{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 FEB j 0 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 FEB j 0 2003 U.S. Nuclear Regulatory Commission ATTN:
In the Matter of                                                 ))                Docket No. 50-390 Tennessee Valley Authority WATTS BAR NUCLEAR PLANT (WBN)                               - JANUARY 2003 MONTHLY OPERATING REPORT Enclosed is the January 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.                                         If you have any questions concerning this matter, please call me at (423) 365-1824.
Document Control Desk Washington, D.C. 20555 Gentlemen:
Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc:             See page 2 Prmted o, recycded paper
Docket No.
In the Matter of Tennessee Valley Authority 50-390 WATTS BAR NUCLEAR PLANT (WBN)
JANUARY 2003 MONTHLY OPERATING REPORT Enclosed is the January 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.
If you have any questions concerning this matter, please call me at (423) 365-1824.
Sincerely, P.
L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc:
See page 2 Prmted o, recycded paper
) )


U.S. Nuclear Regulatory Commission Page 2 FEB 1 0 2003 cc (Enclosure):
U.S. Nuclear Regulatory Commission Page 2 FEB 1 0 2003 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. Kahtan N.
Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Georgia 30303


ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT   (WBN)
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT JANUARY 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1
MONTHLY OPERATING REPORT JANUARY 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1


OPERATING DATA REPORT Doc ket No.                 50-390 Unit Name:                 WBN Unit 1 Dat                        February 5, 2003 Con npleted By-           P. P. Salkeld Tele phone.                 (423) 365-3635 Rep orting Period:         January 2003
OPERATING DATA REPORT Doc Unit Dat Con Tele Rep
: 1. Design Electrical Rating (MWe-Net):           1155 2 Maximum Dependable Capacity (MWe-Net):         1125 Month  Year-to-Date Cumulative
: 1.
: 3. Number of Hours Reactor was Critical                         744      744      53909.5
2 ket No.
: 4. Hours Generator On-Line                                     744      744      53644.2
50-390 Name:
: 5. Unit Reserve Shutdown Hours                               00        0.0        0.0
WBN Unit 1 February 5, 2003 npleted By-P. P. Salkeld phone.
: 6. Net Electrical Energy Generated (M'Wh)                                     874381   874381     59340449 E-2
(423) 365-3635 orting Period:
January 2003 Design Electrical Rating (MWe-Net):
Maximum Dependable Capacity (MWe-Net):
: 3. Number of Hours Reactor was Critical
: 4.
Hours Generator On-Line
: 5. Unit Reserve Shutdown Hours
: 6.
Net Electrical Energy Generated (M'Wh)
Month 744 744 00 874381 Year-to-Date Cumulative 744 53909.5 744 53644.2 0.0 0.0 874381 59340449 E-2 1155 1125


UNIT SHUTDOWNS DOCKET NO:                     50-390 UNIT NAME:                    WBN-1 DATE:                        February 5, 2003 COMPLETED BY:                P. P. Salkeld TELEPHONE:                    (423) 365-3635 REPORT PERIOD: Januar 2003 Type'      Duration      Reason 2      Method          Licensee        System --,Component                Cause and Corrective Action to*,
UNIT SHUTDOWNS DOCKET NO:
No.        Date Codeode              4                  Prevent Recurrence
UNIT NAME:
                                      ,(Hour)          '         .of    .          Event Shutting        Report No.
DATE:
Down None        N/A            N/A          N/A          N/A          N/A              N/A            N/A            N/A          The unit operated at or near 100% power for the entire month of January.
COMPLETED BY:
2 Reason:                                           3Method                                    4 Instructions  for Preparation of
TELEPHONE:
'F: Forced A-Equipment Failure (Explain)                       1-Manual                                  Data Entry sheets for Licensee S: Scheduled B-Maintenance or Test                               2-Manual Trip/Scram                      Event Report (LER)
50-390 WBN-1 February 5, 2003 P. P. Salkeld (423) 365-3635
C-Refueling                                         3-Automatic Trip/Scram                    (NUREG - 1022)
'F: Forced S: Scheduled 2 Reason:
D-Regulatory Restriction                           4-Continuation Outage E-Operator Training / License Examination           5-Other (Explain)
A-Equipment Failure (Explain)
F-Administrative G-Operational Error (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H- Other (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
Summary:     The unit operated at or near 100% power for the entire month of January. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.
(NUREG - 1022)
E-3}}
Summary:
The unit operated at or near 100% power for the entire month of January. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.
E-3 REPORT PERIOD: Januar 2003 No.
Date Type' Duration Reason2 Method Licensee System
--,Component Cause and Corrective Action to*,
,(Hour)
.of Event Codeode 4
Prevent Recurrence Shutting Report No.
Down None N/A N/A N/A N/A N/A N/A N/A N/A The unit operated at or near 100% power for the entire month of January.}}

Latest revision as of 12:29, 16 January 2025

January 2003 Monthly Operating Report for Watts Bar Nuclear Plant
ML030440078
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/10/2003
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML030440078 (5)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 FEB j 0 2003 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C. 20555 Gentlemen:

Docket No.

In the Matter of Tennessee Valley Authority 50-390 WATTS BAR NUCLEAR PLANT (WBN)

JANUARY 2003 MONTHLY OPERATING REPORT Enclosed is the January 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.

If you have any questions concerning this matter, please call me at (423) 365-1824.

Sincerely, P.

L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc:

See page 2 Prmted o, recycded paper

) )

U.S. Nuclear Regulatory Commission Page 2 FEB 1 0 2003 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. Kahtan N.

Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)

MONTHLY OPERATING REPORT JANUARY 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1

OPERATING DATA REPORT Doc Unit Dat Con Tele Rep

1.

2 ket No.

50-390 Name:

WBN Unit 1 February 5, 2003 npleted By-P. P. Salkeld phone.

(423) 365-3635 orting Period:

January 2003 Design Electrical Rating (MWe-Net):

Maximum Dependable Capacity (MWe-Net):

3. Number of Hours Reactor was Critical
4.

Hours Generator On-Line

5. Unit Reserve Shutdown Hours
6.

Net Electrical Energy Generated (M'Wh)

Month 744 744 00 874381 Year-to-Date Cumulative 744 53909.5 744 53644.2 0.0 0.0 874381 59340449 E-2 1155 1125

UNIT SHUTDOWNS DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-390 WBN-1 February 5, 2003 P. P. Salkeld (423) 365-3635

'F: Forced S: Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

Summary:

The unit operated at or near 100% power for the entire month of January. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.

E-3 REPORT PERIOD: Januar 2003 No.

Date Type' Duration Reason2 Method Licensee System

--,Component Cause and Corrective Action to*,

,(Hour)

.of Event Codeode 4

Prevent Recurrence Shutting Report No.

Down None N/A N/A N/A N/A N/A N/A N/A N/A The unit operated at or near 100% power for the entire month of January.