ML20081A853: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* | {{#Wiki_filter:* | ||
uemas Addrese Alattma Power Company | uemas Addrese Alattma Power Company 600 North 18th Street Post Offica Box 2641 | ||
Birmingham, Alabama 35291 Telephone 205 783-6081 | 'J I | ||
Birmingham, Alabama 35291 Telephone 205 783-6081 | |||
~ t. ' N. n e | |||
[*f{g} 'P O F. L Clayton, Jr. | |||
Senior Vice President Flintridge Building | g! | ||
;. r,1.'. | |||
October 18, 1983 | Senior Vice President AlabamaPbwer Flintridge Building the southem electic system b | ||
g3 gd 7.1 October 18, 1983 | |||
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W. | ' Docket No. 364 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W. | ||
Suite 3100 Atlanta, Georgia 30303 | Suite 3100 Atlanta, Georgia 30303 | ||
==Dear Sir:== | ==Dear Sir:== | ||
Joseph M. Farley Nuclear Plant Unit 2 Licensee Event Reports Nos. | Joseph M. Farley Nuclear Plant Unit 2 Licensee Event Reports Nos. | ||
LER 83-040/03L-0 and LER 83-041/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written notification of the occurrences. | LER 83-040/03L-0 and LER 83-041/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written notification of the occurrences. | ||
If you have any questions, please advise. | If you have any questions, please advise. | ||
Yours very truly, | Yours very truly, | ||
+swM F. L. Clayton J r. | |||
FLCJr/KWM:nac Enclosures xc: Director, IE (30 copies) | FLCJr/KWM:nac Enclosures xc: Director, IE (30 copies) | ||
Director, MIPC (3 copies) | Director, MIPC (3 copies) | ||
CO -) | |||
eggysc# | |||
}O" 8310270061 831010 | |||
) l PDR ADOCK 05 S | |||
_}} | |||
Latest revision as of 08:25, 14 December 2024
| ML20081A853 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/18/1983 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20081A855 | List:
|
| References | |
| NUDOCS 8310270061 | |
| Download: ML20081A853 (1) | |
Text
uemas Addrese Alattma Power Company 600 North 18th Street Post Offica Box 2641
'J I
Birmingham, Alabama 35291 Telephone 205 783-6081
~ t. ' N. n e
[*f{g} 'P O F. L Clayton, Jr.
g!
- . r,1.'.
Senior Vice President AlabamaPbwer Flintridge Building the southem electic system b
g3 gd 7.1 October 18, 1983
' Docket No. 364 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.
Suite 3100 Atlanta, Georgia 30303
Dear Sir:
Joseph M. Farley Nuclear Plant Unit 2 Licensee Event Reports Nos.
LER 83-040/03L-0 and LER 83-041/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written notification of the occurrences.
If you have any questions, please advise.
Yours very truly,
+swM F. L. Clayton J r.
FLCJr/KWM:nac Enclosures xc: Director, IE (30 copies)
Director, MIPC (3 copies)
CO -)
eggysc#
}O" 8310270061 831010
) l PDR ADOCK 05 S
_