
i i
i i
CERTIFICATE OF SERVICE                                                                 :
CERTIFICATE OF SERVICE I, Thomas A. Schmutz, hereby certify that the foregoing Answers To Board's 14 Questions was served this 1st day of March
I, Thomas A. Schmutz, hereby certify that the foregoing Answers To Board's 14 Questions was served this 1st day of March                                                             }
}
1988, by mailing copies thereof (unless otherwise indicated),                                                               j t
1988, by mailing copies thereof (unless otherwise indicated),
.l                       first class mail, postage prepaid tot i
j t
* Peter B. Bloch, Esquire                         *B. Paul Cotter, Jr., Esq.                                                 !
.l first class mail, postage prepaid tot i
Chairman                                           Chairman                                                                 i Atomic Safety and Licensing                         Atomic Safety and Licensing                                             {
* Peter B. Bloch, Esquire
Board                                               Board Panel                                                           !
*B.
U.S. Nuclear Regulatory                             U.S. Nuclear Regulatory                                                 ,
Paul Cotter, Jr., Esq.
l Commission                                         Commission Washington, D.C.               20555               Washington, D.C.                         20555                         [
i Chairman Chairman Atomic Safety and Licensing Atomic Safety and Licensing
* Alan S. Rosenthal, Esq.                             Assistant Director for Chairman                                               Inspection Programs                                                   !
{
Atomic Safety and Licensing                         Comanche Peak Project Division                                           i Appeal Panel                                     U.S. Nuclear Regulatory U.S. Nuclear Regulatory                               Commission                                                           f Commission                                       P.O. Box 1029                                                           ;
Board Board Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory l
Washington, D.C.                 20555               Granbury, TX         76048                                             l l
Commission Commission Washington, D.C.
1/   Asterisk indicates service by hand or overnight courier.                                                               l i
20555 Washington, D.C.
20555
[
* Alan S. Rosenthal, Esq.
Assistant Director for Chairman Inspection Programs Atomic Safety and Licensing Comanche Peak Project Division i
Appeal Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission f
Commission P.O. Box 1029 Washington, D.C.
20555 Granbury, TX 76048 l
l 1/
Asterisk indicates service by hand or overnight courier.
l i
r
r
                                                                                                                                                    ,i
,i


. s 2-
s 2-
  *Juanita Ellis                       Robert D. Martin President, Case                     Regional Administrator, 1426 South Polk Street                 Region IV Dallas, TX 75224                     U.S. Nuclear Regulatory Commission William R. Burchette, Esquire       611 Ryan Plaza Drive Heron, Burchette, Ruckert,           Suite 1000
*Juanita Ellis Robert D. Martin President, Case Regional Administrator, 1426 South Polk Street Region IV Dallas, TX 75224 U.S. Nuclear Regulatory Commission William R.
      & Rothwell                       Arlington, Texas 76011 Suite 700 1025 Thomas Jefferson St., N.W.   *Dr. Kenneth A. McCollom Washington, D.C. 20007           Administrative Judge 1107 West Knapp
Burchette, Esquire 611 Ryan Plaza Drive Heron, Burchette, Ruckert, Suite 1000
* William L. Clements                 Stillwater, Oklahoma     74075 Docketing & Service Branch U.S. Nuclear Regulatory             Joseph Gallo, Esquire Commission                       Hopkins & Sutter Washington, D.C. 20555           Suite 1250 1050 Connecticut Avenue, N.W.
& Rothwell Arlington, Texas 76011 Suite 700 1025 Thomas Jefferson St.,
* Billie Pirner Garde                 Washington, D.C. 20036 Government Accountability Project                         *Janice E. Moore, Esquire Midwest Office                       Office of the General Counsel 104 E. Wisconsin Avenue - B         U.S. Nuclear Regulatory Appleton, WI     54911-4897             Commission Washington, D.C. 20555 Renea Hicks, Esquire Assistant Attorney General
N.W.
* Anthony Roisman, Esquire Environmental Protection             1401 New York Avenue,   N.W.
*Dr. Kenneth A. McCollom Washington, D.C.
Division                         Suite 600 Capitol Station                     Washington, D.C. 20005 P.O. Box 12548 Austin, Texas   78701             Lanny A. Sinkin Christic Institute Robert A. Jablon, Esquire           1324 North Capitol Street Spiegel & McDiarmid                 Washington, D.C. 20002 1350 New York Avenue,   N.W.
20007 Administrative Judge 1107 West Knapp
Washington, D.C. 20005-4798       Nancy Williams CYGNA Paergy Services, Inc.
* William L. Clements Stillwater, Oklahoma 74075 Docketing & Service Branch U.S. Nuclear Regulatory Joseph Gallo, Esquire Commission Hopkins & Sutter Washington, D.C.
* Elizabeth B. Johnson               2121 N. California Blvd.
20555 Suite 1250 1050 Connecticut Avenue, N.W.
Oak Ridge National Laboratory       Suite 390 P.O. Box X Building 3500           Walnut Creek, CA     94596 Oak Ridge, Tennessee 37830 David R. Pigott
* Billie Pirner Garde Washington, D.C.
  *Dr. Walter H. Jordan                 Orrick, Herrington & Sutcliffe 881 West outer Drive               600 Montgomery Street Oak Ridge, Tennessee     37830       San Francisco, CA   94111
20036 Government Accountability Project
*Janice E. Moore, Esquire Midwest Office Office of the General Counsel 104 E. Wisconsin Avenue - B U.S. Nuclear Regulatory Appleton, WI 54911-4897 Commission Washington, D.C.
20555 Renea Hicks, Esquire Assistant Attorney General
* Anthony Roisman, Esquire Environmental Protection 1401 New York Avenue, N.W.
Division Suite 600 Capitol Station Washington, D.C.
20005 P.O. Box 12548 Austin, Texas 78701 Lanny A.
Sinkin Christic Institute Robert A.
Jablon, Esquire 1324 North Capitol Street Spiegel & McDiarmid Washington, D.C.
20002 1350 New York Avenue, N.W.
Washington, D.C.
20005-4798 Nancy Williams CYGNA Paergy Services, Inc.
* Elizabeth B. Johnson 2121 N. California Blvd.
Oak Ridge National Laboratory Suite 390 P.O.
Box X Building 3500 Walnut Creek, CA 94596 Oak Ridge, Tennessee 37830 David R.
Pigott
*Dr. Walter H.
Jordan Orrick, Herrington & Sutcliffe 881 West outer Drive 600 Montgomery Street Oak Ridge, Tennessee 37830 San Francisco, CA 94111


r 0                     9                                                                     i i
r 0
I
9 i
* Robert A. Wooldridge, Esquire                                               i Worsham, Forsythe, Sampels                                             ;
" i I
                          & Wooldridge                                                         ,
* Robert A. Wooldridge, Esquire i
2001 Bryan Tower, Suite 3200                                           :
Worsham, Forsythe, Sampels
Dallas, Texas 75201                                                   !
& Wooldridge 2001 Bryan Tower, Suite 3200 Dallas, Texas 75201
                *W. G. Counsil Executive Vice President                                               i Texas Utilities Electric -                                             i General Division                                                     .
*W.
400 N. Olive, L.B. 81                                             ,
G. Counsil Executive Vice President i
Dallas, Texas 75201                                                   l N
Texas Utilities Electric -
Thomas A. Schmutz   / -
i General Division 400 N. Olive, L.B.
Dated: March 1, 1988                                                 i I
81 Dallas, Texas 75201 l
i t
N Thomas A. Schmutz
I r
/
                                                    ^}}
Dated:
March 1, 1988 i
I i
t I
r
^}}

Latest revision as of 13:14, 11 December 2024

Answers to Board 14 Questions (Memo;Proposed Memo of 860414) Re Action Plan Results Rept Vii.C.* Responses Provided to Action Plan Vii.C Re Const Reinsp/Documentation Review Plan. Supporting Documentation & Certificate of Svc Encl
ML20147D732
Person / Time
Site: Comanche Peak  
Issue date: 03/01/1988
From: Hansel J, Schauf J
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
References
CON-#188-5728 OL, NUDOCS 8803040120
Download: ML20147D732 (160)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _

hI V o.

00LKETED UWC Filed:

March g 1RM -)

P343 UNITED STATES OF AMERICA 0FFICE GF shsriAs v NUCLEAR REGULATORY COMMISSION 00CKEigr E RvlCf, before the ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of

)

Docket Nos. 50-445-OL

)

50-446-OL TEXAS UTILITIES GENERATING

)

COMPANY et al.

)

)

(Application for an (Comanche Peak Steam Electric

)

Operating License)

Station, Units 1 and 2)

)

}

=

ANSWERS TO BOARD'S 14 QUESTIONS (Memo; Proposed Memo of April 14, 1986)

Regarding Action Plan Results Report VII.c In accordance with the Board's Memorandum; Proposed Memo-randum and Order of April 14, 1986, the Applicants submit the answers of the Comanche Peak Response Team ("CPRT") to the 14 questions posed by the Board, with respect to the Results Report published by the CPRT in respect of CPRT Action Plan VII.c, "Construction Reinspection / Documentation Review Plan."

Opening Request:

Produce copies of any CPRT-generated checklists that were used during the conduct of the action plan.

Re.:ponse:

Multiple checklists in the form of Quality Instructions were developed and used during implementation of Issue-specific Action Plan (ISAP) VII.c.

8803040120 880301 d)

PDR ADOCK 05000445 LO '

G PDR 3 7

/

i The checklists from these instructions delineating the inspec-tion requirements are attached.

Question No. 1:

1.

Describe the problem areas addressed in the report.

Prior to undertaking to address those areas through sampling, what did Applicants do to define the problem areas further?

How did it believe the problems arose?

What did it discover about the QA/QC documentation for those areas?

How extensive did it believe the problems were?

ResDonse:

This ISAP was self-initiated to give TU Electric management assurance of the safety of the Comanche Peak Steam Electric Sta-tion (CPSES), regardless of the extent to which issues might have been raised by external sources.

ISAP VII.c included a reinspection / documentation review of the safety-related products of construction work activities performed at CPSES that were accepted by Quality Control (QC).

This review was intended to provide additional confidence ensuring that the investigative efforts of the CPRT program were of sufficient depth and breadth to permit conclusive statements regarding the adequacy of CPSES quality of construction to be extended to the balance of the A-E derign scope for the safety-related portions of the plant.

The visual reinspection and documentation review effort also pro-duced data useful for the evaluations performed under other action plans and extended into areas that were specifically identified by external sources.

This self-initiated action plan was developed and imple-mented primarily because it represented the most direct, reli-able, and achievable method of producing additional confidence 2

that previously-unidentified concerns related to the quality of construction of the hardware ut CPSES vould be identified, evaluated, and resolved.

It also provided additional confidence that any adverse impact on installed hardware that might have resulted from potentially inadequate qualification of historical QC inspectors would be identified and addressed.

ISAP VII.c consisted of a sample reinspection of accessible QCoaccepted safety-related construction work products, supple-mented by a review of related quality documentation when inspec-tion attributes were generically not recreatable.

It covered all Unit 1, Unit 2, and common areas, including those not spe-cifically covered by other CPRT ISAPs.

Question No. 2:

2.

Provide any procedures or other internal documents that are necessary to understand how the checklists should be inter-preted or applied.

Response

Following is a list of quality instructions that were pre-pared to provide the necessary interpretations and understand-ings for each checklist:

QI-008 Reinspection of Conduit /I-E-COUT QI-010 Reinspection of Electrical Equipment /I-E-EEIN QI-011 Documentation Review of Electrical Equipment /

R-E-EEIN QI-012 Reinspection of Instrumentation Equipment /I-E-ININ QI-013 Documentation Review for Instronentation Equipment /

R-S-ININ a

QI-014 Reinspection of Cables /I-E-CABL QI-015 Documentation Review of Cables /R-E-CABL QI-016 Reinspection of Cable Trays /I-E-CATY QI-017 Documentation Review of Cable Tray /R-E-CATY QI-019 Reinspection of Small Bore Pipe Supports /I-S-SBPS QI-020 Documentation Review of Small Bore Pipe Supports /

R-S-SBPS QI-021 Reinspection of Piping System Bolted Joint /

Materials /I-M-PBOM QI-022 Documentation Review of Piping System Bolted Joints / Material /R-M-PBOM QI-023 Reinspection of KVAC '4quipment Installation /

I-M-HVIN QI-025 Reinspection of Large Bore Piping Configuration /

I-M-LBCO QI-026 Reinspection of Small Bore Piping Configuration /

I-M-SBCO QI-027 Reinspection of Large Bore Pipe Supports - Rigid /

I-S-LBSR QI-028 Documentation Review of Large Bore Pipe Supports -

Rigid /R-S-LBSR QI-029 Reinspection of Iarge Bore Lipe Supports -

Non-rigid /I-S-LBSN QI-030 Documentation Review of Large. Bore Pipe Supports -

Non-rigid /R-S-LBSN r

1

-4

e o

QI-031 Reinspection of Containment Liner and Tank Stain-less Steel Liner /I-S-LINR QI-032 Documentation Review of Containment Liner and Tank Stainless Steel Liners /R-S-LINR QI-033 Reinspection of Fuel Building Fuel Pool Liners /

I-S-FPLR QI-034 Documentation Review of Fuel Building Fuel Pool Liners /R-S-FPLR QI-035 Reinspection of HVAC Duct Supports /I-S-HVDS QI-036 Documentation Review of HVAC Duct Supports /R-S-HVDS QI-039 Reinspection of HVAC Ducts and Plenums /I-M-DUPL QI-040 Documentation Review of HVAC Ducts and Plenums /

R-M-DUPL QI-041 Reinspection of Field Fabricated Tanks /I-M-FFTA QI-042 Documentation Review of Field Fabricated Tanks /

R-M-FFTA QI-043 Reinspection of Concrete Placement /I-S-CONC QI-044 Documentation Review of Concrete Placements /

R-S-CONC QI-045 Reinspection of Structural Steel /I-S-STEL QI-046 Documentation Review of Structural Steel /R-S-STEL QI-047 Reinspection of Small Sore Pipe Welds / Materials /

I-M-SBWM QI-048 Documentation Review of Tubing Welds / Material /

)

R-M-TUW'.

i. -

o QI-049 Reinspection of Large Bere Pipe Welds / Materials /

I-M-LBWM QI-050 Reinspection of Pipe Welds / Material /I-M-PIWM QI-051 Reinspection of Pipe Whip Restraints /I-S-PWRE QI-052 Documentation Review of Pipe Whip Restraints /

R-S-PWRE QI-053 Reinspection of Category I Conduit Supports /

I-S-COSP QI-054 Documentation Review of Category I Conduit Supports /R-S-COSP QI-055 Reinspection of Instrument Pipe / Tube Supports /

I-S-INSP QI-056 Documentation Deview of Instrument Pipe / Tubing Supports /R-S-INSP QI-057 Documentation Review of Fill and Backfill Placement /R-S-FILL QI-059 Reinspection of Mechanical Equipment Installation /

I-M-ME1H QI-066 Reinspection of Equipment Supports /I-S-EQSP QI-067 Documentation Review of Equipment Supports /R-S-EQSP QI-068 Documentation Review of Cement Grout /R-S-GRTC QI-069 Documentation Review of Epoxy Grout /R-S-GRTE QI-070 Rainspection of Tubing Welds Material /I-M-TUWM QI-071 Reinspection of Lighting cable /I-E-LITG QI-072 Documentation Review of Lighting Cable,R-E-LITG

=(

=

QI-073 Documentation Review of Pipe Welds / Material /

R-M-PIWM QI-074 Documentation Review of NIS Cable Terminations /

R-E-NIST QI-075 Reinspection of Piping Bends Fabrication /I-M-PBFA Please note that some numbers in sequence appear to ba omitted.

These numbers were assigned to quality instructions generated for other ISAPs or investigations.

Question No. 3:

3.

Explain any deviation of checklists from the inspection report documents initially used in inspecting the same attributes.

Response

For each checklist, attributes that have safety signifi-cance were determined according to the following definition:

A safety-significant attribute encompasses one or more characteristics of a component or construction activity that, if not in accordance with applicable design documents, codes, and standards, could impair the ability of the component / activity to perform its safety-related function under design loading conditions.

To determine safety-significant attributes, the QA/QC Review Team reviewed relevant design information, including design drawings, specifications, and other required documents (such as codes and standards) incorporated by reference into the specifications.

At the time the CPRT checklists were formu-lated, no comparison was made between the CPRT checklists and the inspection report documents initially used in inspecting the same attributes.

However, if a finding was identified by tl.e CPRT as the result of a reinspection or documentation review conducted under ISAP VII.c, the subsequent root cause evaluation process ofter, examined the original inspection documentation and underlying inspection procedure in pursuit of root cause.

Question No. 4:

4.

Explain the extent to which the checklicts contain fewer attributes than are required for conforman:e to codes to which Applicants are committed to conform.

Response

The appropriate design documents (FSAR, specifications, etc.) conta'ined the criteria to meet code requirements.

These documents were reviewed to determine attributes that have safety significance; i.e.,

attributes that have a potential to impair a component's or system's ability to perform its safety-related function under design loading conditions.

Attributes that were (1) excluded for being non-safety-significant, (2) included in other action plans, or (3) included in documented corrective action programs from the reinspection /

documentation checklists were documented and retained in the VII.c file.

Question No. 5:

5.

(Answer Question 5 only if the answer to Question 4 is that the checklists do contain fewer attributes.)

Explain the engineering basis, if any, for believi.ng that the safety margin for components (and the plant) has not been degraded by using checklists that contain fewer attributes than are required for conformance to codes.

' t

Response

Plearc see the response to question 4.

Question No. 6:

6.

Set forth any changes in checklists while they were in use, including the dates of the changes.

Response

All items in the random sample from each construction work category were inspected to the final issue of each checklist.

The working files contain a history of all checklist revisions, including reasons for changes.

Question No. 7:

7.

Set forth the duration of training in the use of checklists end a summary of the content of that training, including tield training or other practical training.

If the train-ing has changed or retraining occurred, explain the reason for the changes or retraining and set forth changes in duration or content.

Response

Before Quality Instructions and related checklists were issued, they were reviewed in detail with the inspection personnel assigned to the VII.c reinspection program.

Before inspections began, each attribute's inspection instruction was reviewed to determine how clear and easily understood it and the accept / reject criteria were.

During use, checklists were sometimes revised for the purpose of further clarifying the particular inspection activity.

Appropriate training was given for each change.

Thus, training was an ongoing activity while inspection was in progress.

All training was documented; the VII.c files contain this documentation.

Question Ne. 8:

8.

Provide any information in Applicants' possession concern-ing the accuracy of use of the checklists (or the inter-observer reliability in using the checklists).

Were there any time periods in which checklists were used with questionable training or QA/QC supervision?

If applicable, are problems of inter-observer reliability addressed statistically?

Response

The CPRT QOC Group instituted an overview program of surveillance of the work performed by inspectors.

A portion of each inspector's work was reinspected by another inspector, similarly trained and instructed, using the same checklist, training, and instruction.

This resulted in reliability data for each inspector that was reviewed weekly by the QA/QC Review Team Leader.

Any significant change in the inspector's performance was noted, and corrective action was taken.

Additionally, please see the response to question 11.

Question No. 9:

9.

Summarize all audits or supervisory reviews (including reviews by employees or consultants) of training or of use of the checklists.

Provide the factual basis for believing that the audit and review activity was adequate and that each concern of the audit and review teams has been resolved in a way that is consistent with the validity of conclusions.

Response

All QA/QC Review Team activities have been included in audits conducted to date.

Responses and corrective actions were subsequently verified during follow-up audits.

Audits of the training of QA/QC Review Team personnel and audits of the procedural checklists they used were performed directly or indirectly.

Following is a tabulation of those audits to date for ISAP VII.c:

Audit S/N Method ISAP Procedure 86-06 indirect VII.c CPP-003, QAP-28 86-03 direct VII.c CPP-003 86-02 direct VII.c CPP-003 85-03 direct VII.c CPP-003 85-01 direct VII.c CPP-003 The QA surveillance program continually verified QA/QC Review Team compliance concurrent with specific activities and supp).ied current information to the RTL and key QA/QC personnel regarding:

- performance in accordance with program requirements and procedures

- program activities that required correction Formal corrective actions were tracked and followed to closure.

Question No. 10:

10.

Report any instances in which draft reports were modified in an important substantive way as the result of management action.

Be sure to explain any change that was objected to (including by an employee, supervisor, or consultant) in writing or in a meeting in which at least one supervisory or management official or NRC employee was present.

Explain what the earlier drafts said and why they were modified.

Explain how dissenting views were resolved. 1

Response

No substantive modification was made to Results Report drafts as a result of management action.

Question No. 11:

11.

Set forth any unexpected difficulties that were encountered in completing the work of each task force and that would be helpful to the Board in understanding the process by which conclusions were reached.

How were each of these un-expected difficulties resolved?

Response

On January 7, 1986, the NRC identified a concern regarding the differences in results obtained from hardware inspections performed by the CPRT and surveillance inspections perfr,raci by the NRC.

These differences were characterized by NRC personnel as occurring at a rather high rate.

Based on this information, the SRT temporarily suspended the CPRT hardware inspection in order to determine the extent and causes of the apparent inspec-tion errors and to institute any appropriate corrective action.

A five-man subcommittee was appointed by the SRT chairman to conduct this investigation.

The results of the investigation revealed that some NRC concerns wire valid and that the consequent error rate differ-ence was approximately 1%.

While this rate is not unacceptably high, the SRT investi.gation did identify opportunities to improve the then-current inspection efforts.

Specific recommendations for program enhancement were made as follows:

t ;

1.

Complete review of QIs to eliminate omicsiens and sources of possible interpretive errors.

2.

Conduct training and walkdowns on QIs for reinspection personnel and others as necessary.

3.

Emphasize to all personnel that the highest priority is completeness and accuracy on the inspections.

Schedule considerations, while important, are secondary to work quality.

4.

The SRT subcommittee should conduct a debriefing ses-sion for Qoc personnel who participated in the investi-gation and include other interested parties as appropriate.

These recommendations were implemented along with several others described in corrective Action Request (CAR) CP-016.

Included in the CAR action was a reinspection of hardware popu-lations with a high inspection error rate and the recommitment to perform overview inspections.

This overview program described previously in the response to question 8 was just starting when the VII.c inspections were halted.

CAR CP-016 confirmed the intent to track the inspection error rates of individual inspectors and discipline groups and to take timely corrective action as necessary.

With implementation of the cor-rective action, the inspections for VII.c were resumed in late January 1986.

The NRC formally transmitted their findings in inspection report 50-445/86-01; 50-446/86-01, which identified i

two CPRT deviations related to the failure to comply with

. l

approved instructions in performance of reinspections and in-adequate engineering review during preparation of an inspection checklist.

TU Electric responded, describing the corrective action taken.

No further unexpected difficulties were encoun-tered in this area.

Another area of difficulty was encountered when the NRC expressed some concern regarding safety significance evalua-tions.

On September 1, 1987, TU Electric received NRC inspec-tion report 50-445/87-04; 50-446/87-04.

The inspection examined CPRT activity related to the evaluation of inspection and docu-mentation review deviations for safety significance.

Certain weaknesses, including some of potential generic concern, were identified with respect to the safety significance evaluation (SSE) process and results.

Areas of potential generic concern included:

(1) determinations that deviations based on lack of required documentation were not safety-uignificant, (2) improper or inadequate checking of calculations, (3) no consideration of manufacturer criteria and recommendetions in performing SSEs, and (4) apparent lack of consideration of the need to update or rectify certified stress /

design reports.

The CPRT undertook two safety significance evaluation review programs.

The first program, "SSE Continuing Review Program," was performed to (1) provide assurance that the SSEs accurately analyzed the deviating plant conditions and identi-fled construction deficiencies or input to Results Reports for trend analysis and (2) ensure that the SSEs conformed to the Safety Significance Evaluation Group procedural requirements, such as problem description, completeness, and justification of L

conclusions.

This program developed a screening process to determine which SSEs were to be subjected te a more detailed review.

The objective of the screen was to focus the review on those SSEs that could have led to the failure to identify all construction deficiencies or adverse trends.

The second program, "VII.c Technical Review Program," was conducted to ensure that the trend analysis process of the VII.c program, as implemented, did not fail to identify any adverse or unclassified trends.

To accomplish this task, a technical review of the SSEs, as well as the trend analyses conducted for VII.c, was performed.

The Technical Review Program included all SSEs and associated calculations, with tne exception of (1) SSEs for deviations that are already covered under CPRT recommenda-tions for corrective action, (2) eleviations that by their nature cannot be safety-significant, and (3) documentation review deviations.

These two review programs resulted in a recommendation that a number of SSEs be revised, primarily for clarification or completeness.

These revisions were completed by December 17, 1907.

As of January 31, 1988, responses have been submitted to the NRC for all open items on NRC inspection report 50-445/87-04; 50-446/87-04.

4 Question No. 12:

12.

Explain any ambiguities or open items in the Results Repcet.

Response

No ambiguities exist in the ISAP VII.c Results Report.

Several items that could not be addressed in the individual appendices (for example, cross-population generic implications) were referred to the Collective Evaluation Report for resolution.

Question No. 13:

I 13.

Explain the extent to which there are actual or apparent conflicts of interest, including whether a worker or super-visor was reviewing or evaluating his own work or supervis-ing any aspect of the review or evaluation of his own work or the work of those he previously supervised.

Response

The CPRT instituted an objectivity evaluation procedure that required personnel involved in CPRT activities carefully to examine possible areas of conflict and to signify whether a con-flict existed.

No worker or supervisor has reviewed, evaluated, or supervised any aspect of the review or evaluation of his own work.

No conflicts of interest exist.

Question No. 14:

14.

Examine the report to see that it adequately discloses the thinking and analysis used.

If the language is ambiguous or the discussion gives rise to obvious questions, resolve the ambiguities and anticipate and resolve the questions.

Response

We believe that no ambiguities exist and that no obvious questions are unanswered. -

i Respectfully submitted,

()

/

l Joh/j M. Schauf Action Flan VII.c Isd0e Coordinator to 3hn L. Hansel

\\

eview Team Leader The CPRT Senior Review Team has reviewed the foregoing responses and concurs in them.

I b

W b

. l

..9 QI-008 Rev. 4 Page 1 of 2 CCPJJIG E FE M elsF048r T*Att CEECILtST ror m flos DESC T R171 car 10s FEC 80.

Conduit I-E-CM'T IAEI I OI 1 hRELESPECTI0a O v=tf i O noctmidrit:0= izvtiv 0 watt EQUImDI MARK / TAG #0.

O co'+ea etuncino.

A ACCIFT BAJECT BATE

1) $1:e 6 Material a b
).!dentificaties a b

e

3) Origin and Destinat,1on
4) Fittines a

b e

d

$) Espansion Fittings

6) Benda
7) 1.assth and M 1 Potate,,

FADa&ED ST:

M IDT D tt:

SISCIPttut Oct.

Daft LEAD 015CIPLlut peCE.

DAtil EsarhIm bis AFF30VE ST:

& F3 F h W R CATE LEAD INbPECTOR CATE CFF-007.lA. Revtston 0

Attach:ent 6.9 QI-008 Rev. 4 Ia g s 2E2 COWCME PEAR RESPOW5E TEAM CEICR2.!ST PCP N TIOD DESC f n1FICAT10p PKG.40.

Conduit 1 5-CtN'T PACE,L CT 1 vn:T!cAtt0N ACCI?!

R.E.'ECT DATE I

8) Tiesible Conduit a

~

b c

d I

i

9) Cable Trey laterface a

b f

10) Clearance a

b

11) Fire Steps and Seals a

b i

i e

i d

) Separation at a?

b:

b,"

t s;

c5 t

er

13) Junction Bones b

I t

t

?

2. 's

.a, s

2

Attach ent 6.1 01-010 Re..

3 Page 1 of 1 REINSPECTION CRECK11ST ELECTRICAL EQUIPMENT CO.w31 PDJ. Ul?0NSI t!M C31CC I$T P:P'.u ;;;n Otis.

vt1;T;c4 ;cW PKG 30.

c.ie n tCa t s tr e t t-r-stix Pact t Or _L QGA;.17Y 1313bO!!CN Q U DIIEEIIO" EN I

Qt-010 L4L;?.~.Di Wi:A0 #0.

O ooc xc<: Art:= intre at: 2 COMMcN vit1FICAT:Ch A

ACCI7T RMICT DATI v

1 rhystest A

tdeettfteatten 7

2 Assembly or g n ton

\\h/

a. tecetten
b. Ottentation 4 tamate i N N l

PRI?AA D ST:

Af t10%C ST ttSC:Pt wt 1301.

CAtt LEM CllCl?tiNI EX R. ~

OAit unrE..R 5Y; AJPLOV D si iniLmt can LIA: INS*0t Y

cr-x u. no.w o

Attach ent 6.1 QI-0!!

Rev. I 1

Page 1 of 2 CRECKLIST

)

i CCMAJ8C11 PEAK I.E.SPCult TIM CEECC.1ST PQFMICM DEsc tERITICAT:CM FEG No.

Electricot Yquipeest 1.E.t1Is Pact t op W 11 D1TECCTICM QI-Cll OiruSr:CTton a est: i EUIrr mi MAM/;AG 30.

@pog;MIFTATIONLITIEW pt 2

[ C3ecW M IFICATIce

(

N

\\A ACCIFT BUICT DATI

1. Assembly Medif teettee asent Number and lacpector cattifteattee ay n

.. Asse.bly or Modificaties b

h/

b. laspector Certifiesttee

(

!. Assembly Modifiest Document Number and Inspector Certif trat tee -

N T

V

s. Aseeably i

Modifies tic

b. Inspector certifteattee I

f i

1. Assembly. Modificaties Cocueest Number j

and taspector l

Certificatten

\\

s. Assembly or Medif teetion
b. laspector certifteattee MM IT 8 AFFLOT C St; l

1 O W IFL WI EBC1.

Daft

[M btsc:t;;NE Ext.

Da!I W r m as BTi A F10 m 512 3* N 7F LEC D$PtC On ga;g m

l CPF 4 ?.lA. tenet,a 0

..1 QI-011 Rev. 1 CHECKLIST (Cont'd)

COMANCat PEAK ttSPOWlt TEAM CB CK1,1ST PDFllLATION DESC vERIFICAT105 FEC #0.

Electriest Equipeest 1-I-Etty FACE _ 0F _

V ERIFICATION RMS ACCEPT blJECT DATE

/

Document pueber

1. Assembly. Modificettes t

tes

s. Assembly or Modifteattee A

A

b. !aspector Certificettee

/"A

(/h i

Y Document Dueber

1. Assembly. Modification and Inspector Certifteattee

(

V

a. Assembly or Modificattee h
b. Inspector 3

Certifteettee

\\ N

1. W eebly Document pueber Cettificatt 6

.. usemb17 er Modif teattee

b. laspector Certifiesttee
1. Assembly. Modift attee Document Number sad laspector Certifleaties

.. u.embly.*

Modifteattes

b. !aspector Certifteettee j

i CFt-007.13. Revteteu Q 2

_,,,.1 QI-012 Rev. 1 Page 1 of 1 COMANCHE PE.G. R1570NSE TT.AM Cu CI'I$T-FCPUI.A!!CN CL5C VEM TICA;1on tro 3o, INSUL' MENTATION EQUIFKENT I-E-IKIN FACI 1 CT d QUALITY LN$3UCT10N

@ U US?ECTION O cwt: 1 QI-012 LQCl?.".CC P.MA/IAC NO.

DOCW DfTATICH HTIIV UNIT 2 Q C0W.05 TERITICATICH A

O l11JICT DATI ACCIFT

1. Instrusentation Piping /

Tubing and Components 1.1 Material Identification 1.2 Fiping/ Tubing

\\

Site and Marking

)

a.

A

\\

b.

A 1.3 Routten

\\ NW\\

1.4 slope

\\1

\\V 1.$ Air Cap 1.6 Separation A

\\\\Y 1.7 stes lends,,,.

.V

~>

~ 1.8 Ties Rose

/

M" Installation v

\\

e

2. Insttv3ents 2.1 Identification 2.2 Location I

2.3 Installation 2.4 Separation

2. S Carase "PLEIAID 31:

MFROVD BT:

Disci?t:NL ENOR.

DATE LEAD DISCIFLINE INCR.

- DAII D5?LG R AY:

MFLOVD 11:

iniina DATE LEAD INS?t: R CATE C?? 007.tA, levssion 0

Attacheer.t 6.1 QI-013 Rev. 5 Page 1 of 1 COMANC31 P!M RESPONSE TLui CIEC3::.IST F0P R Il0N DESC VEF.1 FICA 110W FKG NO.

Instrumentation Equipsent 1.g.ININ.

FACILOF d QUALITT LNST1UCT10N qt.og3 0iEtN5Frctto" O cNt! t EQUl?.".EN*.uRJ/1AC NO.

@ DOCU. E ATION R.E71EV cNIT 2 O ccie<cN VILITICA!!CN s

AU I

ACCIFT LIJECT DATI A

1. Inspection Report and Inspector Certification
2. Instrvsentation Tubing Manufacturing Record Sheet and Inspector

[\\

Certification

3. Tube lender Qualification Fors A \\

3.1 Z Ovality If Mete Than 81 fi

's y

p8 FR.EFAR.D 31:

AFFl.7VD ST:

D15 !PLINE ESOR.

DATE L

DISCIPLINI EN01.

DATE Ih5FLGIR 51:

AFFECVD SY 8

35n;;;;g cA;E LLC INSFECTOR DATE C?F.007.LA. Levision 0

Attcchment 6.9 QI-014 Rev. 1 Page 1 of 2 CDMANCdt FIAK RISPCN$1 TIAM C2tCn lst POP',.A;Ich OESC VERIF!CATICN PEG No.

CA3LES I*t-CABL PACI ' 0F d z

QUA1.in IN$71VCTION LILN$PtCTION WII l Q1-014 EQUIP.".Dit MAA/ T AC EO.

O oce;'xo':4: tea arv:S O at: 2 O corce" vtR1PICATICN ACCI77 RIJECT DATE

1) Site / Type / Color h

tc.

AW Xt A n

.e A

<m v

v

3) Spacing (Power Cables)

[ Y, ww

4) Slack s

/$3

\\[ V e

I l' --

V d

A T

5) Identification b
6) Routleg PRDAAD III Al?&CV C II:

0:50:Pt;N1 t%R.

A!!

LEAD !$;;?t:N1 I?01.

3A!!

IN5HGR 41; Al?tGVD 411

.>st!-..a

ATI

'IAD

?<I?!!*!%

DAII C?? C.!A. Revistan 0

,,9 QI-014 Rev. 1 CONANCHE PE!J ttSPCH$t TEAM CHECKL!ST POP N T10N DESC VttlTICATION FKG >0.

CABLES 1-t-CABL PACE 2 0F 2 VERIFICAT10N "NI ACCIFT REJECT DATE

7) Send Radius
8) Supports t

a b

c

9) Sepstation A

b X"/

10) Splices /tepstes b

/A

\\ 'I L \\T I V

e d

A '/

11) Terminations 4

b XX

\\V e

A ANN 7 4

(Cs X

?

e

\\h N fI

\\ V A )

f2

/_

)

% \\'

f3 LL' V

fa V

_T f5 d1 1 6 L /

ay R

h t

3 h

1

12) Tie Doe s a

b e

4 CFP-C07.nl Levasten 0 2

L_

Attechter.: 6.1 QI-015 Rev. 4 Page 1 of 2 CM.V;CXI FI.4 f.I57:531 TIM C3IO:".:$7 Nf.-a;;;.s ;I5; it?.;;;;A;;cs tk;..;.

cutis R-1-CML PA;I ! T 1 G.'A.'N 151:A.;;;;N u.ets O ut::52::= =

0 aut in;2..I;.!.WAi:A;.%.

@ 000W.DrTA!; :t RI?!!v

] w;; 2 0 ::w.::

vi?.:T;CA7;;N

{

^

I AO:27; l R.I.*I;;

DATIl ID OII I

l I

1.0 Innecter a

^

Certt!!catten b

i t

I

//

e

\\\\^

d X'/

e

\\ \\/ >

f

(\\

\\/

\\\\

2.1 Racevay Astert-e

'\\\\TI V

at e fer tvil b

I e

i e X'/

i 2.: Full Tensten a

/ \\\\\\ \\

b i

i c

8 8

\\ENW\\

d A h \\V e

A

\\W f

\\\\\\

\\/

\\ \\N, ' \\

2.3 C4tle Lutricatt N

77D AAD 3T:

MP1;bC SI:

~

0150:?'.;N! Ih;R.

DA;1

'. ! c O ! 5 0 : ?'.. :.1 1:.01.

DA!!

iMils!L; lia M!J.;' R 414 t

si W ;a

C

' N Bl?!;" t DA!!

C??-X I. A. Rev'.st.:n 0

Attoch ent 6.1 QI-015 Rev. 4 CCr# CHI PEAK t!$F055t TLt.M CPICKLIST PCP AATICh CE5C vtR111 CAT LS PAC 50.

CABLIS R E-CA3L PACI L CT 1

% ERIFIC A*lCN L

I ACCEPT P. EJECT DATE Attribute not detu?teted en origital 7"CC0 inspectices.

Ceretic IR issued.

2.4 teleted 2.5 :efects/catage l

2.6 Catie Testing a

\\.x >

2.7 Catie Jattet/

V Itsulatice Renval 2.8 te:ted a

cerrectices b

A

\\\\

.\\l\\

\\)

e

/MX\\

2.9 spitees/

g 3

1 m iesis 2.10 Feat shrinkatte g

Tubits of Kits qv 2.11 tapairs 2.12 Frefabricated a Cables b

e t

CPP-CC7.11, Sev1stan 0 2

..5 QI-016 Rev. 3 Page 1 of 2 CHECKLIST CONA:lC:lt P!AT. RESPON5! TEAM CHECILIST Fvf Qi10h CtX dt?.1FICaf;cs Pr4 30.

CAltt T u Y t*t-CATT-FACE 1 0F 2 QUALITY IN5:1WCTION gg gg x Lt1NSFECTION Q UNIT t (QLI?:st.%I rWLAi!AC bO.

O ooc w crt^tre" alvttv 0 entt

. O c:xxe" vtR1FICAT10N A D II

  • I ACCIFT LIJECT Daft

$ 1 Cable Tray identification and b

3.1.7

' V>

>q^

$ t.3 T N V

5.2 Camage

$.2

+

=

{

$.3 Configuretten

$.3.1 bD\\

s.3.2 5.3.3 b

5.3.4 5.3.3 s.,.s 3.4 Clearante

$.$ Tire Steps FLIFAAD ST:

AFFLQvta ST 015c!PLtht t>01.

CAtt LEA: DISC PLI.%E tisCR.

CATE IM5FtGILD BY AFFA0n D 81:

INsu m K CA!;

LEAD thSPICTOR SA!!

CPFaWli.lA. Revistan 0

..5 QI-016 Rev. 3 CHECK 11ST (Cont'd)

CONANCHE PEAK S!$PON$E TEA,M CHECKLIST e

POPLLAi!QN DESC

%1Rif1 CAT [VM FLC h0.

C All.E TRAT l t-CATT-FACE L OF 1

%ER!TICATICN A

"I RN5 ACCEPT REJtCT DATE 5.6 Separation Critetta

$.7.1 Leestion b

5.7.2 Wald $1:e A

5.7.1 Weld tength (4

S.7.4 Fusion

/\\

$.7.5 Cratere d

5.7.6 Weld trefiles

$.7.7 Undercut x

vs:>A /

5.7.8 Percetty

.m

(

?.7.9 Overlap

$.7.10 Surface $1aa v

5.7.11 Weld Crache 5.7.12 Veldere ID tecord Symbol Veldere TD r

CPP-Q?.it. Sevtsten 0 I

2

Attach snt 6.1 QI-017 Rev. I Page 1 of 1 COMWilt P'u etsP%3t itM Cuttttist NFwVf Wa DL5s v LP & T 1011'W Pt #9 rehte Trans l'F fAtt FACE I Of 1 M ' 1k&t&wGt&Wu O esta$rtet*

O att i LQUIPMKAI MA8Asi w No.

@ 00CDDTAfl04 BCTitv O att 2 O c==

vi*titsAtrum SIEII ACC!PT etJfC CAtt I. Cable Tre? IR 8'4 8'

1. Tre? Cevee 18 8"8 I' ""*
3. Weldtes peterd Dee. he.

_ [

eerd Welder lft g,

V e.

D A

.,,,e O tte t PL t at test.

catt L t A.D O ll C l P 41'a t l's t.

blE DarlsT G 114 Ah t0*LD 4ti

. : an s ra,-

t; w ;alf'

's e s't c'9..wt ? t a, e s, s e i.e 4

1

,.1 COMANCHE PEAK RESPONSE TEAM QI.o}9 CHECKLIST Rev. 4 POPULATION DESC VERIFICATION PKG NO.

1 SMALL BORE PIPE SUPPORTS I-S-SBPS-PAGE 1 0F 6 l

QUALITT INSTRUCTION QI-019 X REINSPECTION O usIt t EQUIPMENT MARK / TAG NO.

DOCUMEKfATION RIVIEW UNIT 2

((] COMMON VERIPICATION A

KZMA##S ACCEPT REJECT DATE 1 Identification 2 Location and Orientation 3 Configuration e

A. Corponents B. Materials N/A N/A Document Review only' C. Installation D. Clearance E. brouting F. Baseplates G. Edge Distance N/A N/A Information Only 4 Bolting A. Engagement B. Surface Contact C. Richmond Insert D. Locking Devices E. U-Bolts F. Torque Wrench No.

Cal. Due PRIPAAED BT:

APPROVED BY:

DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5PELIED BY:

APPROVED BY:

IN5FILIVR DATE LEAD INSPECTOR DATE CPP-007.1A Revision 0

COMASCHE PEAK RES?ONSE TEAM QI-0M CHICKLIST I M tI M E NhE SUPPORT!

bbbbbhbW 2

6 PAGs. _ 0F VERITICATION A

BUTE ACCEPT REJECT DATE 5 Welding 5.1 Integral A. Location B. Size C. Profile D. Reinforcement E. Undercut F. Surface G. Offset H. Cracks Lack of Fusion

1. welders ID J. Rurt 5.2 Non-integral A. Location B. Site C. Profile D. Reinforcement E. Undercut F. Surface G. Offset H. Cracks, Lack of Fusion I. Welders ID N/A N/)

Document Reviev Only 6 Concrete Expansion Anchors A. Site B. Length

~

C. tabedsent D. Spacing E. Angularity F. Nut Engagement and Bearing G. Concrete Damage

..+va

.= 1

A i ;.s ;..,.. ; '.:

CC'). SCHE PIAK RES?OISE TEAM QI-019 CHECKLIST Rev. 4 NthhhE ['hE SUPPORTS N-[-NEE 3

6 PAG.c,_, OP VERIFICATION AIIE13UIE

'^A ACCEPT REJECT DATE 7 Component Support Catalog Items A. Snubber

1. Angularity
2. Jam Nut Torque
3. Parallelism
4. Pin-to-Pin Cold Setting
5. Bearing Spacers
6. *1hread Engagement
7. Safety Wire e
8. Eye Rod Threads
9. Eye Rod Thread Engageeent
10. Binding

/ Offset

11. Fasteners
12. Sperical Bearing B. Sway Struts
1. Hardware
2. Rear Bracket Orientation
3. Angularity 4.

Sperical BearinF

5. Eye Rod Threads
6. Eye Rod Thread Engagement
7. Eye Rod Jan Nut
8. Binding
9. Fasteners
10. Strut Pin (Vertical)
11. Bearing Spacers
12. Torg.of Load Stud
13. Parallelism

As ies h. ;.; '.

COMA.NCHE PEAK RESPONSE TEAM QI-019 CHECKLIST Rev. 4 SkEhIIkbNEPlhESUPPORTS kbbhkhhb 4

6 PAC.c,_, 0 T VERIFICATION AII IIUII REMARXS ACCEPT REJECT DATE l

7 Component Support Catalog Items (Cont'd)

C. Spring Can/

Constant Support

1. Size
2. Travel Stops
3. B e am Attachment
4. Rod
5. Threads
6. Thread e

Engagement

7. Angularity
8. Fasteners e

D. Low Friction Bearing Plates

1. Location
2. Plate type
3. Lubricant
4. Corners l
8. Modified Component Support Catalog Items A. NPSI Sway Struts
1. Adjustable Struts (

L)

Weld Site Profile Per 5.5.2 (A)

Reinforcement Per 5.5.2 (B)

Undercut Per 5.5.2 (C)

Surface of Weld Per 5.5.2 (D)

Offset Per 5.5.2 (E)

Cracks, Lack of Fusion Per 5.5.2 (F)

A;; ch e ; 5.1 COMASCHE PEAK RES?ONSE TEAM QI-019 CHECKLIST Rev. 4 SNbh0MNb SUPPORTS gjf]gjgN G

0.

5 6

pac.c __ 07 VERITICATION ATTRISCTE REMARKS ACCEPT REJECT DATE

8. Modified Component Support Catalog Items (Cont'd)
2. Fixed Sway St ruts (ii)

Weld Site Profile Per 5.5.2 (A)

Reinforcement Per 5.5.2 (B)

Undercut Per 5.5.2 (C)

Surrace of Weld Per 5.5.2 (D)

Offset Per 5.5.2 (E)

Cracks, Lack of Fusion Per 5.5.2 (F) e B. ITT Grinnell Sway St ruts Weld Size Profile Per 5.5.2 (A)

Reinforcement Per 5.5.2 (B)

Undercut Per 5.5.2 (C)

Surface of Weld Per 5.5.2 (D) t offset Per 5.5.2 (E)

Cracks, Lack of Tusion Per 5.5.2 (F)

C. Snubber Transition Kits Weld Site Profile Per 5.5.2 (A)

Reinforcement Per 5.5.2 (B)

Undercut Per 5.5.2 (C)

Surface of Weld Per 5.$.2 (D)

Offset Per 5.5.2 (E)

Cracks, Lack of Tusion Per 5.5.2 (F) c 1

3........

3

A i i. d....... ; '.

CCMA.NCHE PEAX RES?ONSE TEAM QI-019 CHICKLIS7 Rev. 4 kkkt kbNE P$hE SUPPORTS fkbhkkhb c __6 6

PAG.

0F VERITICATION AIIEIIUII REMARKS ACCEP*

REJECT DATE

  • . " !fff f C:r;:n:::

Support Catalog Items (Cont'd)

D. NPSI Torward Bracke t Site 1/4 - 10 Bracket Dimensio'ns(i )

Bracket Welds (ii)

Weld Site Profile Per 5.5.2 (A)

Reinforcement Per 5.5.2 (B)

Undercut Per 5.5.2 (C)

Surface of Weld Per 5.5.2 (D) e Offset Per 5.5.2 (E)

Cracks, Lack of Fusion Per 5.5.2 (T)

Distortion (iii)

E. hPSI Forward Bracke Size 35 and 100 Bracket Dimensions (1}

Forward Brackar Weldo(11)

Weld Site Profile Per 5.5.2 (A)

Reinforcement Per 5.5.2 (B)

Undercut Per 5.S.2 (C)

Sv.rface of Weld Per 5.5.2 (D)

Offset Per 5.5.2 (E)

Cracks Lack of Fusion Per 5.5.2 (F)

T. Dual Spring Can Assemblies

1. Assembly Dimensions (J )
2. Weld Sites (ii)

Weld Site Profile Per 5.5.2 (A)

Reinforcement Per 5.5.2 (B)

Undercut Per 5.5.2 (C)

Surface of Weld Per S.5.2 (D)

Offset Per 5.5.2 (E)

Cracks Lack of Fusion Per 5.5.2 (F) s,.

..1 a

QI-020 Rev. 1 Page 1 of 2 COMA,C3E P!M RISPON$t TIAM 9

C310::.15*

PGF'.bn;> ;L5; 7Ekin0An CN PKG 30.

IMI I OI.

SyAL SCRI FIFE $'.7 PORTS QCCTI 131TIUC 1CN OIInir=::=

0=t c1 020 RIV. 1 LOG?. CG.We 44 %.

@ DOC"METTATION LE71EW

[ ITNI* 1

[ COMMCN v il: T*.0A!!cw t

I AC IFT l 1UECT lCA!!l

1. $werett tackase
2. trawtet tevtsten N/A WIA
3. luttert Packste Review
4. Testeeter cetttfteattees
1. West Musters 6.

Veldtet A. Procedute Apolteattee B. Veld Material Traces %t!!te C. Velder N a t i f ic a t t oe s D. Procedure Na11f teattees E. IL;act Tests 1.

11.

111.

Aff EV C Sti PLI?AAID II:

O!!C FLINI EE 2.

CA!!

t! C D 15;' ?'..N1 t'41.

DATE A.PPk0V Q IT:

ib5FIL.R 314

. 5 : ; -

.a 3., ' ;

'. ; c

!?!:- t 7 4?!

'? ? + m! '..h. t e ".. n )

Attach ent 6.1 QI-020 Rev. 1 Page 2 of 2 COMANCtt PEAR RESPoult TEAM CEECElst FCFMUQN M5C fn1TICAT10W Pt.G 50.

2 2

N1 0F 5% L 80Rt FIFE SUPPORTS TILIFICATION ADUM ACCEP*

RIJECT DATE

6. Velding (Cont'd) tv.

v.

P. West Treat =ent C. Reid Peines

7. Coccrete EzPansion Anchers A. Etitt Bolt Tereue
9. telt Stattee
c. Severk D. Role Det11tet
t. Setttet e

p.

WDE Docuneetatten e.

Steetfie ttess A. Torque 1.

11.

111.

iv.

3. Settet Cae setttet C. Sewhat Adaptet thread eetatement D. SesWer ettche CM -MI.ll. Revisken 0

..1 COMANCHE PEAK RESPONSE TEAM QI-021 CHECKLIST Rev. 2 F0FVLATION DESC VERITICATION FKG NO.

Piping Systen Bolted I-M-PBOM.

PACE 1 0F l

Joints / Material QUALITY INSTRUCTION QI-021

() REINSPECTION

((] UNIT 1 "E UI? MENT MARK / TAG S0.

DOCUMENTATION REVIEb'

[ UNIT 2-

[] CCMHON VERITICATION RD4AlutS ACCEPT REJECT DATE

1) Bolt / Screw / Cap Screw Diameter
2) Nut Neight
3) Bolt / Scud / Cap Screv Thread Engagement 4A) Bolt / Stud / Cap Screw and Nut Material 4B) Casket / Dielectric Type
5) Tiange Rating and Type
6) Bolted Joint Completeness
7) Gaske Coverage j

FRIP ARED BY :

APPROVED BY DISCIPLINE $NGR.

DATE LEAD DISCIPLINE ENGR.

DATE INSFELIED BY:

APPROVED SY :

IN57!CTOR DATE LEAD INS?ECTOR DATE

':?? a07. A.

R e v'. n an 0

..1 COMANCRE PEAE RESPONSE TEAM Q1 022 i

CEECKLIST Rey, 1 chanee Notice 002 F0FULATION DESC VERITICATION PKG No.

Piping Systen Bolted R-M-PBOM-PACE 1 0F,2,

Joints / Material j

QUALITT INSTRUCTION QI-022

([] REINSPECTION

(~] UNIT 1 EQUIPMENT MARK / TAG No.

@ DOCUMENTATION REVIEW D UNtT 2 O como*

VERIPICATION I

N ACCEPT REJECT DATE

1) Bolt / Stud / Cap Serev Verification 1A) Q.C. Verification / Sign Off
15) Bolt / Stud / Cap Screv Nut Certification 1" Nominal Diameter and Smaller IC) Bolt / Stud / Cap Screw and Nut Color Code Verification-1" Nominal Diameter and Smaller 1D) Bolt / Stud / Cap Screw and Nut Certi-fication-Greater than 1" Nominal Diameter
2) Deleted
3) Deleted
4) Alignment Verification
5) Deleted PRIPARED ST:

APPROVED SY:

DISCIPLINE ENCR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5FILIED BY APPROVED SY; LM5FILIUR DATE LEAD INSFECTOR DATE CPP-007.1A. Revision 0

..1 COMA.NCHE PEAK RES?ONSE TEAM QI-022 CHICKLIST Rev. 1 Channe Notice 001 POP!.*LAT;0N DESC VERIT; CAT;0N PKG.NO.

P1 Ping System Bolted R-M-PSOM-PAGE 1 OT 2

Joints / Material VERITICATION AI

  • IUII ACCE?!

REJECT DATE

6) Deleted
7) QC Inspector Certification l

l l

C??-007.13. Rev ston 0

..1 COMANCHE PEAK RESPONSE TEAM QI-023. Rev. 3 CHECKLIST Page 1 of 3 POPULATION DESC VERITICATION PKC NO.

HYAC EQUIPMENT INSTALLATION 1-M-HVIN-PACE 1 0F j QUALITY INSDUCTION QI-023 RIINSPECTION O ew1T t EQUIPMENT MARK / TAG NO.

O DoCvxExTATION REv1Ev 0 uw1T 2 O ConMON VERIFICATION IIKAIII ACCEPT REJECT DATE

1. Identification
2. Location
3. Orientation
4. Duct Connections i
a. Bolt Tension
b. Casket
1. Continuity r
2. Caps
c. Thread Engagement
5. Flange Site PREPARED ST:

APPROVED AT:

DISCIPLINE ENCR.

DAtt LEAD DISCIPLINE Ehh,

DATE INSPECTED ST:

APPROVID ST:

INSPECTOR DATE LEAD IMSPECTOR DATE CPP-007.!A, Revision 0

7 COMANCHE PDK RESPONSE TEAM Attcchsent 6.1 I

CRECKLIST QI-023 Rev. 3 Page 2 of 3 "POPULATION DESC VERITICATION PKG NO.

MVAC EQUIPMENT INSTALLAT10N 1-M-WVIN-

-t VERITICATION 3

ACCEPT RIJECT DATE

6. Tans
a. Tan Wheel Clearance
b. Tiexible 3

Connections 1.

Configuration 2.

Connections

c. (Sub-Attribute Deleted)
d. Axial Fans
7. Fire Dampers and Penetrations
a. Configuration
b. Retaining Angles
1. Site
2. Dimensions z
c. Fire Damper /

l Sleeve Attachment t

C??-007.15. Reauten 0

COMANCVE PEJX RESPONSE TEAM 01 CRECKLIST QI-023. Rev. 3 Page 2 of 1 POPVLATION DESC VERITICATION PKG No.

j MVAC EQUIPMENT INSTALLATION 1-M-HVIN-

-$ O F,_9, VERITICATION 3 TE 3

ACCEPT REJECT DATE

8. Modulating and Isolation Dampers
a. Configuration 1.Flanga Bolt Spacing i
2. Actuator Mounting Brat'st a
b. Actuator
9. Gravity Dampers l
a. Free Movement

(

l l

b. Counterweight 1
10. Air Flow Monitoring Stations l

1

a. Instrumentation l

Connection I

C??-So? 15. Re" s t en 0 t

l Attcchsent 6.1 COMANCRE FEAK RESPONSE TEAM QI-025 CRECKLIST gey, 4 F0FVLATION DESC VERIFICATION PKG NO.

LARCE BORE PIPING I-M-LBC0 FACE 1 0F 3 CONFICL' RATION QUALITT INSTRUCTION QI-025

()) REINSPECTION

[)) UNIT 1 EQUIPMENT MARK / TAG No.

00CIDENTATION REVIEV UNIT 2

[ COMMON VERIFICATION ADI I

ACCEPT REJECT DATE

1. PipinR Orientation
a. Component Sequence
b. Centerline Elevation c. N-S. E-k' Loca t ion
d. Linear Dimensions
e. Branch Connections
f. Piping Clearances
g. Nominal Pipe Site
h. Slope
1. Mechanical Joint Location
2. Valves
a. Elevation
b. Stem Angle
c. Valve Identification Number
d. Flev Direetten FREPARED BY:

APPROVED BY:

DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5FICTLD BY:

APPROVED BY:

IM5FICTOR DATE LEAD INSPECTOR DATE CPP-007 lA Revision 0

f P

o COMANCME PIAK RES?0NSE TEAM Q1-025 CHICKLIST I*

FOPtlLATION DESC VER1TICATION PKG.NO.

1.ARGE BORE PIPING I-M-LBCO PAGE 1 0F 3

CONFICt1tATION VER1FICATION Am SC RD'. ARKS ACCEPT REJECT DATE

3. Eccentric Reducers
a. Orientation
4. Deleted
5. Orifice /T1ow Element Assemblies
a. T1ange Tap Orientation
b. Location
c. Identification
d. Flow Direction

)

6. Expansion Joints
a. Identification
b. Tie Bars
c. Dimensions
7. Screwed Joints
a. Deleted
b. Deleted
c. Joint Sealant 1

e***...

%C'-.akJS )

{

o ms...-...

C.;

i COMA.NCHE FEAK RES?0NSE TEAM QI-025 l

CRECKLIST I

f

(

POPULATION DESC VERITICA* ION PKG NO.

t LARGE SORE PIFING I-N-LSCO PAGE J OT J CONFIC11tATION VERITICATION A

I ACCIPT REJECT DATE II2AE3

8. $ trainers i

t

a. Identification No, t
b. Flow Direction
9. Moment Restraints
a. Identification i
10. Elbows 1

i

s. Identification I

i l

6 l

1 r

E f

[

L e

f i

I i

i o.st'.,1, Ed"',b,*+

~

COMANCHE FEAK RESPONSE TEAM.1 CXECKLIST nt.026 Rev. 3 g"gg gg VERIFICATION PKG NO.

1-M-SnCO.

PAGE 1 0F,_1, CONFIGURATION QUALITT INSTRUCTION QI-026 (j) REINSPECTION

((] UNIT 1 I

EQUIPMINT MAJK/ TAG No.

C DOCtHDffAT10N RIVIEV O extT 2

((] CCHMON VERIFICATION A

II RD KKS ACCEPT RIJECT DATE

1. Piping Orientation
a. Component Sequence
b. Centerline Elevation
e. N-S.E-V Location
d. Linear Dimensions
e. Branch Connections
f. Piping Clearances
s. Nominal Pipe Site
h. Slope
1. Mechanical Joint location
2. Valves
a. Elevatten
b. Stem Angle
c. Valve Identification No.

l

d. Flow Direction PREPARED BY:

APPROVED BY:

DISCIPLINE ENCR.

DATE LEAD DISCIPLINE ENCR.

DATE IN5FEc;La BY:

APPROVED BY:

i "IN5FECTOR DATE L EAD INSPECTOR DATE CFF.007.!A. Revt:1on 0

o COMANCHE PEAK RESPONSE TEM.1 CRECKLIST QI.026 r

Rev. 3 P0F' LATION DESC VERITICA;10N PKG No.

J SMALL DORE PIPING PACE ~ ST ~2 l

I*N*IICO' CONFICt' RATION L

VERITICATION I

A REMAKXS ACCEPT KIJECT DATE

3. Eccetstric Reducers

[

a. Orientatten, A. Deleted 1

5.

Orifice /flo.

f Element Assemblies

a. Plange Tap

__, Orientation t,

' cation l

c. Identification 4

.d. Flev Direction 1

t 6.

Expansion Joints i

a. Identification
b. Tie Bars i

t

c. Dimensions i

7.

Screwed Joints l

t

a. Deleted t

I i

)

b. Deleted l

j

e. Joint Sealant t

t i

8.

Strainers

a. Identiffeatian No.

l l

b. Tiov Direction 9.

Moment Restraints

a. Identification 1
10. Elbows
a. Identification

[

i l

vw..

I e ' '.00.'. ;, i,

w.,

)

i l

[

r

..1 QI-027 Rev. 3 j

Page 1 of 3 COMANCHE PEAK RESPON5E TEAM CHECKLIST PGP'J.AI'CN OLSC VERITICATICN FKG.10.

LARGE BCRI PIPE SUPP-RIGID I-5-L85R-b QUALITY INSTRUCTION gg,g p

{LIINSPECTION O trxzT t EQUIPMENT MA11/IAC NO.

O ooc=="Ttoa tr'ta O trait 2 0==

vt11TICATIOC ATTRIBUTE ACCEPT REJECT DATE

1. _Identifiestion
2. Location and Orientation en.
3. Configuration

_A. Components S. Materials N/A N/A C. Insta11stien Tor information only D. Clearance E. Grouting of laseplates/T1oors T. Grouting of SasePlates/

Walle 6 Ceiliese

4. Bolting A. Entagement
8. Surface Contatt C. Rietoond Insert D. Lockins Devices

~E U-bolto T. Torque C. Edae Distance N/A N/A N. Grout-In Anchors for information only

5. Integral Attactment Velds A. Location
5. Site C. Profile D. Reinforcement E. Undercut ue F. Surface Cod ition PRIPAAZD Eit MPtovtD 8f:

DISCIPLINt DCR.

DATE IN5F h4 2 III LEAD DISCIPLINE Deck.

DAtt M PECTED ST:

im h wK DATI LEAD INSPECTCt DATE CPP-007.lA. Revision 0

Attech2ent 6.1 QI-027 Rev. 3

yr cx Pra.tt:?st: : >.x 03!0T.*. * !!

'/~}'.'.4!;;N ;!i; 711; ;;A ;;s px; :.;.

LARGE 80KI P!PI St'PP-RIC :D I-5 Last-

?A;I 2 07 3 VER;T;CA!;CN lLI.*!CT DA!!

IEMAAE3 AC0!P*

5. Integral Attachment Velds (Cont'd)

C. Offsets H. Cracks / Fusion

1. Welder ID N/A N/A For Information only J. Rust
6. Support Velds (NF)

A. Location 8

B. Stae C. Profile D. Seinforceteet E. Undercut F.

Surface C. Offsete H. Cracks / Fusion

1. 6 elder ID N/A N/A For Inf ormation Only
7. Concrete Espansion Anchors A. $13e/ length B. Embedeset Length C. Bolt Spacina D. Anaulerity E. Concrete Oamage F. Nut Engagement /

Beatles

8. Ceaponent Support Catalog Itema A. Sway Strut
1. Hardware
2. Rear Bracket Orientation
3. Araularity 4.

Spherical Bestina S. Eye Rod Thread 7 i

6. Eye Rod Thread Ersagement
7. Eve Rod Jaa Nut l
8. Sindtes t
9. Fasteners i
10. Bearteg Spacer (s)

/ Vertical Lead Pin it. Beartra Spacer (s)

12. Torque

'7 ' 'd.'. 3. ' d". n :e i l

i

Attachrent 6.1 QI-027 Rev. 3 I

.u. ::e.: ?!c 1::? sst :.e XI;;;*. ~ ~

!;?..

s
11; 41R;7;;4 ;n ?R
4.

LMCI BORI PIPE $UPP RIC10 1-5-LB19-FA;- 3 :T 3 VER;7;;A : N A

  • 3' I

lRI.*!;Tl3 ATE AC;;PI

8. Component Support Catalog Itema (Cont'd)
13. Clapp Halves B. Low Friction Bearing Plate
1. Location
2. Plate Tne
3. Lubricant 4

Coreers

9. Modified Component Support Catalog Items A. NP$1 $way $truts
1. Adjuetable Struts (i) held Stae i

I Per 5.6.1 Profile Retnforcement i

Per 5.6.2 Per 5.6.3 Undercut i

Per 5.6.6 Surface of beld I

I

Offset Cracks. Lack of Per 5.6.6 Fusten l

2. Fized $way Strute(it)

Veld $1re Per 5.6.1 y,,ggg, Per 5.6.2 Reinforcement Per 5.6.3 (ndercut l

Surf ace of nield Per 5.6.6 I*'

I'0*

[

Offset Cracks. Lack of Per 5.6.6 Tusion

8. ITT Crinnell $way Struts l

Veld Site Per 5.6.4 pg,ggg, Per 5.6.2 Reinforcement Per 5.6.3 Undereut Surface of weld Per 5.6.6 Per 5.6.5 ngg,,,

Cracks. Lack of Per $.6.6 yy,g,,

i

,3, y,

3

.1 QI-028 Revision 1 Page 1 of 3 CCMANCHE PEAK RISPONSE TIAM CHICI.IST POPULATION DESC VERITICATION PKG NO.

P ACE 1 0F _3 LARCE BORI PIPE SUPP-RICID R-S-LBSR-QUALITY INS RUCTION QI-028 0iztx5rictio" O est: t EQUIPMENT MARK / TAG NO.

@ DOCMGNTATION RIVIEW G ent: 2 O cowHos VIIITICATION ACCIFT IIJICT DATE

1. Support Package
2. Drawing Revision
3. Support Package Review N/A N/A
4. Inspector Certifications
5. Heat Numbers 6.

Welding A. Procedure Application B. Weld Material Traceability C. Welder Qualifications D. Procedure Qualificatione PRIPARED ST:

APP 10V C ST:

DISCIFLINI ENCE.

DATE LEAD DISCIPLINI ENGR.

DATI INsFE46w RT:

APPROVE BY:

I iN5FIGGK DATE L EAD IN S P EC*CR DATE C?P-007.lA. Revision 0 l

Attachmene 6.1 Q2-028 Revision 1 Page 2 of 3 COMANCRE FEAK RESPONSE TEAM CHECILIST F0FU1AT105 DESC YE11TICAT10N FKG NO.

LARGE BORZ FIFE SITFF-RICID R-5-LBSR.

FACE 2 0F 3 VERIFICATION ACCEPT REJECT DATE

6. Welding (Cont'd)

E. Impact Tests a.

b.

c.

d.

e.

F. Heat Treatment C. Hold Points

7. Concrete Expansion Anchors A. Hilti Bolt Torque l

1.

2.

B. Bole Specina C. Rework D. Hole Drillina E. Settint 8.

NDE Docusentation

(

i l

l t

I i

4 CFF-007.18. Revision 0

{

.1 Q1-028 Revision 1 Page 3 of 3 COMANCRE PEAK RESPONSE TEAM CECKLIST POPtTLATION DESC VERIFICAIl0N FKC NO.

LARGE BOFI FIPE SUPP-RIC1D R-S-LBSR.

FACE 3 0F 3 VERIFICATION lZNARK3 ACCEPT RZJECT DATE 5.

Specific Items A. Torque 1.

2.

3.

i l

t CPP-007.18. Reviston 0

i Attachnent 6.1 QI-029 Rev. 3 Page 1 of 8 1

1 CCFMC3! FLE R$PON$Z !!.L.M CIEC"L

  • ST NbfNNhkhksePPotTS

~

~

  • 1-s-u$u mz, er 1.,

non.arcio (u$w) w e m astu;CTron Q1-029

@11!NSFICTION

[ C7I* 1 m. w :. w n u.4o.

xC wrme, m:u c e,: :

C C019CN Vn:T CAT :N ACCIPT LL*tCT DA!!

1. Identification
2. Location and Orientation ta=
3. Ceafiguration A. Componest e (Ter Documentation
3. Materiale 5/A N/A Review Dely)

C. Inste11stten i

D. Clearance I. Grouting for lasepistes/Floore F. Grouting for laaeplates /Valle and ceilinas

4. Solting A. Esassement
3. Surf ace Contact C. R.ic k ed Insert D, t.ockies Devices F1ZFA1Z3 ST MPLCVD 81:

DISC:F'.INE DC3.

0 An t.IAD D I S O F'. n DO R.

DA*!

J3 m.a.i ITa M F1CVG lia

. nit.. e n 7;

'. IAD N$7t; ;e 34;t 07

'4*

'. A. Revt.4 an 1

. - ~ - - - -.- - - ---

- - - ~

8 Attachamt 6.1 QI-029 Rev. 3 COFM CRE PLAK tt3?CNSE Tf.AM CIICI:.15T Fo?'." A!!CN OL5C VEk;T;CA!"Om fLG 30.

LARGE SORI FIPE SL'7PCRTS

!=$.L35N-Fact 2 0F 8 NON-t!CID (LBSN)

~

~

(CRIT! CAT:CN AT3 18CTE N

ggggy; gg7gg; gg7g 6

sentas wont's;

t. U-Bolte F. Torque C. Edse Distance N/A N/A (For Informatten Only)
3. Crout-In Aachere
3. Integral Attaciment Welde A. Location
3. Site C. Profile D. totaforceneet
t. Dadercut w*

F. Surface Condittee C. Offsete

5. Cracks /Pusten
t. Walder ID N/A N/A fFer Inferestion Ont?

J. Rust

6. SupPert Welds (57)

A. Loestion B. Site C. Profile D. Ratafeveseset

t. Cadercut F. Surf ace C. Offsets

?? ^01. 6 3. tr*

1

Attachznt 6.1 QI-029 Aev. 3 COPMCRE FEM 115?CNSE !!AM CIECI: ST MP'.A;;GN 0150.

VE1; FICA!!CN PKC 30.

LARCI Boll! FIPE St'FPORTS

!=5-LS$W.

Fact L Of 1 NCF-8!Cf D (L PS'O VC1:TICA ;0N A

l RL*.1CT ACCIM DA*!

6. Support Welds (Cont'd)

N. Cracke/ Fusion I. Welder ID N/A N/A (For Information Ontv)

7. Concrete Espansion Anchors A. Sise/ Length
3. tebedeent length C. Belt Specina

_ D. Annulerit?

t. Cenerete Desame F. Nut Engegement/

Searles

8. Component Support Catalog Items A. Snubber
1. Arrularitt
2. Jae Wut fortue
3. Para 11elles
6. Fin-to-Pin /

Cold settina

5. Beartea Spacers 6.

Thread teassenes e l

7 Safee? Lock Wire

8. tre 904 Threads i

..e

4. Rea.stan ;

i I

3

Attechnent 6.1 QI-029 Rev. 3 CO.W:31 PLAK Rt5FON51 !!AM C7t:C ;5T ror'..a ;;N 315; VER;FICM;CN PK; 30.

LARGE SCRI PIPE St'? PORTS 1-5.L35N Fact 4 0F 8 NCN.RfCID (tl5W) v!1:TicAT;0N A

II AC tF*

LLit:T DATE BA. Snubber (Cont'd)

9. Eye Rod nread tnaarement
10. Ifndina/ Offset II. Fastseers
12. $pherical tearina
5. Struts
1. Rardware
2. tear 3 racket Orientation
3. Aravlarity
4. Spherical tearina S. tee Red Thessde
6. Eye Itod nread tenarement
7. Eye led Joe Nut
8. Itadier/0ffast
9. Fasteners
10. Saaring Spacers Vertteal Lead Pts

!!. Searles $ Pacer (s)

12. Toreve of lead Stud
13. Para 11elten g

..'?.W:..h.

le

..1 01-029 Rev. 3 CCWCXE PEAK RE$FCNSE TEM CIECI:.!$T 70r m !;0.1 015C VIA!TICA!!CN PLC 30.

W CE SCRE PIPE SL*Prott$

I-$-LB$N PACE 5_ 07 L p0M-t!CID (1.3$N)

VE1 FICAT*0N A U IUII lRLIECT ACCE?"

DATE C. $pting/Cen Constant Support

1. Stee
2. Trave! Stepe
3. Seen Attacheent
4. Support Rod

$. P!reade

6. Thread Erneseeent
7. Anaulerttv i
8. Festeners D. Low Friction leerias Plates
1. toestien
7. Plate Type
3. Lubricant
4. Corners P. Modified Component Suppett Catalog

!tese A. WP$1 $way Struts

1. Adjustable Struts (1) l l

Weld Stee l

Profile Per 5.6.1 telefereesent Per 5.6.2 1

l

..r se....

n ;

I 5

l

..1 01-029 Rev. 3 ComCu rtn ustonst Tru CEECIList PCFilLA!!ON QLSC VDITICATICu FG 30.

LAACE 3011 FIP SUPotts 1 5-L15N pagg 6 0F 8 Non-11CID (LBSN) rMITICATION arwAart AT M 13UTE gy g,1C DATE

9. Modified CouPosest Support Catalog Itene (Cont'd)

Per 5.6.3 onderest Serface of Veld Per $.6.4 Per $ 6.5 offset Cracks. lack of Per $.4.6 Pustes

2. Pized Swe?

Struto (L1) e Veld Sise Per 5.6.1 Proftie Per S.6.2 tatafereement Per S.6.3 onderest Parface of Veld Per S.6.4 Per 5.6.5 offest Cracks, lack of Per 5.6.6 Puston

    • N B. ITT

[

svey veld k_ ___ _ - - $

Per $ 6.1 prettie Per 5.6.2 1siaf erc ement Per 5.6.3 onderest Serface of weld Per 5.6.4 Per 5.6.5 offset Cracka Lack of Per S.6.6 Pustos

" * ** ?. L t. Lavi s t * ?

e l

l 6

A2tachment 6.1 Q1-029 Rev. 3 COMA.NCXE PEAK RISPCN$t TIM CIECII!ST

c. OI$;

VER;TICAILOW PLG 30.

PCPJL4 1

LAACI DCLE PIPE SL*PPORTS 1 5-L85N pacg 7 0F ~0

"~

NON-11CID (LBSN) vtt:ricAttcN ACCIPTlLZ.TICT A

DATT.

9. Modified CoePonent Support Catalog items (Cent't)

C. Saubber Tramettion Lite Veld Stae Per $.6.1 Proftte Per $.6.2 seinforcenset Per $.6.3 Dedereut Per $.6.4 Surfece of Wald Per $.6.5 Offset Cracks, Lack of Per 5.6.6 Pusten D. 3751 Forward Bracket

$1:e 1/4 - 10

1. Brocket Olsenetece (1)
2. Bracket Velde (11)

Veld $tse Per $.6.1 Profile Per $ 6.2 Re t af orc ement Per S 6.3 Dodereue Per 5.6.4 Surf ace of Veld Per S.6.5 Offset Cracks. Lack of Per S.6.6 Pasten Dieterttee (111)

".?? Y17..;

7

..1 QI-029 Rev. 3 CCPM CXE PEAK LI$PCN!! TEAM CIECI:.13T PCP'.h !;ou CESC VEAIFICA ;cu fL; so.

1ARCE nott PIPE SUPPORTS 1-$-I.8 SN pagg ~ op 4

8 NON-t!ctD (Ltsu)

~

V!1ITICATICN A

ACCIFT RI. JECT DATT 9.16edif ted Coeponent SvPport Catalog Itene (Cont'd)

E. IrPSI Porward Brecket $tse 3$

and 100 Brecket Dimeestone(t)

Perverd Bracket velde (11)

Weld Sise Profile Per 5.6.1 totaforceaset Per $.6.2 Ondereve Per 5.6.3 Serfere of Wald Per 5.6.4 j ffset Per 5.6.5 Cracks, Lack of Puetoe Per $.6.6 P. Dual SprLas Can Assemblies

1. Assembly Diassa t ose (t)
2. Weld Stsee (11) l Weld Stas l

Profile Per $.6.1 totaforcenest Per 3.4.2 endereut Per 5.6.3 J 9tface of Veld Per $.6.4 offset Per 5.4.5 Crocke, Lath of Puesee Per 5.6.6

"" **' ' * ~tstee 1 8

I

1 Attcchrent 6.1 QI-030 Revision 1 Page 1 of 3 COMANCTI PEAK RISPONSE TF.AM CEECI:.IST PDPL'LAtlCN DESC VERlTICATICN FKG NO.

LARGE BORE FIFE SUFFORTS R-5-LISN-PAGE L OF NON-RICID QUAL;U INSTRUCTION Q1-030 RIV. O CREINSFECTION O ex 7t EQUlFMINT MAAI/ TAG NO.

C DOCUMENTATION RIVIEW O c"tT 2 COMMON VIRIFICATION ACCIFT IIJECT DATI

1. Support Feeksne
2. Drevina Revision
3. Support Packane Review N/A N/A
4. Inspector Certifications
5. Neat Numbers 6.

Welding A. Procedure Application B. Weld Material Traceabilit?

C. Velder Qualifications D. Procedure Qualificatione PRIFAAID ST:

AFFROVD ST:

DISCIPLINE Dect.

DATI t.IAD DISCIFtLNE ENGR.

DATI LMPEwau II:

AFFROVED ST:

6MFEL.M DATI LEAD IN$PiCTOR DA*E C:'F-007.1A. Revision 0

Attcchm:nt 6.1 QI-030 Revision 1 CWANCEI PEAK RISFONSE TEAM CEICKLIST F0F h T10M DESC VTRIFICATION FKG No.

2 LAME 50RZ FIFE St'FFCETS FACE 0F R-5-LBSy.

NOM-RICID VE11FICATION A

ACCEPT RIJECT DATE E. Impact Tests a.

b.

c.

d.

e.

Y F. Meat Treatment C. Rold Pointe

7. Concrete Expansion Anchors A. Hilti Belt Torque 1.

2.

B. Soit Specina C. Rework D. Bole Drillina E. Settina 8.

NDE Documentation 9.

Specific Itema A. Torque 1.

2.

3.

4

! CFF,007. LA.. Revision 0 2

e Attachrent 6.1 QI-030 Revision 1 COMANCHE FEAK RISFONSE TEAM l

CEICILIST F0F h T10M DESC YE11FICAT10p FKC po.

3 3

LARGE BORZ FIFE SUFFORTS R-5-LB $ig.

FACE 0F NON-RICID TE11FICAT10M Amm ACCEPT RZJECT DATE

9. Specific Itene (Cont'd1
5. Sprina con Settina C. Snubber Adapter thread enseassent D. Snubber stroke CPP-007. L 8. hvision 0 L

3

Attsch 2.

6.1 Q '.

  1. 2 *.

.- t.....

c CE::r?.!?~

C*Fx:~7.I FLG R*S?0::1I Titl!

CZI"Z'

  • ST P07.~.A ;03 CE50 vi?.17;cA ;cs Fgc sc.

Reins;ect. of Cent. Liner &

PAC 1 OT 2 Tank $.S. Liner QUral 1 IN571UC;;CN Q1-031

([] LIIN37EC'!CH UN1! 1 E;Lli.*.ENT PuJA/ TAG No.

O ooc:x ::A:tCs mIvtt; cNt: 2 CCMMON vtR;7;;A;1cs i

RIMAE 5 ACCI?*

RI.*ICI DA~Il A1 Esse Matarial Local C4eteurs

s. ran 1 inch gap be tween 6-f oot tesplate and plate i

b.' Max 1 1/2 inch gap between 6 foot i

tesplate and plate seress veld seae 4

c. Max 3/8 inch gap berveen 15 inch teselste er.d plate
d. Max 3/4 inch deviation fres 10 strait e edte h

foot A2 Veld seas offset

a. Max 3/32 inch off-set for 3/8 inch I

shell plate

b. Mas 1/8 inch off-set for 1/2 inch deze plate t

j l

FRIFALID 31:

AFFROVED SY:

i e

ls DISCl?LINE ENC 1.

DATE LEAD DISCIPLINE ENCR.

DATE L.N5?ELiLa BYs AFFRQVCD BY:

j "Th 5 F L sTL E DATE

'LLAD IM5FECTOR D ATI

~*

CPP-007.lA. Revision 0

a..

4

Attach.e.t 6.1 C1.r?'

't..

i CF.IC F'. '. !T ( c :. t ' d )

i CCYJ2:CEI PEAX RI5?C:*!I II/.M CEICK'.1!T PC? aAiloh DESC VERIFICATICh FKC EO.

Reinspect. of Cont. Liner FACE 2 CT 2

~

~

6 Tank $.S. Liner V Ee.1F ICAT ICS INI ACCEPT REJECT DATE

c. Offset faired at least 3-to-1

?

l A3 Weld Sean Surface i

s. Tree of coarse ripples or grooves.

overlaps, or abrupt tidses er vallevs

b. Undercut does not exceed 1/32 inch

\\

c. Tivsh with base saterial or has uniform crown.

Reinforcement does not exceed 3/32 inch at each face.

t1 Tack 557 Liners i.

Reinstectien

a. Wald surface free of coarse ripples or grooves, over-laps, and abrupt ridges or vallevs.
b. Undercut does not exceed 1/32 inch
c. Veld surface is flush with base 1,

saterial or has

.r-r uniform crevn.

- Reinf orcesent

+

~

height does not 2

' *[ ',

4.",

ti,'

U

<J

-l exceed 3/32 inch -

-o+

et each face, f.g,

/g '.

..d.* Exposed, surface. *

, ~.

. ;j a o f[,1.q',E Q,"( gM,

.;***,;;f

.ef S.S. liner is 3

' ', " = -

free of rust.

. e,,- ;.. v j.,s,.,;; y.e.'s,..'s e

w

..s. J...

,. 3:-

. i.:...

.1,,,.,.

,...\\. '

g..
p
.s..

.s

.q-c.h..Q,T'Z..,.;.%g?

,y.1y ' l ' ' :..,.

.a a i c.

.. j:-

.
:..', t'

. a. - - ;-. ; s *..n s. i- * :,h

?

'I CPF-C47.ll Revision 0

~.

2

Attechnent 6.1 QI-032 Rev. 3 Page 1 og 2 CHECK 1.IST CCNA.H"J!! F1AE 115?CN$E T!AM C12CI:.;3 l r;r'.w ;; a GEss vn;nCAn;n PLC.1C.

FACE 1 CF 1 QtJ C 71 IbstE CI*CN c1-01:

OEZssrC::c=

0 est: i

(%;P.2:G FAAKt!aC AC.

@ DOC"MINTA!!CW 1271

[ U3;; 1 V

O c==

nunar:0.

A N

ACCIFT RL*1C*

DA!!

5.1 ?acord Oravies a.' etat Identifi-eettec h Welder Identifi-caties 5.2 neerial Traceantitte a Matettal Certified as SA-537 Ct.2/A240-30&L b Mterial 1.D. La verified by inspecties 5.3 Welstaa a Weld precedure tientttted b Fistehed weld initiated and dated c Weld precedure applicable to 5A-537 CL-2 (CR-3) feeneairm ee eel?)

d Weld precoh re approved by Gibbs &

R 1 *.1 e Weld Cesplete Column inittsted and dated f1D AAID at t MF10TD 4t DisCtr. vt '31C1.

Daft Miic R uft DIGE.

DATI part..w s':s gruyn 31:

. m w.su DATI LLAD 05 M C il DAT%

CF-27.tA. Revtsua 0

Attach ent 6. 1 QI-032 Rev. 3 CHECKLIST (cont'd)

COMANCRE FEAK tt$PCNSE TIAM C11CC 13T FGF'.u i1CM Dt3C V nITICAf!CN PLC 30.

FACE A 0F 2 VERIFICAT10N IM3 I

ACCEPT LIJECT DATE 5.4 Welders /weldies costseere Qus11f1:etten a Valid for period of welding b Valid for veld Precedure

!.3 pendestructive tsaminettee (ICE) a IfDE report traceability to weld ietet b IrDE tapert traceability to IrDE stecedure c Irtt evaluator signed off d ladiographic fits evaluated and stamed off.

e vacuve les Test 3.6 nt Operators /

Inspector Certificaties a Certifiesties valid for period of WDE l

l b Certificaties valid for IfDE Proce ss /1 wpectisa c 0Ferator/tveluater to e Laret II l

CF' MY.13. Revisies 0 2

..1 QI-033 Rev. 1 Page 1 of I CHECKLIST COMMCII PEAK II5FCW5E TIAM CRECC.IST PCF R TICN DE5C VE11TICAIICM FEC 30.

Reinspection of Twel lids.

FACI 1 CT I

~

Fuel Fool Linere QUALITT INSTRUCTION gg.c33 hLEINSFECTION O UNt! t EQ;IFMnt: MAAK/!AG.10.

DOCQGNTATICH IITIEW UNIT 2 COMMcN VT11nCATION ATTRIBUTE ACCIFT R1 JECT DA!!

1. Weld Surface Rainspection e.

Olet tequired) b.

Weld surface free of irregularities such as sertations.

ridges. crevices.

pinholes c.

Surface to free of rust / corrosion l

i l

paryAng st:

AFF10TED BY 015CinINI DGR.

Dart LtAD 015C1 FLINT Doct. -~ DATI usarh.w bis AFF10VD ST:

nrua ATI LEAD IMlFiC*ct DATE CFF-M7.1A. Levisten 0

Attechment 6.1 QI-034 Rev. 2 Page 1 of 3 CHECKl.1ST COMANCHE PEAK RISPCNSE TIM CHECK:. ST PQPl.h ;;cN DESC vtt;ncA;;cN rt; so.

ITIL BLDC. FOOL LINits FACI 1 cr,,,J,,

QUAL;TT INS 3UCTION QI.034 LIINSFECTION

[ W:T L EQCIFMEh"I MAJKiTAG so.

@ DOCTMENTATION RIVIEW

[ UNIT 1 O coice" vn 1 M CAT 10N ACCZFT 11 JECT DATE N

5.1 Liner Material

s. Liner Plate Nterial is type 304L
b. k1k hterial issue fres Verehouse is Type 3041 5.2 Welding
e. Velder ersbol
b. Weld Filler Material Lea (VFML) number
c. Weld precedure number
d. Final T.T. of surf ace preparation taitialled and dated
e. Repair process sheet welder eyebol
f. Weld & Repair veld procedure valid and a pp roved PLDAAID 3Y:

A2?101ED B11 D1sc:Ft1NT '3ct.

Daft LAAD 0R$CIFtLFt Dact.

DATT l

23F N s.u 5":

AFFECT 12) BT

  • m h
  • d DATI (EAD IN5FICTOR DAti C?F-M I.1A. Revtaten 0

1 Attachcent 6.1 QI-034 i

Rev. 2 CHECKLIST (Cont.)

COPM CXI PEAx RIs?0Nst ;IAM CXIC'.:L:s!

?';?'t ^.; 3 ;II" vtR;T;;A;;cs 7c so,

!"llIL BLOC. P0OL LIFERS FACI,,2,CF 1 mt:r::A::cs AC0!?!

RIJECT 3 ATE N3 5.2 Velding (Cont'd)

3. Isene of VTML or 14GL per Log. and valid for veld procedure l

5.3 Welder / welding l

i Operator qualificaties

s. Yelid for period of performing velde i
b. Yelid for the weld l

procedure i

5.4 Mon-destructive Esasiastion (ME)

s. Titel F.T. 6 T.S.

sianed and dated l

b. Weld ember identified
c. Et procedure identified
d. Et results are sirned sad dated
e. Repair veld to l

identified

f. Repair RE procedures are identified
3. Repair Et reevite signed and dated l

i

...,-.:..e.. u. :. >

2

Attach ent 6.1 QI-034 Rev. 2 CHECKLIST gCont.)

COME C3I PEAK RIs?0NS: :tAy.

CKIC%'.* $!

I PCP'.14;;;h ;ISC

IR;7;CA;;os t u sC, ITEL ILDC. FOOL LINERS

? ACE,1 0F 1 VER*T CAT;0N I

AC;I?

11;tC; OA;I EUMI 5.5 IrDE Operetor Qualification Qualification valid for the period of IrDI Ouellfication valid i

for IrDE procedure Operater to e Level II

$.6 Stud Welding

e. Pre-Froduction Test
1. Weld Procedure Number l
2. Beed Test i
b. Producties Test
1. Stud Site
2. After Weld Leonth toeste
3. Tisual !aspecties for Welding &

Reed Teste 5.7 Stud Welding taspectet Certificaties

  • Inspector Certificatian Talid for Period of Stud Welding
  • Inspector le Certifie<

tevel !!

? *. r '.:. ' r.. n :.. )

3

Attcchment 6.1 COMANCHE PE.U* RIS?ONSE TIAM QI-035 CHECKI.IST Rev. 2 POP'JLA!;0N DESC VERIPICAT;0N PKG N0.

EVAC DUCT SUPPORTS I-S-HVDS PAGE 1 OT 4 QUAL;TY INSTRUCTION QI-035

] REINSPECTION

[iUNIT1 EQUI? MINT MARK / TAG NO.

DOCi:MINTATION RIV!EW

[ UNI 2

((] COMMON VERIPICATION A

I R MAIAI ACCEPT RIJECT DATE l

1. Support Location 1A. Along the duet axis IB. Support Clearance N/A N/A Tor Information Only Check
2. Support Frame Configuration and Orientation 2A. General Configuration
23. Member Orientation i

2C. Member Sire 2D. Member Lengths and Dimensions 2E. Minimum Edge Distances (Steel Members) 2T.1 Attachments within "Cantilever" regions 2T.2 Attachment Locations on "Strip" Plates 2T.3 Spacing of PREPARED SY:

APPROVED 8,Y:

DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5FECTED BY:

APPROVED 6Y:

IN5FICTGR DA!;

LEAD INSPECTCR DATE C? ?- It) ?..\\. ?.d"J 4 W n )

CCMA.': CME ?!AK RES? OSSE TEAM.1 QI-035 CHICXL*ST Rev. 2 N h(N Sbk)RTS Y FTie F 3 '" * -

p AG c _2_ OT 4 VER*FICAT*CN l

^III 3 REMAAKS ACCI?*

REJECT DATE 2G. Support Provided b)

Existing Structure 2H. Attachment to Duet Equipment 2J. Attachment of Other Supports 2K. Duet Size

3. Welding 3A. Weld Location 3B. Weld Size 3C. Weld Length 3D. Fusion 3E. Craters i

3T. Weld Profiles 3C. Undereut 3H. Porosity 3J. Overlap 3K. Surface Slag 3L. Cracks 3M. Welder ID symbol N/A N/A For Information Only

4. Concrete Expansion Anchors 4A. Bolt Size and Numbe?

4A.1 Belt Diameter

_ s.w e.1 CCFJ2: CME PEAX RES?CSSE TEAM QI-035 CXIC7/.1ST Rev. 2 P9?'JL.r!!CN DESC VER;F;CA!;0N ?K; NO.

KVAC DUCT SUPPORTS I-S-HVDS

?AC13__ 0F 4 VER;TICA!!CN l

AI EI3U I REM. ARKS ACCEPT REJECT DATE 4A.2 Bolt Type, Length and Quantity 4B.

Embedment 4C.

Bolt Spacing 4C.1 Hilti to Hilti 4C.2 Hilti to Richmond

' Bolts, Concrete Edges and Abandoned Bolts / Holes 4C.3 Hilti to Embedded Plate Edges 4D.

Angularity 4E.

Nut Engagement and Bearing 4E.1 Nut Engagement 4E.2 Sloped Surfaces 4E.3 Welding Hilti Bolts 4E.4 Nut Bo t t oming

5. Richmond Screv Ar.ehors 5A. Minimum Thread Engagement SB.

Bolt Tightness 5C.

Insert Spacing l

5D.

Sloped Surface 5E. Richmond Bolt Material N/A N/A Por Information Only_

..1 I

COP.CCHE ?!AX RES?CSSE II.syv CMICK' S; QT-035 Rev. 2 PO?'J A!!08 DESC VER;7ICAT*CN ?KC NO.

HVAC DUCT SUPPORTS I-S-HVDS

?ACI4 OT 4 VERITICA!!CN 1

l

^

3

'8 ACCI?!

REJECT DATE

6. Miscellaneous Bolting 6A.

Bolt Size 68.

Bolt Material Type 6C.

Thread Engagement 6D. Washers 6E.

Torque / Tightness 6T.

Sloped Sarface

7. Touch-up Calvanizing N/A N/A Tor Information Only I

4 9

e e

=b o

..1 COMANC3E PEAK RES?0NSI TEAM QI-036 CHECKLIST Rev. 2 POP'JLATION DESC VERIPICATION PKG 30.

2 HVAC DUCT SUPPORTS R-S-HVDS-PAGE 1 OT QUALITY INSTRUCTION QI-036 CREINSPECTION

{ UNI; 1 EQUl? MENT W X/ TAG S0.

X DOCUMENTATION RIV!EW

[, UNI;2

((] COMMCN VERIFICATION

^

REMARKS ACCEPT REJECT DATE SA. ERC Reinspection NA NA For Information Only Drawings 5A.1 Duct Support Detail Drawing 5A.2 Duct Support NA NA Tor Information Only Location Plan (Layout) Drawing 5B. Duct Support Inspector Certifications i

SC. Weld Procedure Application 5C.1 Base Material 5C.2 Filler Material SD. Welder Qualification 5E. Weld Fit-up Inspection PREPARED BY:

APPROVED SY:

DISCIPLINE ENCR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5PECTED SY:

APPROVED SY:

N5?ECTOR DA*E LEAD INSPECTCR DATI j

Q P- '0 7.. A. R e".; n a n )

i j

ess.c...mi c.;

COMA.NCHE ?!AX RES?ONSE TEAM QI-036 CHECKLIST R*V' 2

POPCLA!!ON DESC VERIFIgAf!ON?KCNO.

NVAC DUCT SUPPORTS 2

2 PACE op VERIFICATION AI ElIUI kCKARXS ACCEPT RIJECT DATE SF. Hilti Bolt Torque 5F.1 Torque Wrench Number SF.2 Torque Wrer.ch Calibration ST.3 Torque Value

50. Abandoned Roles Covered by Duet Support Members

- Spacing 5H. Cut Rebar

$J. Resetting of Hilti Bolts 4

....s-

1 Page 1 ef 2.2 COMANCHE PEAK RES?ONSE TEAM QI.036 CHECXI,IST Rev. 2 POPULATION DESC VERITICATION PKG NO.

HVAC DUCT SUPPORTS R-S-HVDS-200 PACE 1 OT j QUALITY INSTRUCTION QI.036 CREINSPECTION

] UNIT 1 EQUI? MENT MARK / TAG NO.

x00CUMINTATION REV!!W

[x UN; 2 DUCT SUPPORT MATERIAL TRACEABILITY

[XC0Fy.ON VERITICATION AW3ME EIMAEES ACCEPT REJEC*

DATE Purchase Order No.:

$K 1 Material Specification 5K.2 CMTR or C of C SK.3 Inspector's Certification

.........o.........

~

Purchase Order No.t SK.1 Meterial Specification 5K.2 CMTR or C of C 5K.3 Inspector's Certification

.........o.........

Purchase Order No.:

5K.1 Material Specification l

l 5K.2 CMTR or C of C 5K.3 Inspector's Certification

..........................,.........o.........

.......,..............................=

PREPARD BY:

APPROV D BY:

DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE T FEG La BY:

APPROVED BY:

IN 5F EGOR DATE L EAD IN SP EC*CR DATE 0?P-407.'.A. Rev;s un ]

L

Pag 2 2 ef 2 n66 6n..u6 v..

COMANCHE PEAK RES?ONSE TEAM Q1-036 CHECKLIST Rev. 2 POPL1A*!CN DESC VERIFICATION PRO S0.

KVAC DUCT SUPPORTS R-S-HWS-20v 2

2 PACE 0F VERITICATICN A ** ** " '* 3 U *' '

REMARKS

^

ACCEPT RIJECT DATE Purchase Order No.:

SK.! Material Specification 5K.2 CMTR or C of C SK.3 Inspector's Certification

......................o........o.................,,................................

Purchase Order No.:

5K.! Material Specification 5K.2 CMTR or C of C 5K.3 Inspector's Certification

................................o.................o.................................

Purchase Order No.:

SK.1 Material Specification 5K.2 CMTR or C of C SK.3 Inspector's Certification

........o........

l l

Purchase Order No.:

5K.1 Material Specification 5K.2 CMTR or C of C 5K.3 Inspector's Certificatios 4

,n '
z.

~......

}

=

Attach ent 6.1 01-030 CCMANCHE PIAK RES?CNSI IIA'4 Rev. 1 CHECK *.!ST POP 7LAT*0S DESC VEy,;y;CA!!ON ?KG N0.

HVAC Duets and Plenues I-M-DUPL-

? ACE 1 0F 3 QUALITY INSTRUCTION

({) REINS?!CT!ON

[)) UN; 1 QI-039 EQUIPMENT MARK / TAG NO.

DOCUMENTATION REVIEW

] UNI :

((] COMMON VERIFICATION RI23. ARKS ACCIPT REJECT DATE

1. Sheet Metal Duet
a. Elevation
b. Location Perpendicular to Air Flow
c. Area
d. Length
e. Duct Gage
f. Reinforcing Angle Site
g. Reinforcing Angle Spacing
h. Companien Angle Size
1. Longitudinal Seam
j. Tie Rod Spacing
k. Tie Rod Diameter
1. Gasket
m. Nuts and Bolts
2. Vall Penetration
a. Minimum Length
b. Maximum Extension
c. Gasket
d. Nuts and Bolts
3. Welding
a. Location
b. Weld Site
c. Length
d. Fusion
e. Craters PRIFARG BY:

APPROVED BY:

DISCIPLINE ENGR, DATE LEAD DISCIPLINE ENGR.

DATE IN5PELIED BY APPROVED BY:

IN5PE'*VR DATE LEAD INSPECTOR DATE

~~

  • C??-007.1A. Revision 0

Attachesnt 6.1 Q1-039 COMA.NCHE PEAX RESPONSE TEAM Rev. 1 CHECKLIST POPL'LATION DESC VERITICATION PKG S0.

HVAC Duet. and Plenums I-M-DUPL-PAGE _2_ OP 3

VERIFICATION IEMAEKS ACCEPT REJECT DATE

f. Veld Profiles
g. Undercut
h. Porosity
1. Overlap
j. Surface Slag
k. Cracks
1. Touch-up Galvanizing 4.

Splitter Damper

a. Installation
b. Nuts and Bolts
c. Locked in Place
5. Extractor
a. Installation
b. Angle Size
c. Bolts
6. Turning Vane
s. Installation
b. Geometry
c. Gage
7., Grille. register and Diffuser
a. Location
b. Installation
c. Gaskets
d. Nuts and Bolts
8. Voluer. Damper
s. Installation
b. Gaskets
c. Nuts and Bolts cl. Locked in Place
9. Access Door
a. Installation
b. Gasket
c. Nuts and Bolts
10. Instrument Test Roles
a. Caps
b. Gasket
c. Bolts 095.^o' te e..4e4mn n

Attechesnt A.'

a'

+

01-039 C0KANCHE PEAK RESPOSSE TEAM Rev. !

CHECKLIST POPULATION DESC VERIFICATION PKG NO.

MVAC D'ict s a-d Plenues I-M-DUPL P AGE _3_ 0F 3

VERIFICATION REMARKS A

ACCEPT REJECT DATE

11. Tubing Connection
a. Installation b,. Nuts and bolts
12. Pipe Connection
a. Pipe Site
b. Pipe Length
13. Instrument Mounting
a. Installation
b. Mounting Bracket
c. Nuts. Bolts and Vashers
14. Plenues
a. Location
b. Sheet Metal Gage
c. Reinforcing Angle Site
d. Reinforcing Angle Spacing
e. Gasket
f. Nuts and Bolts
15. Plexible Connection
a. Location
b. Companion Angle Size
c. Nuts. Bolts and Washers
d. Pusalignment
16. Concrete Expansion Anchors
a. Site and Number
b. Embedment
c. Bolt Spacing
d. Angularity
e. Concrete Damage
f. Nut Ingagement and Bearing CPT c'7.lB. Revision 0

Attcchsent 6.1 COMANCHE PEAK RESPONSE TEAM QI-040 CRECKLIST Rev. 1 POPULAT!ON DESC VERITICATION PKG NO.

MVAC Ducts and Plenuss R-M-DUPL-PAGE 1 0F 2 QUALITY INSTRUCTION CRIINSPECTION

] UNI; 1 QI-040 EQUIPMENT MARK / TAC S0.

DOCUMENTATION REVIEW

[ UNI; 2 BSC Dvs. 2323-M BSC Subsystem C COMMON VERIFICATION

^

EIMAlUt3 ACCEPT REJECT DATE

1. Pressure Test
2. Material Cage
3. Turning Vane Installation
4. Wald Procedure Application (Ducts and Tiexible Connections)
a. Base Material
b. Filler Metal Classification

'l

5. Weld Procedure Application (Plenuas)
a. Welding Procedure
b. Base Material
c. Filler Metal Classification PRIPARID BT:

APPROVED BY:

t DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5FEa w BY:

Apygoygp gy:

NFIGOR DATE LEAD INSPECTOR DATE C??-dO7. !A Revuton 0 1

COMANCHE PEAK RESPONSE TEAM 0

CHECKLIST g,y, g

~EdFULAT10N DESC VERITICATION PKG NO.

RVAC Ducts and Plenuss R-M-DUPL-PAGE 2_0F 2 VERIFICATION REMARKS

^

ACCEPT REJECT DATE

6. Welder Qualification
7. Inspector's Certification
a. Welding
b. Pressure Test
c. Material Cage
d. Turning Vane Installation
8. Material Traceability *
9. Valding
10. Touch-up Galvanizing I
  • Note Material Traceabi1 Lty for steet meta 1, structural angles and nuts and bolts are found in R-M-DUPL-150 (see che:klist Attachment h.2), R-M-DUPL-151 (see checklist Attachment 6.3), and R-N-DUPL-15: (see chenklist Attachment 6.4) l respectively.

d CPP 007.15. Revision 0

..3 COMANCHE ?!.AK IISPONSE TEAM QI-040 CHECKLIST g,y, t F0FULAT!,0N DESC VERITICATION FKG NO.

RVAC Ducts and Plenues R-M-DUPL-150 FACE L OF 1 QUALITY INSTRUCTION CREINSPECTION UNI; 1 QI-040 EQUIPMENT MARK / TAG NO.

@ DOCWENTATION RIVIEV UNI; 2 Sheet Metal COMMON Material Traceability VERITICATION REMARKS ACCIPT RIJECT DATE Purchase Order Numbert

1. Material
2. CMTR or COC
3. Inspector's Certification Purchase Order Numbert
1. Material
2. CMTR or COC
3. Inspector's Certification Purchase Order Number
1. Material
2. CMTR or COC
3. Inspector's Certification PRIFARED BY:

APPROVED SY DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5FEuw 5Y:

APPROVED BY:

IN57EGOR DATE LEAD INSPECTOR

~ DATE CPP-007.lA. Revision 0

COMANCHE PEAK RESPONSE TEAM o

CHECKLIST g,y, g

POPUl.ATION DESC VERIFICATION PKG NO.

RVAC Ducts and Plenuss R-M-DUPL-150 PACE L Or 3 VERIFICATION REMARKS ACCEPT REJECT DATE Purchase Order Number:

1. Material
2. CMTR or COC
3. Inspector's Certification Purchase Order Number:
1. Material
2. CMTR or COC
3. Inspector's Certification Purchase Order Number:
1. Material
2. CMTR or COC
3. Inspector's Certification Purchase Order Number:
1. Material
2. CMTR or C0C
3. Inspector's Certification i

d i

CPP-607.18. Revision 0

f' COMANCHE PEAK RESPONSE TEAM Q1 0 0 CHECKLIST g,y, g

POPULATION DESC VERITICATION PKG NO.

PACE 10F A HVAC Ducts and 71enuss R-M-DUPL-150 VERITICATION IDIAEES ACCEPT REJECT DATE Purchase Order Number

1. Material
2. CNTR or COC
3. Inspector's Certification Purchase Order Numberi 1

l

1. Material
2. CNTR or COC
3. Inspector's Certification Purchase order Numbert
1. Material
2. CMTR or COC
3. Inspector's Certification Purchase Order Number
1. Material
2. CNTR or COC l
3. Inspector's l

Certification l

l 4

l CPP-007.lB. Revision 0

..3 COMANCHE PEAK RISPONSE TEAM 91 04o CRELC.IST Rev. 1 POPULATION DESC VERITICATION FKG NO.

RVAC Ducts and Flenuss R-M-DUPL-151 FACE I 0F 3 QUALITY INSTRUCTION

[REENSPECTION

] UNIT t QI-040 EQUIPMENT MARX / TAG S0.

@ DOCUMINTATION REVIEW UNIT 2 l

Structural Angles Material Traceability C COMMott VERIFICATION EUIAAE3 ACCEPT REJECT DATE Purchase Order Numbert

1. Material
2. CKIR or COC
3. Inspector's Certification Purchase Order Number
1. Material
2. CMTR or C0C
3. Inspector's Certification Purchase Order Humber:
1. Material
2. CMTR or COC
3. Inspector's Certification FEI?AAD IT:

APPROVED BY:

DISCIPLINE ENGR.

DATI LEAD DISCIPLINE ENGR.

DATE IN5PEGI m &Y:

APPROVED BY:

~

NFMK DATE LEAD INSPEC*0R DA*E C??-007. !A. llevuun 0

..3 COMANCHE PEAK RESPONSE TEAM QI.040 CHECKLIST Rev. 1 POPU1.ATION DESC VERITICATION PKG No.

HVAC Ducts and Plenues R-M-DUPL-151 PACE L OF 3 VERIFICATION REMARKS ACCEPT REJECT DATE Purchase Order Number:

1. h terial
2. CMTR or COC
3. Inspector's Certification Purchase Order Number:
1. W terial
2. CNTR or COC
3. Inspector's Certification Purchase Order Number:
1. h terial
2. CMTR or COC
3. Inspector's Certification e

4 Purchase Order Number:

1. h terial l
2. CMTR or COC
3. Inspector's certificatten i

I

(

CPP-007.lB Revision 0

j Attochment 6.3 COMANCHE PEAK RESPONSE TEAM QI-040 CHECKLIST g,y, 1

i POPULATION DESC VERIFICATION PKG NO.

l HVAC Ducts and Plenuse R-M-DUPL-151 PAGE L Or 3 i

VERIFICATION RDIARKS ACCEPT REJECT DATE s

l Purchase Order Number:

1. Material
2. CWTR or C0C
3. Inspector's Certification l

Purchase Order

[

Number:

1. Material
2. CNTR of COC
3. Inspector's Certification i

Purchase Order Number:

1. Materisi
2. CWrR or COC
3. Inspector's i

Certification Purchase Order 6

I Number i

i

1. Materisi I
2. CATR or COC l
3. Inspector's certification t

i t

i l

1 L

CFF-007.18. Revision 0

..4 COMANCRE FEAK RESPONSE TEAM Q1 04o CHECKl.IST gev, g F0FULAT10N DESC VERITICATION FKG No.

HVAC Ducts and Plenuss R-M-DUPL-152 FACE I 0F 3 QUALITT INST 7UCT10N 0aftNs?ECr20N o UNz! t QI-040 EQUIPMENT MAJtK/ TAG No.

@ DOCUMENTATION RIVIN UNIT 2 Nuts and Bolts h terial Traceability O coNxoN VERIFICATION N

ACCIPT RIJECT DATE Purchase Order Numbert

1. Material
2. CMTR or COC
3. Inspector's Certification Purchase Order Number
1. Material
2. CNTR or COC
3. Inspector's Certification Purchase Order Numberi
1. Material
2. CNTR or COC
3. Inspector's Certification PaEFAAD ST:

AFFROV Q SY; DISCIPLINE ENGR.

DATI LEAD DISCIPLINI ENGR, DATE IN5fIuw BT:

APPROVE SY:

WNM DATI LEAD INSPECTOR DATE C??-007 lA. Revuton 0

E 1

COMANCHE PEAK RESPONSE TEAM f*!

  • CHECKLIST gey, t j

i POPULATION DESC VERITICATION PKG NO.

MVAC Ducts and Plenuss R-M-DUPL-152 PACE L OF 3 VERIFICATION REMARKS ACCEPT REJECT DATE Purchase Order Number

1. h terial
2. CNTR or COC
3. Inspector's l

Certification Purchase Order Numbert

1. hterial
2. CNTR or COC
3. In,spector's Certification Purchase Order Number
1. Material
2. _CMTR or COC
3. Inspector's Certification Purchase Order Number
1. Material
2. CMTR or COC
3. Inspector's certification t

CPP-007.18. Revision 0

..4 COMANCHE PEAK RESPONSE TEAM QI-040 CHECKLIST g,y, 3

POPULATION DESC VERIPICATION FKG NO.

HVAC Ducts and Plenues R-M-DUPL-152 PAGE L OP 3 VERIFICATION RDIAAKS ACCEPT REJECT DATE Purchase Order Number:

1. h terial
2. CMTR or COC
3. Inspector's Certification Purchase Order Number
1. h terial
2. CMTR or C0C
3. Inspector's Certification i

i Purchase Order Number

1. hterial
2. OfTR or COC
3. Inspector's i

Certification Purchase Order Number:

l

1. h terial
2. CNTR or COC
3. Inspector's Certification l

1 4

CFP-007.lB. Revision 0

Attcchsent 6.1 QI-041 COMANCIE PEAK RIS?ONSE TEAM Rey, t CRE M IST Page t og 3 POPULATION DESC 7ERITICAT10N PEG No.

Field Fabricated Tanks I-M-TTTA-PAGE 1 0F 3 QUALITY INSTRUCTION

@ LIINSPECTION O gyIT t QI-041 EQUIPMENT Mass,/ TAG N0.

] 00c;MccATIog gzvity 0 Uwt: 2 O councN TIRITICATION N

ACCIPT REJECT DATE 1.

Name Plate 2.

Shell Top Angle 3.

Anchor Bolt Ring 4

Anchor Bolt Chairs 5.

Anchor Solt Tightness 6.

Out of Roundness 7.

Longitudinal Weld Sean Offsets 8.

Sotton Plate Weld Seas of f set 9.

Rozzle Site and Type A. Site B. Type

10. Nozzle Location
11. Nozzle Insert Reinforcement Plate
12. Nossle and Manhole Reinforcing Pads PREPARID BT APPROVED BY:

DISCIPLINI DGE.

DATI LEAD DISCIPLINE ENGR.

DATE IN57EWw BY APPROVID ST:

L.W EG UR DATE LEAD INSPECTOR DATE CPP-007.1A. Levision 0 w

..5 QI-041 COMANCIE PEAK RESPONSI TEAM Rev. 1 CIECKLIST POPULAIION DESC VERIPICATION PKG NO.

Tield Tabricated Tanka I-M-TTTA-P ACI __,2 0T 3

YERITICATION tZNARXS ACCITT REJECT DATI

13. Seirmic Restraint l

l 1

A. Installation B. Elevation l

C. Weld 14 Internal Pipe A. Arrangement i

l B. Dimensions

15. Welds A. Configuration Size and Profile B. Butt Veld Rainforcement C. Undercut D. Surfaces of Weldo E. Offset of Butt Velds T. Tairing of Offseta G. Cracks. Lack of Tusion and Crater Cracks R. Indications
16. Base Materials A. Material Identification B. Material Defects d

C??-007. L3. Reva. sun 0

j Att chae:t 6.1 QI-041 COMANCE PEAK R15?0NSE TEAM g,y, g

CB CKI,IST POPULATION DESC YERITICATION PRC 30.

Field Tabricated Tanks I-M-TTTA-Pact _3 07 3

YE11TICATION IN ACCEPT RIJECT DATE

17. Weld Rust
18. Material Rust
19. Grout 4

C??-407.L3. Rev.ston 0

M taehaent 6.1 CI-00 KEV. 1 Pege 1 of 2 COM.A.%"EI PIM II5?CNSE TT.AM C11 ll:.IIT 9

F0F'A.An;N DESC TE? H CAUCN Pia 80.

FA*I 1 CF."

r".D TA3P!!ATT3 TAN 1t3 R-M-7F"A=

QCAL*IT D37L"CUCN O izusit:=cw 0 c:r:: t 01-062 EQIJ17."I.C.u1KtIA.3 Wo.

h DOC MINTinCN RIT!IV O ow:: 2 C COMMCM run:Ana, i

AC.~?T LI *In DCE

1. Disensional Yorification A. Tack Diameter
3. Shell Disseter e

C. Yassel lead Dlaseter D. Temperat7 Foundation tevel E. Taek lettos Crown

2. Rydrostatic Test A. Borizontal Tank
3. Tlat lettos Tank
3. Escord Dravtags A. Joint Identifiestion
5. Veldere Identifiestien C. Welding frecedure Specifiestion D. Record Drawing Table $1 noffs PSIFAAID ST AFF10T C ST:

015C:7t DI OsC2.

DaTI LEAD D15CIPLDE DC1.

DATI L23Fh.w Bla atF10V D ST:

i.oit w a CATI LIAD mstte Ost DATE C??'007.1A.Rev'1Tien0'

Attachsent 6.1 Q7-042 R E *.*. 1 Page 1 og 1 COMA 3C11 !!AK RJ.37CN5% TIAM C11CZ:.: T PCI'.';.an;S 303; TD T;32;0N PK3 30.

IE CI TIII.2 TA31:CA!D TANT.S 1-M-T77A-VTR.:T.A! GN l3.T*ICT'DATI ACO:77

3. (wont'd) t.

Et Procedures identified

4. U 1d Materials recedure Amorovs1
6. Velder and Veldize Cee?stor Ous11!! cations
7. Wendestnctive Examiutions A. Veld Joint 1

Identificatios

3. NCE Procedure / Report Identification I

C. Leviewer Certificatica

8. Wondestructive

'**=4-ation Personnel Certi.fications A. NDE Personnel Certification

5. Vision Test Record 1

C. WDE Certifiestion

9. Setraic Leatralas As-luilt Dimensions 10.Materisi Verification 4

C?- W.48, aavist'o's 0

~

..1 QI-Ot.3 Rev. 2 Page 1 of 2 CDMANCII PtAE 115 Poult TTM C11CE.1ST FGF u nas DEK vn m CATIce PEG 30.

C05C1.ETS PLACDerf IMI L Of b um aimCuc.

Q1-04)

@LIU5PICT10W C C3:71 GG.rMENT MAAKi;a; so.

O occ==r:AT:o= tritiv 0 cut :

O C=*eW ro m CA m u ACCIFT SUICT DATI 1.

tecettea A.

Welle. Cel s e.

Piete. Fedestale.

Cutbe. Fede S.

$1aba c.

le es 2.

Sist A.

Welle. Cutbe.

31obe B.

Columme. Piere.

Podestels C.

lease 3.

Serfste taopecties A.

Welle. Curbs.

Cal m e. Pters.

Podestole. Pode S.

$lebe. Seems PREPA& E lil df t0TD l t etst!Ptlyt t3L;t.

tatt (tg ttsc rt!st N,t.

SATT

  • sars..no ITs MPRCvD 31:

. m t-

=

&n L LAD !N 57 t p t

~5att CPPWi.LA. Revuun 0

P AttaChaent 6.1 I

Q1-043 Rev. 2 l

I ComApCut PEAR Bt5POPlt TEAM CNECELllt PONLATION Dtic V RIFICAT10It PEG N0.

PACE 1 0F 1 Co#CttTE PLACDEWT Tp!FIC Afl0li ATTRIDL'TE ACCEPT BEJECT DATE 6.

Ceted Roles t

s.

tratte n.

Patches I.

Aether Solte A.

B, i

I C.

5.

gebodded Flotta and $tructural the re s L

i

[

r b

r i

i ta'.*i' 45, trvioinn 0 1

1 l

i 2

i 1

Attech:ent 6.1 QI-044 Rcv. 3 Page 1 of 3 CHECKLIST CosWK1it itM Rt8 Posts Ttait Ct1CEL181 rurnAuge esss entricattos pts as, tact i er.L c et.. rtete.e.

i 00 AL tT1 185TEUCT1W OinuiriCtta=

0 it i 414t4 W LF 2 rf AAAE/1AG 80.

@ 90C9mrTAftes agTtw Q gutt 1 Ocm vrtirICAftse '

N actEFT taJtCT 94TE l.

helge Pts. Centrate totablog 6 Ceeveytag i

A. Rised h elge Carde.

Staedff r

8. Rised Deatge Carde.

Steelfled DF The Flete C. ptsed Destys Carde-Frenettiene

9. letet Fleet testes e
f. lateb Ticket F. Treek staese.

j tevetoete*6 C. Trut 9teekstas flas 3.

Fotos. Esmettoettes Jetate A. testattettse of i

fore nout

3. testattettee of CasstrestLee Jetote l

tenAas sta gr min l' DtlCIPttst luct, 36 7 igag gtgg;rtgyg gjgg.

34T5 W FEU38 I14 AFFEMW BTs Ems,as WaT1 LIAR talytcT;t pa;t Cf f =Wif lA. tectstaa 4 t

1 Attach ent 6.1 Q1-044 Rev. 3 CHECKLIST (Cont'd)

I f

CesW Cat PLAR tt8 poult TEMI CWIG1lff MFVLATIUB DE5C TfttFICAfice FRG 30 FACI 1. Of.J, Cemetete Fleteneet trttFICATIOU I

ACCEPT ttJtCT Beft e

C. Seteele att See 9, Post Card flee-off 3.

Rebet. Cedwelde.

Wateretere. Anther talte. tahedded fletei A. Webstellee.

Spostes. Ceestete Covet & Proper tastellettes S. Cedweld/ Lap lettsee C. Asehetese Length et newete

9. Amhet letto.fype
8. testattettee of waterstate F. leete11stfee of tonedeset 4 Depeettist ud Ceneeltaettee
a. Pieteneet tete
9. Pteeeeeet Lift C. flessenet Teeheiene
8. Pfesegeet Ctede
f. vthtetere Seeed F. Tinester ces,ett.
4. Tibreter Penettettee trr.Mr.s e, se,t elee e 2

Attechment 6.1 QI-044 Rev. 3 CHECKLIST (Cont'd)

ConoCu rts usrovst TT.AM CE ct2.1ST PorUtAllom DLSC tralricAttou rst. 30.

FACI J OF J Centrete Placement FttirICAttou

&CCEPT 13 JECT DatT 5.

Attethte Deleted 4.

la-Process canctete Teste A. Air centent

3. Slumre C. Coverste Toepersevre 7.

Coring

=.

A. Curie 3 Sagwirement e Troperly addrassed l

9. Chriss Las T.attia_les end tetti 8.

Cearteesf.ve Stressth feet Baselte A. Laktstery Cured

. g;,.

Cvitad o re

3. Field Cated Cyltaders _.

2 eettee t-f Me 9.

1:

10. t upeettes W Test Peteeenal Cartifiest';m i

l l

l CO?-40'. Lt. levtsten d 3

Attcchment 6.1 QI-045 Rev. 4 Page 1 of 6 CDMANGE PEAI RISPCN5Z TIAM CIECI:.IST F0Pr A!;0N DL5G V nITICAilCN PKG.10.

STRUCTVRA1 STEEL I-5-STtt FACE 1 CF,,j,

QUA.L;TT LN571UCTICH Q1-045

@IIDSPECTTCW

['CN!!i 1.QGIFMINT MAAA/IAC.10.

O occ=rx:A:to" ar'tiv 0 cst: 2 C019CN VTRIFICAT105 A

ACCIFT RIJECT DATI l

A Member N/A Inf'irmation Mneder Al) location A2) Site Information only A3) Meterial Ident W /A.2 A4) Leenth A5) orientatioa l

A6) Alterattoes N/A Info restion Bander i

a) tocation

_ b) Site c) Limit of Alteration d) te-entreat Cornere e) Cuts and teles PRIFARED 8t:

Affl0T D Its DISCIPLIW1 DeC1.

DATE L M 015C1F'.151 08C8.

DAtt int m s.w ITs A FROTED ST:

.n r tu va UAn LEAD INSPEC Ot 0A!!

C?P-C.tA. tevtsun 0

l Attcchment 6.1 QI-045 Rev. 4 COPANCME FIM 115?CN$l !!A4 l

i C3E 7.*;5T

?^?.b ;;;> ;&i;

.IR:T;;AT*08 PK; 30.

stavCnut sTtzt t-s-sttt PA;I J er 3

.In:rt:A;:cs

^

AC0!?!

RIJECT DATE 5 Connection N/A Informatice Needer ll) tocation

52) Siz e
13) Orientation B&) Velde N/A 1Bif ormatite Reader a) toestion b) Weld Site c) Weld Lenath I

_d ) Fusion i

I e) Cratere f) Weld troffles a) Utdareut h) Porootty

1) overlap _
1) Surf ace Staa k) Cracks Information Only
1) Walder ID Srebel 5/A Attachneet 6.3 l

l

55) Strvetersi loltima N/A 1 oformati pe Eseder j

s) Solt Diameter b) Material c) Questity i

1 i

d

?s. w.:.

~4...,s.'=

2 1

..1 QI-045 Rev 4 CO.*x:CMI P!AK RISPONSE TIM C *i t C-*. ; 5

  • 1 M P '.~.A
> 315C

t!t;T;CA!;Cs PK; sc.

i STRUCTt*RAL STEEL I-5-STTL P ACI J 0T,,,,,6 vtR;rt:AT;;N lLIJICTlDAIT A

ACCIP!

l 1

55) Structural l

Solting (Cont'd) d) Vsehere 1

e) leveled Vsehere f) Role Coverer.e a) Jos pute I

I h) Thread Ea goesnt i) Edge Diet ence a

l

3) Tiahtentos i

k) Seering

1) Specief.

e) Confinretten

56) Richrend Inseets N/A in f ores t i,pe Eseder e) Throod Essesseset b) Ti'thenese c) Vasher d) '.oc et toe e) Edse Dietence
57) Concrete Espension

(

Aschefs w/A : sformati pe Reeder 57.1 Stae and Dumber e) Diameter b) Tyye. Length.

Febee i

~ ~..

.:. *e.. c.:=

1 1

3

AttCchmen8 6.1 QI-045

)

Rev 4 C0Fxic'.4E ?!AK R15?CN11 TEAM CXIC"*.;17

?;'.h ;Cs ES-

'.'II;T;;A* ;;N ?G. C.

N

?ACI &CT 6

1-5-STYL 1

STRUCTtM STEEL VER;Tt:At:05 l

WM ANP.5 AC ty7 Kgygg; 7A7Z l

a 87.2 Embedmont tensch N/A Informattle Meeder 57.3 Solt Specina a) Center to Center Specins l

b) Bilti to i

Richaced c) 511tt to Embed Plates 97.6 Anavlerity f

St $ Concrete teatas l

37.6 Nut Engagenoot N/A leformett rt, Easder i

and leering I

.e', put Eeastseest

~

b) Seartes e) Bott e t di Weld J

N/A l eformati m leader 37.7 Configuratios a) Locettoe b) Edae Dietsace

18) laseplates
89) Crovt 3

i

?~.

. ;... v.. - >

d

.....1 QI-045 Rev. 4 C0m XE PIAK RE5?CN$t !!M I

C'.4 E 07.; 5I

?0?.b ;;05 0130

'ta;7;;A;;;s px; n,

STRtlCTURAL STEEL I-$-STtt FACI J0T _6 vn:tI AT:cs ACCEPT LI.'t CT DATI RD.AES C) Field Installed i

Details N/A Information Needer Cl) location C2) Site C3) Orientation CA) Veld W/A Informatine Header si Loestion b) Weld Site

) Wald Lenath
4) Fustos e) Craters f) Veld Profiles

_ J Caderent h) Porosity

1) Overlap

!) Surface Slaa k) Cracks Information only

1) Velder ID Srebel W/A Attachasnt 6.3 CS) Bottlan W /A sforestipe Reader a) tolt Disaster l

b) Material e) Quantity i

4

' t " *. e '. : = 1 l

1 F

5

I i

..1 i

QI-045 l

Rev 4

)

CCPANCME PIAK 1!$PCNSE TEM

{

CXECn !st FCP'..a!*;> ;!ic

.11t;-*.CA;;08 PK; :so, STRt'CTtlix, STEEL 1-5-STEL P ACI 6 0f,,,,,J vtur:CAn:N fR. EJECT ACCI?*

3A*!

I

'3 C5) Solting (Cont'd) l di Weehere e) leveled Weehere f) Role Coversas a) Jos Nute h) Thread Enneaseent i) Edme Distance

3) Ti g ies I

h) learina f

_ _z

1) Specisa el Cosfigurettee

-..c 2.

s,...,,,..

9 1

l t

6 L

Attechtten2 6.1 QI-0/.6 Rev. 2 Page 1 of 3 COMANCRE PEAE RESPONSE TEAM CEECILIST F0FL" ATION DESC VERITICATION PEG No.

Structural Steel R-5-STEL.

FACE t 0F 1 QUA.LITT INSTRUCT 10W Ql-U46 012t=5'ect2o=

0 cvit i EQU1FMENT MAAK/ TAC NO.

X DOCDGNTATION RZY1EV O vatt 2 O===

s Vtt1FICATIou ATTRIBUTE A.CCEPT REJECT DATE A.

Cons t ruction Operation Traveler f

PacLane N/A INFORMATIONAL NEADER A.1) inspection Package l

A_.2) Drevinao A.J) Inspector Certificatter.

N/A INFORMATIONAL NEADER A 3.1) Inspection Report A.3.2) Weld Inspection Docuanntation Card A.3.3) Material Requisition i

A.3.4) Structural Aseembly verification Card A.3.5) Construction Operation Traveler A.3.6) Other Documents (list) rtD AnzD af:

AFFlovID ST:

DISCIFtlyt BBCt.

Daft LEAD D.$CIPLINT EMCt.

Daft uarh6w bis AFFRvwo RT:

Anarzuwa DATI LEAD IE5FECT05 DATE CFF=007.lA. Levision 0

1 1

At20cheene 6.1 QT-046 P.ev. 2 C::%NCME PEAK RI5?CNSE TEAM C'dICKI,15T PCF'.h !;CN OESC VER:T; CAT:CN FC NC.

Structural Steel R-5-5TEL-PACI 2 or 3

VER:r: CAT:CN l

ltP"AJtXS lR. EJECT

^# 3UI DA*E ACCIFT 8.

Member 5.1 Welding N/A INFOR.MATIONAL HEADER B.I.1 Weld Procedure Ous3fiestion 3.1.2 Weld Precedure Appliestion N/A INFORMATIONAL NEADER

.) s.. wec.1 b) Filler Metal c) Material nickne e s B.1.3 Velder Qualifications 3.1.4 Strese Relievina 8.2 Concrece Er;ansion Anchors N/A IN70RMATIONAL NIADER 3.2.1 Torque N/A IN70RMATIONAL PEADER a) C611bration b) Torque value 3.2.2 late Spacias 3.2.3 Reverk N/A IN70RMATIOMAL NEADER a) n read Fit b) Restampina 3.2.4 Note Drillina B.2.5 Settina

,.....a. Rertsten i 2

[

Attachrent 6.1 01-046 Rev. 2 CCPMCME P!AK RES?CNSE TEAM CECKI,IST POP'.'.A!;CN 015C Structural Steel VER*TICA!;GN PK; No.

R

  • S-S TIL=

FACE 30T 3

vn;rICA;;ON AW5m l

l RLIECT ACCI?T DATE IUwtXs B.3 S truc tural Boltina N/A INFORMATIONAL HEADER 3.3.1 Tiahtness

3. 3.2 Torque N/A INFORMATIONAL READER a) Torque value b) Calib?aeion B.a Stud Velding W/A TNFORMAff0NAL READD 3.4.1 Daily Qualiffration Report e

_tj. 2 Stud Teettas C.

Material Ttacesbility N/A i

INFORMATION READER I

I a) Rest Number Conforufty

~

b) Material Conformity

)

4.' f m.,, * * * = As... n ;

e 1

3

o e

Attachr.ent 6.1 QI-047 Rev. 2 Page 1 of 2 l

COMANCHE PIAE RESPONSE TEAM C11CC.IST POP h T10N DESC VERIFICATION PEG NO.

PIPE VE1.DS/ MATERIALS I-M-SBWM-PAGE 1 0F QUALITT INST 1UCTION QI-047

[IIINSPECTION UNIT 1 EQUIPMINT MARK / TAG NO.

DOCUMENTATION RITIEW C UNIT 2 COMMON VIIIFICATION ACCIFT IIJECT DATE 1.

WEI.D S A. Configuration B.

Site & Profile l

C.

Butt Weld l

Reinforcement D.

Radial Wald l

Shrinkage E.

Undercut

{

F.

Suzf ar.a oi nialda l

C.

Cracks. I.ack of l

Fusion. Crstar Cracks PRIFARED BY:

APPROTED BY:

DISCIF1,INE ENG1.

DATE LEAD DISCIFtlNI DeGt.

DATI LE3FMu RTL AFFlsie 111 LN5FEGUR DATI E SPECTOR DATE CPP-007.lA. Revision 0

r _ _ _ _ _ _ _

i A22achmen2 6.1 QI-047 Rev. 2 1

C0!'J4:C*'I ?!.'J at:7CN:: -w:

C?.ECX:. ST

?0P'J A!!0N DESC

'/ERIFICA!!CN PKG NO.

PIPE WELDS / MATERIALS 1-M-SBWM-

?^0Z L OF L VERITICATION

  1. I

[

ACCEPT R.T. JECT DATE l

H.

Veld Rust (Stainless steel only)

I.

Welders ID Symbol N/A N/A Use Data Recording l

Form. Attachment 6.6 (not accept / reject attribute)

J.

ID and Location 2.

BASE NATERIAI.S A.

Esse Material N/A N/A Use Data Recording l

Form. Attachment 6.6 Traceability (not accept /

reject attribute) l 5.

Base Material Defects l

C.

Base Material tust (Stainiees steal only) l

!*h)

'd,J*.*".

)

2

..1 COMANCHE PEAK RESPONSE TEAM QI.04g CHECKLIST Rev. 1 POPULATION DESC VERIFICATION PKG NO.

Tubing Welds / Material R-M-TUWM-PAGE 1 0F 1 QUALITT INSTRUCTION QI-048 REINSPECTION

[)) UNIT 1 EQUIPMENT MARK / TAG NO.

]DOCUMENTATIONREVIEW UNIT 2 COMMON VERIFICATION ACCEPT REJECT DATE NW

1. Weld Procedure Application
2. Base Material Traceability
3. Weld Material Traceability 4, Weld Procedure Qualification
5. Welder Qualifications
6. 1:old Points
7. Inspector Certification PREPARED BY:

APPROVED BY:

DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE INSPECTED BY:

APPROVED BY:

IN5FECTOR DATE LEAD INSPECTOR DATE

T?-007 lA. Revision 0 o,

..1 QI-049 Rev. 1 Page 1 of 2 j

l COMANCHE PEAK RISPONSE TEAM ~'

CRICII,1ST F0F h :10W DESC VERITICATION FKG NO.

PIPE VELDS / MATERIALS I-M-LSWM-FACE 1 0F 1 QUALITT LNST10CTION QI-069

@LIINSPECTION UNIT 1 EQU1FMZNT MARK / TAG NO.

] DOCUMENTATION RITIEW UNIT 2 O cowMow TERITICATION ACCIFT RIJECT DATE 1.

VELDS A. Configuration B.

Site 6 Profile C.

Eutt Wald peinforcement D.

Ladial Weld Shrinkage E.

Undercut F.

$srface of Belds C.

Cracks. Lick of Fusion, Crater Cracks

{

F1ZIARZD IT:

AFF10TED ST:

DLSCIFtDrt EEGE.

DATI LEAD DISCIF%Drt DeG1.

DATE LaartwAw II:

AFFR0v w ht:

&nrzbwn DATI LEAD INSPECTOR DATE CU-007.1A. Revistan 0

..1 QI-049 Rev. 1 CCHANCRZ PEAK RISPONSE TEAM CEECKLIST POPULATION DESC YERITICATION PKG NO.

PIPE VELDS / MATERIALS I-M-LSWH.

FACE L OF L l

YERIFICATION 4

ACCEPT RIJICT DATE H.

Veld Rust (Stainless steel only)

I.

Welders ID Symbol N/A N/A Use Data Recording l

(not accept / reject Form, Attac hent 6.4 attribute)

J. ID and Location 2.

BASE MATERIALS A.

Base Material N/A N/A Use Data Record #,ng l

Traceability Fort, Attachment 6.4 (not accept /

reject attribute) l 8.

Base Material Defects l

C.

Base Material Raat (Stainises steal only) i I C F,007.it..tevtetoe 8 2

..1 QI-051 Rev. 3 Page 1 of 3 a

CcewsC1t PtA8 tt3Poelt !!st

.38CEL;8T I

rar. w ;;s ar3c

. nir!;.afsce FEG e0.

PIPt W111P t.8$?1AINTS

!*5 Pvtt Fact. 3P 1 3 4 ITT 181 N GT108 ot cli

@ Mt387tCT!=

[ pt?

or,m,

.m..

C ac==titta =ta C att O-mcm.

&TTBt3ffl agggy ggggt gggg M

!. Identtfttettea

1. Leestfee
3. Otteatettea
4. Ceaf t#wrettee
4. Cem,mente
8. 84tettele il piph Seteegth le e t na

-,86 14e eestestate

~

l' Otiere 9/a e/A Dee tr'i sy eele. Betged en att 4.3 C. 1metallettee ti towel 4 Plume ti-Cleeastsee t:( seetretet seettfit

9. Rose Ptetes I. P lantes F. a t t et heont e S. Cete A. tevirouseet

() Amtleet feep.

3/A W/A tti testen Cend.

sta rie

9. Ces e

Ptgtg3 gt; a# F1 M n l' a

311 ; ;it Onc t.

Sait LEaa S ti::P'.MW 3aN

..iart. TEE ITa a#FleTED II ur

.u

An

'. I.AD ;11 F Y.~!I 78 $ * '. A. t e *. 4 % e *, I I

l 1

l

Attcchaent 6.1 QI-051 Rev. 3 l

c:wcas ita instws: ta cza.~ :sf I

r';F.' !W H5; in;f;;a!!38 ft; eO.

PIPS WIP t!FTRAtFTS tel PWR4 i4EI L Of L

,.., mme

-t 4CC M l 18.*8CT$478

6. Setstag
6. Itse b n d et Des. Berter sal 7.

B.

' etat Detette S/A 5/A Seeerd an attamtmoet 6.6

' esber lese

' ere e

.se t.ma poetse is.

In t emmaammes

f. Ansbet tette
4. 018 W Iseette 6 Pie ed ed le t t e i

toe 6 wel

.1 em i ma l' t l

s

'es er e\\ V ene

.l Terete w

et) Bet taAas umet vill Mrsed tagegensht 1%f aiOmpede B. Coastete 8spenetmi asehers'Pitti bell,s)

.)

.,no 6 mr

'lB

"-t

_ t

)

das M

9) man.ariET

  • )

';aearete ?

et) 'Impaganses a d tematan 1

0. WM
a. resagrea usee W1de ama Lm.

,e'

_t T:

hMana

(

'r^^^-

T1,)

,ad t.aa t t oes fi l ilhld laat l

Dec. BeTier 9 elf is) be* dets f3 f/4 t '4

&amete se Mt. 6.It

/

  • e e i i

l l

I

I Attachaent 6.1 1

QI-051 Rev. 3 i

l 1

i

  • ameC31 Pf4 8187% I8 h 1 04.*** ' I f F F.b C ;1 &3;

.'T1;T;;anDe l'; #G.

P!Pt W!P IllitAtWTl l*S*PWtt N1,,,10f y i

srt:1;;4: :S lACC'.F" f 81.TtT f SATI

8. BF Welde 1)

.Mettee If) lue 4 Prvfile t

111 ' l've las i

19' Creeks.

1 Vederret I

f vi; lar f ac e L

Dee. Beete Dely et t) tieldet's G 8/A f/4 leasse se hat. 4.19 C. 41 etbet soles

,)

'etettee.

t us it

'helse I

tv (refere e

Pfefile et' Generent

1) Pereelt?

et.if veerles 1

J) Ilea a) Creese Bee. BeTies Delf ef) Weldet's G S/3 pre St49fd se att. 4.19 e

e l

1

'4 i

l I

i l

3

i

..1 QI-052 Rev. 2 Page 1 of 3 CHECKLIST aci..

eas e..

C0mC11 FLd 115? oust t!xt et OST C3!:21:st see. 1 FJP..47.;a 3(56 ggt;7; h;;;p pt; sc, Pipe mit teatratste 8-$-PWI PA:t 1 CF 1 G E P. i3&TL;;;;;m 0t-Os!

O seus><:r>W D a:t i EGw'I:G Ws;4 4.

@ DCCOmrtAT; s arrity Q gy ; g O Cac, i,.veie,

,et....

WTt:r::Attos 6

, AC* M LL*tCT SA!!l

8. Coastnettee operactee travelet A. Traveler fetiste S. Drewtate 3/4 W/A lateed on Attac h at d.l C. Inspotter Cettif test tea
1. Woldtag A. Wide i
5. Wald Procedere ovattfiesttet C. W 14 Precedere App 1&satten
1. Code
t. Vase utettel
3. f t11er Nest
3. 4t't S ttkasse D. Welder Qu1111tattees
1. let Walde
1. C14! welds isDAAD ST:

atit:vc sta 31s**P'.:vt N a.

ta;g t w pts;;p'.;ig ce;a, ca;t

.astLs.G sI; asyge n gg,

  • '- J
en LW :57t; ;t Sa?:
    • ? Wl'. la. levu ten 0 I

i

\\

l Attech3Gnt 6.1 QI-052 Rev. 2 CHECKLIST (Cont'd)

Attenneemt 6.4 Cor.A> Cut PIM 815PChlt itAM gg.031 Catcr.15T te,. t FCF.LA!!3 015C Vit! FICA;;3 P G 3C.

Ptpa Whip teettsinto tal-PVlt IA01 L Of L statFt:Attew AC !PT tilt T D&!!

3

2. weldtes (Cent'd)
t. Geld Potate F. $ttees Relief
1. Ttee
f. unae
1. tote
4. Tetel Time
3. lishmend lasette/

toteided telte

4. Ceestate Esposeten Anthste (311tt's)

A. Tettwo

1. Celtbeettee
1. Toftve false
9. lsee tsa C. toweth
1. Bread fit
1. testeestea S. Structutet Settias 4 leertaa Jetste S. fttattes Joiste
1. Teetve
1. Celtbrottee k
  • *
  • 6 8. 'ev i s t ee 0 2

1

Attach:ent 6.1 1

01-052 Rev. 2 CHECKLIST (Cont'd)

I attactment 6.4 CamANC1tt PtAE 911PCN51 TIM c1432 CFICC151 te,. 1 M !!om CI5C vtRITICAT10s PEG #0.

Pipe m p Restraints t*S.PWat Pact L Of L vtstr! CAT 10s A I ACCEPT REJECT Datt INI

6. Material tracentility A. Mst'1. Certs.
1. a t t
1. CAA
3. Re s t Be /Ca t ese 1. 0 C. Metettal Coefenstte
7. Set Cet 6

l l

/P

.l.

e,-; gag. Q 3

..1 COMANCHE PEAK RISPONSE TT.AM Q[.053 CHECKLIST Rev. 1 Pace 1 of 4 POPU1.ATION DESC VERIPICAI!ON PKG No.

CATEGORY I CONDUIT SUPPORTS PACE 1 OP 4 QUALITT INSTRUCTION RIINSPECTION

[ UNIT 1 EQUI? MINT.".ARX/TA0 No.

]DOCiKINTATIONRE7IEW UNI 2 C CCMMON i

VERITICATION AMME ACCIPT RIJECT DATE 1.0 Orientation 2.0 Configuration 2.1 Components

a. Type, etc.
b. Visual Damage 2.2 Dimensions
a. Support Dia.
b. Plate Thickness 2.3 Conduit Bearing,

i 2.4 Clamp "t" w brance 2.5 Tube Steel Vent Role e

2.6 Base Plates 3.0 Capacity / Span 3.1 Capacity

a. Cond. size loc.
b. Adj. span len.
c. Elec. fit,
d. Gen. layout
e. Addt'l. iteps
f. M-D sup sketch
g. Tr. sup. sketch PRIPARID BT:

APPROVED ST:

DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5PECID BY:

APPROVED BY:

IN 5 F EGQ K OATE LEAD INSPECTOR DATE CPP-007.lA. Revision 0 0144 (POPDES)

A::acn.en: 6.01-053 Rev.

QL Page 2 of 4 I

CC2'.\\.Cll: ? FAT AI.3f0!!5C ICRi CHICKLIST furut.ATivM ODC VLAD LCAfluN FAL 6W.

i:ATEGORY I CUNDUlf SUPr0A1 g FACE

.S OF 4 V ta l p I CAT 1 lH ATTRIBUTE ACCEPT RE.!;CT DATE 3.2 Span

a. Adj. spans
b. Dist. free tan pt.
c. Adj. span w/ fit.
d. Vall-susp. sup.
e. Tbd. cond w/LSD
f. Addt'1. attr.

I 4.0 M.sterist Verification I

i 4.1 Mark number 6.2 tolting maternal 5.0 Solting 5.1 Engatesent

a. Aolts. studs
b. Unistrut nuts

(

5.2 Vashers

a. Use
b. Reveled vashers 5.3 Edge Distance 5.4 R1,bsord Inserts
a. Thread engagement i
h. Nuts, bolts

\\

~

5.5 Connections

n. Dis.
b. Quantity
c. Spacina J. Untstr. botta. out 5.6 Torque
s. Tor. spec.
b. Nu ter. spect.
c. Faluted tyr-vv/.ts, sevassen u

". U"ou

/"4'

Attacr ent 6..01-053 Rev.

1 Page 3 of 4 CC.wC:lt PE.u RE*.*u:;5E Tr.M CRECKLIST FvfuLAT1ch DLSC VEALTICAI1VN FW :.V.

CATECORY ! CCNDUlf SL7FOR1 5 FACE L CF L VEA1FICAf!VN ATT118UTE AccEFT REJECT DATE 6.0 Concrete Espanelon Anchors i

6.1 Site and Number

a. Dia.
b. Tyre, etc.

i 6.2 !:.b e dse n t 6.)

Bolt Spacing

a. Stac aJj. anchore
b. Spec. to otten etc.
c. Dist, to adj. pits
6. I.

Angularity

(

e 6.5 Concrete Damage 6.6 Nwt F.n ge r.e s a n t and Bearing

a. Nut engagement b~ Surface contact
c. Bottoo out
d. Velded nut 7.0 Welding 7.1 Location 7.2 Veld Stre 7.3 Veld f.ength 7.4 Tusion 7.5 Craters 7.6 Weld Profile 7.7 Undercut "I U"l trr-evt.4&. 8.svisive W
r..

Atta:ncen* -

l 01-053 Rev.

2, Page 4 of 4 CO:w:Clis P:M REST'J:'5E TT.AM CHECKLIST PVru1ATION DESC V L AITILA1lWN FM NW.

FACEL OF L CATECCAT 1 CONDUIT SOFFOR1 5 vex 1FICATita A m tlUTE ACCEPT REJECT DATE 7.0 Velding (Cont'd)

'?.8 Fotosity 7,. 9 overlap 7.10 Surface Slas I

7.11 Cracks 7.12 We!Jer ID i

e l

l I

l

l " %8'V' ~ )

*l' #

Grr-wl. L t. nev 6e 6wk W l

r k

..1 COMANCHE PEAK RESPONSE TEAM QI-054 CHECKLIST Rev. 1 POPULATION DESC VERIFICATION PKG NO.

ategory I Conduit Supports R-S-COSP PAGE 1 0F 2

/"

QUALITY INSTRUCTION QI-054

() REINSPECTION

[)) yNI; 1 EQUIPMENT MARK / TAG S0.

] 70CUMENTATION REVIEW C UNI 2 COMMON VERIFICATION

^

REMARKS ACCEPT REJECT DATE

1. Inspector Certification
a. Date
b. Procedure
2. Material Traceability I
3. Concrete Expansion Anchors 3.1 Torque
a. Calibr. due date I

S,. Torque setting

_, 3.2 Eolt Spacing 3.3 Rework

4. Welding 4.1 Weld Procedure Application 4.2 Welder Qualification 4.3 Veld Procedure Qualification PREPARED BY:

APPROVED BY:

DISCIPLINE ENCR.

DATE LEAD DISCIPLINE ENGR.

DATE INSPECIED BY:

APPROVED BY:

IN5FECTOR DATE LEAD INSPECTOR DA!!

C??-i107.!A. Revision 0

COMANCHE PEAK RESPONSE TEAM 05 CHECKLIST Rev. 1 POPULATION DESC VERIFICATION PKG NO.

PAGE 10F 1 Category 1 Conduit Support i R-S-COSP 1

1 VERIFICATION RD'JJtKS ACCEPT REJECT DATE

5. Stud Welding
a. Daily Qualification
b. Production Studs
c. Final Visual
6. Structural Bolting
7. Drawing Revision
8. Junction Box Config.

l t

4 CTP 007.12 Revici:r. 0

..1 0I-055 Rev. 2.

Page 1 of 3 C0y.ANCII PLG RIS7CW5I TIM C1 ICE.*.37 FQPM;CN DESC 7E7.;n G CCN ir.G.10.

FACI 1CF[

D5TRNINT FIFE /TVlt StTFFORTS I 3 57 QUA:.;n D571UCC CN QI-035 b IIUI?!CUC8 C C3II L ECUI?:'.CC.*AAK./;AG 30.

C DCCMCACCN IIT!El C UN!! !

$7??CET ID C CC1M:N FII:nCACCN 4

E ACC:7T lII.*ICT l OA;I l l

1.

Location and Crientation a.

I l

6.

c.

j 2.

Configuration 2.1 Components a.

I I

I 2.2 Cis6nsion s I

2.3 suas

.4 laseplates I

Tor infersation oni" 3.

Material ferificarton N/A N/A 4

Solting 4.1 Esgagement 4.1 Surface Contact a.

I I

i.

I I

FID ALD ST :

artCyc IT 31!C:7'.3t Dct.

A;I t.Lc 311C;7'.*':I DC1.

3AT!

  • M7 hw 41 a ptcy c st
  • N h GK DA;;

t, Lc als 7 t.70 R DAT!

C??-Mf. !A. Revtston 0

i AtBachment 6.1 QI-055 Rev. 1 Page 2 of 3 CCyxtCRE FIAK RISPCNSI It.W CHIC *".: 57 FOP L ;;0N ;!!C VER;T* CAT *0N FKC 30.

INSTR FIFt/n*3E $*'FFCRTS I-5-INSF-F ACI.3. O F,,,,),

~

Vt1LIFICA!!CN A

I I

ACCI7T RZJECT DATI

4. Bolting (cont.)

4.3 Vashers 4.4 Edge Distance 4.5 Spring Nuts 4.6 Richsend Inserts a.

b.

4.7 Torque a.

b.

c.

5. Concrete Expaesion Anchors 5.1 Si:e and Number
a. _

b.

5.2 E-ted ent 5.3 lolt $ Facing a.

b.

c.

l 5.4 Angularity 5.5 Concrete Damage i

t C??-007. L t. Revis ton 0 t

.,_4

-,,..c,-

.I.1 QI-055 n.v. 2.

Page 3 cf 3 CCPE CXE FEAK R!!PON$l IF).M CXICX:,:37 F0F'.h;;cs OtsC v!R;F; CAT *CN FKC No.

INSTR FIFI/TVlt,tWFORTS 1-5-INSF-FACI J CF J Vtt: FICA;;0N ACCEPT RIJECT DATI M3

5. Concrete ExFansion Anchors (Cont'd) 5.6 Engagement and searing a.

b.

c.

d.

6. Velding 6.! Location 6.2 Veld Site l

l 6.3 Veld Length 6.4 Fusion 6.5 Craters 6.6 Veld Profiles

{

6.7 Undercut 6.8 Fotosity l

1 6.9 overlap 6.10 Surface Slag 6.11 Cracks 6.1: Velder ID M/A N/A for Inforsation oniv C??-20 7.13. Revts un J

Attacheent 6.1 QI-056 Rev. 1 Page 1 of 2 CCyxtC?.I Pt.15. RISPCSSE TI.C4 C7.IO.~ 57 P0f'.~ A!' CS CEIC VEP.ITIC.C;CN PKC NC.

PAC: 1 OT 2 Instrument Pipe / Tube R-S-ISSP-Suceerts QL'AL;Tt 135T3OTICN REINSPECT!CN

[I Cll: 1 QI-056 Q DCCt?.Cr:A* CN RI7 ri

[I C4; 2 EC.U;?.43I ?.A!J.i AC 80.

[1 CC:c'.CM

~

VERIT CA!!CN i

RCdA?IS 3

lRI.*EC*

DATIl ACCIPT

1. Inspector Certificatica
a. Date
b. Procedure
2. Material Traceability
a. Msterial
b. Heat Number
3. Concrete Expansien Anchors 3.1 Torque
a. C.*ibt. Joe data
b. Tereue settine 3.2 Bolt Seacint 3.3 Rework l

PRIPARD BY:

APPROVED BY:

DISCIPLINI ENCR.

CATE LEAD DISCIPLINE ENC 1.

DATE I.NSF ECID 8't ;

APPRCVED BT:

Gi5FECTCR DA!;

LEAD IN5?!CTCR

~ DATE CPF-007.1 A. Revu un 0

Attcchnent 6.1 QI-056 Rev. 1 COMASCHE PEAK RESPONSE TE.2.M CHECKLIST POP'AATICN DESC VERITICA!10N PKC S0.

Instruzent Pipe / Tube g.$.735p.

PACE L OF 1 Suerorts VERITICA!1CS RD%RKS

^

ACCEPT REJECT DATE

. Stud Velding

a. Daily Ovalification
b. Production Studs
c. Pinal Visual
5. Drawine Revisien CPP-007.18. Revision 0 7

..1 COMANCRE PEAK RESPONSE TEAM QI-057 CHECKLIST Rev. 7 POPULATION DESC VERIPICATION PKG NO.

Till & Packfill R-S-FILL-PAGE 1 0F,_;[

Placement (SSI Dae)

QUALITT INSTRUCTION QI-057 REINSPECTION

(~) UNIT 1 EQUIPMENT MARK / TAG NO.

X DOCLMENTATION REVIEW UNIT 2 Inspector's Daily Report No.

COMMON VERITICATION ATTRIBUTE RD(AkKS ACCEPT REJECT DATE A SSI DAM A.1 General

a. Plans & Specifications
b. Zone Delineation
c. Datage due to hauling Equipment
d. Borrow Sources
e. Foundation Recuirements A.2 Impervious Material Placement
a. Material Blend
b. Layer Thickness
c. Surface Roughening
d. Distribution of Corpactive Effort
e. Crowning
f. Debris Removal A.3 Rock Fill Placement
a. Layer Thickness
b. Debris Removal A.4 Filter Placement
a. Layer Thickness
b. Avoid Contamination
c. Avoid Segregation
d. Contamination Avoided A.5 Moisture Control
a. Filter Zone Wetting
b. Borrow Pit Irrigation A.6 Processing Impervious Fill
a. Moisture "PREP ARED BY :

APPROVED BY:

DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5PECTED BY:

APPROVED BY:

IN5FEcTgR DATE LEAD INSPECTOR DATE CPP-007.lA, Revision 0

Attachtent 6.1 COMASCHE PIAK RES?ONSE TEAM QI-057 CHECKLIST Rev. 7 POPULAT;CN DESC VER;FICAT;0N PKC S0.

Fill & Backfill R-S-TILL-PACE 2 0F 2 Placement (SSI Dam)

-~

VERIFICATION

^

I

^'

ACCIPT REJECT DATE

b. Surface Moistening
e. Over vet Layers A.7. Processing Rockfill
a. Layer Placement
b. Stones Distribution
c. Placement Coordinat ion A.8 Compaction Equipment A.9 Impe rvious Fill Compaction
a. Number of Passes
b. Rolling Pattern
c. Test Sampling A.10. Filter Compaction A.ll Rock Fill Compaction
a. Number of Passes
b. Additional Passes A.12 Testing
a. Frequency of Testina
b. IDR Test Location
c. Test Results Test Location
d. Density Criteria Men
e. Reference Applicab1L ity
f. Reference Consistency
3. Rapid Compaction
h. Material Testing A.13 Personnel Certification

C0KANCRE PLAK RESPONSE TEAM.2 QI-057 CRECKLIST Rev. 7 POPULATION DESC VERIFICATION PKG NO.

Fill & Backfill Placement R-S-TILL-PACE 1 0F _2_,

(Except for SSI Dam)

QUALITT INSTRUCTION QI-057

([] REINSPECTION

((] UNIT 1 EQUIPMENT MARK / TAC NO.

DOCUMENTATION RIVIEW UNIT 2 CC'1 MON VERIFICATION A m IBUTE IINAI#'I ACCEPT REJECT DATE B Pill and Backfill (Except For SSI DAM)

B.1 Extent of Backfill B.2 Soil Backfill Placement Signature Card

a. IR Notation
b. Signed and Dated B.3 Stockpiles
a. Construction
b. Identification B.4 Preparation of L'erking Surf ace B.5 Placement of Backfill
a. Lift Thickness
b. Moisture Control PREPAAED BY:

APPROVED BY:

DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5PELIED BY:

APPROVED BY:

IM5FIcTOR DATE LEAD INSPECTOR DATE CPP-007.lA, Revision 0

Attachtent 6.2 COMASCHE PEAX RES?ONSE TEAM QI-057 CHECKLIST Rev. 7 Po?L"LATION DESC VERIFICA!10N PKG NO.

Till & Backf111 Placement R-S-TILL-PACE 2 0F 2 (Except for $51 Dam)

~~

VER;FICATION AI II I

'^ $

ACCEPT REJECT DATE B.6 Testing i

a. Frequency of Testing
b. Inspection Report Test Location
c. Test Results Test Location
d. Density Criteria Met i
e. Reference Applicabil ity
f. Reference Consistene v
s. Gradation Testing B.7 Preparation of Trench es
a. Trench Excavation
b. Claystone Removal B.8 Backfill / Bedding Placement
a. Lift Thickness
b. Moisture Control
e. Shaped Bedding
d. Pipe Spacing
e. Hand-Taeping B.9 Personnel Certificatien

l COMANC3E ? EAT. RESPONSE TEAM Attachmen2 6.1 QI-059 C3ECC.:ST Rev. 5

?OPULAI;CS ;il.

VIRI?! CAT *CN ?KO NO.

Mechanical "c.'v.prent Installatie-I.g.ggtN.

?ACZ 1 07 3

QUA' * !*! *:iS!?..C!

  • CN q1 059 (j) REINS?!CT!0N

((} CN; EQUl?.". INT.WJ. !AG S0.

[ DOCTMENTATION REV!!!!

[ W: :

(()COMMCN VERITICATION A I I

ACCIPT REJECT DATE kZMA>XS 1.

Equipment Identifiention 2.

Temporary Coatings and Preservatives 3.

Rust (Stainless Steel only) 4 Location 5.

!!evation i

6.

Orientation i

7.

Levelness 8.

Configuration 9.

Grout i

10. Anchor Bolt Location
11. Anchor Belt Hardware
12. Ancher Bolt Engagement
13. Anchor Bolt Tightness Required Torque I

PREPAAED ST:

APPROVED BY:

DISC:?t:NE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATI

N5?Icisa 5Y

APPROVED SY:

.35?Ic.;K 3A!!

LEAD.*!!S?!CTOR DATI

??- 4R. ' A. Rev. nan 0 l

t unt 6.1 CCP.cCSE ?!AK RIsposst ;;Ag C2IC:" :$7 Rev. 5

?0P'~AI;0S DESC

  • iER;7;CA!!ON ?KG 30.

Mechanical Equipment

? ACE L OF 9

1-M-MEIN-Ynarm11meten VERITICAT!0S AC0!?!

RI.* E CT DATI E"M3

14. Parallel Alignment
15. Angular Alignment
16. Coupling Cap
17. Seismic Restraints I

18.-Concrete Expansion Anchors (Hilti)

Site

19. Hilti Type. Length,

& Nueber

20. Hilti Embedment t
21. Hilti Bolt Spacing I

l

22. Hilti Angularity I
23. Hilti Concrete Damage
24. Nilti Nut Engagement and Bearing
25. Spent Fuel Storage Rack Orientation
26. Spent Tuel Storage Rack Installation
27. Spent Tuel Storage Rack Leveling Pads t

i

Attcchment 6.1 COMANC'clE PLAT. RESPONSE TP.M 01-066 C3ECXLIST Rev. 1 POPULATION DESC VERITICATION PKG NO.

Equipment Supports I-S-EQSP PAGE 1 0F 3 (EQSP)

QUALITY INSTRUCTION QI-066

@ REINSPECTION O estT t EQUIPMENT.%BX/ TAG S0.

DOCUMENTATION REVIEW C UNIT 2 CCW.0N VERIPICATION

^

RDd.ARIS ACCEPT REJECT DATE

1. Identification N/A N/A
2. Location & Orientation
3. Configuration
4. Velding A. AVS Velds (1) Location (ii) Size (iii) Length fiv) Tusion (v) Craters (vi) Profiles (vii) l'ndercut (viii) Porosity (ix) Overlap (x) Slas (xi) Cracks PREPARED BY:

APPROVED BY:

DISCIPLINE ENGR.

DATE

' LEAD DISCIPLINZ ENGR.

DATE IN5PEcI m BY:

APPROVED BY:

IN5FECTOR DATE LEAD INSPECTCR DATE CPP-007,1.\\. Revuun 0

Attcchment 6.1 COMANCHE PEAK RESPONSE TEAM QI-066 CHECKLIST gev. 1 POPL'LATION DESC VERIFICATION PKC NO.

Equipment Supports I-S-EQSP PACE 2 0F 3

(EQSP)

VERITICATION REMARKS ACCEPT REJECT DATE

4. Welding (Cont'd)

B. NF Welds (i) location (ii) Site (iii) Undercut (iv) Surface Condition (v) Cracks Lack of Fusion (vi) Walder ID Symbol N/A N /A

5. Bolting A. Attachments B. Materials Thd. Rod. =

C. Engagement D. Surface Contact

,, E. Torquing

6. Concrete Expansion Anchors A. Size & Type B. Length C. Embedment D. Spacing (1)

(ii)

(iii)

E. Angularity 4

' ? ? -*W. '. 3. h v '. s

  • c n 9

..1 COMANCHE PEAK RESPONSE TEAF.

QI-066 CHECKI.!ST Rev. I POPtJLATION DESC VERIFICATION PKG NO.

Equipment Supports 1-5-EQSP PAGE 3 0F 3

~

(EQSP)

VERITICATION KZNARXS ACCEPT REJECT DATE

6. Cone.Exp.Ancht (Cont'd)

F. Engagement

& Bearing (1)

(ii)

(iii)

(iv)

C. Concrete Damage 4

C o-007 l3, Re'us.cn 9

COMANCHE PEAK RESPONSE TEAM 6

CHECC.IST Rev. 1 POPULATION DESC VERITICATION PKG NO.

Equipment Supports R-S-EQSP PAGE 1 0F 1 (EOSP)

QUALITY INSTRUCTION QI-067

@ REINSPECTION O UNI 1 EQUIPMENT MARK / TAG NO.

DOCUMENTATION REVIEW UNIT 2 CCMd.ON VERIPICATION AW3UTE RDd. ARKS ACCEPT REJECT DATE

1. Support Package
2. Operations Traveler
3. Inspector Certification
4. Welding (i) Weld Procedure Qualification (ii) Weld Procedure Application (iii) Welder Qualifications (iv) Rold Points (v) Stress Relief
5. Concrete Expansion Anchors (1) Torque (ii) Spacing (iii) Rework (iv) Role Drilling (v) Setting PREPARED BT:

APPROVED BY:

DISCIPLINI ENGR.

DATE LEAD DISCIPLINI ENGR.

DATE IN5FEuw BY:

APPROVED BY:

IN5FEGOR DATE LEAD INSPECTOR DA*E C??-dO7.lA. Revision 0

Attachmerit 0.4 CCF).NCHE PEAK RES?ONSE TEAM QI-067 CHECKLIST Rev. 1 POP'aATION D'Iupports VERITICATION PKG NO.

SC Equipment !

R-S-EQSP PAGE 2 0F 2

(EQSP)

VERITICATION

^ '

iLDiARKS ACCEPT REJECT DATE

6. Structural Bolting (i) Bearing Joints (ii) Friction Joints
7. Matrarial Traceability (1) Materiab Certification C??-N7.tE, Revision 0

^

COMANCRE PEAK RESPONSE TEAM 01 -

CHECKLIST Rev. 3 POPULATION DESC VERIFICATION PKG NO.

CEMENT CRot'T R-S-GRTC-PAGE 1 0F 3

QUALITY INSTRUCTION QI-068 CREINSPECTION UNIT 1 EQUIPMENT MARK / TAG NO.

{ DOCUMENTATION RIVIEW UNIT 2 COMMON VERIFICATION A m Il m REMARKS ACCEPT RZJECT DATE

1. PREPLACEMENT/ PLACEMENT
a. Cleanliness
b. Area Free of Vibration
e. Attribute Deleted
d. Prevetting
2. PLACDLENT
a. Grout Proportions, Mix Time & Temperature
b. Placing and Consolidation
c. Surface Temperature
3. POST-PLACEMENT
a. Curing
b. Compressive Strength Test
4. PERSONNEL CERTIFICATION
a. Valid Certification
b. Certified to Procedures PREPARED BY:

APPROVED ST:

DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE_

LRsFIuu BY:

APPROVED BY:

IN5rEuvR DATE LEAD INSPECTOR DATE CPP-007.1A. Revision 0

..1 COMANCRE PEAK RESPONSE TEAM QI-069 CHECKLIST Rev. 2 POPULATION DESC VERIPICATION PKG NO.

I EP0XY GROUT R-S-CRTE PAGE 1 0F QUALITT INSTRUCTION QI-069, REV. 0

[)) REINSPECTION

((] UNIT 1 EQUIPMENT MARK / TAG NO.

X DOCUMENTATION REVIEW UNIT 2 COMMON VERIPICATION AMIIUI IINAAES ACCEPT REJECT DATE

1. Preplacement

~

a) Equipment Base and Baseplate Gaps b) Placement Holes e) Cleanliness

2. Placement a) Surface Terp.

b) Mixing Operation c) Placing

3. Post Placement a) Cure Time b) Compressive Strength Test
4. Personnel Certification a) Valid Certification PREPARED BY APPROVED BY:

DISCIPLINE ENOR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5FELIED BY:

APPROVED BY:

-~'*p AT E LEAD INSPECTOR DATE InsFIctum CPP-007.lA Revision 0

Atttchment e.1 COMANCHE PEAK RESPONSI TEAM QI-070 CHECKLIST Rev. 2 POPULATION DESC VERIPICATION PKG NO.

Tubing Welds / Material I-M-TUWM-0 PAGE 1 0F 1

QUALITY INSTRUCTION QI-070

@ REINSPECTION UNIT 1 EQUIPMENT MARX / TAG NO.

DOCUMENTATION REVIEW C UNIT 2 O coxxos

=-

VERIFICATION

^

RIMARKS ACCIPT REJECT DATE

1. IVBING WELDS
a. Veld ID and Location
b. Cenfiguration
c. Weld Size
d. Undercut
e. Overlap
f. Cracks Lack of Fusion f

[/ j f

Tors. Attachment 6.4)

/

(Use Data Recording

g. Welders ID symbol (not accept / reject attribute)

/,/

/

h. Weld Rust
2. BASE MATERIAL

,/

a. Material (Use Data Racording Traceability

(

j Torm, Attachment 6.4) f (not accept / reject attribute)

/

b. Material Defect's'
e. Material Rust PREPARID IT:

APPROVED RT:

DISCIPLINE DGR, DATE LEAD DISCIPLINE DGR, DATE IN5FEuw bis APPROVED BY:

IN5FECTOR CATE LEAD INSPECTOR DATE C".P-g07.Id. Rey 1sion 0

AttaChoent 6.1 QI-071 Rev. 1 Page 1 of I CRECKLIST C0wC21 P!.AK RZ570M11 TTAt CitCC.137 FGFA!!Ch Ot&C WE11TICA*1QN PEG 3g, w

tighting cable 1-t-LITC FACI 1 or 1 QCAL171 D$!!CCTION QI-071 Otrustre:2oa O e=1: 1 racir..cn = < e so.

O ac:=:me" tmrv 0 mt:

O c===

Vit!TICAT:on AC0ZFT L1JICT CATE

1. Stee/ Type
2. Celer-code b
3. testinatten Nv)

....e a

5. Correct Vire Jetet

\\x s

v X

6. late Ceeductor V\\(

3

t. Cet e.eteren a

Oh M

. ve r.io s.

t se. Ceeductors in les e ma the nazimum number of condotters per bos site is computed show celeviation

o.. e t u i..

FLIFARD 31:

Artt0V Q ST:

!50:P'.*wt D;t.

cAn ttAD ::sc:Ptiwt tys;t.

San 73rl.sw lit eJ F1^YD 31:

. m :-.eu

An

' Lc n!?ta t SA!!

  • ??-407. LA. Revu us 0 L

COMANC11 PEAK RESPONSE TEAM CEECKLIST FQFULATION DE5C VERIPICATION PKG NO.

Lighting Cables R-E-LITG-PAGE 1 0F 1

QUALITY INSTRUCTION QI-072 Oartus>EcTto" O ext? t EQUIPMENT MAAK/ TAC No.

@DOCUMENTATIONRIVIEW C UNIT 2 COMMON VERIPICATION KIMAJUt3 ACCEPT R. EJECT DATE 5.1 Inspector Certification 5.2

a. Conduit Swabbed
b. Lubrication
c. Damage
  • Record IR No.. Inspector's name and date signed PREPARED BY:

APPROVED ST:

DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE inarEu w BY:

APPROVED BY:

AusrEuvR DATE LEAD INSPECTOR

~ DATE CP-007. !A. Revuton 0

>.1 QI-073 Rev. O COMANCRE FEAK RESPOWSE TEAM CitCELI(T FQFVLATION DESC VE11FICAT10N FIG NO.

FACE 10Fb Pipe Velde/ Material R.M.FIVM-0i2t=5'ictio" O cutt 5 QUALITT INSTRUCTION QI-073 EQUIFKENT MARJ./ TAG NO.

@DOCQMNTATIONREVIEW C UNIT 2 O conca vtt1FICAT10N ACCIFT RIP.CT DATE

1. Base Material Traceability
2. Weld Material Traceability
3. Weld Procedure Application
4. Weld Procedure Ous11fication
5. Welder Qualifications
6. Rold Pointe
7. Inspector Certifiestion.
8. flydrostatic Test FR.EFAAED ST:

AFFLOVED ST:

DISCIFLINE EIICE.

DATE LEAD DISCIPLINI ENGL.

DATE 23rNw IT AFFROVED RI:

m r tcTus.

DATI LEAD IN1FEC' TOR DA!!

w -

AttcCheert 6.1 QI-074 Rev. O Page 1 of I Cowcar rtAs ustoN$t Tru C11CILIST F9F R T10N DE5G Vn1TICAT10m PEG.10.

N1$ CA3tt TrtMINATION$

t.E.N15T FACI [ CT ]

oca.m almCit0E Q1 074

] UIN5?tcTt0N C CNIT 1 EQUIPMDfI MAni/IAC NO.

C DCCMDrTATION RITIIV O C"tt C COMICN VH1FICATION A

I ACCI7T 11 JECT DATF.

3.1 leapector Certificetton VV 5.2 imetallation of MIS Cable Connectore v

5.3 N18 Cable toevletten and testatence feettet S.4 Coupling of Contwe tore

\\<

v 5.3 Seldered Connectione fj FED A&E ST :

AFFROVO ST 015CIPLIW1 DhCR.

CAft LEAD D!$C17t!W1 DeCL.

DATI mrh.w H4 AFFECfD 81 m n w.a DATI LEAD LN5P!C"Ot DATE l

JPP-lp!.14. Levtsten Q 5

..1 COMANCHE PEAK RESPONSE TEAM QI.075 CHECKI,IST Rey, o POPULATION DESC VERITICATION PKG Ho.

PIPING BEND TAERICATION 1-M-PBTA PAGE 1 0F 1

QUALITY INSTRUCTION QI-075

@ REINSPECTION O out: t EQUIPMENT MARK / TAG NO.

DOCUMENTATION RIVIEW UNIT 2 O coxxon VERITICATION

^

ACCEPT REJECT DATE IZMAAE3

1. Radius
2. Ovality i
3. Buckling / Flattening t

i i

i 1

1 PREPARED ST:

APPROVED ST:

I DISCIPLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE IN5FI'4w BT:

APPROVED BT:

t IM5FILwK DATE LEAD INSPECTOR DATE I

CPP-007.lA. Revision 0 i

w a

00(KETED UNITED STATES OF AMERICA USPGC NUCLEAR REGULATORY COMMISSION M MAR -1 P3:43 before the OCkifuYfnhj$[*

ATOMIC SAFETY AND LICENSING BOARD BRANCH

)

I In the Matter of

)

Docket Nos. 50-445-OL

)

50-446-OL

[

TEXAS UTILITIES GENERATING

)

I COMPANY et al.

)

)

(Application for an (Comanche Peak Steam Electric

)

Operating License)

~

Station Units 1 and 2)

)

)

i i

CERTIFICATE OF SERVICE I, Thomas A. Schmutz, hereby certify that the foregoing Answers To Board's 14 Questions was served this 1st day of March

}

1988, by mailing copies thereof (unless otherwise indicated),

j t

.l first class mail, postage prepaid tot i

  • Peter B. Bloch, Esquire
  • B.

Paul Cotter, Jr., Esq.

i Chairman Chairman Atomic Safety and Licensing Atomic Safety and Licensing

{

Board Board Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory l

Commission Commission Washington, D.C.

20555 Washington, D.C.

20555

[

  • Alan S. Rosenthal, Esq.

Assistant Director for Chairman Inspection Programs Atomic Safety and Licensing Comanche Peak Project Division i

Appeal Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission f

Commission P.O. Box 1029 Washington, D.C.

20555 Granbury, TX 76048 l

l 1/

Asterisk indicates service by hand or overnight courier.

l i

r

,i

s 2-

  • Juanita Ellis Robert D. Martin President, Case Regional Administrator, 1426 South Polk Street Region IV Dallas, TX 75224 U.S. Nuclear Regulatory Commission William R.

Burchette, Esquire 611 Ryan Plaza Drive Heron, Burchette, Ruckert, Suite 1000

& Rothwell Arlington, Texas 76011 Suite 700 1025 Thomas Jefferson St.,

N.W.

20007 Administrative Judge 1107 West Knapp

  • William L. Clements Stillwater, Oklahoma 74075 Docketing & Service Branch U.S. Nuclear Regulatory Joseph Gallo, Esquire Commission Hopkins & Sutter Washington, D.C.

20555 Suite 1250 1050 Connecticut Avenue, N.W.

20036 Government Accountability Project

  • Janice E. Moore, Esquire Midwest Office Office of the General Counsel 104 E. Wisconsin Avenue - B U.S. Nuclear Regulatory Appleton, WI 54911-4897 Commission Washington, D.C.

20555 Renea Hicks, Esquire Assistant Attorney General

  • Anthony Roisman, Esquire Environmental Protection 1401 New York Avenue, N.W.

Division Suite 600 Capitol Station Washington, D.C.

20005 P.O. Box 12548 Austin, Texas 78701 Lanny A.

Sinkin Christic Institute Robert A.

Jablon, Esquire 1324 North Capitol Street Spiegel & McDiarmid Washington, D.C.

20002 1350 New York Avenue, N.W.

Washington, D.C.

20005-4798 Nancy Williams CYGNA Paergy Services, Inc.

Oak Ridge National Laboratory Suite 390 P.O.

Box X Building 3500 Walnut Creek, CA 94596 Oak Ridge, Tennessee 37830 David R.

Pigott

  • Dr. Walter H.

Jordan Orrick, Herrington & Sutcliffe 881 West outer Drive 600 Montgomery Street Oak Ridge, Tennessee 37830 San Francisco, CA 94111

r 0

9 i

" i I

  • Robert A. Wooldridge, Esquire i

Worsham, Forsythe, Sampels

& Wooldridge 2001 Bryan Tower, Suite 3200 Dallas, Texas 75201

  • W.

G. Counsil Executive Vice President i

Texas Utilities Electric -

i General Division 400 N. Olive, L.B.

81 Dallas, Texas 75201 l

N Thomas A. Schmutz

/

Dated:

March 1, 1988 i

I i

t I

r

^