ML20101D073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NG-96-0624, Monthly Operating Rept for Feb 1996 for DAEC]]
| number = ML20101D073
| issue date = 02/29/1996
| title = Monthly Operating Rept for Feb 1996 for DAEC
| author name = Middlesworth G, Woodward R
| author affiliation = IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000331
| license number =
| contact person =
| document report number = NG-96-0624, NG-96-624, NUDOCS 9603190362
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 6
}}
 
=Text=
{{#Wiki_filter:,
1 Duane Amoc Energy Center e
      'h                                                                                                      3277 CAEC P:aa
                ,      ,                                                                                      Pato. A 5233 Telephone 319 8517611 Fat 319 8517511 March 11,1996                                                            I NG-96-0624 UTILITIES Mr. Ifubert J. Miller Regional Administrator                                                                                                i Region 111 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351
 
==Subject:==
Duane Arnold Energy Center                                                                                  I Docket No: 50-331 Operating License DPR-49 February 1996 Monthly Operating Report
 
==Dear Mr. Miller:==
l l
Please find enclosed the Duane Arnold Energy Center Mammy Operating Report for February 1996. The report has been prepared in accordance with the guidelines of NUREG-0020 and distribution has been made in accordance with DAEC Technical Specifications, Section 6.ll.l.c.
Very truly yours, M                      %
G    Van Middlesworth                                        I Plant Manager, Nuclear GDV/RBW                                                                                                                i Enclosures File A ll8d cc:
U.S. Nuclear Regulafory Commission                  Mr. Dennis Murdock Attn: Document Control Desk                          Centrallowa Power Cooperative Mail Station PI-37                                  Box 2517 Washington, DC 20555-0001 (Origa                    Cedar Rapids, IA 52406 Mr. Glenn Kelly                                      Dr. William A. Jacobs, Jr.
Project Manager                                      GDS Associates,Inc.
I Whiteflint North                                  Suite 720 Mail Stop 13E21                                      1850 Parkway Place i1555 Rockville Pike                                  Marietta, GA 30068-8237 Rockville, MD 20852 Document Control Desk                                Mr. Dale Arends INPO Records Center                                  Corn Belt Power Cooperative 700 Galleria Parkway                                  130013th Street North Atlanta, GA 30339-5957                                ilumboldt. IA 50548 Ms. Lisa Stump                                        DOCU Iowa State Utilities Boscd Lucas State Office Building                          NRC Resident inspector l                              Des Moines, IA 50319 I
I Mr. Fred Yost                                        Ms. Kathleen Shea Director, Research Services                          Morgan, Lewis, Bochius                          ,
Utility Data Institute                                1800 M St. NW 1700 K St. NW, Suite 400 190043 Washington, DC 20006 Washington, DC 20036-5859
[ /(h#
                                                                                                                                /
l 9603190362 960229 l          PDR    ADOCK 05000331
!          R                          PDR l                                                                                                              4,es<= s.m.:como. ,
 
l OPERATING DATA REPORT DOCKET NO:                  50-0331 DATE:            03/11/96 Unit:        Duane Arnold Energy Cgntgr COMPLETED BY:                  Richard Woodward TELEPHONE:                  (319)851-7318 OPERATING STATUS Average Daily Power Level
: 1. Unit Name: Duane Arnold Energy Center 500
: 2. Reporting Period: Februarv 199Jl                                                                          _
400 1
: 3. Licensed Thermal Power (MW ):th EiiE                                        ;E
                                                                                        ,  300 v
: 4. Nameplate Rating (Gross MWe DER): 565.7 (Turbine)
                                                                                    .a 200
: 5. Design Electrical Rating (Net MWe DER): 118                                      100 0
: 6. Maximum Dependable Capacity (Gross MW            e MDC): 510 1            6    11      16      21 26
: 7. Maximum Dependable Capacity (Net MWe MDC): 520
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through
: 7) since the last report, Give Reasons: Items #fi and #1 reflect 5 % increased canacity credit resulting from heat rate imorovement. Ihe change officiallv took effect .Ianuary L.192fi,
: 9. Power Level to Which Restricted, If Any (Net MWe): Not Aeolicable
: 10.      Reasons for Restrictions,if Any: No.1 Anolicable February-96                      1996              Cummutative
: 11. Hours in Reporting Period                                          696.0                1,440.0                    184,776.0
: 12. Number of Hours Reactor Was Critical                              696.0                1,440.0                    139,965.8
: 13. Reactor Reserve Shutdown Hours                                        0.0                    0.0                        192.8
: 14. Hours Generator On-Line                                            696.0                  1,440.0                  136,553.8
: 15. Unit Reserve Shutdown Hours                                          0.0                    0.0                          0.0
: 16. Gross Thermal Energy Generated (MWH)                        1,106,221.6          2,282,978.5                  191,544,192.9
: 17. Gross Electrical Energy Generated (MWH)                      376,754.0            779,425.0                  64,191,395.6
: 18. Net Electrical Energy Generated (MWH)                        355,493.7              735,489.0                  60,212,503.6            l l
: 19. Unit Service Factor                                              100.0 %                100.0 %                      73.9 %
: 20. Unit Availability Factor                                        100.0 %                100.0 %                      73.9 %
: 21. Unit Capacity Fa: tor (Using MDC Net)                            98.2%                  98.2 %                      68.8 %
: 22. Unit Capacity Factor (Using DER Net)                              94.9 %                  94.9 %                      65.9 %
: 23. Unit Forced Outage I. ate
                                .                                            0.0%                    0.0%                        10.7 %
: 24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of each): N!%
: 25. If Shutdown at End of Report Period, Estimated Date of Startup: N!%
 
      . AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-0331 DATE: 03/11/96 Unit: Duane Arnold Energy Center COMPLETED BY: Richard Woodward TELEPHONE: (319) 851-7318 MONTH February 1996 Day    Average Daily Power 12 vel (MWe-Ne0 1            534.4 2            530.4 3            532.2 4            531.9 5            534.8 6            532.3 7            528.9 8            519.6 9            492.1 TO            254.9 11            361.7 12            502.9 13            521.3 14            513.9 15            511.7 16            519.1 17            523.1 18            523.4 19            525.1 20            526.7 21            529.6 22            528.5 23            529.4 24            531.1 25            533.3 26            534.2 27            534.6 28            535.2 29            536.2
                                                                                ]
 
DOCKET NO: 50-0331 DATE: 03/11/96                                                                                        -
Unit: Duane Arnold Fnercy Center COMPLETED BY: Richard Woodward                                                                                      ,
TELEPIIONE: (319)851-7318 UNIT SIIUTDOWNS AND POWER REDUCTIONS REPORT MONTil: February 1996 No.      Date -  Type    Duration    Reason  Method of Licensee Event System Code Comp. Code                                                                                                                          Cause (1)    (llours)    (2)      Shutting    Report #                (4)                    (5)
Down Reactor (3) 2    Feb. 7 - 27  S          0        B          5          n/a                TA                    V, FCV      Turbine Control Valve Testing, Control Rod Sequence (28.0 full                                        (Main Turbine (Valve, Flow Exchange,"A" Motor-Generator Set Maintenance, maintain power                                            System,                    Control    margin to thermal limits hours                                            various)                    Valve) equivalent) 1 - F: Forced          2 - Reason                                    3 - Method:                                4 - Exhibit G- Instructions for S: Scheduled          A-Equipment Failure (Explain)                  1-Manual                                    Preparation of Data Entry B-Maintenance or Test                          2-Manual        Scram                      Sheets for Licensee Event C-Refueling                                    3-Automatic      Scram                    Report (LER) File (NUREG-D-Regulatory Restriction                      4-Continued                                0161)
E-Operator Training & License Examination      5-Reduced Load F-Administrative                              9-Other (Explain)                      5 - Exhibit I (Same Source)
G-Operational Error (Explain)
II-Other (Explain)
..                                      _                                      =  _ _ _ _        _ _ _ _ _            _ - _ - _ _ _ _ _ - _ _ _ _ _ - _ _ - _ _ _ - _ _ _ _ _ _ - -- _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _
 
        ,                                    REFUELING INFORMATION
          ,        .                                              DOCKET NO: 50-0331 DATE: 03/11/96 Unit: Duane Arnold Energy Center COMPLETED BY: Richard Woodward TELEPHONE: (3191 851-7318
: 1. Name of facility.
Duane Arnold Energy Center
: 2. Scheduled date for next refueling shutdown.
Refuel Outage XIV to begin October 10,1996.
: 3. Actual date for restart following refueling.
November 14,1996
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes RTS 269, T.S. 3.2, " Plant Containment Systems" RTS 288, T.S. 2.1,3.2," Reactor Water Clean-up Systems Vessel Level isolation Set-Point Change"
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
RTS 269, submitted December 22,1995 RTS 288, submitted January 18,1996
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
No
: 7. Current and projected fuel assemblies inventory:
l Number of          Projected date oflast Fuel            refueling that can be i Assemblies                      discharged Installed in reactor core (following refueling)              368      j                n/a Previously discharged from core to Spent Fuel Storage  ,    1408                        n/a Pool (following refueling)                              i Under present physical capacity of Spent Fuel Storage        2411                        2007 Pool Under Licensed Capacity of Spent Fuel Storage Pool          3152      ,                2014
 
  ,  e                                                                                                                                            j DOCKET NO.: 50-0331 DATE: 03/11/96                                                  i Unit: Duane Arnold Enerev Center                            l COMPLETED BY: Richard Woodward                                                j TELEPilONE: (319) 851-7318 Monthly Operational Overview for February 1996:
The DAEC operated at full thermal power throughout the month except:
* February 7 - 8, to perform scheduled turbine control valve surveillance testing and a control rod sequence exchange,0.9 full-power-hours lost.
* February 9 - 10, to perform maintenance on the "A" Recirculation Pump Motor-Generator Set.14.1 full-power-hours lost.
* February 11 - 27, to maintain margin to thermal limits,14.9 full-power-hours lost.
Total forgone production (including other small planned losses) was the equivalent of 32.0 full-power hours of operation.
At the end of the month the Duane Arnold Energy Center had operated 269 consecutive days, its best-ever continuous operating run.
Allocation of Production & Losses:                                                          Electncal Capacity Factor Full Power Output        %of 565.7 Equivaleni MWe              MWe      Hours (Design Gross Rating)            ,
Actual Metered Net Electnc Output                                                              510.8            90.3 %      628.4  l Actual Metered Plant Electnc Loads                                                                30.5            5.4%      37.6 Load Following                                                                                      0.0            0.0%        0.0 Off-Line                                                                                            0.0            0.0%        0.0
(-) Weather losses, ie., condenser pressure < 2.75 in lig / Cire Water Temp < 74.5 'F              -2.1          -0.3%        -2.6 Planned Capacity Losses: Turbine Control Valve Testing Seq. Exchange, Thermal Linut              22.8            4.0%      28.0 l
Unplanned Capacity Losses                                                                          0.0            0.0%        0.0 Normal Capacity Losses (Avg MWth < 1658)                                                            0.2            0.0%        0.2 Metering Losses (Avg indic MWe - Avg MWHe)                                                          2.7            0.5%        3.4 Etriciency Losses (Weather Norm-Full-Power-MWe < 565.7)                                            DJi            Ol%          L.Q ;
Design Gross Electric Output        565.7          100 0 %      6960 There were no Licensee Event Reports.
Licensine Action Summary:
Plant Availability:                      100.0 %  Unplanned Auto Scrams (while/ critical) this month:                  0 Number of reportable events:            0        Unplanned Auto Scrams (while/ critical)last 12 months:                1 i
I
.}}

Latest revision as of 01:55, 24 September 2022