  !        'PGwk                                                   DIABLO CANYEN POWER PLANT                                                                   ..
_ ~. -
l:,,,,,ga                       .                    PROCEDURE ON-YHE-SPOT CHANGE                                                               '?     ,
-c_,-
p,,o   , no.       EP M-7                    a 011 Spill Isolation & Clean-Up Frocedure
'PGwk DIABLO CANYEN POWER PLANT l:,,,,,ga PROCEDURE ON-YHE-SPOT CHANGE
                                                                            # 5 hh no.iO                              O iaaO                                    !'
'?
d Ih                   Trp.or en.no. O reauaaewr(e               a>
EP M-7 a # 5 hh no.iO O
Technical Assistance 0Tiaaaaaa'w(v.a.>;tair.tioao.te on,     ,  Steven A. Denison
iaaO p,,o
                        %,,, o,,                                                                                                                                 _
, no.
p,e,   d cm no.: (con m. .n.r m. went et anyn.1 pm dwe?             W. H No)
011 Spill Isolation & Clean-Up Frocedure Ih Trp.or en.no. O reauaaewr(e a>
                                                      ~
0Tiaaaaaa'w(v.a.>;tair.tioao.te d
      ,                                        (Does'it constitut an unreviesed saf.ty/.nviromental qwstion? O,Yts D No)                                       -
Technical Assistance on, Steven A. Denison
J                             Pg. 2, Part 2             "Non-Company agencies if any oil reaches the creek or ocean"
%,,, o,,
p,e, d cm no.: (con m..n.r m. went et anyn.1 pm dwe?
W.
H No)
(Does'it constitut an unreviesed saf.ty/.nviromental qwstion? O,Yts D No)
~
J Pg. 2, Part 2 "Non-Company agencies if any oil reaches the creek or ocean"
:1
:1
-i Fed. National Response Center Coast Guard San Francisco (Captain of the Port)
-i Fed. National Response Center Coast Guard San Francisco (Captain of the Port)
[             Telephone i changed to: (415) 437-3073 s
[
              .s                                                                  .
Telephone i changed to: (415) 437-3073 s
d                                                                                          .
.sd
                        "'"*"''' N                 The Coast Guard number was (415) 556-3740, and was changed to the above number.
"'"*"''' N The Coast Guard number was (415) 556-3740, and was changed to the above number.
t Aumona.iion. _
t
                                                                                            *    *                    -#            [/        )
[/
(Pt.nt ude.g.mqf5t.N)             (Piant M.n.e.m.nt seen wisAo uo.n )
)
                                                                                                                                        ~olne*
Aumona.iion. _
Is diat. distribution to th. Control Roo and aff.ct.d work ar.as required? O YEs M NO                   Initial Distribution Sy:
(Pt.nt ude.g.mqf5t.N)
                                                                                                                          /
(Piant M.n.e.m.nt seen wisAo uo.n )
Distributad To: O control Roo. O Others Oat. R.c.tved by Docu ent Control             9 - 1 I-Sr 3, lI esac a .nde u                       r.     n _ no   ,m             2GS-D                                    ,= 14 d.y.
~ lne*
h *- o.'.     --O -O -
o Is diat. distribution to th. Control Roo and aff.ct.d work ar.as required? O YEs M NO Initial Distribution Sy:
u           '
Distributad To: O control Roo.
p{ =aasa==rO O - O O O
O Others
                                                                                                      . _            ,. n_                o_
/
ll
Oat. R.c.tved by Docu ent Control 9 - 1 I-Sr 3, lI 2GS-D
: l.         '
,= 14 d.y.
ig
esac a
                        % = a.,           =d ow ca ne.O *aamas w.===.O                                         ,                                . . . .    .
.nde u
9%       Achon T.k.n/a.m res:                                                                                                           _
r.
IAc N W8                                                   _
n _ no
11 TION:        O J**"* %                   O ==                                                         ri     e .dda.a.i n i.E           ,
,m h
[                         8310270588 831025
* o.'.
!                        PDR ADOCK 05000275
- --O -O -
_ _ _ _ _ Y _ _ . _. .
u p{
n _
o_
=aasa==rO O - O O O ll l.
i
% = a.,
=d ow ca ne.O *aamas w.===.O g
9%
Achon T.k.n/a.m res:
IAc N W8 O **"* %
O==
ri e.dda.a.i n i.E J
11 TION:
[
8310270588 831025 PDR ADOCK 05000275 Y


u - w.,            ,    ,              < . _ .        . _ _m          ,  ,2               7                   , ,    .xc%
,2 7
I P3wE                                                 OtABLO CANYON POWER PLANT                                                                                                   '
_m
                                                                                                                                                                                                    }
.xc%
  ] M37                                                       PROCEDURE ON THE-SPOT CHANGE
u - w.,
[       ,
I P3wE OtABLO CANYON POWER PLANT
}
] M37 PROCEDURE ON THE-SPOT CHANGE EP M-1
# 10 L 3 b a i O O
i a a ''
- E
[
p,eeeews No.
p,eeeews No.
EP M-1                      ,,,,      # 10 L 3 b a i O                        O              i a a ''
Employee In.iury or Illness (Non-Radiological) j-s ym, il Type os enene. @ PERuANENT (peon)
j-E ym,            Employee In.iury or Illness (Non-Radiological)
TEMPORARY (ywesw); Espiration Date Technical Assistance on,
  , s
, Steven A. Denison
* TEMPORARY (ywesw); Espiration Date il               Type os enene. @ PERuANENT (peon)
%w p,, e cnense: (ones ses emer em Mont si engnal proceewe?
Technical Assistance                                           on,   , Steven A. Denison                                                           ,
We No)
                  %w p, , e cnense: (ones ses emer em Mont si engnal proceewe?                           We     No)                                                   ~
~
H                                         (Dues
H (Dues
* t's fanstitute an unroviewed safety /enviremental ouestion? O Yss (D no)                                                                           ,
* t's fanstitute an unroviewed safety /enviremental ouestion? O Yss (D no)
Attachment 7 " Company panel of physicians, ambulance and hospitals
, " Company panel of physicians, ambulance and hospitals serving the intnediate area around Diablo Canyon" i
"                                                              serving the intnediate area around Diablo Canyon"                                                                                             i I
Ambulance Change Bay Ambulance phone number to: 543-2626_
Ambulance           Change Bay Ambulance phone number to: 543-2626_
5 a
                                                                          "                    a
Physicians The remark for the physicians' exchange should be
:.!          5                                                                                                                                                          '
" General operator for different physicians."
Physicians           The remark for the physicians' exchange should be
~
                                                              " General operator for different physicians."
1 l
($
i The new number was found by phone cakl. The remark for the nuesen ser cmanse:
physicians' exchange was needed for clarity.
i Autnortantons.
j IPise ^ ^ '.. -_ @
(Ptent "O.-..E StaffgSRO Ucone)
/Dee*
Initial Distrmtion By:
Immediate distrhtion to the Control Roos and affected wort areas required? O YEs NO Distributed To: O Control Room O Others o.s. nec.i..d by o.cument Contrei F-//- S'3 ll!
~ i'a 643
% anove sous14asys esne no
.n pw.u ne w.
n, noimermen d,,
- O.
ne A _
O 5
Pomo,is n pcase ow cnsnee Adamonalinnermeaan t
~
~
1 l          ($ i nuesen ser cmanse:
.f Acmon TakesvRomans:
The new number was found by phone cakl. The remark for the
~
:                                    physicians' exchange was needed for clarity.
$s
i Autnortantons.                                                                                                                '
~is e = = _._ ~. --
j IPise ^ ^ '. . -_ @
CS-
(Ptent "O .- ..E StaffgSRO Ucone)                                  /Dee*
**=====* =aa'=aa' ''*** [
NO Initial Distrmtion By:
I D:STRIBUTION:
Immediate distrhtion to the Control Roos and affected wort areas required? O YEs Distributed To: O Control Room O Others o.s. nec.i..d by o.cument Contrei                  F-//- S'3 ll!    esne no          .n pw.u ne w.          n,      noimermen                  ~ i'a 643                              % anove sous14asys d,,          - O                      "*""'"""**'
0 ''."."of,sh O ome =
O ne        A _                                          _
e
5
--e. = -
! t                  Pomo ,is n pcase ow cnsnee                            Adamonalinnermeaan                                                                                  , ..              .
w-
                                                                                                                                                                                        ~
-w----w-+-w-e-
            .f       Acmon TakesvRomans:
-w
  ~
-w-m---
            $s                                                             -
------w---.-.--,,,m,w--we.-.,,-,y----__
            ~is     e =- = _ ._ ~. --
y--
                                                          - CS-
w-.
                                                                                                                                                          **=== ==* =aa'=aa' ''*** [
---*---pw--ee
I   D:STRIBUTION:               0 ''."."of,sh
--y,.y y
                                            ,,                          O ome =
-w---9,y
                                                                  -           e           -
-.--gyw g 9. pyg
                                                                                                                          ---*---pw--ee           --y,.y       y -w---9,y     -.--gyw g 9. pyg         -


            ..      . ,          a.- p . . a . . mga                                   . x..m.2..:a . ,             .. u ..       .      ..: :.u w               ,
a.- p.. a.. mga x..m.2..:a.,
        -        a i
u..
  ?
..: :.u w a
l                                              .
i
                                                                                                  *      ~
?
                                                                                                                                .REV 1 05/14/81 i    ff
.REV 1 i
  ?.                                                                     PACIFIC GAS AND El.ECTRIC COMPANY                                                       :I i                                                                   . CORPORATE EMiRGENCY RESPONSE PLAN                                                       i I.
~
h                                                                           IMPLEMENTING PROCEDURES
l 05/14/81 ff
  .                      Effective Date: 08/29/83                                                                                                                   1
?.
  .i
PACIFIC GAS AND El.ECTRIC COMPANY
                                                                                    , TABLE OF ORGANIZATION Nueer           Revision                               Date                                   Title 4
:I i
1.1 '    '
. CORPORATE EMiRGENCY RESPONSE PLAN i I.
l02                         : 07/14/83 Activation of the Corporate Emergency                                 -
h IMPLEMENTING PROCEDURES Effective Date: 08/29/83 1
  ;                                            .        .                                          Response Organization 1.2               02                         07/15/83           ' Activation of the Corporate Incident Response Center                     .
, TABLE OF ORGANIZATION
2.1               02                         07/25/83           . Plan Maintenance 2.2       . ;.j00                       . 07/15/83,           , Emergency. Preparedness Training Program                               ;
.i Nueer Revision Date Title 1.1 '
]                               3.1''
l02
3.2
: 07/14/83 Activation of the Corporate Emergency 4
                                                . Ol ' ' -     ,
Response Organization 1.2 02 07/15/83
                                                                          ' 05/01/81             . Governmental Relations
' Activation of the Corporate Incident Response Center 2.1 02 07/25/83
                                                                                                                                        ~
. Plan Maintenance 2.2 j00
J02                           08/08/81.             Public Relations 3.3               01                         05/01/81             Law                                               '-
. 07/15/83,
3.4               02                         07/26/83               Insurance
, Emergency. Preparedness Training Program
<-                            3.5               01                     [05/01/81                 Safety. Health and Claims                             .
]
2 3.6             ~ 02 '.         ,          .07/20/83             . Security                                           ,
3.1''
g             -
. Ol ' ' -
3.7 4.1 00                         05/01/81               Personnel' Relations                                   ,
' 05/01/81
02                          07/25/83              Materials 4.2             '02                                                                                                                       "
. Governmental Relations
07/14/83               Telecomunications 4.3               02                         08/13/81               Radiological Analysis and Protection                             ,
~
4.4               01                         05/01/81               General Construction 4.5               01                         05/01/81               Engineering and Technical Support 4.6               01                         05/01/81               Computer Systems and Services 4.7               03                 '
3.2 J02 08/08/81.
07/29/83               Nuclear Plant Operations 4.8               02                         07/28/83               Division Support i
Public Relations 3.3 01 05/01/81 Law 3.4 02 07/26/83 Insurance 3.5 01
4.9               02                         07/22/83               Quality Assurance f
[05/01/81 Safety. Health and Claims 2
3.6
~ 02 '.
.07/20/83
. Security g
4.1 02 07/25/83 Materials 3.7 00 05/01/81 Personnel' Relations 4.2
'02 07/14/83 Telecomunications 4.3 02 08/13/81 Radiological Analysis and Protection 4.4 01 05/01/81 General Construction 4.5 01 05/01/81 Engineering and Technical Support 4.6 01 05/01/81 Computer Systems and Services 4.7 03 07/29/83 Nuclear Plant Operations 4.8 02 07/28/83 Division Support i
4.9 02 07/22/83 Quality Assurance f
i
i
                                                                                                                                                          -so O                                                                                                                           -
-so O
ij                                                                                                 i
ij i
['       . . . .        .. . -.-                  - - --------.- --.                                              .        -
['


                                                                                                                      .g.-                           -# ,
.g.-
L.         +,_ _w i       ,                      o          I N                                                                                                                                                                           ,. i
L.
                                      ,  ,                                                                                  ,          .                                                                          - - '6
+,_ _w i
:                                                                                                                                                                              u    0, e                     e-OSAA fe/ sal nav.03                                                                                                                                                               '
I N i
o
'6 u
e e-OSAA fe/ sal nav.03 0,
NUMBER: 2.1 PACIFIC ftAS and ELECTRIC COMPANY s',
NUMBER: 2.1 PACIFIC ftAS and ELECTRIC COMPANY s',
yggg                                         CORPORATE EMERGENCY RESPONSE PLAN                                                         REVISION: 2 DATE: 07/25/83                                 !
yggg CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 DATE: 07/25/83 Ii IMPLEMENTINGPROCEDURE
                                                                                                                                                                                '^"' ' ' '
'^"' ' ' '
  .                                                    Ii                IMPLEMENTINGPROCEDURE                                                                                                                          -    I e
e ME
ME                                                                                                   '
.j PLAN MAINTENANCE l'
l
SIGNATURE RESPONSIBILITY DATE TITLE 7g PREPARED BY-SENIOR NUCLEAR GENERATION ENGINEER PERSONNEL ANE ENVIRONMENTAL SAFETY, NPO D
.j                                                                     ,                                        PLAN MAINTENANCE
N SUPINtdSING NUCLEAR GENERATION ENGINEER DrDenMMet Akn CNU4DnMMCMTat CarrTV WDA REVIEWED AND CONCURRED BY
                                                                                                                                                                                                        - .                    l l'
( _/
SIGNATURE RESPONSIBILITY                                                                                                                                     DATE TITLE PREPARED BY-7g SENIOR NUCLEAR GENERATION ENGINEER PERSONNEL ANE ENVIRONMENTAL SAFETY, NPO D                                                                                                                                 N SUPINtdSING NUCLEAR GENERATION ENGINEER DrDenMMet Akn CNU4DnMMCMTat CarrTV WDA REVIEWED AND CONCURRED BY                                     ( _/                           ius                                                       /1 MANAGER NUCLES M LANT OPERATIONS APPROVED BY                                       /_ [
ius
                                                                                    //
/1 MANAGER NUCLES M LANT OPERATIONS
                                                                                                                      /t I
/_ [
VICF[/ RESIDENT,NUCLEARPOWERGENERATION 7
APPROVED BY
APPROVED BY                                                                   m g,_                                 Q                                       ,
/t
DIRMh, PRESIDf8f'S N@RjdD/ISORY C0"24ITTEE                                                                                                                                     _
//
i 4
I VICF[/ RESIDENT,NUCLEARPOWERGENERATION 7
4                                                                                                                                                                                                                           I 1
APPROVED BY m g,_
Q DIRMh, PRESIDf8f'S N@RjdD/ISORY C0"24ITTEE 4
I 4
I
I
                                                                                                                                                                -                                                              l
^
                                                                                                                                                                                                          ^ ''      '
n
    ;                                                                                                                                                                                                                          l n
(
(                                                                               .
\\
                    \
w---~v
m ,
--.---------,-,eew, ew--,,---e,g,
w---~v       --.---------,-,eew,               ,,-., ,    ew--,,---e,g,     - ,y   -q----.yvwg--- - , - .         ---y-.             ,
,y
-q----.yvwg--- -, -.
---y-.
m,


_._ __                                                    z                                       _                . . . . .- -
z
                                                                                                                                                                                                            =+.
=+.
l}           e
l}
* i d                                                                                                               .                        .
i e
d
:6
:6
:i
: i
    .                    m e m arv en                                                                                                                                                                                                     [tL PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 2.1
[t m e m arv en L
            .gv       ~~"
PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.1
i                                                                                                                                                                                     """''
.gv
i                                                                    IMPLEMENTING PROCEDURE                                                                                                                                           .
~~"
TITLE                                                                                                                                                      DATE: 07/25/83                                         -
CORPORATE EMERGENCY RESPONSE PLAN i
i PLAN MAINTENANCE                                                                                     PAGE OF OF 07 t
IMPLEMENTING PROCEDURE DATE: 07/25/83 i
i TITLE PLAN MAINTENANCE PAGE OF OF 07 t
a f
a f
  .f                                                                                                                   ,
.f 3
3 e
e
                                                                                                        ~ '                                                                             *
~ '
      %                                                                                                                                                  .          t                           ,          *          ,
t 4
* 4                              4                                               #
4 ORGANIZATIONAL OUTLINE I.
ORGANIZATIONAL OUTLINE I. SCOPE 9
SCOPE 9
: 11. DISCUSSION W
11.
I 111. RESPONSIBILITIES f
DISCUSSION I
IV.     INSTRUCTIONS V. REFERENCES VI.     ATTACHMENTS s
W 111.
RESPONSIBILITIES f
IV.
INSTRUCTIONS V.
REFERENCES VI.
ATTACHMENTS s
(
(
0 e
0 e
e 9*       so f- ,
e 9*
l
so f-l
                  .)
.)
                                                                                      .                                                                                                                                            I
I
                \
\\
                        .n             .- w                                 --          ~       . ~.                           --
.n
m               -- --
.- w
                                                                                                            ,    - - _ - , . - , - ,          ,,,,_a.                           -
~
                                                                                                                                                                                          -,,. ,--  --_,,,,,--_-n,-n_
. ~.
m
,,,,_a.
p.
--_,,,,,--_-n,-n_


                                    . ~ , -     A=w=.:-           ~ + :-:--a ..~s - c. L Ja i ,        . .i.        u  - - n. = a                  i j       .        e 1                                                                               .        .                                                    -s J      .
L Ja i,
                                                                                                                                                  'j enese uma nev.es
..i.
[
u
Pacific GAS and ELECTRIC c0MPANY                                                             -
- - n. = a i
r CORPORATE EMERGENCY RESPONSE PLAN                         NUMBER: 2.1 lM 1
. ~, -
                    ~
A=w=.:-
IMPLEMENTING PROCEDURE REnSI N: 2 DATE: 07/25/83                         _
:-:--a
  !                                              PLAN MAINTENANCE                                           ~PAGE 03 0F 07 4!
..~s c.
l I. SCOPE l
~ +
The scope of this Implenenting Procedure is to assign t-esponsibilities and detail tasks for meintaining the Corporate Emergency Response Plan (CERP),         ~
j e
1 J
-s
' j enese uma nev.es Pacific GAS and ELECTRIC c0MPANY
, [
CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 2.1 r
lM IMPLEMENTING PROCEDURE
~
REnSI N: 2 1
DATE: 07/25/83 PLAN MAINTENANCE
~PAGE 03 0F 07 4!
l I.
SCOPE The scope of this Implenenting Procedure is to assign t-esponsibilities and detail tasks for meintaining the Corporate Emergency Response Plan (CERP),
~
its Implementing Procedures, and the Nuclear Emergency Response Comunications Directory.
its Implementing Procedures, and the Nuclear Emergency Response Comunications Directory.
II.. DISCUSSION                           ,,      '
II.. DISCUSSION This Implementing Procedure provides the requirements for the review, and updating of the Corporate Emeroency Response Plan, its Implementing Procedures, and the Nuclear Emergency Response Comunications Directory; and provisions for the dissemination of updated information to all Corporate Emergency Response Organization personnel.
$                            This Implementing Procedure provides the requirements for the review, and                                                 ,
III. RESPONSIBILITIES Individuals covered 'by this Implementbg Procedure shall find their L.;;)
updating of the Corporate Emeroency Response Plan, its Implementing Procedures, and the Nuclear Emergency Response Comunications Directory; and provisions for the dissemination of updated information to all Corporate Emergency Response Organization personnel.
respcnsibilities and duties under their normal.(non emergency) position title in the Procedure Instructions section.
III. RESPONSIBILITIES
IV.
                ,            Individuals covered 'by this Implementbg Procedure shall find their L.;;)               respcnsibilities and duties under their normal .(non emergency) position title in the Procedure Instructions section.
INSTRUCTIONS A.
IV. INSTRUCTIONS
Supervising Nuclear Generation Engineer 1.
;                            A. Supervising Nuclear Generation Engineer
Responsible for the day-to-day control and implementation of the Corporate Emergency Response Plan (CERP), its Implementing Procedures, and related controlled documents.
: 1. Responsible for the day-to-day control and implementation of the Corporate Emergency Response Plan (CERP), its Implementing Procedures, and related controlled documents.
2.
: 2. Receive policy guidance and direction regarding the CERP and related documents from the Manager, Nuclear Plant Operations Department.
Receive policy guidance and direction regarding the CERP and related documents from the Manager, Nuclear Plant Operations Department.
: 3. Periodically evaluate new or revised regulatory documents, plans of                                   -
3.
interfacing emergency preparedness organizations, and implementing procedures (e.g., Title 10. Code of Federal Regulations; NUREGs; Regulatory Guides; the applicable County emergency plan (s); and the Diablo Canyon Power Plant Emergency Plan) to ensure that the information contained in the Corporation Emergency Response Plan (CERP), its Implementing Procedures.
Periodically evaluate new or revised regulatory documents, plans of interfacing emergency preparedness organizations, and implementing procedures (e.g., Title 10. Code of Federal Regulations; NUREGs; Regulatory Guides; the applicable County emergency plan (s); and the Diablo Canyon Power Plant Emergency Plan) to ensure that the information contained in the Corporation Emergency Response Plan (CERP), its Implementing Procedures.
Response Communications Directory                   is,and the Nuclear Emergency current.
Response Communications Directory is,and the Nuclear Emergency current.
: 4. Based upon the results of the above evaluations of the various                     - -              -
4.
l.
Based upon the results of the above evaluations of the various l.
regulatory documents, plans, and procedures, (or recomendations from                             -
regulatory documents, plans, and procedures, (or recomendations from the appropriate corporate personnel) prepare, as appropriate, j
            ; "',                        the appropriate corporate personnel) prepare, as appropriate, j
~
            ~
proposed revisions and updates to the following controlled documents:
proposed revisions and updates to the following controlled documents:
(-                                       ..
(-
l N
l N
p ,             w,-.--r.yp
m
---.---w ee.-e.>w-m----,-_--_--%,,,w_..e,,,,%-
-e._,_,--_,..-4,,.._w.-
.,_,wm-,,
w
,m._.,_,,__,-,m,c,,,-,
wg.,.,-.-g----,9%,-m.
. w ee p,
,, 9 w,-.--r.yp


        =           '
=
j                                                                                                                                               e
j e
                                                                                                                                                              '4 lI               ee.esas tor,as nev.ca Ih-l                                                   PACIFIC gas and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN                                 NIA4BER: 2*1                           ~-   I l- @                                       IMPLEMENTING PROCEDURE "E"
'4 lI Ih ee.esas tor,as nev.ca l
* DATE: 07/25/83                                 I
PACIFIC gas and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NIA4BER: 2*1 I
.,                                                  PLAN MAINTENANCE                                                 PAGE 04 0F 07                     .
~-
                                                                                                                                                                  ~l
l- @
                                                                                                                        ~
IMPLEMENTING PROCEDURE "E"
: a. Corporate Emergency Response Plan (CERP) j                                       b. CERP Implementing Procedures
DATE: 07/25/83 PLAN MAINTENANCE PAGE 04 0F 07
.i
~l a.
: c. Nuclear Emergency Response Comunications Directory
Corporate Emergency Response Plan (CERP)
: d. Energency Response and Recovery Activities Record                                                                     '
~
5." Proposed controlled document revisions and changes shall be reviewed,                                              ,
j b.
'a                                       concurred with, and approved as designated in Procedure Attachment 1,
CERP Implementing Procedures
                                          " Responsibilities for Controlled Document Review and Approval".
.i c.
NOTE: The Supervising Nuclear Generation Engineer shall affix his signature, as appropriate, to controlled document revisions and updates prior to forwarding for management review, concurrence with, and approval.                                                                               -
Nuclear Emergency Response Comunications Directory d.
: 6. On a quarterly basis, or when significant changes are known to have occurred, issue updated changes to the following controlled
Energency Response and Recovery Activities Record 5."
        @                                documents:
Proposed controlled document revisions and changes shall be reviewed,
: a. CERP Implementing Procedure Attachments
'a concurred with, and approved as designated in Procedure Attachment 1,
: b. Nuclear Emergency Response Comunications Directory NOTE: The issuance of.these updates to controlled documents only requires approval of the Supervising Nuclear Generation Engineer level.
" Responsibilities for Controlled Document Review and Approval".
NOTE: The Supervising Nuclear Generation Engineer shall affix his signature, as appropriate, to controlled document revisions and updates prior to forwarding for management review, concurrence with, and approval.
6.
On a quarterly basis, or when significant changes are known to have occurred, issue updated changes to the following controlled documents:
a.
CERP Implementing Procedure Attachments b.
Nuclear Emergency Response Comunications Directory NOTE: The issuance of.these updates to controlled documents only requires approval of the Supervising Nuclear Generation Engineer level.
NOTE: As appropriate, the various CERO Departments / Functional Group Coordinators shall be periodically contacted to update their respective CERP Implementing Procedure Attachments.
NOTE: As appropriate, the various CERO Departments / Functional Group Coordinators shall be periodically contacted to update their respective CERP Implementing Procedure Attachments.
: 7. Controlled documents shall be issued to CERO Departmental / Functional Group personnel, appropriate Company officers, and Company emergency response facilities, as follows:
7.
: a. Initial issuance of controlled documents shall be made using Procedure Attachment 2. " Document Transmittal".
Controlled documents shall be issued to CERO Departmental / Functional Group personnel, appropriate Company officers, and Company emergency response facilities, as follows:
Subsequent revisions and updates of controlled documents shall be b.
a.
issued using Procedure Attachment 3. " Notice of Controlled Document Change".                                                                             ..          -
Initial issuance of controlled documents shall be made using Procedure Attachment 2. " Document Transmittal".
          <J                             c. Instructions for executing controlled document changes shall be b                                   issued with each " Notice of Controlled Document Change" using L
b.
Procedure Attachment 4. " Controlled Document Transmittal Sheet".
Subsequent revisions and updates of controlled documents shall be issued using Procedure Attachment 3. " Notice of Controlled Document Change".
                                                                                                  - - - - -- - , - - -          , - , ,  -          = , - ,
<J c.
Instructions for executing controlled document changes shall be b
issued with each " Notice of Controlled Document Change" using Procedure Attachment 4. " Controlled Document Transmittal Sheet".
L
,w-,-,
=, -,


m, m :
m, m :
* m_ _ _ - - _                          o.. . t       .v               - -
o..
c -- -             - - - _                  --
t
p                     'B l                                                                                                                     .      .                                                                          =s
.v c -- -
m_
p
'B l
=s
:i
:i
                                - u. t,a m u PACIFIC GAS and ELECTRIC COMPANY
'}
                                                                                                                                                                                                            '}
- u. t,a m u PACIFIC GAS and ELECTRIC COMPANY
CORPORATE EMERGENCY RESPONSE PLAN                                                   NUMBER: 2*1
:}= D CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 2*1
                              ~
~
:}=
RE m N: 2 1
1              D                                                      IMPLEMENTING PROCEDURE                                                                          RE m N: 2                                 l DATE: 07/25/83                         _
IMPLEMENTING PROCEDURE DATE: 07/25/83 PLAN MAINTENANCE PAGE 05 0F 07
PLAN MAINTENANCE                                                                     PAGE 05 0F 07
-i d.
.;                                                                                                                                                                                                            -i
Upon determination that controlled documents are no longer needed they shall be recalled using Procedure Attachment 5. " Recall of a
: d. Upon determination that controlled documents are no longer needed
Controlled Document".
.,                                                                        they shall be recalled using Procedure Attachment 5. " Recall of                                                                       !
NOTE:
a                                                                          Controlled Document".
Appropriate records and mailing lists shall be maintained to ensure proper record keeping of centrolled documents and their distribution, 8.
NOTE:         Appropriate records and mailing lists shall be maintained to ensure proper record keeping of centrolled documents and their distribution, q                                            8.                     Revision lists for each of the following controlled documents shall
Revision lists for each of the following controlled documents shall q
                                                                  -be updated on a quarterly basis or when significant changes are known to have taken place:
-be updated on a quarterly basis or when significant changes are known to have taken place:
: a. Corporate Emergency Response Plan (C'ERP) b.
Corporate Emergency Response Plan (C'ERP) a.
b.
CERP Implementing Procedures
CERP Implementing Procedures
: c. - Nuclear Emergency Response Consnunications Directory.
: c. - Nuclear Emergency Response Consnunications Directory.
: 9.                     Revisions and changes to controlled documents shall be prepared in h~s)                                                         the format prescribed using Procedure Attachment 6. " Controlled Document Organization and Format".
9.
Revisions and changes to controlled documents shall be prepared in h~s) the format prescribed using Procedure Attachment 6. " Controlled Document Organization and Format".
: 10. On-The-Spot-Changes (OTSC) to all controlled documents covered by this Procedure may be issued on the Supervising Nuclear Generation Engineer's authority using Procedure Attachment 7 "On-The-Spot-Change" to effect changes to controlled documents which will be included in the applicable documents next revision or update.
: 10. On-The-Spot-Changes (OTSC) to all controlled documents covered by this Procedure may be issued on the Supervising Nuclear Generation Engineer's authority using Procedure Attachment 7 "On-The-Spot-Change" to effect changes to controlled documents which will be included in the applicable documents next revision or update.
OTSC's shall be considered part of the changed document unless it is superceded by another OTSC, incorporated in a subsequent document revision or update, or rescinded.
OTSC's shall be considered part of the changed document unless it is superceded by another OTSC, incorporated in a subsequent document revision or update, or rescinded.
: 11. On an annual basis, initiate a review of the CERP and its Implementing Procedures to ensure that:
: 11. On an annual basis, initiate a review of the CERP and its Implementing Procedures to ensure that:
: a. The appropriate principal and alternate individuals are assigned to all Corporate Emergency Response Organization positions.
a.
:                                                                b. The current Federal and State regulatory positions are incorporated,
The appropriate principal and alternate individuals are assigned to all Corporate Emergency Response Organization positions.
: c. All CERO Departmental / Functional Group notification lists reflect the current emergency response organization and correct emergency notification infomation.                                                                                             --
b.
: 12. Annually, as a minimum, initiate a review of all existing Letters-of-Agreement for the Diablo Canyon Power Plant Emergency Plan to ensure their validity and effectiveness, and investigate the necessity for fomulating new agreements to accommodate changes in                                                                       ,
The current Federal and State regulatory positions are incorporated, c.
the various emergency response organizational structures or methods of operation.
All CERO Departmental / Functional Group notification lists reflect the current emergency response organization and correct emergency notification infomation.
s y-     v   -m - w   , . - - - - - - - - - -                        ,    ,--,,,.,.----r           'w-   ----e - * --. *    ---w-- -i----a w -M       -w- - -  -*--w +     -        -
: 12. Annually, as a minimum, initiate a review of all existing Letters-of-Agreement for the Diablo Canyon Power Plant Emergency Plan to ensure their validity and effectiveness, and investigate the necessity for fomulating new agreements to accommodate changes in the various emergency response organizational structures or methods of operation.
: m.         ._                m               =       m     -
s y-v
eeesas e m nev..a                                                                                       :i PACIFIC GAS and ELECTRIC c0MPANY                                     '
-m w
4                                                    CORPORATE EMERGENCY RESPONSE PLAN                 NLM8ER: 2.1               -
,--,,,.,.----r
1'O
'w-
;;                                            IMPLEMENTING PROCEDURE
----e
                                                                                                          "'''S' "
---w--
QATE: 07/25/83           -
-i----a w
Pt.AN MAINTENANCE                                   PAGE 06 0F 07 B. Manager, Nuclear Plant Operations Department j               -
-M
: 1. Responsible for providing policy guidance and direction for the CERP and its related documents to the Supervising Nuclear Generation p                                               Engineer, Personnel and Environmental Safety Section.
-w-
: 2. Receive general policy and direction guidance from the Vice President, Nuclear Power Generation Department.
-*--w
h                                       3. Periodically evaluate new or revised regulatory documents, plans of interfacing emergency preparedness organizations, and implementing procedures (e.g., Title 10. Code of Federal Regulations; NUREGs; Regulatory Guides; the applicable county emergency plan (s); and the
+
?                                             Corporate Emergency Response Plan) to ensure that the information contained in the Corporate Emergency Response Plan and its Implementing Procedures is current.                                               -
 
: 4. Advise the Supervising Nuclear Generation Engineer of any changes in the Diablo Canyon Power Plant Emergency Plan or its Implementing
m.
            /
m
            @                                  Procedures which may impact on the CERP or its Implementing               .
=
m
:i eeesas e m nev..a PACIFIC GAS and ELECTRIC c0MPANY 4
CORPORATE EMERGENCY RESPONSE PLAN NLM8ER: 2.1 1'O IMPLEMENTING PROCEDURE
"'''S' "
QATE: 07/25/83 Pt.AN MAINTENANCE PAGE 06 0F 07 B.
Manager, Nuclear Plant Operations Department j
1.
Responsible for providing policy guidance and direction for the CERP and its related documents to the Supervising Nuclear Generation p
Engineer, Personnel and Environmental Safety Section.
2.
Receive general policy and direction guidance from the Vice President, Nuclear Power Generation Department.
h 3.
Periodically evaluate new or revised regulatory documents, plans of interfacing emergency preparedness organizations, and implementing procedures (e.g., Title 10. Code of Federal Regulations; NUREGs; Regulatory Guides; the applicable county emergency plan (s); and the
?
Corporate Emergency Response Plan) to ensure that the information contained in the Corporate Emergency Response Plan and its Implementing Procedures is current.
4.
Advise the Supervising Nuclear Generation Engineer of any changes in the Diablo Canyon Power Plant Emergency Plan or its Implementing Procedures which may impact on the CERP or its Implementing
/
Procedures.
Procedures.
: 5. Proposed controlled document revisions and changes shall be reviewed, i
5.
concurred with, and approved as designated in Procedure Attachment 1
Proposed controlled document revisions and changes shall be reviewed, concurred with, and approved as designated in Procedure Attachment 1 i
                                              " Responsibilities for Controlled Document Review and Approval".
" Responsibilities for Controlled Document Review and Approval".
C. Vice President, Nuclear Power Generation Department
C. Vice President, Nuclear Power Generation Department 1.
: 1. Responsible for providing overall policy guidance and direction for the CERP (as part of the overall emergency preparedness program) to                       ,
Responsible for providing overall policy guidance and direction for the CERP (as part of the overall emergency preparedness program) to j
j                                            the Manager Nuclear Plant Operations.                                                     '
the Manager Nuclear Plant Operations.
: 2. Review and concur with proposed revisions to the CERP and related controlled documents prepared by the Supervising Nuclear Generation Engineer as provided in Procedure Attachment 1. " Responsibilities for
2.
  .,                                        Controlled Document Review and Approval".
Review and concur with proposed revisions to the CERP and related controlled documents prepared by the Supervising Nuclear Generation Engineer as provided in Procedure Attachment 1. " Responsibilities for Controlled Document Review and Approval".
t D. Vice Presidents, Department Managers, and Functional Group Coordinators
t D.
,I                                       1. Review and concur with proposed revisions to the CERP and its related controlled documents as provided in Procedure Attachment 1                               ,
Vice Presidents, Department Managers, and Functional Group Coordinators
ll                                            " Responsibilities for Controlled Document Review and Approval".                           '
,I 1.
Review and concur with proposed revisions to the CERP and its related controlled documents as provided in Procedure Attachment 1 ll
" Responsibilities for Controlled Document Review and Approval".
I i
I i
: 2. Implement, as appropriate, approved revisions to the CERP and its             -
2.
      ;    O                                related controlled documents to ensure effective and efficient v'                               Departmental / Functional Group response in the event that the CERP is activated.                                                                     '
Implement, as appropriate, approved revisions to the CERP and its O
w,.   .,o.,,,a swn,-w                                         ~ ~ * * ' * "
related controlled documents to ensure effective and efficient v'
Departmental / Functional Group response in the event that the CERP is activated.
w,.
.,o.,,,a swn,-w
~ ~ * * ' * "
l-.-------.------...-.-------~~------------------------
l-.-------.------...-.-------~~------------------------


          - - ~ , _             . .
- - ~, _
                                                  . . -                                            - t   . _ A. m,_. _ . z _ _ w.,m g.         .s, sswu                 1
- t
                                                                                                                .                                                      -  y
. _ A.
                    -              mi I
m,_.
PACIFIC GAS and ELECTRIC COMPANY ti{
_. z _ _ w.,m g.
1                                                                                                                                            NUMBER: 2'I               -
.s, sswu 1
i O                  ~~                                                         CORPORATE EMERGENCY RESP 0tlSE PLAN
y ti{
                                                                                                                                                                                )
mi I
REVISION: 2 IMPLEMENTING PROCEDURE                                                                                                .
PACIFIC GAS and ELECTRIC COMPANY 1
DATE: 07/25/83               _
CORPORATE EMERGENCY RESP 0tlSE PLAN NUMBER: 2'I
PLAN MAINTENANCE                                                               PAGE 07 0F 07 t
~~
y
)
: 3. Reconsnend revisions and changes to the CERP on its related controlled documents to the Supervising Nuclear Generation Engineer, as appropriate.                                                                                             '
i O IMPLEMENTING PROCEDURE REVISION: 2 DATE: 07/25/83 PLAN MAINTENANCE PAGE 07 0F 07 t
E.       President's Nuclear Advisory Comittee Review and approve revisions to the CERP and it's Implementing Procedures i                                           as provided in Procedure Attachment 1. " Responsibilities for Controlled j                                         Document Review and Approval".
y 3.
  .                    V.           REFERENCES A.       Diablo Canyon Power Plant Emergency Plan B.       Corporate Emergency Response Plan VI. ATTACHMENTS
Reconsnend revisions and changes to the CERP on its related controlled documents to the Supervising Nuclear Generation Engineer, as appropriate.
                ,                    1.       Responsibilities for Controlled Document Review and Approval
E.
(# : :,
President's Nuclear Advisory Comittee Review and approve revisions to the CERP and it's Implementing Procedures i
: 2.       Letter, " Document Transmittal"
as provided in Procedure Attachment 1. " Responsibilities for Controlled j
: 3.       Letter, " Notice of Controlled Document Chante"
Document Review and Approval".
: 4.       Form 69-083, " Controlled Document Transmittal Sheet"
V.
: 5.       Letter, " Recall of Controlled Documents"
REFERENCES A.
: 6.       Controlled Document Organization and Format
Diablo Canyon Power Plant Emergency Plan B.
: 7.       Form 69-099, "On-The-Spot-Change"
Corporate Emergency Response Plan VI. ATTACHMENTS 1.
: 8.       Form 69-062, " Nuclear Emergency Response Comunications Directory" J
Responsibilities for Controlled Document Review and Approval
a   . .    .
(#
M t
2.
          %s y-,     m.,-w--         g     -
Letter, " Document Transmittal" 3.
                                                          ,y,.-   - . - - _ . . , . -        --                      m ,   -    ,,,,-q,--,, , ~ ,
Letter, " Notice of Controlled Document Chante" 4.
Form 69-083, " Controlled Document Transmittal Sheet" 5.
Letter, " Recall of Controlled Documents" 6.
Controlled Document Organization and Format 7.
Form 69-099, "On-The-Spot-Change" 8.
Form 69-062, " Nuclear Emergency Response Comunications Directory" J
a M
t
%s y-,
m.,-w--
g
,y,.-
m,
,,,,-q,--,,
, ~,
 
,. k ') s ' n t_o ~wl=_<,Am y a -
.a
- >U l.
~--
*d
=m
~
.t PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMEhGENCY RESPONSE PLAN p
90 IMPLEMENTING PROCEDURE
!8 ATTACHMENT: 1 TITLE PLAN MAINTENANCE DATE: 07/25/83 t
PAGE 010F 03
\\
l RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVAL i
j Responsibility Item Preparation Review Approval Corporate (SeeNote1)
Vice President, NPGD
. Chairman, PNAC Emergency
. President and


              , . k ') s ' n t_o
===Response===
                  -                  ~wl=_< ,Am y      a -      .a
Chief Operating Plan Officer
                                                                                  - >U  - ' '            l.            -    --    ~--                      - -
]
                                                                                                                                                                                                        =m *d
. Chainnan of the Board and Chief Executive Officer Implementing (SeeNote1)
                                                                                                                                                                                                            ~
(SeeNote2)
                                -, _ .,                                                                                                                                                                        .t PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMEhGENCY RESPONSE PLAN
Procedures 1.1 Mgr., Nuclear Plant Operations
* p 90 !8                                                IMPLEMENTING PROCEDURE ATTACHMENT: 1
(}
. .;                    TITLE                                PLAN MAINTENANCE                                                          DATE: 07/25/83                                                                ,
Mgr., Diablo Canyon Project Exec VP-Facilities and Electric Resources Development 1.2 Mgr., Nuclear Plant Operations 2.1 Senior Mgr., Nuclear Plant Engineer Operations
t PAGE 010F 03
-NPO Supervising Nuclear Generation Engineer s
                                                                                                                                                                                                                      \'
2.2 Mgr., Nuclear Plant Operations Supervising Nuclear Generation Engineer 3.1 Mgr., Agency Relations Mgr., Governmental and Public Affairs VP-Governmental Relations Sr. VP-Corporate Relations 3.2 Mgr. of Public Relations VP-Corporate Communications V
l                                                    RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVAL i
3.3 Sr. VP and General Counsel VP and General Attorney 3.4 Mgr. of Insurance Executive VP and Chief Financial Officer
j                                                                                            Responsibility
-~ >
    ,                        Item                      Preparation                                    Review                              Approval Corporate                    (SeeNote1)                      . Vice President, NPGD                    . Chairman, PNAC Emergency                                                                                                . President and
.em e
:                      Response                                                                                                      Chief Operating Plan                             '
w-ww
Officer
-s
]                                                                                                     ,
-ew
                                                                                                                                  . Chainnan of the Board and Chief Executive
,ww-w.-m 7---
    ;                                                                                                                                  Officer Implementing               (SeeNote1)                                                                 (SeeNote2)                                                                   -
g
Procedures                                                                                                                                                                         '
,,,,,rm
1.1                                               .. Mgr., Nuclear Plant Operations
,,,-,s--
(}                                                                           .
,,-,--,,,,e----,-,_v
Mgr., Diablo Canyon Project Exec VP-Facilities and Electric Resources Development 1.2                                                 . Mgr., Nuclear Plant Operations 2.1                 Senior                         . Mgr., Nuclear Plant Engineer                         Operations
                                                        -NPO                         . Supervising Nuclear Generation s
Engineer 2.2                                                 . Mgr., Nuclear Plant
      .                                                                                    Operations
                                                                                      . Supervising Nuclear Generation Engineer 3.1                                                 . Mgr., Agency Relations
                                                                                      . Mgr., Governmental and Public Affairs
                                                                                      . VP-Governmental Relations
                                                                                      . Sr. VP-Corporate Relations 3.2                                                 . Mgr. of Public Relations                                                                       -                -
                                                                                      . VP-Corporate Communications                                                                                 -
V                      3.3                                                 . Sr. VP and General Counsel
                                                                                      . VP and General Attorney 3.4                                                 . Mgr. of Insurance                                                                                                     "
                                                                                      . Executive VP and Chief Financial Officer
            -      -~ >       .em e w-ww   -s - -ew -
                                                                                                                ,ww-w.-m   ,-,-g ,-  ,,,,,rm ,,, ,,,-,s--     ,,-,--,,,,e----,-,_v                           ,-


                                                                                                            ~-                                        ~.    . = .    ~w . . A .~ w                             a, .           _a.     -
~w.. A.~ w a,.
1                                                                                                                                                                                                                                                       .
_a.
                                                                                                                                                                                                                                                  ~    '6 e,-eu umn m as i;
~-
PACIFIC GAS and ELECTRIC COMPANY                                                                           NUMBER: 2.1                                           [.
~.
~.I PGwE                                                          CORPORATE EMERGENCY RESPONSE PLAN                                                                                 REVISION: 2 r!         O..                                               IMPl.EMENTING PROCEDURE                                                                                                                   ATTACHMENT: 1
. =.
1
'6
~
i; e,-eu umn m as
~.I PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.1
[.
CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE r!
O..
IMPl.EMENTING PROCEDURE ATTACHMENT: 1
-s
-s
[
[
TITLE                                                                       PLAN MAINTENANCE                                                                                 .DATE: 07/25/83 PAGE 02 0F 03                                   - '
TITLE PLAN MAINTENANCE
                                                                                                                                                                                                                                                                  \
.DATE: 07/25/83 PAGE 02 0F 03
\\
RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVA'L s
RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVA'L s
Responsibility a                             Item                                           Preparation                                                               Review                                           Approval Implementing Procedures j~ .                                   3.5                                                                                 :. Mgr., Safety. Health, and
Responsibility a
* Claims
Item Preparation Review Approval Implementing Procedures j~.
                                                                                                                                  . VP and General Attorney
3.5
                                                                                                                                  . Sr. VP and General Counsel
:. Mgr., Safety. Health, and Claims
  >                                  3.6                                                                                       . Director of Security                                 .          Sr.VP-Operations
. VP and General Attorney
                                                                                                                                  . VP-General Services                                                                                                 _-
. Sr. VP and General Counsel 3.6
3.7                                                                                       . Mgr., Personnel Relations
. Director of Security Sr.VP-Operations
                                                                                                                                  . Sr. VP-Personnel
. VP-General Services 3.7
            @J                       4.1                                                                                         . Mgr., Materials
. Mgr., Personnel Relations
                                                                                                                                  . VP-General Services
. Sr. VP-Personnel
                                                                                                                                  . Sr. VP-Operations 4.2                                                                                       . Mgr. of Telecomunications
@J 4.1
                                                                                                                                  . Sr. VP-Operations 4.3                                                                                         . Mgr., Nuclear Plant Operations 4.4                                                                                         . VP-General Construction
. Mgr., Materials
                                                                                                                                . Executive VP-Facilities and Electric Resources Development                                                                                         .
. VP-General Services
4.5                                                                                         . VP-Engineering
. Sr. VP-Operations 4.2
                                                                                                                                . Executive VP-Facilities and Electric Resources
. Mgr. of Telecomunications
:                                                                                                                                          Development
. Sr. VP-Operations 4.3
  "/                                 4.6                                                                                       . VP-Computer Systems and Services
. Mgr., Nuclear Plant Operations 4.4
      ,                                                                                                                        . Executive VP and Chief                                                                             -    ._      m
. VP-General Construction
      .                                                                                                                                          Financial Officer                                                                           _._
. Executive VP-Facilities and Electric Resources Development 4.5
      ,        y_
. VP-Engineering
U                     4.7                                                                                       . Mgr., Nuclear Plant                                                                                             '
. Executive VP-Facilities and Electric Resources Development
Operations
"/
                                                                                                          .                    . Executive VP-Facilities and Electric Resources                                                                                     '
4.6
      ;                                                                                                                                        Development
. VP-Computer Systems and Services
                                                                                --.w.                                                              =
. Executive VP and Chief m
eF    .wep. mpg.           . - -                                             -.=.e+--r=
Financial Officer y_
                  -,y   -      ~ - -         , - , . - . , - - - - - - - _ , _ _ -   -
U 4.7
. Mgr., Nuclear Plant Operations
. Executive VP-Facilities and Electric Resources Development eF
.wep. mpg.
--.w.
-.=.e+--r=
=
-,y
~ - -
-.--.-7-.
 
-, = ~ +
:-~..=.-
--...~..
.- m w -...
x b
(


x          ,,      .
===v..
                                                    - , = ~ +                :-~..=.-              > --. ..~..      .- m w - .. .
j PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.1
                                                                                                                                        - b
. L E
  ;                              ===v..                                                                                                     (
ESP NS 00 2 h
j                                                               PACIFIC GAS and ELECTRIC COMPANY             NUMBER: 2.1             .
PGwE fD IMPLEMENTING PROCEDURE A m C ENT. 1 TITLE
L PGwE E           ESP NS                         00 2                 h fD                                       IMPLEMENTING PROCEDURE                                     A m C ENT. 1
~
                                                  ~
~
TITLE                                                                                '
PLAN MAINTENANCE DATE: 07/25/83 i
                                                                                                                                            ~
PAGE 03 0F 03 RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVAL Responsibility Item Preparation Review Approval Note 1; The CERP and all of it's Implementing Procedures require the preparation signature of the NPO Department Supervising Nuclear Generation
PLAN MAINTENANCE                           DATE: 07/25/83       ,
~
i PAGE 03 0F 03           -
.j Engineer, P&ES Section, unless otherwise noted.
RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVAL Responsibility Item                 Preparation                           Review               Approval Note 1; The CERP and all of it's Implementing Procedures require the preparation       ~
Note 2: All CERP Implementing Procedures require the approval of the Vice President, Nuclear Power Generation Department, and the Chairman of the President's Nuclear Advisory Comittee.
signature of the NPO Department Supervising Nuclear Generation
  .j                                             Engineer, P&ES Section, unless otherwise noted.
Note 2: All CERP Implementing Procedures require the approval of the Vice                 -
President, Nuclear Power Generation Department, and the Chairman of the President's Nuclear Advisory Comittee.
O
O
            .D                                                                                           .
.D 1
1 l
l le
le
.e
                                                                                                                                .e =   .
=
        -      %=.,   m.-   ..m     . ~ .                   -~*e--
%=.,
          --                                     -.                           g
m.-
..m
. ~.
-~*e--
p 3
g y.
: r.,,r-,.--g..
gw
~ry-
-v w
y ym.-
e cm, w-,.-%,wa
.my,..
--wm e


                                                                          -    . = _ _ -                                                                      -
. = _ _ -
r _=                     _    .                                        - -
r _=
                                                                                                                                                                                                                                                                      ./6 ;
./6 ;
                          +mmo anve cr=i CERP IP NUMBER: 2.1 -i <
+mmo anve cr=i CERP IP NUMBER: 2.1 -i <
PO6                                                                                                                                                                                                           N E rkT! 2 j                           POR _lMTRA-COMPANY USES                                                                                                 -                                                                                                                       "
PO6 N E rkT! 2 j
DATE: 07/25/83 n -
POR _lMTRA-COMPANY USES n -
??j g h"*'                                                     DEPARTMENT OF NUCLEAR PLANT OPERATIONS PAGE 01 0F 01 FM No.                                                                                                               * '
DATE: 07/25/83
j Rs LETTER OF suwser                                         Document Transmittal                                                                                                                                                                         -
??j g h"*'
To Ohdmien er                                                                                                                                                                                               -
PAGE 01 0F 01 DEPARTMENT OF NUCLEAR PLANT OPERATIONS FM No.
ns=====
Rs LETTER OF j
.i i                                         .                                                                    .- ., ,                                . p+                 l                    -                                                            '
suwser Document Transmittal To Ohdmien er ns=====
                                                                                .                                                                      w:     ,
.i i
                                                                                                                            '                              *~
l p+
l
w:
    $                                                                    1.- As a member of the Emergency Response Organization under the Diablo Canyon Power Plant Emergency Plan or                                                                                                                 2 m
*~
    )
l 1.- As a member of the Emergency Response Organization under the Diablo Canyon Power Plant Emergency Plan or 2
                                                                                                      - Corporate Emergency Response Plan b                                                           you are hereby assigned the below identified document (s)
m
)
- Corporate Emergency Response Plan b
you are hereby assigned the below identified document (s)
Con' trolled Copy Number Corporate Emergency Response Plan -----
Con' trolled Copy Number Corporate Emergency Response Plan -----
Nuclear Emergency Response Comununications Di rectory - - - - - - - - - --
Nuclear Emergency Response Comununications Di rectory - - - - - - - - - --
Oth' erg
Oth' erg 2.
: 2. Please acknowledge your receipt of the above indicated document (s) by signing, dating and returning this form to L.J. CURTIS-77 Beale Street. Room 1451 isuadiately upon receiving this transmittal.
Please acknowledge your receipt of the above indicated document (s) by signing, dating and returning this form to L.J. CURTIS-77 Beale Street. Room 1451 isuadiately upon receiving this transmittal.
0
0 5IENATURE OF DDCIMENT HDLDER DATE
      ,                                                                        5IENATURE OF DDCIMENT HDLDER                                                                                                                           DATE                 , ..        .
(;
(;
e
e w,,
                ,_                            __ _ , _              w,,                                 wn-             ~~ - m = wnMH*''                        ' " ' ' " *          '
wn-
w-wy-     -----ww       es.----w-,. -i-,---,--wygy..-----gy         w->-m- esemw-up-m.--M-----+-%yse.---w.-q-,,--ws.we- mei---wq,.-.w e-                             y.m-e--,-cwe-.e     -ww--,w,-,-.ywo-ww-y,-en- e en-
~~ - m = wnMH*''
w-wy-
-----ww es.----w-,.
-i-,---,--wygy..-----gy w->-m-esemw-up-m.--M-----+-%yse.---w.-q-,,--ws.we-mei---wq,.-.w e-y.m-e--,-cwe-.e
-ww--,w,-,-.ywo-ww-y,-en-e en-
-a
-- mm


_ - _ _ _ _                              _.      .                  -                                -            .n.                       u =                                   .
.n.
                                                                                                                                                                                                                    .e   .      ~ ~ . . -
u =
i           -                      *                                                                                                                                          .
.e
                      * * *
~ ~.. -
* CERP IP NUMBER:
i 2.1 "' l CERP IP NUMBER:
POwE                                                                                                                                                                                       REVISION: 2         2.1 "' l rom m mtA - couramy vsse                                                                                                                                                                   ATTACHMENT: 3              .    [
POwE REVISION: 2 ATTACHMENT: 3
DATE: 07/25/83
. [
          ~
rom m mtA - couramy vsse DATE: 07/25/83
Fa= om er                                                                                                                                                                                 PAGE 01 0F 01 1                               ousnmem                 DEPARTIENT W NUC12AR FIANT OPERATIONS Fu No.                   231                                 . ,
~
Rs Larvan er
Fa= om er PAGE 01 0F 01 1
* s m act                  Notice of Controlled Document Change To DMuon er Operumma ,                                                                                                                                                                                ,
ousnmem DEPARTIENT W NUC12AR FIANT OPERATIONS Fu No.
: 7.                        ,-                                                                        .
231 Rs Larvan er Notice of Controlled Document Change s m act To DMuon er Operumma,
~i                                                                 ,
7.
                                                                                                                                            ,                    7..
~i 7..
: 1. Controlled document change number
1.
: 2. Please insert the attached asterial into your controlled copy of the h                                                                         Corporate Emergency Response Plan (CERP)
Controlled document change number 2.
C)                                                                         Nuclear Emergency Response Comunications Direc.torv                                                                                               .
Please insert the attached asterial into your controlled copy of the h
: 3. Any change in the Document Holder's name or address should be reported inumediately to STEVE FOSTER, PERSONAL & ENVIRONMENTAL SAFETY SECIION RM 1406 Ext. 22-6522 l                                                         4. If you no longer need your copy of this controlled document.
Corporate Emergency Response Plan (CERP)
C)
Nuclear Emergency Response Comunications Direc.torv 3.
Any change in the Document Holder's name or address should be reported inumediately to STEVE FOSTER, PERSONAL & ENVIRONMENTAL SAFETY SECIION RM 1406 Ext. 22-6522 l
4.
If you no longer need your copy of this controlled document.
please return it, with this form.
please return it, with this form.
: 5. RECEIFT ACENOW1EDGDENT I have received and complied with the instructions for the above controlled document change.
5.
Signature of Doc eent Holder                                                                                                             Date
RECEIFT ACENOW1EDGDENT I have received and complied with the instructions for the above controlled document change.
: 6. Please sign, date, and return this " Notice of Controlled Document Change" to L.3. CURTIS, 77 Beale Street, Room 1452.
Signature of Doc eent Holder Date 6.
                                                                                                                                                                                                                                                  'N g                 ,
Please sign, date, and return this " Notice of Controlled Document Change" to L.3. CURTIS, 77 Beale Street, Room 1452.
'N g
e i
e i


                                                                                        . .  ,                                              . . ,              ,  ,x               . m _ .. .~ .         _
,x
CERP IP NUMBER: 2.1                           d*
. m _...~.
                                    "** " " ' ' * * ' ' ' '                                                                                                                                      REVISION: 2                                         i'
d CERP IP NUMBER: 2.1
;j PACIFIC GAS and ELECTRIC COMPANY                                                    AppECTED DOCUMENTIS):
* REVISION: 2 i'
ATTACHMENT: 4 DATE: 07/25/83
ATTACHMENT: 4
[
[
pg,g           NUCLEAR PLANT OPER ATIONS DEPARTMENT p                                             .' [
PACIFIC GAS and ELECTRIC COMPANY AppECTED DOCUMENTIS):
'' '
DATE: 07/25/83
* CORPORATE EMERGENCY REMSE PLAN
.' [
. ,                i,. -                                                                                                                           Corporate Emergency Response Plan (CERP)
;j pg,g NUCLEAR PLANT OPER ATIONS DEPARTMENT p
:!                  l                                 CONTROLLED DOCUMENT TRANSMITTAL SHEET                                                                         Nuclear Emergency Response Comshunications Directory                                           ;
CORPORATE EMERGENCY REMSE PLAN i,. -
Approved:                                                                                               Change Number:                                                                                     ,
Corporate Emergency Response Plan (CERP) l CONTROLLED DOCUMENT TRANSMITTAL SHEET Nuclear Emergency Response Comshunications Directory Approved:
e                             Date:                                                                                                 Change Date:                                 .                                                      I g                                                    CHANGEIS)                                                                     INSTRUCTIONS                                       CHANGE SUMM ARY c!
Change Number:
            +
e Date:
g                                                 .
Change Date:
                                                                                                  '                  s (         +                                                                                             ,
I CHANGEIS)
4                                                                                                                                                           .
INSTRUCTIONS CHANGE SUMM ARY g
f    s.                                                                           <-
c!
kd                                                                                                                                                                                                 *
+
                    ,-                                                                                                                                                                                                                .~
g s (
O
+
                                                                                            - -                              ,                CONTINUED ON REVERSE SIDE After revising your controlled document in accordance with the above appropriate instructions place this sheet in the front of the affected document. Future changes will be numbered consecutively. If there are any questions plosse call:
4 f
i-                               , _ _ _ _ _ _ - - - -           -v-   - - - + - - , , - - - - . <     e   -                 , ,    , - , _ . - _ . _  ,,,..w,e     y- ,,,----7,.._w,,.,-,,--p,
s.
kd
.~
O CONTINUED ON REVERSE SIDE After revising your controlled document in accordance with the above appropriate instructions place this sheet in the front of the affected document. Future changes will be numbered consecutively. If there are any questions plosse call:
i-
----m
-a
-v-
- - - + - -,, - - - -. <
e
-w
,,,..w,e y-
,,,----7,.._w,,.,-,,--p,


      . ,a _           a . . -
.,a _
: w. - w . 2 . w w= x. . ; maw. . . ., .-- :                                                             , a           sma_w. . .
a..
                                                                                                                                                                                            -  '6 i                                                                                                                                                                                            ~.i
: w. - w. 2. w w= x.. ; maw....,.-- :
            #,,..,,,....,                                                                                                                            CERP IP NUMBER: 2.1                               'r'
, a sma_w...
  }                                                                                                                                                 REVISION: 2                                 -
'6
PGwE
~.i i
  'j                                                                                                                                                 ATTACHMENT: 5
CERP IP NUMBER: 2.1
  ;    ... rom mvna-coupauv uses y                                                                                                                                            DATE: 07/25/83
'r
  ~;
}
FAGE 010F 01 From oivi.4ea or NUCLEAR PLANT OPERATIONS                                                                                                                                             -
REVISION: 2
o rm at                                                                                                                           -                                                  -
'j PGwE ATTACHMENT: 5 rom mvna-coupauv uses DATE: 07/25/83
Fn.t No.
~;
Rs LETTam or
y FAGE 010F 01 From oivi.4ea or NUCLEAR PLANT OPERATIONS o rm at Fn.t No.
    ;          summer           Recall of Controlled Documents                                                                                 ,
Rs LETTam or summer Recall of Controlled Documents To Dussoa or j
To Dussoa or j             ossart==at
ossart==at Please return the following controlled documents.
'!                        Please return the following controlled documents.
DOCUMENT CONTROL NUMBER
DOCUMENT                                                                                 CONTROL NUMBER                                                   ,
~
                                                                                                                                                                                                  ~
Corporate Emergency Response Plan................
Corporate Emergency Response Plan ................
Q Nuclear Emergency Response Comunications D i rec to ry........................................
Q                           Nuclear Emergency Response Comunications D i rec to ry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Emergency Response and Recovery Activities Record...........................................
Emergency Response and Recovery Activities Record ...........................................
If you have any questions regarding this request please contact Stephen Foster at extention 22-6522.
If you have any questions regarding this request please contact Stephen Foster at extention 22-6522.
l t
l t
Line 557: Line 764:
l
l
!i
!i
                                                                                                                                                                                        ' N 6
' N 6
LJ
LJ
                                                      ~
~
                                                                                                                                        ~ '
m-4 4-"
4-"           +
+
                                            ._,%,,.,              m-4 y-.      - - , --_-. ,  e--  -.--,-.%-               , , - . - , . .
~ '
                                                          -w-,                  -        -- ---.--,-,---      , , ,  y----,      -.#    w
-w-,
--w y----,
w y-.
e--


                              ,                ..          a .                   - -. ~ . -- an - -    . .      . .-  ._,c     --
a.
i, u eu. e m m. n                                                                                                           Ik PACIFIC GAS and ELECTRIC COMPANY                                         '
- -. ~. -- an
APORATE EMERGENCY RESPONSE MAN NUMBER: 2'I POwE                                                                                       REVISION: 2
._,c i,
    $9                                               IMPLEMENTING PROCEDURE                                 ATTACM ENT: 6 PLAN MAINTENANCE                 DATE: 07/25/83 PAGE 010F 02             -
Ik u eu. e m m. n PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2'I APORATE EMERGENCY RESPONSE MAN POwE REVISION: 2
CONTROLLED DOCUMENT ORGANIZATION AND FORMAT 3
$9 IMPLEMENTING PROCEDURE ATTACM ENT: 6 PLAN MAINTENANCE DATE: 07/25/83 PAGE 010F 02 CONTROLLED DOCUMENT ORGANIZATION AND FORMAT A.
A. Implementing Procedure Cover Sheet (Fom 69-034A)
Implementing Procedure Cover Sheet (Fom 69-034A) 3 1.
: 1.         In the identification block in the upper right hand portion of the form enter the following infomation using capital letters:
In the identification block in the upper right hand portion of the form enter the following infomation using capital letters:
NUMBER:
NUMBER:
REVISION:
REVISION:
DATE:
DATE:
                                                        'PAGE     OF
'PAGE OF 2.
: 2.         In the " Title" block, enter the name of the Implementing Procedure.
In the " Title" block, enter the name of the Implementing Procedure.
: 3.         In the " Responsibility" column, enter the following appropriate entries in capital letters:
3.
: a.     PREPARED BY
In the " Responsibility" column, enter the following appropriate entries in capital letters:
: b.     REVIEWED AND CONCURRED BY
a.
: c. APPROVED BY
PREPARED BY b.
: 4.         In the " Signature / Title" column, enter the title of the responsible individual in the lower half of each Responsibility row item.
REVIEWED AND CONCURRED BY c.
B. Implementing Procedure Continuation Sheet (Fom 69-034B)
APPROVED BY 4.
: 1.         In the identification block in the upper right hand side of each page on the fom, enter the following information:
In the " Signature / Title" column, enter the title of the responsible individual in the lower half of each Responsibility row item.
B.
Implementing Procedure Continuation Sheet (Fom 69-034B) 1.
In the identification block in the upper right hand side of each page on the fom, enter the following information:
NUMBER:
NUMBER:
REVISIONi DATE:
REVISIONi DATE:
PAGE       OF
PAGE OF 2.
: 2.         In the " Title" block enter the name of the applicable Department / Functional Group.
In the " Title" block enter the name of the applicable Department / Functional Group.
I
3.
: 3.       Use the format outlined on page 2 of the Implementing Procedure Cover Sheet as shown below:
Use the format outlined on page 2 of the Implementing Procedure Cover Sheet I
I.       SCOPE
as shown below:
<                                          II. DISCUSSION III. RESPONSIBILITIES                                                             '      ~
I.
IV. INSTRUCTIONS
SCOPE II. DISCUSSION III. RESPONSIBILITIES IV. INSTRUCTIONS
                                                                                                                                ~
~
V.       REFERENCES
V.
    'd                                     VI. ATTACMENTS I                           4.         Enter all infonnation material within the borders of each page.
REFERENCES
ew                 -u-                        -        -
~
          ,7,e,--_-,y---           -------v+w                     ,,-w-w--r--,       y
'd VI. ATTACMENTS I
4.
Enter all infonnation material within the borders of each page.
ew
-u-
,7,e,--_-,y---
-------v+w
,,-w-w--r--,
w y
,------,w
.y7--
,e-ew- - - -<
e.
m---
-wr
-+c--pw-u----------~*------*---------T-
-^ ^


                .m            -;          -    %e m -               e , m m.2 a.m ..                               a# m.e w.m.._ .- 2 l '
%e m -
                                                                                                                                                                                                    - ?6 i
e, m m.2 a.m..
ee-ous to/eas arv on                                                                                                                                                                                     ,
a# m.e w.m.._.- 2
PACIFIC GAS and ELECTalC COMPANY                                                          gggggg; g,1                                                   I. I conNRA Eutno NCY n sMNSE MN                                                  -
.m l
REVISION: 2 PowE 1],k'                                         IMPLEMENTING PROCEDURE                                                                                 ATTACHMENT: 6                                             .
- ?6 i
E
ee-ous to/eas arv on conNRA Eutno NCY n sMNSE MN gggggg; g,1 I. I PACIFIC GAS and ELECTalC COMPANY 1],k' REVISION: 2 PowE IMPLEMENTING PROCEDURE ATTACHMENT: 6 E
  ;                                                          PLAN MAINTENANCE ~                                                                   DATE: 07/25/83                           -
PLAN MAINTENANCE ~
                                                                                                                                                                                                          ~
DATE: 07/25/83
~
PAGE 02 0F 02 CONTROLLED DOCUMENT ORGANIZATION AND FORMAT
PAGE 02 0F 02 CONTROLLED DOCUMENT ORGANIZATION AND FORMAT
          ~
~
C.     Implementing Procedure Attachments (Form 69-034B)                                                                                 ,
C.
: 1.     In the identification block in the upper right' hand side of each                                                                                                                   l Implementing Procedure Continuation Sheet enter the following information:
Implementing Procedure Attachments (Form 69-034B) 1.
                                      ,          NUMBER:                                                                                                             '
In the identification block in the upper right' hand side of each l
REVISION:                                                                                               ^                                          --
Implementing Procedure Continuation Sheet enter the following information:
ATTACHMENT:                 .
NUMBER:
1                                     <
REVISION:
ATTACHMENT:
1
^
DATE:
DATE:
PAGE     OF                                                                                                                                                             ;
PAGE OF 2.
: 2.     Enter the title of the Attachment immediately below the double line of the heading for each page. A double line should be drawn immediately below the title of the Attachment.                                                                                                                                      .
Enter the title of the Attachment immediately below the double line of the heading for each page. A double line should be drawn immediately below the title of the Attachment.
: 3. Each Attachment shall have its own unique pagination.
3.
D. The Corporate Emergency Response Plan shall be formatted in the same manner (v~;                 which the Diablo Canyon Power Plant Emergency Plan is.                                               ,
Each Attachment shall have its own unique pagination.
E.      N'u clear Emergency Response Conmunications Directory (Fom 69-062).                                                                                     .
D.
: 1. Enter the revision number and revision date in the upper right hand side of each page.
The Corporate Emergency Response Plan shall be formatted in the same manner (v~;
: 2. Enter all material within the borders of each page.
which the Diablo Canyon Power Plant Emergency Plan is.
s e                                                       o L
N' clear Emergency Response Conmunications Directory (Fom 69-062).
                                                                                                                                                                                                    +g s n' w,-   ,e,,,       - - - , - - , - , - , - , , - - _ , , , , - ,      ,_,,,e,- +q,   -- - - , , _    ,.,_,_g,,..--s,g -                  , _ - - - , , ,
E.
u 1.
Enter the revision number and revision date in the upper right hand side of each page.
2.
Enter all material within the borders of each page.
s e
o L
+g s n'
,w-w,-
,e,,,
,_,,,e,-
+q,
,.,_,_g,,..--s,g


.u         .        .
.u
'l                                                                                                                                                                                                       .
'l
;j             69-099 (7/83) Rev. 0 mCmc ans AND ELECTMC COMPMY
;j 69-099 (7/83) Rev. 0
                                                                                                                                                                                                '}        ~'
'}
r
mCmc ans AND ELECTMC COMPMY
                  ""                                                                                                                                                                                          f-g                                            CORPORATE EMERGENCY RESPONSE PLAN ON-THE SPOT CHANGE                                                 CERP IP NUMBER: 2.1 b(
~'
REVISION: 2                                       -
r CORPORATE EMERGENCY RESPONSE PLAN f-g b(
ATTACHMENT: 7 DATE: 07/25/83                                 ~
ON-THE SPOT CHANGE CERP IP NUMBER: 2.1 REVISION: 2 ATTACHMENT: 7 DATE: 07/25/83 piense,e me.
piense,e me.                                                 m                                                                 PAGE 01 0F 01                                           '
m PAGE 01 0F 01
    ,                    nas Type of Charge: O an = =T                                         raiam:x w ir                   c. 4,.1,so i.t.                 -
~
nas Type of Charge: O an = =T raiam:x w ir
: c. 4,.1,so i.t.
penseems cheness (Dese as ener me emere os enenes as O asi
penseems cheness (Dese as ener me emere os enenes as O asi
      )
)
5                                                                                                                                                                                   ~
5 I
m I
~
G' I
m G'
l          (   -
I l
DISTMSUTION:                                                 -
(
O sea = = o'v==' a=====a O a=-e O a=s =                       _
DISTMSUTION:
                                                        -ev-.--,y-w-,+ew,.__wwe,a.-,             , . - - g                     yvc--_,,__.----w-,wrg         w-w-ww--wm--m---   -g-y%   .*    ---,m,.
O sea = = o'v==' a=====a O a=-e O a=s =
                                                                                                              -..w----9,-g
- - ' - -m.---m.
-ev-.--,y-w-,+ew,.__wwe,a.-,
,. - - g
-..w----9,-g yvc--_,,__.----w-,wrg w-w-ww--wm--m---
-g-y%
---,m,.


q                                                                                                                     .
q b
b i                                                                                                                                                                               ,
i so os2 (sori new i L I_
  !                    so os2 (sori new i                                                                                                                                     L I_
.l PACIFIC GAS and ELECTRIC COMPANY NUCLEAR PLANT DPERATIONS DEPARTMENT NUCLEAR EMERGENCY RESPONSE COMMUNICATIONS DIRECTORY kh
.l                                               PACIFIC GAS and ELECTRIC COMPANY                         NUCLEAR PLANT DPERATIONS DEPARTMENT                                     -
(
NUCLEAR EMERGENCY RESPONSE COMMUNICATIONS DIRECTORY kh
tERP IP NUMBER: 2.1 REVISION: 2 ATTACHMENT: 8 DATE: 07/25/83 PAGE 01 0F 01 8
(                                                                                                                                 tERP IP NUMBER: 2.1               _
REVISION: 2 ATTACHMENT: 8                   .
DATE: 07/25/83 PAGE 01 0F 01 8
s I
s I
9 e
9 e
0
0
            ' ]I                                                                                                                                             .
,.' ]I D
D 1
1 l
                                                                                                                                                                    -e l
-e
(                                                           ..
(
        .-.        _        , _ . _    .._.-, _., . - .            - -,..    ,r-,_ - . , - - . ._ -
7-
,r-,_
r


          =
w--w as 8 m v-~
                    ?w-                        .
.. a n ~ s i + :e m % w = + m.-n u w s w a
                                                              . - w--w as 8 m                             v-~         "
=
                                                                                                                          .. a n ~ s i + :e m % w = + m .-n u w s w a
?w-
,1
,1
                                                                                                                                                                          -6
-6 l.
: l.                                 .                                                                                                                                      Sj I                                                                                                                                                                             f b= => =v. n                                                                                                                                           !  ;'
Sj I
NUMBER: 2.2
f b= => =v. n NUMBER: 2.2
          #4                                                                           PACIFIC BAS sad ELECTRIC COMPANY
#4 PACIFIC BAS sad ELECTRIC COMPANY
          'd yggg                                               ConronATE EMERGENCY RESPONSE PLAs                       REVISION: 0 DATE: 07/15/83
'd yggg ConronATE EMERGENCY RESPONSE PLAs REVISION: 0 DATE: 07/15/83
                                                                                                                                              "^''
?
?
1 O                               IMPLEMENTINGPROCEDURE
O IMPLEMENTINGPROCEDURE
                                                                                                                                                      ' ' '                  ~
"^''
~
1 N
~
~
N              EMERGENCY PREPAREDNESS TRAINING PROGRAM
EMERGENCY PREPAREDNESS TRAINING PROGRAM
,q SIGNATURE
,q SIGNATURE RESPONSIBILITY DATE TITLE gg, PREPARED BY SR. NUCLEAR GENERATION ENGINEER
. ;,                              RESPONSIBILITY                                                                                                 DATE TITLE                 - __                      .      - ..
[e4M EMERGENCY PLANNING REVIEWED AND CONCURRED BY SUPEJtVIJMfG lyKLEAR GENERATION LNfalNttR PERSUIGIEL & ENVIRONMENTAL SAFETY 3
gg, PREPARED BY SR. NUCLEAR GENERATION ENGINEER EMERGENCY PLANNING
(i REVIEWED AND CONCURRED BY t
[e4M             ..
MAlb8kR,NUCLEdRPLANTOPERATIONS I
REVIEWED AND                                                                 '
)
CONCURRED BY SUPEJtVIJMfG lyKLEAR GENERATION LNfalNttR PERSUIGIEL & ENVIRONMENTAL SAFETY                               ,
)
3 (i               REVIEWED AND
APPROVED BY mjEgmy1. mmo.m Nem.
;                            CONCURRED BY                                                                       t I
l
)                                                                        MAlb8kR,NUCLEdRPLANTOPERATIONS APPROVED BY                                               )
[ffm m A A APPR0vED By 7
mjEgmy1. mmo.m                                           Nem.
MIRMAN', PRESIDEld'S NUCGEAR SDpSORY h/f COMITTEE l (
l                             APPR0vED By
ww
[ffm m A A MIRMAN', PRESIDEld'S NUCGEAR SDpSORY                                     h/f7 COMITTEE l         (                                                               -
-ee,.----+--.e-yyv y-.
ww   -
.*wr,--p,-,wp-+y
                -ee,.----+--.e-yyv     -
-,.w.,.-me,-_
y-. .*wr,--p,-,wp-+y       -,.w.,.-me,-_                   -.w-   yp,e-e,.e-
-.w-yp,e-e,.e-m.
m,-,-w,-me-ow,mmm,-r-e-me=m=-m----o--w--me-2---


                                                ..      .        - c. ~ , , _ s c; .;.
o.u wdy;yh_
                                                                  .                    .:w.,
- c. ~,, _ s c;.;.
:    - w,._~y.+."
.:w.,
                                                                                                  .      ci - ev. e o.u wdy;yh_
- w,._~y.+."
                                                                                                                                            ~ .,.
ci -
                                                                                                                                                  ^i' ee-eun to/en new.oz                                                                                                                 r
ev.
  ;                                                      PACIFIC GAS and ELECTRIC COMPANY                                                       ~
e
.5 CORPORATE EMERGENCY RESPONSE PLAN                           NUMBER: 2*2 i
~,.
O        ~ ~ "
^i r
                                                                                                                  "'" 5 ' "
ee-eun to/en new.oz PACIFIC GAS and ELECTRIC COMPANY
IMPLEMENTING PROCEDURE sarE: 07/is/83                     -
~
EMERGENCY PREPAREDNESS TRAINING PROGRAM                               PAGE 02 0F 07                   .
CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 2*2
J g
.5 i O
* p I
~ ~ "
5 i
IMPLEMENTING PROCEDURE
'.e.'
"'" 5 ' "
ORGANIZATION AL OUTLINE
sarE: 07/is/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 02 0F 07 J
: l.     SCOPE II. DISCUSSION h                                               lit.     RESFONSIBILITIES IV.       INSTRUCTIONS V.     REFERENCES VI.       ATTACHMENTS l
g p
                                                                                                                                    .a       -
I 5
89 t
i
          '._8
'.e ORGANIZATION AL OUTLINE l.
                                                                            .                                                                )         .
SCOPE II. DISCUSSION h
lit.
RESFONSIBILITIES IV.
INSTRUCTIONS V.
REFERENCES VI.
ATTACHMENTS l
.a 89 t
'. _ 8
)
1
1


                      .                    =        -c.. A . _          ,,  .. c : ma - e. , _       . s.um,_. + m c ., mu.m .m           ,
.. c : ma - e., _
~}
. s.um,_. + m c., mu.m.m
l
-c.. A. _
: u. m. : ==v. n Pacmc GAS and ELECTRIC COMPANY               NUMBER: 2.2
=
                                                                                                                                      )f 3
)f
        /<                                                         CORPORATE EMERGENCY RESPONSE PLAN O                     PGwE                                                                                       REVISION: 0 IMPLEMENTING PROCEDURE                                 oxyg: o7,1g,g3         _
~}
TITLE EMERGENCY PREPAREDNESS TRAINING PROGRAM                       PAGE 03 0F 07       -
3
                                                                                          ~
: u. m. :==v. n l
I.                   SCOPE                     --                                                .
Pacmc GAS and ELECTRIC COMPANY NUMBER: 2.2
/<
CORPORATE EMERGENCY RESPONSE PLAN O
PGwE REVISION: 0 IMPLEMENTING PROCEDURE oxyg: o7,1g,g3 TITLE EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 03 0F 07 I.
SCOPE
~
The scope of this Implementing Procedure is to describe the responsibilities and requirements for the Corporate Emergency Response Plan training program as required by 10CFR50.47(b)(16).
The scope of this Implementing Procedure is to describe the responsibilities and requirements for the Corporate Emergency Response Plan training program as required by 10CFR50.47(b)(16).
                                                                                                                                      ~
~
j                       II. DISCUSSION                                       ,-  -
j II. DISCUSSION A.
A. General This Implementing Procedure provides instructions for the implementation of a coordinated annual training program for Corporate Emergency Response Organization (CERO) personnel with assignments under the Corporate                 -
General This Implementing Procedure provides instructions for the implementation of a coordinated annual training program for Corporate Emergency Response Organization (CERO) personnel with assignments under the Corporate Emergency Response Plan (CERP). CERO training will be accomplished in three phases with activities in both a classroom atmosphere and participation in drills and exercises:
Emergency Response Plan (CERP). CERO training will be accomplished in             -
h' B.
three phases with activities in both a classroom atmosphere and participation in drills and exercises:
Definitions of Terms 1.
h'                                       B. Definitions of Terms
Training activity:
: 1. Training activity:
A training activity is the process by which the skills of individual personnel are improved and refined to meet or exceed prescribed qualification standards for the perfonnance of their specified duties and responsibilities under the CERP.
A training activity is the process by which the skills of individual personnel are improved and refined to meet or exceed prescribed qualification standards for the perfonnance of their specified duties and responsibilities under the CERP.
: 2. Drill:
2.
Drill:
A drill is a supervised instruction period aimed at developing and maintaining required skills for a particular task / assignment.
A drill is a supervised instruction period aimed at developing and maintaining required skills for a particular task / assignment.
: 3. Exercise:
3.
Exercise:
An exercise is an event which tests a major portion of the basic elements within the CERP and demonstrates the capability of the CERO to respond to an emergency.
An exercise is an event which tests a major portion of the basic elements within the CERP and demonstrates the capability of the CERO to respond to an emergency.
C. Corporate Emergency Response Organization Training Program
C.
: 1. Program Description                                                               -
Corporate Emergency Response Organization Training Program 1.
In order to maintain emergency preparedness training requirements as required by NRC regulation 10CFR50.47(b)(16), CERO personnel training.   -
Program Description In order to maintain emergency preparedness training requirements as required by NRC regulation 10CFR50.47(b)(16), CERO personnel training.
is accomplished in three training activity phases, as described         -
is accomplished in three training activity phases, as described below:
below:
w-,
w-,
              --.n....-.     . , - - . , . - ~ -
--.n....-.
., - -.,. - ~ -
.,,_,,.,,.,--,,,a.,
-----.,,--,,.,n.
n,....
- - - -.--,,,,e,


w, ~:,,
m.a.F.,
                            .a.  .-                      m.a.F .,
.a-
                                                                                            .a-                 . a s . ^n ~w                     ~. m= :
. a s. ^n ~w
* 1 Yh      '
~. m= :
                        .                                                                                                                                                      t j           ..u. e m nev. es                                                                                                                                               .
w, ~:,
k l                                         PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 2.2
.a.
              ~                                                                                                                     "' " "
Yh
1                                 IMPLEMENTING PROCEDURE                                                                                                                     .
* 1 t
    ,                                                                                                                              DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM                                                           PAGE 04 0F 07                             .
j
;                                    Phase'                                         Activity Description I             General introductory course to explain the purpose and function of the CERP in support of the Diablo Canyon Power Plant _ Emergency Plan.
..u. e m nev. es
II             Courses designed to provide CERO personnel with specific                                                               .
. k l
:!                                                  . training instruction for executing assigned duties
PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN
  . .;                                              and responsibilities as identified in Procedure
~
    ?
1 IMPLEMENTING PROCEDURE DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 04 0F 07 Phase' Activity Description I
Attachment 1, "CERO Training Program Courses".
General introductory course to explain the purpose and function of the CERP in support of the Diablo Canyon Power Plant _ Emergency Plan.
III           Drills and exercises designed to provide CERO personnel with " hands on" experience using appropriate facilities, equipment, and procedures.                                                                                             ;
II Courses designed to provide CERO personnel with specific
. training instruction for executing assigned duties and responsibilities as identified in Procedure, "CERO Training Program Courses".
?
III Drills and exercises designed to provide CERO personnel with " hands on" experience using appropriate facilities, equipment, and procedures.
NOTE: CERO training, drills, and exercises will be conducted in coordination with DCPP training activities.
NOTE: CERO training, drills, and exercises will be conducted in coordination with DCPP training activities.
: 2. Program Objectives                                                           .
2.
The training program objectives are to provide for the following types of training:
Program Objectives The training program objectives are to provide for the following types of training:
: a. Corporate emergency preparedness management training for those individuals assigned to perform the principal and alternate i                                         functions of the CERO Departmental / Functional Group Coordinators and Recovery Manager.
a.
: b. Corporate emergency preparedness procedure training for those individuals assigned specific duties and responsibilities as identified in the implementing procedures.
Corporate emergency preparedness management training for those individuals assigned to perform the principal and alternate i
: c. Corporate emergency preparedness refresher training courses for all emergency response personnel activated under the Corporate Emergency Response Plan.
functions of the CERO Departmental / Functional Group Coordinators and Recovery Manager.
: 3. Program Requirements
b.
: a. Initial training All CERO personnel are required to complete the courses                                                               .-
Corporate emergency preparedness procedure training for those individuals assigned specific duties and responsibilities as identified in the implementing procedures.
designated for their assigned emergency plan title (s) as                                                                 -
c.
specified in Procedure Attachment 2. "CERO Personnel Classroom pO                             Training Requirements" for each CERP Implementing Procedure.
Corporate emergency preparedness refresher training courses for all emergency response personnel activated under the Corporate Emergency Response Plan.
                                                                        -, - - --   --,--g-   --y g. -.- - - - -   ---,--,.-c- p-w   - - , - - -  ap-- - ,-m       - * - - -
3.
Program Requirements a.
Initial training All CERO personnel are required to complete the courses designated for their assigned emergency plan title (s) as specified in Procedure Attachment 2. "CERO Personnel Classroom pO Training Requirements" for each CERP Implementing Procedure.
-i.---w-------,,----,.-w,w
--,--g-
--y g.
---,--,.-c-p-w ap--
,-m


i e        a e
i
                            .~. - v ~ ,. v . w . -           = -       ,                  - - - =       = as                                   '-is u
.~. - v ~,. v. w. -
  ,.                                                                                                                                                          i
= -
  +
- - - =
r es-osas e,reas nav.es                                                                                                                       '
= as
j                                                      PACIFIC SAS and ELECTRIC c0MPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 2.2
'-is u e
        @;        PowE                                                                                       REVISION: 0 1         ,
a e
          -                                  IMPLEMENTING PROCEDURE                                            DATE: 07/15/83                                     -
i
UTW
+
  ]                                   EMERGENCY PREPAREDNESS TRAINING PROGRAM                                 PAGE 05 0F 07                                   .
r es-osas e,reas nav.es j
-t
PACIFIC SAS and ELECTRIC c0MPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PowE REVISION: 0 IMPLEMENTING PROCEDURE 1
: b. Refresher training CERO personnel maintain their " trained on an annual basis" status by participating in either of the following activities:
DATE: 07/15/83 UTW
]
EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 05 0F 07
-t b.
Refresher training CERO personnel maintain their " trained on an annual basis" status by participating in either of the following activities:
Scheduled (announced or unnanounced) drills throughout the year, the Annual Emergency Preparedness Exercise Dress Rehearsal or Exercise; or
Scheduled (announced or unnanounced) drills throughout the year, the Annual Emergency Preparedness Exercise Dress Rehearsal or Exercise; or
!J                                                                                       ,
!J I
I
Applicable phase II training courses as specified in Procedure Attachment 2. "CERO Personnel Classroom Training Requirements".
* Applicable phase II training courses as specified in Procedure Attachment 2. "CERO Personnel Classroom Training Requirements".
D.
D. Program Conduct & Documentation                                                                                           .
Program Conduct & Documentation 1.
: 1. CERO emergency preparedness training program will be conducted and coordinated with other Departments, b
CERO emergency preparedness training program will be conducted and coordinated with other Departments, b
r
2.
: 2. Training courses will be conducted in accordance with NP0 Administrative Procedures.
Training courses will be conducted in accordance with NP0 r
: 3. Approved lesson plans for CERO training courses shall be used in the conduct of all classroom training activities.
Administrative Procedures.
: 4. All CERO classroom training activities snall be documented with the following records:
3.
: a. Attendance Records.
Approved lesson plans for CERO training courses shall be used in the conduct of all classroom training activities.
: b. Correlation of attendance with training requirements.
4.
: c. Maintain status of training completed by individuals.
All CERO classroom training activities snall be documented with the following records:
III. RESPONSIBILITIES Personnel with assigned responsibilities under this Procedure, as identified
a.
_                      by their non-emergency titles, should perform their assigned tasks as detailed in the Procedure Instructions section below.
Attendance Records.
IV. INSTRUCTIONS                                                                                                               .      .
b.
                                                                                                                                                          ~
Correlation of attendance with training requirements.
              .._.            A. Supervising Nuclear Generation Engineer, Personnel and Environmental
c.
('.                     Safety
Maintain status of training completed by individuals.
: 1. Schedule, coordinate, and implement specialized training programs to instruct and qual'ify those personnel responsible for implementing the                                                 -
III. RESPONSIBILITIES Personnel with assigned responsibilities under this Procedure, as identified by their non-emergency titles, should perform their assigned tasks as detailed in the Procedure Instructions section below.
Corporate Emergency Response Plan. The scope, nature, and frequency of those programs shall be specified for all CERO personnel.
IV. INSTRUCTIONS A.
                                                                                                      ---wm,   --y,., , ,-   y . - . . . - - . - -    e, ,
Supervising Nuclear Generation Engineer, Personnel and Environmental
~
.. _.('.
Safety 1.
Schedule, coordinate, and implement specialized training programs to instruct and qual'ify those personnel responsible for implementing the Corporate Emergency Response Plan. The scope, nature, and frequency of those programs shall be specified for all CERO personnel.
a
.___,,___.___m m
,.y
, -,,,,a p
.w%,--y--e,---
w
---wm,
--y,.,,,-
y e,


w:me>.:k m a m w                                                                                                                                               .cr                           __        m   a" . _ e x aw.
w:me>.:k m a m w
j
.cr m
                                                                                                                                                                                                                                                  ~
a". _
                                                                                                                                                                                                                                                          -.'6 j                                                                                                                                                                                                                                                         q d
e x aw.
1               s,e u. <m n m .as i
-.'6 j
PACIFIC GAS an Conconari imi d.i.LECTRic,CO.M,A,.Y                 cv nis o s ta .                                                                                                    NUMBER: 22
~
  ; 3
q j
        '"                                                                                                                                                                                                                        "'" S ' " ;
1 i
IMPLEMENTING PROCEDURE                                                                                                                                                             DATE: 07/15/83                 _
s,e u. <m n m.as d
EMERGENCY PREPAREDNESS TRAINING PROGRAM                                                                                                                                                     PAGE 06 0F 07 i                                                                                                                                                                                                                                                         .
PACIFIC GAS an Conconari imi d.i.LECTRic,CO.M,A,.Y.
: 2.     Ensure that all drills are supervised and evaluated by a qualified drill instructor and that the basic objective (s) of each drill are met.
NUMBER: 22 cv nis o s ta 3
: 3.     Ensure CERO participation in the scheduled monthly comunications drills between DCPP and the San Luis Obispo County Sheriff's Office, State Office of Emergency Services and NRC. Such participation.shall range from:                                                                                                                                                                                                   -
"'" S ' " ;
l                                         a.     Limited alerting and notification of key CERO personnel and Departmental / Functional Group Coordinators, to 4
IMPLEMENTING PROCEDURE DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 06 0F 07 i
: b.     Full comunications alerting / notification of all CERO personnel and possible activation of selected emergency response facilities.                                                                                                                                                                                           ;
2.
B.     Manager, Nuclear Plant Operations Department b.I                           1. Remain cognizant of all Corporate emergency preparedness training -
Ensure that all drills are supervised and evaluated by a qualified drill instructor and that the basic objective (s) of each drill are met.
3.
Ensure CERO participation in the scheduled monthly comunications drills between DCPP and the San Luis Obispo County Sheriff's Office, State Office of Emergency Services and NRC. Such participation.shall range from:
l a.
Limited alerting and notification of key CERO personnel and Departmental / Functional Group Coordinators, to b.
Full comunications alerting / notification of all CERO personnel 4
and possible activation of selected emergency response facilities.
B.
Manager, Nuclear Plant Operations Department b.I 1.
Remain cognizant of all Corporate emergency preparedness training -
courses, drills, and exercises to ensure that effective and efficient interfaces between the Site and Corporate emergency response organizations will be maintained during an emergency.
courses, drills, and exercises to ensure that effective and efficient interfaces between the Site and Corporate emergency response organizations will be maintained during an emergency.
: 2. Direct the Supervising Nuclear Generation Engineer, P&ES Section, to schedule, coordinate, and implement the CERP Training Program.
2.
: 3. Ensure that critiques of all Corporate emergency preparedness drills
Direct the Supervising Nuclear Generation Engineer, P&ES Section, to schedule, coordinate, and implement the CERP Training Program.
!                                            and exercises are conducted as soon as possible after their performance 'to ensure that the emergency response actions of the
3.
!                                            various Departments / Functional Groups within the Corporate Emergency l                                             Response Organization are properly evaluated, and any corrective action, if required, is implemented.
Ensure that critiques of all Corporate emergency preparedness drills and exercises are conducted as soon as possible after their performance 'to ensure that the emergency response actions of the various Departments / Functional Groups within the Corporate Emergency l
C.       Vice President, Nuclear Power Generation Department
Response Organization are properly evaluated, and any corrective action, if required, is implemented.
      ,                                1. Provide overall coordination of required emergency preparedness i
C.
training programs and drills for all Company emergency response personnel involved in any way with the Corporate Emergency Response l'
Vice President, Nuclear Power Generation Department 1.
Provide overall coordination of required emergency preparedness training programs and drills for all Company emergency response i
personnel involved in any way with the Corporate Emergency Response l'
Organization during an event requiring the activation of the Corporate Emergency Response Plan.
Organization during an event requiring the activation of the Corporate Emergency Response Plan.
4 ,!
4,!
            ,r,v--,.e     ,,-    ,,,,---,--e     s--.--- -.,  ,n-, , , , , - - , , , , , , , . , , , , , , , , , . . , - - , , , . . , - . - , . , , , - - , , , _ , , - - , - , , . , , , . , , , - , _ _ _ , - , - , , - .
,r,v--,.e
,,,,---,--e s--.---
,n-,


eaux
eaux 4
      .              4 No j                         cm.                  ..
No j
                                                                                                                                                                                                    ~l, 3
~l, cm.
PACIFIC gas and ELECTRIC COMPANY i                                                                                                                                                        NUMBER: 2.2                                     -
3 PACIFIC gas and ELECTRIC COMPANY NUMBER: 2.2 i
CORPORATE EMERGENCY RESPONSE PLAN POwE                                                                                                                                   REVISION: 0 i     @                                                    IMPLEMENTING PROCEDURE                                                                       o,7e: o7,1g,33 WE 1                                               EMERGENCY PREPAREDNESS TRAINING PROGRAM                                                                   PAG 5 07 0F 07                               -
CORPORATE EMERGENCY RESPONSE PLAN POwE REVISION: 0 i
D.               Departmental / Functional Group Coordinators
IMPLEMENTING PROCEDURE o,7e: o7,1g,33 WE 1
: 1. Participate in the applicable CERP Emergency Preparedness Training
EMERGENCY PREPAREDNESS TRAINING PROGRAM PAG 5 07 0F 07 D.
,                                                  Program activities to maintain familiarity with the CERP, its
Departmental / Functional Group Coordinators 1.
  ,                                                Implementing Procedures, and the Nuclear Emergency Response
Participate in the applicable CERP Emergency Preparedness Training Program activities to maintain familiarity with the CERP, its Implementing Procedures, and the Nuclear Emergency Response Comunications Directory.
* Comunications Directory.
2.
: 2. Ensure that respective CERO Departmental / Functional Group personnel
Ensure that respective CERO Departmental / Functional Group personnel participate in and maintain training requirements.
  ;                                                participate in and maintain training requirements.                                                                                              .
E.
E.               President's Nuclear Advisory Comittee The President's Nuclear Advisory Comittee will oversee required emergency preparedness drills and exercises.
President's Nuclear Advisory Comittee The President's Nuclear Advisory Comittee will oversee required emergency preparedness drills and exercises.
V.       REFERENCES                                                                                                                                                             ,-
V.
A.               Diablo Canyon Power Plant Emergency Plan
REFERENCES A.
([i                   B.               Corporate Emergency Response Plan                                                                                         -
Diablo Canyon Power Plant Emergency Plan
C.               Nuclear Power Generation Manual, Volume 3 " Nuclear Plant Operations Department Procedures Manual" Chapter II VI. ATTACHMENTS
([i B.
: 1.               CER0 Training Program Courses
Corporate Emergency Response Plan C.
: 2.               CERO Personnel Classroom Training Requirements 1
Nuclear Power Generation Manual, Volume 3 " Nuclear Plant Operations Department Procedures Manual" Chapter II VI. ATTACHMENTS 1.
                                                                                                                                                                                                "M g
CER0 Training Program Courses 2.
CERO Personnel Classroom Training Requirements 1
"M g
I
I
        , , , _ , , ,        , , , . - ,                        . . . , . - - - - -            - -            --e-     -            -*"*
--e-
ei-  - * - - -
--w----
                  --- - -              -_          ___ - - - -            --w---- .-.---me,           - . , .--    .- w---- ,-m.- - -   ,g. w.
.-.---me, w----
9-v--- -    m---------   -
,-m.- - -
,g.
w.
9-v---
m---------
ei-


_          __u        : -.
_.w,we,n;_ =
                                  ~
-. =,.a =. :._ w.
                                    +. --    .    -      _.w,we,n;_ =               - . =, .a = . :._ w .                                                           c ._
c._
4 i                         c=> =v.                                                                                                                                             ij_
~
i                                                                                                                                                                                   5 i                                                PACIFIC GAS and ELECTRIC COMPANY                                                       NUMBER: 2.2                               T.
__u
CORPORATE EMERGENCY RESPONSE PLAN
+.
  '                  PGwE                                                                                                                 REVISION: 0
4 ij_
          @                              IMPLEMENTING PROCEDURE                                                                           ATTACHMENT 1                             .
i c=> =v.
TITLE                                                                                                                                                      ~
i 5
DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM                                                             PAGE 010F 01                           -
PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 T.
CERO Training Program Courses
i CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0 IMPLEMENTING PROCEDURE ATTACHMENT 1 TITLE
;l                                                                                                   -
~
Training       Course                                                                                                           Applicable Phase       Number                         Course Title                                                                       CERP IP I         EPG-201     Corp. Emergency Response Plan and DCPP Emergency q                                               -
DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 010F 01 CERO Training Program Courses
P l a n 0 v e rv i ew . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Al l t                         II h
;l Training Course Applicable Phase Number Course Title CERP IP I
    ;                                EPG-204     CIRC Support Staff Responsibilities.......................                                                     1.2 EPG-205     CERO Management Personnel Responsibilities                                                                     1.I EPG-210   Security and Personnel Relations Departments.........                                                     3.6, 3.7             2
EPG-201 Corp. Emergency Response Plan and DCPP Emergency q
    ,                              EPG-215   Materials Department                                                                                             4.1
P l a n 0 v e rv i ew........................................... Al l t
                .                  EPG-220     Nu cl ea r Pl ant Operations Department. . . . . . . . . . . . . . . . . . . . . . . 4.7 3
II h
EPG-225     Division Support Group                                                                                         4.8 EPG-230   Qual i ty As surance Depa rtment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.9 EPG-235   Telecommunications Department                                                                                   4.2 EPG-240   General Construction, Engineering and Technical Support, and Computer Systems and Services Departments..................................... 4.4, 4.5, 4.6 EPG-245   Radiological Protection and Analysis Group                                                                     4.3 EPG-250   Law, Insurance, and Safety, Health, and Claims Departments..................................... 3.3, 3.4, 3.5 EPG-255   Governmental Relations and Corporate Communica ti ons Depa rtments. . . . . . . . . . . . . . . . . . . . . . . . . .                       3.1, 3.2 III                 Drills and Exercises i                   Miscellaneous Courses 9
EPG-204 CIRC Support Staff Responsibilities.......................
EPG-256   NOTEPAC Computer Conferencing System. . . . . . . . . . . . . . . . . . . . . . 3.2 EPG-257   SLO County Emergency Response Plan Overview                                                             As.Needed     .      .
1.2 EPG-205 CERO Management Personnel Responsibilities 1.I EPG-210 Security and Personnel Relations Departments.........
se ed pw-                                                                                             - , . -     -      -.--w-,------mm.-.<---y                                   c
3.6, 3.7 2
EPG-215 Materials Department 4.1 EPG-220 Nu cl ea r Pl ant Operations Department....................... 4.7 3
EPG-225 Division Support Group 4.8 EPG-230 Qual i ty As surance Depa rtment.............................. 4.9 EPG-235 Telecommunications Department 4.2 EPG-240 General Construction, Engineering and Technical Support, and Computer Systems and Services Departments.....................................
4.4, 4.5, 4.6 EPG-245 Radiological Protection and Analysis Group 4.3 EPG-250 Law, Insurance, and Safety, Health, and Claims Departments.....................................
3.3, 3.4, 3.5 EPG-255 Governmental Relations and Corporate Communica ti ons Depa rtments..........................
3.1, 3.2 III Drills and Exercises i
Miscellaneous Courses 9
EPG-256 NOTEPAC Computer Conferencing System...................... 3.2 EPG-257 SLO County Emergency Response Plan Overview As.Needed se ed pw-3 7
w
-ww
?ec-,,
y
--im-..-
-.--w-,------mm.-.<---y
--------r
-7wp-+-y-c


                  ,                              + ~ s;-:- 2 ~ > _.ma %:. :i ; w - +. e                                   n                                 i.n u w                           ,. w: g e m w w _
+ ~ s;-:- 2 ~ > _.ma %:. :i ; w - +. e n
es-esem CAas sesv.sa PACIFIC GAS and ELECTRIC COMPANY                                                             NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN                                                                                                     ,
i.n u w
PGwE                                                                                                                                             REVISION: 0
,. w: g e m w w _
  ;       g                                             IMPLEMENTING PROCEDURE                                                                                           3 m esses 1 2 EMERGENCY PREPAREDNESS TRAINING PROGRAM DATE: 07/15/63                                                     -
es-esem CAas sesv.sa PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0
PAGE 01 0F 18                                                   ,
; g IMPLEMENTING PROCEDURE 3 m esses 1 2 DATE: 07/15/63 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 01 0F 18 CERO Personnel Classroom Training Requirements
CERO Personnel Classroom Training Requirements
*CERO MANAGEMENT (CERP IP 1.1)*
                                                                                *CERO MANAGEMENT (CERP IP 1.1)*
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER i
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER i               : ; ii.i                           :
: ; ii.i EMERGENCY PLAN TITLE E E E S $ 2l0 R W ? # 8 $ 8.0;
EMERGENCY PLAN TITLE                                                                           E E E S $ 2l0 R W ? # 8 $ 8.0;
~,~ ~ ~,~ ~,~ ~ ~ ~ ~ ~.~ ~.~
                                                                                                                            ~ ,~ ~ ~,~ ~,~ ~ ~ ~ ~ ~.~ ~.~
i a j.1 i
i       i il i                 ! i i a j .1 :
i il i
l'
! i l l f.I.
* I
l' I
:                        Recovery Manager                                                                                                               ,
I Recovery Manager l{i,1,x Corporate Emergency Coordinator o,
                                                                                                                                                                                              .l .l .f ".I.
le I
I Corporate Emergency Coordinator                                                                 o,               le           I           j               l{i,1,x Corp. Technical and Logistical                                                                                 l         ~l~                         "~~; [~ ' !
j Corp. Technical and Logistical el l
eli ;e X
~l~
Coordinator                                                                                                  :      ,
"~~; [~ ' !
                                                                                                                                                                                              .l
X Coordinator
                                                                                                                                                                                              .i         l
;e
_ _ _ _ _ _ _ _            _ _.. .__.                                                  .a Corp. Liaison Coordinator
.l l
* e, e .e               1 l :       ,I       i     ,
i
J,,,. x                               ,
.i
Public Information Recovery Mgr.                                                                 e;           .el 6 ;j                             ll'               l ix I
.a Corp. Liaison Coordinator
Radiologic ~al Emergency Recovery Manager
* e, e.e l :
                                                                                                                          ~*
,I i
l l              g;
J,,,. x 1
                                                                                                                                                                  ;!        l
Public Information Recovery Mgr.
                                                                                                                                                                                        *.          { [*
e;
            /]
.el 6 ;j ll' l ix Radiologic ~al Emergency Recovery l
: t.                    . . . . - - .    . . . . . . . _ . .
l g;
                                                                                                                                                                                    ~ ~~                      '
{ [*
Engineering ar.c' Logistics                                                                                         '
I
e                  e                    ,
/]
Manager l
~*
t.
Engineering ar.c' Logistics
~ ~~
i x
i x
Recovery Manager                                                                                 .
e e
i
Recovery Manager i
                                                                                                                                                                  .   . ie
ie Operations and Analytical le!. ',,i
                                                                                                                                                                                            ~ ~ ' '
~ ~ ' '
Operations and Analytical Recovery Manager e
e i
le!
x Recovery Manager i: ; !
i i: ; !         . ',,i;l i
;l j
                                                                                                                                                                            ,                ;,          j x
i i
i i
1 x == As Needed
i 1
        - . - - -  . - . .                                                      . - ,    .-e.- . - - - -_ - , . ,                , . .            - - . , ,              w-         >,          ,-        .-e,m...-- - - . .
x== As Needed
.-e.-
w-
.-e,m...-- - -..


_ . _ _      .        _ _ . . , .      , . . .    .,    s   w ..-.-,       ,.m_     m.-                 - <      ;- su ,4-                ovsw; _ i o
;- su
ee-ose temi uv.oa
,4-ovsw; _ i s
                                                                                                                                                                      .i j
w..-.-,
;                                                  PACIFIC GAS sad ELECTRIC COMPANY                                                                                 :
,.m_
NUMBER: 2.2
m.-
:                                               CORPORATE EMERGENCY RESPONSE PLAN                                                                                   '    b' PGwE                                                                                                         REVISION: 0
*o
          @                                IMPLEMENTING PROCEDURE                                                               ATTACHMENT: 2 EMERGENCY PREPAREDNESS TRAINING PROGRAM DNE:07/15/83               ,
. i j
PAGE 02 0F 18                         .
ee-ose temi uv.oa PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 2.2
                          ~
: b' CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0 IMPLEMENTING PROCEDURE ATTACHMENT: 2 DNE:07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 02 0F 18
~
CERO Personnel Classroom Training Requirements
CERO Personnel Classroom Training Requirements
* ACTIVATION OF THE CORPORATE INCIDENT RESPONSE CENTER (CERP IP 1.2)*
* ACTIVATION OF THE CORPORATE INCIDENT RESPONSE CENTER (CERP IP 1.2)*
EMERGENCY PREPAREDNESS COURSE         -
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER g
(EPG) NUMBER
l i
                                                                                                .  .                , e                         i      .
, e
g    l EMERGENCY PLAN TITLE
;;;;f g! NoSohoy'ggghNg EMERGENCY PLAN TITLE N
                                                                                              ;;;;f N
N NNNNN N:N N N N N N N
g! NoSohoy'ggghNg N NNNNN                   N:N N N N N N N
! i I
                            .                                    .'                                I   .          . i           !i            -
. i
                                                                                                                                                    'f~^""
'' 'f~^""
g   ,
~
Corp. Liaison Coordinator                                                * 'i'.                                       !            12            ~
g
l                                                                                                                                         '
* 'i'.
  .                 CIRC Administrative Support'                                                   l   '
l Corp. Liaison Coordinator 12 CIRC Administrative Support' l
l i     4 l i 1 :e-I                 -
l i
Group Coordinator                    _
4 l i 1 :e-I e.e!
e.e!
l l
                                                                                                !        !          l     l           _    ,;,,      '
Group Coordinator Illll1 li i
CIRC Administrative Support                                                     !                                                  i ee                 1 s Illll1 li
CIRC Administrative Support 1
                                                                                                                                      -              e Group Coordinatcr Staff                                            ,_,        _ p, , ;l .,               q '.. l :           i               .
ee s
CIRC Telephone 0perator                                               , e.e.        . .
e
                                                                                                                                      'i: u-O                                                                                           .
_ p,, ;l., q '.. l :
I l
Group Coordinatcr Staff i
CIRC Telephone 0perator
, e.e.
'i:
u-O I
l l
l l
1 l
1
l
" co x = As Needed
                                                                                                                                                              " co x = As Needed


                  'a .   . a.w = w             .:. :                    u    . . = .._- . , _ . . .n
'a.
                                                                                                            ,_g, : =. :       - ~. ._ ,         ,4 . -
. a.w = w
                                                                                                                                                            =o w u. om env.u                                                                                                                                         ('
.. =.._-., _..
PACIFIC GAS and ELECTRIC COMPANY                                             NUMBER: 2.2
.n u
:                                        '              '                    '      "' 8' PowE                                                                                                         REVISION: 0
,_g, : =. :
  ,  r;3                     IMPLEMENTING PROCEDURE                                                                     ATTACHMENT 2 DA           07/15/83                 i EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 03 0F 18                       ,
- ~.._,
CERO Personnel Classroom Training Requirements
,4. -
=o
(
w u. om env.u PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 8'
PowE REVISION: 0 r;3 IMPLEMENTING PROCEDURE ATTACHMENT 2 DA 07/15/83 i
EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 03 0F 18 CERO Personnel Classroom Training Requirements
* GOVERNMENTAL RELATIONS DEPARTMENT (CERP IP 3.1)*
* GOVERNMENTAL RELATIONS DEPARTMENT (CERP IP 3.1)*
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER i          I        l      t EMERGENCY PLAN TITLE                                                                    g g g o g o f g g ) glg g.g g m ~ wwmmmmmmmmmmm I             I i         e_,
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER g g o g o f g g ) glg g.g g i
Corp. Governmental Relations                                                             ,  ,                                  , g Coordinator                                                                                                                     ! -
I l
Governmental Relations Representatives                                                                                                             *g     x
t EMERGENCY PLAN TITLE g
                                                                                                      'l                                      >
m
~
wwmmmmmmmmmmm I
I i
e _
Corp. Governmental Relations
, g Coordinator Governmental Relations Representatives
'l
*g x
V. J l
V. J l
l l
l l
D e
D e
x = As Needed v---e--           e.---- - - - - - - * - -             -
x = As Needed y
v---e--
-w-w--
e.----
-.y,,-,---w-------------y-w--------.,---w-e v
.e-,-


:-;a , n %an,s ,           ~.S.     -4.m w z. . .w.   . -9 _       __
=.g
u         ,      .,            = .g                ,
,,_c ;.
                                                                                                                                                      ,_c ; .
:-;a, n %an,s,
I e,
~.S.
          - u. tems: nev..:
-4.m w z...w.
PACIFIC GAS and ELECTRIC COMPANY                                         NUMBER: 2.2                                   -
-9 _
CORPORATE EMERGENCY RESPONSE PLAN PGwE                                                                                                     REVISION: 0 C                         IMPLEMENTING PROCEDURE                                                             A m t CnT. 2 DkTE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM (AGE 040F18                                   .
u I
CERO Personnel Classroom Training Requirements                               - -
e,
                        . :
- u. tems: nev..:
PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0 C
IMPLEMENTING PROCEDURE A m t CnT. 2 DkTE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM (AGE 040F18 CERO Personnel Classroom Training Requirements
* CORPORATE COMUNICATIONS DEPARTMENT (CERPIP3.2)*
* CORPORATE COMUNICATIONS DEPARTMENT (CERPIP3.2)*
                        -                                  EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE                                                 g g g oN                          ppo                g         y, g N     N   -N     N N             N N N           N uN NNtN
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE g g g p p g
                                                                                                            .                        ,      Ll    .
y, g o
                                                                                                                        !                * ; x L!
o N
Corp. Public Infonnation Coord.                                                                       '
N
                                                                                                                                  '        e e. x Media Center Representative                                           *                ; I
-N N
* i                                  e e' x News Director Interim Public Information                                           ,                                                        , ,l x Recovery Manager                                                                                                                                 .
N N
Public Information Recovery Mgr.                                     e        e                                      ,      eie,      x 4    . .
N N
Public Infonnation Specialist                                         .                                                      fe' x
N N uN NNtNLl
                                                                                                                            ~           *'~
* ; x L!
      ,m                                                                                                                                     .
Corp. Public Infonnation Coord.
: m. Technical Assistant to the Public                                     e
; I e e. x Media Center Representative i
                                                                                                                                          .*          x Information Recovery Manager                                                                                         ,
e e' x News Director Interim Public Information
l            Technical Assistant to the
,,l x Recovery Manager e
* l  ;I                     I               e         x l                 News Director                         ,
e eie, x Public Information Recovery Mgr.
4 fe' x
Public Infonnation Specialist
~
*'~
,m Technical Assistant to the Public e
x m.
Information Recovery Manager l
Technical Assistant to the
.; I I
e x
l 1
News Director l
1 x = As Needed r
,m
,---w-s-,,.-,
w.
,,__-<,g.,_
,.s
-m-_..
p,,
,.-w,_.-,,w--
ce m
,_,,e-
, -. =,, - -
..,y--
-,,,y--
,y.
m- - -
 
lj..
1
1
        .                                                                                                                                                    1 x = As Needed r  ,m
- w
 
.;.1_
lj. . 1      ,.-      ,-          , ~ ,                        ..    - w   .; .1_ . 4.                   _3..                     s_m .   . .._ , r,w#r.o. .w hl
. 4.
                                                                                                                                                                                                                                                              --t i l t                                                       u. me ==v. =                                                                                                                                                                                               i
_3..
'!                                                                                          PACIFIC GAS and ELECTRIC COMPANY                                                                                   HUMBER: 2.2 i
s_m.
CORPORATE EMERGENCY RESPONSE PLAN
..._, r,w#r.o..w
'                                                      PGwE                                                                                                                                                 REVISION: 0
, ~,
: g.                                                        .
h l
IMPLEMENTING PROCEDURE                                                                                                           ATTACIPENT 2 EMERGENCY PREPAREDNESS TRAINING PROGRAM DATE 07/15/83 PAGE 05 0F 18                                   .
- i l t
CERO Personnel Classroom Traiaing Requirements
u.
me==v. =
-t i
PACIFIC GAS and ELECTRIC COMPANY HUMBER: 2.2 i
CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0 g.
IMPLEMENTING PROCEDURE ATTACIPENT 2 DATE 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 05 0F 18 CERO Personnel Classroom Traiaing Requirements
* LAW DEPARTMENT (CERP IP 3.3)*
* LAW DEPARTMENT (CERP IP 3.3)*
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER
                                                                                                                                                                                                                                    ! ! .j                     -
! !.j EMERGENCY PLAN TITLE g g go g
EMERGENCY PLAN TITLE                                                                                   g             g             go e o g o eo                     g ggg m m m u m m m m m m m.m m m m f
g ggg e o o eo m
}                                                         Corpoiate Law Department Coord.
m m u m m m m m m m.m m m m f
Onsite Attorney                                                                                           ,                                                                ,
}
Staff Members                                                                                             ,                                                ,
Corpoiate Law Department Coord.
                                                                                                                                                                                                                                                          = %
Onsite Attorney Staff Members
= %
r t
r t
4 .
4 a+
a+
h
h
              .C
.C
                                                                                                                                                                                                        , , . , , - - _ _ - , - ,        ,.a--    ,                .
--..u
      - - - - - - - - - - - - - - - _ _- - - - - - . _ ,                            --._.u      ---------..~--,-,-.,,,,_,-.---w               , - - - - - . -, - - , , , , , - - - . , , , , -
---------..~--,-,-.,,,,_,-.---w
 
,.a--
  ,-      :_::a   ~..; w :-. 4 x -~~:: A cc a .< O           ,
:_::a
                                                                +w,   - s~ &:a e e seu~im             - u%: w, a
~..; w :-. 4 x -~~:: A c a
                                                                                                                              '      l
.< O
                                                                                                                            -o 4                         .
+w,
: u. m anv.                                                                                                               ,e, PACIFIC GAS and ELECTRIC COMPANY                   NUMBER: 2.2                                     -
- s~ &:a e e seu~im
CORPORATE EMERGENCY RESPONSE PLAN PGwE s                                                                                REVISION: 0 IMPLEMENTING PROCEDURE                                       ATTAC ENT. 2 TITLE                                                                                                                     -
- u%: w, a c
.                EMERGENCY PREPAREDNESS TRAINING PROGRAM                          DATE: 07/15/83 PAGE 06 0F 18                               .
-o 4
          ~
: u. m anv.
CERO Personnel Classroom Training Requirements
,e, PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0
,
' s IMPLEMENTING PROCEDURE ATTAC ENT. 2 TITLE DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 06 0F 18 CERO Personnel Classroom Training Requirements
* INSURANCE DEPARTMENT (CERP IP 3.4)*
* INSURANCE DEPARTMENT (CERP IP 3.4)*
:            ,.y                                   EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE                                         5 g g o $ o ko W o $ o8 8 h; N N N N N N N N N N N NsN N N l
~
Corporate Insurance Coordinator                             *    *                  '
y EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER ko W o $ o8 8 h; EMERGENCY PLAN TITLE 5 g g o $ o N
Coord. of Property Loss Control                             e
N N N N
* Coord, of Insurance Administration                           ,                        e C                                                                                     -
N N N N N
t I
N NsN N
                                                                                          --,--_,.c       --
N l
w _ _
Corporate Insurance Coordinator Coord. of Property Loss Control e
Coord, of Insurance Administration e
C t
I
--,--_,.c w _ _
y--.e_,
.-w__-_


    ._,...,a                                 m.
._,...,a m.
t'.a u - J -                                   - ' :: & ~           ' Y ::r ' " " - '"
t'.a u - J -
                                                                                                                            -                          -    ~~!? '+L~     MMWNfw 1                              1
- ' :: & ~
                                                                                                                                                                                                        ~    '6
' Y ::r ' " " - '"
                                                      .                                                                                                                                                      q m ,. === .=v. =                                                                                                                                                                       -'n PACMC SAS and ELECTRIC COMPANY                                                                     NUM8ER: 2.2                                 ;
~~!? '+L~ MMWNfw 1
;j                                                                                                     '              "
'6
POwE                                                                                                                                         REVISION: 0 1                                                 IMPLEMENTING PROCEDURE (9                                                                                                                                                    ATTACNMENT: 2
~
                                                                                                                                                                                                                ~
q m,.===.=v. =
EMERGENCY PREPAREDNESS TRAINING PROGRAM                                                                         ,          TE: 07/15/83 PAGE 07 0F 18                           -
-'n PACMC SAS and ELECTRIC COMPANY NUM8ER: 2.2
..                                                    CERO Personnel Classroom Training Requirements 3
;j POwE REVISION: 0 1 (9 IMPLEMENTING PROCEDURE ATTACNMENT: 2 TE: 07/15/83
~
EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 07 0F 18 CERO Personnel Classroom Training Requirements
..3
* SAFETY, HEALTH, AND CLAIMS DEPARTMENT (CERP IP 3.5)*
* SAFETY, HEALTH, AND CLAIMS DEPARTMENT (CERP IP 3.5)*
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE                                                                                 ~
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER
g              o
*o!**~
* o* o eo              *o!**~
EMERGENCY PLAN TITLE o
l                                                                    -
* o
8  m    S*E E N N O N!ElEN l          i N!00 l
* o e o S*EE N N O l
Corp. Safety. Health, and Claims                                                                       ,      ,                                        ,
8 g
  ..                          Coordinator
~
    .                      Director - Safety Engineering                                                                         e                                     ,
N!ElEN N!00 m
e Senior Claims Attorney                                                                                 e                                               e Senior Health Physicist                                                                               e                                               e                         _-
l i
Senior Claims Investigator                                                                             e                                               e           __
l Corp. Safety. Health, and Claims Coordinator Director - Safety Engineering e
Claims Attorney                                                                                       e                                             . e A)
e Senior Claims Attorney e
Field Claims Investigator                                                                             e                                             l e Senior Fire Protection Engineer                                                                       e                                             '
e Senior Health Physicist e
                                                                                                                                                                                    *l Safety coordinator                                                                                     e 8l l
e Senior Claims Investigator e
me     e&     e 94 9 %
e Claims Attorney e
. e A)
Field Claims Investigator e
l e Senior Fire Protection Engineer e
*l Safety coordinator e
' 8l l
me e&
e 94 9
1
1


                                                                          , _ ~. - m                                          -~ ,_:.. w w m m c a.,,+,,:.w w n u_e a r =.
-~,_:.. w w m m c a.,,+,,:.w w n u_e a r =.
                    .=(                     .
, _ ~. - m
                                                    .=_ w .
..=(
                                                                                                                                                                                                                    -9         ,
.=_ w.
                    == .mi .=v. =
-9
PACIFIC SAS and ELECTINC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NtM8ER: 2.2                                                     3[
 
PGwE                                                                                                                                 REVISION: O Gm3                                   IMPLEMENTING PROCEDURE                                                                                   ATTACmENT: 2                                           .
==.mi.=v. =
                                                                                                                                                                                                                              ~
3[
TITLE EMERGENCY PREPAREDNESS TRAINING PROGRAM                                                                    -
PACIFIC SAS and ELECTINC COMPANY NtM8ER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: O Gm3 IMPLEMENTING PROCEDURE ATTACmENT: 2 TITLE DAiE:07/15/83
DAiE:07/15/83 PAGE 08 0F 18                                                     -
~
  ;                                                CERO Personnel Classroom Training Requirements                                                                                             -
EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 08 0F 18 CERO Personnel Classroom Training Requirements
o
*Wttl0ITY DEPARTMENT (CERP IP 3.6)*
                                                              *Wttl0ITY DEPARTMENT (CERP IP 3.6)*
o q
q EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER I
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER glg I
EMERGENCY PLAN TITLE                                                                                         ym  g glg m g g e g g g ggg m       m m m m m m m m,m m m mlm Corparate Security Coordinator                                                                               o       e e Building Security Supervisor                                                                                 ,        ,
EMERGENCY PLAN TITLE y g g g e m
Security Representatives                                                                                     ,        ,                    -
g g g ggg m
CfG1                                                                                                                           e e
m mlm m m m m m m m m,m m m Corparate Security Coordinator o
h l
e e Building Security Supervisor Security Representatives CfG1 e
                                                                                                                                                                                                              -o a
e h
                                                                ~
l
                                                        -- ,       --,--,,-,-----,----.,.-,-,,,,,__,-,--.-------,--,---nw.~.n                                 , -ver-,,.,.e
-o a
                                                                                                                                                                          ,              .,,,n-  - - - , - - , - - - , - -
~
-ver-,,.,.e
.,,,n-
--,--,,-,-----,----.,.-,-,,,,,__,-,--.-------,--,---nw.~.n


                                                          .      . w_.
. w_.
                                                                                .~ -    -  :          ^ mu                   c   +-
^ mu c
                                                                                                                                      . b a =v.
+-
                                                                                                ~
.~ -
j PACIFIC SAS and ELECTRIC COMPANY                       NUMBER: 2.2 PGwE                                                                                     REVISION: 0 g                           IMPLEMENTING PROCEDURE                                           ATTACHMENT: 2 EMERGENCY PREPAREDNESS TRAINING PROGRAM                                   DATE: 07/15/83                           -
b j
PAGE 09 0F 18                         ,
~
                .                  CERO Personnel Classroom Training Requirements '               --
a =v.
PACIFIC SAS and ELECTRIC COMPANY NUMBER: 2.2 PGwE REVISION: 0 g
IMPLEMENTING PROCEDURE ATTACHMENT: 2 EMERGENCY PREPAREDNESS TRAINING PROGRAM DATE: 07/15/83 PAGE 09 0F 18 CERO Personnel Classroom Training Requirements '
* PERSONNEL RELATIONS DEPARTMENT (CERP IP 3.7)*
* PERSONNEL RELATIONS DEPARTMENT (CERP IP 3.7)*
i EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER l
i EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER l
EMERGENCY PLAN TITLE                                               g g m o e o e o eom             g ggg N N ,N N g               ,
EMERGENCY PLAN TITLE g g m o e o e o eom g ggg N
Corporate Personnel Relations                                       ,    , ,
N,N N g
Coordinator On Site Personnel Representative                                   e     e                                       l Personnel Representatives                                           e     e                                       l
Corporate Personnel Relations Coordinator On Site Personnel Representative e
        )
e l
l Personnel Representatives e
e
)
l l
l l
l w
l w
                                                                                                                                  *e
*e w-w--e--e
                                                                                              -,     ---y--       -ww--w--g         --    --e   --
-ww-+
w seum.
,-w,-w--v-w Twr-
-y
---y--
---v-
-ww--w--g
--e


_~ _ .
_~ _.
                                                                          -:-.._a                   a                   - = w             ..w ~. . a _ .. a a a m e w a w a. _ .a.
-:-.._a a
o f
- = w
e.m. m .                                                                                                                                                           ~ h, PACulC sAS and ELECTWC COMPA8Y                                                       NUMBER: 2.2                 -
..w ~.. a _.. a a a m e w a w a. _.a.
l                                                                              CORPORATE EMERGENCY RESPONSE PLAN PowE                                                                                                                                               REVISION: 0 O                                                             IMPLEMENTING PROCEDURE                                                                               ATTAC m m 2 TIT 1.E
'o f
* DA'TE: 07/15/83               -
~ h, e.m. m.
EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 10 0F 18               .
PACulC sAS and ELECTWC COMPA8Y NUMBER: 2.2 l
CERO Personnel Classroom Training Requirements
CORPORATE EMERGENCY RESPONSE PLAN PowE REVISION: 0 O
IMPLEMENTING PROCEDURE ATTAC m m 2 DA'TE: 07/15/83 TIT 1.E EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 10 0F 18 CERO Personnel Classroom Training Requirements
* MATERIALS DEPARTMENT (CERP IP 4.1)*
* MATERIALS DEPARTMENT (CERP IP 4.1)*
L-                            .                                                    I   EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE g g gggggggg gggm 2 m m u mmmmmmmmmmm
I EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER L-EMERGENCY PLAN TITLE g g g g g g g g g g g g g m
                                                                                                                                                                            \             \ \
-2 m m u m m m m m m m m m m m
Corporate Materials Coordinator Procurement Coordinator                                                                                                     e       e Transportation Coordinator                                                                                                   e       e           ,
\\
9
\\
      .    . ::/
\\
l l
Corporate Materials Coordinator Procurement Coordinator e
1
e Transportation Coordinator e
          ;                                                                                                                                                                                                      \
e 9
v                                                                                                                                                                                         g B
. ::/
                    -- , , , -                         . _ - , . -- -          . , , - - - - . -                                ----,-,-s   , - - - - - .
l
                                                                                                      -,,y,-%,,,--,.,,s                                                                        -w-
\\
g v
B
-,,y,-%,,,--,.,,s
----,-,-s
,_,,__er-we w -,,, -,
y
--,-,,,---e-
-w-


    .. p _ ,w                   ., a w . s =                   . .:-. :                            .
.. p _,w
                                                                                                                                                            -_u       . = :- am                     __-.
., a w. s =
i                                                                                                                                                                                                    .o j     .                                                                                                                                                                                                  ..
-_u
mu. i== i=v.                                                                                                                                                                         .I j                             .                        PACIFIC SAS and ELECTRIC COMPANY                                                                             NUMBER: 2.2                                 i PGwE REVISION: 0 IMPLEMENTING PROCEDURE Q                            EMERGENCY PREPAREDNESS TRAINING PROGRAM m ACNMENT: 2 DATE: 07/15/83                           -
. = :- am i
PAGE 11 0F 18                           ,
.o j
CER0 Personnel Classroom Training Requirements l                                                 *COM10NICATIONS DEPARTMENT (CERP IP 4.2)*
mu. i== i=v.
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE                                                                           g g                             g o g g g g g g g g g.gg u             m mum mm m m m m mgevmjm Corporate Comunications                                                                         ,                            ,              e Coordinator
.I j
    $                    Comunications Engineering Support Coordinator Comunications Maintenance e                                           e                                     -
PACIFIC SAS and ELECTRIC COMPANY NUMBER: 2.2 i
Support Coordinator Repair Team                                                                                     o                                           e
PGwE REVISION: 0
:. Q IMPLEMENTING PROCEDURE m ACNMENT: 2 DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 11 0F 18 CER0 Personnel Classroom Training Requirements l
*COM10NICATIONS DEPARTMENT (CERP IP 4.2)*
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE o g g g g g g g g g.gg g g g mgevmjm u
m mum mm m m m m Corporate Comunications e
Coordinator Comunications Engineering Support Coordinator Comunications Maintenance e
e Support Coordinator Repair Team o
e
(')
(')
Wire Chief                                                                                     e                                         - e TelephoneOperators(Chief)                                                                       e                                           e Electric System Dispatcher,                                                                     e                                           e;                           ,
Wire Chief e
  .?
e TelephoneOperators(Chief) e e
Electric System Dispatcher, e
e;
.?
l l
l l
e 0
e 0
a- - - . , .-- ,, -.,---,--,,--.-,---.----------.a                   , , - - - . . - --. -
a- - -.,.--,,
-.,---,--,,--.-,---.----------.a


_            --                      > :,2 :. . u:ucxhakwa.;a : w:                     '
> :,2 :.. u:ucxhakwa.;a : w:
                                                                                                            ~   ~-       -' 4:a
~
                                                                                                                                                    =o n4w asm nuv.n                                                                                                                         'l PAclFIC BAS and ELECTitlC COMPANY                   NLMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN                                                             r i                 PowE                                                                                             REVISION: 0~
~-
  ,@                                                  IMPl.EMENTING PROCEDURE                                     A m CNMENT. 2 1                                              EMERGENCY PREPAREDNESS TRAINING PROGRAM TE 07/15/83                       -
-' 4:a
PAGE 12 0F 18                       .
=o
CERO Personnel Classroom Training Requirements .
'l n4w asm nuv.n PAclFIC BAS and ELECTitlC COMPANY NLMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN i
  ;
PowE REVISION: 0~
r IMPl.EMENTING PROCEDURE A m CNMENT. 2 TE 07/15/83 1
EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 12 0F 18 CERO Personnel Classroom Training Requirements.
* RADIOLOGICAL ANALYSIS AND PROTECTION GROUP (CERP IP 4.3)*
* RADIOLOGICAL ANALYSIS AND PROTECTION GROUP (CERP IP 4.3)*
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE                                                 g g       oh gg g~ o~~
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE oh o o
m m ~~ ~ ~ ~~
o g g gg g g g m
o                    o  gg
m ~~
                                                                                                                                    ~ ~ ~~
~ ~ ~~
Radiological Emergency Recovery
~ ~~
                                                                                                                                                        ~
~ ~ ~~
q                                                                                                ,    ,                  ,            x Manager Emergency Supervising Engineer                                       e                     ,
q Radiological Emergency Recovery
e             x Radiological Monitoring Director                                     e                       'e             x CIRC EARS Doerator
~
* e            x             .
x Manager Emergency Supervising Engineer e
EOF EARS Operator                                                   e                         e   .
e x
x Supervising Meteorologist                                           a                         e             x C             DER Laboratory Director                                             e                         e ,
Radiological Monitoring Director e
x EOF Secretary                                                       e                         e ,j         x UDAC Staff                                                         .                          ,,            x EOF Administrative Staff                                           e             .
'e x
l,,      l  . x l
CIRC EARS Doerator e
7 U                                                                                                                                  )
x EOF EARS Operator e
                                                          .    ~*
e x
x = As Needed                                                                                                                          ,
Supervising Meteorologist a
e x
C DER Laboratory Director e
e x
EOF Secretary e
e
,j x
UDAC Staff x
EOF Administrative Staff e
l,,
l
l
. x l
7U
)
~*
x = As Needed l
e e.n-~
,_e...,,
a n


              , . . .                            . -                              ~ 1= ? + '' c 1.a_~ ~ v ' ~                                         .. . - w_:w
~ 1= ? + '' c 1.a_~ ~ v ' ~
                                                                                                                                                            -          .2                             .
... - w_:w
.2
_wii b
_wii b
                    .me    .
i
i
: e. ,
.me e.
  !                      .                                                        PACIFIC EAS and ELECTRIC COMPANY                                                                               NUMBER: 2.2                                             L PGwE                                                                                                                                                                                 REVISION: 0
PACIFIC EAS and ELECTRIC COMPANY NUMBER: 2.2 L
  ,g                                           IMPLEMENTING PROCEDURE                                                                                                                             ATTACNnENT: 2 EMERGENCY PREPAREDNESS TRAINING PROGRAM                                                                                                  ..          .
PGwE REVISION: 0
DATE: 07/15/83                                         -
,g IMPLEMENTING PROCEDURE ATTACNnENT: 2 DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 13 0F 18 CERO Personnel Classroom Training Requirements i
PAGE 13 0F 18                                         .
CERO Personnel Classroom Training Requirements i
* GENERAL CONSTRUCTION DEPARTMENT (CERP IP 4.4)*
* GENERAL CONSTRUCTION DEPARTMENT (CERP IP 4.4)*
a EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER 1
a EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER 1
EMERGENCY PLAN TITLE                                                                                                                     g     g go sRg o go ggggg N                 N N N N
EMERGENCY PLAN TITLE g g g s R g o
* N     N   N N   N             %                                              N N       NN 4           Corporate Construction Coordinator
o g o g g g g g N
,-              Site Construction Coordinator                                                                                                             e                                                         o Manager. Line Department                                                                                                                   e                                               ,
N N
e Manager, Civil-Hydro Department                                                                                                           e                                                         e Manager Gas-Mechanical Services                                                                                                                                                                                                           .
N N
Department                                                                                 -
N
Manager, Personnel and Clerical e
% N N N N N
    'Qv            Services Department                                                                                                                   9l I
N NN 4
Corporate Construction Coordinator Site Construction Coordinator e
o Manager. Line Department e
e Manager, Civil-Hydro Department e
e Manager Gas-Mechanical Services Department Manager, Personnel and Clerical
'Q Services Department 9l e
v I
W 4
W 4
: 6. s
: 6. s
                                                                                    ~
~
                              - - . , - - - . , _ - - , , ~ , . , , , . , , . , , ,             .,,n,      ,    . - . - , , - , , , ,, , , - .- . , , .                    - - . - , . . . - , . . , _ , , - . , _ . , , - , , , , - ..- . , , ,
- -., - - -., _ - -,, ~,.,,,.,,.,,,
.,,n,


                      -_                    __.-    =~         -
=~
                                                                              -  n, - w~       . a u ,.= u u .a ,._ n                   x. . ~ . .;_.
n, -
                                                                                                                                                        - *6 me.               m.=
w~
                                                              .                                                                                          ~l r'
. a u,.= u u.a,._ n x.
i PACIFIC GAS and ELECTRIC COMPANY                         NUMBER: 2.2 coRronATE EMERGENCY RESPONSE PLAN o      O                             . IMPLEMENTING PROCEDURE                                                 ATTACHMENT: 2 DME. 07/1}/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 14 0F 18                               -
. ~..;_.
*6
~l me.
m.=
r PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 i
coRronATE EMERGENCY RESPONSE PLAN O
. IMPLEMENTING PROCEDURE o
ATTACHMENT: 2 DME. 07/1}/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 14 0F 18
(
(
CERO Personnel Classroom Training Requirements
CERO Personnel Classroom Training Requirements
                        .5
.5
* ENGINEERING DEPARTMENT (CERP IP 4.5)*
* ENGINEERING DEPARTMENT (CERP IP 4.5)*
i . '-       a EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE                 ,                                  g g     g o c eN g gggg8$$2
i. '-
                                                        ,                                N   N N N N     N N N N N N N N N Corporate Engineering Coordinator Chief. Design Drafting                                                   *
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER a
* Chief Mechanical and Nuclear                                             ,                      , ,
EMERGENCY PLAN TITLE g g g o c e g g g g g 8 $ $ 2 N
Engineer Chief Electrical Engineer
N N
* 4                                     -
N N
Chief Civil Engineer                                                     e
N N
* 0                                                             -
N N
e 6
N N
9 e
N N
G ee.   =
N N
Corporate Engineering Coordinator Chief. Design Drafting Chief Mechanical and Nuclear Engineer Chief Electrical Engineer 4
Chief Civil Engineer e
0 e
6 9
e G
ee.
=
8g F
8g F
                                                                                                                      ,--_,-,.-.,,,,,,,._.,n
,..,..---,,n.,
,--_,-,.-.,,,,,,,._.,n


                                                    < um - . . . -            -
< um -... -
                                                                                                                                          .. ~- e , w -, a w _s e x -w,e                                                       ._--.
.. ~- e, w -, a w _s e x -w,e
                                                                                                                                                                                                                                --o
--o
                                    = =.               .=                                                                                                                                                                             ;
= =.
PACIFIC SAS and ELECTRIC COMPANY                                                     NUMBER: 2.2                                       L CORPORATE EMERGENCY RES/0NSE PLAN
.=
  '                                                                                                                                                                                    REVISION: 0 IMPLEMENTING PROCEDURE
PACIFIC SAS and ELECTRIC COMPANY NUMBER: 2.2 L
        @                                                EMERGENCY PREPAREDNESS TRAINING PROGRAM ATTACNMENT: 2 A : 07/15/83                                   -
CORPORATE EMERGENCY RES/0NSE PLAN REVISION: 0 IMPLEMENTING PROCEDURE ATTACNMENT: 2 A : 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM
  ,                                                                                                                                                                              . PAGE 15 0F 18                                   ,
. PAGE 15 0F 18 CERO Personnel Classroom Training Requirements
                                                  .                                CERO Personnel Classroom Training Requirements                                                   -
* COMPUTER SYSTEMS AND SERVICES DEPARTMENT (CERP IP 4.6)*
* COMPUTER SYSTEMS AND SERVICES DEPARTMENT (CERP IP 4.6)*
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE                                                                                 ,
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE g m.e e o e e m e o em e s 2
g         m.e e o e e m e o em e                       s 2 m          RR E N N E N R Z s2 0 0 Corporate Computer Applications                                                                 -
RR E N N E N R Z s2 0 0 m
's                                               Coordinator Supervising Engineering Computer e                                   . e Applications Specialist Supervising Computer Technology                                                                                                                                                       ,
Corporate Computer Applications Coordinator
e                                     e                                        '
's Supervising Engineering Computer e
Specialist                                                                                                                                                     _
. e Applications Specialist Supervising Computer Technology e
Supervising Computer Operations e                                     o Q                                         Specialist Supervising Infonnation Systems                                                                     ,                                      ,
e Specialist Supervising Computer Operations e
Specialist og L M 6
o Q
          - , _ _ _ _ - _ _ . , _ _ _ . _ _ , ,                . _ , , _ , . . . _ , , . . . ,                    .,      , ,, _ , , _ ,      _ __    _,.-.,,,m         ..__,,.._,_y         ,. r - . _ , , - , _ , . - ,
Specialist Supervising Infonnation Systems Specialist og M
L 6
_,.-.,,,m
..__,,.._,_y r -. _,, -, _,. -,


      ;..wc    .                 .~      _, m .-      ,      ..                             , .mm_e.
,.mm_e.
_                   . . m._a b
.. m._a
es-etas lotestpesy.ea PAcWic GAS and ELECTRIC COMPANY                     NUMBER: 2.2                 -
;..wc
L PowE                                                                                 REVISION: 0
.~
  !@          TITLE IMPLEMENTING PROCEDURE                                         ATTAC. ENT. 2 DATE: 07/15/83                 -
_, m.-
EMERGENCY PREPAREDNESS TRAINING PROGRAM           ..
b es-etas lotestpesy.ea PAcWic GAS and ELECTRIC COMPANY NUMBER: 2.2
PAGE 16 0F '18               .
- L PowE REVISION: 0 IMPLEMENTING PROCEDURE ATTAC. ENT. 2 TITLE DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 16 0F '18 CERO Personnel Classroom Training Requirements
CERO Personnel Classroom Training Requirements
* NUCLEAR PLANT OPERATIONS DEPARTMENT (CERP IP 4.7)*
* NUCLEAR PLANT OPERATIONS DEPARTMENT (CERP IP 4.7)*
                                                      .          EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER                         i EMERGENCY PLAN TITLE                                                 g g go go ggggggggg N N N N N N N N N N N N N N N Recovery Manager                                                   *  *
EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER i
* Corporate Liaison Coordinator                                       e o e                         x Corporate Tachnical and Logistical Coordinator Operations and Analytical Recovery Manager Radiological Emergency
EMERGENCY PLAN TITLE g g g g o g g g g g g g g g o
    ,@            Recovery Manager                                                                       .
N N
Engineering and Logistics                                           ,  ,
N N N N
Recovery "e
N N
        "g x = As Needed
N N
N N
N N
N Recovery Manager Corporate Liaison Coordinator e
o e
x Corporate Tachnical and Logistical Coordinator Operations and Analytical Recovery Manager Radiological Emergency Recovery Manager Engineering and Logistics Recovery "e
"g x = As Needed


f eg.amum _ u m _ .a. 2..2. .2m su--mos.ume ha t-m ' ~                                                                                                                                                                                                   "-
f eg.amum _ u m _.a. 2..2..2m su--mos.ume ha t-m ' ~
E
E
:l j       .
:l j
3                             mu. == =v.                                                                                                                                                                                                                         -
3 mu.== =v.
p
p PsCIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PowE REVISION: 0
  ,                                                                                          PsCIFIC GAS and ELECTRIC COMPANY                                                                           NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN
,i 3
,i 3                  PowE                                                                                                                                                                 REVISION: 0
IMPLEMENTING PROCEDURE ATTACMENT 2
              &,                                                                 IMPLEMENTING PROCEDURE                                                                                                 ATTACMENT 2                                                     .
~
                                                                                                                                                                                                                                                                        ~
TE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PME 17 0F 18
EMERGENCY PREPAREDNESS TRAINING PROGRAM TE: 07/15/83
~
  ;                                                                                                                                                                                                      PME 17 0F 18                                               -
CERO Personnel Classroom Training Requirements 4
                                                ~
4 CERO Personnel Classroom Training Requirements
* DIVISION SUPPORT GROUP (CERP IP 4.8)*
* DIVISION SUPPORT GROUP (CERP IP 4.8)*
J                 EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER 1
J EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER 1
EMERGENCY PLAN TITLE a 8 m8 uo m$ om mR om mW o$
EMERGENCY PLAN TITLE a 8 8 o
m u                                                   m m m mum S $,$.2 Corporate Division Coordinator                                                                                           '  *                *                                                              *
o R W o$ S $,$.2 o
  -r                                                                                                                                                               .                                              .
m u
  .k W
m u m m m m m m m m mum Corporate Division Coordinator
-r
.k W
L t
L t
                                                                                                                                                                                                                                                        =         .
=
89
89
                  ..s
..s
                'U l
'U l
x = As Needed
x = As Needed


    . ,      a, 2 -         ..as   '2 ~~;         ' "W: - - --         ' ' ' ~  *
- W L=
                                                                                        - W L=                  " -- = '?* ' ' ' M' ~ 'h % -
" -- = '?* ' ' ' M' ~ 'h % -
ask b m.-.                                                                                                                                           !i
a, 2 -
                    ,                      PACIFIC GAS and FLECTRIC COMPANY                                                 NUMBER: 2.2                       :  L CORPORATE EMERGENCY RESPONSE MAN                                                                                         t-PGwE                                                                                                           REVISION: 0 g                           IMPLEMENTING PROCEDURE                                                                   ATTACNMENT: 2 EMERGENCY PREPAREDNESS TRAINING PROGRAM                            .                '
..as
                                                                                                                                  . 07/15/83                       -
'2 ~~;
                                                                    ,                                        .- PAGE 18 0F 18                                 .
' "W: - - --
                    . .: -          CERO Personnel Classroom Training Requirements .. ~~ '
' ' ' ~
* QUALITY ASSURANCE DEPAR1NENT (CERP IP 4.9)*                                                                                   l EME %ENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE                                                 5 g N
ask b
ER $
!i m.-.
N NN 2RRWS$8883 N N N N N N N N N N N l
L PACIFIC GAS and FLECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE MAN t-PGwE REVISION: 0 g
Corporate Quality Assurance                                         ,      ,                              ,
IMPLEMENTING PROCEDURE ATTACNMENT: 2
Coordinator Records Management Coordinator                                       e                                     e Senior Quality Engineer -
. 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM
Program Development                                                                                                                           .
.- PAGE 18 0F 18 CERO Personnel Classroom Training Requirements.. ~~ '
Senior Quality Engineer -
* QUALITY ASSURANCE DEPAR1NENT (CERP IP 4.9)*
EME %ENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE 5 g ER $ 2 R R W S $ 8 8 8 3 N
N NN N
N N
N N
N N
N N
N N
Corporate Quality Assurance Coordinator Records Management Coordinator e
e Senior Quality Engineer -
Program Development Senior Quality Engineer -
Auditing
Auditing
(",   Quality Assurance Supervisor Design Drafting Coordinator s
(",
Quality Assurance Supervisor Design Drafting Coordinator s
I
I
                                                                                                                                                  .e W
.e W
e                 *
e w...-v,
                                                                                                , - - - - - - - - - - , - ~ ~ -       -r   -
,,---,r_v-
, - - - - - - - - - -, - ~ ~ -
-r
-r


u.
- ; 2.- u ' pg mee e
o n _-
_u: _
4
4
                  - ; 2.- u ' pg          mee                                          e      o n _-                              --
\\
_u: _  ,                                  . _ ,    , , .  #                u.          _
                                      \
y
y
                . . , _ . ,                                                                                                                                                                                                                        .( '
.(
NUMBER: 3.4                                                       -
NUMBER: 3.4 I.
I.                                                                               PACIFIC GAS and ELECTRIC COMPANY j              yggg                                                          CORPORATE EMERGENCY RESPONSE PLAN                                                                 REVISION: 2
PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 yggg
                                                                                                                                                                                  ,DATE: 07/26/83 m                                                                                                                                         , PAGE 010F 08 i   i                           IMPLEMENTINGPROCEDURE                                                                                                                                                            .    ,
,DATE: 07/26/83 j
TITLE                           INSURANCE                                                                                                                                             l G                                                                                                                                               .
m IMPLEMENTINGPROCEDURE
SIGNATURE DATE RESPONSIBILITY TITLE
, PAGE 010F 08 i
:                                                                                          *                                  ~
i TITLE INSURANCE G
1            PREPARED BY
SIGNATURE DATE RESPONSIBILITY TITLE 1
                                                                                                                                ^
PREPARED BY
                                            /
~
W                  NUCLEAR PFJSONNfL 42 T.""
^
NERATIONlhqlNEER MENTAL SAFETY, NPO REVIEWED AND                                                                                                                       ,
W NUCLEAR NERATIONlhqlNEER
CONCURRED BY s                                                                                 '
/
MANAGER INSURANCE                                                                                 f
PFJSONNfL 42 T.""
                                                                                                                                                                      )3)[
MENTAL SAFETY, NPO REVIEWED AND
b      REVIEWED'AND CONCURRED BY
)3)[
[                       [                                                 p                                               '
f CONCURRED BY s
EXECUTIVE                 CE PRESIDENT AND CHIEF FTNANETAI OFFirFR l                  APPROVED BY                                            O[                                                               .W                                 ?
MANAGER INSURANCE b
                                                                                                                                                                                            ;   33 VICENESIDENT,NUCLIARPOWkGENERATION APPROVED BY                                                                  M.m [                                                                         (               ///
REVIEWED'AND
C6AIRMAM,PRESIDEpSNUCLORA5VIf0RY CON 41TTEE                                                                     /
[
[
p CONCURRED BY EXECUTIVE CE PRESIDENT AND CHIEF FTNANETAI OFFirFR O[
.W
?
; 33 l
APPROVED BY VICENESIDENT,NUCLIARPOWkGENERATION M.m [
(
///
APPROVED BY C6AIRMAM,PRESIDEpSNUCLORA5VIf0RY CON 41TTEE
/
4
4
                                                                                                                                                                                                                                        *eq
*eq
          'f
'f
                          ,-.--e.-
,-.--e.-
                                      ,,. -- - - - , , . - - - - - - - - - - - - -                ---r~- - - - - - - . . . . - - - . . , - -             - - - - - - - - - - - - - . - . - . -            -  . . - - . . - - - , . ~
---r~- - - - - - -.... - - -.., - -
.. - -.. - - -,. ~


                                                                                                                                                                  ~ .. . L. . 2.2 hAlbbd-
~... L.. 2.2 hAlbbd-
                  .L_~~-             11 - .       ' t % d A.Lt           - - M '' ***M'
.L_~~-
                                                                                                            .              * ?"                   * - '#i f''' '
11 -.
                                                                                                                                                                                          =
' t % d A.Lt
- - M ''
***M'
* ?"
'#i f'''
=
ee-eua creas asv.es
ee-eua creas asv.es
                                                                                                                                                                                                't PACIFIC GAS and ELECTRIC COMPANY                                                                                                                           L NUMBER: 3.4 2
't PACIFIC GAS and ELECTRIC COMPANY L
CORPORATE EMERGENCY RESPONSE PLAN PGwE m
CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4 2
TITLE IMPLEMENTING PROCEDURE                                                                                               . REVISION: 2 D TE: 07/26/83                         ;
PGwE
INSURANCE                                                                                                               PAGE 02 0F 08
- m IMPLEMENTING PROCEDURE
(                                                         -
. REVISION: 2 TITLE D TE: 07/26/83 INSURANCE PAGE 02 0F 08
I
(
,                                    ORGANIZATIONAL OUTLINE I.     SCOPE
I ORGANIZATIONAL OUTLINE I.
: 11.       DISCUSSION                                                                                                                             2 til.       RESPONSIBILITIES f,:7).
SCOPE 11.
IV.       INSTRUCTIONS V.       REFERENCES VI.       ATTACHMENTS i
DISCUSSION 2
til.
RESPONSIBILITIES f,:7).
IV.
INSTRUCTIONS V.
REFERENCES VI.
ATTACHMENTS i
N s..,
N s..,
                                          -    .,--_e     ,.  . . , . -            , . - . .  . . - _ . . . . , , _ - . , , ., ,. - - - - . ,                - , , ,  ,    .        - - . , - - .
.,--_e


              .~,-                                    .
~ u m.,_ m e a e d m h m m
w                w        ..    ~ u m .,_ m e a e d m h m                                                   m           1 PAclFIC gas and ELECTRIC COMPANY                                                                                 k
1
        .                                                CORPORATE EMERGENCY RESPONSE PLAN                                                           NUMBER: 3.4             [
. ~, -
  !      qV-)                               IMPLEMENTING PROCEDURE                                                                                 - REVISION: 2 TITLE                                                                                                                                                       ~
w w
INSURANCE                                                                                             PAGE 03 0F'08 I.         SCOPE The scope of-this Implementing Procedure is to provide notification to Insurance Department personnel and assure insurance support services in the                                                                           1 event that the Corporate Emergency Response Plan (CERP) is activated.
PAclFIC gas and ELECTRIC COMPANY k
II. DISCUSSION A.                                                              s                                                                          -
CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4
ThisImplementingProcedureprovidesin'tructionsforguiding(Departmenta personnel who have Corporate Emergency Response Organization CERO) assignments should the CERP be activated.
[
B. Departmental support services include:
qV-)
: 1. Providing advice to other Company Departments on the Company's nuclear property insurance.                                                                                                                 ~
IMPLEMENTING PROCEDURE
: 2. Property loss control.
- REVISION: 2 TITLE
: 3. Damage cost accumulation.
~
INSURANCE PAGE 03 0F'08 I.
SCOPE The scope of-this Implementing Procedure is to provide notification to Insurance Department personnel and assure insurance support services in the 1
event that the Corporate Emergency Response Plan (CERP) is activated.
II. DISCUSSION ThisImplementingProcedureprovidesin'tructionsforguiding(Departmenta A.
s personnel who have Corporate Emergency Response Organization CERO) assignments should the CERP be activated.
B.
Departmental support services include:
1.
Providing advice to other Company Departments on the Company's nuclear property insurance.
~
2.
Property loss control.
(]
(]
C. Procedure Attachment 1. " Department Organizational Relationships" illustrates how the Department interfaces with other Company Departments and non Company Organizations.
3.
Damage cost accumulation.
C.
Procedure Attachment 1. " Department Organizational Relationships" illustrates how the Department interfaces with other Company Departments and non Company Organizations.
III. RESPONSIBILITIES Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.
III. RESPONSIBILITIES Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.
l                   IV. INSTRUCTIONS A. Corporate Insurance Coordinator
l IV. INSTRUCTIONS A.
: 1. Take those actions indicated for the appropriate emergency action level classification below:
Corporate Insurance Coordinator 1.
NOTIFICATION OF UNUSUAL EVENT
Take those actions indicated for the appropriate emergency action level classification below:
: 2. If the event concerns a Notification of Unusual Event emergency action level classification, no notification will nonnally be made to the Corporate Insurance Coordinator.                                                                                           '' '  -
NOTIFICATION OF UNUSUAL EVENT 2.
NOTE: CERP Implementing Procedure 1.1. " Activation of the Corporate i         b,-                                           Emergency Response Organization" describes the activation of l
If the event concerns a Notification of Unusual Event emergency action level classification, no notification will nonnally be made to the Corporate Insurance Coordinator.
                                                    . the_CERP.         '
NOTE: CERP Implementing Procedure 1.1. " Activation of the Corporate i
l
b,-
Emergency Response Organization" describes the activation of
. the_CERP.
l l


J, .         ' -
J,.
                                                                    ~s_._         ww               _w m m ram-y . _ o,uaa#_,umu,,
~s_._
b                                                                                                                                                       b es-enes foress sesv.os                                                                                                                   -f PACIFIC GAS and ELECTRIC COMPANY                                                       $
ww
CORPORATE EMERGENCY RESPONSE PLAN                           NUMBER: 3.4 O                                   IMPLEMENTING PROCEDURE                                                               REVISION: 2 DATE:  07/26/83 TITLE                                                                                                                                   ,
_w m m ram-y. _ o,uaa#_,umu,,
INSURANCE                                                           PAGE 04 0F 08 S
b b
i y                                     ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY
-f es-enes foress sesv.os PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4 O
  ~'                         A          3. Receive event notification from the Corporate Liaison Coordinator that theCorporateEmergencyResponsePlan(CERP)hasbeenactivated.
IMPLEMENTING PROCEDURE REVISION: 2 07/26/83 DATE:
: 4. Detemine from the Corporate Liaison Coordinator Plant status infonnation, emergency action level classification, and any special Departmental response actions.
TITLE INSURANCE PAGE 04 0F 08 S
  ;                                    5. Notify the following Departmental personnel and non Company Organization and advise them of the emergency action level classification and any special requests from the Corporate Liaison Coordinator:
y ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY i
: a.                 Coordinator of Property Loss Control
A
: b.                 Coordinator of Insurance Administration c..                 MNL/ Marsh and McLennan (ay!
~'
: 6. Establish and direct a Department operation in the General Office with 1                                              required Departmental support personnel.
3.
: 7. Coordinate with the following CERO personnel for requests regarding
Receive event notification from the Corporate Liaison Coordinator that theCorporateEmergencyResponsePlan(CERP)hasbeenactivated.
            .                                  insurance services:
4.
: a.                 Corporate Safety, Health, and Claims Coordinator
Detemine from the Corporate Liaison Coordinator Plant status infonnation, emergency action level classification, and any special Departmental response actions.
: b.                 Corporate Law Department Coordinator
5.
: 8. Advise the Corporate Liaison Coordinator of Departmental operations status on a periodic basis, and as requested.
Notify the following Departmental personnel and non Company Organization and advise them of the emergency action level classification and any special requests from the Corporate Liaison Coordinator:
: 9. Assure the continuous (24 hour) continuity of Department personnel and resources necessary to support the emergency response effort over a protracted period of time.
a.
Coordinator of Property Loss Control b.
Coordinator of Insurance Administration c.. MNL/ Marsh and McLennan (a
y!
6.
Establish and direct a Department operation in the General Office with required Departmental support personnel.
1 7.
Coordinate with the following CERO personnel for requests regarding insurance services:
a.
Corporate Safety, Health, and Claims Coordinator b.
Corporate Law Department Coordinator 8.
Advise the Corporate Liaison Coordinator of Departmental operations status on a periodic basis, and as requested.
9.
Assure the continuous (24 hour) continuity of Department personnel and resources necessary to support the emergency response effort over a protracted period of time.
: 10. Advise the Corporate Liaison Coordinator on matters of insurance.
: 10. Advise the Corporate Liaison Coordinator on matters of insurance.
: 11. Establish General Office primary interface with imL/ Marsh and McLennan on procedural matters and the general method of cost accumulation.
: 11. Establish General Office primary interface with imL/ Marsh and McLennan on procedural matters and the general method of cost accumulation.
                                                                                                                                            ~
: 12. Obtain all documentation necessary to substantiate a cash advance from
                                                                                                                                                    ~    -
~
: 12. Obtain all documentation necessary to substantiate a cash advance from                                   _
~
                .                                IML/ Marsh and McLennan.                                                                                       ,
IML/ Marsh and McLennan.
4
4
              ~
~
: 13. Review all insurance-related questions from the media as requested by the Corporate Put11c             !        Infonnation Coordinator.
: 13. Review all insurance-related questions from the media as requested by the Corporate Put11c Infonnation Coordinator.


          ._        .          _ , .~ ,,     n. e.w - ~ + - '       -
_,.~,,
n==   w' ' " M*=!=in=MGMM do ee enes oms nev.ca i
e.w - ~ + - '
t                                            Pacific SAs and ELECTRIC c0MPANY                                           -
n==
I PGwE                         c0RPORATE EMERGENCY RESP 0NSE PLAN NUMBER: 3.4                 "
w' ' " M*=!=in=MGMM n.
:    q                            IMPLEMENTING PROCEDURE                                 . REVISION: 2 TITLE                                                                         DATE: 07/26/83             _
do ee enes oms nev.ca i
INSURANCE PAGE 05 0F 08
Pacific SAs and ELECTRIC c0MPANY
-I t
PGwE c0RPORATE EMERGENCY RESP 0NSE PLAN NUMBER: 3.4 q
IMPLEMENTING PROCEDURE
. REVISION: 2 TITLE DATE: 07/26/83 INSURANCE PAGE 05 0F 08
: 14. If required, dispatch support personnel to the San Luis Obispo area.
: 14. If required, dispatch support personnel to the San Luis Obispo area.
Transportation arrangements shall be made using Procedure Attachment
Transportation arrangements shall be made using Procedure Attachment
  !                                4. "Onergency Transportation Instructions".
: 4. "Onergency Transportation Instructions".
: 15. Maintain the Department's " Emergency Response and Recovery Activities Record" binder in a current status.
: 15. Maintain the Department's " Emergency Response and Recovery Activities Record" binder in a current status.
: 16. Upon direction by the Corporate Liaison Coordinator deactivate the                           !
: 16. Upon direction by the Corporate Liaison Coordinator deactivate the Departmental emergency response effort.
Departmental emergency response effort.
l
                                                                                                            ,                l l
: 17. Log all incoming and outgoing communications which are related to the emergency response effort using Procedure Attachment 5, " Emergency Connunications Log Sheet".
: 17. Log all incoming and outgoing communications which are related to the emergency response effort using Procedure Attachment 5, " Emergency Connunications Log Sheet".
NOTE: Completed " Emergency Communications Log Sheets" shall be placed               .
NOTE: Completed " Emergency Communications Log Sheets" shall be placed 1.
: 1.                                        in the Department's " Emergency Response and Recovery Activities           -
in the Department's " Emergency Response and Recovery Activities Record" binder.
Record" binder.
O
: 18. Maintain a written record of all pertinent emergency , response and O
: 18. Maintain a written record of all pertinent emergency, response and N
N                          recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".
recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" bindar.
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" bindar.
B. Coordinator of Property Loss Control
B.
: 1. Take those actions indicated for the appropriate emergency action level classification below:
Coordinator of Property Loss Control 1.
NOTIFICATION OF UNUSUAL EVENT
Take those actions indicated for the appropriate emergency action level classification below:
: 2. For a Notification of Unusual Event emergency action level classification no notification will be made.
NOTIFICATION OF UNUSUAL EVENT 2.
ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY
For a Notification of Unusual Event emergency action level classification no notification will be made.
: 3. Receive event notification from the Corporate Insurance Coordinator that the Corporate Emergency Response Plan has been activated.                             ;
ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.
: 4. Determine from the Corporate Insurance Coordinator the emergency             . _
Receive event notification from the Corporate Insurance Coordinator that the Corporate Emergency Response Plan has been activated.
action level classification and the extent of any requested response.           _
4.
        ~                                                                                                                   l
Determine from the Corporate Insurance Coordinator the emergency action level classification and the extent of any requested response.
: 5. Upon receipt of the event notification establish a working
~
("                       relationship with the following Department and non Company Organization:
5.
l
Upon receipt of the event notification establish a working
("
relationship with the following Department and non Company Organization:


                                                                                    ,            se                           - -- 2             c,-     '::u           ,
se 2
                                                                                                                                                                                ' ww" : '
c,-
I                                                                                                                                                                                                                         b i F 3
'::u
{                             =. == a v. =
' ww" : '
I b
i F
3
{
If
If
  ;                                                                                pacific sAs and ELECTRIC c0MPANY                                                                                                             -
=.== a v. =
., ,                                                                            c0RPORATE EMERGENCY RESPONSE PLAN                                                       NUMBER: 3.4 d             e"'                                             IMPLEMENTING PROCEDURE                                                                                   . REVISION: 2 i
pacific sAs and ELECTRIC c0MPANY c0RPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4 d
TITLE                                                                                                                                      DATE: 07/26/83 INSURANCE                                                                                       PAGE 06 0F 08
e"'
  ~
IMPLEMENTING PROCEDURE
Ai                      a.             Accounting Depa'rtment - for detailed methods of accumulating all y                                       . costs associated with damage to onsite property.
. REVISION: 2 i
: b.             NHL/ Marsh and McLennan - for coordination of their various -
DATE: 07/26/83 TITLE INSURANCE PAGE 06 0F 08
~
A i a.
Accounting Depa'rtment - for detailed methods of accumulating all y
. costs associated with damage to onsite property.
b.
NHL/ Marsh and McLennan - for coordination of their various -
property adjusters and insurance consultants.
property adjusters and insurance consultants.
: 6.       Coordinate the scheduling of all site visits requested by insurance companies and ensure that insurance company personnel are accompanied                                                                                         '
6.
ci                                                           at all times during such visits by a representative of the Department.
Coordinate the scheduling of all site visits requested by insurance companies and ensure that insurance company personnel are accompanied ci at all times during such visits by a representative of the Department.
: 7.       Periodically apprise the Corporate Insurance Coordinator of property loss control matters, and as requested.
7.
: 8.       Log all incoming and outgoing connunications which are related to the emergency response effort using Procedure Attachment 5. " Emergency                                                                                             .
Periodically apprise the Corporate Insurance Coordinator of property loss control matters, and as requested.
Communications Log Sheet".                                                                                                                                   -
8.
NOTE: Completed " Emergency Connunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities 5                                                             Record" binder which is maintained by the Corporate Insurance Coordinator.
Log all incoming and outgoing connunications which are related to the emergency response effort using Procedure Attachment 5. " Emergency Communications Log Sheet".
: 9.       Maintain a written record of all pertinent emergency response and recovery activities using Procedure Attachment 6, " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Connunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities 5
Record" binder which is maintained by the Corporate Insurance Coordinator.
9.
Maintain a written record of all pertinent emergency response and recovery activities using Procedure Attachment 6, " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Insurance Coordinator.
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Insurance Coordinator.
C.         Coordinator of Insurance Administration
C.
                                                                                                                                                                                                                          ~
Coordinator of Insurance Administration 1.
: 1.       Take those actions indicated for the appropriate emergency action
Take those actions indicated for the appropriate emergency action
    .                                                        level classification below:
~
      .                                                                                          NOTIFICATION OF UNUSUAL EVENT l                                             2.       For a Notification of Unusual Event emergency action level classification no notification will be made.
level classification below:
ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY                                                                         . . . .         _
NOTIFICATION OF UNUSUAL EVENT l
: 3.      Receive event notification from the Corporate Insurance Coordinator                                                                             -
2.
(                                       - that the Corporate Emergency Response Plan has been activated.                                                                                         g
For a Notification of Unusual Event emergency action level classification no notification will be made.
        ,,-,-----v--e-,..,s-=-,           ,,--e-+--   ---.--es,--cre-----r---,         -a,.--   ,----w .--.. -, - - - ..r.-,     - . - - . . - + - -   . , .- . -._              .----w -------, -              + - - - -
ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.
Receive event notification from the Corporate Insurance Coordinator
(
- that the Corporate Emergency Response Plan has been activated.
g
,,-,-----v--e-,..,s-=-,
,,--e-+--
---.--es,--cre-----r---,
-a,.--
,----w
.--.. -, - - -..r.-,
-. - -.. - + - -
.----w
+ - - - -


_. g _-                           _              .
.__e
_u, a w-z?m r :
n g _-
c
c
                                                                                            .__e
'o
_u , a ,- :- .            _ w-                                  '
~
z?m r :                          n
.t e,m nav.ea PACIFC gas and ELECTRIC c0MPANY F
                                                                                                                                                                                                              ~   'o    ,
CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4 a
e,m nav.ea
IMPLEMENTING PROCEDURE
                                                                                                                                                                                                                  .t PACIFC gas and ELECTRIC c0MPANY                                                                                                                         F CORPORATE EMERGENCY RESPONSE PLAN                                                                       NUMBER: 3.4 a                                   IMPLEMENTING PROCEDURE                                                                                         . REVISION: 2 TITLE                                                                                                                                                       ATE: 07/26/83                               _
. REVISION: 2 TITLE ATE: 07/26/83 INSURANCE PAGE 07 0F 08 4.
INSURANCE                                                                                                           PAGE 07 0F 08
Function as the primary alternate for the Corporate Insurance Coordinator if, for any reason', he is not available.
: 4.               Function as the primary alternate for the Corporate Insurance Coordinator if, for any reason', he is not available.
5.
: 5.             Determine from the Corporate Insurance Coordinator the emergency action level classification and the extent of any requested response.
Determine from the Corporate Insurance Coordinator the emergency action level classification and the extent of any requested response.
: 6.             Obtain all documentation necessary for a cash advance from NML/ Marsh and McLennan as appropriate to the severity of the emergency, or as requested.
6.
: 7. Maintain comunications with the Corporate Insurance Coordinator for administering other insurance coverage which may be involved as the result of the emergency event and for assessing the adequacy of this coverage.
Obtain all documentation necessary for a cash advance from NML/ Marsh and McLennan as appropriate to the severity of the emergency, or as requested.
: 8.             Log all incoming and outgoing communications which are related to the                                                                                                     -
7.
emergency response effort using Procedure Attachment 5 " Emergency Communications Log Sheet".
Maintain comunications with the Corporate Insurance Coordinator for administering other insurance coverage which may be involved as the result of the emergency event and for assessing the adequacy of this coverage.
8.
Log all incoming and outgoing communications which are related to the emergency response effort using Procedure Attachment 5 " Emergency Communications Log Sheet".
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Insurance Coordinator.
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Insurance Coordinator.
: 9.             Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6 " Emergency Response and Recovery Activities Log Sheet".
9.
Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6 " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Insurance Coordinator.
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Insurance Coordinator.
V. REFERENCES A. Corporate Emergency Response Plan B. CERP. Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization".
V.
REFERENCES A.
Corporate Emergency Response Plan B.
CERP. Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization".
M
M
      'M_'
'M_'
                        - _ - . - . - - -      y-,,y,   , , _ _ , , - _ , _ _ , _ , - ,          -            , , .-____.&,    _ - . . . _ . - _ , _ - - . . . _ _            _ ~ - . _ _ - . . - .
y-,,y,
.%. ~-.
_ ~ -. _ _ -.. -.


                            >ue=-,                           _a.       --                                                __
>ue=-,
                                                                                                                                ~
_a.
a..         - . e_=   -
a..
                                                                                                                                                                      -an 1                                                                                                                                                                         -
-. e_=
ee osas esieas nav.ca
-an
    .                                                                PACIFIC GAS sad ELECTRIC COMPANY                                                                             -
~
    't CORPORATE EMERGENCY RESPONSE PLAN                                     NUMBER: 3.4 PGwE           -
1 ee osas esieas nav.ca PACIFIC GAS sad ELECTRIC COMPANY
1 g               ,
't CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4 PGwE 1
IMPLEMENTING PROCEDURE                                                 - REVISION: 2 l
g IMPLEMENTING PROCEDURE
TITLE                                                                                                       DATE: 07/26/83 INSURANCE                                                                 PAGE 08 0F 08 vie. ATTACHMENTS 4
- REVISION: 2 l
: 1.       Department Organizational Relationships
TITLE DATE: 07/26/83 INSURANCE PAGE 08 0F 08 vie. ATTACHMENTS 4
: 2.       Emergency Plan Titles, Personnel Assignments, and Notification List
1.
: 3.       Emergency Organization Contact List
Department Organizational Relationships 2.
: 4.       Emergency Transportation Instructions
Emergency Plan Titles, Personnel Assignments, and Notification List 3.
: 5.       Fonn 69-084, " Emergency Consnunications Log Sheet"
Emergency Organization Contact List 4.
: 6.       Form 69-085, " Emergency Response and Recovery Activities Log Sheet" N
Emergency Transportation Instructions 5.
O                                                                                                                   .
Fonn 69-084, " Emergency Consnunications Log Sheet" 6.
l 9 N v                                                                                                                                                                 s
Form 69-085, " Emergency Response and Recovery Activities Log Sheet" N
                                                                      ~
O l
9 N
v s
~
e l
e l
l
l
          --,--,-----,,-a--                     - - . - - - ,                    .,-    . - - , . - -. - - , . - - - . , .              - - ~ . - - - - ,   - - - - -
--,--,-----,,-a--
- - ~. - - - -,


                                  -.          . J., . . 1_ _ . _.               _
J.,.. 1_ _. _.
3               ,
3
                                                                                                                                                        ,  ,3 i
,3 i
  ''                                                                                                                                                              ..o
..o
]               e -ese sma: nev.es
]
                                                                                                                                  ~
~
f_
f_
  -i                                                     PACIFIC GAS and ELECTRIC COMPANY                                             NUMBER:     3.4 i                                                   CORPORATE EMERGENCY RESPONSE PLAN POswE                                                                                                               REVISION- 2                       I IMPl.EMENTING PROCEDURE                                                                   -
e -ese sma: nev.es
j (G        TITLE                    INSURANCE
-i PACIFIC GAS and ELECTRIC COMPANY NUMBER:
                                                                                                                                        ,m ca,g,7 DATE: 07/26/83 1
3.4 i
PAGE 01 0F 01               .
CORPORATE EMERGENCY RESPONSE PLAN POswE REVISION-2 (G
DEPARTMENT ORGANIZATIONAL RELATIONSHIPS                                                                           l E
IMPl.EMENTING PROCEDURE j
i                                                                                                                                                                     1 ese m
,m ca,g,7 1
    ,                                                              ,                  samassa
TITLE INSURANCE DATE: 07/26/83 PAGE 01 0F 01 DEPARTMENT ORGANIZATIONAL RELATIONSHIPS E
..s I     see emmen n Mamem M elmethTem t
i ese m
I
samassa
                                                                  -                              -.                      1   -
..s I
NTE yg ESSASEh4M
see emmen n Mamem M elmethTem t
                                                                                                        -        u.NTE-SBBIBeethTen GBenemaATOR gesagenATOR (O.                                                             .l                .I   _.
I 1
I r      .-..,
NTE u.NTE yg ESSASEh4M SBBIBeethTen GBenemaATOR (O.
j am,                I        eo                       I       en'   l l
gesagenATOR
                                        -                1TJ
.I I
                                                          !            T .
.l r
                                                                          '-                    ====-
l I
                                                                                                -E             -
eo I
j
en' am, j
                                                            ._..            -_.._.._...a                 . . . . _.!
1TJ l
l
 
                                                                                  .A"'"'"-
====-
m temamamew Gamanuma
j T.
_ _ . .        Sussemams summmes M -Segumme kmAhum SmummeGumur We - W Sgmuudhum SmIEe W - ensmus emus o
-E
e       .
-_.._.._...a l
                                                                                                                                                                *e
.A"'"'"-
m temamamew Gamanuma Sussemams summmes M -Segumme kmAhum SmummeGumur We - W Sgmuudhum SmIEe W - ensmus emus o
e
*e
,ew
--e
...a..-e
--...ww
__.-._....--.--.-,---._m


                                            = :- :. sa u.-  :  . . a . = . u Gw .. .
. a. =. u Gw...
                                                                                            .,w.<- :.    .a . . . .. - - . - .     ,
.,w.<-
y w-     .         . ,.            ~.
.a..... - -. -.
:-                                                                                                                                 O l                                                                                                                                       t ee4sme ert:1rev cs                                                                                                     !,
y
PACIRC GAS sad ELECTRIC COMPANY                     NUMBER: 3.4                         L CORPORATE EMERGENCY RESPONSE PLAN                                                         i-PGwE                                                                               REVISION: 2 (n,,-                            IMPLEMENTING PROCEDURE-                                   . ATTACHMENT: 2 M LE DATE: 07/26/83 INSURANCE PAGE 010F 02                     .
~.
NAME                                 HOME PHONE C
= :- :.
EMERGENCY PLAN TITLES NON EMERGENCY TITLE                 BUSINESS PHONE
s a u.-
                                                                                                                              ~1 Corporate Insurance                 1. W. P. Noone Coordinator                             Manager of Insurance
w-O l
: 2. R. M. Reider Director, Insurance Administration
t ee4sme ert:1rev cs PACIRC GAS sad ELECTRIC COMPANY NUMBER: 3.4 L
: 3. C. A. Lewis Coordinator of Property Loss Control
CORPORATE EMERGENCY RESPONSE PLAN i-PGwE REVISION: 2 IMPLEMENTING PROCEDURE-
          -          Coordinator of Property             1. C. A. Lewis Loss Control                             Coordinator of Property Q.                                                        Loss Control
. ATTACHMENT: 2 (n,
: 2. UNASSIGNED
M LE INSURANCE DATE: 07/26/83 PAGE 010F 02 NAME HOME PHONE EMERGENCY PLAN TITLES C
: 3. B. J. Casey Assistant Insurance Analyst Coordinator of Insurance             1. R. M. Reider l                       Administration                           Director Insurance Administration
NON EMERGENCY TITLE BUSINESS PHONE
: 2. B. J. Casey Assistant Insurance Analyst
~1 Corporate Insurance 1.
: 3. C. A. Lewis Coordinator of                           -
W. P. Noone Coordinator Manager of Insurance 2.
Property Loss Control M
R. M. Reider Director, Insurance Administration 3.
                                  ~                                                                                         ~
C. A. Lewis Coordinator of Property Loss Control Coordinator of Property 1.
C. A. Lewis Q.
Loss Control Coordinator of Property Loss Control 2.
UNASSIGNED 3.
B. J. Casey Assistant Insurance Analyst Coordinator of Insurance 1.
R. M. Reider l
Administration Director Insurance Administration 2.
B. J. Casey Assistant Insurance Analyst 3.
C. A. Lewis Coordinator of Property Loss Control M
~
~
nw
nw


:- 1:a.   ..::~..2 2 = t :--u.=   . - :. + w.
~
                    ,--..--.._.-...a-
,--..--.._.-...a-2_u-
            ~                                            ... 2_u-        .
:- 1:a.
                                                                                                                                      .  'o
..::~..2 2 =
              ~ , - ,... n . a v . .
t
3 PACIFIC GAS and ELECTR C COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER ** 3*4                         f
:--u.=
                ~"                                                                                   nEnSiON: 2 c-                                 IMPLEMENTING PROCEDURE                                       -
. - :. + w.
ATTACHMENT: 2                         ;
'o
                " E-
~, -,... n. a v..
                        .            INSURANCE                                                     DATE: 07/26/83 PAGE 02 0F 02
3 PACIFIC GAS and ELECTR C COMPANY NUMBER ** 3*4 f
                      ~
CORPORATE EMERGENCY RESPONSE PLAN
NAME                                 HOME PHONE EMIPEENCY PLAN TITLES NON EMERGENCY TITLE                   BUSINESS PHONE
~"
            , -        4i.                                                                                                  ,}
nEnSiON: 2 c-IMPLEMENTING PROCEDURE ATTACHMENT: 2
NML/ Marsh and McLennan               1. Quentin Jackson General Mgr. Nuclear Mutual Limited
" E-INSURANCE DATE: 07/26/83 PAGE 02 0F 02
)                                                         2. D. F. Brown Fire / Extended Coverage Loss Control Supervisor
~
: 3. J. Mras Loss Adjustment Supervisor f
NAME HOME PHONE EMIPEENCY PLAN TITLES 4i.
NON EMERGENCY TITLE BUSINESS PHONE,}
NML/ Marsh and McLennan 1.
Quentin Jackson General Mgr. Nuclear Mutual Limited
)
2.
D. F. Brown Fire / Extended Coverage Loss Control Supervisor 3.
J. Mras Loss Adjustment Supervisor f
s j 5
s j 5
e
e
]
]
ae
ae p
                                                                                                                  - - - -      p "1
"1


_. .u__                     ; .:. . = . a =_.s. . = e a. _n :x. u._ n.= __
(
(              . . , . . . . . :: . . . - .. . .:.- :. 2:- -                _                                ..    ..
..,..... ::... -....:.- :. 2:- -
o se4m totest nav er                                                                                                                 l PACIFIC GAS and ELECTRIC COMPANY                                 NUMBER-   3.4 L-                                                                                                                              *
_..u__
[
;.:.. =. a =_.s.. = e a. _n :x. u._ n.= __
l                                                   CORPORATE ELIERGENCY RESPONSE PLAN
o l
              ~                                                                                                         REnSION: 2 a                                  lMPLEMENTING PROCEDURE                                                       . ATTACHMENT: 3 (D       WE INSURANCE                                                                    DATE: 07/26/83 PAGE 010F 02         ,,
se4m totest nav er L-PACIFIC GAS and ELECTRIC COMPANY NUMBER-3.4
EMERGENCY ORGANIZATION CONTACT LIST l
. [
NAME                                         EMERGENCY LOCATION ORGANIZATION OR EMERGENCY TITLE                                                                                                 ,
l CORPORATE ELIERGENCY RESPONSE PLAN
BUSINESS PHONE                               EMERGENCY PHONE Recovery Manager                               1. J. D. W ##~ -- .                           EOF s
~
                                -                                2. L A. Raymond                   _
REnSION: 2 lMPLEMENTING PROCEDURE a
: 3. J. D. Townsend                     .
. ATTACHMENT: 3 (D
: 4. R. C. Thornberry                                                       1 m!         Corporate Liaison                             1. R. J. McDevitt                             CIRC (t          Coordinator                                                                   ..
WE DATE: 07/26/83 INSURANCE PAGE 010F 02 EMERGENCY ORGANIZATION CONTACT LIST l
                                                                                                        -    ~
ORGANIZATION OR NAME EMERGENCY LOCATION EMERGENCY TITLE BUSINESS PHONE EMERGENCY PHONE Recovery Manager 1.
: 2. S. R. Foster
J. D. W ##~ --.
: 3. T. A. Moulia
EOF s
: 1. R. H. Miller                               Ganar=1 ne< 4 -
2.
Corporate Public                                                      -
L A. Raymond 3.
Infonnation Coordinator                                     _f
J. D. Townsend 1
: 2. C. G. Poncelet                                                         -
4.
: 3. H. N. Peelor i
R. C. Thornberry m!
Corporate Safety, Health                       1. B. P. Sadler                               General Office
~
                                                                                                                  ~
(t Corporate Liaison 1.
and Claims Coordinator                                     .-
R. J. McDevitt CIRC Coordinator 2.
                                                                                                                            ----'~~~"     -
S. R. Foster 3.
  ;                                                            2. C. W. Allen
T. A. Moulia Corporate Public 1.
                                                                              /
R. H. Miller Ganar=1 ne< 4 -
(-                                                         3. J. C. Vocke f                                                                 .
Infonnation Coordinator
: 4. M. C. Jonas_
_f 2.
C. G. Poncelet 3.
H. N. Peelor i
Corporate Safety, Health 1.
B. P. Sadler General Office
~
and Claims Coordinator 2.
C. W. Allen
- - - - ' ~ ~ ~ "
/
(-
3.
J. C. Vocke f
4.
M. C. Jonas_
m d
m d


                . w .:   . .    . a :. . = =
- = - =u = A w=i-i = '
                                                    . =- - . .               - - - - - - = - =u = A w=i- i = '                .. =
.. =
e
. w.:
          .,,4=..v..                                                                                                                     .i PACIFIC GAS and ELECTRIC COMPANY                                       3.4 CORPORATE EMERGENCY RESPONSE PLAN NUMB ER*-
. a :.. = =
I PGwE                                                                                   REVISION: 2
. =- -..
  < ;)
-e
IMPLEMENTING PROCEDURE                                              " ATTACHMENT: 3 M LE INSURANCE                                                   .      DATE: 07/26/83 PAGE 02 0F 02                     .
.i
                    ~ ~
.,,4=..v..
EMERGENCY ORGANIZATION CONTACT LIST                                         -  p 45 ORGAdIZATIONOR NAME                                   EMERGENCY LOCATION EMERGENCY TITLE BUSINESS PHONE                         EMERGENCY PHONE Corporate Law                     1. P. A.. Crane, Jr.
PACIFIC GAS and ELECTRIC COMPANY NUMB ER*-
General Office Department                         -                  -.                -                  :2 Coordinator
3.4 CORPORATE EMERGENCY RESPONSE PLAN I
: 2. R. Ohlbach
PGwE REVISION: 2 IMPLEMENTING PROCEDURE
: 3. R. F. Locke
< ;)
                                                                  ~
" ATTACHMENT: 3 M LE INSURANCE DATE: 07/26/83 PAGE 02 0F 02
                                                                ./
~
  ,,            Construction                     1. G. S. Gee                           General Office Q,             Accounting Department                         ,-
~
: 2. UNASSIGNED
EMERGENCY ORGANIZATION CONTACT LIST p
: 3. UNASSIGNED
45 ORGAdIZATIONOR NAME EMERGENCY LOCATION EMERGENCY TITLE BUSINESS PHONE EMERGENCY PHONE Corporate Law 1.
                                                                                                                                *e k
P. A.. Crane, Jr.
L                                           .
General Office Department
u                                     -
:2 Coordinator 2.
R. Ohlbach 3.
R. F. Locke
~
./
Construction 1.
G. S. Gee General Office Q,
Accounting Department 2.
UNASSIGNED 3.
UNASSIGNED
*e k
L u


                                                                = = :.....=..                           ~._.u                 :.u.:2 m :_w
= = :.....=..
            .....:...-.._..:.--                  -.-2.                                              .
. ~._.u
j           w . e c ,, m v .,                                                                                                                   j PACIFIC GAS sad ELECTRIC COMPANY                                     NUMBER: 3.4                     I CORPORATE EMERGENCY RESPONSE PLAN                                                                   - [.
:.u.:2 m :_w
.          P GeeE                                                                                               REVISION: 2 IMPLEMENTING PROCEDURE                                                         rrTACHMENT: 4
-.-2.
'    <h TITLE DATE: 07/26/83                 -
j j
INSURANCE                                                                     PAGE 0,1 0F 04                 ?
w. e c,, m v.,
I PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 3.4 CORPORATE EMERGENCY RESPONSE PLAN
- [.
P GeeE REVISION: 2 IMPLEMENTING PROCEDURE rrTACHMENT: 4
<h DATE: 07/26/83 TITLE INSURANCE PAGE 0,1 0F 04
?
ENERGENCY TRANSPORTATIDN INSTRUCTIONS C
ENERGENCY TRANSPORTATIDN INSTRUCTIONS C
!            A. Critical Emergency Response Personnel
A.
: 1. Upon receipt of notification of the emergency event, the following critical emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:
Critical Emergency Response Personnel 1.
                              . Recovery Manager i                             . Operations and Analytical Recovery Manager
Upon receipt of notification of the emergency event, the following critical emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:
                              . Engineering and Logistics Recovery Manager
. Recovery Manager i
                              . Radiological Emergency Recovery Manager
. Operations and Analytical Recovery Manager
                              . Public Information Recovery Manager All other PGandE emdrgency response support personnel traveling to the San Luis Obispo area shall arrange transportation in accordance with the instructions set forth in B. below.
. Engineering and Logistics Recovery Manager
: 2. The above-listed individuals may elect to utilize their own vehicles or any
. Radiological Emergency Recovery Manager
(({?g
. Public Information Recovery Manager All other PGandE emdrgency response support personnel traveling to the San Luis Obispo area shall arrange transportation in accordance with the instructions set forth in B. below.
      ./                one of the following transportation services:
2.
: a. Corporate Aircraft
The above-listed individuals may elect to utilize their own vehicles or any
(({?g one of the following transportation services:
./
a.
Corporate Aircraft
: 1) General 0ffice....................................
: 1) General 0ffice....................................
                                                                                                                                      \
\\
: 2) Oa kl and Airport Hange r #8. . . . . . . . . . . . . . . . . . . . . . . . .
: 2) Oa kl and Airport Hange r #8.........................
: b. Oakl and Execu tive Ai r Temina1. . . . . . . . . . . . . . . . . . . . . . . .                       l L
b.
(ask for PGandE Transportation Coordinator)                                 6
Oakl and Execu tive Ai r Temina1........................
: c. 24-hcur Fixed Wing Air Charter Services:                         ,
L l
: 1) Cal-West Aviation (Concord) . . . . . . . . . . . . . . . . . . . . . . . (415 )825-3544 (415)672-0214 (415)932-5794
(ask for PGandE Transportation Coordinator) 6 c.
: 2) Skyways Avia tion, Inc. (San Carlos). .. .. .... .. . . .. (415)593-1448 415 574-4704 415 345-7423 o                                                                                                                415 573-1152
24-hcur Fixed Wing Air Charter Services:
: 3) CoastalAir(SanLuisObispo).....................(805)544-6464                                             -  -
: 1) Cal-West Aviation (Concord)....................... (415 )825-3544 (415)672-0214 (415)932-5794
: 4) Golden Gate Piper (San Ca rlos) . . . . . . . . . . . . . . . . . . . . (408)446-2439
: 2) Skyways Avia tion, Inc. (San Carlos)............... (415)593-1448 415 574-4704 415 345-7423 415 573-1152 o
: 5) PacificPiperAviation(SanJose)................. 408 294-4016
: 3) CoastalAir(SanLuisObispo).....................(805)544-6464
                                                    .                                                              408 225-2540                 '
: 4) Golden Gate Piper (San Ca rlos).................... (408)446-2439
408 374-9985
: 5) PacificPiperAviation(SanJose)................. 408 294-4016 408 225-2540 408 374-9985


_ (. .  ,              n,      ,,. ;                    .          .,p.                                              ,-+ a m    e      v.c s-www ... . : va                             v''-         -
v.c s-www.... : va v''-
                                                                                                                                                                ~
.,p.
,-+ a m
_ (..
n, e
s!
s!
                  -                - . .                                                                                                                                                                                    :iL !l PACIFIC GAS sad ELECTRIC c0MPANY                                                     gggggg       3,4 3
:i !
CORPORATE EMERGENCY RESPONSE PLAN O                                               IMPLEMENTING PROCEDURE                                                                                                 EllSET           4                             l TITLE                                                                                                                                                          DATE: 07/26/83                               _
~
INSURANCE                                                                                                         PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)
L l PACIFIC GAS sad ELECTRIC c0MPANY gggggg 3,4 CORPORATE EMERGENCY RESPONSE PLAN 3
ii A. ditical Emerge'ncy Response Personnel (Cont'd.)
O IMPLEMENTING PROCEDURE EllSET 4
: d.             24-hour Helicopter Air Charter Services (in order of preference):
DATE: 07/26/83 TITLE INSURANCE PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)
: 1) Aris Helicopters, Ltd. (San                                                       Jose).................               (408)293-0800 (408)354-0039
i i A. ditical Emerge'ncy Response Personnel (Cont'd.)
: 2) Astrocopte rs (0akl and) . . . . . . . . . . . . . . . . . . . . . . . . . . . . (415 )635-6860
d.
  ,                                                                                                                                                                                (415)687-5179
24-hour Helicopter Air Charter Services (in order of preference):
  ;                                                                                                                                                                                (415)939-5683
: 1) Aris Helicopters, Ltd. (San Jose)................. (408)293-0800 (408)354-0039
: 3) California Helicopter Airways, Inc. (Hayward)..... (415)783-4000 (415)632-3529                               .
: 2) Astrocopte rs (0akl and)............................ (415 )635-6860 (415)687-5179 (415)939-5683
: e.            The telephone company yellow pages list additional air charter services, h                           f.             Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.
: 3) California Helicopter Airways, Inc. (Hayward)..... (415)783-4000 (415)632-3529 e.
The telephone company yellow pages list additional air charter
: services, h
f.
Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.
To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following numbers as appropriate:
To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following numbers as appropriate:
: 1) During normal office hours GoldenGateDivision..........................(415)557-0640
: 1) During normal office hours GoldenGateDivision..........................(415)557-0640
: 2) During non-office hours Oakland Dispatch Center....................... (415)658-9115 Connunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide,
: 2) During non-office hours Oakland Dispatch Center....................... (415)658-9115 Connunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide, g.
: g.             Regardless of the mode of transportation used, prior to departure, each individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other
Regardless of the mode of transportation used, prior to departure, each individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information. The Corporate Technical and Logistical Coordinator will then advise the Corporate Division Coordinator to ensure that any necessary ground logistical support is in place prior to the arrival of personnel in the San Luis Obispo area.
    ,                                                    special requirements or information. The Corporate Technical and Logistical Coordinator will then advise the Corporate Division                                                                           .    .
v--
Coordinator to ensure that any necessary ground logistical support is in                                                                                   _
~~- --
place prior to the arrival of personnel in the San Luis Obispo area.
,,,,,.,,,wn,,
v-- ~~- --         ,,,,,.,,,wn,,       - - , , - - -    ..,.-------,-,-,,,---,,..-.,--,,,,,-------,----,,-,----------,,,,,,-n,,,-n
..,.-------,-,-,,,---,,..-.,--,,,,,-------,----,,-,----------,,,,,,-n,,,-n
                                                                                                                                                          ,.    ,,--,,,,,,m,--,,,,v---,-,.,---           --- - -        n.-n--
,,--,,,,,,m,--,,,,v---,-,.,---
n.-n--


    .. - = ..:. . a           .:.:=         23.               -
.. - =..:.. a
m 1: = . = = - = -           .----a.--         ---.g
.:.:=
'                                                                                                                      -o i
23.
!                                        PACIFIC gas and ELECTRIC CoLIPANY                     NUMBER: 3.4                 I CORPORATE EMERGENCY RESPONSE PLAN                                                 .[
m 1: =. = = - = -
P G-E                                                                                 REVISION: 2 n                       IMPLEMENTING PROCEDURE                                             ATTACMENT: 4 W    TITLE DATE: 07/26/83 INSURANCE                                   .
.----a.--
PAGE 03 0F 04 EMERGENCY TRANSp0RTATION INSTRUCTIONS (Cont'd.)
---.g
it                                                                                         '
-o i
B. 'dther Emergency ~ Response Personnel
PACIFIC gas and ELECTRIC CoLIPANY NUMBER: 3.4 I
: 1. All other PGandE emergency response support personnel traveling to the San Luis Obispo area shall use their own vehicles or transportation services provided by PGandE.
CORPORATE EMERGENCY RESPONSE PLAN
: 2. If PGandE transportation services are to be used, personnel should proceed to make transportation arrangements in one of the following manners:
.[
: a. During nonaal office hours, contact the General Office Travel Desk (Room 1610, 77 Beale Street). The primary telephone numbers for the Gencral Office Travel Desk are:
P G-E REVISION: 2 n
IMPLEMENTING PROCEDURE ATTACMENT: 4 DATE: 07/26/83 W
TITLE INSURANCE PAGE 03 0F 04 EMERGENCY TRANSp0RTATION INSTRUCTIONS (Cont'd.)
it B. 'dther Emergency ~ Response Personnel All other PGandE emergency response support personnel traveling to the 1.
San Luis Obispo area shall use their own vehicles or transportation services provided by PGandE.
2.
If PGandE transportation services are to be used, personnel should proceed to make transportation arrangements in one of the following manners:
During nonaal office hours, contact the General Office Travel Desk a.
(Room 1610, 77 Beale Street). The primary telephone numbers for the Gencral Office Travel Desk are:
T
T
                                                  ~ r                                                                     .    ,
~ r
                                                          /
/
: b. If these lines are busy, the following alternate telephone numbers                       ,
b.
{                     should be used:                                                           .
If these lines are busy, the following alternate telephone numbers
{
should be used:
l
l
                                                        )
)
: c. During non-office hours, following receipt of notification of the emergency event, emergency response personnel should proceed directly to the Executive
During non-office hours, following receipt of notification of the c.
emergency event, emergency response personnel should proceed directly to the Executive
* Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).
* Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).
Note:     Personnel are advised to bring only a minimum amount of baggage.
Note:
: d. If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability,
Personnel are advised to bring only a minimum amount of baggage.
: e. Regardless of the mode of transportation used, prior to departure, each individual shall contact the Recovery Manager or Coordinator to whcm (s)he functionally reports and advise him of the estimated times of departure.and arrival, the arrival location in the San Luis Obispo area,--            -      -
d.
and any other special requirements or infonr.ation.                                     _
If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability, Regardless of the mode of transportation used, prior to departure, each e.
: f. The Transportation Coordinator will coordinate arrangements, as required, with the Corporate Division Coordinator for Ground transportation and
individual shall contact the Recovery Manager or Coordinator to whcm (s)he functionally reports and advise him of the estimated times of departure.and arrival, the arrival location in the San Luis Obispo area,--
('                    lodging for . GandE P              personnel in the San Luis Obispo area.
and any other special requirements or infonr.ation.
e W -
f.
The Transportation Coordinator will coordinate arrangements, as required,
('
with the Corporate Division Coordinator for Ground transportation and lodging for. GandE personnel in the San Luis Obispo area.
P e
W -


                                                                                                                                  . ~uas.
~
                                                                                                                                                              ~            ~
~
Il a s. " w w .                         s
s. ~uas.
:c < ~ > i-                       ~ -. : - .w
:c < ~ > i-
<:-  -. ,            p c.eux: ' -
~ -. : -.w p c.eux: ' -
                                .                      - ud: .. : n -
- ud:.. : n -
  !                                                                                                                                                                                                                    i   ,
Il a s. " w w.
ee-sus rosas new.en                                                                                                                                                                                     .*l
i ee-sus rosas new.en
                                                                                                                                                                                                                        ~
.*l PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.4
        .                                                  PACIFIC GAS and ELECTRIC COMPANY                                                                 NUMBER: 3.4
~
.!                                                      CORPORATE EMERGENCY RESPONSE PLAN
CORPORATE EMERGENCY RESPONSE PLAN c
  '          ~~"
~~"
* c                              IMPLEMENTING PROCEDURE                                                                                             5'5El$T DATE: 07/26/83 4
IMPLEMENTING PROCEDURE 5'5El$T 4
TITLE INSURANCE                                                                                                         PAGE 04 0F 04 EMERGENCY TRANSPORTATION INSTRUCT 1.ONS lY '                             DIRECTIONS FROM NIMITZ FREEWAY
DATE: 07/26/83 TITLE INSURANCE PAGE 04 0F 04 EMERGENCY TRANSPORTATION INSTRUCT 1.ONS lY '
                                      /*   '
DIRECTIONS FROM NIMITZ FREEWAY
/*
: 1. ja.aguth on HEGENBERGER lt0AD (RT 17) 1 mile
: 1. ja.aguth on HEGENBERGER lt0AD (RT 17) 1 mile
: 2. " urn riaht onto D0OLITTLE DRIVE.
: 2. " urn riaht onto D0OLITTLE DRIVE.
* 3. " urn left onto LANGLET STREET.
: 3. " urn left onto LANGLET STREET.
: 4. ' urn riaht at EARHART ROAD and part in the                               n parking lot on the corner.                                             N 7
: 4. ' urn riaht at EARHART ROAD and part in the n
f                                     ,
parking lot on the corner.
+.                     san asanesesaF         , pg.
N 7
L                              -
f L
o.
*, pg.
y                                                      .            .                    .m             ,
+.
3           __
san asanesesaF o.
                                      \   .
.m y
                                                      ''                g                               ,
3
j;
\\
_l ;% .N                           ~
g l j; g
l                 g                          - . .-
_l ;%.N
                                                                                                                                              ~
~
j                 fy\-     \
l
l                      ':s
':s h
                                                                                                                          -            h
~
                                                          --                            w;                             %
j fy\\-
n&
\\
D,                           '+ , "T emt                       .        ,.
w;
                                                                                                                                                            - l,
- l, n&
                                                                              ,N                                          ,
D,
pl /                                                                                    -
'+, "T emt pl /
                                    ,    3           e ,' .,~. .
,N s,, p'.
                                                                                                ,K x1 v g ,'
3 e,'.,~..
* s,, p'.
,K x1 v
                  .k                         Q                                                                                     \
g,'
k                   .
l
l                                                                                                                  '
.k Q
\\
k
[
[
f                                     ,P-i
f
                                                                                                  -                5
,P 5
:4e
: p. r,. )~..f.
: p.         r , . )~..f.
:4e i
                                                                                                                                          .\ ct m.p,
.\\ c m.p, 9= -)
                                        + ,-                      .
t L
9= -)       .
.,3
L z%,
+,-
                                                                                                                                                                                    ,,.,3     _
z%,
                                                                                                                  ^                *:                                                  i.,
f-Q ~ <
f-               Q~<                             .. ,
i.,
4               .-                          q d j' -'
^
/
4 q
d j'
\\
u
u
                                                                                        /
,. i.s A.
                                                                                        \
h i
    .                                                      .                                                                                , . i .s, A .
.u. z '
h
3l'.
                                                                                                .u. z '
. llll"
                                                                                                                                  .                                        i 3l'.
[
                                                                                    . llll"           ._-              ,,                                                                                . . .
i
                                                      #                                              [                         i
{
{                                 ,,
)
                                                                                                                                                                                                                  )
y.; {s.
y .;                                           ,            ,      .        ..
s
s                 {s .            .....


tjt,'         f!               ,(:itI   r1     bit .i $i           +tL   ?   rIki   P[t I>Pi Li(, Ii     ! t Lt Irt       ll'       ,
tjt,'
4 a                                                                                                                     E         "
f!
S     h9 ma                                                                                                              R a                                                                                                              E               .
,(:itI r1 bit.i $i
n                                                                                                               V s      e                                                                                                      E              .
+tL
e                                                                                                      R E                  ot                                                                                                              E               ,
?
    '        G                                                                                                                                  O s
rIki P[t I>Pi Li(,
A                                                                                                                                                  -
Ii
P      t                                                                                                                          W l
! t Lt Irt ll' 4
3      E T
a E
A                                -
S h9 m
e O
R aa E
I T
n V
C d e D                                                                                                                                  i s          ,
E s
S                                                                                                                                      o
e e
            'Y                                                                                                                                    u v
R ot E
i E
* s t
E S
E G
E G
A S
O A
S E                               '.
s W
M                                                           >
P t
l 3
IO E
T e
T Cd A
D es i
S o
'Y uv i
E s
ES t
EGA SSE M
N O
N O
I T
ITACO L
A C                                                                      '
YC 8
O L
N l
Y C                                                                                                                                              8 N                                                             .          l E                                                             .
E G
G R                                                                       i E
i R
e t         u G     E       t T                     G E                     N I
Ee t
E                      L H y   r L
u G
A
E t
              -    S ev                  C N G T        i Y A L OC        A            D NP L                         E A SE S P
T G
L L
E N
RNN A                   1 7
I E
A C
L H y L
OO CP O    I II t
r A
C S I  E     T RR A                     N T Y C                   O C
S e
E C I
v C
I LNN E E U T
N G iT A O C D
A D GR M I
Y L NP L A
IL NE A4 M F
E A E S LL P S R N N A
F SEh O                   A A E C                   R GT                     O CA I
A 17 C
R C               E L
OO O t
F I
CP II I
O N                   T CP E AR I
S C
T POG                     Y C
T E
C R                   N E       E        E
IRR A T Y C NO C C I
* M       n a        G R
I EL N N T
                                                                                                                                            -      i    e E A              E N         e                                                                                                            0 i t                                                                                                            0 E
E E U A
v
G I
                                #        t                                                                                                        e T                         t J.
D R M NE M IL F
e s
A4 F
R
h SE O A
                                                                                                                                                  )
A E C R
2 8
GT CA Y O
                                                                                                                                                  /
E R C I
                                  .                                                                                                              8 g           EI
L F O N T
* 1
ICP E T
                ,        se n
I AR POG Y
is 4
C R C
5 Tsa                                                                                                                    0 m                I 4
E N
t 9
E E
M na G
E A
R i
e N
Ee 0 i tE 0
v t
e T
s R
t e
)
2 J.
8
/
8 g
EI 1
se 4
nis 5
m Ts 0
a 4
9 I
i t
i t
                                                                                                                                ;i'     lII ;'        I'j1
t 44I
                          ':                        44I              '                    ,
,ii
                                                                                                  *          ,ii
;i' lII I'j1


                  ,                                                                                                =  'O N ANO ELENANY                                     CORPORATE EMERGENCY RESPONSE PLAN           f Pews
'O
=
N ANO ELENANY CORPORATE EMERGENCY RESPONSE PLAN f
Pews
{
{
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET                             {
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET
e EMEROSNCY LOCATION                                                   TOOAY'S DATE PAGE h               tu TwE (21 ts:
{
ENTEREO SV           -
EMEROSNCY LOCATION TOOAY'S DATE PAGE e
(2000 two.)
h tu (21 ts:
(INITIALSI is               (si            
TwE ENTEREO SV (2000 two.)
(INITIALSI is (si


==SUMMARY==
==SUMMARY==
OF ACTIVITY PERFORMED                   tel                   -
OF ACTIVITY PERFORMED tel
                        .                                                            (
(
                                                              - t, e
- t, e
s,   yI* <;,        '    e' o
s, yI*
e' o
W i
W i
  ,k   '
,k
    . {.                                                                                 e 06 M
. {.
S.006 (8/82) Rev. 00                                                 SEE INSTRUCTIONS ON REVERSE
e 06 M
S.006 (8/82) Rev. 00 SEE INSTRUCTIONS ON REVERSE


_                ;  . - ~ . -      1 -   .
1 -
                                                                                    . _ . m_m              ..      __,. ;;.1 _ _.3 ;         .u._..-..   -
__,. ;;.1 _ _.3 ;
ii
.u._..-..
                                                                                                                                                            =0
. - ~. -
. _. m_m ii
=0
;l '
;l '
                                                                                                                                                                  ,i
,i
                      .    =>=vn
=>=vn NUMBER: 3.6
  '                                                                                                                              NUMBER: 3.6                     [
[
  '                                                                                                                                                                r
PACIFIC GAS and ELECTRIC COMPANY r
          '                                                                PACIFIC GAS and ELECTRIC COMPANY REVISION: 2 q
CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 ggg q
:6
:6
              ..                ggg                                    CORPORATE EMERGENCY RESPONSE PLAN
-DATE: 07/20/83
                                                                                                                                -DATE: 07/20/83
"^*' ' ' 7 Ii IMPLEMENTING PROCEDURE TITLE SECURITY d
                                                                                                                                  "^*' ' ' 7                     -
' SIGNATURE DATE RESPONSIBILITY TITLE
Ii                         IMPLEMENTING PROCEDURE                                                                         -
's DMNM M M
                                  -                            TITLE SECURITY d
PREPARED BY SUPERVISIN(INijCLEAR 8ENEP.ATION ENGINEER f
                                                                                      ' SIGNATURE DATE
PERSONNEL AND NVIRONMENTAL SAFETY
, ,:                        RESPONSIBILITY                                                                                                 -
^
TITLE
' gg REVIEWED AND
    's PREPARED BY DMNM M                               M SUPERVISIN(INijCLEAR 8ENEP.ATION ENGINEER                                     f PERSONNEL AND NVIRONMENTAL SAFETY REVIEWED AND
: 7. s g.g
                                                            ^      ^
^
                                                                      '. ' gg     -
CONCURRED BY DIRECTOR OF SECUR I -
: 7. s g .g CONCURRED BY DIRECTOR OF SECUR I -                                                                   ,
f
f
                                                                      .'                      - },: \, .i                     ._
- }, \\,.i d
REVIEWED AND d      "i [ / .
"i [ /.
CONCURRED BY                     VICE PRESIDENT - GENERAL SERVICES REVIEWED AND                                 /                 .   ,f, M                               iif/f CunCURRED BY
REVIEWED AND CONCURRED BY VICE PRESIDENT - GENERAL SERVICES REVIEWED AND
                                                                  ~
/
o            n v i SENIOR VICE PRESIDENT - OPERAT MNS /
.,f, M iif/f CunCURRED BY o
Y                     r                            ff).2f/3 APPROVED BY                                 #
n v i
~
SENIOR VICE PRESIDENT - OPERAT MNS /
Y ff).2f/3 APPROVED BY r
VICE 0 RESIDENT - NUCLEAR POWER GENERATION
VICE 0 RESIDENT - NUCLEAR POWER GENERATION
                                                                                                                  =
=
APPROVED BY                       CHAIRMAN - PRESIDM',1"2 i' ADVISORY COMITTEE                               _-
APPROVED BY CHAIRMAN - PRESIDM',1"2 i' ADVISORY COMITTEE f'
f'
_.__.,__y m.
-. - _,,. ~ - _,... -,. _, _ _


      .-    -        -            -      ~            - .a _. u .u w ,_ e . -- -- -              -                  _
-.a _. u.u w,_ e. --
~
j
j
: n. ~ n,, ~ ,. ..                                                                                              .?.
.?.
j                                    PACIFIC GAS and ELECTRIC COMPANY             NUMBER *- 3.6                               r   '
: n. ~ n,, ~,...
CORPORATE EMERGENCY RESPONSE PLAN
PACIFIC GAS and ELECTRIC COMPANY NUMBER *- 3.6 j
                                                                                      "" ' S ' "    *
r CORPORATE EMERGENCY RESPONSE PLAN
  '                ~~"
~~"
O                         IMPLEMENTING PROCEDURE                           DATE: 07/20/83 TITLE                                                           PAGE 02 0F 07 SECURITY N
"" ' S ' "
ORG ANIZATIONAL OUTLINE
O IMPLEMENTING PROCEDURE DATE: 07/20/83 TITLE PAGE 02 0F 07 SECURITY N
: l. SCOPE II. DISCUSSION 111.     RESPONSIBILITIES IV.     INSTRUCTIONS V.     REFERENCES VI.       ATTACHMENTS f
ORG ANIZATIONAL OUTLINE l.
SCOPE II.
DISCUSSION 111.
RESPONSIBILITIES IV.
INSTRUCTIONS V.
REFERENCES VI.
ATTACHMENTS f
l
l
{
{
l-Se O'%
l-Se O'%
_/                                                                                                           i
_/
                          .-      e.
i e.


1 smwasm_,u -                                                                     2         _ , _ _            ,
smwasm_,u -
2 1
y
y
                                                                                                                                            .:o i                                                                                                                                               ,
.:o i
              -ou. w.m m. .a PACIFIC GAS and ELECTRIC COMPANY                 NUMBER: 3.6                       f CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2                       I POwE
-ou. w.m m..a PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 f
'. 'g                                           IMPLEMENTING PROCEDURE                                         oATE: 07/20/83 WE                                             SECURITY                                         PAGE 03 0F 07                     _
CORPORATE EMERGENCY RESPONSE PLAN I
I ." SCOPE The scope of th.is Implementing Procedure is to specify the direction and coordination of the following activities:
POwE REVISION: 2
A.          Augmenting, as necessary, the site security supervisory staff.
'. 'g IMPLEMENTING PROCEDURE oATE: 07/20/83 WE SECURITY PAGE 03 0F 07 I." SCOPE The scope of th.is Implementing Procedure is to specify the direction and coordination of the following activities:
B.           Ensuring that the responsible Departments in the General Office and in the San Luis Obispo Area are infonned of the emergency situation. Any                                 .
Augmenting, as necessary, the site security supervisory staff.
requirements for additional offsite security measures will be sd=ir.i:tered by the General Office Security Department.
A.
C.         Providing security at all offsite emergency response centers located on Company property, as needed.
B.
D.         Coordinating security for news conferences.                                                           ,
Ensuring that the responsible Departments in the General Office and in the San Luis Obispo Area are infonned of the emergency situation. Any requirements for additional offsite security measures will be sd=ir.i:tered by the General Office Security Department.
II. DISCUSSION A.           This Implementing Procedure provides instructions to those personnel in the General Office Security Department who have functions to
C.
(].
Providing security at all offsite emergency response centers located on Company property, as needed.
D.
Coordinating security for news conferences.
II. DISCUSSION A.
This Implementing Procedure provides instructions to those personnel in the General Office Security Department who have functions to
(]
perform during an emergency involving the Corporate Emergency Response Plan (CERP).
perform during an emergency involving the Corporate Emergency Response Plan (CERP).
B.           Procedure Attachment 1, " Department Organizational Relationships" illustrates how the Department interfaces with other Company Departments and non Company organizations.
B.
Procedure Attachment 1, " Department Organizational Relationships" illustrates how the Department interfaces with other Company Departments and non Company organizations.
III. RESPONSIBILITIES Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.
III. RESPONSIBILITIES Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.
IV. INSTRUCTIONS A.           Corporate Security Coordinator
IV. INSTRUCTIONS A.
: 1.           Take those actions indicated for the appropriate emergency action level classification below:
Corporate Security Coordinator 1.
NOTIFICATION OF UNUSUAL EVENT
Take those actions indicated for the appropriate emergency action level classification below:
: 2.         For a Notification of Unusual Event emergency action level.            .          .
NOTIFICATION OF UNUSUAL EVENT 2.
classification, no notification will nonna11y be made to the                 ._
For a Notification of Unusual Event emergency action level.
q                                              Corporate Security Coordinator.
classification, no notification will nonna11y be made to the Corporate Security Coordinator.
s NOTE: .CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" describes the                         -
q s
activation of the CERP.
NOTE:.CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" describes the activation of the CERP.


              ~
~
_;w            -
w u., m u m _ -~
mw      ,,      w u., m u m _ -~               =         w.a                           - u     2 s =     n-.-
=
                                                                                                                                                        .:s
w.a u
:i PACIFIC GAS and ELECTRIC COMPANY                                           NUMBER
2 s =
* 3.6                   I
n-.-
.f      .                                                                                                                                                      L CORPORATE EMERGENCY RESPONSE PLAN                                                                               "
_;w m w
f
.:s
                ~                                                                                                               "'" S ' "
:i
* h Np IMPl.EMENTING PROCEDURE                                                                   OATE: 07/20/83 SECURITY                                                                   PAGE 04 0F 07                 _
.f PACIFIC GAS and ELECTRIC COMPANY NUMBER
                                #            ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY i                                 3. Receive event notification from the Corporate Liaison Coordinator that the Corporate Emergency Response plan has been activated.
* 3.6 I
: 4. Determine from the Corporate Liaison Coordinator the emergency action level classification and any special Departmental response actions.
L CORPORATE EMERGENCY RESPONSE PLAN f
: 5. Notify the following Department personnel and advise them of the emergency action level classification in effect and any special requests from the Corporate Liaison Coordinator:
~
    ,                                    a.         Building Security Supervisor
"'" S ' "
: 6. Instruct the Building Security Supervisor to implement security procedures to restrict access to the Corporate Incident Response                                                 -
h IMPl.EMENTING PROCEDURE Np OATE: 07/20/83 SECURITY PAGE 04 0F 07 ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY i
Center (CIRC) (14th floor, 77 Beale Street) to those personnel
3.
                                        'below:
Receive event notification from the Corporate Liaison Coordinator that the Corporate Emergency Response plan has been activated.
: a.        Personnel appearing on Procedure Attachment S. " CIRC
4.
        @-                        -                  Restricted Access Authorization List", or
Determine from the Corporate Liaison Coordinator the emergency action level classification and any special Departmental response actions.
: b.         Personnel authorized access by the Corporate Liaison Coordinator, or his designee.
5.
: 7. Establish and direct a Departmental operation in the Generel Office with required Departmental support personnel.
Notify the following Department personnel and advise them of the emergency action level classification in effect and any special requests from the Corporate Liaison Coordinator:
: 8. Coordinate. *s necessary, Departmental activities with the following CE:0 personnel:
a.
: a.         Corporate Law Department Coordinator
Building Security Supervisor 6.
: b.         Site Emergency Coordinator                                                                         ,
Instruct the Building Security Supervisor to implement security procedures to restrict access to the Corporate Incident Response Center (CIRC) (14th floor, 77 Beale Street) to those personnel
: 9. Assurethatcontinuous(24 hour)Departmentaloperationsare
'below:
                  -                        maintained over a protracted period of time.
Personnel appearing on Procedure Attachment S. " CIRC a.
Restricted Access Authorization List", or b.
Personnel authorized access by the Corporate Liaison Coordinator, or his designee.
7.
Establish and direct a Departmental operation in the Generel Office with required Departmental support personnel.
8.
Coordinate. *s necessary, Departmental activities with the following CE:0 personnel:
a.
Corporate Law Department Coordinator b.
Site Emergency Coordinator 9.
Assurethatcontinuous(24 hour)Departmentaloperationsare maintained over a protracted period of time.
: 10. Assure the availability of Department personnel and resources necessary to support the Departmental emergency response effort.
: 10. Assure the availability of Department personnel and resources necessary to support the Departmental emergency response effort.
: 11. As directed by the Corporate Liaison Coordinator, dispatch any additional security personnel, as required, to the San Luis.0bispo                                         _
: 11. As directed by the Corporate Liaison Coordinator, dispatch any additional security personnel, as required, to the San Luis.0bispo Transportation arrangements shall be made using Procedure area.. " Emergency Transportation Instructions".
area. Transportation arrangements shall be made using Procedure Attachment 4. " Emergency Transportation Instructions".                                                     l
l
: 12. Function as corporate security liaison with local officials in the San Luis Obispo area.                                                                                             .
: 12. Function as corporate security liaison with local officials in the San Luis Obispo area.
                                                                                      ..w,, - - , . - _ ,. - - - - - - , - ,
--m.
..w,,


a                               -wm-             , #m ,ge , m.o ;%r . w.1 m,               p .     m ,       ,-
a
-wm-
, #m,ge, m.o ;%r. w.1 m, p.
m,
b
b
    ^
^
uses,em nav.on L
uses,em nav.on PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 L
3 PACIFIC GAS and ELECTRIC COMPANY                     NUMBER: 3.6                       F
3 c0RPORATE EMERGENCY RESPONSE PLAN F
        -                                            c0RPORATE EMERGENCY RESPONSE PLAN 1              POwE                                                                                         REVISION: 2 1     @                                  IMPl.EMENTING PROCEDURE                                         oATE: 07/20/83 TITLE                           SECURITY                                               PAGE 05 0F 07
POwE REVISION: 2 1
[                                         13. If necessary, direct the Building Security Supervisor to implement 3                                          security procedures to ensure physical security, personnel i
1 IMPl.EMENTING PROCEDURE oATE: 07/20/83 TITLE SECURITY PAGE 05 0F 07
security, and assets security in and around the General Office Building complex.
[
: 14. Maintain the Department's " Emergency Response and Recovery Activities Record" binder in a current status, a
: 13. If necessary, direct the Building Security Supervisor to implement security procedures to ensure physical security, personnel 3
: 15. Upon direction by the Corporate Liaison Coordinator deactivate the i                                             Departmental emergency response effort.
i security, and assets security in and around the General Office Building complex.
: 14. Maintain the Department's " Emergency Response and Recovery Activities Record" binder in a current status,
: 15. Upon direction by the Corporate Liaison Coordinator deactivate the a
i Departmental emergency response effort.
t
t
: 16. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 6,
: 16. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 6,
                                                " Emergency Comunications Log Sheet".
" Emergency Comunications Log Sheet".
NOTE: Completed " Emergency Comunications Log Sheets" shall be i
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery i
placed in the Department's " Emergency Response and Recovery Activities Record" binder.
Activities Record" binder.
: 17. Maintain a written record of pertinent emergency response and O''                                   recovery activities using Procedure Attachment 7, " Emergency Response and Recovery Activities Log Sheet".
: 17. Maintain a written record of pertinent emergency response and O''
recovery activities using Procedure Attachment 7, " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder.
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder.
B. Building Security Supervisor
B.
: 1. Take those actions indicated for the emergency action level classifications below:
Building Security Supervisor 1.
NOTIFICATION OF UNUSUAL EVENT
Take those actions indicated for the emergency action level classifications below:
: 2. Under this emergency action level classification no event "l                                          notification is expected.
NOTIFICATION OF UNUSUAL EVENT "l
ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY
2.
: 3. Receive event notification from the Corporate Security Coordinator that the Corporate Emergency Response Plan has been activated.
Under this emergency action level classification no event notification is expected.
: 4. Determine from the Corporate Security Supervisor the event                       ''  ~
ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.
emergency action level classification.                                             _
Receive event notification from the Corporate Security Coordinator that the Corporate Emergency Response Plan has been activated.
I b                                 5. As directed by the Corporate Security Coordinator, implement security procedures-to restrict access to the Corporate Incident Response Center (14th floor, 77 Beale Street) to the following                             .
4.
personnel:
Determine from the Corporate Security Supervisor the event
 
~
                            - u .u a s: a                                  --n_.>  _w            ..m, , .p . ,     w,., mmb-                      -
emergency action level classification.
I b 5.
As directed by the Corporate Security Coordinator, implement security procedures-to restrict access to the Corporate Incident Response Center (14th floor, 77 Beale Street) to the following personnel:
.p., w,., mmb-
: 4. m._ :
: 4. m._ :
di us e insi asv.on                                                                                                                                                         ~
- u.u a s: a
7
--n_.>
                                                                                                                                                                                                  ~
_w
;                                                    PACIFIC GAS sad ELECTRIC COMPANY                                               NUMBER: 3.6                                               "
..m, di 7
~
us e insi asv.on
CORPORATE EMERGENCY RESPONSE PLAN
~
+
~
POwE                                                                                                               REVISION: 2 6                               IMPLEMENTING PROCEDURE                                                                       oATE: 07/20/83                                           .
PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 3.6
                                                                                                                                                                                                ~
~
ME                                   SECURITY                                                                       PAGE 06 0F 07
CORPORATE EMERGENCY RESPONSE PLAN POwE REVISION: 2
: a.          Personnel appearing on Procedure Attachment 5,'" CIRC Restricted Access Authorizati6n List", or
+ 6 IMPLEMENTING PROCEDURE oATE: 07/20/83
: b.         Personnel authorized access by the Corporate Liaison Coordinator, or his designee.
~
: 6. As directed by the Corporate Security Coordinator, implement security procedures necessary to ensure physical security, personnel security, and assets security in and around the General                                                                                     !
ME SECURITY PAGE 06 0F 07 Personnel appearing on Procedure Attachment 5,'" CIRC a.
Office Building complex.
Restricted Access Authorizati6n List", or b.
l
Personnel authorized access by the Corporate Liaison Coordinator, or his designee.
: 7. Log all incoming and outgoing communications which are related to the emergency response effort using Procedure Attachment 7,
6.
                                            " Emergency Comunications Log Sheet".
As directed by the Corporate Security Coordinator, implement security procedures necessary to ensure physical security, personnel security, and assets security in and around the General Office Building complex.
NOTE: Completed " Emergency Comunications Log Sheets" shall be                                                                               -
l 7.
placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.
Log all incoming and outgoing communications which are related to the emergency response effort using Procedure Attachment 7,
O                           8. Maintainawrittenrecordofpertinentemergencyresponseand recovery activities using Procedure Attachment 7, " Emergency Response and Recovery Activities Log Sheet".
" Emergency Comunications Log Sheet".
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.
O Maintainawrittenrecordofpertinentemergencyresponseand 8.
recovery activities using Procedure Attachment 7, " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be forwarded to the Departicant's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be forwarded to the Departicant's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.
C. Security Representatives
C.
: 1.     Take those actions indicated for the emergency action level classifications below:
Security Representatives 1.
NOTIFICATION OF UNUSUAL EVENT
Take those actions indicated for the emergency action level classifications below:
: 2.       Under this emergency action level classification no event
NOTIFICATION OF UNUSUAL EVENT 2.
:                                              notification is expected.
Under this emergency action level classification no event notification is expected.
ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY
ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.
: 3.       Receive event notification from the Corporate Security Coordinator that the Corporate Emergency Response Plan has been activated. _ . .                                                               _
Receive event notification from the Corporate Security Coordinator that the Corporate Emergency Response Plan has been activated. _..
                                                                                                                                                                            ~
4.
: 4.       Perform security activities as directed by the Corporate Security
Perform security activities as directed by the Corporate Security
                                                                                                                                                                                            )
~
      '      u/                                   Coordinator.
u/
        , - -                - , -    -      , , ,            ...,-,_-,-..,_..,,,n     -. - . , .              . - , - ,      - - _ . , , , , . , . --
Coordinator.
)
...,-,_-,-..,_..,,,n


_.      .-              _-                  =                 ,          -
=
w . . - u_n         >.        s.,           __c        . c _ ~ n ,   ._
w.. - u_n s.,
: u.                        v. n PACIFIC GAS and ELECTRIC c0ZPANY                                         NUMBER: 3.6                         'i conPonATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE                                                                       DATE: 07/20/83 Lo     TITLE                                                   SECURITY                                                                 PAGE 07 0F 07
_ _ c
: 5. Log incoming and outgoing comunications related to.the emergency response effort using Procedure Attachment 6 " Emergency Comunications Log Sheet".
. c _ ~ n,
                              -                        NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.
u.
: 6. Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 7. " Emergency Response and Recovery Activities Log Sheet".                                                                    .
: v. n PACIFIC GAS and ELECTRIC c0ZPANY NUMBER: 3.6
'i conPonATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE DATE: 07/20/83 Lo TITLE SECURITY PAGE 07 0F 07 5.
Log incoming and outgoing comunications related to.the emergency response effort using Procedure Attachment 6 " Emergency Comunications Log Sheet".
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.
6.
Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 7. " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" should be forwarded to the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" should be forwarded to the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.
V. REFERENCES A. Diablo Canyon Power Plant Emergency Plan 7,,
V.
B. Corporate Emergency Response Plan C. Diablo Canyon Security Plan D. Diablo Canyon Contingency Plan i
REFERENCES A.
E. CERP Procedure 1.1, " Activation of the Corporate Emergency Response Organization" VI. ATTACHMENTS
Diablo Canyon Power Plant Emergency Plan 7,,
: 1. Department Organizational Relationships l                                            2. Emergency Plan Titles, Personnel Assignments, and Notification List li                                            3. Emergency Organization Contact List
B.
: 4. Emergency Transportation Instructions
Corporate Emergency Response Plan C.
: 5. Restricted Perscnnel Access Authorization List 1
Diablo Canyon Security Plan i
: 6. Form 69-084, " Emergency Comunications Log Sheet"
D.
: 7. Fom 69-085 " Emergency Response and Recovery Activities Log Sheet"                                                         _
Diablo Canyon Contingency Plan E.
CERP Procedure 1.1, " Activation of the Corporate Emergency Response Organization" VI. ATTACHMENTS 1.
Department Organizational Relationships Emergency Plan Titles, Personnel Assignments, and Notification List l
2.
l i 3.
Emergency Organization Contact List 4.
Emergency Transportation Instructions 5.
Restricted Perscnnel Access Authorization List 1
6.
Form 69-084, " Emergency Comunications Log Sheet" Fom 69-085 " Emergency Response and Recovery Activities Log Sheet" 7.
(
(
          'i
'i
                                                                          ~
~
e l
e l


m ,
m,
                                                                                                                          ,g,,,                                                                                 ,                                             .
,g,,,
                                                            . 2gsm.g                             .                                                           ., g . .
,.g.
                                                                                                                                        ,.g.
., g..
_r,                                .u,g ; -
_r,
                                                                                                                                                                                                                                                                                              .\
.u,g ;
: e. u s e,m m .sv.on                                                                                                                                                                                                                                                     '
. 2gsm.g
NUMBER: 3.6 PACIFIC GAS and ELECTRIC COMPANY                                                                                                                                                                                  L CORPORATE EMERGENCY RESPONSE PLAN
.\\
  ;                                                                                                                                                                                                                        REVISION: 2 PGwE
: e. u s e,m m.sv.on PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 L
    .O                                                                       IMPLEMENTING PROCEDURE                                                                                                                       .ATTAcNsENT 1 TITLE                                                                                                                                                                                     DATE: 07/20/83                                               .
CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE
SECURITY l-PAGE 01 0F 01
.O IMPLEMENTING PROCEDURE
\
.ATTAcNsENT 1 TITLE DATE: 07/20/83 SECURITY l-PAGE 01 0F 01
L                                                                                   DEPARTMENT ORGANIZATIONAL RELATIONSHIPS o
\\
e,ca,,,,
L DEPARTMENT ORGANIZATIONAL RELATIONSHIPS o
y                        .
y e,ca,,,,
    ',                                                                                                                            in esa emie es o ars
in esa emie es o ars unne=
                                                                                              -                                    unne=
egemesmaTon
egemesmaTon
                            /                                                           osa = ^rs                               som m ar                                                                 one               eg.,   r.
/
s o                                                              , ,, % ,,                1                 secuany                1                                   .a.m.
osa = ^rs som m ar one eg.,
ouar ry           masamma
r.
                                                                                                                                                                                                                            - .=
1 1
                                                                                                                                - .=
so ouar masamma
                                                                                      ,,,,,,,,,,,,,              j.-                                                g i                                                 i.                                                     ,
.a.m.
ry j.-
g secuany
-.=
-.=
i i.
7._.._.._.._.
7._.._.._.._.
p___y so                                                                       eo
p___y
_A_9_J  = :               ee l
_A_9_J l
GutemeeeCY
so eo
                                                          *e =ammet              -
= :
sin amouanv m use var,ves                  n,sumars an.s f ,,,,,,,,,,t   ,,,
ee n,sumars f
_a==am,,,,                l        ,,,,,,,,,,
GutemeeeCY sin amouanv an.s
,,,,,,,,,,t
*e =ammet m use var,ves l
_a==am,,,,
I I
I I
                                                                                                                                                =
l
l                                                                                                                                en u           e i
=
emarty osmewes WWEEE W-use amasseur
i en u e
                                                                                    .__                  emmusumusen
emarty osmewes WWEEE W-use amasseur emmusumusen
                                                                                    . - _.._.. causammmed Pmemmed W = eumummW Susume Ommer GIIIC = emusemeensamm nasmmmsemmer ser -temsmunycumummePamuy s p P = cannesemovempummestum ES = h Las endus M = emme emus                                                                                                                                                                           ..              _
. - _.._.. causammmed Pmemmed W = eumummW Susume Ommer GIIIC = emusemeensamm nasmmmsemmer ser -temsmunycumummePamuy s p P = cannesemovempummestum ES = h Las endus M = emme emus
__r, . - - - , - .,_ ,               . _ . , _ , , _ . , . . _ , . _ _ . .          _ _ _    _ -        ,.,__.,..,m....             . . , _ . . , . _ . _ _ , , - _ _ - , _ - - . , _ _ , . - _ _ _ , ,                            _ . . _ . . . . _ _ - - _ _ . . _ _ . - _ , _
__r,. - - -, -.,_,
,.,__.,..,m....


                                .w . , 4 .. _2-. ;,-a - . m        ._    m m. m_.-.w . .._ .       m. _    . . . : .u.a u.az _a _a .r _           j o
m m.
I co-ow istaat arv ok PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6             f CORPORATE EMERGENCY RESPONSE PLAN                                   REVISION: 2         -[
m_.-.w..._.
PGwE                                                                                         . ATTACHMENT 2 O                                  IMPLEMENTING PROCEDURE                                                          ATE: 07/20/83       ;
m.
                  . TITLE                                                                                                 PAGE 01 0F OI SECURITY EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND__ NOT HOME PHONE
... :.u.a u.az _a _a.r _
                                                          '                                NAME BUSINESS
j
                              ~                                                    NON EMERGENCY TITLE                                   _
.w., 4.. _2-. ;,-a -. m
EMERGENCY TI'TLE -
'o I
: 1. L. H. Shaffer Corp. Security Coordinator                                     Director of Security
co-ow istaat arv ok NUMBER: 3.6 f
PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2
-[
O IMPLEMENTING PROCEDURE PGwE
. ATTACHMENT 2 ATE: 07/20/83
. TITLE SECURITY PAGE 01 0F OI EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND__ NOT HOME PHONE NAME BUSINESS NON EMERGENCY TITLE
~
EMERGENCY TI'TLE
: 1. L. H. Shaffer Corp. Security Coordinator Director of Security
: 2. J. R. Van Schaick Supervising Security Rep.
: 2. J. R. Van Schaick Supervising Security Rep.
: 3. R. Dunleavy 3r. Security Rep.
: 3. R. Dunleavy 3r. Security Rep.
: 1. V. Dettman Security Representatives                                       5ecurity Representative t-e     v
: 1. V. Dettman Security Representatives 5ecurity Representative t-v e
: 2. M. Person                 __
: 2. M. Person 3ecurity Representative
3ecurity Representative
: 3. J. Nichols Security Representative
: 3. J. Nichols Security Representative
: 4. L. Lawrence Security Representative
: 4. L. Lawrence Security Representative
: 5. L. Adams f                                                                                       Security Representative
: 5. L. Adams f
Security Representative
: 6. F. C. Kobely _ tative Security Represen
: 6. F. C. Kobely _ tative Security Represen
: 1. R. J. Eiden _ _            _ _ _
: 1. R. J. Eiden _ _
Butiding Security Supervisor                                 3ecurity Supervisor
Butiding Security Supervisor 3ecurity Supervisor
: 2. A. Jinkerson                       ~
: 2. A. Jinkerson
                                                                                        ~ Administrative Assistant
~
: 3. R. D. Manning                   _
~ Administrative Assistant
Manager, Building and c'                                                                           Administrative Services Dept.
: 3. R. D. Manning Manager, Building and Administrative Services c'
                                                        .                                                                                    W' man.e=, m _
Dept.
                                                ~
W'
                                    -w h ==me
-w
~
man.e=, m _
h==me


_ . .L.- . . a. w w c. .. =...       w2 % . .           ., w   >.1.x 2+;x w ~ a -                   a ~ x m w ~ --                           ;
_..L.-..
4
: a. w w c... =...
            <u. nau any n I,
w2 %..
PACIFIC GAS and ELECTRIC COLIPANY                         .          NUMBER: 3.6                 .
w
                                                                                                                                                ~}
>.1.x 2+;x w ~ a -
P G -> E CORPORATE EkERGENCY RESPONSE PLAN REVISION: 2                          I e                          IMPLEMENTING PROCEDURE                                                         4TrACHMENT: 3 v                                                                                                                                             -
a ~ x m w ~ --
TITLE                                                                                           DATE: 07/20/83                       -
4 I,
SECURITY
<u. nau any n PACIFIC GAS and ELECTRIC COLIPANY NUMBER: 3.6
                                                        -                                                    PAGE 01 0F 02 EMERGENCY ORGANIZATION CONTACT LIST NAME                               EMERGENCY LO TIOf ORGANIZATION OR BUSINESS PHONE                                       PHONE EMERGENCY TITLE                                                                                              ---
~}
San Luis Obispo County                             DUTY OFFICER                               SHERIFF'S FACILITY Sheri.ff's Off.i.ce       - - .    .
REVISION: 2 I
                                                      ~
CORPORATE EkERGENCY RESPONSE PLAN P G -> E IMPLEMENTING PROCEDURE 4TrACHMENT: 3 e
Recovery Manager                                   1. J. D. Shiffer_ /                       , EOF f                                                                                        or               '
v TITLE DATE: 07/20/83 SECURITY PAGE 01 0F 02 EMERGENCY ORGANIZATION CONTACT LIST ORGANIZATION OR NAME EMERGENCY LO TIOf EMERGENCY TITLE BUSINESS PHONE PHONE San Luis Obispo County DUTY OFFICER SHERIFF'S FACILITY Sheri.ff's Off.i.ce
~
f Recovery Manager
: 1. J. D. Shiffer_ /
, EOF or
: 2. W. A. Rayrtond
: 2. W. A. Rayrtond
_-J                                                                   -
_-J
: 3. _J._D. Townsend
: 3. _J._D. Townsend
    'C%
'C%
    ~,                                                                         -
~,
: 4. R. C. Thornberry Corporate Liaison Coordinator                     1. R. 1. McDevitt                       -
: 4. R. C. Thornberry Corporate Liaison Coordinator
7 CIRC I
: 1. R. 1. McDevitt CIRC 7
: 2. S. R._ Foster                     .
I
: 2. S. R._ Foster
__mm<-=
__mm<-=
: 3. T. A. Moulia                 ..
: 3. T. A. Moulia Site Security Supervisor
Site Security Supervisor                           1. L. G. Lunsford                           OSC l                                                                                                                               '            -
: 1. L. G. Lunsford OSC l
: 2. R. G. Todaro
: 2. R. G. Todaro
                                                                          /
/
l    ''-                                                      3. Unassigned I
: 3. Unassigned l
                                                                                                                                  , , . <            J
I J


                                                                      = ca; . ._ . . , . , . , _ _ . , , _ , _ ,   ,      ._
Z i,.-.i._
  - _ - . . Z i,.-.i._                        _ _ _., _.
= ca;.._.,.,., _ _.,, _, _,
_ _ _ .        . v. enn   <v u                                                                                                                         '
: v. enn
PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6                       -  k CORPORATE EMERGENCY RESPONSE PLAN                         REVISION: 2                           I P G e<E                                                           -
<v u PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 k
g                                      IMPLEMENTING PROCEDURE                                               . m icanenT. 3 07/20/83 TITLE                                                                                                                                 _
CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 I
SECURITY                                                 PAGE 02 0F 02 EMERGENCY RESPONSE ORGANIZATION CONTACT LIST (Cant'd.                           =.      . ..
P G e<E IMPLEMENTING PROCEDURE
NAME                EMERGENCY LOCATION ORGANIZATION OR                                                                               PhTNE BUSINESS PHONE
. m icanenT. 3 g
                          . EMERGENCY TITLE
07/20/83 TITLE SECURITY PAGE 02 0F 02 EMERGENCY RESPONSE ORGANIZATION CONTACT LIST (Cant'd.
: 1. D. Okabayashi             OSC On-Site Personnel Rep.                                                             ,          T
=.
'                                                                                        2. L. Campbell i                                                                                       .
EMERGENCY LOCATION NAME ORGANIZATION OR PhTNE
7 -                                                 ,
. EMERGENCY TITLE BUSINESS PHONE
: 3. Unassigned _         g i
: 1. D. Okabayashi OSC On-Site Personnel Rep.
T
: 2. L. Campbell i
7 -
: 3. Unassigned _
g i
f
f
          '. t a                                                                                               i
'. t a i
                                                                                                                        ~
~
h t
h t
4     = .    .
4
            ,e                                                                                                                                         .
=.
mW e
,e mW e
e
e
                                  .pmas.-. se %
.pmas.-. se %
                      .W
.W


w:.:-.x~ u..-..:. w.=,x a - m
w:.:-.x~ u..-..:. w.=,x a - m
    -                                                                                    -.w -
-.w -
                                                                                                                                                        -o
-o 8
                                                                                                                                                            '.:8 40 -0 348 f,/5 23 8'tV. 02         - - - - - - ~ -
-0 348 f,/5 23 8'tV. 02
- - - - - - ~ -
{
{
PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.6               .[
40 PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6
PGwE                                                                                                           REVISION: 2 O                                     IMPLEMENTING PROCEDURE ATTACHMENT: 4
.[
                                                                                                                                                                ~
CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 2 O
TITLE                                           SECURITY                                                     DATE: 07/20/83       ,
IMPLEMENTING PROCEDURE ATTACHMENT: 4
PAGE 010F 04                 -
~
EMERGENCY TRANSPORTATION INSTRUCTIONS A. - Critical Emergency Response Personnel
TITLE SECURITY DATE: 07/20/83 PAGE 010F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS A. - Critical Emergency Response Personnel 1.
: 1.     Upon receipt of notification of the emergency event, the following critical emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:                                                                                                                   .
Upon receipt of notification of the emergency event, the following critical emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:
                                            . Recovery Manager
. Recovery Manager
                                            . Operations and Analytical Recovery Manager
. Operations and Analytical Recovery Manager
                                            . Engineering and Logistics Recovery Manager Y                                           . Radiological Emergency Recovery Manager
. Engineering and Logistics Recovery Manager Y
                                            . Public Infomation Recovery Manager.                                                                              .
. Radiological Emergency Recovery Manager
. Public Infomation Recovery Manager.
All other PGandE emergency response support personn_el traveling to the San Luis Obispo area shall arrange transportation in accordance, with the instructions set forth in B. below.
All other PGandE emergency response support personn_el traveling to the San Luis Obispo area shall arrange transportation in accordance, with the instructions set forth in B. below.
r;q                                                                 ~
r;q
D                 2. The above-listed individuals may elect to utilize their own vehicles or any one of the following transportation services:
~
: a. Corporate Aircraft General 0ffice.................................... (
D 2.
: b. Oakland Executive Ai r Teminal . . . . . . . . . . . . . . . . . . . . . . . . (
The above-listed individuals may elect to utilize their own vehicles or any one of the following transportation services:
(ask for PGandE Transportation Coordinator) s
a.
: c. 24-hour Fixed Wing Air Charter Services:
Corporate Aircraft General 0ffice....................................
: 1)     Cal-WestAviation(Concord).......................(415)825-3544                                           -
(
(415)672-0214 (415)932-5794
b.
: 2) Skyways Avia tion , Inc. (San Carlos) . . . . . . . . . . . . . . . (415)S93-1448 (415)S74-4704 415 345-7423 415 573-1152
Oakland Executive Ai r Teminal........................ (
                                                                                                                                                          ~
(ask for PGandE Transportation Coordinator) s c.
5                                          3) Coastal Ai r (San Luis 0bispo). . . . . . . . . . . . . . . . . . . . . (805)S44-5464 - ~ ~
24-hour Fixed Wing Air Charter Services:
: 4) Gol den Gate Pi per (Sa n Ca rlos) . . . . . . . . . . . . . . . . . . . . (415 )592-2550 s                                                                                                                  (408)446-2439
1)
Cal-WestAviation(Concord).......................(415)825-3544 (415)672-0214 (415)932-5794
: 2) Skyways Avia tion, Inc. (San Carlos)............... (415)S93-1448 (415)S74-4704 415 345-7423 415 573-1152 5
: 3) Coastal Ai r (San Luis 0bispo)..................... (805)S44-5464 - ~ ~
~
: 4) Gol den Gate Pi per (Sa n Ca rlos).................... (415 )592-2550 (408)446-2439 s
(
(
l
l
: 5) Bay AiI cha rte r (Haywa rd) . . . . . . . . . . . . . . . . . . . . . . . . . (415)703-3665                       ,
: 5) Bay AiI cha rte r (Haywa rd)......................... (415)703-3665


_-& a , m m e = m m x
smn_w w-Aimwa
      .,              p .m.w a m -                   u-   s smn_w w-Aimwa                                                                                            4 l
_-& a, m m e = m m x 4
:                                                                                                                                                                :6 ;-
p.m.w a m -
NUMBER: 3.6 1                                                   PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN bl'
u-s
  .                PGwE                                                                                                               REVISION: 2                     'I g                                IMPLEMENTING PROCEDURE                                                                         m ,cangn7: 4
:6 ;
                    "                              SECURITY                                                                         DATE: 07/20/83                     _
bl' 1
PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS
PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 2
'I IMPLEMENTING PROCEDURE m,cangn7: 4
. g SECURITY DATE: 07/20/83 PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS
['
['
                        -            6) Pacific Piper Aviation (San Jose) . . . . . . . . .. .. . . . .. 408)294-4016 4   225-2540 4   374-9985
: 6) Pacific Piper Aviation (San Jose)................. 408)294-4016 4
: d. 24-hour Helicopter Air Charter Services (in order of preference):
225-2540 4
                                    -1) Aris Helicopters, Ltd. (San                 Jose).................                     (408)293-0800
374-9985 d.
  .'                                                                                                                          -(408)354-0039 d
24-hour Helicopter Air Charter Services (in order of preference):
: 2) Astrocopters           (0akland)............................                           (415)635-6880 687-5179 939-5683
-1) Aris Helicopters, Ltd. (San Jose).................
: 3) Garli ch Enterpri ses (Concord) . . . . . . . . . . . . . . . . . . . . . (415 )228-1500                                     '
(408)293-0800
(415)825-8346 g;.g                          4) California Helicopter Airways Inc. (Hayward)...., (415)783-4000 b'                                                                                                                        (415)632-3529
-(408)354-0039
: e. The telephone company yellow pages list additional air charter services.
: 2) Astrocopters (0akland)............................ (415)635-6880 d
: f. Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.
687-5179 939-5683
: 3) Garli ch Enterpri ses (Concord)..................... (415 )228-1500 (415)825-8346
: 4) California Helicopter Airways Inc. (Hayward)...., (415)783-4000 g;.g (415)632-3529 b'
The telephone company yellow pages list additional air charter e.
services.
f.
Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.
To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following numbers as appropriate:
To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following numbers as appropriate:
: 1) During nonnal office hours Gol den Ga te Divi sion. . . . . . . . . . . . . . . . . . . . . . . . . . (415 )S57-0640                     .
: 1) During nonnal office hours Gol den Ga te Divi sion.......................... (415 )S57-0640
: 2) During non-office hours Oakland Dispatch Center....................... (415)658-9115 Comunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide.
: 2) During non-office hours Oakland Dispatch Center....................... (415)658-9115 Comunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide.
: g. Regardless of the mode of transportation used, prior to departure, each -
Regardless of the mode of transportation used, prior to departure, each -
g.
individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and
individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and
(                             arrival, the arrival location in the San Luis Obispo area, and any                                                         .
(
other special requirements or information. The Corporate Technical and Logistical _ Coordinator will then advise the Corporate Division Coordinator to enture that any necessary ground logistical support is                                                               '
arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information. The Corporate Technical and Logistical _ Coordinator will then advise the Corporate Division Coordinator to enture that any necessary ground logistical support is in place prior to the arrival of personnel in the San Luis Obispo area.
in place prior to the arrival of personnel in the San Luis Obispo area.


-....,... p .. ; - . -.. w                         au w .x.w.u- - - n~             -- --~ ~
-....,... p.. ; -. -.. w au w.x.w.u- - - n~
                                                                                                                    ?i GG43m (9'313 Rtv 02                                                                                         [j PACIFIC GAS and ELECTRIC COMPANY               NUMBER: 3.6               '
-- --~ ~
I' CORPORATE EMERGENCY RESPONSE PLAN                                               ;
?i
p                            IMPLEMENTING PROCEDURE                                   4713castur: 4 QJ    TITLE SECURITY                                         DATE: 07/20/83   -
[j GG43m (9'313 Rtv 02 PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 I
PAGE 03 0F 04
CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 4713castur: 4 pQJ TITLE SECURITY DATE: 07/20/83 PAGE 03 0F 04
                                                                                                                      ~
~
EMERGENCY TRANSPORTATION INSTRUCTIONS B. Other Emergency Response Personnel
EMERGENCY TRANSPORTATION INSTRUCTIONS B.
: 1. All other PGandE emergency response support personnei traveling to the San Luis Obispo area shalt use their own vehicles or transportation services provided by PGandE.
Other Emergency Response Personnel 1.
: 2.     If PGandE transportation services are to be used, personnel should proceed to make transportation arrangements in one of the following manners:
All other PGandE emergency response support personnei traveling to the San Luis Obispo area shalt use their own vehicles or transportation services provided by PGandE.
2.
If PGandE transportation services are to be used, personnel should proceed to make transportation arrangements in one of the following manners:
: a. 'During nomal office hours,' contact the General Office Travel Desk (Room 1610, 77 Beale Street). The primary telephone numbers for the General Office Travel Desk are:
: a. 'During nomal office hours,' contact the General Office Travel Desk (Room 1610, 77 Beale Street). The primary telephone numbers for the General Office Travel Desk are:
!                                                /
/
f           I
f I
                                    ~       u
u
: b. If these lines are busy, the following alternate telephone numbers m
~
should be used:
b.
U                                -
If these lines are busy, the following alternate telephone numbers should be used:
                                    -        a
mU a
: c. During non-office hours, following receipt of notification of the emergency event, emergency response personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).
During non-office hours, following receipt of notification of the c.
Note:     Personnel are advised to bring only a minimum amount of                     .
emergency event, emergency response personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).
baggage.
Note:
: d. If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability.
Personnel are advised to bring only a minimum amount of baggage.
: e. Regardless of the mode of transportation used, prior to departure, each individual shall contact the Recovery Manager or Coordinator tn whom e
d.
(s)he functionally reports and advise him of the estimated times of         --  -  -
If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability.
departure and arrival, the arrival location in the San Luis Obispo                 -
Regardless of the mode of transportation used, prior to departure, each e.
area, and any other special requirements or infomation.
individual shall contact the Recovery Manager or Coordinator tn whom (s)he functionally reports and advise him of the estimated times of e
e-              f. The Transportation Coordinator will coordinate arrangements, as required, with the Corporate Division Coordinator for Ground transpor-tation and lodging for PGand E personnel in the San Luis Obispo area.                       ,
departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or infomation.
f.
The Transportation Coordinator will coordinate arrangements, as e-required, with the Corporate Division Coordinator for Ground transpor-tation and lodging for PGand E personnel in the San Luis Obispo area.


z     .z       r . _ -       s. _.1   _ _ __                  _                .        1                   .              .
z
                                                                                                                                                                                    --o s             ..m                     ._...m.
.z r. _ -
: s. _.1 1
--o s
..m
._...m.
's esam wesi n w sa i
{
PAclFic GAS and ELECTRIC COMPANY NUMBER: 3.6 I
C0F.PORATE EMERGENCY RESPONSE PLAN i
po wE REVISION: 2 IMPl.EMENTING PROCEDURE
: g 3774 cant 37: 4 TITLE SECURITY DATE: 07/20/83 PAGE 04 0F 04 MAP TO OAKLAND INTERNATIONAL AIRPORT EXECUTIVE AIR TERMINAL d
Y' d
D'IRECTIONS FROM NIMITZ FREEWAY
# "'""'hD
: 1. En south on HEGEMBERGER ROAD (RT 17) 1 mile
./
~
: 2. " urn riaht onto D0OLITTLE DRIVE.
'IP
: 3. ' urn left onto LANGLEY STREET.
I
: 4. " urn rioht at EARHART ROAD and park in the
^
s parting lot ten the corner.
t
*(
; y-y 4,
.g.
m+/ '
i a
4 c
C' e
%N m
x w
q k
Is 4,
,e
~ ;
[
tt;s''
. %. :, ' i J
L',hy,'\\-P. D, - -
. r.
l
l
  ;                                                                                                                                                                                                                                      's    1 esam wesi n w sa                                                                                                                                                                                                              i
.2.
{                                                            PAclFic GAS and ELECTRIC COMPANY                                                                                    NUMBER: 3.6                                            I '
y v
C0F.PORATE EMERGENCY RESPONSE PLAN i        po wE                                                                                                                                                                      REVISION: 2
, w.
:  g                                    IMPl.EMENTING PROCEDURE                                                                                                                  3774 cant 37: 4 TITLE                                            SECURITY                                                                                                              DATE: 07/20/83                                        _
l g
  -                                                                                                                                                                                  PAGE 04 0F 04 MAP TO OAKLAND INTERNATIONAL AIRPORT EXECUTIVE AIR TERMINAL d          #
[s T
Y'          '
e ' s x A. ? N c-
d    D'IRECTIONS FROM NIMITZ FREEWAY                                                                    .                         # "'""'hD
.a a
                                      ./                          1. En south on HEGEMBERGER ROAD (RT 17) 1 mile                                                    ~
(<i v p
                                              '                    2. " urn riaht onto D0OLITTLE DRIVE.                                                              -                                                      '
.. e+ m
                                                ^
..,,.,f
                                                          'IP      3. ' urn left onto LANGLEY STREET.
~%-
I                                            4. " urn rioht at EARHART ROAD and park in the                                                                                                  ''-
x L,,
t                          '                        parting lot ten the corner.
_~N ' f 6 +..
                          ;                              s y-
L
                                                                                                                    *(          .                                   ;                                                  y            .
? '.
                        . . . . . . . . ,         .g.
%g
4,            -
.-'1
m+/ '
, T gu.
'
T,.
i      _
, 'g T.. @, a v
c        a
.N s
                                                                                                                                                                                          %N x
,g s.
C' m
: 3. - - -
w  -
n..
e q
.O
* Is 4,             ,e              ~;          *          .                           k              *
.D 6
                                                                                                                  &                    ,.               J                                              . r. '-                          :
*I
L',hy,'\-P.2.. D, - - [
,..- l
l              -
: r. '
tt;s''                                  . %. :, ' i                                    .          .
s Mavm
l        ,
./
g y                                v
8 '.. /\\
[s
+''
                                                                                                                                                                                                          , w.
~
T
J
(<i,.,fe ' s x ~%-                               A. ? N                                    c-. x                                                                          .a a
..e s
                                                                                                                                                                                                        '.. . e+ m
s W
                                                                                                          '*                                             L, ,                      v p                                .
N-
                  ' ,*                        %g                                                        _~N                                            6 +..                     L            ?
~
                                                                                                                      ' f                                                                            ,
\\
T
6
                                          .                     .-'1 T,.                        , 'g                :,                            . . ,
\\.
gu.
f;.spd s
* T.. @, a
l q
                -                                              v                                .N            *.                '
k i
/.
s
s
                                        ,g                            .
~~
n ..
L N+
6 s.
2.
                                                                                                                                                                                            .O
Y.b.a
: 3. -..- -
~
                                                                                                                                                                                                              .D                ,
-w
s                  *I      ,..- l
%c\\
                                                                                                                                                                  '_                                                      r. '
O i
8            '.. /\N-+''
T j
                                                                                                                                                                ~
y J
J                                  ..e                                                            s                                                    s Mavm                                                                                                                  '
Y y'f
                                                                                              ./
+
                                    -                                  ~
                                                                                              \      -
W                    '
6q                                                                                    s          .
f;.spd l                                                            \.                '                                              .-
k                                            :. . .
                                                                                                              ~~
s          /.  '
:                          i L                                 ,
N+                                                                                       2.
                                                                                            ~
Y.b.a                                 -w                           .-
J
                                            %c\                                                   OT                                                          j                                 y                                 ..
i Y                   ..
y'f
                                                                                                                                +                                               .    . ...
l
l


                                  .;__ -      a.. = ..a. a               :
a.. =..a. a
                                                                                - - - - - - - - -  . =- w- a -                      -
. =- w-a -
p
p
__          - m. ,
- m.,
ee< ue Staasetv ca PACIFIC GAS cad ELECTRIC COMPANY                         NUMBER: 3.6                   !
ee< ue Staasetv ca PACIFIC GAS cad ELECTRIC COMPANY NUMBER: 3.6 r
r CORPORATE EMERGENCY RESPONSE PLAN                                                           L PGwE                                                                                     REVISION: 2                     "
CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 2 L"
IMPLEMENTING PROCEDURE                                             377,cnnt37; 3
IMPLEMENTING PROCEDURE 377,cnnt37; 3
  ,)     (           TITLE                       SECURITY DATE: 07/20/83 PAGE 010F 12
,)
  ,                      .c..                           CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION L!ST l
(
  >                    A. The ON DUTY Corporate Emergency Response Organization (CERO) personnel who are
TITLE SECURITY DATE: 07/20/83 PAGE 010F 12 CORPORATE INCIDENT RESPONSE CENTER
                          - authorized to make on-the-spot changes to this Restricted Access List are:
.c..
: 1. Merrber of Corporate Administrative Sucport Conrdinator's Staff at Guards Table,14th Floor, 77 Beale. street ''                     ]
RESTRICTED PERSONNEL ACCESS AUTHORIZATION L!ST l
: 2. CorporateLiaisonCoordinator[                                 /
A.
: 3. Corporate Emergency Coordinator                     -      ,/ - :. .
The ON DUTY Corporate Emergency Response Organization (CERO) personnel who are
j                     B. Restricted Personnel Access Authorization List (*means CERO member):
- authorized to make on-the-spot changes to this Restricted Access List are:
CIRC BADGE ISSUED DEPARTMENT                               YES     NO NAME b                   -
1.
Merrber of Corporate Administrative Sucport Conrdinator's Staff at Guards Table,14th Floor, 77 Beale. street ''
]
2.
CorporateLiaisonCoordinator[
/
3.
Corporate Emergency Coordinator
,/ -
j B.
Restricted Personnel Access Authorization List (*means CERO member):
CIRC BADGE ISSUED NAME DEPARTMENT YES NO b
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
e m g e m, 9
e m
f       ==
g e
m, 9
f
 
==
P O
P O
* rl'.,-..,.'                       .-___J'_   : L_7_~_L'   v.       c Q'_ Q' _ u :_ n i   ug_ _ . .        ._n,  -                  ,
* ug_ _..
                                      . ' 3Q__*
._n, rl'.,-..,.'
  -t                                                                                                                                         .  %
. ' 3Q__*
                        -cu. er.n       v.u         -
.-___J'_
PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 j                                                     CORPORATE EMERGENCY RESPONSE PLAN                                                     l[
: L_7_~_L' v.
j                                              IMPLEMENTING PROCEDURE                                           ATTACHMENT: 5 M LE SECURITY DATE: 07/20/83
c Q'_
  ,                                                                                                            PAGE 02 0F 12                     .
Q' _ u :_
CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.' Restricted Personnel Access Authorization List (*means CERO member):
n i
CIRC BADGE ISSUED NAME                                     DEPARTMENT
-t
    ,                                                                                                              YES       NO q                                                             .
-cu. er.n v.u PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 l[
.j
j CORPORATE EMERGENCY RESPONSE PLAN j
                                                                              +
IMPLEMENTING PROCEDURE ATTACHMENT: 5 M LE SECURITY DATE: 07/20/83 PAGE 02 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.' Restricted Personnel Access Authorization List (*means CERO member):
0
CIRC BADGE ISSUED NAME DEPARTMENT YES NO q
* THE INFORMATION ON THIS PAGE AND'ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
.j
+
0 THE INFORMATION ON THIS PAGE AND'ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
l l
l l
f
f
                                                                                                                                    ,e s =   =
,e s
=
=
6 e
6 e
y                 -  -<---.-r-
y
-<---.-r-y c---wy.e-o
%y.
-.,m
,.--s.--w
-+-----sm


nsues:. . w                         ~.         - .          . . =: . c. _
nsues:.. w
~.
.. =:. c.
i
i
' ?g 1           u. mm m u PACIFIC GAS sad ELECTRIC COMPANY               NUMBER: 3.6                     !
' ?g 1
CORPORATE EMERGENCY RESPONSE Pt.AN                                                 ,
: u. mm m u PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 3.6 CORPORATE EMERGENCY RESPONSE Pt.AN IMPLEMENTING PROCEDURE ATTACanENT: S
IMPLEMENTING PROCEDURE                                     ATTACanENT: S
~DATE: 07/20/83 TITLE SECURITY PAGE 03 0F 12 CORPORATE INCIDENT RESPONSE CENTER
  '          TITLE                  SECURITY
-i 4
                                                                                          ~DATE: 07/20/83 PAGE 03 0F 12 CORPORATE INCIDENT RESPONSE CENTER         -i 4               .
RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B. - Restricted Personnel Access Authorization List (*means CERO member):
RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B. - Restricted Personnel Access Authorization List (*means CERO member):
CIRC BADGE ISSUED YES     NO NAME                              DEPARTMENT
CIRC BADGE ISSUED NAME DEPARTMENT YES NO
-4                                                                                                                   .
-4 O
O                                             -
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
i N_E 4
i N_E 4


a,           ~   ,.m, . _ _>wn_-w vm ,3 -. . -                           u   u- o &c_, - -   o r -h - -    2.= , __ _
o r -h - -
'l                                                                                                                                           -o l           o ccm mes                                                                                                                             l PACIFIC GAS and ELECTRIC COMPANY                                 NUMBER: 3.6                       [
2.=, __ _
  .                                          CORPORATE EMERGENCY RESPONSE PLAN 3           PGwE                                                                                                 REVISION: 2 IMPLEMENTING PROCEDURE                                                         477,cayen1 3
a,
'l D ,#       TITLE SECURITY                                                             DATE: 07/20/83                   .
~
2 PAGE 04 0F 12 CORPORATE INCIDENT RESPONSE CENTER'
,.m,. _ _>wn_-w vm,3 -.. -
  .                                    RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B. ' Restricted Personnel Access Authoriza, tion List (*means CERO member):
u u-o &c_, - -
CIRC BADGE ISSUED NAME                                                       DEPARTMENT                       YES     NO
'l
.;                                  s  .      .. .                                            .
-o l
                                                                                                        ~       .
l o ccm mes PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6
e 9
[
CORPORATE EMERGENCY RESPONSE PLAN 3
PGwE REVISION: 2 IMPLEMENTING PROCEDURE 477,cayen1 3
'l D,#
TITLE SECURITY DATE: 07/20/83 PAGE 04 0F 12 2
CORPORATE INCIDENT RESPONSE CENTER' RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B. ' Restricted Personnel Access Authoriza, tion List (*means CERO member):
CIRC BADGE ISSUED NAME DEPARTMENT YES NO
~
s e
9
(%
(%
V THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
V THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
l s
l s
De O
De O
              -     -                 ,-       ,,-w,      - . , - -         - -   ,-_m-     -
,,-w,
,-_m-
------,,--,e
"-ee--
su-
-w--
----v----r
- -
* n


          ~
~ _ _.
                , m ax     .
, m ax a.>.w
                                      ...      a.>.w     ,u~     ,
,u~
                                                                                            . ,    ~ _ _ .  , _
~
es-tsee E/em sesv.(2                                                                                               ~d PACIFIC GAS sad ELECTRIC COMPANY                 NUMBER: 3.6                     [
es-tsee E/em sesv.(2
'                                                        '    '              "'  "                                                I-PGwE                                                                                 REVISION: 2 IMPLEMENTING PROCEDURE g         TITLE                         SECURITY ATTACHMENT: s DATE: 07/20/83-               ,
~d PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 3.6
PAGE 05 0F 12
[
                                                                                                                                ~
I-PGwE REVISION: 2 IMPLEMENTING PROCEDURE ATTACHMENT: s g
TITLE SECURITY DATE: 07/20/83-PAGE 05 0F 12
~
CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST 2
CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST 2
B. Restricted Personnel Acce,ss Authorization List (*means CERO member):
B.
CIRC BADGE ISSUED NAME                                   DEPARTMENT                       YES       NO t
Restricted Personnel Acce,ss Authorization List (*means CERO member):
e 4 -%-
CIRC BADGE ISSUED NAME DEPARTMENT YES NO t
      ")
e 4
")
u THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
u THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
5
5
_      ~.
~.


                ._z.
,. _ _. d i, t me u-.
                                .c.  , ,e    ,. _ _ . d i , t        m  %_ ._  t me     u- .       . ac 1;
. ac t
              .    ,o - -
.c.
                                                                                                                      }
,,e m
PACIFIC GAS and ELECTRIC COMPANY           NUMBER: 3.6                     :
._z.
1                                    CORPORATE EMERGENCY RESPONSE PLAN PGwE                                                                     REVISION: 2 O                         IMPLEMENTING PROCEDURE                               377,ca, cur: 3 N                         SECURITY                                     DATE: 07/20/83
1;
                                                                                                                    ~
}
PAGE 06 0F 12               -
,o - -
:                                        CORPORATE INCIDENT RESPONSE CENTER j                                 RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B. Restricted Personnel Access Authorization List (*means CERO member):
PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 1
CIRC BADGE ISSUED NAME                               DEPARTMENT                 YES     'NO
CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 2 O
  .;                                              -c 6
IMPLEMENTING PROCEDURE 377,ca, cur: 3 N
~
SECURITY DATE: 07/20/83 PAGE 06 0F 12 CORPORATE INCIDENT RESPONSE CENTER
:j RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.
Restricted Personnel Access Authorization List (*means CERO member):
CIRC BADGE ISSUED NAME DEPARTMENT YES
'NO
- c 6
4 e
4 e
w a
w a
j U                                   ,
j U
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT l                                   IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT l
IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
i i
i i
s l
s l
l l
l l
i 1
i 1
                                                                                                          *p to i
*p to i
                                              ~
~
t
t


_jg.g-                      .: :  =..=-                      2 e 2 % ,y _-,        m-      . a,, - , : _-%a%,s.a.     xmm.m . _
a,,
m u . = = v.cm
-, : _-%a%,s.a.
                                                                                                                                                -l PACIFIC GAS and ELECTRIC COMPANY                                       NUMBER: 3.6                     i CORPORATE EMERGENCY RESPONSE PLAN
xmm.m. _
                                                                                                                                              ,}
=..=-
IMPLEMENTING PROCEDURE                                                          arTACsMENT: S TITLE                   SECURITY                                                                 DATE: 07/20/83                 _
2 e 2 %,y _-,
PAGE 07 0F 12 C
m-
_jg.g-m u. = =
v.cm
- l PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 i
CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE
,}
arTACsMENT: S TITLE SECURITY DATE: 07/20/83 PAGE 07 0F 12 C
CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.' Restricted Personnel Access Authorization List (*means CERO member):
CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.' Restricted Personnel Access Authorization List (*means CERO member):
CIRC BADGE ISSUED NAME                                               DEPARTMENT                             YES     N0
CIRC BADGE ISSUED NAME DEPARTMENT YES N0
                                                                ,1 e
,1 e
            \
\\
    ' yr THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
' yr THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
M %
M b
* b .o k
.o k
      ',sk
',sk
                                                                            - =--o-     -
=--o-c e---w.-
- w e-w-,--y e


n u .. . . .       .~     .= , .. .aw..~ .   ~     c.-    . . = ,                ,
~
                                - .    =_                  . -
c.-
                                                    ~                                                                                                 -
.. =,
es-ops feters uv.et PACIFIC GAS and ELECTRIC COMPANY                     NUMBER: 3.6                         .[
...aw..~.
                                                                                                                                                      ~ g.
=_
CORPORATE EMERGENCY RESPONSE PLAN POwE                                                                                              REVISION: 2
n u.....
          @                                    IMPLEMENTING PROCEDURE                                             a m casen7 3 TITLE                                   SECURITY                                                 DATE: 07/20/83                         -
.~
PAGE 08 0F 12                         ,
.=,
CORPORATE INCIDENT RESPONSE CENTER
~
  '                                                  RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIS,T B.         Restricted Personnel Access Authorization List (*means CERO member):
es-ops feters uv.et PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6
CIRC BADGE ISSUED DEPARTMENT                         YES     NO NAME 9
.[
POwE REVISION: 2
~ g.
CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE a m casen7 3 TITLE SECURITY DATE: 07/20/83 PAGE 08 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIS,T B.
Restricted Personnel Access Authorization List (*means CERO member):
CIRC BADGE ISSUED NAME DEPARTMENT YES NO 9
e
e
                                                    /
/
O THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
O THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
t a w           -
t a
v e       a. 4 E
w v
        -rw       . , . .        ,---%      -
e a.
4 E
-rw y-,,
._m


                                                                                                  .      ____. _ - ..                . . _ . _ _ . ~ , .
.. _. _ _. ~,.
  !                                                                                                                                                                          - o j               cu.emas m .:                                                                                                                                                       ;
- o j
PACIFIC gas and ELECTRIC COMPANY                                   NUMBER: 3.6 CORPORATE EMERGENCY RESPONSE PLAN                                                                                               [
cu.emas m.:
                                                                                                                                                                                    -p 1-O 2
PACIFIC gas and ELECTRIC COMPANY NUMBER: 3.6
IMPLEMENTING PROCEDURE                                                       .AT7ACaMENT: S TITLE                             SECURITY                                                             DATE: 07/20/83                                           ,
[
PAGE 09 0F 12 CORPORATE INCIDENT RESPONSE CENTER                           '
CORPORATE EMERGENCY RESPONSE PLAN
RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST i
-p 1-IMPLEMENTING PROCEDURE
.AT7ACaMENT: S O
2 TITLE SECURITY DATE: 07/20/83 PAGE 09 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST i
B." Restricted Personnel Access Authorization List (*means CERO member):
B." Restricted Personnel Access Authorization List (*means CERO member):
CIRC BADGE ISSUED NAME                                           DEPARTMENT                                         YES           NO
CIRC BADGE ISSUED NAME DEPARTMENT YES NO
:i Qs                                                      .
:i Q
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
s THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
l l
l l
l                                                                                                                                                                                 .
l t
t     ,
*'-s
          -s
..w_.
                                                                                  .~-               =
.~-
                                                              ..w_.
=
                --7                 m ~c--,   +-g     y       -  *        -          -- y--w     < _              y--         w     w           ,w-r   - . - - - -w,--          - - -
--7 m
~c--,
+-g y
y--w y--
v-w w
w
,w-r
-w,--


                                                                                                          , ~ . .
+
_ u_               -
, ~..
n..:..-._,,             .u...-=         +          - .        _                                        ,
_ u_
                                                                                                                          -o I           e cus cwm asv.ca                                                                                                   :;
n..:..-._,,
    ,                                              PACIFIC GAS and ELECTRIC COMPANY         NUMBER: 3.6                             -}
.u...-=
CORPORATE EMERGENCY RESPONSE PLAN                                                         I-PGwE                                                                       REVISION: 2
-o I
:                                 IMPLEMENTING PROCEDURE                                311,c gn1 3 (9        M LE                         SECURITY                                     DATE: 07/20/83                             _
e cus cwm asv.ca PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6
PAGE 10 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRlCTED PERSONNEL ACCESS AUTHORIZATION LIST
-}
                =
CORPORATE EMERGENCY RESPONSE PLAN I-PGwE REVISION: 2 IMPLEMENTING PROCEDURE
B. Restricted Personnel Access Authorjzation List (*means CERO member):
: (9 311,c gn1 3 M LE SECURITY DATE: 07/20/83 PAGE 10 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRlCTED PERSONNEL ACCESS AUTHORIZATION LIST
CIRC BADGE ISSUED NAME                                     DEPARTMENT               YES     NS THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMEhT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
=
B.
Restricted Personnel Access Authorjzation List (*means CERO member):
CIRC BADGE ISSUED NAME DEPARTMENT YES NS THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMEhT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
i
i
          .- w                                                                                                                   ,
.- w
        \   /
\\
                                                                                                                          - - ~ , ,
/
- - ~,,


                                                                                                                        ~) -
~ )
cu. imm m.ca
'l cu. imm m.ca PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6
                                                                                                                                'l PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.6                 '[
'[
  ,                                                                                                                                  [.
CORPORATE EMERGENCY RESPONSE PLAN
g                                IMPLEMENTING PROCEDURE                                 . ATTACsMENT: S TITLE                                   SECURITY                                       D TE: 07/20/83                 _
[.
PAGE 11 0F 12 CORPORATE INCIDENT RESPONSE CENTER
IMPLEMENTING PROCEDURE
    .                                            RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.' Restricted Personnel Access Authorization List (*means CERO member):
. ATTACsMENT: S g
CIRC BADGE ISSUED NAME                                             DEPARTMENT               YES       NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
TITLE SECURITY D TE: 07/20/83 PAGE 11 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.' Restricted Personnel Access Authorization List (*means CERO member):
l I
CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT l
s l
IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
l 8 mee
I s
                  . - - -     - - . - - - .                                     ~,---
l l
8 mee
---.,-g-
_y
~,---
,-w-y,
,-w.
--s-----,.
w---
-y- - _ _ - -
--,,.-m_,


        ; w .a.e,u= --                       ~= >~a ww                                           =xw w                 -
; w.a.e,u= --
:=r   - a-._     - u a - - -- >+u u
~= >~a ww
  !.                                                                                                                                                                        ~     %
=xw w
            <u   o.a m. u                                                                                                                                                         -;
:=r
PACIFIC GAS and ELECTRIC COMPANY                                       NUMBER: 3.6 CORPORATE EMERGENCY RESPONSE PLAN
- a-._ - u a - - -- >+u u
                                                                                                                                                                                  -f POwE                                                                                                                             REVISION: 2                             I j G                                           IMPLEMENTING PROCEDURE                                                                       4773castn1; 3 SECURITY                                                                   DATE: 07/20/83                         _
~
PAGE 12 0F 12 CORPORATE INCIDENT RESPONSE CENTER
<u o.a m. u CORPORATE EMERGENCY RESPONSE PLAN
:                                                        RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST
- f PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 POwE REVISION: 2 I
j G IMPLEMENTING PROCEDURE 4773castn1; 3 SECURITY DATE: 07/20/83 PAGE 12 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST
.q 4
.q 4
B.     Restricted Personnel Access Authorization List (*means CERO member):
B.
CIRC BADGE ISSUED NAME                                                           DEPARTMENT                                   YES           NO
Restricted Personnel Access Authorization List (*means CERO member):
* e w
CIRC BADGE ISSUED NAME DEPARTMENT YES NO e
9 THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
w 9
THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.
1 O
1 O
4 9
4 9
        -    .      . - .            ,,,w.-       -          -e-
,,,w.-
                          - -,-----            - - - - -  -p     ,        , , .  - - - - - -      , - - - - _~.     -        -w-ww---   ,,----w---------p   ----,.w-  - -
-e-
-p
, - - - - _~.
-w-ww---
,,----w---------p
----,.w-


                                                                                                          ~
~
                                                                                                  . .                .              . ~ . .            .-.
. ~..
              %-                                                    gi}.,                                                ,.9 '                               ,
gi}.
f               (' #                                               6                                                     's   .
,.9 '
PAC 8FIC GAS AND ELECTRIC COMPANY         EMERGENCY LOCATION pg,g                                                                                                    TOOAV"S DATE                     PAGE j                         CORPORATE EMERGENCY RESPONSE PLAN                                                                                                 ,
f
EMERGENCY COMMUNICATIONS LOG SHEET             ::                                  sa                             ta ruse           NAME                                 ACTiverY (2400awsJ  18I
(' #
                                                                                                                                                    ---m 171 98MAES g                EMERGENCY TITLE OR AFFILlATION e
6
i
's PAC 8FIC GAS AND ELECTRIC COMPANY EMERGENCY LOCATION TOOAV"S DATE PAGE j
* f 9
pg,g CORPORATE EMERGENCY RESPONSE PLAN EMERGENCY COMMUNICATIONS LOG SHEET sa ta ruse NAME ACTiverY
---m (2400awsJ 18I 171 98MAES EMERGENCY TITLE OR AFFILlATION g
e f
i 9
C e
C e
i l                                                                                                                       ,
i l
4 h
4 h
r i
r i
4 s
4 s
O 8 RWEM
O 8 RWEM l
<                      ,                                                                                                                                  s
s m/
                                                                                ' *                            *  ,                              m/


l       ,            .
l
              )
)
* o 1
1
irAEIFRMIAS ANO ELECTRIC C088PANY                       CORPORATE EMERGENCY RE5PONSE PLAN             g POwE                                                                                                             &
*o irAEIFRMIAS ANO ELECTRIC C088PANY CORPORATE EMERGENCY RE5PONSE PLAN g
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET                                   '
POwE EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET semanosNcy Location TooAv s cATE PAGE in in In TNdt ENTEREDSY ladep lus.)
semanosNcy Location                                                     TooAv s cATE   PAGE
(INITIALS)
    '        in                                                                       in             In TNdt                                                                             ENTEREDSY ladep lus.)                                                                           (INITIALS)
~
                                                                                                                              ~
(48 (si
(48               (si                


==SUMMARY==
==SUMMARY==
OF ACTIVITY PERFORMED                   tm                     .
OF ACTIVITY PERFORMED tm I
I p
p
( ,,
(,,
s m
s m
            ~                                                                                                           ..
~
l S COStt/82) Mov. 00                                                       SEE INSTRUCTIONS ON REVERSE
l S COStt/82) Mov. 00 SEE INSTRUCTIONS ON REVERSE


1,.
m-s_
                                                    ~   =. = = m-                                   _
~
_                m-        --  s_
=. = = m-1,.
e i
e i
                  ..~ r..u m e s NUMBER: 4.1 h,h                                                                    PACIFIC GAS sad ELECTRIC COMPANY i
..~ r..u m e s NUMBER: 4.1 PACIFIC GAS sad ELECTRIC COMPANY h,h CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 pggg DATE: 07/25/83 i
pggg                                            CORPORATE EMERGENCY RESPONSE PLAN                                               REVISION: 2 DATE: 07/25/83       _
PAGE 010F 09 IMPLEMENTINGPROCEDURE
                                ~                                                                                                                    PAGE 010F 09 i    ,                    IMPLEMENTINGPROCEDURE
~
* MATERIALS SIGNATURE DATE RESPONSIBILITY
i MATERIALS SIGNATURE DATE RESPONSIBILITY TITLE A
* TITLE
~
                                                                                  -  A                                                                                  ~
h
PREPARED BY h       _/                         ,
_/
f SU!JRfISIfiG                     NUCLEAR GENERATION ENGINEER                                   /
PREPARED BY SU!JRfISIfiG NUCLEAR GENERATION ENGINEER f
PETSONNEL AND ENVIRONMENTAL SAFETY, NPO
/
                                                                                        -                        "-                                    pff/p3           '
PETSONNEL AND ENVIRONMENTAL SAFETY, NPO pff/p3 REVIEWED AND CONCURRED BY MANAGER, MATERIALS
REVIEWED AND CONCURRED BY                         MANAGER, MATERIALS
&,7 f
      &,7 N
N REVIEWED AND VICE PRESIDENT - GENERAL SERVICES J
f REVIEWED AND                                                                                                                         J CONCURRED BY VICE PRESIDENT - GENERAL SERVICES
CONCURRED BY
                                  ^                                                                                            '
/f, !N>
                                                                                                                                                          /f, !N>
^
                        $NR D                             "SENIORVICEPRESMENT-$PER4710NS I
$NR D "SENIORVICEPRESMENT-$PER4710NS I
l                M                                            g' { @ 3 APPROVED BY
g' { @ 3 l
                                                                                    ~
M APPROVED BY VI(F/ PRESIDENT') NUCLEAR POWER
VI(F/ PRESIDENT') NUCLEAR POWER GENERATION APPROVED BY
~
                                                          " CHAIRMAN - PRESIQ%dT'S NUC6AR/ /
GENERATION APPROVED BY
" CHAIRMAN - PRESIQ%dT'S NUC6AR/ /
ADVISORY COMITTEE
ADVISORY COMITTEE
            .a!
.a!
(                                       ..
(
4 . - - - -         , . . . . . . . - - .        .      . . _ . - _ - _ _ _ _ - - . -      - - - - - - - -      ~
4. - - - -
~


  . _ ,        ,- -                :- -- ; u u ::. .
,,3 ea2. u-:xw,. ng
                                                                              . ,,3 ea2. u-:xw, . ng . _ , _                _ , _ , _
*L_ _
                                                                                                                                          *L_ _
:- -- ; u u ::..
ee eua ema arv.os l1
l1 ee eua ema arv.os
[
[
PACIFIC GAS and ELECTRIC COMPANY                                                                               '
PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMEMGENCY REEPONSE PLAN NUMBER: 4.1 r
CORPORATE EMEMGENCY REEPONSE PLAN                                               NUMBER: 4.1                   r
~~"
        "    ~~"                                                                                                                                             ;
IMPLEMENTING PROCEDURE
IMPLEMENTING PROCEDURE                                                             .a?ISION: 2 DATE: 07/25/83 TITLE                                                                                                                                   .
.a?ISION: 2 DATE: 07/25/83 TITLE MATERIALS PAGE 02 0F 09 e
MATERIALS                                             PAGE 02 0F 09 e
1
1
(
(
0 ORGANIZATIONAL OUTLINE I.                   SCOPE II. DISCUSSION                                                                                     -
0 ORGANIZATIONAL OUTLINE I.
c i'                                         lil.                   RESPONSIBILITIES IV.                   INSTRUCTIONS V.                 REFERENCES VI.                     ATTACHMENTS
SCOPE II. DISCUSSION ci' lil.
                                                                                                                                            # %    e o
RESPONSIBILITIES IV.
g s
INSTRUCTIONS V.
e
REFERENCES VI.
                          - - . - -    ,n,         . - , - - . . , - - ,        ,    . . - , -, ,,        , , - - -. ,-
ATTACHMENTS e
o g
s e
,n,


s .p    -          ._ww.m                 - as                     .:w.:-               a~ ~                 , -        --        - -
._ww.m
                                                                                                                                                                      -  'o i                                                                                                                                                                           i es-95e3 (9/tal NEV. 02                                                                                                                                         '
- as
PActFlc gas and ELECTRIC c0MPANY                                         NUMBER: 4.1
.:w.:-
    '7 c0RPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE IMPLEMENTING PROCEDURE                                                             DATE: 07/25/83 TITLE                                                                                                         PAGE 03 0F 09 MATERIALS                                                                                                       ,
a~ ~
: 1.      SCOPE The scope of this Implementing Precedure is to provide notification to Materials Department personnel and assure materials support services in event that the Corporate Emergency Response Plan (CERP) is activated.
s.p
'o i
i es-95e3 (9/tal NEV. 02 PActFlc gas and ELECTRIC c0MPANY NUMBER: 4.1 c0RPORATE EMERGENCY RESPONSE PLAN REVISION: 2
'7 IMPLEMENTING PROCEDURE PGwE DATE: 07/25/83 TITLE PAGE 03 0F 09 MATERIALS 1
SCOPE The scope of this Implementing Precedure is to provide notification to Materials Department personnel and assure materials support services in event that the Corporate Emergency Response Plan (CERP) is activated.
II. DISCUSSION _
II. DISCUSSION _
'                              A.
This Implementing Procedure provides instructions for guiding (Depa CERO) personnel who have Corporate Emergency Response Organization A.
This Implementing Procedure provides instructions for                                         CERO)guiding (Depa personnel who have Corporate Emergency Response Organization assignments should the CERP be activated.
assignments should the CERP be activated.
B. Departmental support services include:
Departmental support services include:
: 1. Notification of appropriate State and County agencies to determine travel conditions for personnel and equipment traveling to the San                                                             ,
B.
Notification of appropriate State and County agencies to determine travel conditions for personnel and equipment traveling to the San 1.
Luis Obispo area.
Luis Obispo area.
When required, establishment of a Local Procurement Center in the Sa h                               2.
When required, establishment of a Local Procurement Center in the Sa h
2.
Luis Obispo area.
Luis Obispo area.
C. Precedure Attachment 1, " Department Organizat                                                                                           .
Precedure Attachment 1, " Department Organizat C.
and non Company organf rations.
and non Company organf rations.
III. RESPONSIBILITIES _
III. RESPONSIBILITIES _
Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Instructions section.
Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Instructions section.
IV. INSTRUCTIONS A. Corporate Materials Coordinator 1.
IV. INSTRUCTIONS A.
Take those actions indicated for the appropriate emergency action level classification below:
Corporate Materials Coordinator Take those actions indicated for the appropriate emergency action 1.
NOTIFICATION OF UNUSUAL EVENT
level classification below:
: 2. For a Notification of Unusual Event emergency a Materials Coordinator.                                                                           -                      -
NOTIFICATION OF UNUSUAL EVENT For a Notification of Unusual Event emergency a 2.
              \
Materials Coordinator.
NOTE:
CERP Inplementing Procedure 1.1, " Activation of the Corporate
CERP Inplementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" describes the activation the CERP.
\\
ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY _                                                                   .
Emergency Response Organization" describes the activation NOTE:
_--.*..-e--g --  ---.----e.w-%,. --we   a_.-m-- y y.%.. y---   is-       ---%. .w   . - - - _ - , _
the CERP.
ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY _
_--.*..-e--g
---.----e.w-%,.
--we a.-m--
y y.%..
y---
is-
.w


a
a
                                                                                                                                                                                    =O
=O
(
(
PACIFIC GAS and ELECTRIC COMPAllY                                     NUMBER: 4.1
PACIFIC GAS and ELECTRIC COMPAllY NUMBER: 4.1 CORPORATE EMERGENCY RESPONSE PLAN
  '{. '"
'{.
CORPORATE EMERGENCY RESPONSE PLAN                                                                                             '
REVISION: 2 IMPLEMENTING PROCEDURE DATE4 07/25/83 TITLE PAGE 04 0F 09 MATERIALS Receive event notification from the Corporate Technical and Logistical
REVISION: 2 IMPLEMENTING PROCEDURE                                                                         DATE4 07/25/83 TITLE                                                                                                                       PAGE 04 0F 09                                   .
: 3.. Coordinator that the Corporate Emergency Response Plan has been activated.
MATERIALS
Determine from the Corporate Technical and Logistical Coordinator the 9
: 3.        Receive event notification from the Corporate Technical and Logistical
4.
                                        . Coordinator that the Corporate Emergency Response Plan has been activated.
emergency action level classification and any special Departmental c
9
: 4. Determine from the Corporate Technical and Logistical Coordinator the emergency action level classification and any special Departmental c
response actions.
response actions.
: 5.      Notify the following Department personnel and advise them of the
Notify the following Department personnel and advise them of the 5.
  -                                      emergency action level classification in effect and any special requests from the Corporate Technical and Logistical Coordinator:
emergency action level classification in effect and any special requests from the Corporate Technical and Logistical Coordinator:
: a.           Transportation Coordinator
a.
: b.           Procurement Coordinator l                                    6. Establish and direct a Department operation in the General Office with required Departmental support personnel.
Transportation Coordinator b.
: 7. Coordinate, as necessary, Departmental activities with the following CERO personnel:
Procurement Coordinator Establish and direct a Department operation in the General Office with l
([h
6.
: a. . Corporate Quality Assurance Coordinator
required Departmental support personnel.
: b. Corporate Construction Coordinator
Coordinate, as necessary, Departmental activities with the following 7.
: 8.      Assure that continuous (24 hour) Departmental operations are maintained.
([h CERO personnel:
: 9.     Assure the availability of Department personnel and resources necessary to support the Departmental emergency response effort.
: a.. Corporate Quality Assurance Coordinator b.
            .                    10 .          Coordinate Departmental functions to provide for the following services:
Corporate Construction Coordinator Assure that continuous (24 hour) Departmental operations are maintained.
: a.        Procurement of materials
8.
: b.       Contract services
Assure the availability of Department personnel and resources 9.
: c.       Transportation
necessary to support the Departmental emergency response effort.
: 11.        When required, dispatch the Procurement Coordinator and any Department support personnel, as necessary, to establish a Local Procurement Center at the Materials . Facility 442, 800 Price Canyon Road, Pismo Beach. Transportation arrangements will be made using Procedure Attachment 4, " Emergency Transportation Instructions".
Coordinate Departmental functions to provide for the following 10.
: 12.        Keep the Materials Department Manager apprised if any demands placed                                                                 -
services:
upon Department personnel, the action taken to meet those demands, and                                                           ~
Procurement of materials a.
        ''                                      any problems involving the Department's emergency response effort.                                                                    .
b.
Contract services c.
Transportation When required, dispatch the Procurement Coordinator and any Department 11.
support personnel, as necessary, to establish a Local Procurement 442, 800 Price Canyon Road, Pismo Center at the Materials. Facility Transportation arrangements will be made using Procedure Beach., " Emergency Transportation Instructions".
Keep the Materials Department Manager apprised if any demands placed upon Department personnel, the action taken to meet those demands, and
~
12.
any problems involving the Department's emergency response effort.
9
9
            ----v,*-   - , - - - - ,      , - -            m -,-.y       -- , , + ,
----v,*-
                                                                                                --,9   - e , , .-. m--, - . ,_-_,, ,-n-- ,-----,.e     -,,w.--,- -- - ---,
m
-,-.y
--,, +,
--,9 e
m--,
,-n--
,-----,.e
-,,w.--,-


                                                                  .~                 . -                  ~
.-.~..m
                                                                                                                  .-.~. .m ee-enas to/est new.ea PACIFIC GAS and ELECTRIC COMPANY                                                   .
~
CORPORATE EMERGENCY RESPONSE PLAN                     NUMBER: 4.1 L                                 IMPLEMENTING PROCEDURE                                         . REVISION: 2 TITLE                                                                                      DATE: 07/25/83                 ,
.~
MATERIALS                                   PAGE 05 0F 09
ee-enas to/est new.ea PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.1 L
: 13. Prepare and distribute, on a timely basis, any necessary reports j                                  regarding the Department's efforts and emergency operations to apprise other Company Departments who are involved in the emergency response
IMPLEMENTING PROCEDURE
  -                                  effort.
. REVISION: 2 DATE: 07/25/83 TITLE MATERIALS PAGE 05 0F 09
: 13. Prepare and distribute, on a timely basis, any necessary reports regarding the Department's efforts and emergency operations to apprise j
other Company Departments who are involved in the emergency response effort.
: 14. Track and close-out all Department files initiated to meet the emergency.
: 14. Track and close-out all Department files initiated to meet the emergency.
: 15. Maintain the Department's " Emergency Response and Recovery Activities l
: 15. Maintain the Department's " Emergency Response and Recovery Activities l
Record" binder in a current status.
Record" binder in a current status.
: 16. Upon direction by the Corporate Technical and Logistical Coordinator deactivate the Department emergency response effort.
: 16. Upon direction by the Corporate Technical and Logistical Coordinator deactivate the Department emergency response effort.
i                           17. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5. " Emergency                               ,
i
Comunications Log Sheet".
: 17. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5. " Emergency Comunications Log Sheet".
NOTE:         Completed " Emergency Communications Log Sheets" shall be O.2                                         placed in the Department's" " Emergency Response and Recovery Activities Record" binder.
NOTE:
: 18. Maint'ain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".       ,
Completed " Emergency Communications Log Sheets" shall be O.2 placed in the Department's" " Emergency Response and Recovery Activities Record" binder.
NOTE:         Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Records" binder.
: 18. Maint'ain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".
B. Transportation Coordinator
NOTE:
: 1. Take those actions indicated for the appropriate emergency action
Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Records" binder.
(                                       level classifications below:                                                                   ,
B.
l l                                                     NOTIFICATION OF UNUSUAL EVENT
Transportation Coordinator 1.
: 2. For a Notification of Unusual Event emergency action level classification no notification will be made.
Take those actions indicated for the appropriate emergency action
ALERT SITE AREA EMERGENCY, AND GENERAL EMERGENCY
(
: 3. Receive event notification from the Corporate Materials Coordinator''                         ~
level classifications below:
that the Corporate Emergency Response Plan has been activated.                           __
l l
: 4. Determine from the Corporate Materials Coordinator the emergency action level classification in effect and extent of any requested response.-             ,
NOTIFICATION OF UNUSUAL EVENT 2.
For a Notification of Unusual Event emergency action level classification no notification will be made.
ALERT SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.
Receive event notification from the Corporate Materials Coordinator''
~
that the Corporate Emergency Response Plan has been activated.
4.
Determine from the Corporate Materials Coordinator the emergency action level classification in effect and extent of any requested response.-


_ _                            _ + -                                   -                    u - _ _ -                                        --
_ + -
                                                                                                                                                                          -    y,
u y,
                                                                                                                                                                                *j <
J
J              ee-ous e,reat nav.oa                                                                                                                                               !
*j <
PACIFIC gas and ELECTRIC COMPANY                                                                                       L
ee-ous e,reat nav.oa PACIFIC gas and ELECTRIC COMPANY c0APORATE EMERGENCY RESPONSE PLAN NUMBER: 4.1 L
        -                                            c0APORATE EMERGENCY RESPONSE PLAN NUMBER: 4.1 REVISION: 2 IMPLEMENTING PROCEDURE                                                                     DATE: 07/25/83 TITLE                                                                                                             PAGE 06 0F 09 MATERIALS
REVISION: 2 IMPLEMENTING PROCEDURE DATE: 07/25/83 TITLE PAGE 06 0F 09 MATERIALS
                                                                                                                                                                                  ~
~
: 5. Upon receipt of the event notification establish a trav'el operation, as soon as possible, at the below locations for the times indicated with necessary Department support personnel:
Upon receipt of the event notification establish a trav'el operation, 5.
      -                                  a. General Office (77 Beale Street, Room 1610) - during business hours.
as soon as possible, at the below locations for the times indicated with necessary Department support personnel:
: b. Oakland Airport (Executive Air Tenninal) - non business hours and
General Office (77 Beale Street, Room 1610) - during business a.
  ~
hours.
Oakland Airport (Executive Air Tenninal) - non business hours and b.
~
weekends.
weekends.
: 6. Determine travel conditions between the San Francisco Bay Area and San Luis Obispo area for deciding on the most appropriate means of transporting personnel and materials by establishing contact with the following organization, as necessary:
Determine travel conditions between the San Francisco Bay Area and San 6.
                            .              a. Nation Weather Service                                                                                                         -
Luis Obispo area for deciding on the most appropriate means of transporting personnel and materials by establishing contact with the following organization, as necessary:
: b. California Highway Patrol                                                                                                     -
a.
: c. State and San Luis Obispo County agencies
Nation Weather Service b.
: d. Airports
California Highway Patrol State and San Luis Obispo County agencies c.
: 7. Coordinate, as necessary, initial and ongoing transportation activities with the following CERO personnel:
d.
: a. Corporate Division Coordinator
Airports 7.
: b. Procurement Coordinator
Coordinate, as necessary, initial and ongoing transportation activities with the following CERO personnel:
: 8. Arrange transportation, as required, for Company personnel from the General Office and San Francisco Bay Area to and from the San Luis Obispo area.
Corporate Division Coordinator a.
: 9. Coordinate initial and ongoing arrangements, as required, with the
b.
'                                          Corporate Division Coordinator for ground transportation and lodging for Company perso,nnel temporarily assigned to the San Luis Obispo area.
Procurement Coordinator Arrange transportation, as required, for Company personnel from the 8.
: 10. Coordinate requests from the Procurement Coordinator for transporting material from point of origin to delivery location, verify release for shipment and in-transit movement, and expedite delivery.
General Office and San Francisco Bay Area to and from the San Luis Obispo area.
: 11. Upon activation of the Local Procurement Center in San Luis Obispo, coordinate through the Center return travel of Company personnel to the San Francisco Bay Area.
Coordinate initial and ongoing arrangements, as required, with the 9.
: 12. Prepare and distribute status reports concerning materials shipment .                                                     ..
Corporate Division Coordinator for ground transportation and lodging for Company perso,nnel temporarily assigned to the San Luis Obispo area.
I c.'                              and' delivery to the Procurement Coordinator, and others, as appropriate.
Coordinate requests from the Procurement Coordinator for transporting 10.
material from point of origin to delivery location, verify release for shipment and in-transit movement, and expedite delivery.
Upon activation of the Local Procurement Center in San Luis Obispo, 11.
coordinate through the Center return travel of Company personnel to the San Francisco Bay Area.
Prepare and distribute status reports concerning materials shipment.
12.
and' delivery to the Procurement Coordinator, and others, as c.
I appropriate.
9
9
      ^~
^~
                                                .  - , - . -    ,..-y = . ,- ,,, ----.,.+m--g---   g. - - - - - , . - _ , ., - . ,  - - - - - , ,  - - - - -.---4+-,     ww
---w-
 
---,-w
w.w g            m2 -            m      m. A h w               =     -    --      -"' =>           I +~ ~~
,..-y
                                                                                                                              'o
=.,-,,,
    .                                                                                                                          1l
----.,.+m--g---
: v.                                                                                               I' L
--9
l Pacific sAS and ELECTRIC c0MPaNY             NUMBER: 4.1 CORPORATE EMERGENCY RESPONSE PLAN PGwE                                                                          RUISION: 2 IMPLEMENTING PROCEDURE                                 DATE: 07/25/83 TITLE                                                                       PAGE 07 0F 09 MATERIALS
: g. - - - - -,
: 13. Establish long-term support schedules and assign responsibilities.
--9
: 14. Periodically apprise the Corporate Materials Coordinator on transportation matters during the emergency, and as requested.
-.---4+-,
: 15. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5, " Emergency Communications Log Sheet".              .
ww
Completed " Emergency Communications Log Sheets" shall be NOTE:
: m. A h w I +~ ~~
=
-"' =>
w.w g m2 -
m
'o 1l I'
v.
Pacific sAS and ELECTRIC c0MPaNY NUMBER: 4.1 L
l CORPORATE EMERGENCY RESPONSE PLAN RUISION: 2 PGwE IMPLEMENTING PROCEDURE DATE: 07/25/83 TITLE PAGE 07 0F 09 MATERIALS Establish long-term support schedules and assign responsibilities.
13.
Periodically apprise the Corporate Materials Coordinator on transportation matters during the emergency, and as requested.
14.
Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5, " Emergency 15.
Communications Log Sheet".
Completed " Emergency Communications Log Sheets" shall be
[
[
NOTE:
placed in the Department's " Emergency Respons Materials Coordinator.
placed in the Department's " Emergency Respons Materials Coordinator.
16.
Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6 " Emergency Response and 16.
Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6 " Emergency Response and                     .
Recovery Activities Log Sheet".
Recovery Activities Log Sheet".
NOTE:
Completed " Emergency Response and Recovery Activities Log NOTE:
Completed " Emergency Response and Recovery Activities Log
i Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is i
      ,            i                                 Sheets" shall be placed in the Department's " Emergency i
maintained by the Corporate Materials Coordinator.
Response and Recovery Activities Record" binder which is maintained by the Corporate Materials Coordinator.
C.
C. Procurement Coordinator Take those actions indicated for the appropriate emergency action l
Procurement Coordinator Take those actions indicated for the appropriate emergency action l
1.
1.
level classification below:
level classification below:
NOTIFICATION OF UNUSUAL EVENT
NOTIFICATION OF UNUSUAL EVENT For a Nothfication of Unusual Event emergency action level 2.
: 2.      For a Nothfication of Unusual Event emergency action level classification no notification will be made.
classification no notification will be made.
ALERT. SITE AREA EMERGENCY. AND GENERAL EMERGE                      '
ALERT. SITE AREA EMERGENCY. AND GENERAL EMERG Receive event notification from the Corporate Materials Coordinator that the Corporate Emergency Response Plan has been activated.
: 3. Receive event notification from the Corporate Materials Coordinator that the Corporate Emergency Response Plan has been activated.
3.
I
Deter 1nine from the Corporate Materials Coordinat 4.
: 4. Deter 1nine from the Corporate Materials Coordinat response.
I response.
: 5. Upon receipt of the event notification establish a                       ..
Upon receipt of the event notification establish a 5.
below, as directed by the Corporate Materials Coordinator:
below, as directed by the Corporate Materials Coordinator:
: a. General Office
General Office Local Procurement Center in San Luis Obispo a.
: b. Local Procurement Center in San Luis Obispo
b.


                                                        =                       - -      - -
=
                                  ;g.,           , ; w.           m,.  .. , a      .s _
m,.
, a
.s
, ; w.
;g.,
4
4
                                                                                                                                    -i 8.u.    .sv ..
-i PActFic EAs and ELEcTale c0MPANY NUMBER: 4.1
PActFic EAs and ELEcTale c0MPANY               NUMBER: 4.1                 {
{
CORPORATE EMERGENCY REsPOWst PLAN                                             i-REVISION: 2 5                             IMPLEMENTING PROCEDURE                                     DATE: 07/25/83                 ,
8.u.
TITLE                                                                          PAGE 08 0F 09             ,
.sv..
MATERIALS On an ongoing basis. consult with the Corpora
CORPORATE EMERGENCY REsPOWst PLAN i-REVISION: 2 5
                                      ~
IMPLEMENTING PROCEDURE DATE: 07/25/83 PAGE 08 0F 09 TITLE MATERIALS On an ongoing basis. consult with the Corpora 6.
6.
San Luis Obispo area at Materials Facility 442, Pismo Beach.
San Luis Obispo area at Materials Facility 442, Pismo Beach.
('                                             Upon activation of the Local Procurement Center detemine Dep 7.
~
personnel requirements and staff accordingly.
('
I                                        8. As necessary, arrange for the General Office t Procurement Center.
Upon activation of the Local Procurement Center detemine Dep personnel requirements and staff accordingly.
: 9. Provide the materials receiving point with materia
7.
                                                $vailable and appropriate.
As necessary, arrange for the General Office t I
10 .
8.
Procurement Center.
Provide the materials receiving point with materi 9.
$vailable and appropriate.
Periodically apprise the Corporate Materials Coordinator on procurement matters during the emergency, and as requested.
Periodically apprise the Corporate Materials Coordinator on procurement matters during the emergency, and as requested.
11.
10.
Log all incoming and outgoing communications which are re emergency response effort using Procedure Attachment 5. " Emerg Conounications Log Sheet."
Log all incoming and outgoing communications which are re emergency response effort using Procedure Attachment 5. " Emerg 11.
NOTE:
Conounications Log Sheet."
Completed " Emergency Communications Log Sheets" shall b placed in the Department's " Emergency Res Materials Coordinator.
Completed " Emergency Communications Log Sheets" shall b placed in the Department's " Emergency Re NOTE:
12.
Materials Coordinator.
Maintain a written record of pertinent emergency response and r activities using Procedure Attachment 6, " Emergency Response Recovery, Activities Log Sheet".
Maintain a written record of pertinent emergency response and r activities using Procedure Attachment 6, " Emergency Response 12.
NOTE:
Recovery, Activities Log Sheet".
Completed "Energency Response and Recovery Activities L Sheets" shall be placed in the Department's maintained by the Corporate Materials Coordinator.
Completed "Energency Response and Recovery Activities L Sheets" shall be placed in the Department's NOTE:
V. REFERENCES _
maintained by the Corporate Materials Coordinator.
A. Corporate Emergency Response Plan
V.
(                B.
REFERENCES _
CERP Inglementing Procedure 1.1, " Activation of the Corporate Response Organization".
Corporate Emergency Response Plan A.
                                                                                                                          ~ ' "   ~
CERP Inglementing Procedure 1.1, " Activation of the Corporate
VI. ATTACHMENTS                                                                                -
(
            -                            1. Department Organizational Relationships
B.
: 2. Emergency. Plan Titles, Personnel Assignments, and Notifica 4--mM----'g
Response Organization".
VI. ATTACHMENTS
~ ' "
~
Department Organizational Relationships 1.
Emergency. Plan Titles, Personnel Assignments, and Notifica 2.
4--mM----'g m -y.,wem,--,-.r7-,
,,e-cg.%-we--ew
-se.,--gowep
-,rwe'w--w" 8=="'E'T
'*''ww'*"*-"Pr*-PNNww-
.-w he me~-*de-"'i="-War'&"W e9s-'-*=--mM-T----Er''-e'---'e'


pu             &      su.euu1xw:ws                         . 4. u ,2& m ,1:~+!auw:u.se m t
pu su.euu1xw:ws
. 4. u,2& m,1:~+!auw:u.se m t
b j
b j
                  - ee.esas format uv.oz PACIFIC GAS and ELECTRIC COMPANY               NtMBER: 4.1 CORPORATE EMERGENCY RESPONSE PLAN POwE                                                                            REVISION: 2 Ep IMPLEMENTING PROCEDURE                                   .DATE: 07/25/83                       ,
- ee.esas format uv.oz PACIFIC GAS and ELECTRIC COMPANY NtMBER: 4.1 CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 IMPLEMENTING PROCEDURE
TITLE                                                                         PAGE 09 0F 09 MATERIALS
.DATE: 07/25/83 Ep POwE TITLE PAGE 09 0F 09 MATERIALS 3.
: 3. Emergency Organization Contact List
Emergency Organization Contact List 4.
: 4. Emergency Transportation Instructions
Emergency Transportation Instructions Form 69-084, " Emergency Communications Log Sheet" 5.
: 5. Form 69-084, " Emergency Communications Log Sheet"
Form 69-085, " Emergency Response and Recovery Activities Log Sheet" 6.
: 6.      Form 69-085, " Emergency Response and Recovery Activities Log Sheet" 1
1 9
9 1
1 4
4 e
e i
i l
l 1
1
(
(
1 sq' e
1 sq' e
e
--.--,,,,e,
,,.,.,,-.,-,,n---y.


                                          ,e,                                              .:_, ::: . _ _                ca w a_ m                                                 ..                m. . mma. -                       .m _ m .
ca w a_ m
__ ,. _                  7
: m.. mma. -
                                                                                                                                                                                                                                                                                            -b j
.m _ m.
ee4sm lo w sesv.os PACIFIC GAS and ELECTRIC COMPANY                                                                                   NUMBER: 4.1                                                           '-L CORPORATE EMERGENCY RESPONSE PLAN                                                                                         REVISION: 2                                                             ,.
,e, 7
PGwE                                                                                                                                                                                               A M CHMENT: 1
-b j
  .      O 4
ee4sm lo w sesv.os
IMPLEMENTING PROCEDURE                                                                                                               DATE: 07/25/83 TITLE                                                                                                                                                                                             PAGE 01 0F 01 MATERIALS DEPARTMkNTORGANIZATIONALRELATIONSHIPS I
'-L PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.1 CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE A M CHMENT: 1 O
SOP
IMPLEMENTING PROCEDURE DATE: 07/25/83 4
                                                                                                                                                                                                                                '*                          s SGCOVERY IAAfsAGER                                                                                   -
TITLE PAGE 01 0F 01 MATERIALS DEPARTMkNTORGANIZATIONALRELATIONSHIPS I
  ~
SOP s
Clac COftPORATE TECNestCAL ANO                                                                                                                     ~
SGCOVERY IAAfsAGER
LOGa8TICAL                                                                                                                   '
~
C00A06esATOR p ...--             - . . - . .
Clac COftPORATE TECNestCAL ANO
                                                                                        ,                                                                                            80 ;                                         CIRC GLO                                   00 CORPORATE                   .          CORPORATE CORPORAfg                       CORPORATE
~
* OUALITY                             asATRAIALS           -                Cose87Auctices 08vtB0008
LOGa8TICAL C00A06esATOR p...--
* C000tOletATOft C00AOtteATOR                                           h     l C004040eATOR                  ,
CIRC 80 ;
l                                   .
GLO 00 CORPORATE CORPORATE CORPORATE Cose87Auctices CORPORAfg OUALITY asATRAIALS C000tOletATOft 08vtB0008 C004040eATOR C00AOtteATOR h
l                   7.. _.._ . ._ .i                                                                                                 l I                   :                                                                    .0                                 LPc :
l l
                                                                                                                                                        .0 l                  l                                                                                                                I
l 7.. _.._.._.i l
:                  :                                                                                  0Cunsene=T                    :
I l
T=AmercaTATiO=
l
C00nousATOn                                       C00aOasATOn                             l l
.0
t.._.._..__.._.._.._.._.._.._.._I.                                                                                                                                          .
.0 LPc :
I T=AmercaTATiO=
0Cunsene=T C00nousATOn C00aOasATOn l
l t.._.._..__.._.._.._.._.._.._.._I.
LesmusI:
LesmusI:
                                                                                                      - LaneAssammy 1                                                 ---- -                                                    , mumm       m.
- LaneAssammy 1
f 3F - Asamsgemmy Oseressame Passey Csac - Carperumm lamiemma Recomme Commer                                                                                                                                                     ~ ''                    '
, mumm m.
LPC - Lammi Poemuresamma Camaar                                                                                                                                                                                 .-
f 3F - Asamsgemmy Oseressame Passey Csac - Carperumm lamiemma Recomme Commer
_'                                                                  OLO - San Luis Onass l
~ ''
      -- - - - . , - , ,          , , , , , , . . . , . , - , . , , , . . - - . - - -          ,.-,,n,-           , , . . , - . _ , - ,      v._,   ,-n-..--       ,--,  ,-n-,       , , - - , . ,    ,,,---,-,7.--,             , , , - , , . , , , , , - - , , . , - - - - - - , .
LPC - Lammi Poemuresamma Camaar OLO - San Luis Onass l
,.-,,n,-
v._,
,-n-..--
,-n-,
,,,---,-,7.--,


                                        .,.        , . . .= a ; .- ,               z, . .       _ . _ .  ,,
,...= a ;.-,
z,..
9 o'o I
9 o'o I
                                                                                                                                          .g
.g
            . . w ,, n . . , . ,                                                                                                         '
.. w,, n..,.,
PACIFIC GAS and ELECTRIC COMPANY                   NUMBER: 4.1
:b PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.1 CORPORATE EMERGENCY RESP 0tISE FLAN Q
:b CORPORATE EMERGENCY RESP 0tISE FLAN                               '
IMPLEMENTING PROCEDURE ES$1
            ~                                                                                                    ES$1         2 Q                                      IMPLEMENTING PROCEDURE                                              DATE: 07/25/83 TITLE                                                                                               PAGE 01 0F 02 MATERIALS EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST HOME PHONE NAME BUSINESS PiiONE NON EMERGENCY TITLE EMERGENCY PLAN TITLE
~
          -=
2 DATE: 07/25/83 TITLE PAGE 01 0F 02 MATERIALS EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST HOME PHONE NAME NON EMERGENCY TITLE BUSINESS PiiONE EMERGENCY PLAN TITLE k
k
-=
: 1.       E. J. Meyers Corporate                                                               Director, Project Materials                                                           Purchasing Coordinator                                                                               .
1.
: 2.      D. R. Shaffer Director, Materials Purchasing
E. J. Meyers Corporate Director, Project Materials Purchasing Coordinator 2.
: 3.       _J. E. Brennan Supervising Buyer 4         B. E. Roddick Supervising Buyer R. R. Ochsner 5.
D. R. Shaffer Director, Materials Purchasing 3.
Supervising Buyer
_J. E. Brennan Supervising Buyer 4
: 6.         R. E. Gleason Supervising Buyer
B. E. Roddick Supervising Buyer 5.
: 1.       H. W. X1ocke Transportation                                                           Traffic Analyst Coordinator
R. R. Ochsner Supervising Buyer 6.
: 2.       G. Balan_esi Traffic Analyst
R. E. Gleason Supervising Buyer 1.
: 3.       J. A. Marino Supervisor, Traf fic
H. W. X1ocke Transportation Traffic Analyst Coordinator 2.
: 4.       J. H. Ferrell     -
G. Balan_esi Traffic Analyst 3.
Traffic Analyst
J. A. Marino Supervisor, Traf fic 4.
: 5.         R. L. Comyns Traffic Assistant
J. H. Ferrell Traffic Analyst 5.
: 6.         S. C. Gleason         ..
R. L. Comyns Traffic Assistant 6.
Travel Clerk l
S. C. Gleason Travel Clerk l
e                                                                         -m
e
                                                                  --m. ,,Leph--
-m
.s.==,_.
he.-s***+
h-,e_
h-,e_
                        .s.==,_. # he.-s***+
--m.
,,Leph--


            ~_u,.......,_....__                     ._.          ..
~_u,.......,_....__
j to Clee 01:2t EsV CT PAtlFIC GAS and ELECTRIC COMPANY                                                              I' CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.1
j PAtlFIC GAS and ELECTRIC COMPANY I'
              **                                                                                5'rE$'EU'2 G                            IMPLEMENTING PROCEDURE
to Clee 01:2t EsV CT CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.1 G
                                                                                              'DATE: 07/25/83 TITLE                                                                         PAGE 02 0F 02 MATERIALS                             ,
IMPLEMENTING PROCEDURE 5'rE$'EU'2
                            -    EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATIOh LIST HOME PHONE NAME NON EMERGENCY TTrLE             BUSINESS'' PHONE             .
'DATE: 07/25/83 TITLE PAGE 02 0F 02 MATERIALS EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATIOh LIST HOME PHONE NAME EMERGENCY PLAN TITLE NON EMERGENCY TTrLE BUSINESS'' PHONE
EMERGENCY PLAN TITLE
{.
{.         ,--
I Procurement 1.
                                                                                                              ' ' ' '          I -
J. M. MacComack Coordinator Tenior Buyer 2.
Procurement                             1.     J. M. MacComack Tenior Buyer Coordinator
A. J. Weis Senior Buyer 3.
                                          -              2.     A. J. Weis Senior Buyer
M. L. Hurley Buyer 4.
: 3.       M. L. Hurley Buyer
R. G. McInerney Buyer 5.
: 4.       R. G. McInerney Buyer
R. W. Wfison Buyer i
: 5.       R. W. Wfison Buyer i
6.
i                                                        6.       J. C. Buckley Buyer D
J. C. Buckley i
                                                    =
Buyer D
=
0 "9
0 "9
v' I . '
v' I. '
                                              .                                                                              Wb
Wb


n--. . _ . ;:_ ..;~.._~...,_ _ _ , _                                            __ _ _
'.. --- _ a :~.
' .. --- _ a :~.                                                                                                                                      U o
n--.
ee-esee Cieet seev e2 PACIFIC GAS and ELECTRIC COMPANY f
. _. ;:_..;~.._~...,_ _ _, _
CORPORATE EMERGENCY RESPONSE PLAN                                   NUMBER: 4.1                   i PG->E g)                                IMPLEMENTING PROCEDURE                                                       $sEri
U
* 3
*o f
        ~
ee-esee Cieet seev e2 PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.1 i
DATE: 07/25/83 TITLE                                                                                                                         ;
IMPLEMENTING PROCEDURE
MATERIALS PAGE 01 0F 01
$sEri
                      -                                EMERGENCY ORGANIZATION CONTACT LIST NAME                           EMERGENCY LOCATION ORGANIZATION OR                                                                          EMERGENCY PHONE EMERGENCY TITLE                            BUSINESS PHONE                                                             y.
* 3 PG->E g)
Recovery Manager                   1.   ,
DATE: 07/25/83
J. D. Shiffer                           EOF             -
~
                                                                                        -/                                 ..
TITLE PAGE 01 0F 01 MATERIALS EMERGENCY ORGANIZATION CONTACT LIST ORGANIZATION OR NAME EMERGENCY LOCATION EMERGENCY TITLE BUSINESS PHONE EMERGENCY PHONE y.
: 2.       y._A.Raymond__
Recovery Manager 1.
                                                                                            , = -                 .
J. D. Shiffer EOF
: 3.       M .,Townsend                         ''
-/
                                                                                . _ /~
2.
: 4.       R. C. Thornberry CIRC Corporate Technical               1.       J. B. Hoch and Logistical Coordinator
y._A.Raymond__, = -
: 2.       M. R. Tresler                   f
3.
: 3.         R. A. Younc                 _ ,
M.,Townsend
: 1.       D. L. Kennady                           Los Padres District Off.
. _ /~
Corporate                                                     _
4.
Division                                       _ ,.
R. C. Thornberry Corporate Technical 1.
Coordinator                                B. McCloskey 2.
J. B. Hoch CIRC and Logistical Coordinator 2.
: 3.        R. J. McKell                   ___
M. R. Tresler f
3.
R. A. Younc Los Padres District Off.
1.
D. L. Kennady Corporate Division Coordinator 2.
B. McCloskey 3.
R. J. McKell
(
(
o k
o k
sd       9
sd 9
* 9 hM i
9 hM i


-,.-A..___..._.t_....a___-                               ___        ._m._m.,__                   .
-,.-A..___..._.t_....a___-
                                                                                                                                                                ^
._m._m.,__
q' m n ,, m ,, -.       . . . -. . - . - - .                                                                                                            '
r q'
PACIFIC GAS and ELECTAlc COMPANY                                                     NJMBER: 4.1                         N CORPORATE EMERGENCY RESPONSE PLAN PGwE                                                                                                                REVISION: 2
^
      %g                                                                                                                         ATTAC E NT: 4 IMPLEMENTING PROCEDURE                                                                          DATE: 07/25/83                     .
m n,, m,, -.
                                                                                                                                                                  ~
PACIFIC GAS and ELECTAlc COMPANY NJMBER: 4.1 N
TITLE                                                                                                             PAGE 01 0F 04 MATERIALS EMERGENCY TRANSPORTATION INSTRUCTIONS A. Critical Emergency Response Personnel
CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE
: 1. Upon receipt of notification of the emergency event, the following critical emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:                 -
%g IMPLEMENTING PROCEDURE ATTAC E NT: 4 DATE: 07/25/83
                            . Recovery Manager                                                                                                     ,
~
                            . Operations and Analytical Recovery Manager
TITLE PAGE 01 0F 04 MATERIALS EMERGENCY TRANSPORTATION INSTRUCTIONS A.
                            . Engineering and Logistics Recovery Manager
Critical Emergency Response Personnel Upon receipt of notification of the emergency event, the following critical 1.
                            . Radiological Energency Recovery Manager
emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:
                            . Public Information Recovery Manager All other PGandE emergency response support personnel traveling to the                                                                 '
. Recovery Manager
San Luis Obispo area shall arrange transcortation in accordance with the
. Operations and Analytical Recovery Manager
                        ~ instructions set forth in B. below.
. Engineering and Logistics Recovery Manager
        ;          2. The above-listed individuals may elect to utilize their own vehicles or any one of the following transportation services:
. Radiological Energency Recovery Manager
: a. Corporate Aircraft                                                                                                       ,
. Public Information Recovery Manager All other PGandE emergency response support personnel traveling to the San Luis Obispo area shall arrange transcortation in accordance with the
: 1) G en e r a l O f f i c e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
~ instructions set forth in B. below.
: 2) Oakl and Ai rport Ha nge r 18. . . . . . . . . . . . . . . . . . . . . . . . .
The above-listed individuals may elect to utilize their own vehicles or any 2.
: b. Oakland Executive Air Termi na1. . . . . . . . . . . . . . . . . . . . . . . . (415 )S77-46 (ask for PGandE Transportation Coordinator)
one of the following transportation services:
: c. 24-hour Fixed Wing Air Charter Services:
a.
: 1)  Cal-West Aviation (Concord) . . . . . . . . . . . . . . . (415)672-0214                          . . . . . . . . (415 )B25-354 (415)932-5794
Corporate Aircraft
: 2)  Skyways Aviation , Inc. (San Ca rlos). . . . . . . . ..415)574-4704                                . . .. . ((415)S93-1448 415)345-7423
: 1) G en e r a l O f f i c e....................................
(                                                                                                                       ((415)573-1152 Coastal Air (Sa n Lui s Ob is po) . . . . . . . . . . . . . . . . . . . . . (805 )5??-6464 3)
: 2) Oakl and Ai rport Ha nge r 18.........................
: 4) Golden Gate Pip er (San Carlos ) . . . . . . . . . . . . . . . . . . . . (408)446-24 39
Oakland Executive Air Termi na1........................ (415 )S77-46 b.
: 5) Pacific.PiperAviation(SanJose)................. 408)294-4016 408)225-2540                   ~
(ask for PGandE Transportation Coordinator) 24-hour Fixed Wing Air Charter Services:
c.
Cal-West Aviation (Concord)....................... (415 )B25-354 1)
(415)672-0214 (415)932-5794 Skyways Aviation, Inc. (San Ca rlos)............... ((415)S93-1448 2) 415)574-4704 415)345-7423
(
((415)573-1152 Coastal Air (Sa n Lui s Ob is po)..................... (805 )5??-6464 3)
: 4) Golden Gate Pip er (San Carlos ).................... (408)446-24 39
: 5) Pacific.PiperAviation(SanJose)................. 408)294-4016 408)225-2540
~
408)374-9985
408)374-9985
                                            ~
~
                                                        ~.                 --
~.


                                  - a
.u. e
                      .u. e pacific Cas and ELECTRIC c0MPaNY
- a
                                                                                                                                                                                                                        .'l fRIM8ER: 4.1                                           I ConroRaTE EMERGENCY RESPONSE PLAN
.'l pacific Cas and ELECTRIC c0MPaNY ConroRaTE EMERGENCY RESPONSE PLAN fRIM8ER: 4.1 I
                    ~
~
* IMPLEMENTING PROCEDURE                                                                                       N?EET 1
IMPLEMENTING PROCEDURE N?EET 4
:        @          TITLE DATE: 07/25/83 4
DATE: 07/25/83 1
PAGE 02 0F 04                                         ;!
TITLE MATERIALS PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.) '
MATERIALS EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.) '
q A.
q A. Critical Emergency Response Personnel (Cont'd.)
Critical Emergency Response Personnel (Cont'd.)
"                                      d.           24-hour Helicopter Air Charter Services (in order of preference):
d.
: 1) Ari s Helicopters , Ltd. (San Jose) . . . . . . . . . . . . . . .                                               408)293-0600 408)354-0039 635-6880                                     -
24-hour Helicopter Air Charter Services (in order of preference):
2 ) Asteocopters (0akl and) . . . . . . . . . . . . . . . . . . . . . . . . . . . .
: 1) Ari s Helicopters, Ltd. (San Jose)...............
408)293-0600 408)354-0039 635-6880 2 ) Asteocopters (0akl and)............................
)1687-5179
]
]
                                                                                                                                                                            )1687-5179 h939-5683'
h939-5683'
: 3) California Helicopter Aimays, Inc. (Hayward)..... 44                                                                783-4000
<i
<i                                                                                                                                                                          632-3529
: 3) California Helicopter Aimays, Inc. (Hayward)..... 4 783-4000 4
                                    - e.            The telephone company yellow pages list additional air charter services.
632-3529 The telephone company yellow pages list additional air charter
I' Additionally, the Recovery Manager may elect to utilize the services of f.
- e.
the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.                                                                 ,
services.
I Additionally, the Recovery Manager may elect to utilize the services of f.
the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.
To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following numbers as appropriate:
To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following numbers as appropriate:
: 1)  During nonnal office hours Gol den Gat e Divi si on . . . . . . . . . . . . . . . . . . . . . . . . . . (415 )557-06 40
During nonnal office hours 1)
: 2)  During non-office hours Oakl and Dis patch Center. . . . . . . . . . . . . . . . . . . . . . . (415 )658-9115 Comunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation                                                                                                 -
Gol den Gat e Divi si on.......................... (415 )557-06 40 During non-office hours 2)
services the CHP will provide.
Oakl and Dis patch Center....................... (415 )658-9115 Comunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide.
: g.        Regardless of the mode of transportation used, prior to departure, each individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estiwated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other
Regardless of the mode of transportation used, prior to departure, each g.
(                                    special requirements or information. The Corporate Technical and 4
individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estiwated times of departure and
Logistical Coordinator will then advise the Corporate Division Coordinator to ensure that any necessary ground logistical support is in                                                                                 ~ '   -
(
1,                                                 place prior to the arrival of personnel in the San Luis Obispo area.
arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information. The Corporate Technical and Logistical Coordinator will then advise the Corporate Division 4
Coordinator to ensure that any necessary ground logistical support is in
~ '
1, place prior to the arrival of personnel in the San Luis Obispo area.
i M
i M
F v w       *m e
F
            ' ~*                                '* *        ~
' ~*
  -,y--y-4         -,.,.-m   ,.c
~
                                    -gwraw--mm-,g.-           ,p ,,.,.-.,.-.,-e,.,           g,-.w-,.w--,,,,ow---m---ww--, , , , -., , ,         ..-w,. e, wry,m           e.,m   -,-e,-w------.r-w-.--y---
v w
*m e
-,y--y-4
-,.,.-m
,.c
-gwraw--mm-,g.-
,p
,,.,.-.,.-.,-e,.,
g,-.w-,.w--,,,,ow---m---ww--,,,, -.,,,
..-w,.
e, wry,m e.,m
-,-e,-w------.r-w-.--y---


e
e
                                                                                  -_.    ._.~.--._.___._.,.._-_u_.._.                  .
._.~.--._.___._.,.._-_u_.._.
                                                                                                                                                  }
}
o
'o
                                                                                                                                            -l ee-esas rossa new ea PAtlFIC GAS and ELECTRIC COMPANY                       NUMBER: 4.1               - ['
-l
CORPORATE EMERGENCY RESPONSE PLAN                                                     E PG >E                                                                                           REVISION: 2 ATTACW.ENT: 4 O                                      IMPLEMENTING PROCEDURE                                              DATE: 07/25/83 TITLE                                                                                   . PAGE 03 0F 04 MATERIALS EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)
- ['
    ~
ee-esas rossa new ea PAtlFIC GAS and ELECTRIC COMPANY NUMBER: 4.1 CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 E
B. Other Emergency Resoonse Personnel _
PG >E O
: 1. All other PGandE emergency response support personnel traveling to the San Luis Obispo area shall use their own vehicles or transportation services provided by PGandE.                                                       ,
IMPLEMENTING PROCEDURE ATTACW.ENT: 4 DATE: 07/25/83 TITLE MATERIALS PAGE 03 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)
: 2. If PGandE transportation services are to be used, personnel should proceed to make transportation arrangements in one of the following manne'rs:
~
: a.      During normal office hours, contact the General Office Travel Desk (Room 1610, 77 BealeStreet). The primary telephone numbers for the General Office Travel Desk are:
B.
Other Emergency Resoonse Personnel _
All other PGandE emergency response support personnel traveling to the 1.
San Luis Obispo area shall use their own vehicles or transportation services provided by PGandE.
If PGandE transportation services are to be used, personnel should proceed to 2.
make transportation arrangements in one of the following manne'rs:
During normal office hours, contact the General Office Travel Desk a.
(Room 1610, 77 BealeStreet). The primary telephone numbers for the General Office Travel Desk are:
7
7
[                                                                                     .
[
                                                                              ~
i
i        :
~
: b.       If these lines are busy, the following alternate telephone numbers
b.
      '                                should be used:
If these lines are busy, the following alternate telephone numbers should be used:
                                          -          F L         J
F L
: c.      During non-office hours, following receipt of notification of the emergency event, emergency response personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).
J During non-office hours, following receipt of notification of the c.
Note:          Personnel are advised to bring only a mininum amount of baggage.
emergency event, emergency response personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).
: d.      If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability.
Personnel are advised to bring only a mininum amount of baggage.
!                                      Regardless of the mode of transportation used, prior to departure, each e.
Note:
If arrival time is not critical, personnel should call the General Office d.
Travel Desk to verify transportation availability.
Regardless of the mode of transportation used, prior to departure, each e.
individual shall contact the Recovery Manager or Coordinator to whom
individual shall contact the Recovery Manager or Coordinator to whom
(                             (s)he functionally reports and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information.
(
The Transportation Coordinator will coordinate arrangements, as required, il                           f.
(s)he functionally reports and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information.
with the Corporate Division Coordinator for Ground transportation and
The Transportation Coordinator will coordinate arrangements, as required, il f.
    ]f                                  lodging for PGandE personnel in the San Luis Obispo area.
]f with the Corporate Division Coordinator for Ground transportation and lodging for PGandE personnel in the San Luis Obispo area.
e
. e sy.sw a w_
eee<
eee<
                                                                            . e sy.sw a w_
w e emw.-
w ee      emw.-
W--
W--


-                        .c                 ..          w       -          ~ .:               as . _                           _ . =                                     - .
.c w
p                         v           . .
~.:
o ee-esas to/eal soev es PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN                                                                           NJMBER: 4.1                                       i q
as. _
                      ~ ~ "                                                                                                                                                                                   2
_. =
        @                                                      IMPLEMENTING PROCEDURE                                                                                                   SEls"AT                   4 DATE: 07/25/83                                       ,
p v
TITLE                                                                                                                                                                                                          ~
'o ee-esas to/eal soev es PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NJMBER: 4.1 i
MATERIALS                                                                                     PAGE 04 0F 04                                         l EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.) '
~ ~ "
                                                                                                                                                                                                      '*"hD Y '\
2 IMPLEMENTING PROCEDURE SEls"AT q
                                                                    'doinEtTIONS FROM NIMITT FREEWAY                                                                                           I
4 DATE: 07/25/83 TITLE
                                                          /                      3, ra =1+h on MEGENBERGER ROAD (RT 17) 1 mile l                                '                      #            #                                                                                                                                                      '
~
MATERIALS PAGE 04 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.) '
'*"hD l
' Y '\\
'doinEtTIONS FROM NIMITT FREEWAY I
ra =1+h on MEGENBERGER ROAD (RT 17) 1 mile
/
3,
: 2. " urn riant onto D001.ITTLE DRIVE.
: 2. " urn riant onto D001.ITTLE DRIVE.
                      %)      e-1 Y,            3. ' urn left r-;#to LANSLEY STREET.
: 3. ' urn left r-;#to LANSLEY STREET.
4,   " urn riaht at EARHART ROAD and pad in th.                                                                                    ..
%) e-1 Y,
                      .                                                                      .      i.t .n to.               n. ,.
" urn riaht at EARHART ROAD and pad in th.
4, i.t.n to.
: n.,.
5 s
g.
y~
g
g
                                      .........e . yz. t 3
.........e
: g.                                      y y~      .
. yz. t 3
5            s p O,-
y p':=
p':=
- - p O,-
3                              \               -
3
                                                                                            .                                ,s                                       .  - -
\\
                                                                                                                                                                                                  .s
,s
                        ,- ,w                         .
.s 2x
N                                     ;                                                          .
,-,w
2x s
. N 4u j
4u                                         j                             -
.:n s
                                                                                                                            .:n                               >                                                  ..
DJ
DJ                           .>                                        .,.-.        .
,/
a
- js.
                                                                                                          ~
3
                                                                                                                                  ,/
~
                                                                                                                                                            - js.                     ;.                    < . >.
. g._7 a
                                                                                                                                                                                                                . g._7 3
g (I), p
g                                 .,
-@~ ejj
ejj (I) , p f ,.,,                                     7s      % %p                                                       -@~
' f,.,,
                                                          /
* 7 % %
g e
'" p A - 4
                                                                                    ,                                      ,:          ,g.'"
, j; g
A-4 T. r j;
s
                                                                                                                                                                                                                    ..yi
,g.
_ ,,_ . G                           -
/
O                  \, .
./
                                                                                                                                                                                                                        .5 A                 i
_,,_. G O
                            .                                                ./                                                                                                  '
\\,.
* lE', , .
..yi T. r e
                                                ,,                                                                                                                                        ~
.5 A i
fh                      ,
fh
~
lE',,.
c~-
c~-
sy;.,                   ,.
sy;.,
As
As
                                                                            -                                  ~1                                                         , , . . .                                        '4 A                     N,4 N                            '"                                                      '.
~1 N,4
                                                                                                                    ~
'4 A
K.9 N
s%
s%
K.9 i
*(. \\
                                                *(.                       \
...c
h                  _
&dt
g
~
                                                                                                                                    . ..c
h f,
                                                                                                                                                                                      &dt             f, 3,                                 -w-                         r- ~'
i g
                                          #f4                                                                        s.
3,
                                                                                                                              ,,, c. ,
-w-r- ~'
                                                                                                                              = _ _
#f
,,, c.,
4 s.
s.
s.
: k.                                         ,
= _ _
p                                        x..       t t      .v                 .        .
k.
: g.                                      .  . . . . . .
x..
t p
.v t
g.


        --i--.-                                            _
P''P-
P''P-
                  @      h 5                                                                                                               l -o
--i--.-
:          i l                                                                                                           s           f lE             [
h 5
I O                                                                                                                                 ft i     =
l -o i
8                                                                                                                       d            -
l s
e                                                                                                                       i           -
f lE
[
I O
ft i
=
d 8
e i
s
s
: 1. 5 R
: 1. 5 R
r N
r NO E
O E
l w
l-w M                                       .      .
M
('
('
3w W
3 w
                              .                          s 13 .! $                           e e
W.
n, c
s 13 ! $
ae                      5 E! 5                         5 a
e e
                        !.!a,l 5s f
n, a c
E     y                       0 i     =                       E
e 5
: e. O                       >
E! 5 5
b                        N                                                                               . . .            .
a
gg                      g E                                                                                           i ,+
!.!a,l 5 s
m.
E y
                                                                  -                                                                                g y                     .
0 f
9         .
i E
1 I! s   -
=
e.
O b
N g g g E
i m.
,+
g y
9 I! s 1


CC-i FORATE EMERGENCY RE5PONSE PLAN MAS AND ELECTRIC COerAny                                                                                                                                               'j POwE                                                                                                                                                                                                        t EMERGENCY RESPONSE AND RECOVERY ACTIVITIES                                                                         LOGrAoE  SHEET                               l TooAvsoATs                                                 v sneenosNcy LocATeon
CC-i FORATE EMERGENCY RE5PONSE PLAN MAS AND ELECTRIC COerAny
(&'                                                                                                                                                              tai tai ENTERED BY in nesE                                                                                                                                         (INITIALS)                     ,
'j t
(3400#wsJ                                                                                                                                             (si (s)                                   
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET l
POwE TooAvsoATs rAoE v
neenosNcy LocATeon
(&
s tai tai ENTERED BY in nesE (INITIALS)
(3400#wsJ (si


==SUMMARY==
==SUMMARY==
OF ACTIVITY PERFORMED te                                                                                                                                                                                                     '
OF ACTIVITY PERFORMED te (s)
                                                                                                                ;r               _ _
;r t
t l
l
{
{
l                                                                         -
l SEE INSTRUCT lONS ON REV ERS S.006LS/s2) Rev.00
SEE INSTRUCT lONS ON REV ERS S.006LS/s2) Rev.00
- -,,,. - - +, - - - -
                                                                      - - , , , . - - + , - - - -                                            .~qw-----    , - - . -      y                        -    u  --y c-,      -
,.yy,-
                                                                                                        ,.yy,- -
--,,-,----,--.---,,m-
                                                                                                                    --,,-,----,--.---,,m-                                   ,      ,- -
.~qw-----
y u
--y c-,


                                                                                                                                      . - _ _ _ _      _-      c1 T
---~__
                            ---~__                                               -                --
c1 T
                                                                                                                                                                        -b es essa essest sesv es
-b es essa essest sesv es NUMBER: 4.8 rateFIC sAs and ELECYRIC COMPANY x
      '                                                                                                                                        NUMBER: 4.8 rateFIC sAs and ELECYRIC COMPANY x
CORPORATE EMERGENCY RESPONSE PLAN
F3                pggg                                CORPORATE EMERGENCY RESPONSE PLAN                                               . REVISION: 2 DATE: 07/28/83             ,
. REVISION: 2 F3 pggg DATE: 07/28/83 i}i IMPLEMENTING PROCEDURE PAGE 010F 06 DIVISION SUPPORT SIGNATURE RESPONSIBILITY DATE TITLE PREPARED BY g
PAGE 010F 06 i}i             IMPLEMENTING PROCEDURE DIVISION SUPPORT SIGNATURE RESPONSIBILITY                                                                                                             DATE TITLE PREPARED BY         ,                        g                                                                                       ,
StiSdVIsNG NUCLEAR GENERATION ENGINEER PERSONNEL AND ENVIRONMENTAL SAFETY, NPO REVIEWED AND o_
StiSdVIsNG NUCLEAR GENERATION ENGINEER PERSONNEL AND ENVIRONMENTAL SAFETY, NPO REVIEWED AND                                         o_                                                                                           '
h 5 4uta k DIVISI0 h 10 @3 REVIEWED AND
h 5 4uta k DIVISI0 h                                                                             10   @3 REVIEWED AND                           jicd,                     @/                                                  J '
: jicd, y
y CONCURRED BY           v-                         a         n SENIOR VICE PRESIDENV, OPERATI S A
J '
APPROVED BY                                       /'                                                                       g VI[ PRESIDENT, NUdEAR POWER GENERATION N
CONCURRED BY v-a n
                                                ' CHAIRMAN, PRESIDiff'S NUCLEAR' ABV$0RY COPtilTTEE                                                                     /
/
SENIOR VICE PRESIDENV, OPERATI S A
APPROVED BY
/'
g VI[ PRESIDENT, NUdEAR POWER GENERATION N
' CHAIRMAN, PRESIDiff'S NUCLEAR' ABV$0RY COPtilTTEE
/
l
l
(
(
                                                                                                                                                                    =e o
=e o
f                                     ..
f


                                                                                  .:.                                                        . _ ,        ,a_   _ , .                         _ , _.
,a_
s a w ---                       .      . - - -                                                . = _ _    . . _ . .                                                      .
. = _ _
                                                                                                                                                                                                          .    'o h
s a w ---
'o h
r
r
: u. .mi - a PACIFIC GAS ami E LECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN                                                                                   NUMBER: 4.8
: u..mi - a PACIFIC GAS ami E LECTRIC COMPANY
      ' jog PGwE                                                                                                                                             REVISION: 2 IMPLEMENTING PROCEDURE                                                                                                DATE: 07/28/83                                     -
' jog CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.8 PGwE IMPLEMENTING PROCEDURE REVISION: 2 DATE: 07/28/83 TITLE DIVISION SUPPORT PAGE 02 0F 06 9
TITLE DIVISION SUPPORT                                                                                         PAGE 02 0F 06                                     ,
O ORG ANIZATIONAL OUTLINE 1.
9 O
SCOPE 9
ORG ANIZATIONAL OUTLINE
: 11. DISCUSSION ll1.
: 1.                 SCOPE 9
RESPONSIBILITIES IV.
: 11. DISCUSSION ll1.                 RESPONSIBILITIES IV.                 INSTRUCTIONS V.               REFERENCES VI.                 ATTACHMENTS s
INSTRUCTIONS V.
REFERENCES VI.
ATTACHMENTS s
I
I
  ,[
,[
9
9


_r..            .
_r..
a_         _
a_
                                                                                                                                      .i_ .
.i_.
                                                                                                                                            -b e oue can m.es                                                                                                                         $
-b e oue can m.es PACIFIC gas and ELECTRIC c0MPANY
PACIFIC gas and ELECTRIC c0MPANY                                                                     [
[
    ,                                  CORPORATE EMERGENCY RESPONSE PLAN                                               NUMBER: 4.8 g                         IMPLEMENTING PROCEDURE                                                                   REVISION: 2 TITLE                                                         .                                              DATE: 07/28/83 DIVISION SUPPORT                                                 .
CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.8 g
                                                                                                                      ,PAGE 03 0F 06
IMPLEMENTING PROCEDURE REVISION: 2 TITLE DATE: 07/28/83 DIVISION SUPPORT
(                   -
,PAGE 03 0F 06
I. SCOPE The scope of this Implementing Procedure is to provide notification to the Coast Valleys and other Division personnel and assure division support services in the event the Corporate Emergency Response Plan (CERP) is activated.
(
I.
SCOPE The scope of this Implementing Procedure is to provide notification to the Coast Valleys and other Division personnel and assure division support services in the event the Corporate Emergency Response Plan (CERP) is activated.
II. DISCUSSION A.
II. DISCUSSION A.
This   Implementing personnel  who have Corporate Procedure     provides Emergency      Response instructions Organizationfor        guiding (Division' CERO) assignments should the CERP be activated.
This Implementing Procedure provides instructions for guiding (Division' personnel who have Corporate Emergency Response Organization CERO) assignments should the CERP be activated.
B. Division support services include:
B.
: 1. Coordination of ground transportation and lodging of Company personnel                                           I temporarily assigned to the San Luis Obispo area.
Division support services include:
: 2. Line repair crews for restoring electrical power.
1.
      '                                                                                                  ~
Coordination of ground transportation and lodging of Company personnel I
: 3. Providing emergency supplies.
temporarily assigned to the San Luis Obispo area.
: 4. Coordinating and conduct of connunity relations programs.
2.
: 5. Teleconnunications repair personnel.
Line repair crews for restoring electrical power.
: 6. Nontechnical Company personnel resource pool.
~
C. Procedure Attachment 1. " Department Organizational Relationships" illustrates how' the Coast Valleys Division interfaces with other Company Divisions and Departments.
3.
III. RESPONSIBILITIES Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.                  .
Providing emergency supplies.
A. Corporate Division Coordinator l     (                1. Take those actions indicated for the appropriate emergency action level classifications below:                                                                             ,,  _
4.
                                                                                                                                          ~
Coordinating and conduct of connunity relations programs.
NOTIFICATION OF UNUSUAL EVENT l
5.
''k                   2. For a Notification of Unusual Event emergency action level classification, no notification will normally be made to the Corporate Division Coordirrator.                                                                                            .
Teleconnunications repair personnel.
                                        ,    __    ,  ___                          - - - - - , -            " = - *
6.
 
Nontechnical Company personnel resource pool.
                                                                          ..      m    .m         m     _  _-            ,
C.
C.M,ClHC   SASmsad d
Procedure Attachment 1. " Department Organizational Relationships" illustrates how' the Coast Valleys Division interfaces with other Company Divisions and Departments.
ooriim        cvE.LEcr.lc m a mcoMPa.Y .           NunsER: 4.8
III. RESPONSIBILITIES Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.
          ,,m REVISION: 2
A.
:                         IMPLEMENTING PROCEDURE W>     y,7t,
Corporate Division Coordinator
                                                                                        - DATE: 07/28/83 DIVISION SUPPORT                             PAGE 04 0F 06                 _
(
r
l 1.
'                '  ~
Take those actions indicated for the appropriate emergency action level classifications below:
NOTE: CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" describes the activation of                       ;
NOTIFICATION OF UNUSUAL EVENT
the CERP.                                                                       ,
~
ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY
l''k 2.
: 3. Receive event notification from the Corporate Technical and Logistical Coordinator that the Corporate Emergency Response Plan has been activated.                     -                               .
For a Notification of Unusual Event emergency action level classification, no notification will normally be made to the Corporate Division Coordirrator.
                                    ,                                                                                -l' Determine from the Corporate Technical and Logistical Coordinator the 4.
" = -
emergency action level classification and any special Departmental -
* m
.m m
d C.M,ClHC SAS sad E.LEcr.lc coMPa.Y.
NunsER: 4.8 ooriim m cv m a m m
,,m IMPLEMENTING PROCEDURE REVISION: 2
: W>
- DATE: 07/28/83 y,7t, DIVISION SUPPORT PAGE 04 0F 06 r
~
NOTE: CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" describes the activation of the CERP.
ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.
Receive event notification from the Corporate Technical and Logistical Coordinator that the Corporate Emergency Response Plan has been activated.
-l 4.
Determine from the Corporate Technical and Logistical Coordinator the emergency action level classification and any special Departmental -
response actions.
response actions.
  -                    5. Notify the appropriate Coast Valleys and other Division personnel, as necessary, and advise them of the emergency action level                                   ,
5.
classif,1 cation and any special requests from the Corporate Technical                   .
Notify the appropriate Coast Valleys and other Division personnel, as necessary, and advise them of the emergency action level classif,1 cation and any special requests from the Corporate Technical and Logistical Coordinator.
and Logistical Coordinator.
6.
: 6. Establish and direct a Division operation at the Los Padres District i:                           Office with required Division support personnel.
Establish and direct a Division operation at the Los Padres District i:
: 7. Coordinate with the following CERO personnel for requests regarding division support services:
Office with required Division support personnel.
: a.       Corporate Materials Coordinator
7.
: b.       Corporate Construction Coordinator
Coordinate with the following CERO personnel for requests regarding division support services:
: c.         Corporate Teleconnunications Coordinator
a.
: d.         Public Information Recovery Manager
Corporate Materials Coordinator b.
: e.         Site Construction Coordinator                                               .
Corporate Construction Coordinator c.
: f.        Transportation Coordinator
Corporate Teleconnunications Coordinator d.
: g.       Repair team supervisor.
Public Information Recovery Manager e.
: 8. Advise the Corporate Technical and Logistical Coordinator of Division f
Site Construction Coordinator f.
Transportation Coordinator g.
Repair team supervisor.
8.
Advise the Corporate Technical and Logistical Coordinator of Division f
operations status on a periodic basis, and as requested.
operations status on a periodic basis, and as requested.
: 9. Assurethecontinuous(24 hour)continuityofDivisionpersonneland                 ~     ~
9.
Assurethecontinuous(24 hour)continuityofDivisionpersonneland
~
~
resources necessary to support the emergency response effort.
resources necessary to support the emergency response effort.
: 10. Maintain the Division's " Emergency Response and Recovery Activities                 h Record" binder in a current status.
: 10. Maintain the Division's " Emergency Response and Recovery Activities h
N
Record" binder in a current status.
N em9w--
---e---mmer==--e>eww---ewe - egur
-1
-v
<s ee--v'-zTW-awsw N-s---''e-ee w w wwsta-.-v e'N-N WN+-'*"'-Sw--e'c-P-P"---
' " '-*-----^
m u


                      ='                r_. m _ ,                        ... -             -
m..~.-s_a
w        - : a - -_                   ,   m
- : a - -_
                                                                                                                                                        . .~ .-s_a A
='
30-035 1D/93) MSW.C2                                                                                                                                                         -
r_. m _,
PACIFIC GAS and ELECTRIC COMPANY                                                                                                         [
w A
CORPORATE EMERGENCY RESPONSE PLAN                                                               NLMBER: 4.8                                       ;
30-035 1D/93) MSW.C2 PACIFIC GAS and ELECTRIC COMPANY
rg                           IMPl.EMENTING PROCEDURE                                                                                 REVISION: 2
[
        'i     TITLE                                                                                                                        DATE: 07/28/83
CORPORATE EMERGENCY RESPONSE PLAN NLMBER: 4.8 rg IMPl.EMENTING PROCEDURE REVISION: 2
                                                                                                                                                                                              ~
'i DATE: 07/28/83 TITLE
DIVISION SUPPORT                                                                       PAGE 05 0F 06
~
                                                                                                                                          . o a                              11. Work closely with the Site Construction Coordinator to assure that maximum effective use is made of Comptny local transportation resources during the emergency.
DIVISION SUPPORT PAGE 05 0F 06
. o
: 11. Work closely with the Site Construction Coordinator to assure that a
maximum effective use is made of Comptny local transportation resources during the emergency.
: 12. Coordinate with the Corporate Telecomunications Coordinator requests for telecomunications system repair services by the Repair Team Supervisor.
: 12. Coordinate with the Corporate Telecomunications Coordinator requests for telecomunications system repair services by the Repair Team Supervisor.
: 13. If required, coordinate the assignment of personnel and, resources from the other Company divisions to assist the Coast Valleys Division's efforts during the emergency. Transportation arrangements for support personnel traveling to the San Luis Obispo area shall be made in accordance with the instructions in Procedure Attachment 4. " Emergency Transportation Instructions".
: 13. If required, coordinate the assignment of personnel and, resources from the other Company divisions to assist the Coast Valleys Division's efforts during the emergency. Transportation arrangements for support personnel traveling to the San Luis Obispo area shall be made in accordance with the instructions in Procedure Attachment 4. " Emergency Transportation Instructions".
: 14. Coordinate arrangements, as required, with the Corporate Technical and                                                                                 '
: 14. Coordinate arrangements, as required, with the Corporate Technical and Logistical Coordinator and the Transportation Coordinator for ground transportation and/or lodging of Company personnel temporarily assigned to the San Luis Obispo area.
Logistical Coordinator and the Transportation Coordinator for ground transportation and/or lodging of Company personnel temporarily assigned to the San Luis Obispo area.
: 15. Coordinate with the owners / managers of equipment supply and service sources in the San Luis Obispo area to ascertain their capabilities and availabilities to support recovery efforts.
          -                    15. Coordinate with the owners / managers of equipment supply and service sources in the San Luis Obispo area to ascertain their capabilities and availabilities to support recovery efforts.
: 16. Locate and coordinate the use of temporary local office space and storage facilities in the San Luis Obispo area, as required.
: 16. Locate and coordinate the use of temporary local office space and storage facilities in the San Luis Obispo area, as required.
: 17. Locate and coordinate the use of additional meeting and conference facilities in the San Luis Obispo area, as required.
: 17. Locate and coordinate the use of additional meeting and conference facilities in the San Luis Obispo area, as required.
: 18. Institute comunity relations programs to accurately infom local                                                                             '
: 18. Institute comunity relations programs to accurately infom local residents of the event and its significance.
residents of the event and its significance.
: 19. Coordinate the preparation of messages for use on the local Company infomation hotlines with the Public Infomation Recovery Manager, who is located at the Emergency Operations Facility.
: 19. Coordinate the preparation of messages for use on the local Company infomation hotlines with the Public Infomation Recovery Manager, who is located at the Emergency Operations Facility.
: 20. Respond to requests from the Recovery Manager.
: 20. Respond to requests from the Recovery Manager.
(                   21. Upon direction by the Corporate Technical and Logistical Coordinator deactivate Division support emergency response efforts.
(
: 22. Log all incoming and outgoing consnunications related to the emergency                                                                               -
: 21. Upon direction by the Corporate Technical and Logistical Coordinator deactivate Division support emergency response efforts.
response effort using Procedure Attachment 5. " Emergency                                                                                       -
: 22. Log all incoming and outgoing consnunications related to the emergency response effort using Procedure Attachment 5. " Emergency Comunications Log Sheet".
Comunications Log Sheet".
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in~the Division's " Emergency Response and Recovery Activities Record" binder.
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in~the Division's " Emergency Response and Recovery Activities                                                                                   '
--w
Record" binder.
--wmv m-%--
-                                            - - - - - . -._ -        --w     --wmv - m-%--   - ---  ---*?Nse   - Wt -w--- w--'7'm--w*rw-'-       r'y'   y-wNN '-' ' - --W==r   *--* y         e
---*?Nse
- Wt
-w---
w--'7'm--w*rw-'-
r'y' y-wNN
--W==r y
e
 
. = __.
m.
n_
_ u. m =:. s.. a m
_ q_ _. j
't


_ q_ _. j      . = __ .  . _
==
: m.        _          n_  _
}
_ u. m =:. s. . a        -
ee<se wea auv.ca PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.8 PGwE IMPl.EMENTING PROCEDURE REVISION: 2 O
m
- qATE: 07/28/83 y.,.,
                                                                                                                                          == 't ee<se wea auv.ca
DIVISION SUPPORT PAGE 06 0F 06 e
                                        . PACIFIC GAS and ELECTRIC COMPANY
~
                                                                                                                                              }  -
,23. Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6 " Emergency Response and Recovery Activities Log Sheet".
CORPORATE EMERGENCY RESPONSE PLAN                     NUMBER: 4.8                                   ;
NOTEi Complete " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Division's " Emergency Response and Recovery Activities Record" binder.
PGwE IMPl.EMENTING PROCEDURE                                         REVISION: 2 O     y.,. ,                                                                          - qATE: 07/28/83 DIVISION SUPPORT                                   PAGE 06 0F 06 e
t V.
                    ~   '
REFERENCES i
                              ,23. Maintain a written record of pertinent emergency response and recovery
A.
  .,                                activities using Procedure Attachment 6 " Emergency Response and Recovery Activities Log Sheet".
Corporate Emergency Response Plan B.
NOTEi Complete " Emergency Response and Recovery Activities Log
CERP Implementing Procedure 1.1, " Activation of the Corporats Emergency Response Organization".
    -                                        Sheets" shall be placed in the Division's " Emergency Response and Recovery Activities Record" binder.
VI. ATTACHMENTS 1.
t V. REFERENCES i
Department Organizational Relationships 2.
A. Corporate Emergency Response Plan                                                 ,
Emergency Plan Titles, Personnel Assignments, and Notification. List 3.
B. CERP Implementing Procedure 1.1, " Activation of the Corporats Emergency Response Organization".
Emergency Organization Contact List 4.
VI. ATTACHMENTS
Emergency Transportation Instructions
: 1. Department Organizational Relationships
{
: 2. Emergency Plan Titles, Personnel Assignments, and Notification. List
5.
: 3. Emergency Organization Contact List
Form 69-084, " Emergency Consnunications Log Sheet" l
!                        4. Emergency Transportation Instructions
i 6.
{                               Form 69-084, " Emergency Consnunications Log Sheet" l                         5.
Form 69-085 " Emergency Response and Recovery Activities Log Sheet" s
i
: 6. Form 69-085 " Emergency Response and Recovery Activities Log Sheet" s
l l
l l
1     ,
1
                                                                                                                                    *M S e
*M S
e


_u.-_             ..,s...:.
_u.-_
                                                                            . . ,- . v :-                                         >    -              '
..,s...:.
                                                                                                                                                                                          ~
..,-. v :-
                                                                                                                                                                                                    -s&wa m                       ,      -                  - -.
~
_    a
-s&wa m a
<                                                                                                                                                                                                                                                                            :    a es-enas somas new.es                                                                                                                                                                                                                                   "l PACIFIC GAS and ELECTRIC COMPANY                                                                                                         N' 4*0 2
a "l
N
es-enas somas new.es PACIFIC GAS and ELECTRIC COMPANY N
]                                                                          ConPORATE EMERGENCY RESPONSE PLAN
N' 4*0 2
                        ~ ~ "                                                                                                                                                                                   N'" 5 ' "
]
ConPORATE EMERGENCY RESPONSE PLAN
~ ~ "
N'" 5 ' "
L@
L@
*T IMPLEMENTING PROCEDURE                                                                                                                               . ATTACHMENT: 1 TITLE                                                                                                                                                                                 DATE: 07/28/83 DIVISION SUPPORT PAGE 010F 01                                                   .
IMPLEMENTING PROCEDURE
DEPARTMENT ORGANIZATIONAL RELATIONSHIPS
. ATTACHMENT: 1
*T TITLE DIVISION SUPPORT DATE: 07/28/83 PAGE 010F 01 DEPARTMENT ORGANIZATIONAL RELATIONSHIPS
)
)
SOF
SOF
                                                                                                                                                        .0COWE.Y MAasAGE.                                   g I                                 .
.0COWE.Y MAasAGE.
a=             ,
g I
I    w W pO. ATE                                               M IC YgCDesseCAL Afeg l
I w
LOS88TICAL
a=
                                                                                                                                                                                                      "    WSO.esAT.IO90                                                       .
W pO. ATE l
M OSIGATO.                                             .SCOVE E48EA 8 .Y                                                      -
M IC YgCDesseCAL Afeg WSO.esAT.IO90
.SCOVE.Y LOS88TICAL E48EA 8 M OSIGATO.
l 1
l 1
I
I
: r.                ._            . ._. . , I
.._.., I
(                                                             so                                                .e        :
(
m l.Il n                                un
r.
: l.                                un                        g      co
m l.I so
                                                                                                                                                                                                              -o=n Ar-e=."",m'. .                              "T:=                                     r,t.-                     rt.9                                 :
.e l
                                                                                                                                                                                                  ;                -=
l
L.
-o=n e=."",m'.
l l                                                                     ..
"T:=
_.. .._. .I
r,t.-
                                                                          ==                                       een,         3 i :i no                    I                j g                                                                             ""                  j l
rt.9 g
                                            "J,~,,,1^,'g"                                       =r"a"u.Cr.io=                 l, !.               *
Ar-un n
* g*'8v5                                              .nE.J                 .
un co
                                                                .                                  ,                           i!                                                                                               l l
-=
I                                  L __ _ _I i.                                      ..          .._.
l l L.
Lased:
_...._..I 3 :i I
j no i
 
==
: een, g
"J,~,,,1^,'g"
=r"a"u.Cr.io=
l !.
*
* g*'
.n J j
8v5 E.
l
,i !
l I
L __ _ _I i.
l Lased:
Lane Asemesy
Lane Asemesy
                                          . - .                    _      .musenssamm
.musenssamm Dementum Puummmel SOP - Esmessmus=.ppuseum Puninsy essee-Caspervanlamaman assimus.uest k
                                              . .              . . - . . Dementum Puummmel SOP - Esmessmus= .ppuseum Puninsy essee-Caspervanlamaman assimus.uest k                           OLO-San Lees oness
OLO-San Lees oness
                                                ,-m                     mm-n
,-m mm-n
: e. - emmed W                                                                                                                                                                                     , ,            ,            ,
: e. - emmed W li lm, t.
li lm, t.
.v.,
    , - - -      .v.,     4             .-    . - , , , - - .                    . - - . - , .
4
                                                                                                                                    . - . , , , , ,        - . , ,,,,,,,,,.. _ ,,._., , ,, ,_ .                      ,,_n,,.<-.        -, , _ . , . . - - - - - , - - .
,,_n,,.<-.


__ 7 s
__ 7
MSat Ol12$ 8etV. (3                                                                                         I PACIFIC GAS sad ELECTRIC COUPANY         NWBER* 4*8 CORPORATE EMERCENCY RESPONSE PLAN                                               f
*s MSat Ol12$ 8etV. (3 I
                ~ ~ "                                                                      aEvlSI N: 2
PACIFIC GAS sad ELECTRIC COUPANY NWBER* 4*8 CORPORATE EMERCENCY RESPONSE PLAN f
* IMPLEMENTING PROCEDURE                                   ATTACHMENT: 2 "Y
aEvlSI N: 2 IMPLEMENTING PROCEDURE
DATE: 07/28/83                 ,
~ ~ "
DIVISION SUPPORT
ATTACHMENT: 2 "Y
:PAGE 01 0F 01 EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST HOME PHONE
DATE: 07/28/83 DIVISION SUPPORT
                                      .                          NAME EMERGENCY PLAN TITLE                                                     BUSINESS PHONE NON EMERGENCY TITLE                                     __
:PAGE 01 0F 01 EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST HOME PHONE NAME EMERGENCY PLAN TITLE BUSINESS PHONE NON EMERGENCY TITLE Corporate Division 1.
: 1. D. L. Kennady Corporate Division Coordinator                                  Los Padres District Manager
D. L. Kennady Los Padres District Coordinator Manager 2.
: 2. B. McCloskey Los Paares District Marketing Manager
B. McCloskey Los Paares District Marketing Manager 3.
: 3. R. J. McKell                         "
R. J. McKell Los Padres District Electric Superintendent 4.
Los Padres District Electric Superintendent
Alternate number -
* 4. Alternate number -
(
(                                                       Morro Bay Switching Center l
Morro Bay Switching Center l
I i
I i
me W
me W


          . .     -  2 . . ~. a ..      :    -
.e..
                                                      .e..      -m:.,-w.x:.. ua-...--               - .- - . m   -
-m:.,-w.x:.. ua-...--
                                                                                                                          .w..           _
-.- -. m
                                                                                                                                              - s es-eLee C/saJetv 13
.w..
                                                                                                                                                  ,I
2.. ~. a..
                                      -            PACIFIC GAS sad ELECTRIC CollPANY
- s es-eLee C/saJetv 13
                                        - '" CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4*8                      .['
, I PACIFIC GAS sad ELECTRIC CollPANY NUMBER: 4*8
REVISION: 2                         r IMPLEMENTING PROCEDURE                                                       ATTACHMENT: 3 DIVISION SUPPORT                                                 6 ATE: 07/28/83                     ;
- '" CORPORATE EMERGENCY RESPONSE PLAN
                                                                                                            . *PAGE 01 0F 02         .
.['
EMERGENCY ORGANIZATION CONTACT LIST NAME                                 EMERGENCY LOCATION ORGANIZATION OR
REVISION: 2 r
IMPLEMENTING PROCEDURE ATTACHMENT: 3 DIVISION SUPPORT 6 ATE: 07/28/83
. *PAGE 01 0F 02 EMERGENCY ORGANIZATION CONTACT LIST
(
ORGANIZATION OR NAME EMERGENCY LOCATION EMERGENCY TITLE BUSINESS PHONE EMERGENCY PHONE Recovery Manager 1.
J. D. Shiffer
_ EOF
....no 2.
W. A. Raymond
: 3. _J. D. Townsend_
/
4.
R. C. Thornberry Corporate Technical and
: 1..J. B. Hoch CIRC Logistical Coordinator 2.
M. R. Tresler 3.
R. A. Young Public Infor: ration 1.
C. H. Peterson EOF Recovery Manager
: 2..
: 1. M. Kilpatrick 3.
S. N. Coffey Site Construction 1.
R. D. Etzler
_ SLO h ~d~ c--+--
(
(
EMERGENCY TITLE BUSINESS PHONE                            EMERGENCY PHONE Recovery Manager                            1. J. D. Shiffer                ,-    _ EOF  .
i or Coordinator 2.
                                                                                . ...no
.N. M. Norem
: 2. W. A. Raymond          .
(
: 3. _J. D. Townsend_          _ . _ ,
, 3.
                                                                                            /                          -
D. A. Rockwell M'
: 4. R. C. Thornberry                                                                  .
m
Corporate Technical and                    1. .J. B. Hoch                            CIRC Logistical Coordinator                                   ,
: 2. M. R. Tresler              _
: 3. R. A. Young                __
Public Infor: ration                        1. C. H. Peterson                      EOF Recovery Manager                                      _-
: 2. . 1. M. Kilpatrick
: 3. S. N. Coffey c--+--
Site Construction                          1. R. D. Etzler                        _ SLO h ~d~
(            Coordinator                                                        i or
: 2.    .N. M. Norem
(                                                                 ..
                                                          , 3. D. A. Rockwell                                                                         .
M' m


    .=              ;n.m...=.a. w _..w__ a __ca s . m _ w .g a_v.;w ,g.,.m ,.;__ _ _ 1
;n.m...=.a. w _..w__ a __ca s. m _ w.g a_v.;w,g.,.m,.;__ _ _ 1
                                                                          '                                                 - '6 ee-osas remat arv. or                     . . , . .    -m    ,
.=
                                                                                                      ~
'6
lf PACIFIC GAS and ELECTRIC COMPANY                   NUMBER: 4.8                       I' CORPORATE EMERGENCY RESPONSE PLAN                                                       [
-m lf
PGwE                                                                               REVISION: 2 O                               IMPLEMENTING PROCEDURE                                 - ATTACHMENT: 3 ME                         DIVISION SUPPORT                                     DATE: 07/28/83                     -
~
                                                                                                ? AGE 020F02                     -
ee-osas remat arv. or PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.8 I'
                        -                  EMERGENCY ORGANIZATION CONTACT LIST NAME               EMERGENCY LOCATION ORGANIZATION OR EMERGENCY TITLE                                                       EMERGENCY PHONE BUSINESS PHONE                                   -,
CORPORATE EMERGENCY RESPONSE PLAN
Transportation                               1. H. W. Klocke       ~
[
General Office ''
PGwE REVISION: 2 O
Coordinator                                                   ,-
IMPLEMENTING PROCEDURE
: 2. G. Balanest
- ATTACHMENT: 3 ME DIVISION SUPPORT DATE: 07/28/83
: 3. J. A. Marf no   -
? AGE 020F02 EMERGENCY ORGANIZATION CONTACT LIST ORGANIZATION OR NAME EMERGENCY LOCATION EMERGENCY TITLE EMERGENCY PHONE BUSINESS PHONE Transportation 1.
: 4. J._H. Ferrell
H. W. Klocke General Office ''
                                                                              , . /*
~
: 5. R. L. Comyns
Coordinator 2.
: 6. S. C. Gleason l                                                                                                                         ..
G. Balanest 3.
l
J. A. Marf no 4.
                                                  .                                                                  P
J._H. Ferrell
                            .mese _.
,. /*
w     ..- .
5.
R. L. Comyns 6.
S. C. Gleason l
l P
.mese _.
w


                  .c _      . _ . _ . . . , . _<. ;. w.sta . . . .n_. :ma m wm ._
. _. _...,. _<. ;. w.sta....n_. :ma m wm._
._. m q...
._. m q...
.c _
ee41sa temas sNtv.Ca
ee41sa temas sNtv.Ca
                                    ~
~
PACIFIC GAS sad ELECTRIC COMPANY                                     NUMBER: 4*8                   . I' CORPORATE EMERGENCY RESPONSE PLAN
PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 4*8
        ~
. I' CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE lE
e'    TITLE IMPLEMENTING PROCEDURE                                                        lEr        T 4
~
                                                                                                                'DATE: 07/28/83 1
r T 4 e
PAGE 010F 04
'DATE: 07/28/83 TITLE 1
                  .                      DIVISION SUPPORT                                                     .o EMERGENCY TRANSPORTATION INSTRUCTIONS A.     Critical Emergency Response Personnel
PAGE 010F 04 DIVISION SUPPORT
: 1. Upon receipt of notification of the emergency event, the following critical emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:
.o EMERGENCY TRANSPORTATION INSTRUCTIONS A.
                              . Recovery Manager
Critical Emergency Response Personnel Upon receipt of notification of the emergency event, the following critical 1.
                              . Operations and Analytical Recovery Manager                                                     '
emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:
                              . Engineering and Logistics Recovery Manager
Recovery Manager Operations and Analytical Recovery Manager Engineering and Logistics Recovery Manager Radiological Emergency Recovery Manager
                              . Radiological Emergency Recovery Manager Public Infomation Recovery Manager All other PGandE emergency response support personnel traveling to the 3an Luis Obispo area shall arrange transportation in accordance with the lnstructions set forth in 8. below.
. Public Infomation Recovery Manager All other PGandE emergency response support personnel traveling to the 3an Luis Obispo area shall arrange transportation in accordance with the lnstructions set forth in 8. below.
: 2. The above-listed individuals may elect to utilize their own vehicles or any one of the following transportation services:
The above-listed individuals may elect to utilize their own vehicles or any 2.
: a. Corporate Aircraft                                                               P              7
one of the following transportation services:
P 7
a.
Corporate Aircraft
: 1) Gencral Office....................................
: 1) Gencral Office....................................
: 2) Dakland Airport Hanger         i8.........................
: 2) Dakland Airport Hanger i8.........................
                                                                                                                                      /
,/
: b. Oakland Executi ve Ai r Te rmina1. . . . . . . . . . . . . . . . . . . . . . . . L.
Oakland Executi ve Ai r Te rmina1........................
                                                                                                                                    /
/
a (ask for PGandE Transportation Coordinator)
b.
: c. 24-hour Fixed Wing Air Charter Services:
L.
(Concord).......................                       (415)825-3544             ~
a (ask for PGandE Transportation Coordinator) 24-hour Fixed Wing Air Charter Services:
: 1) Cal-West Aviation                                                                (415)672-0214 (415)932-5794
c.
: 2) Skyways Aviation, Inc. (San Carlos) . . . . .. ... . .. . . . 415)S93-1448 415)574-4704 415)345-7423 415)573-1152 I
: 1) Cal-West Aviation (Concord)....................... (415)825-3544
Coastal Air (San Lui s 0bispo) .. . . . . . . . . . . . . . . . . . . . (805)544-6454. .              .
~
: 3)                                                                                                       -
(415)672-0214 (415)932-5794
: 4) Gol den Gate Piper (San Ca rlos) . . . . . . . . . . . . . . . . . . . . (408)445-2439
: 2) Skyways Aviation, Inc. (San Carlos)............... 415)S93-1448 415)574-4704 415)345-7423 415)573-1152 I
[,                                                                                                                                          .
Coastal Air (San Lui s 0bispo)..................... (805)544-6454..
: 5) Pacific Piper Aviation (San Jose). . . . . .. . . . . . . . .. . 408)294-4016     4CG 225-2540 408 374-9955
3)
 
[,
:n                           - .            1                         -        --  .-              . -- -            .-              _- .
: 4) Gol den Gate Piper (San Ca rlos).................... (408)445-2439
o            ,                ,
: 5) Pacific Piper Aviation (San Jose)................. 408)294-4016 4CG 225-2540 408 374-9955
m,                  -
:n 1
                                                            .                PACIFIC SAs and ELECTRIC COMPANY
                                                                                                                            ~
gygggg 4,3 ij CORPORATE EMERGENCY RESPONSE PLAN
          ~
                      ~
* I[
4 IMPLEMENTING PROCEDURE                                                                    I'U!ET T            4 TITLE                                                                                                                            .
                                                                                                                                                            . 07/28/83 DIVISION SUPPORT                                                              PAGE 02 0F 04                              _
o
o
                                                                                                                                                                                                ~
~
i m,
PACIFIC SAs and ELECTRIC COMPANY gygggg 4,3 j
I[
CORPORATE EMERGENCY RESPONSE PLAN 4
~
~
IMPLEMENTING PROCEDURE I'U!ET T
4
. 07/28/83 TITLE DIVISION SUPPORT PAGE 02 0F 04 o
EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)
EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)
S                           A. Critical Emergency Response Personnel (Cont'd.)
~
  ^
S A.
S                                       d.       24-hour Helicopter Air Charter Services (in order of preference):
Critical Emergency Response Personnel (Cont'd.)
b                                                   1) ArisHelicopters,Ltd.(SanJose)................. 408 293-0800                                                                                   <
^
408 354-0039 u '                                              2)~     Astrocopters(0akland)............................                                               635-6880
S d.
    .                                                                                                                                                        687-5179 C                                                                                                                                                           939-5683 -
24-hour Helicopter Air Charter Services (in order of preference):
: 3) California Helicopter Airways, Inc. (Hayward)..... (415)783-4000 (415)632-357.9
b
: e.       The telephone company yellow pages list additional air charter                                                                             ;
: 1) ArisHelicopters,Ltd.(SanJose)................. 408 293-0800 408 354-0039 u
services.
2)~ Astrocopters(0akland)............................
: f.       Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.
635-6880 687-5179 C
l                                                 To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following nun 6ers as appropriate:
939-5683 -
: 3) California Helicopter Airways, Inc. (Hayward)..... (415)783-4000 (415)632-357.9 e.
The telephone company yellow pages list additional air charter services.
f.
Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.
l To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following nun 6ers as appropriate:
: 1) During nonnal office hours Golden Gate Division.......................... (415)S57-0640
: 1) During nonnal office hours Golden Gate Division.......................... (415)S57-0640
: 2) During non-office hours OaklanaDispatchCenter.......................(415)658-9115 Comunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide.                                                                                                           -
: 2) During non-office hours OaklanaDispatchCenter.......................(415)658-9115 Comunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide.
: g.       Regardless of the mode of transportation used, prior to departure, each individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information. The Corporate Technical and I                                       Logistical Coordinator will then advise the Corporate Division                                                                                   i Coordinator to ensure that any necessary ground logistical support is in place prior to the arrival of personnel in the San Luis Obispo area.
g.
                                                                                                                                                                                          }
Regardless of the mode of transportation used, prior to departure, each individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information. The Corporate Technical and I
                          -    _ + -
Logistical Coordinator will then advise the Corporate Division i
T-*-               --r   ---*'N----     ww--ww e   '-e e e-- w e e mewe g-wmvmw- e w         w       _e-------ww----                         -
Coordinator to ensure that any necessary ground logistical support is in place prior to the arrival of personnel in the San Luis Obispo area.
w---ww',-     =   m-wm---
}
_ + -
T-*-
--r
---*'N----
ww--ww e
'-e e
e-- w e e mewe g-wmvmw-e w w
e-------ww----
M+e-
---s w---ww',-
=
m-wm---


- _ _ _ __ m.. __. __m -
w._
m__ m _
m_____
c
c
                        - _ _ _ __ m .. __ . __m -                            w._            m__ m _              m_____
-s
                                                                                                                                                              -s
~. i
                                                                                                                                                                  ~. i
'{
      -. m e, e m os                                                                                                                                               '{
-. m e, e m os PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.8 I
PACIFIC GAS and ELECTRIC COMPANY CORPORATE EuERGENCY RESPONSE PLAN NUMBER: 4.8                                   I
CORPORATE EuERGENCY RESPONSE PLAN
      ~
~
* O                           IMPLEMENTING PROCEDURE                                                               "'$ET r               4 k                                                                                                               . DATE: 07/28/83                                 _
O IMPLEMENTING PROCEDURE
TIT M                                                                                                                                           -
"'$ET r
PAGE 03 0F 04 DIVISION SUPPORT                                                           -                                        -
4 k
            ~
DATE: 07/28/83 TIT M PAGE 03 0F 04 DIVISION SUPPORT
~
EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)
EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)
W B. Other Emergency Response Personnel
W B.
: 1. All other PGandE emergency response support personnel traveling to the San Luis Obispo area shall use their own vehicles or transportation services provided by PGandE.
Other Emergency Response Personnel All other PGandE emergency response support personnel traveling to the 1.
i            2. If PGandE transportation services are to b'e used, personnel should proceed to make transportation arrangements in one of the following manners:                                                           ,
San Luis Obispo area shall use their own vehicles or transportation services provided by PGandE.
: a.      During normal office hours, contact the General Office Travel Desk (Room 1610,77 BealeStreet). The primary telephone numbers for the General Office Travel Desk are:
If PGandE transportation services are to b'e used, personnel should proceed to i
* u               b
2.
: b.      If these lines are busy, the following alternate telephone numbers should be used:
make transportation arrangements in one of the following manners:
During normal office hours, contact the General Office Travel Desk a.
(Room 1610,77 BealeStreet). The primary telephone numbers for the General Office Travel Desk are:
b u
If these lines are busy, the following alternate telephone numbers b.
should be used:
(
(
L.               - J                                                         ~
L.
: c. During non-office hours, following receipt of notification of the emergency event, emergency response personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).                             '
J
Note:              Personnel are advised to bring only a minimum amount of baggage.
~
: d.        If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability.
During non-office hours, following receipt of notification of the emergency event, emergency response personnel should proceed directly to c.
: e.        Regardless of the mode of transportation used, prior to departure, each I                          individual shall contact the Recovery Manager or Coordinator to whom (s)he functionally reports and advise him of the estimated times of                                                 s            .
the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).
departure and arrival, the arrival location in the San Luis Obispo area                                                 . _ . _
Personnel are advised to bring only a minimum amount of baggage.
Note:
If arrival time is not critical, personnel should call the General Office d.
Travel Desk to verify transportation availability.
Regardless of the mode of transportation used, prior to departure, each individual shall contact the Recovery Manager or Coordinator to whom e.
I (s)he functionally reports and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area s
and any other special requirements or inforrration.
and any other special requirements or inforrration.
s f.
s The Transportation Coordinator will coordinate arrangements, as required f.
The Transportation Coordinator will coordinate arrangements, as required with the Corporate Divisien Coordinator for Grcund transportation and C                          lodging for' PGandE personnal in the San Luis Obispo area.                                                                              .
C with the Corporate Divisien Coordinator for Grcund transportation and lodging for' PGandE personnal in the San Luis Obispo area.
e 4
4 e
                                                                                                        *-"*M*- ****We*-*wep-    <=+='****~6**
<=+='****~6**
w+ * + meusu.- -  -g    we< t* -m***eme-a-we
we< t* -m***eme-a-we
                    =a _,m,<. e emaw,e. 6 # $ se .
*-"*M*-
****We*-*wep-
=a
_,m,<.
e emaw,e. 6 # $ se.
w+ * + meusu.- -
-g


                            ._                                      .                                  .                    . w _. .                                                        - - . . -                _ .
. w _..
_              a.           x2                 .
a.
As
x2 As
                                                                                                                                                                                                                                                                            ^i u wea asv..:                                                                                                                                                                                                                                                       g PACIFIC GAS and ELECTRIC COMPANY                                                                                                   NUMBER: 4.8                                                     I-CORPORATE EMERGENCY RESPONSE PLAN Q' ~, POwE                                                                                                                                                                                                   REVISION: 2 IMPLEMENTING PROCEDURE                                                                                                                                         ATTACMENT: 4 DAM: 07/28/83                                                 -
^i.,
TITLE DIVISION SUPPORT                                                                                                                               PA8E '04 0F 04                                               ,
u wea asv..:
EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)
g PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.8 I-CORPORATE EMERGENCY RESPONSE PLAN Q' ~, POwE REVISION: 2 IMPLEMENTING PROCEDURE ATTACMENT: 4 DAM: 07/28/83 TITLE DIVISION SUPPORT PA8E '04 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)
Y'                              '
Y'
                                                                'dotatettons                 FRon MIMITI FREEwAv                                                                           .kee '                                 %_
'dotatettons FRon MIMITI FREEwAv
: 1. ggL.Aangh on MEGENBERGER ROAD (RT 17) 1 mile I
.kee '
j#                  *
I j#
                                                        ,                          2. " urn rioht onto 000LITTLE DRIVE.
: 1. ggL.Aangh on MEGENBERGER ROAD (RT 17) 1 mile
A                   q 3. " urn left onto LANGLEY $3EET.
: 2. " urn rioht onto 000LITTLE DRIVE.
: 4. '' urn rinht at EARHART ROAD and part in the                                                                                                                         '-
A q 3. " urn left onto LANGLEY $3EET.
* parting lot on the corner.
: 4. '' urn rinht at EARHART ROAD and part in the parting lot on the corner.
                                                                                    "                                                    '/                                               '9               >,,,.
'/
                                                                                                                                                                                                                                                                .y h                 '..<                                                                                                        -
'9
                        ..........r m 4,/ e
.y h
: 4.                                   .
m 4,/ e 4.
g.,
..........r g.,
e..
\\
                    *                                             \                       h                                                a     fa s                                                                                             ns
h a
                                                                                                                                                              = , . -
fa e..
                                            \                                                      g.                                                                 '                 ~ ""                                          '
\\
          .' ~                           .,                                 i                      !
g.
                                                                                                                                                              's                4
s
                                                                                                                                              >/ Q s.'          W Q
=,. -
ns
.' ~ ;%
~ ""
i 4
tte \\ (E u\\
>/
's s.' W Q
Q l
=l W
.s
,,... c. x
-;.g.
-/.
'/
}
r
+, T''
a
\\
s*l r
g
,g i/
n A. %. s r-
- l t
1.
=
p N
.( 2l 0
N k*/g A
,p s
g
, \\.,..
'a f -
s g,
/
/
p!
'.b 4
+
e' 5
g
.g
'' k 4
, ',, s g
: g. ', -
y
"==~'''q..
4
-kh
- s, s
.3 s
. 4
' '' 4
~1 kg__.
l
l
            =l                          tteW \ (E,
*(
                                                            .s u\
\\-
                                                        -;.g .                                                                                  -/.                                                                    r                  , , . .. c . x
.,,g,/.t.s 6
                                                                                                                                                                          '/                                    '
k l
                                                                                                                                                                                                                                }
f, g 4,
                                              + , T''        \                                                                                a
/.
                                                                                                    ,g                                                     ,.
g de fsp-
i/
r
                                                                                                                                    ,            .       g                                        ,
s*l
                                                                                                                                                                                                                        -          r-
                                                                                            =                                                                A. %. s l                              t
                                                                  ''                                                          1.
p n
N N k*/g s      A                                                          ,p          *
                                                                                                                                                                                                                      .( 2l            .              0
                                                                                                                            'a                                                                                    f -                    .                      s
_"'                , \ .,..                            .
g,                    .
g                                  '
                                            /                                        ,
e'
                                                                                                                                        /
p! g          5
                                                                                                                                                                                        '.b    .
                                                                                                                                                                                                  .g 4
                                                                                                                                                                                                                                                                        +
                                                                                                          ' ,,' s                                                      g          '' k 4'                                      '
                                                                                            "==~'''q..
y                                                              -
4                    ,
                                                                                                                                                                                                                  ..                          g.
                                                                                                                                                                    -kh s                                                            .
s,
                                                                                                                                                                                                                                                          .3 s                '
                                                                          . 4              .
                                                                                                              ~1                                                                              ..                                            ,                   ' '' 4
                                                                                                                                                                                                *(                                                                  <
kg__.                                                                                                l
                                                                  \-                                                                          . .. .
6
                                                                                                                                                                                                                        . ,,g,/ .t.s
      <                                                                          k                                                .
g 4,
                                                                                                                                                            .      /.                      l                                f, de g
fsp-                                                                                                 i
{
{
                                                                                                                                                    .c       .
i T
                                                                                                                                                                                                      ,          ,              T            .              .-
.c y
y                                               <....


I1 -                          '              j!.
I1 j!.
e   tl( ' '
e tl( ' '
ie s
ie i
i m
m s
E W,
M E
E M                                                                            R e
w W,
w G                                                                                               O
R e
_ }      A P      a t
E
E T
}
A N,.
G O
R D
A a
S Y                                                                                               W            .
N,.
a ES a
P t
t
E TA R
* s t
D W
N O
S Y
I T
a E
A C                                                                                                            -
a S
O                                                                                                            -
t s
L Y
t NO ITAC O
C                                 I          ,
L YC I
N                                       ',        ,
N EG R
E G
EG m
R                                          ,
RE TE E
E G                                                                            .
Y H T S
R E        m                                <
lv N G iv A O C Y L NP L A
A E S P S MN N 97 OO O 1
CP I
S C
T E
T E
E H YT S v  l N G v    i Y A L  O    C A
IRR A T Y C NO C C I
NP L A SE S P
I Ee N T
MN N              9 7
Ll E U A
OO O CP      I 1
E G I
S C
D R M L
I E  T RR A                  N T Y C                  O CC      I I
O NE M F
Ee Ll   N              T E  E U               A D GR M I
AM F
L O
O A
NE AM M F
SE A E C R
F SE    O             A A E C                 R GT Y                 O CA                   E I
GT Y
R C               L ON                 T
O CA E
* CP AR E I
R C I
T POG                   Y C
L F ON T
C R                 e                                                                   .            '
8CP E T
E     E f
I AR POG Y
E E
C R C
M    s a
e E
a G
f E
R
E M
* N         E                                                                         0 s
s G
a                                                                        0 E                                                                          ve 8
a E
1 R
a R
                                                                                                          )
N E
    ...                                      a                                                          2 j                                                                             8
0 s
                                                                                                          /
0 aE ve 8
e                                                                           8 w
R 1
g      EI s0 8
a
4 a0                                                                                   8 p      T 4   2
)
2 j
8
/
e 8
w g
EI 8
s0 4
p a0 8
T 4 0
2 9
g 8
(
(
g 0
l il 4
9 8
4 1
                                                                                          ;;1 l,
i i
i   Ii         4 l)i1!
Ii I
4 l)i1!
;;1 l,


_m         -. _ _ _ _ ._- ..        _ _ _ , . _ . . _ _ _ _ _ _ .
_m l
PMFW5As Amo ELEcTnsc c0aspANy                                                                         csorv ATa EMEnvain i nasromsE Pl. Ape             l M
PMFW5As Amo ELEcTnsc c0aspANy csorv ATa EMEnvain i nasromsE Pl. Ape M
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCAfl0N                                                                                                           700AY'S DATE       PAGE
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET
        @ss                                                                                                                                      .
@ss EMERGENCY LOCAfl0N 700AY'S DATE PAGE t
t                                                                                                                                    (21                 13l (1)                                                                                                                                                                    ~
(1)
TIME                                                                                                                                     ENTERED BY (3400 8Wu l                                                                                                                                   (INITIALS)
(21 13l
                                                                                                                                                                                        ~
~
tai                 is:                                  
TIME ENTERED BY (3400 8Wu l (INITIALS)
~
tai is:


==SUMMARY==
==SUMMARY==
OF ACTIVITY PERFORMED                                                         toi U
OF ACTIVITY PERFORMED toi U
d "  '''.,p 4 t 8         jf- [       ' '      q
4 t
                                                                                                                          -      yb               g sJ'S e       - 1       ,                    g
8 sJ'S jf- [
                                                                                      ~'
q yb g
                                                                            %f%
d "
'''.,p e
- 1 g
%f%
~'
D I
D I
I I
I I
i e
i e
l I
l I
8sae5(8/82) Rev.00                                                                                                           SEE INSTRUCTIONS ON REVERSE
8sae5(8/82) Rev.00 SEE INSTRUCTIONS ON REVERSE


dh ,        m_1                                    %Qs_w wm_
, m,,iT ~ - ib.
                                                                          , m,,iT ~ - ib.                   1. -    L'       ,                             _.:
L' dh,
ep.5saa SNeatsustv.ta l
m_1
pacanc sAS and ELECTRIC COMPANY                               NUMBER: 4.9
%Qs_w wm_
, ,                                                          yggg                                      CORPORATE EMERGENCY RESPONSE PLAN                               REVISION: 2 h                                                                               *
: 1. -
                                                                                                                                                                  - DATE: 07/22/83 PAGE 010F 10 i   i       IMPLEMENTING PROCEDURE                                                                                  ,
l ep.5saa SNeatsustv.ta NUMBER: 4.9 pacanc sAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 yggg h
TITLE QUALITY ASSURANCE G
- DATE: 07/22/83 IMPLEMENTING PROCEDURE PAGE 010F 10 i
SIGNATURE RESPONSIBILITY                                                                                                     DATE TITLE j)g _f PREPARED BY SU M ISING NUCLEAR GENERATION ENGINEER                                                 ,
i TITLE QUALITY ASSURANCE G
PERSONNEL ANFENVIRONMENTAL SAFETY SECTI )N RD MANAGER, QUALITY ASSURANCE                                                                         ;
SIGNATURE RESPONSIBILITY DATE TITLE PREPARED BY j)g _f SU M ISING NUCLEAR GENERATION ENGINEER PERSONNEL ANFENVIRONMENTAL SAFETY SECTI )N RD MANAGER, QUALITY ASSURANCE
                                                                                                                          " '"                                    [f/2-fYb CO$RRD                       EXfCUTIVE VICE PRESIDENT FACILITIES ANDELECTRICRESpyRCESDEVELOPMENT APPROVED BY                                                                                                     g VIdPRESIDENT-NdLEARPOWERGENERATIO             i APPROVED BY                                          g[.                                                     /gy "CHAIRMA6!PRESIQfNT'SJUC)i(AR ADVISORY COPHITTEE l
[f/2-fYb CO$RRD EXfCUTIVE VICE PRESIDENT FACILITIES ANDELECTRICRESpyRCESDEVELOPMENT APPROVED BY g
VIdPRESIDENT-NdLEARPOWERGENERATIO i
g[.
/gy APPROVED BY "CHAIRMA6!PRESIQfNT'SJUC)i(AR ADVISORY COPHITTEE l
4
4
      .s'
.s'
                                                                                                                                      ,--.m-    4go.---,-_.wgr--,-,-,-,,-~,-,--,y,-              -- -,-,-,
-------_____----__.=_._.____,---,--,-www.-,,,w-,---.--...--.-_,,-w,,,,ww,w---
        -------_____----__.=_._.____,---,--,-www.-,,,w-,---.--...--.-_,,-w,,,,ww,w---       -
,--.m-w w
-w-w 4go.---,-_.wgr--,-,-,-,,-~,-,--,y,-


          .,,_      m. : w. 3. u. -- ,       1 .,- ~       .m               m _.._2  ;  .aw_ ... . u zm , __
m
                                                                                                                  - o
_.._2
                                                                                                                    'i o
.aw_.... u zm, __
                  . = = - .
: m. : w. 3.
PACIFIC GAS and ELECTRIC COMPANY
: u. --,
[p.
1
CORPORATE EMERGENCY RESPONSE PLAN                 NUMBER: 4.9 PGwE O..                           IMPLEMENTING PROCEDURE                           - JtEVISION: 2 TITLE DATE: 07/22/83               -
.,- ~
QUALITY ASSURANCE                                       PAGE 02 0F 10             ,
.m
C 3
- o
ORGANIZATIONAL OUTLINE                                         -
' i o
: 1. SCOPE II. DISCUSSION lli. RESPONSIBILITIES IV. INSTRUCTIONS V. REFERENCES VI. ATTACHMENTS s .       *
. = = -.
                                                                                                              *M k
[
PACIFIC GAS and ELECTRIC COMPANY p.
CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9 PGwE O..
IMPLEMENTING PROCEDURE
- JtEVISION: 2 TITLE DATE: 07/22/83 QUALITY ASSURANCE PAGE 02 0F 10 C
3 ORGANIZATIONAL OUTLINE 1.
SCOPE II.
DISCUSSION lli.
RESPONSIBILITIES IV.
INSTRUCTIONS V.
REFERENCES VI.
ATTACHMENTS s.
*M k
,w,
,-,--tw


_~       _n                .. a . .       a~~...         s.:     &-  .  . . . _ _      w   ~;, w
_~
                                                                                                                    ~s ee-enas rotesi nav. or
.. a..
                                                                                                                      ~ ,I PACIFIC GAS sad ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN                     NUMBER: 4.9             ;
a~~...
            ~                                                                                     REVISION: 2 O                                IMPLEMENTING PROCEDURE                                  .
s.:
                                                                                                  ' DATE: 07/22/83       .
w
TITLE                                                                                                      ~
~;, w
_n
~s
~,I ee-enas rotesi nav. or PACIFIC GAS sad ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9
~
O IMPLEMENTING PROCEDURE REVISION: 2
' DATE: 07/22/83 TITLE
~
QUALITY ASSURANCE PAGE 03 0F 10
QUALITY ASSURANCE PAGE 03 0F 10
: 1.     ' SCOPE The scope of this Implementing Procedure is to provide notification to                           :
' COPE 1.
Corporate Emergency Response Organization (CERO) Departmental personnel and
S The scope of this Implementing Procedure is to provide notification to Corporate Emergency Response Organization (CERO) Departmental personnel and assure Quality Assurance support services in the event the Corporate Emergency Response Plan is activated.
  -                          assure Quality Assurance support services in the event the Corporate Emergency Response Plan is activated.
II. DISCUSSION A.
II. DISCUSSION A. This Implementing Procedure provides instructions for guiding Departmental personnel who have Corporate Emergency Response Organization assignments should the CERP be activated.                     ,
This Implementing Procedure provides instructions for guiding Departmental personnel who have Corporate Emergency Response Organization assignments should the CERP be activated.
B.
Departmental support services include:
Departmental support services include:
B.
1.
: 1. Tracking of materials used to repair, modify, or construct Plant systems and structures.                                                       [
Tracking of materials used to repair, modify, or construct Plant
: 2. Monitoring quality control.
[
: 3. Providing experienced Records Management System (RMS).section personnel to assist in drawing and document retrieval.
systems and structures.
!                                  4. Monitoring the review and approval of procedures generated during event recovery.
2.
!                            C. Procedure Attachment 1, " Department Organizational Relationships" illustrates how the Department interfaces with other Company Departments and non Company organizations.
Monitoring quality control.
3.
Providing experienced Records Management System (RMS).section personnel to assist in drawing and document retrieval.
4.
Monitoring the review and approval of procedures generated during event recovery.
C.
Procedure Attachment 1, " Department Organizational Relationships" illustrates how the Department interfaces with other Company Departments and non Company organizations.
III. RESPONSIBILITIE'S Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.
III. RESPONSIBILITIE'S Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.
IV.       INSTRUCTIONS i                             A. Corporate Quality Assurance Coordinator
IV.
: 1. Take appropriate actions as identified for the emergency action
INSTRUCTIONS i
(                                 level classifications below:
A.
l
Corporate Quality Assurance Coordinator 1.
: i.                                                      NOTIFICATION OF UNUSUAL EVENT
Take appropriate actions as identified for the emergency action
: 2. For a Notification of Unusual Event emergency action level
(
    'b                                  classification no notification from the Corporate Technical and Logistical, Coordinator will be made.
level classifications below:
l NOTIFICATION OF UNUSUAL EVENT i.
'b 2.
For a Notification of Unusual Event emergency action level classification no notification from the Corporate Technical and Logistical, Coordinator will be made.


          ._e~_-      c_c -.                                           .wc negw.a 2 >                   e _-, w_ .t .               .e. .               ,. tm1.:
c_c -.
a    e ,e                                                                                                                  . .
a e,e
L             .
.wc negw.a 2 >
A
e _-, w_.t.
                                                                                                                                                                                      .y i.im nav n                                                                                                                                                           j
.e..
      ~
,. tm1.:
PACIFIC GAS and ELECTRIC COMPANY                                                                                           . J.
._e~_-
CORPORATE EMERGENCY RESPONSE PLAN                                                   NUMBER: 4.9
L A
'      ($
.y j
PGwE IMPLEMENTING PROCEDURE REVISION: 2
i.im nav n PACIFIC GAS and ELECTRIC COMPANY
  -          TITLE                                                                                                                      DATE: 07/22/83                                 -
. J.
H                                                      QUALITY ASSURANCE                                                                 PAGE 04 0F 10                               ,
CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9
~
($
PGwE IMPLEMENTING PROCEDURE
. REVISION: 2 DATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 04 0F 10 H
~
~
NOTE: 'CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" describes the activation of the CERP.
NOTE: 'CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" describes the activation of the CERP.
ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY
ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.
: 3.               Receive event notification from the Corporate Technical and Logistical Coordinator that the Corporate Emergency' Response Plan
Receive event notification from the Corporate Technical and Logistical Coordinator that the Corporate Emergency' Response Plan (CERP)hasbeenactivated.
;.                                              (CERP)hasbeenactivated.
I 4.
I
Determine from the Corporate Technical and Logistical Coordinator the event emergency action level classification and extent of any requested response.
: 4.               Determine from the Corporate Technical and Logistical Coordinator the event emergency action level classification and extent of any requested response.
5.
: 5.               Notify the following Departmental personnel using Procedure Attachment 2, " Emergency Plan Titles, Personnel Assignments, and Notification List" and advise them of any requests from the Corporate Technical and Logistical Coordinator:
Notify the following Departmental personnel using Procedure, " Emergency Plan Titles, Personnel Assignments, and Notification List" and advise them of any requests from the Corporate Technical and Logistical Coordinator:
: a. Senior Quality Engineer - Program Management
a.
: b. Senior Quality Engineer - Auditing
Senior Quality Engineer - Program Management b.
: c. Records Management Coordinator
Senior Quality Engineer - Auditing c.
: d. Quality Assurance Supervisor
Records Management Coordinator d.
: 6.             Establish and direct a Department operation in the General Office with required Departmental support personnel.
Quality Assurance Supervisor 6.
: 7.             Coordinate with the following CERO personnel for requests regarding quality assurance services:
Establish and direct a Department operation in the General Office with required Departmental support personnel.
: a. Corporate Materials Coordinator
7.
: b. Corporate Engineering Coordinator 4
Coordinate with the following CERO personnel for requests regarding quality assurance services:
: c. Corporate Construction Coordinator
a.
: 8.             Periodically apprise the Corporate Technical and Logistical Coordinator of Departmental operations status, and as requested.                                                   -
Corporate Materials Coordinator b.
: 9.             Assure the availability of Departmental personnel and resources
Corporate Engineering Coordinator c.
      ~
Corporate Construction Coordinator 4
necessary to support the emergency response effort.
8.
                            - , - - - , , , - ,              .--,_-,-e-     ,,,,,n,--, ,, ,,,.,_-,,n---   ,
Periodically apprise the Corporate Technical and Logistical Coordinator of Departmental operations status, and as requested.
                                                                                                              ,,-.---.,._---.n . - - . - , - . - .-,--er,     yw,   ,, . --,..          -
9.
Assure the availability of Departmental personnel and resources necessary to support the emergency response effort.
~
.--,_-,-e-
,,,,,n,--,
,,,.,_-,,n---
,,-.---.,._---.n
.-,--er, yw,


                . . . ~                           .                                - .-                      a:-           . ~         = _ ~       _ ~.- w                                          -
_ ~.- w
  ;                                  e,*e,em 19621 NEV E3 e,
... ~
PACIFIC GAS and ELECTRIC COMPANY c0RPORATE EMERGENCY RESPONSE PLAN                               NUMBER: 4.9                           L REVISION: 2 i
a:-
e'                                                                     IMPLEMENTING PROCEDURE E'                                                                                                                                          ~ .DATE: 07/22/83 TITLE QUALITY ASSURANCE                                               PAGE 05 0F 10                       .
~
10.Assurethatcontinuous(24 hour)continuityofDepartmental operations is main.tained over a protracted perici of time.
= _ ~
: 11. As requested, or as Md necessary, dispatch additional Department personnel to the San Luis Obispo area. Transportation arrangements shall be made in accordance with the instruction in Procedure Attachment 4 " Emergency Transportation Instructions".
e,*e,em 19621 NEV E3 PACIFIC GAS and ELECTRIC COMPANY e,
c0RPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9 L
IMPLEMENTING PROCEDURE REVISION: 2 i e'
~.DATE: 07/22/83 E'
TITLE QUALITY ASSURANCE PAGE 05 0F 10 10.Assurethatcontinuous(24 hour)continuityofDepartmental operations is main.tained over a protracted perici of time.
: 11. As requested, or as Md necessary, dispatch additional Department personnel to the San Luis Obispo area. Transportation arrangements shall be made in accordance with the instruction in Procedure " Emergency Transportation Instructions".
: 12. Authorize and coordinate consulting services in support of CERO
: 12. Authorize and coordinate consulting services in support of CERO
                                                                                  ~ Department activities during the emergency.                        .        .
~ Department activities during the emergency.
: 13. Upon direction of the Corporate Technical and Logistical Coordinator deactivate the Departmental emergency response effort.
: 13. Upon direction of the Corporate Technical and Logistical Coordinator deactivate the Departmental emergency response effort.
l
: 14. Maintain the Departmer.t's " Emergency Response and Recovery l
: 14. Maintain the Departmer.t's " Emergency Response and Recovery Activities Record" binder in a current manner.                                                             ,
Activities Record" binder in a current manner.
: 15. Log all incoming and outgoing connunications which are related to 4
: 15. Log all incoming and outgoing connunications which are related to 4
                                                                                  - the emergency response effort using Procedure Attachment 5,
- the emergency response effort using Procedure Attachment 5,
                                                                                    " Emergency Connunications Log Sheet".
" Emergency Connunications Log Sheet".
NOTE: Completed " Emergency Communications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery I
NOTE: Completed " Emergency Communications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery
                                                                                          . Activities Record" binder.
. Activities Record" binder.
i
I i
: 16. Maintain a written record of pertinent emergency response and
: 16. Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6, " Emergency Response and Recovery Activities Log Sheet".
'                                                                                  recovery activities using Procedure Attachment 6, " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder.
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder.
B.                 Senior Quality Engineer - Program Management
B.
: 1. Take appropriate actions as identified under the following emergency action level classifications:
Senior Quality Engineer - Program Management 1.
Take appropriate actions as identified under the following emergency action level classifications:
m NOTIFICATION OF UNUSUAL EVENT
m NOTIFICATION OF UNUSUAL EVENT
(                                                                     For a Notification of Unusual Event emergency action level 2.
(
classification no notification will be made.                                       ,._
For a Notification of Unusual Event emergency action level 2.
classification no notification will be made.
M A
M A
        .-w-e     - - , - _ - - , - - - ._*,--.m. . --.,------..w-,--w--.,,,-                 r...-.-----w...r-.-......         -                      .-,      .-.w     am.-r-_--
.-w-e
._*,--.m.
. --.,------..w-,--w--.,,,-
r...-.-----w...r-.-......
.-.w am.-r- --


amw n:                         x                   . mu - s                 a--         a , = _~ . s_ u               -x>
amw n:
A ee ese mm nuv.or hl
x mu - s a--
a, = _~. s_ u
-x>
A hl
[
[
PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN                                                   NUMBER: 4.9 PGwE IMPLEMENTING PROCEDURE                                                                           : REVISION: 2 TITLE                                                                                                                                              DATE: 07/22/83                         -
ee ese mm nuv.or PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9 PGwE IMPLEMENTING PROCEDURE REVISION: 2 DATE: 07/22/83 TITLE QUALITY ASSijRANCE FAGE 06 0F 10 ALERT. SITE AREA EMERGENCY. AND GENERAL EMERGENCY 3.
QUALITY ASSijRANCE                                                                 FAGE 06 0F 10                       .
Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been activated.
ALERT. SITE AREA EMERGENCY. AND GENERAL EMERGENCY
4.
!                                                                          3.               Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been activated.
Detennine from the Corporate Quality Assurance Coordinator the event emergency action level classification and extent of any requested
: 4. Detennine from the Corporate Quality Assurance Coordinator the event emergency action level classification and extent of any requested
. response.
                                                                                          . response.                                                                              :.
5.
: 5.               Upon receipt of the event notification report to the General Of.fice work location.
Upon receipt of the event notification report to the General Of.fice work location.
: 6.                 Consult with the Corporate Quality Assurance Coordinator ori quality assurance programatic matters, as required.
6.
: 7.                 Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5,
Consult with the Corporate Quality Assurance Coordinator ori quality assurance programatic matters, as required.
                                                                                              " Emergency Comunications Log Sheet".
7.
Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5,
" Emergency Comunications Log Sheet".
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.
: 8.               Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".
8.
Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.
C.                 Senior Quality Engineer - Auditing
C.
: 1.               Take appropriate actions as identified under the following emergency i,                                                                                               action level classifications:
Senior Quality Engineer - Auditing 1.
i                                                                                       NOTIFICATION OF UNUSUAL EVENT
Take appropriate actions as identified under the following emergency i,
: 2.                 For a Notification of Unusual Event emergency action level                                                   - -
action level classifications:
      !,                                                                                        classification no notification will be made.
i NOTIFICATION OF UNUSUAL EVENT 2.
For a Notification of Unusual Event emergency action level classification no notification will be made.
m
m
      +,,.--.--,.,--*-,--.-,,-,,4             ..w,,,.,-,we,ww--w, . _ , . , - , . , - - - , , ,         -            ,,-,,-,,w     ,,wm,,,_,,y4.y-----.     ,,.y-,,,,,,,s--r7,--             .%,s-e     y .e   T+vv - ' = -e-+w-'s-*
+,,.--.--,.,--*-,--.-,,-,,4
..w,,,.,-,we,ww--w,. _,., -,., - - -,,,
,,-,,-,,w
,,wm,,,_,,y4.y-----.
,,.y-,,,,,,,s--r7,--
.%,s-e y
.e T+vv
- ' = -e-+w-'s-*


                                  ,.      . . , ~                                .: = w; -. : ~ a . - . ,_ .c                     .             .,. -__ .                 -          .x                .-s        , .
.: = w; -. : ~ a. -.,_.c
+                   .        .
.x
                                                                                                                                                                                                                              .'o 1                                                                                                                                                                                                                                 :
.-s
saa e,m asv.on                                                                                                                                                                                 ' I, PACIFIC GAS and ELECTRIC c0MPANY                                                                                                           L CORPORATE EMERGENCY RESPONSE PLAN                                                       NUMBER: 4.9                                           i-O                                                             IMPLEMENTING PROCEDURE                                                               -
.., ~
REVISION: 2 TITLE DATE: 07/22/83                                       ;
+
QUALITY ASSURANCE                                                                         PAGE 07 0F 10
.'o 1
                                                                              -ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY
' I, saa e,m asv.on PACIFIC GAS and ELECTRIC c0MPANY L
: 3.               Receive event notification from the Corporate Quality Assurance
CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9 i-O IMPLEMENTING PROCEDURE REVISION: 2 DATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 07 0F 10
:                                                                            Coordinator that the Corporate Emergency Response Plan has been l                                                                           activated.
-ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.
                                                      - 4.                 Determine from the Corporate Quality Assurance Coordinator the event emergency action level classification and extent of any requested response.                                                                        ..
Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been l
: 5.               Upon receipt of the event notification report to the General Office work location.
activated.
: 6.               Consult with the Corporate Quality Assurance Coordinator on quality assurance matters, as required.                                                                                                                     ,
- 4.
: 7.               As directed, coordinate the interface between the onsite and General Office Departmental personnel.
Determine from the Corporate Quality Assurance Coordinator the event emergency action level classification and extent of any requested response.
: 8.               Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5,
5.
                                                                            " Emergency Comunications Log Sheet".
Upon receipt of the event notification report to the General Office work location.
6.
Consult with the Corporate Quality Assurance Coordinator on quality assurance matters, as required.
7.
As directed, coordinate the interface between the onsite and General Office Departmental personnel.
8.
Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5,
" Emergency Comunications Log Sheet".
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurar.ce Coordinator.
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurar.ce Coordinator.
: 9.               Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".
9.
Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.
    ,                                        D.             Records Management Coordinator 4
D.
: 1.             Take appropriate actions as identified under the following emergency action level classifications:
Records Management Coordinator 1.
Take appropriate actions as identified under the following emergency 4
action level classifications:
h"
h"
                                                ..s~-               . - ~
..s~-
      - , - _ _ _ - - - - , _      - - _      c - ,, . , , , , , , , _ - _ ,           _y   , . ,  _ _ , , . , - , - - - , -- ,.  ,, ---.3--,,           r   _ , . , . -
. - ~
                                                                                                                                                                                --.--.4e - - - , . _ _ - . , - - - ,
c -,,.,,,,,,, _ - _,
_y
---.3--,,
r
--.--.4e


                                                                                                                                  =                             -
=
                                                                                                  ~
~
ee4sas formal nav.t2 j
j ee4sas formal nav.t2 PACIFIC GAS and ELECTRIC c0MPANY CORPORATE EMERGENCY RESPONSE PLAN NtMBER: 4,9
PACIFIC GAS and ELECTRIC c0MPANY NtMBER: 4,9 CORPORATE EMERGENCY RESPONSE PLAN                                                  [
[
REVISION: 2 sg                                                     IMPLEMENTING PROCEDURE                                   .
REVISION: 2 sg IMPLEMENTING PROCEDURE SATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 08 0F 10 NOTIFICATION OF UNUSUAL EVENT For a Notification of Unusual Event emergency action level 2.
        "                                                                                                                      SATE: 07/22/83 TITLE                                                                                                                       -
classification no notification will be made.
QUALITY ASSURANCE                                       PAGE 08 0F 10 NOTIFICATION OF UNUSUAL EVENT
ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.
: 2.              For a Notification of Unusual Event emergency action level classification no notification will be made.
Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been activated.
ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY
4.
: 3.             Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been                             .
Determine from the Corporate Quality Assurance Coordinator the event emergency action level classification and extent of any requested response.
activated.                                               ,
5.
: 4.             Determine from the Corporate Quality Assurance Coordinator the event emergency action level classification and extent of any requested response.
Upon receipt of the event notification contact the Department's Design Drafting Records Coordinator to have the Design Drafting Records Center manned by Department personnel familiar with engineering records.
: 5.             Upon receipt of the event notification contact the Department's Design Drafting Records Coordinator to have the Design Drafting                     -
6.
Records Center manned by Department personnel familiar with engineering records.
Upon completion of required notifications to Department personnel report to the General Office work location.
: 6. Upon completion of required notifications to Department personnel report to the General Office work location.
7.
: 7.           As required, dispatch selected Department personnel from the Central Files crea to assist the Design Drafting personnel.
As required, dispatch selected Department personnel from the Central Files crea to assist the Design Drafting personnel.
: 8.           Consult with the Corporate Quality Assurance Coordinator on records management matters, as required.
8.
: 9.         Direct the use of the Company Records Management System (RMS) to allow priority access to RMS documents from the onsite Technical Support Center.
Consult with the Corporate Quality Assurance Coordinator on records management matters, as required.
9.
Direct the use of the Company Records Management System (RMS) to allow priority access to RMS documents from the onsite Technical Support Center.
: 10. Supervise and coordinate the retrieval of drawings and documents for the Corporate Emergency Response Organization.
: 10. Supervise and coordinate the retrieval of drawings and documents for the Corporate Emergency Response Organization.
: 11. Keep the Corporate Quality Assurance Coordinator aporised of records management activities during the emergency.
: 11. Keep the Corporate Quality Assurance Coordinator aporised of records management activities during the emergency.
: 12. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5
: 12. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5
                                                                    " Emergency Comunications Log Sheet".
" Emergency Comunications Log Sheet".
NOTE: Completed " Emergency Comunications Log Sheets" shall be             . _
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder, which is maintained by the
placed in the Department's " Emergency Response and Recovery         .
~, '
I
I Corporate Quality Assurance Coordinator.
        ~ , '
~
Activities Record" binder, which is maintained by the
s-
        '                                                                   Corporate Quality Assurance Coordinator.
,--,yy,
                                                                          ~
--_--.------_y
s-           , - - - -           ,--,yy,     --_--.------_y
--._p,.,,7,
,,.-, -, ---.m, -,. -,. -.- --
--&__y-.,-
m,-.-
-------.---m-,.w--,-


                                                                                      - m               _ _ . _ _      -_ m I                   es4Ses totaal new.gr
- m
                                                                                                                                            'f PACIFIC GAS and ELECTRIC c0MPANY                 NUMBER: 4.9 CORPORATE EMERGENCY RESPONSE PLAN                                       .
-_ m I
[
es4Ses totaal new.gr
h REVISION: 2 m                                          IMPLEMENTING PROCEDURE                                     ~      . 07/22/83
' f PACIFIC GAS and ELECTRIC c0MPANY NUMBER: 4.9 CORPORATE EMERGENCY RESPONSE PLAN
~2'                                                                                                                 .
. [
TITLE                                                                                       PAGE 09 0F 10           ;
h REVISION: 2 IMPLEMENTING PROCEDURE
QUALITY ASSURANCE
- m 07/22/83
                                                                                                                                            ~
~2'
(          13. Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6 " Emergency Response and Recovery Activities Log Sheet".
~
                                                          ' NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency i
TITLE PAGE 09 0F 10 QUALITY ASSURANCE
Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assistance Coordinator.
: 13. Maintain a written record of pertinent emergency response and
E. Quality Assurance Supervisor                                                                 ~
~
: 1. Take appropriate actions as identified under the f'ollowing emergency action level classifications:                                         ,
(
NOTIFICATION OF UNUSUAL EVENT               .
recovery activities using Procedure Attachment 6 " Emergency Response and Recovery Activities Log Sheet".
: 2.            For a Notification of Unusual Event emergency action level                       -
' NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is i
classification no notification will be made.
maintained by the Corporate Quality Assistance Coordinator.
E.
Quality Assurance Supervisor
~
1.
Take appropriate actions as identified under the f'ollowing emergency action level classifications:
NOTIFICATION OF UNUSUAL EVENT 2.
For a Notification of Unusual Event emergency action level classification no notification will be made.
l ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY l
l ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY l
                                      .      3.           Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been activated.
3.
: 4.            Determine from the Corporate Quality Assurance Coordinator the event emergency action level classification and extent of any requested response.
Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been activated.
: 5.            Upon receipt of event notification report to the General Office work location.
Determine from the Corporate Quality Assurance Coordinator the event 4.
: 6.             Consult with the Corporate Quality Assiirance Coordinator on quality assurance matters, as required.
emergency action level classification and extent of any requested response.
: 7.             Track the installation of materials used in construction /
Upon receipt of event notification report to the General Office work 5.
location.
6.
Consult with the Corporate Quality Assiirance Coordinator on quality assurance matters, as required.
7.
Track the installation of materials used in construction /
modification / repair activities at the Plant site.
modification / repair activities at the Plant site.
: 8.            Monitor onsite quality control activities, and as necessary., consult
Monitor onsite quality control activities, and as necessary., consult 8.
    .                                                        with the Senior Quality Engineer - Auditing, on quality control and procurement matters performed in accordance with the Quality Assurance Manual for Operating Nuclear Power Plants using Manual
with the Senior Quality Engineer - Auditing, on quality control and procurement matters performed in accordance with the Quality Assurance Manual for Operating Nuclear Power Plants using Manual
(                                               Procedure 3.1, " Procurement of Items and Services".
(
: 9.          Keep the Corporate Quality Assurance Coordinator apprised of all-       -
Procedure 3.1, " Procurement of Items and Services".
I          ^                                                  onsite Department activities during the emergency.
Keep the Corporate Quality Assurance Coordinator apprised of all-9.
w l
onsite Department activities during the emergency.
      =g-Wee-   Mey                           -----,y-w
I
^
l w
=g-Wee-Mey yrw-----t wwr-w-ww---were
-----,y-w y yw - ww-ryw w.ww ww
----*mg,ww-ww,7w--
so--w-yew,ye-p-es
-wi-mggwww m
=s----e--ee s
-w &w-r--www-w----wwvr---vy----wr-W--
-a,-mp


                                                                                                                                                                          ~                    . . .
,_ w a
                                                                                                                                                                                                      -_,  ,_ w a 4                                                                                                                                                                                                                                   ,
~
  !                                                                                                                                                                                                                                ti i                                                                                                     PACIFIC GAS sad ELECTRIC c0MPANY CORPORATE EMERGENCY RESPONSE PLAN                                                                         NUMBER: 4.9 REVISION: 2 O                                                            IMPLEMENTING PROCEDURE                                                                                                            .
4 ti i
DATE: 07/22/83 TITLE QUALITY ASSURANCE                                                                                     PAGE 10 0F 10
PACIFIC GAS sad ELECTRIC c0MPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9 O
: 10. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5, i                                                                           " Emergency Cosaunications Log Sheet".
IMPLEMENTING PROCEDURE REVISION: 2 DATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 10 0F 10
  -                                                                          NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.
: 10. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5, i
                                                                    ;11. Maintain a written record of emergency response and recovery
" Emergency Cosaunications Log Sheet".
  -                                                                            activities using Procedure Attachment 6. " Emergency Response and                                                                     -
NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.
Recovery Activities Log Sheet".
;11. Maintain a written record of emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is                                                                   ,
NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.
maintained by the Corporate Quality Assurance Coordinator.                                                               -
V.
V.       REFERENCES
REFERENCES 1.
: 1. Quality Assurance Manual for Operating Nuclear Power Plants
Quality Assurance Manual for Operating Nuclear Power Plants 2.
: 2. QA Manual Procedure 3.1, " Procurement of Items and Services"
QA Manual Procedure 3.1, " Procurement of Items and Services" 3.
: 3. Corporate Emergency Response Plan 4   CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" VI. ATTACHMENTS
Corporate Emergency Response Plan 4
: 1. Department Organizational Relationships
CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" VI. ATTACHMENTS 1.
: 2. Emergency Plan Titles, Personnel Assignments, and Notification List
Department Organizational Relationships 2.
: 3. Emergency Organization Contact List
Emergency Plan Titles, Personnel Assignments, and Notification List 3.
: 4. Emergency Transportation Instructions
Emergency Organization Contact List 4.
: 5. Fom 69-084, " Emergency Cosuunications Log Sheet"
Emergency Transportation Instructions 5.
: 6. Fom 69-085 " Emergency Response and Recovery Activities Log Sheet"
Fom 69-084, " Emergency Cosuunications Log Sheet" 6.
* e a
Fom 69-085 " Emergency Response and Recovery Activities Log Sheet" e
                                                                      -___.. ,___--_._,-._ ,. ,--_ , _._.__-_, ,-,, _ . _. - ,,,,,. - ,., ,,,., ,... ._... , _ , , , ,,, ,-, ,- -- ,_ _ -,_e _
a
-___..,___--_._,-._,.,--_, _._.__-_,,-,, _. _. -,,,,,. -,.,,,,.,,...._..., _,,,,,,,-,,- --,_ _ -,_e _


n             +      w: ... ._ e.v.
+na m w: -
                                                            +na m w: -        .                                                                                                        : - . *          -
m/
m/                                          - :- w.
- :- w.
q                                                                                                                                                                                                                                                                                                       to
n w:...._ e.v.
                                                                                                                                                                                                                                                                                                        ~
+
i                                                                                                                                                                                                                                                                                                          i
q to i
                                  ~ ,,-v. n                                                                                                                                                                                                                                                                 i PACIFIC GAS and ELECTRIC COMPANY                                                                                                           NUMBER: 4.9                                                                   I.
~
CORPORATE EMERGENCY RESPONSE PLAN PGwE                                                                                                                                                                                                 REVISION: 2 O                                                   IMPLEMENTING PROCEDURE                                                                                                                               -
ii
                                                                                                                                                                                                                              . ATTACHMENT: 1 DATE: 07/22/83 TITLE                                           QUALITY ASSURANCE
~
                                                                                                                                                                                                                                                                                                            ~
,,-v. n PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.9 I.
PAGE 01 0F 01                                                           .
CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 2 O
DEPARTMENT ORGANIZATIONAL RELATIONSHIPS SOP 1
IMPLEMENTING PROCEDURE
ASCOvtRY taANADER                                                                                                     ,
. ATTACHMENT: 1 DATE: 07/22/83 TITLE QUALITY ASSURANCE
CsRC ComPORATE 75CeesseCAL AssO                                                                                                                             .
~
LOGaSTsCAL                                                                                                                           '
PAGE 01 0F 01 DEPARTMENT ORGANIZATIONAL RELATIONSHIPS SOP 1
COOROsasA7088 g-...-..                           . -...      . ,
ASCOvtRY taANADER CsRC ComPORATE 75CeesseCAL AssO LOGaSTsCAL COOROsasA7088 g-...-..
GO                                            Ce#C                     !                                          00 l                      Ce#C CO81PORATE                             COAPOftAYg y                      CORPORATE CessBTRUCTeGet ba&TERIALS                           SeeGaseEEmiseG                                                                 AmuRAseCE                  -
00 l Ce#C GO Ce#C y
CODAOcesATO4
CORPORATE CO81PORATE COAPOftAYg AmuRAseCE CessBTRUCTeGet ba&TERIALS SeeGaseEEmiseG
* TOR COOROsasATOft                                                                                                       COOstseesATOst
* TOR COOROsasATOft CODAOcesATO4 COOstseesATOst 1
                                                    ' - - - - - - - - - -                                                                  1                                                i . . _.. _.. _ .               . _ . . _ . . _ . . _
i.. _.. _.. _.
r---------                                                                                                                                                                                                                          -
r---------
:                                                                                                                                                                                                                                    I I                                       OO                                                                           90                                 Go                                   C=C                                   :
I I
                                                              $8854001 OuALITY seeGeeseEn                                       maseca cuALITY                                                     RECOftOS                     asALI?v                                                     .
OO 90 Go C=C
I.                    FItOGAAte                                                 EgeGeseEER                                               RAAasA48esEsef               AmumAseCE
$8854001 OuALITY I
seeGeeseEn maseca cuALITY RECOftOS asALI?v FItOGAAte EgeGeseEER RAAasA48esEsef AmumAseCE
(
(
* ggyggertegNTI.                                             teuestseest                                             COOmosesATOR                 guPERVISOm I                                             l                                                                                                                                                                                                                                   :
ggyggertegNTI.
I.
teuestseest COOmosesATOR guPERVISOm I
l I.
Lasamus.
Lasamus.
Lane Anaheresy
Lane Anaheresy l
                                              - .. - .. - ..                Ousertummens Peuummm8 l                                              .0,-.                   0.m.m.m.m. me=0, ComC - Carpmemme amusene Rammmmme Cmuner WC - Opermummi Bessert Caumer GO -stemmelOfeus f
Ousertummens Peuummm8
                                                                                                                                                                                                                                                                                                  *6 f
.0,-.
            '/g
0.m.m.m.m. me=0, ComC - Carpmemme amusene Rammmmme Cmuner WC - Opermummi Bessert Caumer GO -stemmelOfeus f
    - - - -      ,-,-,-,-,-n,-,e-we                   - - - - - -      . , .          - - - - - - , . . - - - - - - - - - ~ - - - - - , - - , - - - - , - - - - , , , - - - -                                          . - - - - - - - - - - - - , - - - - - - - - - - - - - - - - - - - -
*6 f
'/g
,-,-,-,-,-n,-,e-we
- - - - - -,.. - - - - - - - - - ~ - - - - -, - -, - - - -, - - - -,,, - - - -


                                                                                . ,m    ..                    _ .. . .
s_ __ _~af A u.,c.m aux
s_ __ _~af A u . ,c .m aux                                                                 _
.,2.__ _ _ _
                                                          .,2.__ _ _ _     ,_,
.,m m 41m foren EGv t2 NUMSER: 4.9 I
m 41m foren EGv t2                                                                                                     I PACIFIC GAS and ELECTRIC COMPANY NUMSER: 4.9 RE'!ISION: 2               -I' PGwE CORPORATE EMERGENCY RESPONSE PLAN
PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN RE'!ISION: 2
-I'
[
[
A M CHMENT: 2 IMPLEMENTING PROCEDURE (Il TITLE                    QUALITY ASSURANCE
PGwE IMPLEMENTING PROCEDURE A M CHMENT: 2 (Il
                                                                                              - ,DATE: 07/22/83 PAGE 010F 02                 -
-,DATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 010F 02 EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST NAME HOME PHONE EMERGENCY PLAN TITLE NON EMERGENCY TITLE BUSINESS PHONE l
EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST NAME                                       HOME PHONE EMERGENCY PLAN TITLE                                                               BUSINESS PHONE NON EMERGENCY TITLE l                                         j Corporate Quality                       1.     S. M. Skidmore Assurance Coordinator                         Manager,                       i Quality Assurance             :-
Corporate Quality 1.
t
S. M. Skidmore j
: 2. T. G. de Uriarte               ,
Assurance Coordinator
Senior Quality Engineer
: Manager, i
: 3.     P. C. Burgess Senior Quality Engineer -               1.     F. J. Dodd                     .
Quality Assurance t
Program Management       .
2.
Senior Quality Engineer j   2.     K. T. Bergmann Quality Engineer             i t
T. G. de Uriarte Senior Quality Engineer 3.
: 3.     M. L. Braham Quality Engineer Senior Quality Engineer                   1. T. G. de Uriarte (Auditing)             -                      Senior Quality Engineer         ,
P. C. Burgess Senior Quality Engineer -
l    2.     G. W. Heggli 3
1.
Quality Engineer
F. J. Dodd Program Management Senior Quality Engineer j
: 3.     D. S. Aaron Quality Assurance Analyst i
2.
I Record Management Coordinator I   1.     H. M. Cox
K. T. Bergmann Quality Engineer i
'                                                              Records Supervisor
t 3.
M. L. Braham Quality Engineer Senior Quality Engineer 1.
T. G. de Uriarte (Auditing)
Senior Quality Engineer l
2.
G. W. Heggli 3
Quality Engineer 3.
D. S. Aaron Quality Assurance Analyst i
I Record Management I
1.
H. M. Cox Coordinator Records Supervisor
(
(
: 2.     UNASSIGNED                                                   1
2.
                                    '        ~                                                                                   .
UNASSIGNED 1
~
1 mM M
1 mM M
 
: x... ; _
:.:        _ .  : x . . . ; _               w. .n ,__ ,, _ ,,_. . .__                           _
: w..n,__,, _,,_...__
. . - . . -    : . . .: x -
:...: x -
                                                                                                                                      .a 2
.a 2
            ~ 43. w.v ..s ., -
~ 43. w.v..s., -
NUMBER: 4.9                 f PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RisPONsE PLAN REVISION: 2               ff PGwE       -
NUMBER: 4.9 f
_ ATTACHMENT: 2 p~>                         IMPLEMENTING PROCEDURE                                                      4) ATE: 07/22/83 TITLE                   QUALITY ASSURANCE                                                   PAGE 02 0F 02 EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST i                                                                                                           HOME PHONE
PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RisPONsE PLAN REVISION: 2 ff PGwE IMPLEMENTING PROCEDURE
                                                                ~
_ ATTACHMENT: 2 p~>
NAME EMERGENCY PLAN TITLE'                           .
: 4) ATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 02 0F 02 EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST i
BUSINESS PHONE NON EMERGENCY TITLE                                       -+
HOME PHONE NAME EMERGENCY PLAN TITLE'
Quality Assurance Supervisor !                     1. R. T. Twiddy
~
                                                                        - Quality Assurance               .
NON EMERGENCY TITLE BUSINESS PHONE
i                                                                          Supervisor s
-+
: 2. C. M. Seward, Jr.             :
Quality Assurance Supervisor !
1.
R. T. Twiddy
- Quality Assurance i
Supervisor s
2.
C. M. Seward, Jr.
Quality Engineer
Quality Engineer
)
)
                                                              '    3. R. W. Taylor               ;                                  -
3.
Quality Engineer
R. W. Taylor Quality Engineer 4.
:    4. M. S. Dobrzensky           !
M. S. Dobrzensky Quality Engineer Design-Drafting f
Quality Engineer
1.
: 1. H. E. Deady                 l Design-Drafting                              f Records Coordinator                       i           Engineering Recorcs         i Supervisor
H. E. Deady l
: 2. D. W. Houchton Supervisor, Engineering Records & Administrative Services
Records Coordinator i
: 3. D. L. Bullard Administrative Services Supervisor                       ,
Engineering Recorcs i
t-W n
Supervisor 2.
D. W. Houchton Supervisor, Engineering Records & Administrative Services 3.
D. L. Bullard Administrative Services Supervisor t-W n
p.-
p.-
w ..
w..


                                    -_ c:  s -     - ,f -       .-          2_,    .  .. % ,.          _.        , , ,        ,    _,
s -
                  .uc c . 2._
-,f -
      .      e o
2_,
* j so-osaa feisas pav or
.uc c. 2._
                                ^ '
- c:
PACIFIC GAS and ELECTRIC COMPANY -                             - NUMBER: 4.9                      [
e o
CORPORATE ENERGENCY RESPONSE PLAN                                     REVISION: 2                 I PGwE           -
j so-osaa feisas pav or
ATTACHMENT: 3
- NUMBER: 4.9
: c.                             IMPLEMENTING PROCEDURE                                                        --DATE:
[
                                                                                                                  '      07/22/83 V:>
^
TITLE                       QUALITY ASSURANCE                                                                                   -
PACIFIC GAS and ELECTRIC COMPANY -
PAGE 010F 01 EMERGENCY ORGANIZATION CONTACT LIST i
CORPORATE ENERGENCY RESPONSE PLAN REVISION: 2 I
                                                                                                      ;      EMERGENCY LOCATION EMERGENCY PLAN TITLE                         NAME I
PGwE IMPLEMENTING PROCEDURE ATTACHMENT: 3 c.
NORMAL BUSINESS PHONE                     :      EMERGENCY PHONE Recovery Manager                             1. J. D. Shiffer                       l       EOF s-
- DATE: 07/22/83 V:>
                                                                                              /       i t-
TITLE QUALITY ASSURANCE PAGE 010F 01 EMERGENCY ORGANIZATION CONTACT LIST i
: 2. j{. A. Raymond                       - ,
EMERGENCY LOCATION EMERGENCY PLAN TITLE NAME I
: 3. J. D. Townsend
NORMAL BUSINESS PHONE EMERGENCY PHONE Recovery Manager 1.
                                                                                    . __ s'
J. D. Shiffer l
: 4. R. C. Thornberry B. Hoch                              CIRC Corporate Technical and                     1.   ~J.
EOF
Logistical Coordinatcr                 ,
/
t M. R. Tressler                <      -
i s-t
: 2. j{. A. Raymond 3.
J. D. Townsend
. __ s' 4.
R. C. Thornberry Corporate Technical and 1.
~J. B. Hoch CIRC Logistical Coordinatcr t
2.
2.
i                   ../
M. R. Tressler i
i   3. R. A. Young l                  __ _ _ _
../
                                                                                          '~>'
i 3.
i I
R. A. Young ' ~ > '
I
l i
(                                                                                                                           _ . . .
I I
(
gs I
gs I
                                          ~                                                       ___.A..
~
___.A..
u
u


                  .= a w.a.h ; .a_                 uu. . w : - :.u.u a.:       :+- ~~                   a:wa .sg.;aw im.a.u                              ,
a:wa.sg.;aw im.a.u
.= a w.a.h ;.a_
uu.. w : - :.u.u a.:
:+- ~~
E~
E~
          ~ ~
~ ~
                                                                                            ~ ~ ~ ~ ~ ~ ^~
~ ~ ~ ~ ~ ~ ^~
ee-ape is s21 msv 07 PActFic GAS sad ELECTRIC COMPANY                                     NUMBER:       4.9       .!
PActFic GAS sad ELECTRIC COMPANY NUMBER:
I-CORPORATE EMERGENCY RESPONSE PLAN                                       REVISION: 2 PGwE g                                     IMPLEMENTING PROCEDURE                                                 -
4.9 ee-ape is s21 msv 07 I-CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE g
                                                                                                                        . ATTACHMENT: 4 TITLE                                                                                          .        DATE: 07/22/83 QUALITY ASliURANCE PAGE 01 0F 04             -
IMPLEMENTING PROCEDURE ATTACHMENT: 4 QUALITY ASliURANCE DATE: 07/22/83 TITLE PAGE 01 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS A.
EMERGENCY TRANSPORTATION INSTRUCTIONS A.         Critical Emergency Response Personnel
Critical Emergency Response Personnel Upon receipt of notification of the emergency event, the following 1.
: 1. Upon receipt of notification of the emergency event, the following critical emergency response personnel (listed by emergency title) shall
critical emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:
* be responsible for arranging their own transportation, if required, to the San Luis Obispo area:
. Recovery Manager
                                            . Recovery Manager
. Operations and Analytical Recovery Manager
                                            . Operations and Analytical Recovery Manager                                               .
. Engineering and Logistics Recovery Manager
                                            . Engineering and Logistics Recovery Manager
. Radiological Emergency Recovery Manager
                                            . Radiological Emergency Recovery Manager                                             *
. Public Infonnation Recovery Manager.
                                            . Public Infonnation Recovery Manager.
All other PGandE emergency response support personnel travel _ing to the San Luis Obispo area shall arrange transportation in accordance with the
All other PGandE emergency response support personnel travel _ing to the San Luis Obispo area shall arrange transportation in accordance with the
                                                                ~
~
instructions set forth in B. below.
instructions set forth in B. below.
: 2. The above-listed individuals may elect to utilize their own vehicles or
The above-listed individuals may elect to utilize their own vehicles or 2.
                              ~
any os.e of the following transportation services:
any os.e of the following transportation services:                                                         '
~
1
1 a.
: a. Corporate Aircraft
Corporate Aircraft 1)
: 1)     General 0ffice................................
General 0ffice................................
l I
l I
: 2)     Oakl and Ai rport Hanger #8. . . . . . . . . . . . . . . . . . . . .
2)
: b. Oakland Executive Air Tennina1. . . . . . . . . . . . . . . . . . . . . . L-                   -*
Oakl and Ai rport Hanger #8.....................
                                                  '(ask for PGandE Transportation Coordinator)
b.
: c. 24-hour Fixed Wing Air Charter Services:
Oakland Executive Air Tennina1...................... L-
: 1) Cal-West Avia tion (Concord) . . . . . . . . . . . . .(415)672-0214          . . . . . . . . (415 )82 (415)932-5794
'(ask for PGandE Transportation Coordinator) 24-hour Fixed Wing Air Charter Services:
: 2) Skyways #via tion , Inc. (San Carlos). . . . . . . . . . . . . 415)593-1448 415)S74-4704
c.
^                                                                                                                             415)345-7423 415)573-1152 t
: 1) Cal-West Avia tion (Concord)..................... (415 )82 (415)672-0214 (415)932-5794
: 3) Coastal Ai r (San Luis Obispo) .. . . . .. . ...... . . . .. (805)544-6464 -
: 2) Skyways #via tion, Inc. (San Carlos)............. 415)593-1448 415)S74-4704
: 4) Golden Gate Piper (San Carlos).. . .. .......... . . . (408)446-2439
^
: 5) _ Pacific Piper Aviation (San Jose)... .. .. .. . . . . .. (408)294-4016 (408)225-2540 (408)374-9985
415)345-7423 415)573-1152 t
                                                              .me,__ _ '
: 3) Coastal Ai r (San Luis Obispo)................... (805)544-6464 -
: 4) Golden Gate Piper (San Carlos).................. (408)446-2439
: 5) _ Pacific Piper Aviation (San Jose)............... (408)294-4016 (408)225-2540 (408)374-9985
.me,__ _ '
vm em m p m _
vm em m p m _
r,--
r,--


                  -- -.                          4 2w _m         --
4 2w _m w
w            ,_,e. #            4  ,    e ,-ua.um
,_,e.
                  .~ .., - ,,                                                                                                                                                                   ll pacific gas sad ELECTRIC COMPANY                                           NUMBER:         4.9                     I CORPORATE EMERGENCY RESPONSE PLAN PGwE                                                                                                                                 REVISION-             2 g                                                       IMPLEMENTING PROCEDURE                                                             . . ,mca. 4 TITLE                                                   QUALITY ASSURANCE                                                           DATE: 07/22/83                         -
e,-ua.um 4
PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS A.                   Critical Emergency Response Personnel (Cont'd.)
ll
: d.           24-hour Helicopter Air Charter Services (in order of preference):
.~.., -,,
: 1) Aris Helicopters, Ltd. (San                       Jose)...............               (408)293-0800 (408)354-0039
pacific gas sad ELECTRIC COMPANY NUMBER:
"                                                                2)'Astrocopters(0akland)..........................(415)635-6880 (415)687-5179 (415)939-5683
4.9 I
: 3) California Helicopter Airways, Inc. (Hayward)... (415)'783-4000 (415)632-3529                     ,
CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION-2 g
: e.          The telephone company yellow pages list additional air charter services.
IMPLEMENTING PROCEDURE
: f.         Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.
..,mca. 4 TITLE QUALITY ASSURANCE DATE: 07/22/83 PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS A.
Critical Emergency Response Personnel (Cont'd.)
d.
24-hour Helicopter Air Charter Services (in order of preference):
: 1) Aris Helicopters, Ltd. (San Jose)............... (408)293-0800 (408)354-0039 2)'Astrocopters(0akland)..........................(415)635-6880 (415)687-5179 (415)939-5683
: 3) California Helicopter Airways, Inc. (Hayward)... (415)'783-4000 (415)632-3529 The telephone company yellow pages list additional air charter e.
services.
f.
Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.
To arrange emergency transportation 'with the CHP, the Recovery Manager should call one of the following numbers, as appropriate:
To arrange emergency transportation 'with the CHP, the Recovery Manager should call one of the following numbers, as appropriate:
: 1) During normal office hours Golden Gate Division.......................... (415)S57-0640 1                                                                 2) During non-office hours Oakland Dispatch Center....................... (415)658-9115 Connunications with CHP personnel should reference the CHP Golden l
: 1) During normal office hours Golden Gate Division..........................
Gate Division S.O.P. 3.48 which describes the emergency b
(415)S57-0640 1
: 2) During non-office hours Oakland Dispatch Center....................... (415)658-9115 l
Connunications with CHP personnel should reference the CHP Golden b
Gate Division S.O.P. 3.48 which describes the emergency l
transportation services the CHP will provide.
transportation services the CHP will provide.
l I
Regardless of the mode of transportation utilized, prior to I
: g.      Regardless of the mode of transportation utilized, prior to departure, each individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo i                                                          area, and any other special requirements or infomation. The Corporate Technical and Logistical Coordinator will then advise the                                                   -
g.
Corporate Division Coordinator accordingly so as to ensure that'any necessary ground logistical support is in place prior to the arrival of personnel in the San Luis Obispo area.
departure, each individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or infomation. The i
1 w,.
Corporate Technical and Logistical Coordinator will then advise the Corporate Division Coordinator accordingly so as to ensure that'any necessary ground logistical support is in place prior to the arrival of personnel in the San Luis Obispo area.
                          ------+-+~--,---w--w-       ,-,,-,-w,             ,      -,
,1 w,.
                                                                                          - , , , - ,    - , . , . en,rv,,-,- , -  - --,, _w-,m y,y     -  -.m -m-w m---w   - ------r         m
------+-+~--,---w--w-
,-,,-,-w, en,rv,,-,-
_w-,m y,y
-.m
-m-w m---w
------r m


w-           w. w.     - - . n. -       ..-n.---                -- -
G._
G._      a.          -.
a.
ee4sm tcven Rav es                                                                                                 j PActFIC GAS and ELECTRIC CoMPAxy               NUMBER:       4.9         .I CORPORATE EMERGENCY RESPONSE PLAN                                               [
w-
g                              IMPLEMENTING PROCEDURE                                 .. ATTACHMENT: 4 TITLE                           QUALITY ASSURANCE                               DATE: 07/22/83                 -
: w. w.
                                          ~
- -. n. -
..-n.---
j ee4sm tcven Rav es PActFIC GAS and ELECTRIC CoMPAxy NUMBER:
4.9
.I CORPORATE EMERGENCY RESPONSE PLAN
[
IMPLEMENTING PROCEDURE
.. ATTACHMENT:
g 4
TITLE QUALITY ASSURANCE DATE: 07/22/83
~
PAGE 03 0F 04 EMERGENCY TRANSPORTATION I STRUCTIONS
PAGE 03 0F 04 EMERGENCY TRANSPORTATION I STRUCTIONS
                .B.     Other Emergency Response Personnel
.B.
: 1. All other PGandE emergency response support personnel traveling to the San Luis Obispo area shall utilize their own vehicles or transportation services provided by PGandE.
Other Emergency Response Personnel 1.
: 2. If PGandE transportation services are to be utilized, personnel should proceed to make transportation arrangements in one of the following manners:
All other PGandE emergency response support personnel traveling to the San Luis Obispo area shall utilize their own vehicles or transportation services provided by PGandE.
: a. During normal office hours, contact the General Office Travel Desk (Room 1610,77 Beale Street), either in person or via the telephone, to arrange transportation. The primary telephone numbers for the General Office Travel Desk are:
2.
                                                  ..---f
If PGandE transportation services are to be utilized, personnel should proceed to make transportation arrangements in one of the following manners:
: b. If these lines are busy, the following alternate telephone numbers should- be used:                                   ,
During normal office hours, contact the General Office Travel Desk a.
3
(Room 1610,77 Beale Street), either in person or via the telephone, to arrange transportation. The primary telephone numbers for the General Office Travel Desk are:
: c. During non-office hours, following receipt of notification of the emergency event, personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there.
..---f b.
Note: Personnel are advised to bring only a minimum amount of                       .
If these lines are busy, the following alternate telephone numbers should be used:
baggage.
3 During non-office hours, following receipt of notification of the c.
f
emergency event, personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there.
: d. If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability.           9
Note: Personnel are advised to bring only a minimum amount of baggage.
: e. Regardless of the mcde of transportation utilized, prior to departure, each individual shall contact the Recovery Manager or Coordinator to whom (s)he functionally reports and advise him of the
f d.
(                               estimated times of departure and arrival, the arrival location in             '~   -
If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability.
-                                    the San Luis Obispo area, and any other special requirements or                 ,
9 Regardless of the mcde of transportation utilized, prior to e.
infonration.
departure, each individual shall contact the Recovery Manager or Coordinator to whom (s)he functionally reports and advise him of the
: f. The Transportation Coordinator will coordinate arrangements, as
(
                                    . required, with the Corporate Division Coordinator for grcund transportati~on and lodging for PGendE persencel in the I
estimated times of departure and arrival, the arrival location in
'~
the San Luis Obispo area, and any other special requirements or infonration.
f.
The Transportation Coordinator will coordinate arrangements, as
. required, with the Corporate Division Coordinator for grcund transportati~on and lodging for PGendE persencel in the I
San Luis Obispo area.
San Luis Obispo area.


w -                          ::                          .=               -
.=
o op-esas to/est osv.e2 PACIFIC GAS and ELECTRIC COMPANY                                                                                                       huMBER:             4.9                           [
w -
'o op-esas to/est osv.e2 PACIFIC GAS and ELECTRIC COMPANY huMBER:
4.9
[
i.
i.
CORPORATE EMERGENCY RESPONSE PLAN P G'stE                                                                                                                                                                                   REVISION-                     2 O                                               IMPLEMENTING PROCEDURE                                                                                                                                       gr73cangn7: 4 TITLE                                           QUALITY ASSURANCE DATE: 07/22/83                                     -
CORPORATE EMERGENCY RESPONSE PLAN P G'stE REVISION-2 O
PAGE 04 0F 04                                   .
IMPLEMENTING PROCEDURE gr73cangn7: 4 TITLE QUALITY ASSURANCE DATE: 07/22/83 PAGE 04 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS Y'
EMERGENCY TRANSPORTATION INSTRUCTIONS Y'                    '
d DIRECTIONS FROM NIMITT FREEWAY A)* '
d'# DIRECTIONS FROM NIMITT FREEWAY                                                                                     A)* '                     "h _ __
"h _ __
I j,-'   '
I
: 1. En snuih on HEGENBERGER ROAD (RT 17) 1 elle .,
'# 1. En snuih on HEGENBERGER ROAD (RT 17) 1 elle
g
: 2. " urn einht onto DOOLITTLE DRIVE.
: 2. " urn einht onto DOOLITTLE DRIVE.                                                                     -
g j,
                                                          %,     MP               3. ' urn left onto LANGLEY STREET.
MP
4, ' ' urn rinht at EARHART ROAD and park in the                                                                 :                                        '-
: 3. ' urn left onto LANGLEY STREET.
* parking lot on the corner.                                                                           31
' urn rinht at EARHART ROAD and park in the 4, '
                                ',                                        e y
parking lot on the corner.
u   _
31 e
y u
c.,
c.,
3
3 i
                                        ............r        :.=.
/^
                                                              =
:.=.
i                      /^                                                        --
+/ '
s            a
............r s
                                                                                              +/ '                                                                                                          y 3                    \       '
a
g             "
=
s e,.
y e,.
                                                                                                                                                                              ,        .,          7                  $
7 3
                                                    \                                                              I.                     %.            ,
\\
f                 _
g s
k7 2b,                                 '1                                               s.
\\
                                                $.. \
I.
L                        N-                                    ,
f k
                                                  %. a    k.                     .
2b,
                                                                                                              ,, :%                    .? ;              -
'1
                                                                                                                                                                /      . %.4        ,a
%. a.
                                                                                                                                                                                      .p                              v               ......
N
4,( s;                   .
. %.4
j-
$.. \\
                                                                                                                                                                                                                                          .,W    -
L s.
                              .                                                                     _ _,, . \                                   -
7 k
1,M         i \    ,-(            ,
,a
T .D
/
                                                                                                                                                                                                                                      ,\.*
.?
r                                                                                                 p                          .f,'                          *
v
                                                                                                                                                                                                                    .,Y',
.p
s                                                                                                                                                   t                               .
.,W 4,( s; j-
                                                                      ,y                                                                                                                   :_,                        Q Q..        s.wa
\\
                                                -    :  =.                                                                    '.                                  -
i,-(
                                                                                                                                                                                      $,s.*                   .
T.D
                                                                                                                                                                                                                        'i N
_ _,,. \\
                                                                      \.                             '                                          ^-
1,M
f                       % ;- $,: g9s
.f,'
Y',,\\.*
p r
s t
Q.. :
,y ':;
:_ Q
$,s.*
'i N
s. w
=.
\\.
a f
% ;- $,: g
^-
9s
/
j
(
(
                                                                                                                                            ; ...                                /            ,'
s Y,),
j s
-W---
Y,) ,                         -W---                       E~                         --
E~
                                          <f4p.                                                                                          g.
i
m i. s,                             -
<f p.
m. s, 4
g.
v I
v I
c                                                       x           +                                                                                             .
,c x
                                                                                                                                                              \.Yl;. ..                               ,
+
I    Edb
\\....
                                                                                                                                                                                                              ._ v   $    GD 6       ePW l               . . . .
._ v I
Edb GD 6
ePW Yl; l


_._m.,                   _
_._m.,
:_ u .         _
:_ u.
                                                                                ..n.__-. i_.__     _ _ _ _
..n.__-.
a, ._..                  .m_ m - .. ._ e g,us, a                                                                                                                  E.
i_.__
i p'.
a,
g s 5
.m_ m -..._ e g,us, E.
s
a p'.
                                                          ~
i g sI s
I I.
~
1         5 os                                                                                                                 - -
5 I.
Q)           g                                                                                                       - -
1 5
8                                                                                                                                      y-C n     .
os Q) g 8
1.._._ I 4
y-C n
O 8
1 I
h w
4 O
e-1, ,           .
8'>
55                i e
h e-w 1,,
5.3.$5          .                  s
5 5 i
                                          !! E vi
5.3.$5e s
                            $> 2u !
!! E
E! E                           5 a
$> u !
la! a le,[ is I
vi 2 E! E 5
g.EO a.
la a a
E n
le,[
E i-                           W                w o
i s
                                            .E               *                                                                                        .            .
I E
l
E g.
            -vg                                       E        E l]lr -
n a.
i
O i-EW w
                                    -..-.                                - -                               -         - g %-      ,,,--.-m.           .,m.=
.E o
l E
E
-vg l]lr i
r
-m--
--n
-w c
y-
-.c
.s, u
y g
,,,--.-m.
- ea-
-m
.,m.=
wv.--


                                                                                                                                . -. ~~
. -. ~~
i.
i.
          .        .+
.+
                                                                                                                                                -e f
-e f
I 2
I 2
i i                                    EMERGENCY COMMUNICATIONS LOG SHEET I
i EMERGENCY COMMUNICATIONS LOG SHEET i
INSTRUCTIONS 4
I INSTRUCTIONS 4
: c.                                                                                                                                           a f,           Entry i '
c.
Number     Instructions                                                                                                                 {
a f,
a
Entry
-              1.     Identify the emergency location where this Log 3heet is maintained juring an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.)
{
i                                                                                                                                                     ,
i '
i                                                                                                                                                         .
Number Instructions a
: 2.     Enter the date which this Form is tWng used. Start a new Log Sheet each day.
1.
Identify the emergency location where this Log 3heet is maintained juring an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.)
i i
2.
Enter the date which this Form is tWng used. Start a new Log Sheet each day.
1 i
1 i
: 3.     Consecutively number each page used each day.
3.
Consecutively number each page used each day.
3 s
3 s
d
d 4.
: 4.       Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion.
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion.
[-
[
!              5.       Clearly record the name of the individual calling you or whom you are calling.
5.
: 6.       Record the individuals PGandE Emergency Organization Title o- their non PGandE affiliation.
Clearly record the name of the individual calling you or whom you are calling.
1 I              7.      Check the entry activity as to whether the individual called you or you are calling them.           .
6.
;                                                                                                                          .'                          t' a                                                                                                                          *
Record the individuals PGandE Emergency Organization Title o-their non PGandE affiliation.
!                8.     Enter the entire context of the message being communicated. Read back the message to the
1 Che k the entry activity as to whether the individual called you or you are calling them.
!                        individual to assure correct copy / transmission.
I 7.
;                                                                                                                                                        t,
c t'
!                                                                                                                                                        L
8.
!                9.     Enter your initials upon completion of each Log Sheet entry. '
Enter the entire context of the message being communicated. Read back the message to the a
individual to assure correct copy / transmission.
t, L
9.
Enter your initials upon completion of each Log Sheet entry.
f 1
f 1
i
(,
(,
i
i i
: e.          mv . .s.         k i
.s.
k e.
mv i


                                                                                                                                      . .. .. _                _m.__3,_g
- h d.u-c
                                      ~               - h d.u-          c  -----%_              . .              -
_m.__3,_g
                    .      P                                                                                                                                                           1
~
* I
P 1
                                                                                                                                                                              ^
I IEETFTERAs ANo ELacTasc company conronATE EMEnouNcy nEyomst em
* IEETFTERAs ANo ELacTasc company                                             conronATE EMEnouNcy nEyomst em                                         ,
^
I m                                                                                                                                                             I
* I m
                                ,                  EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET                                               PAGE T00AY1 OATE                                     ,
I EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET T00AY1 OATE PAGE tasGROENCY LOCAfl0N
tasGROENCY LOCAfl0N
(,
(,         til (Il *
(Il *
* _       i 33 ENTEnED BY TWE                                                                                                                         IINITIALsl               -
* _
M lut.1 SUMM'ARY OF ACTIVITY PERFORMED                                                           isi m                 sti
i 33 til ENTEnED BY TWE IINITIALsl M lut.1 SUMM'ARY OF ACTIVITY PERFORMED isi m
                              ..(
sti
..(
e e
e e
{
{
f*                                                                                                                                       SEE 1988T AUCTl0NE ON nEVE AsE 3 406IS/02) Mov. 50
f*
                                                                                                                                                                -      y.    *--
SEE 1988T AUCTl0NE ON nEVE AsE 3 406IS/02) Mov. 50 g--
g--    ,    r p     _.    - - , , . , . ,w,, , -    -- - , -  ,,r-- - - - . - - - ,           -m-                 9
r p
,w,,
,,r-- - - -. - - -,
-m-9 y.


__          \
\\
  .            . g o
g
Q i
*o Q
G,                                                                                         ..
i
t EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SMEET INSTRUCTIONS Entry
' G, t
    .                  Number                 instructions 1.-                 Identify the emergency location where this Log Sheet.is maintained               .
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SMEET INSTRUCTIONS Entry Number instructions 1.-
                                            ' during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.)
Identify the emergency location where this Log Sheet.is maintained
i                                                                                                         .
' during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.)
      ,                  2.                  Enter the date which this form is being used. Start a new Log Sheet each day.                                                                         ,
i 2.
: 3.                   Consecutively number each page used each day.
Enter the date which this form is being used. Start a new Log Sheet each day.
: 4.                   Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion.
3.
: 5.                   Enter a summary of each activity being recorded.
Consecutively number each page used each day.
: 6.                   Enter your initials upon completion of each Log Sheet entry.
4.
Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion.
5.
Enter a summary of each activity being recorded.
6.
Enter your initials upon completion of each Log Sheet entry.
l l
l l
i i
i i
t
t
      ~
~
l l
l l
l l'
l l'
c                                                                                                                                     -}}
c
-}}

Latest revision as of 08:21, 14 December 2024

Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 2.1 Re Plant maint,3.4 Re Insurance & 3.6 Re Security
ML20081B472
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/16/1983
From: Schuyler J
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML16340D940 List:
References
PROC-830816-01, NUDOCS 8310270588
Download: ML20081B472 (150)


Text

.-

.s

_ ~. -

-c_,-

'PGwk DIABLO CANYEN POWER PLANT l:,,,,,ga PROCEDURE ON-YHE-SPOT CHANGE

'?

EP M-7 a # 5 hh no.iO O

iaaO p,,o

, no.

011 Spill Isolation & Clean-Up Frocedure Ih Trp.or en.no. O reauaaewr(e a>

0Tiaaaaaa'w(v.a.>;tair.tioao.te d

Technical Assistance on, Steven A. Denison

%,,, o,,

p,e, d cm no.: (con m..n.r m. went et anyn.1 pm dwe?

W.

H No)

(Does'it constitut an unreviesed saf.ty/.nviromental qwstion? O,Yts D No)

~

J Pg. 2, Part 2 "Non-Company agencies if any oil reaches the creek or ocean"

1

-i Fed. National Response Center Coast Guard San Francisco (Captain of the Port)

[

Telephone i changed to: (415) 437-3073 s

.sd

"'"*" N The Coast Guard number was (415) 556-3740, and was changed to the above number.

t

[/

)

Aumona.iion. _

(Pt.nt ude.g.mqf5t.N)

(Piant M.n.e.m.nt seen wisAo uo.n )

~ lne*

o Is diat. distribution to th. Control Roo and aff.ct.d work ar.as required? O YEs M NO Initial Distribution Sy:

Distributad To: O control Roo.

O Others

/

Oat. R.c.tved by Docu ent Control 9 - 1 I-Sr 3, lI 2GS-D

,= 14 d.y.

esac a

.nde u

r.

n _ no

,m h

  • o.'.

- --O -O -

u p{

n _

o_

=aasa==rO O - O O O ll l.

i

% = a.,

=d ow ca ne.O *aamas w.===.O g

9%

Achon T.k.n/a.m res:

IAc N W8 O **"* %

O==

ri e.dda.a.i n i.E J

11 TION:

[

8310270588 831025 PDR ADOCK 05000275 Y

,2 7

_m

.xc%

u - w.,

I P3wE OtABLO CANYON POWER PLANT

}

] M37 PROCEDURE ON THE-SPOT CHANGE EP M-1

  1. 10 L 3 b a i O O

i a a

- E

[

p,eeeews No.

Employee In.iury or Illness (Non-Radiological) j-s ym, il Type os enene. @ PERuANENT (peon)

TEMPORARY (ywesw); Espiration Date Technical Assistance on,

, Steven A. Denison

%w p,, e cnense: (ones ses emer em Mont si engnal proceewe?

We No)

~

H (Dues

  • t's fanstitute an unroviewed safety /enviremental ouestion? O Yss (D no)

, " Company panel of physicians, ambulance and hospitals serving the intnediate area around Diablo Canyon" i

Ambulance Change Bay Ambulance phone number to: 543-2626_

5 a

Physicians The remark for the physicians' exchange should be

" General operator for different physicians."

~

1 l

($

i The new number was found by phone cakl. The remark for the nuesen ser cmanse:

physicians' exchange was needed for clarity.

i Autnortantons.

j IPise ^ ^ '.. -_ @

(Ptent "O.-..E StaffgSRO Ucone)

/Dee*

Initial Distrmtion By:

Immediate distrhtion to the Control Roos and affected wort areas required? O YEs NO Distributed To: O Control Room O Others o.s. nec.i..d by o.cument Contrei F-//- S'3 ll!

~ i'a 643

% anove sous14asys esne no

.n pw.u ne w.

n, noimermen d,,

- O.

ne A _

O 5

Pomo,is n pcase ow cnsnee Adamonalinnermeaan t

~

.f Acmon TakesvRomans:

~

$s

~is e = = _._ ~. --

CS-

    • =====* =aa'=aa' *** [

I D:STRIBUTION:

0 ."."of,sh O ome =

e

--e. = -

w-

-w----w-+-w-e-

-w

-w-m---


w---.-.--,,,m,w--we.-.,,-,y----__

y--

w-.

---*---pw--ee

--y,.y y

-w---9,y

-.--gyw g 9. pyg

a.- p.. a.. mga x..m.2..:a.,

u..

..: :.u w a

i

?

.REV 1 i

~

l 05/14/81 ff

?.

PACIFIC GAS AND El.ECTRIC COMPANY

I i

. CORPORATE EMiRGENCY RESPONSE PLAN i I.

h IMPLEMENTING PROCEDURES Effective Date: 08/29/83 1

, TABLE OF ORGANIZATION

.i Nueer Revision Date Title 1.1 '

l02

07/14/83 Activation of the Corporate Emergency 4

Response Organization 1.2 02 07/15/83

' Activation of the Corporate Incident Response Center 2.1 02 07/25/83

. Plan Maintenance 2.2 j00

. 07/15/83,

, Emergency. Preparedness Training Program

]

3.1

. Ol ' ' -

' 05/01/81

. Governmental Relations

~

3.2 J02 08/08/81.

Public Relations 3.3 01 05/01/81 Law 3.4 02 07/26/83 Insurance 3.5 01

[05/01/81 Safety. Health and Claims 2

3.6

~ 02 '.

.07/20/83

. Security g

4.1 02 07/25/83 Materials 3.7 00 05/01/81 Personnel' Relations 4.2

'02 07/14/83 Telecomunications 4.3 02 08/13/81 Radiological Analysis and Protection 4.4 01 05/01/81 General Construction 4.5 01 05/01/81 Engineering and Technical Support 4.6 01 05/01/81 Computer Systems and Services 4.7 03 07/29/83 Nuclear Plant Operations 4.8 02 07/28/83 Division Support i

4.9 02 07/22/83 Quality Assurance f

i

-so O

ij i

['

.g.-

L.

+,_ _w i

I N i

o

'6 u

e e-OSAA fe/ sal nav.03 0,

NUMBER: 2.1 PACIFIC ftAS and ELECTRIC COMPANY s',

yggg CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 DATE: 07/25/83 Ii IMPLEMENTINGPROCEDURE

'^"' ' ' '

e ME

.j PLAN MAINTENANCE l'

SIGNATURE RESPONSIBILITY DATE TITLE 7g PREPARED BY-SENIOR NUCLEAR GENERATION ENGINEER PERSONNEL ANE ENVIRONMENTAL SAFETY, NPO D

N SUPINtdSING NUCLEAR GENERATION ENGINEER DrDenMMet Akn CNU4DnMMCMTat CarrTV WDA REVIEWED AND CONCURRED BY

( _/

ius

/1 MANAGER NUCLES M LANT OPERATIONS

/_ [

APPROVED BY

/t

//

I VICF[/ RESIDENT,NUCLEARPOWERGENERATION 7

APPROVED BY m g,_

Q DIRMh, PRESIDf8f'S N@RjdD/ISORY C0"24ITTEE 4

I 4

I

^

n

(

\\

w---~v

--.---------,-,eew, ew--,,---e,g,

,y

-q----.yvwg--- -, -.

---y-.

m,

z

=+.

l}

i e

d

6
i

[t m e m arv en L

PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.1

.gv

~~"

CORPORATE EMERGENCY RESPONSE PLAN i

IMPLEMENTING PROCEDURE DATE: 07/25/83 i

i TITLE PLAN MAINTENANCE PAGE OF OF 07 t

a f

.f 3

e

~ '

t 4

4 ORGANIZATIONAL OUTLINE I.

SCOPE 9

11.

DISCUSSION I

W 111.

RESPONSIBILITIES f

IV.

INSTRUCTIONS V.

REFERENCES VI.

ATTACHMENTS s

(

0 e

e 9*

so f-l

.)

I

\\

.n

.- w

~

. ~.

m

,,,,_a.

p.

--_,,,,,--_-n,-n_

L Ja i,

..i.

u

- - n. = a i

. ~, -

A=w=.:-

-:--a

..~s c.

~ +

j e

1 J

-s

' j enese uma nev.es Pacific GAS and ELECTRIC c0MPANY

, [

CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 2.1 r

lM IMPLEMENTING PROCEDURE

~

REnSI N: 2 1

DATE: 07/25/83 PLAN MAINTENANCE

~PAGE 03 0F 07 4!

l I.

SCOPE The scope of this Implenenting Procedure is to assign t-esponsibilities and detail tasks for meintaining the Corporate Emergency Response Plan (CERP),

~

its Implementing Procedures, and the Nuclear Emergency Response Comunications Directory.

II.. DISCUSSION This Implementing Procedure provides the requirements for the review, and updating of the Corporate Emeroency Response Plan, its Implementing Procedures, and the Nuclear Emergency Response Comunications Directory; and provisions for the dissemination of updated information to all Corporate Emergency Response Organization personnel.

III. RESPONSIBILITIES Individuals covered 'by this Implementbg Procedure shall find their L.;;)

respcnsibilities and duties under their normal.(non emergency) position title in the Procedure Instructions section.

IV.

INSTRUCTIONS A.

Supervising Nuclear Generation Engineer 1.

Responsible for the day-to-day control and implementation of the Corporate Emergency Response Plan (CERP), its Implementing Procedures, and related controlled documents.

2.

Receive policy guidance and direction regarding the CERP and related documents from the Manager, Nuclear Plant Operations Department.

3.

Periodically evaluate new or revised regulatory documents, plans of interfacing emergency preparedness organizations, and implementing procedures (e.g., Title 10. Code of Federal Regulations; NUREGs; Regulatory Guides; the applicable County emergency plan (s); and the Diablo Canyon Power Plant Emergency Plan) to ensure that the information contained in the Corporation Emergency Response Plan (CERP), its Implementing Procedures.

Response Communications Directory is,and the Nuclear Emergency current.

4.

Based upon the results of the above evaluations of the various l.

regulatory documents, plans, and procedures, (or recomendations from the appropriate corporate personnel) prepare, as appropriate, j

~

proposed revisions and updates to the following controlled documents:

(-

l N

m

---.---w ee.-e.>w-m----,-_--_--%,,,w_..e,,,,%-

-e._,_,--_,..-4,,.._w.-

.,_,wm-,,

w

,m._.,_,,__,-,m,c,,,-,

wg.,.,-.-g----,9%,-m.

. w ee p,

,, 9 w,-.--r.yp

=

j e

'4 lI Ih ee.esas tor,as nev.ca l

PACIFIC gas and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NIA4BER: 2*1 I

~-

l- @

IMPLEMENTING PROCEDURE "E"

DATE: 07/25/83 PLAN MAINTENANCE PAGE 04 0F 07

~l a.

Corporate Emergency Response Plan (CERP)

~

j b.

CERP Implementing Procedures

.i c.

Nuclear Emergency Response Comunications Directory d.

Energency Response and Recovery Activities Record 5."

Proposed controlled document revisions and changes shall be reviewed,

'a concurred with, and approved as designated in Procedure Attachment 1,

" Responsibilities for Controlled Document Review and Approval".

NOTE: The Supervising Nuclear Generation Engineer shall affix his signature, as appropriate, to controlled document revisions and updates prior to forwarding for management review, concurrence with, and approval.

6.

On a quarterly basis, or when significant changes are known to have occurred, issue updated changes to the following controlled documents:

a.

CERP Implementing Procedure Attachments b.

Nuclear Emergency Response Comunications Directory NOTE: The issuance of.these updates to controlled documents only requires approval of the Supervising Nuclear Generation Engineer level.

NOTE: As appropriate, the various CERO Departments / Functional Group Coordinators shall be periodically contacted to update their respective CERP Implementing Procedure Attachments.

7.

Controlled documents shall be issued to CERO Departmental / Functional Group personnel, appropriate Company officers, and Company emergency response facilities, as follows:

a.

Initial issuance of controlled documents shall be made using Procedure Attachment 2. " Document Transmittal".

b.

Subsequent revisions and updates of controlled documents shall be issued using Procedure Attachment 3. " Notice of Controlled Document Change".

<J c.

Instructions for executing controlled document changes shall be b

issued with each " Notice of Controlled Document Change" using Procedure Attachment 4. " Controlled Document Transmittal Sheet".

L

,w-,-,

=, -,

m, m :

o..

t

.v c -- -

m_

p

'B l

=s

i

'}

- u. t,a m u PACIFIC GAS and ELECTRIC COMPANY

}= D CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 2*1

~

RE m N: 2 1

IMPLEMENTING PROCEDURE DATE: 07/25/83 PLAN MAINTENANCE PAGE 05 0F 07

-i d.

Upon determination that controlled documents are no longer needed they shall be recalled using Procedure Attachment 5. " Recall of a

Controlled Document".

NOTE:

Appropriate records and mailing lists shall be maintained to ensure proper record keeping of centrolled documents and their distribution, 8.

Revision lists for each of the following controlled documents shall q

-be updated on a quarterly basis or when significant changes are known to have taken place:

Corporate Emergency Response Plan (C'ERP) a.

b.

CERP Implementing Procedures

c. - Nuclear Emergency Response Consnunications Directory.

9.

Revisions and changes to controlled documents shall be prepared in h~s) the format prescribed using Procedure Attachment 6. " Controlled Document Organization and Format".

10. On-The-Spot-Changes (OTSC) to all controlled documents covered by this Procedure may be issued on the Supervising Nuclear Generation Engineer's authority using Procedure Attachment 7 "On-The-Spot-Change" to effect changes to controlled documents which will be included in the applicable documents next revision or update.

OTSC's shall be considered part of the changed document unless it is superceded by another OTSC, incorporated in a subsequent document revision or update, or rescinded.

11. On an annual basis, initiate a review of the CERP and its Implementing Procedures to ensure that:

a.

The appropriate principal and alternate individuals are assigned to all Corporate Emergency Response Organization positions.

b.

The current Federal and State regulatory positions are incorporated, c.

All CERO Departmental / Functional Group notification lists reflect the current emergency response organization and correct emergency notification infomation.

12. Annually, as a minimum, initiate a review of all existing Letters-of-Agreement for the Diablo Canyon Power Plant Emergency Plan to ensure their validity and effectiveness, and investigate the necessity for fomulating new agreements to accommodate changes in the various emergency response organizational structures or methods of operation.

s y-v

-m w

,--,,,.,.----r

'w-


e

---w--

-i----a w

-M

-w-

-*--w

+

m.

m

=

m

i eeesas e m nev..a PACIFIC GAS and ELECTRIC c0MPANY 4

CORPORATE EMERGENCY RESPONSE PLAN NLM8ER: 2.1 1'O IMPLEMENTING PROCEDURE

"S' "

QATE: 07/25/83 Pt.AN MAINTENANCE PAGE 06 0F 07 B.

Manager, Nuclear Plant Operations Department j

1.

Responsible for providing policy guidance and direction for the CERP and its related documents to the Supervising Nuclear Generation p

Engineer, Personnel and Environmental Safety Section.

2.

Receive general policy and direction guidance from the Vice President, Nuclear Power Generation Department.

h 3.

Periodically evaluate new or revised regulatory documents, plans of interfacing emergency preparedness organizations, and implementing procedures (e.g., Title 10. Code of Federal Regulations; NUREGs; Regulatory Guides; the applicable county emergency plan (s); and the

?

Corporate Emergency Response Plan) to ensure that the information contained in the Corporate Emergency Response Plan and its Implementing Procedures is current.

4.

Advise the Supervising Nuclear Generation Engineer of any changes in the Diablo Canyon Power Plant Emergency Plan or its Implementing Procedures which may impact on the CERP or its Implementing

/

Procedures.

5.

Proposed controlled document revisions and changes shall be reviewed, concurred with, and approved as designated in Procedure Attachment 1 i

" Responsibilities for Controlled Document Review and Approval".

C. Vice President, Nuclear Power Generation Department 1.

Responsible for providing overall policy guidance and direction for the CERP (as part of the overall emergency preparedness program) to j

the Manager Nuclear Plant Operations.

2.

Review and concur with proposed revisions to the CERP and related controlled documents prepared by the Supervising Nuclear Generation Engineer as provided in Procedure Attachment 1. " Responsibilities for Controlled Document Review and Approval".

t D.

Vice Presidents, Department Managers, and Functional Group Coordinators

,I 1.

Review and concur with proposed revisions to the CERP and its related controlled documents as provided in Procedure Attachment 1 ll

" Responsibilities for Controlled Document Review and Approval".

I i

2.

Implement, as appropriate, approved revisions to the CERP and its O

related controlled documents to ensure effective and efficient v'

Departmental / Functional Group response in the event that the CERP is activated.

w,.

.,o.,,,a swn,-w

~ ~ * * ' * "

l-.-------.------...-.-------~~------------------------

- - ~, _

- t

. _ A.

m,_.

_. z _ _ w.,m g.

.s, sswu 1

y ti{

mi I

PACIFIC GAS and ELECTRIC COMPANY 1

CORPORATE EMERGENCY RESP 0tlSE PLAN NUMBER: 2'I

~~

)

i O IMPLEMENTING PROCEDURE REVISION: 2 DATE: 07/25/83 PLAN MAINTENANCE PAGE 07 0F 07 t

y 3.

Reconsnend revisions and changes to the CERP on its related controlled documents to the Supervising Nuclear Generation Engineer, as appropriate.

E.

President's Nuclear Advisory Comittee Review and approve revisions to the CERP and it's Implementing Procedures i

as provided in Procedure Attachment 1. " Responsibilities for Controlled j

Document Review and Approval".

V.

REFERENCES A.

Diablo Canyon Power Plant Emergency Plan B.

Corporate Emergency Response Plan VI. ATTACHMENTS 1.

Responsibilities for Controlled Document Review and Approval

(#

2.

Letter, " Document Transmittal" 3.

Letter, " Notice of Controlled Document Chante" 4.

Form 69-083, " Controlled Document Transmittal Sheet" 5.

Letter, " Recall of Controlled Documents" 6.

Controlled Document Organization and Format 7.

Form 69-099, "On-The-Spot-Change" 8.

Form 69-062, " Nuclear Emergency Response Comunications Directory" J

a M

t

%s y-,

m.,-w--

g

,y,.-

m,

,,,,-q,--,,

, ~,

,. k ') s ' n t_o ~wl=_<,Am y a -

.a

- >U l.

~--

  • d

=m

~

.t PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMEhGENCY RESPONSE PLAN p

90 IMPLEMENTING PROCEDURE

!8 ATTACHMENT: 1 TITLE PLAN MAINTENANCE DATE: 07/25/83 t

PAGE 010F 03

\\

l RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVAL i

j Responsibility Item Preparation Review Approval Corporate (SeeNote1)

Vice President, NPGD

. Chairman, PNAC Emergency

. President and

Response

Chief Operating Plan Officer

]

. Chainnan of the Board and Chief Executive Officer Implementing (SeeNote1)

(SeeNote2)

Procedures 1.1 Mgr., Nuclear Plant Operations

(}

Mgr., Diablo Canyon Project Exec VP-Facilities and Electric Resources Development 1.2 Mgr., Nuclear Plant Operations 2.1 Senior Mgr., Nuclear Plant Engineer Operations

-NPO Supervising Nuclear Generation Engineer s

2.2 Mgr., Nuclear Plant Operations Supervising Nuclear Generation Engineer 3.1 Mgr., Agency Relations Mgr., Governmental and Public Affairs VP-Governmental Relations Sr. VP-Corporate Relations 3.2 Mgr. of Public Relations VP-Corporate Communications V

3.3 Sr. VP and General Counsel VP and General Attorney 3.4 Mgr. of Insurance Executive VP and Chief Financial Officer

-~ >

.em e

w-ww

-s

-ew

,ww-w.-m 7---

g

,,,,,rm

,,,-,s--

,,-,--,,,,e----,-,_v

~w.. A.~ w a,.

_a.

~-

~.

. =.

1

'6

~

i; e,-eu umn m as

~.I PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.1

[.

CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE r!

O..

IMPl.EMENTING PROCEDURE ATTACHMENT: 1

-s

[

TITLE PLAN MAINTENANCE

.DATE: 07/25/83 PAGE 02 0F 03

\\

RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVA'L s

Responsibility a

Item Preparation Review Approval Implementing Procedures j~.

3.5

. Mgr., Safety. Health, and Claims

. VP and General Attorney

. Sr. VP and General Counsel 3.6

. Director of Security Sr.VP-Operations

. VP-General Services 3.7

. Mgr., Personnel Relations

. Sr. VP-Personnel

@J 4.1

. Mgr., Materials

. VP-General Services

. Sr. VP-Operations 4.2

. Mgr. of Telecomunications

. Sr. VP-Operations 4.3

. Mgr., Nuclear Plant Operations 4.4

. VP-General Construction

. Executive VP-Facilities and Electric Resources Development 4.5

. VP-Engineering

. Executive VP-Facilities and Electric Resources Development

"/

4.6

. VP-Computer Systems and Services

. Executive VP and Chief m

Financial Officer y_

U 4.7

. Mgr., Nuclear Plant Operations

. Executive VP-Facilities and Electric Resources Development eF

.wep. mpg.

--.w.

-.=.e+--r=

=

-,y

~ - -

-.--.-7-.

-, = ~ +

-~..=.-

--...~..

.- m w -...

x b

(

===v..

j PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.1

. L E

ESP NS 00 2 h

PGwE fD IMPLEMENTING PROCEDURE A m C ENT. 1 TITLE

~

~

PLAN MAINTENANCE DATE: 07/25/83 i

PAGE 03 0F 03 RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVAL Responsibility Item Preparation Review Approval Note 1; The CERP and all of it's Implementing Procedures require the preparation signature of the NPO Department Supervising Nuclear Generation

~

.j Engineer, P&ES Section, unless otherwise noted.

Note 2: All CERP Implementing Procedures require the approval of the Vice President, Nuclear Power Generation Department, and the Chairman of the President's Nuclear Advisory Comittee.

O

.D 1

l le

.e

=

%=.,

m.-

..m

. ~.

-~*e--

p 3

g y.

r.,,r-,.--g..

gw

~ry-

-v w

y ym.-

e cm, w-,.-%,wa

.my,..

--wm e

. = _ _ -

r _=

./6 ;

+mmo anve cr=i CERP IP NUMBER: 2.1 -i <

PO6 N E rkT! 2 j

POR _lMTRA-COMPANY USES n -

DATE: 07/25/83

??j g h"*'

PAGE 01 0F 01 DEPARTMENT OF NUCLEAR PLANT OPERATIONS FM No.

Rs LETTER OF j

suwser Document Transmittal To Ohdmien er ns=====

.i i

l p+

w:

  • ~

l 1.- As a member of the Emergency Response Organization under the Diablo Canyon Power Plant Emergency Plan or 2

m

)

- Corporate Emergency Response Plan b

you are hereby assigned the below identified document (s)

Con' trolled Copy Number Corporate Emergency Response Plan -----

Nuclear Emergency Response Comununications Di rectory - - - - - - - - - --

Oth' erg 2.

Please acknowledge your receipt of the above indicated document (s) by signing, dating and returning this form to L.J. CURTIS-77 Beale Street. Room 1451 isuadiately upon receiving this transmittal.

0 5IENATURE OF DDCIMENT HDLDER DATE

(;

e w,,

wn-

~~ - m = wnMH*

w-wy-


ww es.----w-,.

-i-,---,--wygy..-----gy w->-m-esemw-up-m.--M-----+-%yse.---w.-q-,,--ws.we-mei---wq,.-.w e-y.m-e--,-cwe-.e

-ww--,w,-,-.ywo-ww-y,-en-e en-

-a

-- mm

.n.

u =

.e

~ ~.. -

i 2.1 "' l CERP IP NUMBER:

POwE REVISION: 2 ATTACHMENT: 3

. [

rom m mtA - couramy vsse DATE: 07/25/83

~

Fa= om er PAGE 01 0F 01 1

ousnmem DEPARTIENT W NUC12AR FIANT OPERATIONS Fu No.

231 Rs Larvan er Notice of Controlled Document Change s m act To DMuon er Operumma,

7.

~i 7..

1.

Controlled document change number 2.

Please insert the attached asterial into your controlled copy of the h

Corporate Emergency Response Plan (CERP)

C)

Nuclear Emergency Response Comunications Direc.torv 3.

Any change in the Document Holder's name or address should be reported inumediately to STEVE FOSTER, PERSONAL & ENVIRONMENTAL SAFETY SECIION RM 1406 Ext. 22-6522 l

4.

If you no longer need your copy of this controlled document.

please return it, with this form.

5.

RECEIFT ACENOW1EDGDENT I have received and complied with the instructions for the above controlled document change.

Signature of Doc eent Holder Date 6.

Please sign, date, and return this " Notice of Controlled Document Change" to L.3. CURTIS, 77 Beale Street, Room 1452.

'N g

e i

,x

. m _...~.

d CERP IP NUMBER: 2.1

  • REVISION: 2 i'

ATTACHMENT: 4

[

PACIFIC GAS and ELECTRIC COMPANY AppECTED DOCUMENTIS):

DATE: 07/25/83

.' [

j pg,g NUCLEAR PLANT OPER ATIONS DEPARTMENT p

CORPORATE EMERGENCY REMSE PLAN i,. -

Corporate Emergency Response Plan (CERP) l CONTROLLED DOCUMENT TRANSMITTAL SHEET Nuclear Emergency Response Comshunications Directory Approved:

Change Number:

e Date:

Change Date:

I CHANGEIS)

INSTRUCTIONS CHANGE SUMM ARY g

c!

+

g s (

+

4 f

s.

kd

.~

O CONTINUED ON REVERSE SIDE After revising your controlled document in accordance with the above appropriate instructions place this sheet in the front of the affected document. Future changes will be numbered consecutively. If there are any questions plosse call:

i-


m

-a

-v-

- - - + - -,, - - - -. <

e

-w

,,,..w,e y-

,,,----7,.._w,,.,-,,--p,

.,a _

a..

w. - w. 2. w w= x.. ; maw....,.-- :

, a sma_w...

'6

~.i i

CERP IP NUMBER: 2.1

'r

}

REVISION: 2

'j PGwE ATTACHMENT: 5 rom mvna-coupauv uses DATE: 07/25/83

~;

y FAGE 010F 01 From oivi.4ea or NUCLEAR PLANT OPERATIONS o rm at Fn.t No.

Rs LETTam or summer Recall of Controlled Documents To Dussoa or j

ossart==at Please return the following controlled documents.

DOCUMENT CONTROL NUMBER

~

Corporate Emergency Response Plan................

Q Nuclear Emergency Response Comunications D i rec to ry........................................

Emergency Response and Recovery Activities Record...........................................

If you have any questions regarding this request please contact Stephen Foster at extention 22-6522.

l t

I I

l

!i

' N 6

LJ

~

m-4 4-"

+

~ '

-w-,

--w y----,

w y-.

e--

a.

- -. ~. -- an

._,c i,

Ik u eu. e m m. n PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2'I APORATE EMERGENCY RESPONSE MAN POwE REVISION: 2

$9 IMPLEMENTING PROCEDURE ATTACM ENT: 6 PLAN MAINTENANCE DATE: 07/25/83 PAGE 010F 02 CONTROLLED DOCUMENT ORGANIZATION AND FORMAT A.

Implementing Procedure Cover Sheet (Fom 69-034A) 3 1.

In the identification block in the upper right hand portion of the form enter the following infomation using capital letters:

NUMBER:

REVISION:

DATE:

'PAGE OF 2.

In the " Title" block, enter the name of the Implementing Procedure.

3.

In the " Responsibility" column, enter the following appropriate entries in capital letters:

a.

PREPARED BY b.

REVIEWED AND CONCURRED BY c.

APPROVED BY 4.

In the " Signature / Title" column, enter the title of the responsible individual in the lower half of each Responsibility row item.

B.

Implementing Procedure Continuation Sheet (Fom 69-034B) 1.

In the identification block in the upper right hand side of each page on the fom, enter the following information:

NUMBER:

REVISIONi DATE:

PAGE OF 2.

In the " Title" block enter the name of the applicable Department / Functional Group.

3.

Use the format outlined on page 2 of the Implementing Procedure Cover Sheet I

as shown below:

I.

SCOPE II. DISCUSSION III. RESPONSIBILITIES IV. INSTRUCTIONS

~

V.

REFERENCES

~

'd VI. ATTACMENTS I

4.

Enter all infonnation material within the borders of each page.

ew

-u-

,7,e,--_-,y---


v+w

,,-w-w--r--,

w y

,------,w

.y7--

,e-ew- - - -<

e.

m---

-wr

-+c--pw-u----------~*------*---------T-

-^ ^

%e m -

e, m m.2 a.m..

a# m.e w.m.._.- 2

.m l

- ?6 i

ee-ous to/eas arv on conNRA Eutno NCY n sMNSE MN gggggg; g,1 I. I PACIFIC GAS and ELECTalC COMPANY 1],k' REVISION: 2 PowE IMPLEMENTING PROCEDURE ATTACHMENT: 6 E

PLAN MAINTENANCE ~

DATE: 07/25/83

~

PAGE 02 0F 02 CONTROLLED DOCUMENT ORGANIZATION AND FORMAT

~

C.

Implementing Procedure Attachments (Form 69-034B) 1.

In the identification block in the upper right' hand side of each l

Implementing Procedure Continuation Sheet enter the following information:

NUMBER:

REVISION:

ATTACHMENT:

1

^

DATE:

PAGE OF 2.

Enter the title of the Attachment immediately below the double line of the heading for each page. A double line should be drawn immediately below the title of the Attachment.

3.

Each Attachment shall have its own unique pagination.

D.

The Corporate Emergency Response Plan shall be formatted in the same manner (v~;

which the Diablo Canyon Power Plant Emergency Plan is.

N' clear Emergency Response Conmunications Directory (Fom 69-062).

E.

u 1.

Enter the revision number and revision date in the upper right hand side of each page.

2.

Enter all material within the borders of each page.

s e

o L

+g s n'

,w-w,-

,e,,,

,_,,,e,-

+q,

,.,_,_g,,..--s,g

.u

'l

j 69-099 (7/83) Rev. 0

'}

mCmc ans AND ELECTMC COMPMY

~'

r CORPORATE EMERGENCY RESPONSE PLAN f-g b(

ON-THE SPOT CHANGE CERP IP NUMBER: 2.1 REVISION: 2 ATTACHMENT: 7 DATE: 07/25/83 piense,e me.

m PAGE 01 0F 01

~

nas Type of Charge: O an = =T raiam:x w ir

c. 4,.1,so i.t.

penseems cheness (Dese as ener me emere os enenes as O asi

)

5 I

~

m G'

I l

(

DISTMSUTION:

O sea = = o'v==' a=====a O a=-e O a=s =

- - ' - -m.---m.

-ev-.--,y-w-,+ew,.__wwe,a.-,

,. - - g

-..w----9,-g yvc--_,,__.----w-,wrg w-w-ww--wm--m---

-g-y%

---,m,.

q b

i so os2 (sori new i L I_

.l PACIFIC GAS and ELECTRIC COMPANY NUCLEAR PLANT DPERATIONS DEPARTMENT NUCLEAR EMERGENCY RESPONSE COMMUNICATIONS DIRECTORY kh

(

tERP IP NUMBER: 2.1 REVISION: 2 ATTACHMENT: 8 DATE: 07/25/83 PAGE 01 0F 01 8

s I

9 e

0

,.' ]I D

1 l

-e

(

7-

,r-,_

r

w--w as 8 m v-~

.. a n ~ s i + :e m % w = + m.-n u w s w a

=

?w-

,1

-6 l.

Sj I

f b= => =v. n NUMBER: 2.2

  1. 4 PACIFIC BAS sad ELECTRIC COMPANY

'd yggg ConronATE EMERGENCY RESPONSE PLAs REVISION: 0 DATE: 07/15/83

?

O IMPLEMENTINGPROCEDURE

"^

~

1 N

~

EMERGENCY PREPAREDNESS TRAINING PROGRAM

,q SIGNATURE RESPONSIBILITY DATE TITLE gg, PREPARED BY SR. NUCLEAR GENERATION ENGINEER

[e4M EMERGENCY PLANNING REVIEWED AND CONCURRED BY SUPEJtVIJMfG lyKLEAR GENERATION LNfalNttR PERSUIGIEL & ENVIRONMENTAL SAFETY 3

(i REVIEWED AND CONCURRED BY t

MAlb8kR,NUCLEdRPLANTOPERATIONS I

)

)

APPROVED BY mjEgmy1. mmo.m Nem.

l

[ffm m A A APPR0vED By 7

MIRMAN', PRESIDEld'S NUCGEAR SDpSORY h/f COMITTEE l (

ww

-ee,.----+--.e-yyv y-.

.*wr,--p,-,wp-+y

-,.w.,.-me,-_

-.w-yp,e-e,.e-m.

m,-,-w,-me-ow,mmm,-r-e-me=m=-m----o--w--me-2---

o.u wdy;yh_

- c. ~,, _ s c;.;.

.:w.,

- w,._~y.+."

ci -

ev.

e

~,.

^i r

ee-eun to/en new.oz PACIFIC GAS and ELECTRIC COMPANY

~

CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 2*2

.5 i O

~ ~ "

IMPLEMENTING PROCEDURE

"'" 5 ' "

sarE: 07/is/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 02 0F 07 J

g p

I 5

i

'.e ORGANIZATION AL OUTLINE l.

SCOPE II. DISCUSSION h

lit.

RESFONSIBILITIES IV.

INSTRUCTIONS V.

REFERENCES VI.

ATTACHMENTS l

.a 89 t

'. _ 8

)

1

.. c : ma - e., _

. s.um,_. + m c., mu.m.m

-c.. A. _

=

)f

~}

3

u. m. :==v. n l

Pacmc GAS and ELECTRIC COMPANY NUMBER: 2.2

/<

CORPORATE EMERGENCY RESPONSE PLAN O

PGwE REVISION: 0 IMPLEMENTING PROCEDURE oxyg: o7,1g,g3 TITLE EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 03 0F 07 I.

SCOPE

~

The scope of this Implementing Procedure is to describe the responsibilities and requirements for the Corporate Emergency Response Plan training program as required by 10CFR50.47(b)(16).

~

j II. DISCUSSION A.

General This Implementing Procedure provides instructions for the implementation of a coordinated annual training program for Corporate Emergency Response Organization (CERO) personnel with assignments under the Corporate Emergency Response Plan (CERP). CERO training will be accomplished in three phases with activities in both a classroom atmosphere and participation in drills and exercises:

h' B.

Definitions of Terms 1.

Training activity:

A training activity is the process by which the skills of individual personnel are improved and refined to meet or exceed prescribed qualification standards for the perfonnance of their specified duties and responsibilities under the CERP.

2.

Drill:

A drill is a supervised instruction period aimed at developing and maintaining required skills for a particular task / assignment.

3.

Exercise:

An exercise is an event which tests a major portion of the basic elements within the CERP and demonstrates the capability of the CERO to respond to an emergency.

C.

Corporate Emergency Response Organization Training Program 1.

Program Description In order to maintain emergency preparedness training requirements as required by NRC regulation 10CFR50.47(b)(16), CERO personnel training.

is accomplished in three training activity phases, as described below:

w-,

--.n....-.

., - -.,. - ~ -

.,,_,,.,,.,--,,,a.,


.,,--,,.,n.

n,....

- - - -.--,,,,e,

m.a.F.,

.a-

. a s. ^n ~w

~. m= :

w, ~:,

.a.

Yh

  • 1 t

j

..u. e m nev. es

. k l

PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN

~

1 IMPLEMENTING PROCEDURE DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 04 0F 07 Phase' Activity Description I

General introductory course to explain the purpose and function of the CERP in support of the Diablo Canyon Power Plant _ Emergency Plan.

II Courses designed to provide CERO personnel with specific

. training instruction for executing assigned duties and responsibilities as identified in Procedure, "CERO Training Program Courses".

?

III Drills and exercises designed to provide CERO personnel with " hands on" experience using appropriate facilities, equipment, and procedures.

NOTE: CERO training, drills, and exercises will be conducted in coordination with DCPP training activities.

2.

Program Objectives The training program objectives are to provide for the following types of training:

a.

Corporate emergency preparedness management training for those individuals assigned to perform the principal and alternate i

functions of the CERO Departmental / Functional Group Coordinators and Recovery Manager.

b.

Corporate emergency preparedness procedure training for those individuals assigned specific duties and responsibilities as identified in the implementing procedures.

c.

Corporate emergency preparedness refresher training courses for all emergency response personnel activated under the Corporate Emergency Response Plan.

3.

Program Requirements a.

Initial training All CERO personnel are required to complete the courses designated for their assigned emergency plan title (s) as specified in Procedure Attachment 2. "CERO Personnel Classroom pO Training Requirements" for each CERP Implementing Procedure.

-i.---w-------,,----,.-w,w

--,--g-

--y g.

---,--,.-c-p-w ap--

,-m

i

.~. - v ~,. v. w. -

= -

- - - =

= as

'-is u e

a e

i

+

r es-osas e,reas nav.es j

PACIFIC SAS and ELECTRIC c0MPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PowE REVISION: 0 IMPLEMENTING PROCEDURE 1

DATE: 07/15/83 UTW

]

EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 05 0F 07

-t b.

Refresher training CERO personnel maintain their " trained on an annual basis" status by participating in either of the following activities:

Scheduled (announced or unnanounced) drills throughout the year, the Annual Emergency Preparedness Exercise Dress Rehearsal or Exercise; or

!J I

Applicable phase II training courses as specified in Procedure Attachment 2. "CERO Personnel Classroom Training Requirements".

D.

Program Conduct & Documentation 1.

CERO emergency preparedness training program will be conducted and coordinated with other Departments, b

2.

Training courses will be conducted in accordance with NP0 r

Administrative Procedures.

3.

Approved lesson plans for CERO training courses shall be used in the conduct of all classroom training activities.

4.

All CERO classroom training activities snall be documented with the following records:

a.

Attendance Records.

b.

Correlation of attendance with training requirements.

c.

Maintain status of training completed by individuals.

III. RESPONSIBILITIES Personnel with assigned responsibilities under this Procedure, as identified by their non-emergency titles, should perform their assigned tasks as detailed in the Procedure Instructions section below.

IV. INSTRUCTIONS A.

Supervising Nuclear Generation Engineer, Personnel and Environmental

~

.. _.('.

Safety 1.

Schedule, coordinate, and implement specialized training programs to instruct and qual'ify those personnel responsible for implementing the Corporate Emergency Response Plan. The scope, nature, and frequency of those programs shall be specified for all CERO personnel.

a

.___,,___.___m m

,.y

, -,,,,a p

.w%,--y--e,---

w

---wm,

--y,.,,,-

y e,

w:me>.:k m a m w

.cr m

a". _

e x aw.

-.'6 j

~

q j

1 i

s,e u. <m n m.as d

PACIFIC GAS an Conconari imi d.i.LECTRic,CO.M,A,.Y.

NUMBER: 22 cv nis o s ta 3

"'" S ' " ;

IMPLEMENTING PROCEDURE DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 06 0F 07 i

2.

Ensure that all drills are supervised and evaluated by a qualified drill instructor and that the basic objective (s) of each drill are met.

3.

Ensure CERO participation in the scheduled monthly comunications drills between DCPP and the San Luis Obispo County Sheriff's Office, State Office of Emergency Services and NRC. Such participation.shall range from:

l a.

Limited alerting and notification of key CERO personnel and Departmental / Functional Group Coordinators, to b.

Full comunications alerting / notification of all CERO personnel 4

and possible activation of selected emergency response facilities.

B.

Manager, Nuclear Plant Operations Department b.I 1.

Remain cognizant of all Corporate emergency preparedness training -

courses, drills, and exercises to ensure that effective and efficient interfaces between the Site and Corporate emergency response organizations will be maintained during an emergency.

2.

Direct the Supervising Nuclear Generation Engineer, P&ES Section, to schedule, coordinate, and implement the CERP Training Program.

3.

Ensure that critiques of all Corporate emergency preparedness drills and exercises are conducted as soon as possible after their performance 'to ensure that the emergency response actions of the various Departments / Functional Groups within the Corporate Emergency l

Response Organization are properly evaluated, and any corrective action, if required, is implemented.

C.

Vice President, Nuclear Power Generation Department 1.

Provide overall coordination of required emergency preparedness training programs and drills for all Company emergency response i

personnel involved in any way with the Corporate Emergency Response l'

Organization during an event requiring the activation of the Corporate Emergency Response Plan.

4,!

,r,v--,.e

,,,,---,--e s--.---

,n-,

eaux 4

No j

~l, cm.

3 PACIFIC gas and ELECTRIC COMPANY NUMBER: 2.2 i

CORPORATE EMERGENCY RESPONSE PLAN POwE REVISION: 0 i

IMPLEMENTING PROCEDURE o,7e: o7,1g,33 WE 1

EMERGENCY PREPAREDNESS TRAINING PROGRAM PAG 5 07 0F 07 D.

Departmental / Functional Group Coordinators 1.

Participate in the applicable CERP Emergency Preparedness Training Program activities to maintain familiarity with the CERP, its Implementing Procedures, and the Nuclear Emergency Response Comunications Directory.

2.

Ensure that respective CERO Departmental / Functional Group personnel participate in and maintain training requirements.

E.

President's Nuclear Advisory Comittee The President's Nuclear Advisory Comittee will oversee required emergency preparedness drills and exercises.

V.

REFERENCES A.

Diablo Canyon Power Plant Emergency Plan

([i B.

Corporate Emergency Response Plan C.

Nuclear Power Generation Manual, Volume 3 " Nuclear Plant Operations Department Procedures Manual" Chapter II VI. ATTACHMENTS 1.

CER0 Training Program Courses 2.

CERO Personnel Classroom Training Requirements 1

"M g

I

--e-

--w----

.-.---me, w----

,-m.- - -

,g.

w.

9-v---

m---------

ei-

_.w,we,n;_ =

-. =,.a =. :._ w.

c._

~

__u

+.

4 ij_

i c=> =v.

i 5

PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 T.

i CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0 IMPLEMENTING PROCEDURE ATTACHMENT 1 TITLE

~

DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 010F 01 CERO Training Program Courses

l Training Course Applicable Phase Number Course Title CERP IP I

EPG-201 Corp. Emergency Response Plan and DCPP Emergency q

P l a n 0 v e rv i ew........................................... Al l t

II h

EPG-204 CIRC Support Staff Responsibilities.......................

1.2 EPG-205 CERO Management Personnel Responsibilities 1.I EPG-210 Security and Personnel Relations Departments.........

3.6, 3.7 2

EPG-215 Materials Department 4.1 EPG-220 Nu cl ea r Pl ant Operations Department....................... 4.7 3

EPG-225 Division Support Group 4.8 EPG-230 Qual i ty As surance Depa rtment.............................. 4.9 EPG-235 Telecommunications Department 4.2 EPG-240 General Construction, Engineering and Technical Support, and Computer Systems and Services Departments.....................................

4.4, 4.5, 4.6 EPG-245 Radiological Protection and Analysis Group 4.3 EPG-250 Law, Insurance, and Safety, Health, and Claims Departments.....................................

3.3, 3.4, 3.5 EPG-255 Governmental Relations and Corporate Communica ti ons Depa rtments..........................

3.1, 3.2 III Drills and Exercises i

Miscellaneous Courses 9

EPG-256 NOTEPAC Computer Conferencing System...................... 3.2 EPG-257 SLO County Emergency Response Plan Overview As.Needed se ed pw-3 7

w

-ww

?ec-,,

y

--im-..-

-.--w-,------mm.-.<---y


r

-7wp-+-y-c

+ ~ s;-:- 2 ~ > _.ma %:. :i ; w - +. e n

i.n u w

,. w: g e m w w _

es-esem CAas sesv.sa PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0

g IMPLEMENTING PROCEDURE 3 m esses 1 2 DATE
07/15/63 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 01 0F 18 CERO Personnel Classroom Training Requirements
  • CERO MANAGEMENT (CERP IP 1.1)*

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER i

; ii.i EMERGENCY PLAN TITLE E E E S $ 2l0 R W ? # 8 $ 8.0;

~,~ ~ ~,~ ~,~ ~ ~ ~ ~ ~.~ ~.~

i a j.1 i

i il i

! i l l f.I.

l' I

I Recovery Manager l{i,1,x Corporate Emergency Coordinator o,

le I

j Corp. Technical and Logistical el l

~l~

"~~; [~ ' !

X Coordinator

e

.l l

i

.i

.a Corp. Liaison Coordinator

  • e, e.e l :

,I i

J,,,. x 1

Public Information Recovery Mgr.

e;

.el 6 ;j ll' l ix Radiologic ~al Emergency Recovery l

l g;

{ [*

I

/]

Manager l

~*

t.

Engineering ar.c' Logistics

~ ~~

i x

e e

Recovery Manager i

ie Operations and Analytical le!. ',,i

~ ~ ' '

e i

x Recovery Manager i: ; !

l j

i i

i 1

x== As Needed

.-e.-

w-

.-e,m...-- - -..

- su

,4-ovsw; _ i s

w..-.-,

,.m_

m.-

  • o

. i j

ee-ose temi uv.oa PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 2.2

b' CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0 IMPLEMENTING PROCEDURE ATTACHMENT: 2 DNE:07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 02 0F 18

~

CERO Personnel Classroom Training Requirements

  • ACTIVATION OF THE CORPORATE INCIDENT RESPONSE CENTER (CERP IP 1.2)*

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER g

l i

, e

f g! NoSohoy'ggghNg EMERGENCY PLAN TITLE N

N NNNNN N:N N N N N N N

! i I

. i

'f~^""

~

g

  • 'i'.

l Corp. Liaison Coordinator 12 CIRC Administrative Support' l

l i

4 l i 1 :e-I e.e!

l l

Group Coordinator Illll1 li i

CIRC Administrative Support 1

ee s

e

_ p,, ;l., q '.. l :

Group Coordinatcr Staff i

CIRC Telephone 0perator

, e.e.

'i:

u-O I

l l

1

" co x = As Needed

'a.

. a.w = w

.. =.._-., _..

.n u

,_g, : =. :

- ~.._,

,4. -

=o

(

w u. om env.u PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 8'

PowE REVISION: 0 r;3 IMPLEMENTING PROCEDURE ATTACHMENT 2 DA 07/15/83 i

EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 03 0F 18 CERO Personnel Classroom Training Requirements

  • GOVERNMENTAL RELATIONS DEPARTMENT (CERP IP 3.1)*

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER g g o g o f g g ) glg g.g g i

I l

t EMERGENCY PLAN TITLE g

m

~

wwmmmmmmmmmmm I

I i

e _

Corp. Governmental Relations

, g Coordinator Governmental Relations Representatives

'l

  • g x

V. J l

l l

D e

x = As Needed y

v---e--

-w-w--

e.----

-.y,,-,---w-------------y-w--------.,---w-e v

.e-,-

=.g

,,_c ;.

-;a, n %an,s,

~.S.

-4.m w z...w.

-9 _

u I

e,

- u. tems: nev..:

PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0 C

IMPLEMENTING PROCEDURE A m t CnT. 2 DkTE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM (AGE 040F18 CERO Personnel Classroom Training Requirements

  • CORPORATE COMUNICATIONS DEPARTMENT (CERPIP3.2)*

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE g g g p p g

y, g o

o N

N

-N N

N N

N N

N N uN NNtNLl

  • ; x L!

Corp. Public Infonnation Coord.

I e e. x Media Center Representative i

e e' x News Director Interim Public Information

,,l x Recovery Manager e

e eie, x Public Information Recovery Mgr.

4 fe' x

Public Infonnation Specialist

~

  • '~

,m Technical Assistant to the Public e

x m.

Information Recovery Manager l

Technical Assistant to the

.; I I

e x

l 1

News Director l

1 x = As Needed r

,m

,---w-s-,,.-,

w.

,,__-<,g.,_

,.s

-m-_..

p,,

,.-w,_.-,,w--

ce m

,_,,e-

, -. =,, - -

..,y--

-,,,y--

,y.

m- - -

lj..

1

- w

.;.1_

. 4.

_3..

s_m.

..._, r,w#r.o..w

, ~,

h l

- i l t

u.

me==v. =

-t i

PACIFIC GAS and ELECTRIC COMPANY HUMBER: 2.2 i

CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0 g.

IMPLEMENTING PROCEDURE ATTACIPENT 2 DATE 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 05 0F 18 CERO Personnel Classroom Traiaing Requirements

  • LAW DEPARTMENT (CERP IP 3.3)*

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER

! !.j EMERGENCY PLAN TITLE g g go g

g ggg e o o eo m

m m u m m m m m m m.m m m m f

}

Corpoiate Law Department Coord.

Onsite Attorney Staff Members

= %

r t

4 a+

h

.C

--..u


..~--,-,-.,,,,_,-.---w

,.a--

_::a

~..; w :-. 4 x -~~:: A c a

.< O

+w,

- s~ &:a e e seu~im

- u%: w, a c

-o 4

u. m anv.

,e, PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 0

' s IMPLEMENTING PROCEDURE ATTAC ENT. 2 TITLE DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 06 0F 18 CERO Personnel Classroom Training Requirements

  • INSURANCE DEPARTMENT (CERP IP 3.4)*

~

y EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER ko W o $ o8 8 h; EMERGENCY PLAN TITLE 5 g g o $ o N

N N N N

N N N N N

N NsN N

N l

Corporate Insurance Coordinator Coord. of Property Loss Control e

Coord, of Insurance Administration e

C t

I

--,--_,.c w _ _

y--.e_,

.-w__-_

._,...,a m.

t'.a u - J -

- ' :: & ~

' Y ::r ' " " - '"

~~!? '+L~ MMWNfw 1

'6

~

q m,.===.=v. =

-'n PACMC SAS and ELECTRIC COMPANY NUM8ER: 2.2

j POwE REVISION
0 1 (9 IMPLEMENTING PROCEDURE ATTACNMENT: 2 TE: 07/15/83

~

EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 07 0F 18 CERO Personnel Classroom Training Requirements

..3

  • SAFETY, HEALTH, AND CLAIMS DEPARTMENT (CERP IP 3.5)*

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER

  • o!**~

EMERGENCY PLAN TITLE o

  • o
  • o e o S*EE N N O l

8 g

~

N!ElEN N!00 m

l i

l Corp. Safety. Health, and Claims Coordinator Director - Safety Engineering e

e Senior Claims Attorney e

e Senior Health Physicist e

e Senior Claims Investigator e

e Claims Attorney e

. e A)

Field Claims Investigator e

l e Senior Fire Protection Engineer e

  • l Safety coordinator e

' 8l l

me e&

e 94 9

1

-~,_:.. w w m m c a.,,+,,:.w w n u_e a r =.

, _ ~. - m

..=(

.=_ w.

-9

=.mi.=v.

3[

PACIFIC SAS and ELECTINC COMPANY NtM8ER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: O Gm3 IMPLEMENTING PROCEDURE ATTACmENT: 2 TITLE DAiE:07/15/83

~

EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 08 0F 18 CERO Personnel Classroom Training Requirements

  • Wttl0ITY DEPARTMENT (CERP IP 3.6)*

o q

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER glg I

EMERGENCY PLAN TITLE y g g g e m

g g g ggg m

m mlm m m m m m m m m,m m m Corparate Security Coordinator o

e e Building Security Supervisor Security Representatives CfG1 e

e h

l

-o a

~

-ver-,,.,.e

.,,,n-

--,--,,-,-----,----.,.-,-,,,,,__,-,--.-------,--,---nw.~.n

. w_.

^ mu c

+-

.~ -

b j

~

a =v.

PACIFIC SAS and ELECTRIC COMPANY NUMBER: 2.2 PGwE REVISION: 0 g

IMPLEMENTING PROCEDURE ATTACHMENT: 2 EMERGENCY PREPAREDNESS TRAINING PROGRAM DATE: 07/15/83 PAGE 09 0F 18 CERO Personnel Classroom Training Requirements '

  • PERSONNEL RELATIONS DEPARTMENT (CERP IP 3.7)*

i EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER l

EMERGENCY PLAN TITLE g g m o e o e o eom g ggg N

N,N N g

Corporate Personnel Relations Coordinator On Site Personnel Representative e

e l

l Personnel Representatives e

e

)

l l

l w

  • e w-w--e--e

-ww-+

w seum.

,-w,-w--v-w Twr-

-y

---y--

---v-

-ww--w--g

--e

_~ _.

-:-.._a a

- = w

..w ~.. a _.. a a a m e w a w a. _.a.

'o f

~ h, e.m. m.

PACulC sAS and ELECTWC COMPA8Y NUMBER: 2.2 l

CORPORATE EMERGENCY RESPONSE PLAN PowE REVISION: 0 O

IMPLEMENTING PROCEDURE ATTAC m m 2 DA'TE: 07/15/83 TIT 1.E EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 10 0F 18 CERO Personnel Classroom Training Requirements

  • MATERIALS DEPARTMENT (CERP IP 4.1)*

I EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER L-EMERGENCY PLAN TITLE g g g g g g g g g g g g g m

-2 m m u m m m m m m m m m m m

\\

\\

\\

Corporate Materials Coordinator Procurement Coordinator e

e Transportation Coordinator e

e 9

. ::/

l

\\

g v

B

-,,y,-%,,,--,.,,s


,-,-s

,_,,__er-we w -,,, -,

y

--,-,,,---e-

-w-

.. p _,w

., a w. s =

-_u

. = :- am i

.o j

mu. i== i=v.

.I j

PACIFIC SAS and ELECTRIC COMPANY NUMBER: 2.2 i

PGwE REVISION: 0

. Q IMPLEMENTING PROCEDURE m ACNMENT: 2 DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 11 0F 18 CER0 Personnel Classroom Training Requirements l
  • COM10NICATIONS DEPARTMENT (CERP IP 4.2)*

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE o g g g g g g g g g.gg g g g mgevmjm u

m mum mm m m m m Corporate Comunications e

Coordinator Comunications Engineering Support Coordinator Comunications Maintenance e

e Support Coordinator Repair Team o

e

(')

Wire Chief e

e TelephoneOperators(Chief) e e

Electric System Dispatcher, e

e;

.?

l l

e 0

a- - -.,.--,,

-.,---,--,,--.-,---.----------.a

> :,2 :.. u:ucxhakwa.;a : w:

~

~-

-' 4:a

=o

'l n4w asm nuv.n PAclFIC BAS and ELECTitlC COMPANY NLMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN i

PowE REVISION: 0~

r IMPl.EMENTING PROCEDURE A m CNMENT. 2 TE 07/15/83 1

EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 12 0F 18 CERO Personnel Classroom Training Requirements.

  • RADIOLOGICAL ANALYSIS AND PROTECTION GROUP (CERP IP 4.3)*

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE oh o o

o g g gg g g g m

m ~~

~ ~ ~~

~ ~~

~ ~ ~~

q Radiological Emergency Recovery

~

x Manager Emergency Supervising Engineer e

e x

Radiological Monitoring Director e

'e x

CIRC EARS Doerator e

x EOF EARS Operator e

e x

Supervising Meteorologist a

e x

C DER Laboratory Director e

e x

EOF Secretary e

e

,j x

UDAC Staff x

EOF Administrative Staff e

l,,

l

. x l

7U

)

~*

x = As Needed l

e e.n-~

,_e...,,

a n

~ 1= ? + c 1.a_~ ~ v ' ~

... - w_:w

.2

_wii b

i

.me e.

PACIFIC EAS and ELECTRIC COMPANY NUMBER: 2.2 L

PGwE REVISION: 0

,g IMPLEMENTING PROCEDURE ATTACNnENT: 2 DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 13 0F 18 CERO Personnel Classroom Training Requirements i

  • GENERAL CONSTRUCTION DEPARTMENT (CERP IP 4.4)*

a EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER 1

EMERGENCY PLAN TITLE g g g s R g o

o g o g g g g g N

N N

N N

N

% N N N N N

N NN 4

Corporate Construction Coordinator Site Construction Coordinator e

o Manager. Line Department e

e Manager, Civil-Hydro Department e

e Manager Gas-Mechanical Services Department Manager, Personnel and Clerical

'Q Services Department 9l e

v I

W 4

6. s

~

- -., - - -., _ - -,, ~,.,,,.,,.,,,

.,,n,

=~

n, -

w~

. a u,.= u u.a,._ n x.

. ~..;_.

  • 6

~l me.

m.=

r PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 i

coRronATE EMERGENCY RESPONSE PLAN O

. IMPLEMENTING PROCEDURE o

ATTACHMENT: 2 DME. 07/1}/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 14 0F 18

(

CERO Personnel Classroom Training Requirements

.5

  • ENGINEERING DEPARTMENT (CERP IP 4.5)*

i. '-

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER a

EMERGENCY PLAN TITLE g g g o c e g g g g g 8 $ $ 2 N

N N

N N

N N

N N

N N

N N

N N

Corporate Engineering Coordinator Chief. Design Drafting Chief Mechanical and Nuclear Engineer Chief Electrical Engineer 4

Chief Civil Engineer e

0 e

6 9

e G

ee.

=

8g F

,..,..---,,n.,

,--_,-,.-.,,,,,,,._.,n

< um -... -

.. ~- e, w -, a w _s e x -w,e

--o

= =.

.=

PACIFIC SAS and ELECTRIC COMPANY NUMBER: 2.2 L

CORPORATE EMERGENCY RES/0NSE PLAN REVISION: 0 IMPLEMENTING PROCEDURE ATTACNMENT: 2 A : 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM

. PAGE 15 0F 18 CERO Personnel Classroom Training Requirements

  • COMPUTER SYSTEMS AND SERVICES DEPARTMENT (CERP IP 4.6)*

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE g m.e e o e e m e o em e s 2

RR E N N E N R Z s2 0 0 m

Corporate Computer Applications Coordinator

's Supervising Engineering Computer e

. e Applications Specialist Supervising Computer Technology e

e Specialist Supervising Computer Operations e

o Q

Specialist Supervising Infonnation Systems Specialist og M

L 6

_,.-.,,,m

..__,,.._,_y r -. _,, -, _,. -,

,.mm_e.

.. m._a

..wc

.~

_, m.-

b es-etas lotestpesy.ea PAcWic GAS and ELECTRIC COMPANY NUMBER: 2.2

- L PowE REVISION: 0 IMPLEMENTING PROCEDURE ATTAC. ENT. 2 TITLE DATE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PAGE 16 0F '18 CERO Personnel Classroom Training Requirements

  • NUCLEAR PLANT OPERATIONS DEPARTMENT (CERP IP 4.7)*

EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER i

EMERGENCY PLAN TITLE g g g g o g g g g g g g g g o

N N

N N N N

N N

N N

N N

N N

N Recovery Manager Corporate Liaison Coordinator e

o e

x Corporate Tachnical and Logistical Coordinator Operations and Analytical Recovery Manager Radiological Emergency Recovery Manager Engineering and Logistics Recovery "e

"g x = As Needed

f eg.amum _ u m _.a. 2..2..2m su--mos.ume ha t-m ' ~

E

l j

3 mu.== =v.

p PsCIFIC GAS and ELECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE PLAN PowE REVISION: 0

,i 3

IMPLEMENTING PROCEDURE ATTACMENT 2

~

TE: 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM PME 17 0F 18

~

CERO Personnel Classroom Training Requirements 4

  • DIVISION SUPPORT GROUP (CERP IP 4.8)*

J EMERGENCY PREPAREDNESS COURSE (EPG) NUMBER 1

EMERGENCY PLAN TITLE a 8 8 o

o R W o$ S $,$.2 o

m u

m u m m m m m m m m mum Corporate Division Coordinator

-r

.k W

L t

=

89

..s

'U l

x = As Needed

- W L=

" -- = '?* ' ' ' M' ~ 'h % -

a, 2 -

..as

'2 ~~;

' "W: - - --

' ' ' ~

ask b

!i m.-.

L PACIFIC GAS and FLECTRIC COMPANY NUMBER: 2.2 CORPORATE EMERGENCY RESPONSE MAN t-PGwE REVISION: 0 g

IMPLEMENTING PROCEDURE ATTACNMENT: 2

. 07/15/83 EMERGENCY PREPAREDNESS TRAINING PROGRAM

.- PAGE 18 0F 18 CERO Personnel Classroom Training Requirements.. ~~ '

  • QUALITY ASSURANCE DEPAR1NENT (CERP IP 4.9)*

EME %ENCY PREPAREDNESS COURSE (EPG) NUMBER EMERGENCY PLAN TITLE 5 g ER $ 2 R R W S $ 8 8 8 3 N

N NN N

N N

N N

N N

N N

N N

Corporate Quality Assurance Coordinator Records Management Coordinator e

e Senior Quality Engineer -

Program Development Senior Quality Engineer -

Auditing

(",

Quality Assurance Supervisor Design Drafting Coordinator s

I

.e W

e w...-v,

,,---,r_v-

, - - - - - - - - - -, - ~ ~ -

-r

-r

u.

- ; 2.- u ' pg mee e

o n _-

_u: _

4

\\

y

.(

NUMBER: 3.4 I.

PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 yggg

,DATE: 07/26/83 j

m IMPLEMENTINGPROCEDURE

, PAGE 010F 08 i

i TITLE INSURANCE G

SIGNATURE DATE RESPONSIBILITY TITLE 1

PREPARED BY

~

^

W NUCLEAR NERATIONlhqlNEER

/

PFJSONNfL 42 T.""

MENTAL SAFETY, NPO REVIEWED AND

)3)[

f CONCURRED BY s

MANAGER INSURANCE b

REVIEWED'AND

[

[

p CONCURRED BY EXECUTIVE CE PRESIDENT AND CHIEF FTNANETAI OFFirFR O[

.W

?

33 l

APPROVED BY VICENESIDENT,NUCLIARPOWkGENERATION M.m [

(

///

APPROVED BY C6AIRMAM,PRESIDEpSNUCLORA5VIf0RY CON 41TTEE

/

4

  • eq

'f

,-.--e.-

---r~- - - - - - -.... - - -.., - -

.. - -.. - - -,. ~

~... L.. 2.2 hAlbbd-

.L_~~-

11 -.

' t % d A.Lt

- - M

      • M'
  • ?"

'#i f

=

ee-eua creas asv.es

't PACIFIC GAS and ELECTRIC COMPANY L

CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4 2

PGwE

- m IMPLEMENTING PROCEDURE

. REVISION: 2 TITLE D TE: 07/26/83 INSURANCE PAGE 02 0F 08

(

I ORGANIZATIONAL OUTLINE I.

SCOPE 11.

DISCUSSION 2

til.

RESPONSIBILITIES f,:7).

IV.

INSTRUCTIONS V.

REFERENCES VI.

ATTACHMENTS i

N s..,

.,--_e

~ u m.,_ m e a e d m h m m

1

. ~, -

w w

PAclFIC gas and ELECTRIC COMPANY k

CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4

[

qV-)

IMPLEMENTING PROCEDURE

- REVISION: 2 TITLE

~

INSURANCE PAGE 03 0F'08 I.

SCOPE The scope of-this Implementing Procedure is to provide notification to Insurance Department personnel and assure insurance support services in the 1

event that the Corporate Emergency Response Plan (CERP) is activated.

II. DISCUSSION ThisImplementingProcedureprovidesin'tructionsforguiding(Departmenta A.

s personnel who have Corporate Emergency Response Organization CERO) assignments should the CERP be activated.

B.

Departmental support services include:

1.

Providing advice to other Company Departments on the Company's nuclear property insurance.

~

2.

Property loss control.

(]

3.

Damage cost accumulation.

C.

Procedure Attachment 1. " Department Organizational Relationships" illustrates how the Department interfaces with other Company Departments and non Company Organizations.

III. RESPONSIBILITIES Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.

l IV. INSTRUCTIONS A.

Corporate Insurance Coordinator 1.

Take those actions indicated for the appropriate emergency action level classification below:

NOTIFICATION OF UNUSUAL EVENT 2.

If the event concerns a Notification of Unusual Event emergency action level classification, no notification will nonnally be made to the Corporate Insurance Coordinator.

NOTE: CERP Implementing Procedure 1.1. " Activation of the Corporate i

b,-

Emergency Response Organization" describes the activation of

. the_CERP.

l l

J,.

~s_._

ww

_w m m ram-y. _ o,uaa#_,umu,,

b b

-f es-enes foress sesv.os PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4 O

IMPLEMENTING PROCEDURE REVISION: 2 07/26/83 DATE:

TITLE INSURANCE PAGE 04 0F 08 S

y ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY i

A

~'

3.

Receive event notification from the Corporate Liaison Coordinator that theCorporateEmergencyResponsePlan(CERP)hasbeenactivated.

4.

Detemine from the Corporate Liaison Coordinator Plant status infonnation, emergency action level classification, and any special Departmental response actions.

5.

Notify the following Departmental personnel and non Company Organization and advise them of the emergency action level classification and any special requests from the Corporate Liaison Coordinator:

a.

Coordinator of Property Loss Control b.

Coordinator of Insurance Administration c.. MNL/ Marsh and McLennan (a

y!

6.

Establish and direct a Department operation in the General Office with required Departmental support personnel.

1 7.

Coordinate with the following CERO personnel for requests regarding insurance services:

a.

Corporate Safety, Health, and Claims Coordinator b.

Corporate Law Department Coordinator 8.

Advise the Corporate Liaison Coordinator of Departmental operations status on a periodic basis, and as requested.

9.

Assure the continuous (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) continuity of Department personnel and resources necessary to support the emergency response effort over a protracted period of time.

10. Advise the Corporate Liaison Coordinator on matters of insurance.
11. Establish General Office primary interface with imL/ Marsh and McLennan on procedural matters and the general method of cost accumulation.
12. Obtain all documentation necessary to substantiate a cash advance from

~

~

IML/ Marsh and McLennan.

4

~

13. Review all insurance-related questions from the media as requested by the Corporate Put11c Infonnation Coordinator.

_,.~,,

e.w - ~ + - '

n==

w' ' " M*=!=in=MGMM n.

do ee enes oms nev.ca i

Pacific SAs and ELECTRIC c0MPANY

-I t

PGwE c0RPORATE EMERGENCY RESP 0NSE PLAN NUMBER: 3.4 q

IMPLEMENTING PROCEDURE

. REVISION: 2 TITLE DATE: 07/26/83 INSURANCE PAGE 05 0F 08

14. If required, dispatch support personnel to the San Luis Obispo area.

Transportation arrangements shall be made using Procedure Attachment

4. "Onergency Transportation Instructions".
15. Maintain the Department's " Emergency Response and Recovery Activities Record" binder in a current status.
16. Upon direction by the Corporate Liaison Coordinator deactivate the Departmental emergency response effort.

l

17. Log all incoming and outgoing communications which are related to the emergency response effort using Procedure Attachment 5, " Emergency Connunications Log Sheet".

NOTE: Completed " Emergency Communications Log Sheets" shall be placed 1.

in the Department's " Emergency Response and Recovery Activities Record" binder.

O

18. Maintain a written record of all pertinent emergency, response and N

recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".

NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" bindar.

B.

Coordinator of Property Loss Control 1.

Take those actions indicated for the appropriate emergency action level classification below:

NOTIFICATION OF UNUSUAL EVENT 2.

For a Notification of Unusual Event emergency action level classification no notification will be made.

ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.

Receive event notification from the Corporate Insurance Coordinator that the Corporate Emergency Response Plan has been activated.

4.

Determine from the Corporate Insurance Coordinator the emergency action level classification and the extent of any requested response.

~

5.

Upon receipt of the event notification establish a working

("

relationship with the following Department and non Company Organization:

se 2

c,-

'::u

' ww" : '

I b

i F

3

{

If

.== a v.

pacific sAs and ELECTRIC c0MPANY c0RPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4 d

e"'

IMPLEMENTING PROCEDURE

. REVISION: 2 i

DATE: 07/26/83 TITLE INSURANCE PAGE 06 0F 08

~

A i a.

Accounting Depa'rtment - for detailed methods of accumulating all y

. costs associated with damage to onsite property.

b.

NHL/ Marsh and McLennan - for coordination of their various -

property adjusters and insurance consultants.

6.

Coordinate the scheduling of all site visits requested by insurance companies and ensure that insurance company personnel are accompanied ci at all times during such visits by a representative of the Department.

7.

Periodically apprise the Corporate Insurance Coordinator of property loss control matters, and as requested.

8.

Log all incoming and outgoing connunications which are related to the emergency response effort using Procedure Attachment 5. " Emergency Communications Log Sheet".

NOTE: Completed " Emergency Connunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities 5

Record" binder which is maintained by the Corporate Insurance Coordinator.

9.

Maintain a written record of all pertinent emergency response and recovery activities using Procedure Attachment 6, " Emergency Response and Recovery Activities Log Sheet".

NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Insurance Coordinator.

C.

Coordinator of Insurance Administration 1.

Take those actions indicated for the appropriate emergency action

~

level classification below:

NOTIFICATION OF UNUSUAL EVENT l

2.

For a Notification of Unusual Event emergency action level classification no notification will be made.

ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.

Receive event notification from the Corporate Insurance Coordinator

(

- that the Corporate Emergency Response Plan has been activated.

g

,,-,-----v--e-,..,s-=-,

,,--e-+--

---.--es,--cre-----r---,

-a,.--

,----w

.--.. -, - - -..r.-,

-. - -.. - + - -

.----w

+ - - - -

.__e

_u, a w-z?m r :

n g _-

c

'o

~

.t e,m nav.ea PACIFC gas and ELECTRIC c0MPANY F

CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4 a

IMPLEMENTING PROCEDURE

. REVISION: 2 TITLE ATE: 07/26/83 INSURANCE PAGE 07 0F 08 4.

Function as the primary alternate for the Corporate Insurance Coordinator if, for any reason', he is not available.

5.

Determine from the Corporate Insurance Coordinator the emergency action level classification and the extent of any requested response.

6.

Obtain all documentation necessary for a cash advance from NML/ Marsh and McLennan as appropriate to the severity of the emergency, or as requested.

7.

Maintain comunications with the Corporate Insurance Coordinator for administering other insurance coverage which may be involved as the result of the emergency event and for assessing the adequacy of this coverage.

8.

Log all incoming and outgoing communications which are related to the emergency response effort using Procedure Attachment 5 " Emergency Communications Log Sheet".

NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Insurance Coordinator.

9.

Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6 " Emergency Response and Recovery Activities Log Sheet".

NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Insurance Coordinator.

V.

REFERENCES A.

Corporate Emergency Response Plan B.

CERP. Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization".

M

'M_'

y-,,y,

.%. ~-.

_ ~ -. _ _ -.. -.

>ue=-,

_a.

a..

-. e_=

-an

~

1 ee osas esieas nav.ca PACIFIC GAS sad ELECTRIC COMPANY

't CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 3.4 PGwE 1

g IMPLEMENTING PROCEDURE

- REVISION: 2 l

TITLE DATE: 07/26/83 INSURANCE PAGE 08 0F 08 vie. ATTACHMENTS 4

1.

Department Organizational Relationships 2.

Emergency Plan Titles, Personnel Assignments, and Notification List 3.

Emergency Organization Contact List 4.

Emergency Transportation Instructions 5.

Fonn 69-084, " Emergency Consnunications Log Sheet" 6.

Form 69-085, " Emergency Response and Recovery Activities Log Sheet" N

O l

9 N

v s

~

e l

l

--,--,-----,,-a--

- - ~. - - - -,

J.,.. 1_ _. _.

3

,3 i

..o

]

~

f_

e -ese sma: nev.es

-i PACIFIC GAS and ELECTRIC COMPANY NUMBER:

3.4 i

CORPORATE EMERGENCY RESPONSE PLAN POswE REVISION-2 (G

IMPl.EMENTING PROCEDURE j

,m ca,g,7 1

TITLE INSURANCE DATE: 07/26/83 PAGE 01 0F 01 DEPARTMENT ORGANIZATIONAL RELATIONSHIPS E

i ese m

samassa

..s I

see emmen n Mamem M elmethTem t

I 1

NTE u.NTE yg ESSASEh4M SBBIBeethTen GBenemaATOR (O.

gesagenATOR

.I I

.l r

l I

eo I

en' am, j

1TJ l

====-

j T.

-E

-_.._.._...a l

.A"'"'"-

m temamamew Gamanuma Sussemams summmes M -Segumme kmAhum SmummeGumur We - W Sgmuudhum SmIEe W - ensmus emus o

e

  • e

,ew

--e

...a..-e

--...ww

__.-._....--.--.-,---._m

. a. =. u Gw...

.,w.<-

.a..... - -. -.

y

~.

= :- :.

s a u.-

w-O l

t ee4sme ert:1rev cs PACIRC GAS sad ELECTRIC COMPANY NUMBER: 3.4 L

CORPORATE EMERGENCY RESPONSE PLAN i-PGwE REVISION: 2 IMPLEMENTING PROCEDURE-

. ATTACHMENT: 2 (n,

M LE INSURANCE DATE: 07/26/83 PAGE 010F 02 NAME HOME PHONE EMERGENCY PLAN TITLES C

NON EMERGENCY TITLE BUSINESS PHONE

~1 Corporate Insurance 1.

W. P. Noone Coordinator Manager of Insurance 2.

R. M. Reider Director, Insurance Administration 3.

C. A. Lewis Coordinator of Property Loss Control Coordinator of Property 1.

C. A. Lewis Q.

Loss Control Coordinator of Property Loss Control 2.

UNASSIGNED 3.

B. J. Casey Assistant Insurance Analyst Coordinator of Insurance 1.

R. M. Reider l

Administration Director Insurance Administration 2.

B. J. Casey Assistant Insurance Analyst 3.

C. A. Lewis Coordinator of Property Loss Control M

~

~

nw

~

,--..--.._.-...a-2_u-

- 1:a.

..::~..2 2 =

t

--u.=

. - :. + w.

'o

~, -,... n. a v..

3 PACIFIC GAS and ELECTR C COMPANY NUMBER ** 3*4 f

CORPORATE EMERGENCY RESPONSE PLAN

~"

nEnSiON: 2 c-IMPLEMENTING PROCEDURE ATTACHMENT: 2

" E-INSURANCE DATE: 07/26/83 PAGE 02 0F 02

~

NAME HOME PHONE EMIPEENCY PLAN TITLES 4i.

NON EMERGENCY TITLE BUSINESS PHONE,}

NML/ Marsh and McLennan 1.

Quentin Jackson General Mgr. Nuclear Mutual Limited

)

2.

D. F. Brown Fire / Extended Coverage Loss Control Supervisor 3.

J. Mras Loss Adjustment Supervisor f

s j 5

e

]

ae p

"1

(

..,..... ::... -....:.- :. 2:- -

_..u__

.
.. =. a =_.s.. = e a. _n :x. u._ n.= __

o l

se4m totest nav er L-PACIFIC GAS and ELECTRIC COMPANY NUMBER-3.4

. [

l CORPORATE ELIERGENCY RESPONSE PLAN

~

REnSION: 2 lMPLEMENTING PROCEDURE a

. ATTACHMENT: 3 (D

WE DATE: 07/26/83 INSURANCE PAGE 010F 02 EMERGENCY ORGANIZATION CONTACT LIST l

ORGANIZATION OR NAME EMERGENCY LOCATION EMERGENCY TITLE BUSINESS PHONE EMERGENCY PHONE Recovery Manager 1.

J. D. W ##~ --.

EOF s

2.

L A. Raymond 3.

J. D. Townsend 1

4.

R. C. Thornberry m!

~

(t Corporate Liaison 1.

R. J. McDevitt CIRC Coordinator 2.

S. R. Foster 3.

T. A. Moulia Corporate Public 1.

R. H. Miller Ganar=1 ne< 4 -

Infonnation Coordinator

_f 2.

C. G. Poncelet 3.

H. N. Peelor i

Corporate Safety, Health 1.

B. P. Sadler General Office

~

and Claims Coordinator 2.

C. W. Allen

- - - - ' ~ ~ ~ "

/

(-

3.

J. C. Vocke f

4.

M. C. Jonas_

m d

- = - =u = A w=i-i = '

.. =

. w.:

. a :.. = =

. =- -..

-e

.i

.,,4=..v..

PACIFIC GAS and ELECTRIC COMPANY NUMB ER*-

3.4 CORPORATE EMERGENCY RESPONSE PLAN I

PGwE REVISION: 2 IMPLEMENTING PROCEDURE

< ;)

" ATTACHMENT: 3 M LE INSURANCE DATE: 07/26/83 PAGE 02 0F 02

~

~

EMERGENCY ORGANIZATION CONTACT LIST p

45 ORGAdIZATIONOR NAME EMERGENCY LOCATION EMERGENCY TITLE BUSINESS PHONE EMERGENCY PHONE Corporate Law 1.

P. A.. Crane, Jr.

General Office Department

2 Coordinator 2.

R. Ohlbach 3.

R. F. Locke

~

./

Construction 1.

G. S. Gee General Office Q,

Accounting Department 2.

UNASSIGNED 3.

UNASSIGNED

  • e k

L u

= = :.....=..

. ~._.u

.u.:2 m :_w

-.-2.

j j

w. e c,, m v.,

I PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 3.4 CORPORATE EMERGENCY RESPONSE PLAN

- [.

P GeeE REVISION: 2 IMPLEMENTING PROCEDURE rrTACHMENT: 4

<h DATE: 07/26/83 TITLE INSURANCE PAGE 0,1 0F 04

?

ENERGENCY TRANSPORTATIDN INSTRUCTIONS C

A.

Critical Emergency Response Personnel 1.

Upon receipt of notification of the emergency event, the following critical emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:

. Recovery Manager i

. Operations and Analytical Recovery Manager

. Engineering and Logistics Recovery Manager

. Radiological Emergency Recovery Manager

. Public Information Recovery Manager All other PGandE emdrgency response support personnel traveling to the San Luis Obispo area shall arrange transportation in accordance with the instructions set forth in B. below.

2.

The above-listed individuals may elect to utilize their own vehicles or any

(({?g one of the following transportation services:

./

a.

Corporate Aircraft

1) General 0ffice....................................

\\

2) Oa kl and Airport Hange r #8.........................

b.

Oakl and Execu tive Ai r Temina1........................

L l

(ask for PGandE Transportation Coordinator) 6 c.

24-hcur Fixed Wing Air Charter Services:

1) Cal-West Aviation (Concord)....................... (415 )825-3544 (415)672-0214 (415)932-5794
2) Skyways Avia tion, Inc. (San Carlos)............... (415)593-1448 415 574-4704 415 345-7423 415 573-1152 o
3) CoastalAir(SanLuisObispo).....................(805)544-6464
4) Golden Gate Piper (San Ca rlos).................... (408)446-2439
5) PacificPiperAviation(SanJose)................. 408 294-4016 408 225-2540 408 374-9985

v.c s-www.... : va v-

.,p.

,-+ a m

_ (..

n, e

s!

i !

~

L l PACIFIC GAS sad ELECTRIC c0MPANY gggggg 3,4 CORPORATE EMERGENCY RESPONSE PLAN 3

O IMPLEMENTING PROCEDURE EllSET 4

DATE: 07/26/83 TITLE INSURANCE PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)

i i A. ditical Emerge'ncy Response Personnel (Cont'd.)

d.

24-hour Helicopter Air Charter Services (in order of preference):

1) Aris Helicopters, Ltd. (San Jose)................. (408)293-0800 (408)354-0039
2) Astrocopte rs (0akl and)............................ (415 )635-6860 (415)687-5179 (415)939-5683
3) California Helicopter Airways, Inc. (Hayward)..... (415)783-4000 (415)632-3529 e.

The telephone company yellow pages list additional air charter

services, h

f.

Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.

To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following numbers as appropriate:

1) During normal office hours GoldenGateDivision..........................(415)557-0640
2) During non-office hours Oakland Dispatch Center....................... (415)658-9115 Connunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide, g.

Regardless of the mode of transportation used, prior to departure, each individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information. The Corporate Technical and Logistical Coordinator will then advise the Corporate Division Coordinator to ensure that any necessary ground logistical support is in place prior to the arrival of personnel in the San Luis Obispo area.

v--

~~- --

,,,,,.,,,wn,,

..,.-------,-,-,,,---,,..-.,--,,,,,-------,----,,-,----------,,,,,,-n,,,-n

,,--,,,,,,m,--,,,,v---,-,.,---

n.-n--

.. - =..:.. a

.:.:=

23.

m 1: =. = = - = -

.----a.--

---.g

-o i

PACIFIC gas and ELECTRIC CoLIPANY NUMBER: 3.4 I

CORPORATE EMERGENCY RESPONSE PLAN

.[

P G-E REVISION: 2 n

IMPLEMENTING PROCEDURE ATTACMENT: 4 DATE: 07/26/83 W

TITLE INSURANCE PAGE 03 0F 04 EMERGENCY TRANSp0RTATION INSTRUCTIONS (Cont'd.)

it B. 'dther Emergency ~ Response Personnel All other PGandE emergency response support personnel traveling to the 1.

San Luis Obispo area shall use their own vehicles or transportation services provided by PGandE.

2.

If PGandE transportation services are to be used, personnel should proceed to make transportation arrangements in one of the following manners:

During nonaal office hours, contact the General Office Travel Desk a.

(Room 1610, 77 Beale Street). The primary telephone numbers for the Gencral Office Travel Desk are:

T

~ r

/

b.

If these lines are busy, the following alternate telephone numbers

{

should be used:

l

)

During non-office hours, following receipt of notification of the c.

emergency event, emergency response personnel should proceed directly to the Executive

  • Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).

Note:

Personnel are advised to bring only a minimum amount of baggage.

d.

If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability, Regardless of the mode of transportation used, prior to departure, each e.

individual shall contact the Recovery Manager or Coordinator to whcm (s)he functionally reports and advise him of the estimated times of departure.and arrival, the arrival location in the San Luis Obispo area,--

and any other special requirements or infonr.ation.

f.

The Transportation Coordinator will coordinate arrangements, as required,

('

with the Corporate Division Coordinator for Ground transportation and lodging for. GandE personnel in the San Luis Obispo area.

P e

W -

~

~

s. ~uas.

c < ~ > i-

~ -. : -.w p c.eux: ' -

- ud:.. : n -

Il a s. " w w.

i ee-sus rosas new.en

.*l PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.4

~

CORPORATE EMERGENCY RESPONSE PLAN c

~~"

IMPLEMENTING PROCEDURE 5'5El$T 4

DATE: 07/26/83 TITLE INSURANCE PAGE 04 0F 04 EMERGENCY TRANSPORTATION INSTRUCT 1.ONS lY '

DIRECTIONS FROM NIMITZ FREEWAY

/*

1. ja.aguth on HEGENBERGER lt0AD (RT 17) 1 mile
2. " urn riaht onto D0OLITTLE DRIVE.
3. " urn left onto LANGLET STREET.
4. ' urn riaht at EARHART ROAD and part in the n

parking lot on the corner.

N 7

f L

  • , pg.

+.

san asanesesaF o.

.m y

3

\\

g l j; g

_l ;%.N

~

l

':s h

~

j fy\\-

\\

w;

- l, n&

D,

'+, "T emt pl /

,N s,, p'.

3 e,'.,~..

,K x1 v

g,'

l

.k Q

\\

k

[

f

,P 5

p. r,. )~..f.
4e i

.\\ c m.p, 9= -)

t L

.,3

+,-

z%,

f-Q ~ <

i.,

^

/

4 q

d j'

\\

u

,. i.s A.

h i

.u. z '

3l'.

. llll"

[

i

{

)

y.; {s.

s

tjt,'

f!

,(:itI r1 bit.i $i

+tL

?

rIki P[t I>Pi Li(,

Ii

! t Lt Irt ll' 4

a E

S h9 m

R aa E

n V

E s

e e

R ot E

E G

O A

s W

P t

l 3

IO E

T e

T Cd A

D es i

S o

'Y uv i

E s

ES t

EGA SSE M

N O

ITACO L

YC 8

N l

E G

i R

Ee t

u G

E t

T G

E N

I E

L H y L

r A

S e

v C

N G iT A O C D

Y L NP L A

E A E S LL P S R N N A

A 17 C

OO O t

CP II I

S C

T E

IRR A T Y C NO C C I

I EL N N T

E E U A

G I

D R M NE M IL F

A4 F

h SE O A

A E C R

GT CA Y O

E R C I

L F O N T

ICP E T

I AR POG Y

C R C

E N

E E

M na G

E A

R i

e N

Ee 0 i tE 0

v t

e T

s R

t e

)

2 J.

8

/

8 g

EI 1

se 4

nis 5

m Ts 0

a 4

9 I

i t

t 44I

,ii

i' lII I'j1

'O

=

N ANO ELENANY CORPORATE EMERGENCY RESPONSE PLAN f

Pews

{

EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET

{

EMEROSNCY LOCATION TOOAY'S DATE PAGE e

h tu (21 ts:

TwE ENTEREO SV (2000 two.)

(INITIALSI is (si

SUMMARY

OF ACTIVITY PERFORMED tel

(

- t, e

s, yI*

e' o

W i

,k

. {.

e 06 M

S.006 (8/82) Rev. 00 SEE INSTRUCTIONS ON REVERSE

1 -

__,. ;;.1 _ _.3 ;

.u._..-..

. - ~. -

. _. m_m ii

=0

l '

,i

=>=vn NUMBER: 3.6

[

PACIFIC GAS and ELECTRIC COMPANY r

CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 ggg q

6

-DATE: 07/20/83

"^*' ' ' 7 Ii IMPLEMENTING PROCEDURE TITLE SECURITY d

' SIGNATURE DATE RESPONSIBILITY TITLE

's DMNM M M

PREPARED BY SUPERVISIN(INijCLEAR 8ENEP.ATION ENGINEER f

PERSONNEL AND NVIRONMENTAL SAFETY

^

' gg REVIEWED AND

7. s g.g

^

CONCURRED BY DIRECTOR OF SECUR I -

f

- }, \\,.i d

"i [ /.

REVIEWED AND CONCURRED BY VICE PRESIDENT - GENERAL SERVICES REVIEWED AND

/

.,f, M iif/f CunCURRED BY o

n v i

~

SENIOR VICE PRESIDENT - OPERAT MNS /

Y ff).2f/3 APPROVED BY r

VICE 0 RESIDENT - NUCLEAR POWER GENERATION

=

APPROVED BY CHAIRMAN - PRESIDM',1"2 i' ADVISORY COMITTEE f'

_.__.,__y m.

-. - _,,. ~ - _,... -,. _, _ _

-.a _. u.u w,_ e. --

~

j

.?.

n. ~ n,, ~,...

PACIFIC GAS and ELECTRIC COMPANY NUMBER *- 3.6 j

r CORPORATE EMERGENCY RESPONSE PLAN

~~"

"" ' S ' "

O IMPLEMENTING PROCEDURE DATE: 07/20/83 TITLE PAGE 02 0F 07 SECURITY N

ORG ANIZATIONAL OUTLINE l.

SCOPE II.

DISCUSSION 111.

RESPONSIBILITIES IV.

INSTRUCTIONS V.

REFERENCES VI.

ATTACHMENTS f

l

{

l-Se O'%

_/

i e.

smwasm_,u -

2 1

y

.:o i

-ou. w.m m..a PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 f

CORPORATE EMERGENCY RESPONSE PLAN I

POwE REVISION: 2

'. 'g IMPLEMENTING PROCEDURE oATE: 07/20/83 WE SECURITY PAGE 03 0F 07 I." SCOPE The scope of th.is Implementing Procedure is to specify the direction and coordination of the following activities:

Augmenting, as necessary, the site security supervisory staff.

A.

B.

Ensuring that the responsible Departments in the General Office and in the San Luis Obispo Area are infonned of the emergency situation. Any requirements for additional offsite security measures will be sd=ir.i:tered by the General Office Security Department.

C.

Providing security at all offsite emergency response centers located on Company property, as needed.

D.

Coordinating security for news conferences.

II. DISCUSSION A.

This Implementing Procedure provides instructions to those personnel in the General Office Security Department who have functions to

(]

perform during an emergency involving the Corporate Emergency Response Plan (CERP).

B.

Procedure Attachment 1, " Department Organizational Relationships" illustrates how the Department interfaces with other Company Departments and non Company organizations.

III. RESPONSIBILITIES Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.

IV. INSTRUCTIONS A.

Corporate Security Coordinator 1.

Take those actions indicated for the appropriate emergency action level classification below:

NOTIFICATION OF UNUSUAL EVENT 2.

For a Notification of Unusual Event emergency action level.

classification, no notification will nonna11y be made to the Corporate Security Coordinator.

q s

NOTE:.CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" describes the activation of the CERP.

~

w u., m u m _ -~

=

w.a u

2 s =

n-.-

_;w m w

.:s

i

.f PACIFIC GAS and ELECTRIC COMPANY NUMBER

  • 3.6 I

L CORPORATE EMERGENCY RESPONSE PLAN f

~

"'" S ' "

h IMPl.EMENTING PROCEDURE Np OATE: 07/20/83 SECURITY PAGE 04 0F 07 ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY i

3.

Receive event notification from the Corporate Liaison Coordinator that the Corporate Emergency Response plan has been activated.

4.

Determine from the Corporate Liaison Coordinator the emergency action level classification and any special Departmental response actions.

5.

Notify the following Department personnel and advise them of the emergency action level classification in effect and any special requests from the Corporate Liaison Coordinator:

a.

Building Security Supervisor 6.

Instruct the Building Security Supervisor to implement security procedures to restrict access to the Corporate Incident Response Center (CIRC) (14th floor, 77 Beale Street) to those personnel

'below:

Personnel appearing on Procedure Attachment S. " CIRC a.

Restricted Access Authorization List", or b.

Personnel authorized access by the Corporate Liaison Coordinator, or his designee.

7.

Establish and direct a Departmental operation in the Generel Office with required Departmental support personnel.

8.

Coordinate. *s necessary, Departmental activities with the following CE:0 personnel:

a.

Corporate Law Department Coordinator b.

Site Emergency Coordinator 9.

Assurethatcontinuous(24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)Departmentaloperationsare maintained over a protracted period of time.

10. Assure the availability of Department personnel and resources necessary to support the Departmental emergency response effort.
11. As directed by the Corporate Liaison Coordinator, dispatch any additional security personnel, as required, to the San Luis.0bispo Transportation arrangements shall be made using Procedure area.. " Emergency Transportation Instructions".

l

12. Function as corporate security liaison with local officials in the San Luis Obispo area.

--m.

..w,,

a

-wm-

, #m,ge, m.o ;%r. w.1 m, p.

m,

b

^

uses,em nav.on PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 L

3 c0RPORATE EMERGENCY RESPONSE PLAN F

POwE REVISION: 2 1

1 IMPl.EMENTING PROCEDURE oATE: 07/20/83 TITLE SECURITY PAGE 05 0F 07

[

13. If necessary, direct the Building Security Supervisor to implement security procedures to ensure physical security, personnel 3

i security, and assets security in and around the General Office Building complex.

14. Maintain the Department's " Emergency Response and Recovery Activities Record" binder in a current status,
15. Upon direction by the Corporate Liaison Coordinator deactivate the a

i Departmental emergency response effort.

t

16. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 6,

" Emergency Comunications Log Sheet".

NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery i

Activities Record" binder.

17. Maintain a written record of pertinent emergency response and O

recovery activities using Procedure Attachment 7, " Emergency Response and Recovery Activities Log Sheet".

NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder.

B.

Building Security Supervisor 1.

Take those actions indicated for the emergency action level classifications below:

NOTIFICATION OF UNUSUAL EVENT "l

2.

Under this emergency action level classification no event notification is expected.

ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.

Receive event notification from the Corporate Security Coordinator that the Corporate Emergency Response Plan has been activated.

4.

Determine from the Corporate Security Supervisor the event

~

emergency action level classification.

I b 5.

As directed by the Corporate Security Coordinator, implement security procedures-to restrict access to the Corporate Incident Response Center (14th floor, 77 Beale Street) to the following personnel:

.p., w,., mmb-

4. m._ :

- u.u a s: a

--n_.>

_w

..m, di 7

us e insi asv.on

~

~

PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 3.6

~

CORPORATE EMERGENCY RESPONSE PLAN POwE REVISION: 2

+ 6 IMPLEMENTING PROCEDURE oATE: 07/20/83

~

ME SECURITY PAGE 06 0F 07 Personnel appearing on Procedure Attachment 5,'" CIRC a.

Restricted Access Authorizati6n List", or b.

Personnel authorized access by the Corporate Liaison Coordinator, or his designee.

6.

As directed by the Corporate Security Coordinator, implement security procedures necessary to ensure physical security, personnel security, and assets security in and around the General Office Building complex.

l 7.

Log all incoming and outgoing communications which are related to the emergency response effort using Procedure Attachment 7,

" Emergency Comunications Log Sheet".

NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.

O Maintainawrittenrecordofpertinentemergencyresponseand 8.

recovery activities using Procedure Attachment 7, " Emergency Response and Recovery Activities Log Sheet".

NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be forwarded to the Departicant's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.

C.

Security Representatives 1.

Take those actions indicated for the emergency action level classifications below:

NOTIFICATION OF UNUSUAL EVENT 2.

Under this emergency action level classification no event notification is expected.

ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.

Receive event notification from the Corporate Security Coordinator that the Corporate Emergency Response Plan has been activated. _..

4.

Perform security activities as directed by the Corporate Security

~

u/

Coordinator.

)

...,-,_-,-..,_..,,,n

=

w.. - u_n s.,

_ _ c

. c _ ~ n,

u.

v. n PACIFIC GAS and ELECTRIC c0ZPANY NUMBER: 3.6

'i conPonATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE DATE: 07/20/83 Lo TITLE SECURITY PAGE 07 0F 07 5.

Log incoming and outgoing comunications related to.the emergency response effort using Procedure Attachment 6 " Emergency Comunications Log Sheet".

NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.

6.

Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 7. " Emergency Response and Recovery Activities Log Sheet".

NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" should be forwarded to the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Security Coordinator.

V.

REFERENCES A.

Diablo Canyon Power Plant Emergency Plan 7,,

B.

Corporate Emergency Response Plan C.

Diablo Canyon Security Plan i

D.

Diablo Canyon Contingency Plan E.

CERP Procedure 1.1, " Activation of the Corporate Emergency Response Organization" VI. ATTACHMENTS 1.

Department Organizational Relationships Emergency Plan Titles, Personnel Assignments, and Notification List l

2.

l i 3.

Emergency Organization Contact List 4.

Emergency Transportation Instructions 5.

Restricted Perscnnel Access Authorization List 1

6.

Form 69-084, " Emergency Comunications Log Sheet" Fom 69-085 " Emergency Response and Recovery Activities Log Sheet" 7.

(

'i

~

e l

m,

,g,,,

,.g.

., g..

_r,

.u,g ;

. 2gsm.g

.\\

e. u s e,m m.sv.on PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 L

CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE

.O IMPLEMENTING PROCEDURE

.ATTAcNsENT 1 TITLE DATE: 07/20/83 SECURITY l-PAGE 01 0F 01

\\

L DEPARTMENT ORGANIZATIONAL RELATIONSHIPS o

y e,ca,,,,

in esa emie es o ars unne=

egemesmaTon

/

osa = ^rs som m ar one eg.,

r.

1 1

so ouar masamma

.a.m.

ry j.-

g secuany

-.=

-.=

i i.

7._.._.._.._.

p___y

_A_9_J l

so eo

= :

ee n,sumars f

GutemeeeCY sin amouanv an.s

,,,,,,,,,,t

  • e =ammet m use var,ves l

_a==am,,,,

I I

l

=

i en u e

emarty osmewes WWEEE W-use amasseur emmusumusen

. - _.._.. causammmed Pmemmed W = eumummW Susume Ommer GIIIC = emusemeensamm nasmmmsemmer ser -temsmunycumummePamuy s p P = cannesemovempummestum ES = h Las endus M = emme emus

__r,. - - -, -.,_,

,.,__.,..,m....

m m.

m_.-.w..._.

m.

... :.u.a u.az _a _a.r _

j

.w., 4.. _2-. ;,-a -. m

'o I

co-ow istaat arv ok NUMBER: 3.6 f

PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2

-[

O IMPLEMENTING PROCEDURE PGwE

. ATTACHMENT 2 ATE: 07/20/83

. TITLE SECURITY PAGE 01 0F OI EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND__ NOT HOME PHONE NAME BUSINESS NON EMERGENCY TITLE

~

EMERGENCY TI'TLE

1. L. H. Shaffer Corp. Security Coordinator Director of Security
2. J. R. Van Schaick Supervising Security Rep.
3. R. Dunleavy 3r. Security Rep.
1. V. Dettman Security Representatives 5ecurity Representative t-v e
2. M. Person 3ecurity Representative
3. J. Nichols Security Representative
4. L. Lawrence Security Representative
5. L. Adams f

Security Representative

6. F. C. Kobely _ tative Security Represen
1. R. J. Eiden _ _

Butiding Security Supervisor 3ecurity Supervisor

2. A. Jinkerson

~

~ Administrative Assistant

3. R. D. Manning Manager, Building and Administrative Services c'

Dept.

W'

-w

~

man.e=, m _

h==me

_..L.-..

a. w w c... =...

w2 %..

w

>.1.x 2+;x w ~ a -

a ~ x m w ~ --

4 I,

<u. nau any n PACIFIC GAS and ELECTRIC COLIPANY NUMBER: 3.6

~}

REVISION: 2 I

CORPORATE EkERGENCY RESPONSE PLAN P G -> E IMPLEMENTING PROCEDURE 4TrACHMENT: 3 e

v TITLE DATE: 07/20/83 SECURITY PAGE 01 0F 02 EMERGENCY ORGANIZATION CONTACT LIST ORGANIZATION OR NAME EMERGENCY LO TIOf EMERGENCY TITLE BUSINESS PHONE PHONE San Luis Obispo County DUTY OFFICER SHERIFF'S FACILITY Sheri.ff's Off.i.ce

~

f Recovery Manager

1. J. D. Shiffer_ /

, EOF or

2. W. A. Rayrtond

_-J

3. _J._D. Townsend

'C%

~,

4. R. C. Thornberry Corporate Liaison Coordinator
1. R. 1. McDevitt CIRC 7

I

2. S. R._ Foster

__mm<-=

3. T. A. Moulia Site Security Supervisor
1. L. G. Lunsford OSC l
2. R. G. Todaro

/

3. Unassigned l

I J

Z i,.-.i._

= ca;.._.,.,., _ _.,, _, _,

v. enn

<v u PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 k

CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 I

P G e<E IMPLEMENTING PROCEDURE

. m icanenT. 3 g

07/20/83 TITLE SECURITY PAGE 02 0F 02 EMERGENCY RESPONSE ORGANIZATION CONTACT LIST (Cant'd.

=.

EMERGENCY LOCATION NAME ORGANIZATION OR PhTNE

. EMERGENCY TITLE BUSINESS PHONE

1. D. Okabayashi OSC On-Site Personnel Rep.

T

2. L. Campbell i

7 -

3. Unassigned _

g i

f

'. t a i

~

h t

4

=.

,e mW e

e

.pmas.-. se %

.W

w:.:-.x~ u..-..:. w.=,x a - m

-.w -

-o 8

-0 348 f,/5 23 8'tV. 02

- - - - - - ~ -

{

40 PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6

.[

CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 2 O

IMPLEMENTING PROCEDURE ATTACHMENT: 4

~

TITLE SECURITY DATE: 07/20/83 PAGE 010F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS A. - Critical Emergency Response Personnel 1.

Upon receipt of notification of the emergency event, the following critical emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:

. Recovery Manager

. Operations and Analytical Recovery Manager

. Engineering and Logistics Recovery Manager Y

. Radiological Emergency Recovery Manager

. Public Infomation Recovery Manager.

All other PGandE emergency response support personn_el traveling to the San Luis Obispo area shall arrange transportation in accordance, with the instructions set forth in B. below.

r;q

~

D 2.

The above-listed individuals may elect to utilize their own vehicles or any one of the following transportation services:

a.

Corporate Aircraft General 0ffice....................................

(

b.

Oakland Executive Ai r Teminal........................ (

(ask for PGandE Transportation Coordinator) s c.

24-hour Fixed Wing Air Charter Services:

1)

Cal-WestAviation(Concord).......................(415)825-3544 (415)672-0214 (415)932-5794

2) Skyways Avia tion, Inc. (San Carlos)............... (415)S93-1448 (415)S74-4704 415 345-7423 415 573-1152 5
3) Coastal Ai r (San Luis 0bispo)..................... (805)S44-5464 - ~ ~

~

4) Gol den Gate Pi per (Sa n Ca rlos).................... (415 )592-2550 (408)446-2439 s

(

l

5) Bay AiI cha rte r (Haywa rd)......................... (415)703-3665

smn_w w-Aimwa

_-& a, m m e = m m x 4

p.m.w a m -

u-s

6 ;

bl' 1

PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 2

'I IMPLEMENTING PROCEDURE m,cangn7: 4

. g SECURITY DATE: 07/20/83 PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS

['

6) Pacific Piper Aviation (San Jose)................. 408)294-4016 4

225-2540 4

374-9985 d.

24-hour Helicopter Air Charter Services (in order of preference):

-1) Aris Helicopters, Ltd. (San Jose).................

(408)293-0800

-(408)354-0039

2) Astrocopters (0akland)............................ (415)635-6880 d

687-5179 939-5683

3) Garli ch Enterpri ses (Concord)..................... (415 )228-1500 (415)825-8346
4) California Helicopter Airways Inc. (Hayward)...., (415)783-4000 g;.g (415)632-3529 b'

The telephone company yellow pages list additional air charter e.

services.

f.

Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.

To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following numbers as appropriate:

1) During nonnal office hours Gol den Ga te Divi sion.......................... (415 )S57-0640
2) During non-office hours Oakland Dispatch Center....................... (415)658-9115 Comunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide.

Regardless of the mode of transportation used, prior to departure, each -

g.

individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and

(

arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information. The Corporate Technical and Logistical _ Coordinator will then advise the Corporate Division Coordinator to enture that any necessary ground logistical support is in place prior to the arrival of personnel in the San Luis Obispo area.

-....,... p.. ; -. -.. w au w.x.w.u- - - n~

-- --~ ~

?i

[j GG43m (9'313 Rtv 02 PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 I

CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 4713castur: 4 pQJ TITLE SECURITY DATE: 07/20/83 PAGE 03 0F 04

~

EMERGENCY TRANSPORTATION INSTRUCTIONS B.

Other Emergency Response Personnel 1.

All other PGandE emergency response support personnei traveling to the San Luis Obispo area shalt use their own vehicles or transportation services provided by PGandE.

2.

If PGandE transportation services are to be used, personnel should proceed to make transportation arrangements in one of the following manners:

a. 'During nomal office hours,' contact the General Office Travel Desk (Room 1610, 77 Beale Street). The primary telephone numbers for the General Office Travel Desk are:

/

f I

u

~

b.

If these lines are busy, the following alternate telephone numbers should be used:

mU a

During non-office hours, following receipt of notification of the c.

emergency event, emergency response personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).

Note:

Personnel are advised to bring only a minimum amount of baggage.

d.

If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability.

Regardless of the mode of transportation used, prior to departure, each e.

individual shall contact the Recovery Manager or Coordinator tn whom (s)he functionally reports and advise him of the estimated times of e

departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or infomation.

f.

The Transportation Coordinator will coordinate arrangements, as e-required, with the Corporate Division Coordinator for Ground transpor-tation and lodging for PGand E personnel in the San Luis Obispo area.

z

.z r. _ -

s. _.1 1

--o s

..m

._...m.

's esam wesi n w sa i

{

PAclFic GAS and ELECTRIC COMPANY NUMBER: 3.6 I

C0F.PORATE EMERGENCY RESPONSE PLAN i

po wE REVISION: 2 IMPl.EMENTING PROCEDURE

g 3774 cant 37: 4 TITLE SECURITY DATE: 07/20/83 PAGE 04 0F 04 MAP TO OAKLAND INTERNATIONAL AIRPORT EXECUTIVE AIR TERMINAL d

Y' d

D'IRECTIONS FROM NIMITZ FREEWAY

  1. "'""'hD
1. En south on HEGEMBERGER ROAD (RT 17) 1 mile

./

~

2. " urn riaht onto D0OLITTLE DRIVE.

'IP

3. ' urn left onto LANGLEY STREET.

I

4. " urn rioht at EARHART ROAD and park in the

^

s parting lot ten the corner.

t

  • (
y-y 4,

.g.

m+/ '

i a

4 c

C' e

%N m

x w

q k

Is 4,

,e

~ ;

[

tt;s

. %. :, ' i J

L',hy,'\\-P. D, - -

. r.

l

.2.

y v

, w.

l g

[s T

e ' s x A. ? N c-

.a a

(<i v p

.. e+ m

..,,.,f

~%-

x L,,

_~N ' f 6 +..

L

? '.

%g

.-'1

, T gu.

T,.

, 'g T.. @, a v

.N s

,g s.

3. - - -

n..

.O

.D 6

  • I

,..- l

r. '

s Mavm

./

8 '.. /\\

+

~

J

..e s

s W

N-

~

\\

6

\\.

f;.spd s

l q

k i

/.

s

~~

L N+

2.

Y.b.a

~

-w

%c\\

O i

T j

y J

Y y'f

+

l

a.. =..a. a

. =- w-a -

p

- m.,

ee< ue Staasetv ca PACIFIC GAS cad ELECTRIC COMPANY NUMBER: 3.6 r

CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 2 L"

IMPLEMENTING PROCEDURE 377,cnnt37; 3

,)

(

TITLE SECURITY DATE: 07/20/83 PAGE 010F 12 CORPORATE INCIDENT RESPONSE CENTER

.c..

RESTRICTED PERSONNEL ACCESS AUTHORIZATION L!ST l

A.

The ON DUTY Corporate Emergency Response Organization (CERO) personnel who are

- authorized to make on-the-spot changes to this Restricted Access List are:

1.

Merrber of Corporate Administrative Sucport Conrdinator's Staff at Guards Table,14th Floor, 77 Beale. street

]

2.

CorporateLiaisonCoordinator[

/

3.

Corporate Emergency Coordinator

,/ -

j B.

Restricted Personnel Access Authorization List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES NO b

THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

e m

g e

m, 9

f

==

P O

  • ug_ _..

._n, rl'.,-..,.'

. ' 3Q__*

.-___J'_

L_7_~_L' v.

c Q'_

Q' _ u :_

n i

-t

-cu. er.n v.u PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 l[

j CORPORATE EMERGENCY RESPONSE PLAN j

IMPLEMENTING PROCEDURE ATTACHMENT: 5 M LE SECURITY DATE: 07/20/83 PAGE 02 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.' Restricted Personnel Access Authorization List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES NO q

.j

+

0 THE INFORMATION ON THIS PAGE AND'ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

l l

f

,e s

=

=

6 e

y

-<---.-r-y c---wy.e-o

%y.

-.,m

,.--s.--w

-+-----sm

nsues:.. w

~.

.. =:. c.

i

' ?g 1

u. mm m u PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 3.6 CORPORATE EMERGENCY RESPONSE Pt.AN IMPLEMENTING PROCEDURE ATTACanENT: S

~DATE: 07/20/83 TITLE SECURITY PAGE 03 0F 12 CORPORATE INCIDENT RESPONSE CENTER

-i 4

RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B. - Restricted Personnel Access Authorization List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES NO

-4 O

THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

i N_E 4

o r -h - -

2.=, __ _

a,

~

,.m,. _ _>wn_-w vm,3 -.. -

u u-o &c_, - -

'l

-o l

l o ccm mes PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6

[

CORPORATE EMERGENCY RESPONSE PLAN 3

PGwE REVISION: 2 IMPLEMENTING PROCEDURE 477,cayen1 3

'l D,#

TITLE SECURITY DATE: 07/20/83 PAGE 04 0F 12 2

CORPORATE INCIDENT RESPONSE CENTER' RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B. ' Restricted Personnel Access Authoriza, tion List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES NO

~

s e

9

(%

V THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

l s

De O

,,-w,

,-_m-


,,--,e

"-ee--

su-

-w--


v----r

- -

  • n

~ _ _.

, m ax a.>.w

,u~

~

es-tsee E/em sesv.(2

~d PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 3.6

[

I-PGwE REVISION: 2 IMPLEMENTING PROCEDURE ATTACHMENT: s g

TITLE SECURITY DATE: 07/20/83-PAGE 05 0F 12

~

CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST 2

B.

Restricted Personnel Acce,ss Authorization List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES NO t

e 4

")

u THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

5

~.

,. _ _. d i, t me u-.

. ac t

.c.

,,e m

._z.

1;

}

,o - -

PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 1

CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 2 O

IMPLEMENTING PROCEDURE 377,ca, cur: 3 N

~

SECURITY DATE: 07/20/83 PAGE 06 0F 12 CORPORATE INCIDENT RESPONSE CENTER

j RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.

Restricted Personnel Access Authorization List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES

'NO

- c 6

4 e

w a

j U

THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT l

IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

i i

s l

l l

i 1

  • p to i

~

t

a,,

-, : _-%a%,s.a.

xmm.m. _

=..=-

2 e 2 %,y _-,

m-

_jg.g-m u. = =

v.cm

- l PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6 i

CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE

,}

arTACsMENT: S TITLE SECURITY DATE: 07/20/83 PAGE 07 0F 12 C

CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.' Restricted Personnel Access Authorization List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES N0

,1 e

\\

' yr THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

M b

.o k

',sk

=--o-c e---w.-

- w e-w-,--y e

~

c.-

.. =,

...aw..~.

=_

n u.....

.~

.=,

~

es-ops feters uv.et PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6

.[

POwE REVISION: 2

~ g.

CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE a m casen7 3 TITLE SECURITY DATE: 07/20/83 PAGE 08 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIS,T B.

Restricted Personnel Access Authorization List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES NO 9

e

/

O THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

t a

w v

e a.

4 E

-rw y-,,

._m

.. _. _ _. ~,.

- o j

cu.emas m.:

PACIFIC gas and ELECTRIC COMPANY NUMBER: 3.6

[

CORPORATE EMERGENCY RESPONSE PLAN

-p 1-IMPLEMENTING PROCEDURE

.AT7ACaMENT: S O

2 TITLE SECURITY DATE: 07/20/83 PAGE 09 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST i

B." Restricted Personnel Access Authorization List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES NO

i Q

s THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

l l

l t

  • '-s

..w_.

.~-

=

--7 m

~c--,

+-g y

y--w y--

v-w w

w

,w-r

-w,--

+

, ~..

_ u_

n..:..-._,,

.u...-=

-o I

e cus cwm asv.ca PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6

-}

CORPORATE EMERGENCY RESPONSE PLAN I-PGwE REVISION: 2 IMPLEMENTING PROCEDURE

(9 311,c gn1 3 M LE SECURITY DATE: 07/20/83 PAGE 10 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRlCTED PERSONNEL ACCESS AUTHORIZATION LIST

=

B.

Restricted Personnel Access Authorjzation List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES NS THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMEhT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

i

.- w

\\

/

- - ~,,

~ )

'l cu. imm m.ca PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.6

'[

CORPORATE EMERGENCY RESPONSE PLAN

[.

IMPLEMENTING PROCEDURE

. ATTACsMENT: S g

TITLE SECURITY D TE: 07/20/83 PAGE 11 0F 12 CORPORATE INCIDENT RESPONSE CENTER RESTRICTED PERSONNEL ACCESS AUTHORIZATION LIST B.' Restricted Personnel Access Authorization List (*means CERO member):

CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT l

IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.

I s

l l

8 mee

---.,-g-

_y

~,---

,-w-y,

,-w.

--s-----,.

w---

-y- - _ _ - -

--,,.-m_,

w.a.e,u= --

~= >~a ww

=xw w

=r

- a-._ - u a - - -- >+u u

~

^

$NR D "SENIORVICEPRESMENT-$PER4710NS I

g' { @ 3 l

M APPROVED BY VI(F/ PRESIDENT') NUCLEAR POWER

~

GENERATION APPROVED BY

" CHAIRMAN - PRESIQ%dT'S NUC6AR/ /

ADVISORY COMITTEE

.a!

(

4. - - - -

~

,,3 ea2. u-:xw,. ng

  • L_ _
- -- ; u u ::..

l1 ee eua ema arv.os

[

PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMEMGENCY REEPONSE PLAN NUMBER: 4.1 r

~~"

IMPLEMENTING PROCEDURE

.a?ISION: 2 DATE: 07/25/83 TITLE MATERIALS PAGE 02 0F 09 e

1

(

0 ORGANIZATIONAL OUTLINE I.

SCOPE II. DISCUSSION ci' lil.

RESPONSIBILITIES IV.

INSTRUCTIONS V.

REFERENCES VI.

ATTACHMENTS e

o g

s e

,n,

._ww.m

- as

.:w.:-

a~ ~

s.p

'o i

i es-95e3 (9/tal NEV. 02 PActFlc gas and ELECTRIC c0MPANY NUMBER: 4.1 c0RPORATE EMERGENCY RESPONSE PLAN REVISION: 2

'7 IMPLEMENTING PROCEDURE PGwE DATE: 07/25/83 TITLE PAGE 03 0F 09 MATERIALS 1

SCOPE The scope of this Implementing Precedure is to provide notification to Materials Department personnel and assure materials support services in event that the Corporate Emergency Response Plan (CERP) is activated.

II. DISCUSSION _

This Implementing Procedure provides instructions for guiding (Depa CERO) personnel who have Corporate Emergency Response Organization A.

assignments should the CERP be activated.

Departmental support services include:

B.

Notification of appropriate State and County agencies to determine travel conditions for personnel and equipment traveling to the San 1.

Luis Obispo area.

When required, establishment of a Local Procurement Center in the Sa h

2.

Luis Obispo area.

Precedure Attachment 1, " Department Organizat C.

and non Company organf rations.

III. RESPONSIBILITIES _

Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Instructions section.

IV. INSTRUCTIONS A.

Corporate Materials Coordinator Take those actions indicated for the appropriate emergency action 1.

level classification below:

NOTIFICATION OF UNUSUAL EVENT For a Notification of Unusual Event emergency a 2.

Materials Coordinator.

CERP Inplementing Procedure 1.1, " Activation of the Corporate

\\

Emergency Response Organization" describes the activation NOTE:

the CERP.

ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY _

_--.*..-e--g

---.----e.w-%,.

--we a.-m--

y y.%..

y---

is-

.w

a

=O

(

PACIFIC GAS and ELECTRIC COMPAllY NUMBER: 4.1 CORPORATE EMERGENCY RESPONSE PLAN

'{.

REVISION: 2 IMPLEMENTING PROCEDURE DATE4 07/25/83 TITLE PAGE 04 0F 09 MATERIALS Receive event notification from the Corporate Technical and Logistical

3.. Coordinator that the Corporate Emergency Response Plan has been activated.

Determine from the Corporate Technical and Logistical Coordinator the 9

4.

emergency action level classification and any special Departmental c

response actions.

Notify the following Department personnel and advise them of the 5.

emergency action level classification in effect and any special requests from the Corporate Technical and Logistical Coordinator:

a.

Transportation Coordinator b.

Procurement Coordinator Establish and direct a Department operation in the General Office with l

6.

required Departmental support personnel.

Coordinate, as necessary, Departmental activities with the following 7.

([h CERO personnel:

a.. Corporate Quality Assurance Coordinator b.

Corporate Construction Coordinator Assure that continuous (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) Departmental operations are maintained.

8.

Assure the availability of Department personnel and resources 9.

necessary to support the Departmental emergency response effort.

Coordinate Departmental functions to provide for the following 10.

services:

Procurement of materials a.

b.

Contract services c.

Transportation When required, dispatch the Procurement Coordinator and any Department 11.

support personnel, as necessary, to establish a Local Procurement 442, 800 Price Canyon Road, Pismo Center at the Materials. Facility Transportation arrangements will be made using Procedure Beach., " Emergency Transportation Instructions".

Keep the Materials Department Manager apprised if any demands placed upon Department personnel, the action taken to meet those demands, and

~

12.

any problems involving the Department's emergency response effort.

9


v,*-

m

-,-.y

--,, +,

--,9 e

m--,

,-n--

,-----,.e

-,,w.--,-

.-.~..m

~

.~

ee-enas to/est new.ea PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.1 L

IMPLEMENTING PROCEDURE

. REVISION: 2 DATE: 07/25/83 TITLE MATERIALS PAGE 05 0F 09

13. Prepare and distribute, on a timely basis, any necessary reports regarding the Department's efforts and emergency operations to apprise j

other Company Departments who are involved in the emergency response effort.

14. Track and close-out all Department files initiated to meet the emergency.
15. Maintain the Department's " Emergency Response and Recovery Activities l

Record" binder in a current status.

16. Upon direction by the Corporate Technical and Logistical Coordinator deactivate the Department emergency response effort.

i

17. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5. " Emergency Comunications Log Sheet".

NOTE:

Completed " Emergency Communications Log Sheets" shall be O.2 placed in the Department's" " Emergency Response and Recovery Activities Record" binder.

18. Maint'ain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".

NOTE:

Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Records" binder.

B.

Transportation Coordinator 1.

Take those actions indicated for the appropriate emergency action

(

level classifications below:

l l

NOTIFICATION OF UNUSUAL EVENT 2.

For a Notification of Unusual Event emergency action level classification no notification will be made.

ALERT SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.

Receive event notification from the Corporate Materials Coordinator

~

that the Corporate Emergency Response Plan has been activated.

4.

Determine from the Corporate Materials Coordinator the emergency action level classification in effect and extent of any requested response.-

_ + -

u y,

J

  • j <

ee-ous e,reat nav.oa PACIFIC gas and ELECTRIC COMPANY c0APORATE EMERGENCY RESPONSE PLAN NUMBER: 4.1 L

REVISION: 2 IMPLEMENTING PROCEDURE DATE: 07/25/83 TITLE PAGE 06 0F 09 MATERIALS

~

Upon receipt of the event notification establish a trav'el operation, 5.

as soon as possible, at the below locations for the times indicated with necessary Department support personnel:

General Office (77 Beale Street, Room 1610) - during business a.

hours.

Oakland Airport (Executive Air Tenninal) - non business hours and b.

~

weekends.

Determine travel conditions between the San Francisco Bay Area and San 6.

Luis Obispo area for deciding on the most appropriate means of transporting personnel and materials by establishing contact with the following organization, as necessary:

a.

Nation Weather Service b.

California Highway Patrol State and San Luis Obispo County agencies c.

d.

Airports 7.

Coordinate, as necessary, initial and ongoing transportation activities with the following CERO personnel:

Corporate Division Coordinator a.

b.

Procurement Coordinator Arrange transportation, as required, for Company personnel from the 8.

General Office and San Francisco Bay Area to and from the San Luis Obispo area.

Coordinate initial and ongoing arrangements, as required, with the 9.

Corporate Division Coordinator for ground transportation and lodging for Company perso,nnel temporarily assigned to the San Luis Obispo area.

Coordinate requests from the Procurement Coordinator for transporting 10.

material from point of origin to delivery location, verify release for shipment and in-transit movement, and expedite delivery.

Upon activation of the Local Procurement Center in San Luis Obispo, 11.

coordinate through the Center return travel of Company personnel to the San Francisco Bay Area.

Prepare and distribute status reports concerning materials shipment.

12.

and' delivery to the Procurement Coordinator, and others, as c.

I appropriate.

9

^~

---w-

---,-w

,..-y

=.,-,,,


.,.+m--g---

--9

g. - - - - -,

--9

-.---4+-,

ww

m. A h w I +~ ~~

=

-"' =>

w.w g m2 -

m

'o 1l I'

v.

Pacific sAS and ELECTRIC c0MPaNY NUMBER: 4.1 L

l CORPORATE EMERGENCY RESPONSE PLAN RUISION: 2 PGwE IMPLEMENTING PROCEDURE DATE: 07/25/83 TITLE PAGE 07 0F 09 MATERIALS Establish long-term support schedules and assign responsibilities.

13.

Periodically apprise the Corporate Materials Coordinator on transportation matters during the emergency, and as requested.

14.

Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5, " Emergency 15.

Communications Log Sheet".

Completed " Emergency Communications Log Sheets" shall be

[

NOTE:

placed in the Department's " Emergency Respons Materials Coordinator.

Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6 " Emergency Response and 16.

Recovery Activities Log Sheet".

Completed " Emergency Response and Recovery Activities Log NOTE:

i Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is i

maintained by the Corporate Materials Coordinator.

C.

Procurement Coordinator Take those actions indicated for the appropriate emergency action l

1.

level classification below:

NOTIFICATION OF UNUSUAL EVENT For a Nothfication of Unusual Event emergency action level 2.

classification no notification will be made.

ALERT. SITE AREA EMERGENCY. AND GENERAL EMERG Receive event notification from the Corporate Materials Coordinator that the Corporate Emergency Response Plan has been activated.

3.

Deter 1nine from the Corporate Materials Coordinat 4.

I response.

Upon receipt of the event notification establish a 5.

below, as directed by the Corporate Materials Coordinator:

General Office Local Procurement Center in San Luis Obispo a.

b.

=

m,.

, a

.s

, ; w.

g.,

4

-i PActFic EAs and ELEcTale c0MPANY NUMBER: 4.1

{

8.u.

.sv..

CORPORATE EMERGENCY REsPOWst PLAN i-REVISION: 2 5

IMPLEMENTING PROCEDURE DATE: 07/25/83 PAGE 08 0F 09 TITLE MATERIALS On an ongoing basis. consult with the Corpora 6.

San Luis Obispo area at Materials Facility 442, Pismo Beach.

~

('

Upon activation of the Local Procurement Center detemine Dep personnel requirements and staff accordingly.

7.

As necessary, arrange for the General Office t I

8.

Procurement Center.

Provide the materials receiving point with materi 9.

$vailable and appropriate.

Periodically apprise the Corporate Materials Coordinator on procurement matters during the emergency, and as requested.

10.

Log all incoming and outgoing communications which are re emergency response effort using Procedure Attachment 5. " Emerg 11.

Conounications Log Sheet."

Completed " Emergency Communications Log Sheets" shall b placed in the Department's " Emergency Re NOTE:

Materials Coordinator.

Maintain a written record of pertinent emergency response and r activities using Procedure Attachment 6, " Emergency Response 12.

Recovery, Activities Log Sheet".

Completed "Energency Response and Recovery Activities L Sheets" shall be placed in the Department's NOTE:

maintained by the Corporate Materials Coordinator.

V.

REFERENCES _

Corporate Emergency Response Plan A.

CERP Inglementing Procedure 1.1, " Activation of the Corporate

(

B.

Response Organization".

VI. ATTACHMENTS

~ ' "

~

Department Organizational Relationships 1.

Emergency. Plan Titles, Personnel Assignments, and Notifica 2.

4--mM----'g m -y.,wem,--,-.r7-,

,,e-cg.%-we--ew

-se.,--gowep

-,rwe'w--w" 8=="'E'T

'*ww'*"*-"Pr*-PNNww-

.-w he me~-*de-"'i="-War'&"W e9s-'-*=--mM-T----Er-e'---'e'

pu su.euu1xw:ws

. 4. u,2& m,1:~+!auw:u.se m t

b j

- ee.esas format uv.oz PACIFIC GAS and ELECTRIC COMPANY NtMBER: 4.1 CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 IMPLEMENTING PROCEDURE

.DATE: 07/25/83 Ep POwE TITLE PAGE 09 0F 09 MATERIALS 3.

Emergency Organization Contact List 4.

Emergency Transportation Instructions Form 69-084, " Emergency Communications Log Sheet" 5.

Form 69-085, " Emergency Response and Recovery Activities Log Sheet" 6.

1 9

1 4

e i

l 1

(

1 sq' e

e

--.--,,,,e,

,,.,.,,-.,-,,n---y.

ca w a_ m

m.. mma. -

.m _ m.

,e, 7

-b j

ee4sm lo w sesv.os

'-L PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.1 CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE A M CHMENT: 1 O

IMPLEMENTING PROCEDURE DATE: 07/25/83 4

TITLE PAGE 01 0F 01 MATERIALS DEPARTMkNTORGANIZATIONALRELATIONSHIPS I

SOP s

SGCOVERY IAAfsAGER

~

Clac COftPORATE TECNestCAL ANO

~

LOGa8TICAL C00A06esATOR p...--

CIRC 80 ;

GLO 00 CORPORATE CORPORATE CORPORATE Cose87Auctices CORPORAfg OUALITY asATRAIALS C000tOletATOft 08vtB0008 C004040eATOR C00AOtteATOR h

l l

l 7.. _.._.._.i l

I l

l

.0

.0 LPc :

I T=AmercaTATiO=

0Cunsene=T C00nousATOn C00aOasATOn l

l t.._.._..__.._.._.._.._.._.._.._I.

LesmusI:

- LaneAssammy 1

, mumm m.

f 3F - Asamsgemmy Oseressame Passey Csac - Carperumm lamiemma Recomme Commer

~

LPC - Lammi Poemuresamma Camaar OLO - San Luis Onass l

,.-,,n,-

v._,

,-n-..--

,-n-,

,,,---,-,7.--,

,...= a ;.-,

z,..

9 o'o I

.g

.. w,, n..,.,

b PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.1 CORPORATE EMERGENCY RESP 0tISE FLAN Q

IMPLEMENTING PROCEDURE ES$1

~

2 DATE: 07/25/83 TITLE PAGE 01 0F 02 MATERIALS EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST HOME PHONE NAME NON EMERGENCY TITLE BUSINESS PiiONE EMERGENCY PLAN TITLE k

-=

1.

E. J. Meyers Corporate Director, Project Materials Purchasing Coordinator 2.

D. R. Shaffer Director, Materials Purchasing 3.

_J. E. Brennan Supervising Buyer 4

B. E. Roddick Supervising Buyer 5.

R. R. Ochsner Supervising Buyer 6.

R. E. Gleason Supervising Buyer 1.

H. W. X1ocke Transportation Traffic Analyst Coordinator 2.

G. Balan_esi Traffic Analyst 3.

J. A. Marino Supervisor, Traf fic 4.

J. H. Ferrell Traffic Analyst 5.

R. L. Comyns Traffic Assistant 6.

S. C. Gleason Travel Clerk l

e

-m

.s.==,_.

he.-s***+

h-,e_

--m.

,,Leph--

~_u,.......,_....__

j PAtlFIC GAS and ELECTRIC COMPANY I'

to Clee 01:2t EsV CT CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.1 G

IMPLEMENTING PROCEDURE 5'rE$'EU'2

'DATE: 07/25/83 TITLE PAGE 02 0F 02 MATERIALS EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATIOh LIST HOME PHONE NAME EMERGENCY PLAN TITLE NON EMERGENCY TTrLE BUSINESS PHONE

{.

I Procurement 1.

J. M. MacComack Coordinator Tenior Buyer 2.

A. J. Weis Senior Buyer 3.

M. L. Hurley Buyer 4.

R. G. McInerney Buyer 5.

R. W. Wfison Buyer i

6.

J. C. Buckley i

Buyer D

=

0 "9

v' I. '

Wb

'.. --- _ a :~.

n--.

. _. ;:_..;~.._~...,_ _ _, _

U

  • o f

ee-esee Cieet seev e2 PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.1 i

IMPLEMENTING PROCEDURE

$sEri

  • 3 PG->E g)

DATE: 07/25/83

~

TITLE PAGE 01 0F 01 MATERIALS EMERGENCY ORGANIZATION CONTACT LIST ORGANIZATION OR NAME EMERGENCY LOCATION EMERGENCY TITLE BUSINESS PHONE EMERGENCY PHONE y.

Recovery Manager 1.

J. D. Shiffer EOF

-/

2.

y._A.Raymond__, = -

3.

M.,Townsend

. _ /~

4.

R. C. Thornberry Corporate Technical 1.

J. B. Hoch CIRC and Logistical Coordinator 2.

M. R. Tresler f

3.

R. A. Younc Los Padres District Off.

1.

D. L. Kennady Corporate Division Coordinator 2.

B. McCloskey 3.

R. J. McKell

(

o k

sd 9

9 hM i

-,.-A..___..._.t_....a___-

._m._m.,__

r q'

^

m n,, m,, -.

PACIFIC GAS and ELECTAlc COMPANY NJMBER: 4.1 N

CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE

%g IMPLEMENTING PROCEDURE ATTAC E NT: 4 DATE: 07/25/83

~

TITLE PAGE 01 0F 04 MATERIALS EMERGENCY TRANSPORTATION INSTRUCTIONS A.

Critical Emergency Response Personnel Upon receipt of notification of the emergency event, the following critical 1.

emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:

. Recovery Manager

. Operations and Analytical Recovery Manager

. Engineering and Logistics Recovery Manager

. Radiological Energency Recovery Manager

. Public Information Recovery Manager All other PGandE emergency response support personnel traveling to the San Luis Obispo area shall arrange transcortation in accordance with the

~ instructions set forth in B. below.

The above-listed individuals may elect to utilize their own vehicles or any 2.

one of the following transportation services:

a.

Corporate Aircraft

1) G en e r a l O f f i c e....................................
2) Oakl and Ai rport Ha nge r 18.........................

Oakland Executive Air Termi na1........................ (415 )S77-46 b.

(ask for PGandE Transportation Coordinator) 24-hour Fixed Wing Air Charter Services:

c.

Cal-West Aviation (Concord)....................... (415 )B25-354 1)

(415)672-0214 (415)932-5794 Skyways Aviation, Inc. (San Ca rlos)............... ((415)S93-1448 2) 415)574-4704 415)345-7423

(

((415)573-1152 Coastal Air (Sa n Lui s Ob is po)..................... (805 )5??-6464 3)

4) Golden Gate Pip er (San Carlos ).................... (408)446-24 39
5) Pacific.PiperAviation(SanJose)................. 408)294-4016 408)225-2540

~

408)374-9985

~

~.

.u. e

- a

.'l pacific Cas and ELECTRIC c0MPaNY ConroRaTE EMERGENCY RESPONSE PLAN fRIM8ER: 4.1 I

~

IMPLEMENTING PROCEDURE N?EET 4

DATE: 07/25/83 1

TITLE MATERIALS PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.) '

q A.

Critical Emergency Response Personnel (Cont'd.)

d.

24-hour Helicopter Air Charter Services (in order of preference):

1) Ari s Helicopters, Ltd. (San Jose)...............

408)293-0600 408)354-0039 635-6880 2 ) Asteocopters (0akl and)............................

)1687-5179

]

h939-5683'

E O

IMPLEMENTING PROCEDURE ATTACW.ENT: 4 DATE: 07/25/83 TITLE MATERIALS PAGE 03 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)

~

B.

Other Emergency Resoonse Personnel _

All other PGandE emergency response support personnel traveling to the 1.

San Luis Obispo area shall use their own vehicles or transportation services provided by PGandE.

If PGandE transportation services are to be used, personnel should proceed to 2.

make transportation arrangements in one of the following manne'rs:

During normal office hours, contact the General Office Travel Desk a.

(Room 1610, 77 BealeStreet). The primary telephone numbers for the General Office Travel Desk are:

7

[

i

~

b.

If these lines are busy, the following alternate telephone numbers should be used:

F L

J During non-office hours, following receipt of notification of the c.

emergency event, emergency response personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).

Personnel are advised to bring only a mininum amount of baggage.

Note:

If arrival time is not critical, personnel should call the General Office d.

Travel Desk to verify transportation availability.

Regardless of the mode of transportation used, prior to departure, each e.

individual shall contact the Recovery Manager or Coordinator to whom

(

(s)he functionally reports and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information.

The Transportation Coordinator will coordinate arrangements, as required, il f.

]f with the Corporate Division Coordinator for Ground transportation and lodging for PGandE personnel in the San Luis Obispo area.

e

. e sy.sw a w_

eee<

w e emw.-

W--

.c w

~.:

as. _

_. =

p v

'o ee-esas to/eal soev es PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NJMBER: 4.1 i

~ ~ "

2 IMPLEMENTING PROCEDURE SEls"AT q

4 DATE: 07/25/83 TITLE

~

MATERIALS PAGE 04 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.) '

'*"hD l

' Y '\\

'doinEtTIONS FROM NIMITT FREEWAY I

ra =1+h on MEGENBERGER ROAD (RT 17) 1 mile

/

3,

2. " urn riant onto D001.ITTLE DRIVE.
3. ' urn left r-;#to LANSLEY STREET.

%) e-1 Y,

" urn riaht at EARHART ROAD and pad in th.

4, i.t.n to.

n.,.

5 s

g.

y~

g

.........e

. yz. t 3

y p':=

- - p O,-

3

\\

,s

.s 2x

,-,w

. N 4u j

.:n s

DJ

,/

- js.

3

~

. g._7 a

g (I), p

-@~ ejj

' f,.,,

  • 7 % %

'" p A - 4

, j; g

s

,g.

/

./

_,,_. G O

\\,.

..yi T. r e

.5 A i

fh

~

lE',,.

c~-

sy;.,

As

~1 N,4

'4 A

K.9 N

s%

  • (. \\

...c

&dt

~

h f,

i g

3,

-w-r- ~'

  1. f

,,, c.,

4 s.

s.

= _ _

k.

x..

t p

.v t

g.

PP-

--i--.-

h 5

l -o i

l s

f lE

[

I O

ft i

=

d 8

e i

s

1. 5 R

r NO E

l w

M

('

3 w

W.

s 13 ! $

e e

n, a c

e 5

E! 5 5

a

!.!a,l 5 s

E y

0 f

i E

=

e.

O b

N g g g E

i m.

,+

g y

9 I! s 1

CC-i FORATE EMERGENCY RE5PONSE PLAN MAS AND ELECTRIC COerAny

'j t

EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET l

POwE TooAvsoATs rAoE v

neenosNcy LocATeon

(&

s tai tai ENTERED BY in nesE (INITIALS)

(3400#wsJ (si

SUMMARY

OF ACTIVITY PERFORMED te (s)

r t

l

{

l SEE INSTRUCT lONS ON REV ERS S.006LS/s2) Rev.00

- -,,,. - - +, - - - -

,.yy,-

--,,-,----,--.---,,m-

.~qw-----

y u

--y c-,

---~__

c1 T

-b es essa essest sesv es NUMBER: 4.8 rateFIC sAs and ELECYRIC COMPANY x

CORPORATE EMERGENCY RESPONSE PLAN

. REVISION: 2 F3 pggg DATE: 07/28/83 i}i IMPLEMENTING PROCEDURE PAGE 010F 06 DIVISION SUPPORT SIGNATURE RESPONSIBILITY DATE TITLE PREPARED BY g

StiSdVIsNG NUCLEAR GENERATION ENGINEER PERSONNEL AND ENVIRONMENTAL SAFETY, NPO REVIEWED AND o_

h 5 4uta k DIVISI0 h 10 @3 REVIEWED AND

jicd, y

J '

CONCURRED BY v-a n

/

SENIOR VICE PRESIDENV, OPERATI S A

APPROVED BY

/'

g VI[ PRESIDENT, NUdEAR POWER GENERATION N

' CHAIRMAN, PRESIDiff'S NUCLEAR' ABV$0RY COPtilTTEE

/

l

(

=e o

f

,a_

. = _ _

s a w ---

'o h

r

u..mi - a PACIFIC GAS ami E LECTRIC COMPANY

' jog CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.8 PGwE IMPLEMENTING PROCEDURE REVISION: 2 DATE: 07/28/83 TITLE DIVISION SUPPORT PAGE 02 0F 06 9

O ORG ANIZATIONAL OUTLINE 1.

SCOPE 9

11. DISCUSSION ll1.

RESPONSIBILITIES IV.

INSTRUCTIONS V.

REFERENCES VI.

ATTACHMENTS s

I

,[

9

_r..

a_

.i_.

-b e oue can m.es PACIFIC gas and ELECTRIC c0MPANY

[

CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.8 g

IMPLEMENTING PROCEDURE REVISION: 2 TITLE DATE: 07/28/83 DIVISION SUPPORT

,PAGE 03 0F 06

(

I.

SCOPE The scope of this Implementing Procedure is to provide notification to the Coast Valleys and other Division personnel and assure division support services in the event the Corporate Emergency Response Plan (CERP) is activated.

II. DISCUSSION A.

This Implementing Procedure provides instructions for guiding (Division' personnel who have Corporate Emergency Response Organization CERO) assignments should the CERP be activated.

B.

Division support services include:

1.

Coordination of ground transportation and lodging of Company personnel I

temporarily assigned to the San Luis Obispo area.

2.

Line repair crews for restoring electrical power.

~

3.

Providing emergency supplies.

4.

Coordinating and conduct of connunity relations programs.

5.

Teleconnunications repair personnel.

6.

Nontechnical Company personnel resource pool.

C.

Procedure Attachment 1. " Department Organizational Relationships" illustrates how' the Coast Valleys Division interfaces with other Company Divisions and Departments.

III. RESPONSIBILITIES Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.

A.

Corporate Division Coordinator

(

l 1.

Take those actions indicated for the appropriate emergency action level classifications below:

NOTIFICATION OF UNUSUAL EVENT

~

lk 2.

For a Notification of Unusual Event emergency action level classification, no notification will normally be made to the Corporate Division Coordirrator.

" = -

  • m

.m m

d C.M,ClHC SAS sad E.LEcr.lc coMPa.Y.

NunsER: 4.8 ooriim m cv m a m m

,,m IMPLEMENTING PROCEDURE REVISION: 2

W>

- DATE: 07/28/83 y,7t, DIVISION SUPPORT PAGE 04 0F 06 r

~

NOTE: CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" describes the activation of the CERP.

ALERT. SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.

Receive event notification from the Corporate Technical and Logistical Coordinator that the Corporate Emergency Response Plan has been activated.

-l 4.

Determine from the Corporate Technical and Logistical Coordinator the emergency action level classification and any special Departmental -

response actions.

5.

Notify the appropriate Coast Valleys and other Division personnel, as necessary, and advise them of the emergency action level classif,1 cation and any special requests from the Corporate Technical and Logistical Coordinator.

6.

Establish and direct a Division operation at the Los Padres District i:

Office with required Division support personnel.

7.

Coordinate with the following CERO personnel for requests regarding division support services:

a.

Corporate Materials Coordinator b.

Corporate Construction Coordinator c.

Corporate Teleconnunications Coordinator d.

Public Information Recovery Manager e.

Site Construction Coordinator f.

Transportation Coordinator g.

Repair team supervisor.

8.

Advise the Corporate Technical and Logistical Coordinator of Division f

operations status on a periodic basis, and as requested.

9.

Assurethecontinuous(24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)continuityofDivisionpersonneland

~

~

resources necessary to support the emergency response effort.

10. Maintain the Division's " Emergency Response and Recovery Activities h

Record" binder in a current status.

N em9w--

---e---mmer==--e>eww---ewe - egur

-1

-v

<s ee--v'-zTW-awsw N-s---e-ee w w wwsta-.-v e'N-N WN+-'*"'-Sw--e'c-P-P"---

' " '-*-----^

m u

m..~.-s_a

- : a - -_

='

r_. m _,

w A

30-035 1D/93) MSW.C2 PACIFIC GAS and ELECTRIC COMPANY

[

CORPORATE EMERGENCY RESPONSE PLAN NLMBER: 4.8 rg IMPl.EMENTING PROCEDURE REVISION: 2

'i DATE: 07/28/83 TITLE

~

DIVISION SUPPORT PAGE 05 0F 06

. o

11. Work closely with the Site Construction Coordinator to assure that a

maximum effective use is made of Comptny local transportation resources during the emergency.

12. Coordinate with the Corporate Telecomunications Coordinator requests for telecomunications system repair services by the Repair Team Supervisor.
13. If required, coordinate the assignment of personnel and, resources from the other Company divisions to assist the Coast Valleys Division's efforts during the emergency. Transportation arrangements for support personnel traveling to the San Luis Obispo area shall be made in accordance with the instructions in Procedure Attachment 4. " Emergency Transportation Instructions".
14. Coordinate arrangements, as required, with the Corporate Technical and Logistical Coordinator and the Transportation Coordinator for ground transportation and/or lodging of Company personnel temporarily assigned to the San Luis Obispo area.
15. Coordinate with the owners / managers of equipment supply and service sources in the San Luis Obispo area to ascertain their capabilities and availabilities to support recovery efforts.
16. Locate and coordinate the use of temporary local office space and storage facilities in the San Luis Obispo area, as required.
17. Locate and coordinate the use of additional meeting and conference facilities in the San Luis Obispo area, as required.
18. Institute comunity relations programs to accurately infom local residents of the event and its significance.
19. Coordinate the preparation of messages for use on the local Company infomation hotlines with the Public Infomation Recovery Manager, who is located at the Emergency Operations Facility.
20. Respond to requests from the Recovery Manager.

(

21. Upon direction by the Corporate Technical and Logistical Coordinator deactivate Division support emergency response efforts.
22. Log all incoming and outgoing consnunications related to the emergency response effort using Procedure Attachment 5. " Emergency Comunications Log Sheet".

NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in~the Division's " Emergency Response and Recovery Activities Record" binder.

--w

--wmv m-%--

---*?Nse

- Wt

-w---

w--'7'm--w*rw-'-

r'y' y-wNN

--W==r y

e

. = __.

m.

n_

_ u. m =:. s.. a m

_ q_ _. j

't

==

}

ee<se wea auv.ca PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.8 PGwE IMPl.EMENTING PROCEDURE REVISION: 2 O

- qATE: 07/28/83 y.,.,

DIVISION SUPPORT PAGE 06 0F 06 e

~

,23. Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6 " Emergency Response and Recovery Activities Log Sheet".

NOTEi Complete " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Division's " Emergency Response and Recovery Activities Record" binder.

t V.

REFERENCES i

A.

Corporate Emergency Response Plan B.

CERP Implementing Procedure 1.1, " Activation of the Corporats Emergency Response Organization".

VI. ATTACHMENTS 1.

Department Organizational Relationships 2.

Emergency Plan Titles, Personnel Assignments, and Notification. List 3.

Emergency Organization Contact List 4.

Emergency Transportation Instructions

{

5.

Form 69-084, " Emergency Consnunications Log Sheet" l

i 6.

Form 69-085 " Emergency Response and Recovery Activities Log Sheet" s

l l

1

  • M S

e

_u.-_

..,s...:.

..,-. v :-

~

-s&wa m a

a "l

es-enas somas new.es PACIFIC GAS and ELECTRIC COMPANY N

N' 4*0 2

]

ConPORATE EMERGENCY RESPONSE PLAN

~ ~ "

N'" 5 ' "

L@

IMPLEMENTING PROCEDURE

. ATTACHMENT: 1

  • T TITLE DIVISION SUPPORT DATE: 07/28/83 PAGE 010F 01 DEPARTMENT ORGANIZATIONAL RELATIONSHIPS

)

SOF

.0COWE.Y MAasAGE.

g I

I w

a=

W pO. ATE l

M IC YgCDesseCAL Afeg WSO.esAT.IO90

.SCOVE.Y LOS88TICAL E48EA 8 M OSIGATO.

l 1

I

.._.., I

(

r.

m l.I so

.e l

l

-o=n e=."",m'.

"T:=

r,t.-

rt.9 g

Ar-un n

un co

-=

l l L.

_...._..I 3 :i I

j no i

==

een, g

"J,~,,,1^,'g"

r"a"u.Cr.io

l !.

  • g*'

.n J j

8v5 E.

l

,i !

l I

L __ _ _I i.

l Lased:

Lane Asemesy

.musenssamm Dementum Puummmel SOP - Esmessmus=.ppuseum Puninsy essee-Caspervanlamaman assimus.uest k

OLO-San Lees oness

,-m mm-n

e. - emmed W li lm, t.

.v.,

4

,,_n,,.<-.

__ 7

  • s MSat Ol12$ 8etV. (3 I

PACIFIC GAS sad ELECTRIC COUPANY NWBER* 4*8 CORPORATE EMERCENCY RESPONSE PLAN f

aEvlSI N: 2 IMPLEMENTING PROCEDURE

~ ~ "

ATTACHMENT: 2 "Y

DATE: 07/28/83 DIVISION SUPPORT

PAGE 01 0F 01 EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST HOME PHONE NAME EMERGENCY PLAN TITLE BUSINESS PHONE NON EMERGENCY TITLE Corporate Division 1.

D. L. Kennady Los Padres District Coordinator Manager 2.

B. McCloskey Los Paares District Marketing Manager 3.

R. J. McKell Los Padres District Electric Superintendent 4.

Alternate number -

(

Morro Bay Switching Center l

I i

me W

.e..

-m:.,-w.x:.. ua-...--

-.- -. m

.w..

2.. ~. a..

- s es-eLee C/saJetv 13

, I PACIFIC GAS sad ELECTRIC CollPANY NUMBER: 4*8

- '" CORPORATE EMERGENCY RESPONSE PLAN

.['

REVISION: 2 r

IMPLEMENTING PROCEDURE ATTACHMENT: 3 DIVISION SUPPORT 6 ATE: 07/28/83

. *PAGE 01 0F 02 EMERGENCY ORGANIZATION CONTACT LIST

(

ORGANIZATION OR NAME EMERGENCY LOCATION EMERGENCY TITLE BUSINESS PHONE EMERGENCY PHONE Recovery Manager 1.

J. D. Shiffer

_ EOF

....no 2.

W. A. Raymond

3. _J. D. Townsend_

/

4.

R. C. Thornberry Corporate Technical and

1..J. B. Hoch CIRC Logistical Coordinator 2.

M. R. Tresler 3.

R. A. Young Public Infor: ration 1.

C. H. Peterson EOF Recovery Manager

2..
1. M. Kilpatrick 3.

S. N. Coffey Site Construction 1.

R. D. Etzler

_ SLO h ~d~ c--+--

(

i or Coordinator 2.

.N. M. Norem

(

, 3.

D. A. Rockwell M'

m

n.m...=.a. w _..w__ a __ca s. m _ w.g a_v.;w,g.,.m,.;__ _ _ 1

.=

'6

-m lf

~

ee-osas remat arv. or PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.8 I'

CORPORATE EMERGENCY RESPONSE PLAN

[

PGwE REVISION: 2 O

IMPLEMENTING PROCEDURE

- ATTACHMENT: 3 ME DIVISION SUPPORT DATE: 07/28/83

? AGE 020F02 EMERGENCY ORGANIZATION CONTACT LIST ORGANIZATION OR NAME EMERGENCY LOCATION EMERGENCY TITLE EMERGENCY PHONE BUSINESS PHONE Transportation 1.

H. W. Klocke General Office

~

Coordinator 2.

G. Balanest 3.

J. A. Marf no 4.

J._H. Ferrell

,. /*

5.

R. L. Comyns 6.

S. C. Gleason l

l P

.mese _.

w

. _. _...,. _<. ;. w.sta....n_. :ma m wm._

._. m q...

.c _

ee41sa temas sNtv.Ca

~

PACIFIC GAS sad ELECTRIC COMPANY NUMBER: 4*8

. I' CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE lE

~

r T 4 e

'DATE: 07/28/83 TITLE 1

PAGE 010F 04 DIVISION SUPPORT

.o EMERGENCY TRANSPORTATION INSTRUCTIONS A.

Critical Emergency Response Personnel Upon receipt of notification of the emergency event, the following critical 1.

emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:

Recovery Manager Operations and Analytical Recovery Manager Engineering and Logistics Recovery Manager Radiological Emergency Recovery Manager

. Public Infomation Recovery Manager All other PGandE emergency response support personnel traveling to the 3an Luis Obispo area shall arrange transportation in accordance with the lnstructions set forth in 8. below.

The above-listed individuals may elect to utilize their own vehicles or any 2.

one of the following transportation services:

P 7

a.

Corporate Aircraft

1) Gencral Office....................................
2) Dakland Airport Hanger i8.........................

,/

Oakland Executi ve Ai r Te rmina1........................

/

b.

L.

a (ask for PGandE Transportation Coordinator) 24-hour Fixed Wing Air Charter Services:

c.

1) Cal-West Aviation (Concord)....................... (415)825-3544

~

(415)672-0214 (415)932-5794

2) Skyways Aviation, Inc. (San Carlos)............... 415)S93-1448 415)574-4704 415)345-7423 415)573-1152 I

Coastal Air (San Lui s 0bispo)..................... (805)544-6454..

3)

[,

4) Gol den Gate Piper (San Ca rlos).................... (408)445-2439
5) Pacific Piper Aviation (San Jose)................. 408)294-4016 4CG 225-2540 408 374-9955
n 1

o

~

i m,

PACIFIC SAs and ELECTRIC COMPANY gygggg 4,3 j

I[

CORPORATE EMERGENCY RESPONSE PLAN 4

~

~

IMPLEMENTING PROCEDURE I'U!ET T

4

. 07/28/83 TITLE DIVISION SUPPORT PAGE 02 0F 04 o

EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)

~

S A.

Critical Emergency Response Personnel (Cont'd.)

^

S d.

24-hour Helicopter Air Charter Services (in order of preference):

b

1) ArisHelicopters,Ltd.(SanJose)................. 408 293-0800 408 354-0039 u

2)~ Astrocopters(0akland)............................

635-6880 687-5179 C

939-5683 -

3) California Helicopter Airways, Inc. (Hayward)..... (415)783-4000 (415)632-357.9 e.

The telephone company yellow pages list additional air charter services.

f.

Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.

l To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following nun 6ers as appropriate:

1) During nonnal office hours Golden Gate Division.......................... (415)S57-0640
2) During non-office hours OaklanaDispatchCenter.......................(415)658-9115 Comunications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide.

g.

Regardless of the mode of transportation used, prior to departure, each individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or information. The Corporate Technical and I

Logistical Coordinator will then advise the Corporate Division i

Coordinator to ensure that any necessary ground logistical support is in place prior to the arrival of personnel in the San Luis Obispo area.

}

_ + -

T-*-

--r

---*'N----

ww--ww e

'-e e

e-- w e e mewe g-wmvmw-e w w

e-------ww----

M+e-

---s w---ww',-

=

m-wm---

- _ _ _ __ m.. __. __m -

w._

m__ m _

m_____

c

-s

~. i

'{

-. m e, e m os PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.8 I

CORPORATE EuERGENCY RESPONSE PLAN

~

O IMPLEMENTING PROCEDURE

"'$ET r

4 k

DATE: 07/28/83 TIT M PAGE 03 0F 04 DIVISION SUPPORT

~

EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)

W B.

Other Emergency Response Personnel All other PGandE emergency response support personnel traveling to the 1.

San Luis Obispo area shall use their own vehicles or transportation services provided by PGandE.

If PGandE transportation services are to b'e used, personnel should proceed to i

2.

make transportation arrangements in one of the following manners:

During normal office hours, contact the General Office Travel Desk a.

(Room 1610,77 BealeStreet). The primary telephone numbers for the General Office Travel Desk are:

b u

If these lines are busy, the following alternate telephone numbers b.

should be used:

(

L.

J

~

During non-office hours, following receipt of notification of the emergency event, emergency response personnel should proceed directly to c.

the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there (see map on page 04 of these Emergency Transportation Instructions).

Personnel are advised to bring only a minimum amount of baggage.

Note:

If arrival time is not critical, personnel should call the General Office d.

Travel Desk to verify transportation availability.

Regardless of the mode of transportation used, prior to departure, each individual shall contact the Recovery Manager or Coordinator to whom e.

I (s)he functionally reports and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area s

and any other special requirements or inforrration.

s The Transportation Coordinator will coordinate arrangements, as required f.

C with the Corporate Divisien Coordinator for Grcund transportation and lodging for' PGandE personnal in the San Luis Obispo area.

4 e

<=+='****~6**

we< t* -m***eme-a-we

  • -"*M*-
        • We*-*wep-

=a

_,m,<.

e emaw,e. 6 # $ se.

w+ * + meusu.- -

-g

. w _..

a.

x2 As

^i.,

u wea asv..:

g PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.8 I-CORPORATE EMERGENCY RESPONSE PLAN Q' ~, POwE REVISION: 2 IMPLEMENTING PROCEDURE ATTACMENT: 4 DAM: 07/28/83 TITLE DIVISION SUPPORT PA8E '04 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS (Cont'd.)

Y'

'dotatettons FRon MIMITI FREEwAv

.kee '

I j#

1. ggL.Aangh on MEGENBERGER ROAD (RT 17) 1 mile
2. " urn rioht onto 000LITTLE DRIVE.

A q 3. " urn left onto LANGLEY $3EET.

4. urn rinht at EARHART ROAD and part in the parting lot on the corner.

'/

'9

.y h

m 4,/ e 4.

..........r g.,

\\

h a

fa e..

\\

g.

s

=,. -

ns

.' ~ ;%

~ ""

i 4

tte \\ (E u\\

>/

's s.' W Q

Q l

=l W

.s

,,... c. x

-;.g.

-/.

'/

}

r

+, T

a

\\

s*l r

g

,g i/

n A. %. s r-

- l t

1.

=

p N

.( 2l 0

N k*/g A

,p s

g

, \\.,..

'a f -

s g,

/

/

p!

'.b 4

+

e' 5

g

.g

k 4

, ',, s g

g. ', -

y

"==~q..

4

-kh

- s, s

.3 s

. 4

' 4

~1 kg__.

l

  • (

\\-

.,,g,/.t.s 6

k l

f, g 4,

/.

g de fsp-

{

i T

.c y

I1 j!.

e tl( ' '

ie i

m s

M E

w W,

R e

E

}

G O

A a

N,.

P t

E TA R

D W

S Y

a E

a S

t s

t NO ITAC O

L YC I

N EG R

EG m

RE TE E

Y H T S

lv N G iv A O C Y L NP L A

A E S P S MN N 97 OO O 1

CP I

S C

T E

IRR A T Y C NO C C I

I Ee N T

Ll E U A

E G I

D R M L

O NE M F

AM F

O A

SE A E C R

GT Y

O CA E

R C I

L F ON T

8CP E T

I AR POG Y

C R C

e E

f E

E M

s G

a E

a R

N E

0 s

0 aE ve 8

R 1

a

)

2 j

8

/

e 8

w g

EI 8

s0 4

p a0 8

T 4 0

2 9

g 8

(

l il 4

4 1

i i

Ii I

4 l)i1!

1 l,

_m l

PMFW5As Amo ELEcTnsc c0aspANy csorv ATa EMEnvain i nasromsE Pl. Ape M

EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET

@ss EMERGENCY LOCAfl0N 700AY'S DATE PAGE t

(1)

(21 13l

~

TIME ENTERED BY (3400 8Wu l (INITIALS)

~

tai is:

SUMMARY

OF ACTIVITY PERFORMED toi U

4 t

8 sJ'S jf- [

q yb g

d "

.,p e

- 1 g

%f%

~'

D I

I I

i e

l I

8sae5(8/82) Rev.00 SEE INSTRUCTIONS ON REVERSE

, m,,iT ~ - ib.

L' dh,

m_1

%Qs_w wm_

1. -

l ep.5saa SNeatsustv.ta NUMBER: 4.9 pacanc sAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 yggg h

- DATE: 07/22/83 IMPLEMENTING PROCEDURE PAGE 010F 10 i

i TITLE QUALITY ASSURANCE G

SIGNATURE RESPONSIBILITY DATE TITLE PREPARED BY j)g _f SU M ISING NUCLEAR GENERATION ENGINEER PERSONNEL ANFENVIRONMENTAL SAFETY SECTI )N RD MANAGER, QUALITY ASSURANCE

[f/2-fYb CO$RRD EXfCUTIVE VICE PRESIDENT FACILITIES ANDELECTRICRESpyRCESDEVELOPMENT APPROVED BY g

VIdPRESIDENT-NdLEARPOWERGENERATIO i

g[.

/gy APPROVED BY "CHAIRMA6!PRESIQfNT'SJUC)i(AR ADVISORY COPHITTEE l

4

.s'


_____----__.=_._.____,---,--,-www.-,,,w-,---.--...--.-_,,-w,,,,ww,w---

,--.m-w w

-w-w 4go.---,-_.wgr--,-,-,-,,-~,-,--,y,-

m

_.._2

.aw_.... u zm, __

m. : w. 3.
u. --,

1

.,- ~

.m

- o

' i o

. = = -.

[

PACIFIC GAS and ELECTRIC COMPANY p.

CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9 PGwE O..

IMPLEMENTING PROCEDURE

- JtEVISION: 2 TITLE DATE: 07/22/83 QUALITY ASSURANCE PAGE 02 0F 10 C

3 ORGANIZATIONAL OUTLINE 1.

SCOPE II.

DISCUSSION lli.

RESPONSIBILITIES IV.

INSTRUCTIONS V.

REFERENCES VI.

ATTACHMENTS s.

  • M k

,w,

,-,--tw

_~

.. a..

a~~...

s.:

w

~;, w

_n

~s

~,I ee-enas rotesi nav. or PACIFIC GAS sad ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9

~

O IMPLEMENTING PROCEDURE REVISION: 2

' DATE: 07/22/83 TITLE

~

QUALITY ASSURANCE PAGE 03 0F 10

' COPE 1.

S The scope of this Implementing Procedure is to provide notification to Corporate Emergency Response Organization (CERO) Departmental personnel and assure Quality Assurance support services in the event the Corporate Emergency Response Plan is activated.

II. DISCUSSION A.

This Implementing Procedure provides instructions for guiding Departmental personnel who have Corporate Emergency Response Organization assignments should the CERP be activated.

B.

Departmental support services include:

1.

Tracking of materials used to repair, modify, or construct Plant

[

systems and structures.

2.

Monitoring quality control.

3.

Providing experienced Records Management System (RMS).section personnel to assist in drawing and document retrieval.

4.

Monitoring the review and approval of procedures generated during event recovery.

C.

Procedure Attachment 1, " Department Organizational Relationships" illustrates how the Department interfaces with other Company Departments and non Company organizations.

III. RESPONSIBILITIE'S Individuals covered by this Implementing Procedure shall find their responsibilities and duties under their appropriate CERO title in the Procedure Instructions section.

IV.

INSTRUCTIONS i

A.

Corporate Quality Assurance Coordinator 1.

Take appropriate actions as identified for the emergency action

(

level classifications below:

l NOTIFICATION OF UNUSUAL EVENT i.

'b 2.

For a Notification of Unusual Event emergency action level classification no notification from the Corporate Technical and Logistical, Coordinator will be made.

c_c -.

a e,e

.wc negw.a 2 >

e _-, w_.t.

.e..

,. tm1.:

._e~_-

L A

.y j

i.im nav n PACIFIC GAS and ELECTRIC COMPANY

. J.

CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9

~

($

PGwE IMPLEMENTING PROCEDURE

. REVISION: 2 DATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 04 0F 10 H

~

NOTE: 'CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" describes the activation of the CERP.

ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.

Receive event notification from the Corporate Technical and Logistical Coordinator that the Corporate Emergency' Response Plan (CERP)hasbeenactivated.

I 4.

Determine from the Corporate Technical and Logistical Coordinator the event emergency action level classification and extent of any requested response.

5.

Notify the following Departmental personnel using Procedure, " Emergency Plan Titles, Personnel Assignments, and Notification List" and advise them of any requests from the Corporate Technical and Logistical Coordinator:

a.

Senior Quality Engineer - Program Management b.

Senior Quality Engineer - Auditing c.

Records Management Coordinator d.

Quality Assurance Supervisor 6.

Establish and direct a Department operation in the General Office with required Departmental support personnel.

7.

Coordinate with the following CERO personnel for requests regarding quality assurance services:

a.

Corporate Materials Coordinator b.

Corporate Engineering Coordinator c.

Corporate Construction Coordinator 4

8.

Periodically apprise the Corporate Technical and Logistical Coordinator of Departmental operations status, and as requested.

9.

Assure the availability of Departmental personnel and resources necessary to support the emergency response effort.

~

.--,_-,-e-

,,,,,n,--,

,,,.,_-,,n---

,,-.---.,._---.n

.-,--er, yw,

_ ~.- w

... ~

a:-

~

= _ ~

e,*e,em 19621 NEV E3 PACIFIC GAS and ELECTRIC COMPANY e,

c0RPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9 L

IMPLEMENTING PROCEDURE REVISION: 2 i e'

~.DATE: 07/22/83 E'

TITLE QUALITY ASSURANCE PAGE 05 0F 10 10.Assurethatcontinuous(24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)continuityofDepartmental operations is main.tained over a protracted perici of time.

11. As requested, or as Md necessary, dispatch additional Department personnel to the San Luis Obispo area. Transportation arrangements shall be made in accordance with the instruction in Procedure " Emergency Transportation Instructions".
12. Authorize and coordinate consulting services in support of CERO

~ Department activities during the emergency.

13. Upon direction of the Corporate Technical and Logistical Coordinator deactivate the Departmental emergency response effort.
14. Maintain the Departmer.t's " Emergency Response and Recovery l

Activities Record" binder in a current manner.

15. Log all incoming and outgoing connunications which are related to 4

- the emergency response effort using Procedure Attachment 5,

" Emergency Connunications Log Sheet".

NOTE: Completed " Emergency Communications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery

. Activities Record" binder.

I i

16. Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6, " Emergency Response and Recovery Activities Log Sheet".

NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder.

B.

Senior Quality Engineer - Program Management 1.

Take appropriate actions as identified under the following emergency action level classifications:

m NOTIFICATION OF UNUSUAL EVENT

(

For a Notification of Unusual Event emergency action level 2.

classification no notification will be made.

M A

.-w-e

._*,--.m.

. --.,------..w-,--w--.,,,-

r...-.-----w...r-.-......

.-.w am.-r- --

amw n:

x mu - s a--

a, = _~. s_ u

-x>

A hl

[

ee ese mm nuv.or PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9 PGwE IMPLEMENTING PROCEDURE REVISION: 2 DATE: 07/22/83 TITLE QUALITY ASSijRANCE FAGE 06 0F 10 ALERT. SITE AREA EMERGENCY. AND GENERAL EMERGENCY 3.

Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been activated.

4.

Detennine from the Corporate Quality Assurance Coordinator the event emergency action level classification and extent of any requested

. response.

5.

Upon receipt of the event notification report to the General Of.fice work location.

6.

Consult with the Corporate Quality Assurance Coordinator ori quality assurance programatic matters, as required.

7.

Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5,

" Emergency Comunications Log Sheet".

NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.

8.

Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".

NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.

C.

Senior Quality Engineer - Auditing 1.

Take appropriate actions as identified under the following emergency i,

action level classifications:

i NOTIFICATION OF UNUSUAL EVENT 2.

For a Notification of Unusual Event emergency action level classification no notification will be made.

m

+,,.--.--,.,--*-,--.-,,-,,4

..w,,,.,-,we,ww--w,. _,., -,., - - -,,,

,,-,,-,,w

,,wm,,,_,,y4.y-----.

,,.y-,,,,,,,s--r7,--

.%,s-e y

.e T+vv

- ' = -e-+w-'s-*

.: = w; -. : ~ a. -.,_.c

.x

.-s

.., ~

+

.'o 1

' I, saa e,m asv.on PACIFIC GAS and ELECTRIC c0MPANY L

CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9 i-O IMPLEMENTING PROCEDURE REVISION: 2 DATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 07 0F 10

-ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.

Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been l

activated.

- 4.

Determine from the Corporate Quality Assurance Coordinator the event emergency action level classification and extent of any requested response.

5.

Upon receipt of the event notification report to the General Office work location.

6.

Consult with the Corporate Quality Assurance Coordinator on quality assurance matters, as required.

7.

As directed, coordinate the interface between the onsite and General Office Departmental personnel.

8.

Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5,

" Emergency Comunications Log Sheet".

NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurar.ce Coordinator.

9.

Maintain a written record of pertinent emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".

NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.

D.

Records Management Coordinator 1.

Take appropriate actions as identified under the following emergency 4

action level classifications:

h"

..s~-

. - ~

c -,,.,,,,,,, _ - _,

_y

---.3--,,

r

--.--.4e

=

~

j ee4sas formal nav.t2 PACIFIC GAS and ELECTRIC c0MPANY CORPORATE EMERGENCY RESPONSE PLAN NtMBER: 4,9

[

REVISION: 2 sg IMPLEMENTING PROCEDURE SATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 08 0F 10 NOTIFICATION OF UNUSUAL EVENT For a Notification of Unusual Event emergency action level 2.

classification no notification will be made.

ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY 3.

Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been activated.

4.

Determine from the Corporate Quality Assurance Coordinator the event emergency action level classification and extent of any requested response.

5.

Upon receipt of the event notification contact the Department's Design Drafting Records Coordinator to have the Design Drafting Records Center manned by Department personnel familiar with engineering records.

6.

Upon completion of required notifications to Department personnel report to the General Office work location.

7.

As required, dispatch selected Department personnel from the Central Files crea to assist the Design Drafting personnel.

8.

Consult with the Corporate Quality Assurance Coordinator on records management matters, as required.

9.

Direct the use of the Company Records Management System (RMS) to allow priority access to RMS documents from the onsite Technical Support Center.

10. Supervise and coordinate the retrieval of drawings and documents for the Corporate Emergency Response Organization.
11. Keep the Corporate Quality Assurance Coordinator aporised of records management activities during the emergency.
12. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5

" Emergency Comunications Log Sheet".

NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder, which is maintained by the

~, '

I Corporate Quality Assurance Coordinator.

~

s-

,--,yy,

--_--.------_y

--._p,.,,7,

,,.-, -, ---.m, -,. -,. -.- --

--&__y-.,-

m,-.-


.---m-,.w--,-

- m

-_ m I

es4Ses totaal new.gr

' f PACIFIC GAS and ELECTRIC c0MPANY NUMBER: 4.9 CORPORATE EMERGENCY RESPONSE PLAN

. [

h REVISION: 2 IMPLEMENTING PROCEDURE

- m 07/22/83

~2'

~

TITLE PAGE 09 0F 10 QUALITY ASSURANCE

13. Maintain a written record of pertinent emergency response and

~

(

recovery activities using Procedure Attachment 6 " Emergency Response and Recovery Activities Log Sheet".

' NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is i

maintained by the Corporate Quality Assistance Coordinator.

E.

Quality Assurance Supervisor

~

1.

Take appropriate actions as identified under the f'ollowing emergency action level classifications:

NOTIFICATION OF UNUSUAL EVENT 2.

For a Notification of Unusual Event emergency action level classification no notification will be made.

l ALERT, SITE AREA EMERGENCY, AND GENERAL EMERGENCY l

3.

Receive event notification from the Corporate Quality Assurance Coordinator that the Corporate Emergency Response Plan has been activated.

Determine from the Corporate Quality Assurance Coordinator the event 4.

emergency action level classification and extent of any requested response.

Upon receipt of event notification report to the General Office work 5.

location.

6.

Consult with the Corporate Quality Assiirance Coordinator on quality assurance matters, as required.

7.

Track the installation of materials used in construction /

modification / repair activities at the Plant site.

Monitor onsite quality control activities, and as necessary., consult 8.

with the Senior Quality Engineer - Auditing, on quality control and procurement matters performed in accordance with the Quality Assurance Manual for Operating Nuclear Power Plants using Manual

(

Procedure 3.1, " Procurement of Items and Services".

Keep the Corporate Quality Assurance Coordinator apprised of all-9.

onsite Department activities during the emergency.

I

^

l w

=g-Wee-Mey yrw-----t wwr-w-ww---were


,y-w y yw - ww-ryw w.ww ww


*mg,ww-ww,7w--

so--w-yew,ye-p-es

-wi-mggwww m

=s----e--ee s

-w &w-r--www-w----wwvr---vy----wr-W--

-a,-mp

,_ w a

~

4 ti i

PACIFIC GAS sad ELECTRIC c0MPANY CORPORATE EMERGENCY RESPONSE PLAN NUMBER: 4.9 O

IMPLEMENTING PROCEDURE REVISION: 2 DATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 10 0F 10

10. Log all incoming and outgoing comunications which are related to the emergency response effort using Procedure Attachment 5, i

" Emergency Cosaunications Log Sheet".

NOTE: Completed " Emergency Comunications Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.

11. Maintain a written record of emergency response and recovery activities using Procedure Attachment 6. " Emergency Response and Recovery Activities Log Sheet".

NOTE: Completed " Emergency Response and Recovery Activities Log Sheets" shall be placed in the Department's " Emergency Response and Recovery Activities Record" binder which is maintained by the Corporate Quality Assurance Coordinator.

V.

REFERENCES 1.

Quality Assurance Manual for Operating Nuclear Power Plants 2.

QA Manual Procedure 3.1, " Procurement of Items and Services" 3.

Corporate Emergency Response Plan 4

CERP Implementing Procedure 1.1, " Activation of the Corporate Emergency Response Organization" VI. ATTACHMENTS 1.

Department Organizational Relationships 2.

Emergency Plan Titles, Personnel Assignments, and Notification List 3.

Emergency Organization Contact List 4.

Emergency Transportation Instructions 5.

Fom 69-084, " Emergency Cosuunications Log Sheet" 6.

Fom 69-085 " Emergency Response and Recovery Activities Log Sheet" e

a

-___..,___--_._,-._,.,--_, _._.__-_,,-,, _. _. -,,,,,. -,.,,,,.,,...._..., _,,,,,,,-,,- --,_ _ -,_e _

+na m w: -

m/

- :- w.

n w:...._ e.v.

+

q to i

~

ii

~

,,-v. n PACIFIC GAS and ELECTRIC COMPANY NUMBER: 4.9 I.

CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION: 2 O

IMPLEMENTING PROCEDURE

. ATTACHMENT: 1 DATE: 07/22/83 TITLE QUALITY ASSURANCE

~

PAGE 01 0F 01 DEPARTMENT ORGANIZATIONAL RELATIONSHIPS SOP 1

ASCOvtRY taANADER CsRC ComPORATE 75CeesseCAL AssO LOGaSTsCAL COOROsasA7088 g-...-..

00 l Ce#C GO Ce#C y

CORPORATE CO81PORATE COAPOftAYg AmuRAseCE CessBTRUCTeGet ba&TERIALS SeeGaseEEmiseG

  • TOR COOROsasATOft CODAOcesATO4 COOstseesATOst 1

i.. _.. _.. _.

r---------

I I

OO 90 Go C=C

$8854001 OuALITY I

seeGeeseEn maseca cuALITY RECOftOS asALI?v FItOGAAte EgeGeseEER RAAasA48esEsef AmumAseCE

(

ggyggertegNTI.

teuestseest COOmosesATOR guPERVISOm I

l I.

Lasamus.

Lane Anaheresy l

Ousertummens Peuummm8

.0,-.

0.m.m.m.m. me=0, ComC - Carpmemme amusene Rammmmme Cmuner WC - Opermummi Bessert Caumer GO -stemmelOfeus f

  • 6 f

'/g

,-,-,-,-,-n,-,e-we

- - - - - -,.. - - - - - - - - - ~ - - - - -, - -, - - - -, - - - -,,, - - - -

s_ __ _~af A u.,c.m aux

.,2.__ _ _ _

.,m m 41m foren EGv t2 NUMSER: 4.9 I

PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN RE'!ISION: 2

-I'

[

PGwE IMPLEMENTING PROCEDURE A M CHMENT: 2 (Il

-,DATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 010F 02 EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST NAME HOME PHONE EMERGENCY PLAN TITLE NON EMERGENCY TITLE BUSINESS PHONE l

Corporate Quality 1.

S. M. Skidmore j

Assurance Coordinator

Manager, i

Quality Assurance t

2.

T. G. de Uriarte Senior Quality Engineer 3.

P. C. Burgess Senior Quality Engineer -

1.

F. J. Dodd Program Management Senior Quality Engineer j

2.

K. T. Bergmann Quality Engineer i

t 3.

M. L. Braham Quality Engineer Senior Quality Engineer 1.

T. G. de Uriarte (Auditing)

Senior Quality Engineer l

2.

G. W. Heggli 3

Quality Engineer 3.

D. S. Aaron Quality Assurance Analyst i

I Record Management I

1.

H. M. Cox Coordinator Records Supervisor

(

2.

UNASSIGNED 1

~

1 mM M

x... ; _
w..n,__,, _,,_...__
...: x -

.a 2

~ 43. w.v..s., -

NUMBER: 4.9 f

PACIFIC GAS and ELECTRIC COMPANY CORPORATE EMERGENCY RisPONsE PLAN REVISION: 2 ff PGwE IMPLEMENTING PROCEDURE

_ ATTACHMENT: 2 p~>

4) ATE: 07/22/83 TITLE QUALITY ASSURANCE PAGE 02 0F 02 EMERGENCY PLAN TITLES, PERSONNEL ASSIGNMENTS, AND NOTIFICATION LIST i

HOME PHONE NAME EMERGENCY PLAN TITLE'

~

NON EMERGENCY TITLE BUSINESS PHONE

-+

Quality Assurance Supervisor !

1.

R. T. Twiddy

- Quality Assurance i

Supervisor s

2.

C. M. Seward, Jr.

Quality Engineer

)

3.

R. W. Taylor Quality Engineer 4.

M. S. Dobrzensky Quality Engineer Design-Drafting f

1.

H. E. Deady l

Records Coordinator i

Engineering Recorcs i

Supervisor 2.

D. W. Houchton Supervisor, Engineering Records & Administrative Services 3.

D. L. Bullard Administrative Services Supervisor t-W n

p.-

w..

s -

-,f -

2_,

.uc c. 2._

- c:

e o

j so-osaa feisas pav or

- NUMBER: 4.9

[

^

PACIFIC GAS and ELECTRIC COMPANY -

CORPORATE ENERGENCY RESPONSE PLAN REVISION: 2 I

PGwE IMPLEMENTING PROCEDURE ATTACHMENT: 3 c.

- DATE: 07/22/83 V:>

TITLE QUALITY ASSURANCE PAGE 010F 01 EMERGENCY ORGANIZATION CONTACT LIST i

EMERGENCY LOCATION EMERGENCY PLAN TITLE NAME I

NORMAL BUSINESS PHONE EMERGENCY PHONE Recovery Manager 1.

J. D. Shiffer l

EOF

/

i s-t

2. j{. A. Raymond 3.

J. D. Townsend

. __ s' 4.

R. C. Thornberry Corporate Technical and 1.

~J. B. Hoch CIRC Logistical Coordinatcr t

2.

M. R. Tressler i

../

i 3.

R. A. Young ' ~ > '

l i

I I

(

gs I

~

___.A..

u

a:wa.sg.;aw im.a.u

.= a w.a.h ;.a_

uu.. w : - :.u.u a.:

+- ~~

E~

~ ~

~ ~ ~ ~ ~ ~ ^~

PActFic GAS sad ELECTRIC COMPANY NUMBER:

4.9 ee-ape is s21 msv 07 I-CORPORATE EMERGENCY RESPONSE PLAN REVISION: 2 PGwE g

IMPLEMENTING PROCEDURE ATTACHMENT: 4 QUALITY ASliURANCE DATE: 07/22/83 TITLE PAGE 01 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS A.

Critical Emergency Response Personnel Upon receipt of notification of the emergency event, the following 1.

critical emergency response personnel (listed by emergency title) shall be responsible for arranging their own transportation, if required, to the San Luis Obispo area:

. Recovery Manager

. Operations and Analytical Recovery Manager

. Engineering and Logistics Recovery Manager

. Radiological Emergency Recovery Manager

. Public Infonnation Recovery Manager.

All other PGandE emergency response support personnel travel _ing to the San Luis Obispo area shall arrange transportation in accordance with the

~

instructions set forth in B. below.

The above-listed individuals may elect to utilize their own vehicles or 2.

any os.e of the following transportation services:

~

1 a.

Corporate Aircraft 1)

General 0ffice................................

l I

2)

Oakl and Ai rport Hanger #8.....................

b.

Oakland Executive Air Tennina1...................... L-

'(ask for PGandE Transportation Coordinator) 24-hour Fixed Wing Air Charter Services:

c.

1) Cal-West Avia tion (Concord)..................... (415 )82 (415)672-0214 (415)932-5794
2) Skyways #via tion, Inc. (San Carlos)............. 415)593-1448 415)S74-4704

^

415)345-7423 415)573-1152 t

3) Coastal Ai r (San Luis Obispo)................... (805)544-6464 -
4) Golden Gate Piper (San Carlos).................. (408)446-2439
5) _ Pacific Piper Aviation (San Jose)............... (408)294-4016 (408)225-2540 (408)374-9985

.me,__ _ '

vm em m p m _

r,--

4 2w _m w

,_,e.

e,-ua.um 4

ll

.~.., -,,

pacific gas sad ELECTRIC COMPANY NUMBER:

4.9 I

CORPORATE EMERGENCY RESPONSE PLAN PGwE REVISION-2 g

IMPLEMENTING PROCEDURE

..,mca. 4 TITLE QUALITY ASSURANCE DATE: 07/22/83 PAGE 02 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS A.

Critical Emergency Response Personnel (Cont'd.)

d.

24-hour Helicopter Air Charter Services (in order of preference):

1) Aris Helicopters, Ltd. (San Jose)............... (408)293-0800 (408)354-0039 2)'Astrocopters(0akland)..........................(415)635-6880 (415)687-5179 (415)939-5683
3) California Helicopter Airways, Inc. (Hayward)... (415)'783-4000 (415)632-3529 The telephone company yellow pages list additional air charter e.

services.

f.

Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.

To arrange emergency transportation 'with the CHP, the Recovery Manager should call one of the following numbers, as appropriate:

1) During normal office hours Golden Gate Division..........................

(415)S57-0640 1

2) During non-office hours Oakland Dispatch Center....................... (415)658-9115 l

Connunications with CHP personnel should reference the CHP Golden b

Gate Division S.O.P. 3.48 which describes the emergency l

transportation services the CHP will provide.

Regardless of the mode of transportation utilized, prior to I

g.

departure, each individual shall contact the Corporate Technical and Logistical Coordinator and advise him of the estimated times of departure and arrival, the arrival location in the San Luis Obispo area, and any other special requirements or infomation. The i

Corporate Technical and Logistical Coordinator will then advise the Corporate Division Coordinator accordingly so as to ensure that'any necessary ground logistical support is in place prior to the arrival of personnel in the San Luis Obispo area.

,1 w,.


+-+~--,---w--w-

,-,,-,-w, en,rv,,-,-

_w-,m y,y

-.m

-m-w m---w


r m

G._

a.

w-

w. w.

- -. n. -

..-n.---

j ee4sm tcven Rav es PActFIC GAS and ELECTRIC CoMPAxy NUMBER:

4.9

.I CORPORATE EMERGENCY RESPONSE PLAN

[

IMPLEMENTING PROCEDURE

.. ATTACHMENT:

g 4

TITLE QUALITY ASSURANCE DATE: 07/22/83

~

PAGE 03 0F 04 EMERGENCY TRANSPORTATION I STRUCTIONS

.B.

Other Emergency Response Personnel 1.

All other PGandE emergency response support personnel traveling to the San Luis Obispo area shall utilize their own vehicles or transportation services provided by PGandE.

2.

If PGandE transportation services are to be utilized, personnel should proceed to make transportation arrangements in one of the following manners:

During normal office hours, contact the General Office Travel Desk a.

(Room 1610,77 Beale Street), either in person or via the telephone, to arrange transportation. The primary telephone numbers for the General Office Travel Desk are:

..---f b.

If these lines are busy, the following alternate telephone numbers should be used:

3 During non-office hours, following receipt of notification of the c.

emergency event, personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Road, Oakland) and contact the PGandE Travel Representative stationed there.

Note: Personnel are advised to bring only a minimum amount of baggage.

f d.

If arrival time is not critical, personnel should call the General Office Travel Desk to verify transportation availability.

9 Regardless of the mcde of transportation utilized, prior to e.

departure, each individual shall contact the Recovery Manager or Coordinator to whom (s)he functionally reports and advise him of the

(

estimated times of departure and arrival, the arrival location in

'~

the San Luis Obispo area, and any other special requirements or infonration.

f.

The Transportation Coordinator will coordinate arrangements, as

. required, with the Corporate Division Coordinator for grcund transportati~on and lodging for PGendE persencel in the I

San Luis Obispo area.

.=

w -

'o op-esas to/est osv.e2 PACIFIC GAS and ELECTRIC COMPANY huMBER:

4.9

[

i.

CORPORATE EMERGENCY RESPONSE PLAN P G'stE REVISION-2 O

IMPLEMENTING PROCEDURE gr73cangn7: 4 TITLE QUALITY ASSURANCE DATE: 07/22/83 PAGE 04 0F 04 EMERGENCY TRANSPORTATION INSTRUCTIONS Y'

d DIRECTIONS FROM NIMITT FREEWAY A)* '

"h _ __

I

'# 1. En snuih on HEGENBERGER ROAD (RT 17) 1 elle

2. " urn einht onto DOOLITTLE DRIVE.

g j,

MP

3. ' urn left onto LANGLEY STREET.

' urn rinht at EARHART ROAD and park in the 4, '

parking lot on the corner.

31 e

y u

c.,

3 i

/^

.=.

+/ '

............r s

a

=

y e,.

7 3

\\

g s

\\

I.

f k

2b,

'1

%. a.

N

. %.4

$.. \\

L s.

7 k

,a

/

.?

v

.p

.,W 4,( s; j-

\\

i,-(

T.D

_ _,,. \\

1,M

.f,'

Y',,\\.*

p r

s t

Q.. :

,y ':;

_ Q

$,s.*

'i N

s. w

=.

\\.

a f

% ;- $,: g

^-

9s

/

j

(

s Y,),

-W---

E~

i

<f p.

m. s, 4

g.

v I

,c x

+

\\....

._ v I

Edb GD 6

ePW Yl; l

_._m.,

_ u.

..n.__-.

i_.__

a,

.m_ m -..._ e g,us, E.

a p'.

i g sI s

~

5 I.

1 5

os Q) g 8

y-C n

1 I

4 O

8'>

h e-w 1,,

5 5 i

5.3.$5e s

!! E

$> u !

vi 2 E! E 5

la a a

le,[

i s

I E

E g.

n a.

O i-EW w

.E o

l E

E

-vg l]lr i

r

-m--

--n

-w c

y-

-.c

.s, u

y g

,,,--.-m.

- ea-

-m

.,m.=

wv.--

. -. ~~

i.

.+

-e f

I 2

i EMERGENCY COMMUNICATIONS LOG SHEET i

I INSTRUCTIONS 4

c.

a f,

Entry

{

i '

Number Instructions a

1.

Identify the emergency location where this Log 3heet is maintained juring an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.)

i i

2.

Enter the date which this Form is tWng used. Start a new Log Sheet each day.

1 i

3.

Consecutively number each page used each day.

3 s

d 4.

Enter the time for each Log entry. Use the 2400 hour0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> clock to avoid confusion.

[

5.

Clearly record the name of the individual calling you or whom you are calling.

6.

Record the individuals PGandE Emergency Organization Title o-their non PGandE affiliation.

1 Che k the entry activity as to whether the individual called you or you are calling them.

I 7.

c t'

8.

Enter the entire context of the message being communicated. Read back the message to the a

individual to assure correct copy / transmission.

t, L

9.

Enter your initials upon completion of each Log Sheet entry.

f 1

(,

i i

.s.

k e.

mv i

- h d.u-c

_m.__3,_g

~

P 1

I IEETFTERAs ANo ELacTasc company conronATE EMEnouNcy nEyomst em

^

  • I m

I EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET T00AY1 OATE PAGE tasGROENCY LOCAfl0N

(,

(Il *

  • _

i 33 til ENTEnED BY TWE IINITIALsl M lut.1 SUMM'ARY OF ACTIVITY PERFORMED isi m

sti

..(

e e

{

f*

SEE 1988T AUCTl0NE ON nEVE AsE 3 406IS/02) Mov. 50 g--

r p

,w,,

,,r-- - - -. - - -,

-m-9 y.

\\

g

  • o Q

i

' G, t

EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SMEET INSTRUCTIONS Entry Number instructions 1.-

Identify the emergency location where this Log Sheet.is maintained

' during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.)

i 2.

Enter the date which this form is being used. Start a new Log Sheet each day.

3.

Consecutively number each page used each day.

4.

Enter the time for each Log entry. Use the 2400 hour0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> clock to avoid confusion.

5.

Enter a summary of each activity being recorded.

6.

Enter your initials upon completion of each Log Sheet entry.

l l

i i

t

~

l l

l l'

c

-