ML20076L433: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[RBG-15-413, Interim Deficiency Rept DR-93 Re Documentation & Code Stamping of Interconnecting Piping Between Reactor Water Cleanup Hxs.Info Awaited from Atlas Industrial Mfg Co.Next Rept Will Be Submitted by 830812]]
| number = ML20076L433
| issue date = 07/08/1983
| title = Interim Deficiency Rept DR-93 Re Documentation & Code Stamping of Interconnecting Piping Between Reactor Water Cleanup Hxs.Info Awaited from Atlas Industrial Mfg Co.Next Rept Will Be Submitted by 830812
| author name = Booker J
| author affiliation = GULF STATES UTILITIES CO.
| addressee name = Collins J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| docket = 05000458
| license number =
| contact person =
| document report number = 10CFR-050.55E, 10CFR-50.55E, DR-93, RBG-15-413, NUDOCS 8307190179
| document type = DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21), TEXT-SAFETY REPORT
| page count = 1
}}
 
=Text=
{{#Wiki_filter:..
GULF STATES                    UTILITIES COMPANY POSTOFFICE B o x 2 9 51      a DEAUMONT. TEXAS 77704 AREA CODE 713 838-6631 July 8, 1983 RBG- 15,413 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement            ])]@[
h    1
                                                                          )
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011                                        1 R 13 W        ,
hW
 
==Dear Mr. Collins:==
y_t
                                                                                .w-                .
River' Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-93 In'our Interim Report dated May 25, 1983, Gulf States Utilities Company (GSU) informed Region IV of the status of the. condition potentially reportabic under 10CFR50.55(e) concerning documentation and code stamping of the interconnecting piping between the Reactor Water Cleanup heat exchangers (DR-93). GSU is awaiting information from the supplier of the interconnecting piping (Atlas Industrial Manufacturing Company). An interim or final status report will'be submitted by August 12, 1983.
Sin erely,
                                                                        'f<fLM?
                                                                          /
i J. E. B ker 8  Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group
[RfD JEB/PJD/kt cc: Director of Inspection & Enforcement U. S. Nuclear-Regulatory Commission Washington, D. C. 20555 R. L. Brown (SRI)
    '8307190179 03070s PDR ADOCK 05000458.
S                    ppg
_ _{ f. ~ f tjg
        .    -}}

Latest revision as of 11:15, 27 September 2022