ML20076D616: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. . . _ | {{#Wiki_filter:... _ | ||
' 'k NUCLE AR HLGUL AlORY COMMISSION l | |||
Director, Division of Freedom of Infonnation and Publications Services ADM SUBS'ECT: | f w AsmNotos. o c w.,n I+,,,,,/ | ||
bb | July 24,1991 E0-277/278 Peach Bottom MEMOPANDUM FOR: | ||
Chief, Document Control Branch, IRM FROM: | |||
9107300073 910705 | Director, Division of Freedom of Infonnation and Publications Services ADM SUBS'ECT: | ||
REVIEW 0F UtillTY EMERGENCY PLAN DOCUMENT ATION The Division of f reedom of Information and Publications Services has reviewed the attached document and has detennined that it may now be made publicly avallable. | |||
bb +u-f/,h d, | |||
Donnie H. Grimsley, Director Division of freedom of Infonnation and Publications Services Office of Administration ks | |||
/ | |||
9107300073 910705 PR ADOCK 0500 7 | |||
ACCELERATED DISTRIBUTION PEMONSTRATION SYSTEM- | ACCELERATED DISTRIBUTION PEMONSTRATION SYSTEM-REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
. ACCESSION NBR:4MVif ^1' ' | |||
DOC.DATE: 91/07/05 NOTARIZED: NO DOCKET # | |||
FACIL:50-277 Peach Bottom-Atomic Power Station, Unit 2, Philadelph | FACIL:50-277 Peach Bottom-Atomic Power Station, Unit 2, Philadelph 05000277 50-278 Peach Bottom Atomic Power Station, Unit 3, Philadelph 05000278 AUTH,NAME AUTHOR AFFILIATION BECK,G.J. | ||
RECIP.NAME | -Philadelphia Electric Co. | ||
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch-(Document Control Desk) | |||
I' | |||
==SUBJECT:== | ==SUBJECT:== | ||
Forwards Central Files version of revised EPIPs, including | Forwards Central Files version of revised EPIPs, including I | ||
Rev 63 to Emergency Response Procedure (ERP) index,Rev 13 to ERP-140, App 4 & Rev 11 to ERP-140, App 6. | |||
E EmergencyPlanorImplementingProcedur/_ ENCL h | |||
S DISTRIBUTION CODE: AX45D COPIES RECEIVED:LTR | |||
[ | [ | ||
SIZE: | |||
(PropHetary) | |||
TITLE: | |||
REC 3PIENT | es | ||
. NOTES: | |||
REC 3PIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL p | |||
PD1-2_PD 1 | |||
1 MILANO,P. | |||
1 1 | |||
4DM,TM[h$h8 1 | |||
1 | |||
. AEOD/DOA/IRB 1 | |||
1 E | |||
INTERNAL: | |||
m /DREP/PEPB9D 1 | |||
1 REG FILE 01 1 | |||
1 5. | |||
R I | R I | ||
E-S L. | E-S L. | ||
j A | |||
l | D f | ||
3-PLEASE HELP US TO REDUCF W NSTI2 CONTACT THE DOCU.\1ENT CONTROL DESK, ROONI PI-37 (ENT,2nr9) TO I LINilNATE YOUR N ANIE FRONI DISTRIBUTION LISTS I OR LX)CUN1LNTS IOU DON'T N1 ED: | l D | ||
l: | |||
NOTE TO ALL " RIDS" RECIPIENTS: | |||
3-PLEASE HELP US TO REDUCF W NSTI2 CONTACT THE DOCU.\\1ENT CONTROL DESK, ROONI PI-37 (ENT,2nr9) TO I LINilNATE YOUR N ANIE FRONI DISTRIBUTION LISTS I OR LX)CUN1LNTS IOU DON'T N1 ED: | |||
-TOTAL NUMBER OF COPIES REQUIRED: LTTR 6 | |||
ENCL 6 | |||
.. _ ~ | |||
. -. -... ~. | |||
.p' 10 CFR 50 Appendix _E. | |||
Section-V | Section-V PillLADELPIIIA-ELECTRIC COMPANY - | ||
g NUCLEAR GROUP HEADQUARTERS - | |||
g | 955-65 CHESTERBROOK BLVD. | ||
955-65 CHESTERBROOK BLVD. | WAYNE, PA 19087 5691 (215) 64 4 6000 NUCLEAR ENGINEER!NO & $ERVICES DEPARTMENT July-5, 1991 Docket Nos. | ||
WAYNE, PA 19087 5691 (215) 64 4 6000 NUCLEAR ENGINEER!NO & $ERVICES DEPARTMENT July-5, 1991 | 50-277 50-278-License Nos. | ||
Docket Nos. | DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC. 20555 | ||
Washington, DC. 20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Peach' Bottom Atomic Power Station,_ Units 2 and 3 | Peach' Bottom Atomic Power Station,_ Units 2 and 3 Emergency Plan Implementing Procedures | ||
Emergency Plan Implementing Procedures | |||
==Dear Sir:== | ==Dear Sir:== | ||
Enclosed is revisicn 63 to the Emergency Response Procedures-for Peach Bottom'htomic Power Station, Units 2 and 3. | Enclosed is revisicn 63 to the Emergency Response Procedures-for Peach Bottom'htomic Power Station, Units 2 and 3. | ||
These procedures-are being submitted in accordance with 10'CFR | These procedures-are being submitted in accordance with 10'CFR | ||
.50.54(g), 10-CFR 50 - Appen<lix-E, and 10 CFR 50.4. | |||
The following revised procedures _ are enclosed. | |||
--REVISION'63 | |||
ERP-140- | *~ | ||
ERP-140-App. 4 Rev. 13 | |||
" Chemistry Sampling & | |||
Analysis Team-Leader" (CSATL) | Analysis Team-Leader" (CSATL) | ||
:ERP-140 | :ERP-140 App. 6 Rev. 11 | ||
" Security Team Leader" (STL) | |||
In accordance with 10-CFR.2.790(a)(6), we request that | In accordance with 10-CFR.2.790(a)(6), we request that | ||
! names and telephone numbers in the.above procedures be withheld ifrom public disclosure since such disclosures would constitute an | |||
-unwarranted-invasion of'the personal privacy of the individuals-involved. | |||
of'the personal privacy of the individuals-r- | r- | ||
,n | |||
: i. . t | ~ | ||
: i.. t | |||
k | ]* O k | ||
'\\\\ | |||
e | T Lp e | ||
g | |||
- Peach Bottom Atomic Power Station July 5, 1991 | |||
' Emergency Plan Implementing Procedures Page 2 s | |||
Very truly yours, | If you have any questions or require additional information, please do not hesitate to contact us. | ||
Very truly yours, d\\.fNo | |||
{ | |||
J. J. Lyash, USNRC Senior Resident Inspector, PBAPS | a G. | ||
J. Beck, anager Licensing Section Nuclear Engineering & Services Enclosure cc: | |||
T. T. Martin, Administrator, Region I, USNRC (2 copies) | |||
J. | |||
J. Lyash, USNRC Senior Resident Inspector, PBAPS | |||
- _ _ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _}} | |||
Latest revision as of 02:55, 15 December 2024
| ML20076D616 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/05/1991 |
| From: | Beck G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20076D619 | List: |
| References | |
| NUDOCS 9107300073 | |
| Download: ML20076D616 (4) | |
Text
... _
' 'k NUCLE AR HLGUL AlORY COMMISSION l
f w AsmNotos. o c w.,n I+,,,,,/
July 24,1991 E0-277/278 Peach Bottom MEMOPANDUM FOR:
Chief, Document Control Branch, IRM FROM:
Director, Division of Freedom of Infonnation and Publications Services ADM SUBS'ECT:
REVIEW 0F UtillTY EMERGENCY PLAN DOCUMENT ATION The Division of f reedom of Information and Publications Services has reviewed the attached document and has detennined that it may now be made publicly avallable.
bb +u-f/,h d,
Donnie H. Grimsley, Director Division of freedom of Infonnation and Publications Services Office of Administration ks
/
9107300073 910705 PR ADOCK 0500 7
ACCELERATED DISTRIBUTION PEMONSTRATION SYSTEM-REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
. ACCESSION NBR:4MVif ^1' '
DOC.DATE: 91/07/05 NOTARIZED: NO DOCKET #
FACIL:50-277 Peach Bottom-Atomic Power Station, Unit 2, Philadelph 05000277 50-278 Peach Bottom Atomic Power Station, Unit 3, Philadelph 05000278 AUTH,NAME AUTHOR AFFILIATION BECK,G.J.
-Philadelphia Electric Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch-(Document Control Desk)
I'
SUBJECT:
Forwards Central Files version of revised EPIPs, including I
Rev 63 to Emergency Response Procedure (ERP) index,Rev 13 to ERP-140, App 4 & Rev 11 to ERP-140, App 6.
E EmergencyPlanorImplementingProcedur/_ ENCL h
S DISTRIBUTION CODE: AX45D COPIES RECEIVED:LTR
[
SIZE:
(PropHetary)
TITLE:
es
. NOTES:
REC 3PIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL p
PD1-2_PD 1
1 MILANO,P.
1 1
4DM,TM[h$h8 1
1
. AEOD/DOA/IRB 1
1 E
INTERNAL:
m /DREP/PEPB9D 1
1 REG FILE 01 1
1 5.
R I
E-S L.
j A
D f
l D
l:
NOTE TO ALL " RIDS" RECIPIENTS:
3-PLEASE HELP US TO REDUCF W NSTI2 CONTACT THE DOCU.\\1ENT CONTROL DESK, ROONI PI-37 (ENT,2nr9) TO I LINilNATE YOUR N ANIE FRONI DISTRIBUTION LISTS I OR LX)CUN1LNTS IOU DON'T N1 ED:
-TOTAL NUMBER OF COPIES REQUIRED: LTTR 6
ENCL 6
.. _ ~
. -. -... ~.
.p' 10 CFR 50 Appendix _E.
Section-V PillLADELPIIIA-ELECTRIC COMPANY -
g NUCLEAR GROUP HEADQUARTERS -
955-65 CHESTERBROOK BLVD.
WAYNE, PA 19087 5691 (215) 64 4 6000 NUCLEAR ENGINEER!NO & $ERVICES DEPARTMENT July-5, 1991 Docket Nos.
50-277 50-278-License Nos.
DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC. 20555
SUBJECT:
Peach' Bottom Atomic Power Station,_ Units 2 and 3 Emergency Plan Implementing Procedures
Dear Sir:
Enclosed is revisicn 63 to the Emergency Response Procedures-for Peach Bottom'htomic Power Station, Units 2 and 3.
These procedures-are being submitted in accordance with 10'CFR
.50.54(g), 10-CFR 50 - Appen<lix-E, and 10 CFR 50.4.
The following revised procedures _ are enclosed.
--REVISION'63
- ~
ERP-140-App. 4 Rev. 13
" Chemistry Sampling &
Analysis Team-Leader" (CSATL)
- ERP-140 App. 6 Rev. 11
" Security Team Leader" (STL)
In accordance with 10-CFR.2.790(a)(6), we request that
! names and telephone numbers in the.above procedures be withheld ifrom public disclosure since such disclosures would constitute an
-unwarranted-invasion of'the personal privacy of the individuals-involved.
r-
,n
~
- i.. t
]* O k
'\\\\
T Lp e
g
- Peach Bottom Atomic Power Station July 5, 1991
' Emergency Plan Implementing Procedures Page 2 s
If you have any questions or require additional information, please do not hesitate to contact us.
Very truly yours, d\\.fNo
{
a G.
J. Beck, anager Licensing Section Nuclear Engineering & Services Enclosure cc:
T. T. Martin, Administrator, Region I, USNRC (2 copies)
J.
J. Lyash, USNRC Senior Resident Inspector, PBAPS
- _ _ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _